WO2008126999A1 - Dispositif de transfert vertical pour une charge lourde - Google Patents
Dispositif de transfert vertical pour une charge lourde Download PDFInfo
- Publication number
- WO2008126999A1 WO2008126999A1 PCT/KR2008/001869 KR2008001869W WO2008126999A1 WO 2008126999 A1 WO2008126999 A1 WO 2008126999A1 KR 2008001869 W KR2008001869 W KR 2008001869W WO 2008126999 A1 WO2008126999 A1 WO 2008126999A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lift
- operation piece
- heavy load
- vertical
- operation means
- Prior art date
Links
- 230000008878 coupling Effects 0.000 claims description 11
- 238000010168 coupling process Methods 0.000 claims description 11
- 238000005859 coupling reaction Methods 0.000 claims description 11
- 238000010276 construction Methods 0.000 abstract description 17
- 238000003780 insertion Methods 0.000 description 6
- 230000037431 insertion Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 239000012530 fluid Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
- E04G11/24—Construction of lifting jacks or climbing rods for sliding forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Definitions
- the present invention relates to a vertical transferring device for a heavy load, and more particularly, to a vertical transferring device for a heavy load capable of raising and lowering various heavy goods to desired heights in construction sites, loading docks, or the like.
- a formwork is installed at an outer wall of a building structure upon construction of the structure.
- a construction frame functioning as a scaffold is installed at the outer wall of the structure.
- the construction frame is continuously and additionally mounted higher depending on increase in the number of stories.
- a climbing type construction frame entirely lifted by a crane is used when a multistory building is constructed.
- use of the crane increases operation time and cost and causes delay of construction procedures.
- Korean Utility Model Registration No. 423750 entitled Device for Lifting Temporary Stand, which can perform a temporary stand lifting operation using a lift member for lifting a vertical beam in a stepped manner, without using a crane.
- the lift member is locked by locking projections formed at the vertical beam of the temporary stand in a vertical direction at predetermined intervals to lift the vertical beam in a stepped manner.
- the lift member reciprocates through constitution of a hydraulic cylinder and a hook in a lift direction to be selectively locked by any one of the locking projections of the vertical beam. Therefore, it is possible to safely and conveniently lift the temporary stand to a desired height in a stepped manner.
- One aspect of the present invention provides a vertical transferring device for a heavy load including: a vertical member having a height larger than a lift height of the heavy load and including locking members disposed at lift sections; a pair of upper and lower lift operation means, one of which is connected to the heavy load, installed at the vertical member to be alternately raised and lowered along the vertical member as a lift shaft to raise and lower the heavy load, and both of which are put on the locking members at a predetermined height and fixed thereto while raising and lowering without interference with the locking members; and a lift drive means coupled between the upper and lower lift operation means to provide a lift drive force to the lift operation means, wherein the lift operation means includes an upper frame and a lower frame; a support frame for connecting the upper frame and the lower frame; an operation piece installed at the support frame by a rotary support pin and rotatable relative to the locking members such that one end of the operation piece is put on the locking member or supports a lower side of the locking member; an anti-rotation pin installed at the support frame to support
- a vertical transferring device for a heavy load including: a vertical member including a plurality of locking members disposed in a longitudinal direction thereof; a pair of upper and lower lift operation means, one of which is connected to an external structure, and the other of which is raised and lowered without interference with the locking members to stop at a predetermined height and support a lower side of the locking member to raise and lower the vertical member; and a lift drive means coupled between the upper and lower lift operation means to provide a lift drive force to the lift operation means, which is raised and lowered, wherein the lift operation means includes an upper frame and a lower frame; a support frame for connecting the upper frame and the lower frame; an operation piece installed at the support frame by a rotary support pin and rotatable relative to the locking members such that one end of the operation piece is put on the locking member or supports a lower side of the locking member; an anti-rotation pin installed at the support frame to support the other end of the operation piece to prevent rotation of the operation piece when the one
- the vertical member may be formed of two channels, and the locking members may connect the channels to each other.
- seating grooves may be formed at corresponding portions of the operation piece such that the operation piece is stably put on the locking member or supports a lower side of the locking member.
- corresponding portions of the locking members, on which the seating grooves of the operation piece are mounted may be curved, and the seating grooves of the operation piece may have a larger radius of curvature than that of the locking member.
- the operation piece and the rotation support pin may not be rotated relative to each other in a state in which the rotation support pin is coupled to the operation piece.
- coupling surfaces of the rotation support pin and the operation piece may be engaged with each other to prevent relative rotation therebetween.
- the rotation support pin may include a lever for manually rotating the rotation support pin and the operation pin to a desired angle.
- the anti-rotation pin having a rectangular cross-section may be installed at the support frame such that outer surfaces of the anti-rotation pin are sloped with respect to the operation piece, and corresponding portions of the operation piece, which are in contact with the sloped surfaces of the anti-rotation pin, may be sloped.
- the resilient member may be a pair of torsion springs installed at the rotation support frame and disposed at both sides of the operation piece, one end of which is fixed to the operation piece and the other end of which is fixed to the support frame.
- the lift operation means may include guide arms partially surrounding the vertical member.
- the upper and lower frames of the lift operation means may include upper and lower through-holes, respectively, upper and lower ends of the support frame may have left and right through-holes, respectively, and a coupling pin may be inserted into the left and right through-holes to couple the lift operation means to the lift drive means in a state in which an end of the lift drive means is inserted into the upper and lower through-holes.
- the lift operation means may include a fixing hole and a fixing pin for rotating and fixing the operation piece such that the operation piece is not interfered with by the locking members of the vertical member when the lift operation means is initially installed at the vertical member.
- the lift drive means may be a hydraulic actuator.
- a vertical transferring device for a heavy load in accordance with the present invention can provide a simple structure in which a pair of lift operation means are lifted on a vertical member by a lift drive means in a stepped manner.
- the lift operation means of the present invention are installed at an external fixture to be operated such that the vertical member is lifted.
- the vertical transferring device in accordance with the present invention may be connected to a construction frame installed at an outer wall of a building structure to lift the construction frame, or may be connected to a cage to load heavy goods and lift them.
- FIG. 1 is a perspective view of a vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention, which is installed at a channel;
- FIG. 2 is a plan view of the vertical transferring device for a heavy load of FIG. 1 ;
- FIG. 3 is an exploded perspective view of a first lift operation means in accordance with an exemplary embodiment of the present invention
- FIG. 4 is an assembled perspective view of the first lift operation means of FIG. 3;
- FIG. 5 is a front view of the first lift operation means of FIG. 4;
- FIG. 6 is a side view of the first lift operation means of FIG. 5;
- FIGS. 7 to 10 are side views of a vertical member and the lift operation means, showing a raising operation process of the vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention
- FIGS. 11 to 14 are side views of the vertical member and the lift operation means, showing a lowering operation process of the vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention.
- FIGS. 15 to 19 are side views of the vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention, which is installed at an outer structure to raise the vertical member.
- FIG. 1 is a perspective view of a vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention, which is installed at a channel
- FIG. 2 is a plan view of the vertical transferring device for a heavy load of FIG. 1.
- the vertical transferring device for a heavy load in accordance with the present invention includes a vertical member 100, lift operation means 200 and 300, and a lift drive means 400.
- the vertical member 100 is a structural frame having a height higher than a predetermined lift position such that a heavy load (not shown) is raised to a desired height.
- the vertical member 100 has a structure in which two channels 110 and 120 spaced a predetermined distance from each other at their rear surfaces are connected by puller bolts.
- the puller bolt is a bolt having a smooth outer surface, except for a fastening end, and thus may be replaced with a conventional bolt having a bushing coupled thereto.
- a member, in which a boss is coupled to the puller bolt or the conventional bolt, will be referred to as a locking member 130, since the member functions to lock operation pieces 260 and 360 of the lift operation members 200 and 300.
- the locking members 130 are installed between the channels at predetermined intervals corresponding to predetermined sections, at which a heavy load is raised.
- the above vertical member 100 is installed at a structure in a place, in which a lift operation of a heavy load is required (for example, an outer wall of a structure, at which a construction frame is installed).
- the lift operation means 200 and 300 are formed as a pair of upper and lower lift operation means.
- the lower means is referred to as a first lift operation means 200
- the upper means is referred to as a second lift operation member 300.
- the first lift operation means 200 and the second lift operation means 300 are installed at the vertical member 100 to alternately lift using the vertical member as a lift shaft.
- the lift operation means 200 and 300 climb the vertical member 100 without interference of the locking members 130 connecting the two channels 110 and 120 when the lift operation means 200 and 300 are raised, and are locked by the hooking members 130 at a predetermined height to be stopped on the hooking members 130, which will be described below.
- the lift drive means 400 is coupled between the first lift operation means 200 and the second lift operation means 300 to provide a drive force to lift the lift operation means 200 and 300.
- the lift drive means 400 may be a hydraulic actuator providing a large force, and good shock absorption and control performance.
- FIG. 1 illustrates the hydraulic actuator including a hydraulic cylinder 410 for receiving operation fluid from a hydraulic source (not shown) to be operated, a piston rod 420, and so on.
- the first lift operation means 200, the second lift operation means 300, and the lift drive means 400 are assembled to each other and installed at the vertical member 100 as shown in FIG. 1.
- FIGS. 3 and 4 are an exploded perspective view and an assembled perspective view of a first lift operation means in accordance with an exemplary embodiment of the present invention
- FIGS. 5 and 6 are a front view and a side view of the respective lift operation means.
- the first lift operation means 200 and the second lift means 300 have the same constitution, except that coupling positions of the lift drive means 400 are different. Therefore, the lift operation means shown in FIGS. 3 to 6 is referred to as a first lift operation means, and constitution of the first lift operation means will be described.
- the first lift operation means 200 includes an upper frame 210 and a lower frame
- the upper frame 210 has a vertical through-hole 211, into which a lower end of the lift drive means 400 is inserted, to be connected to the lift drive means 400.
- upper ends of the support frames 230 and 230' have right and left through-holes 231 and 231' such that a lower end of the lift drive means 400 inserted into the upper and lower through-holes 211 is fixed by a coupling pin 240. Therefore, as shown in FIG.
- the first lift operation means 200 is coupled to the lift drive means 400 by inserting the coupling pin 240 into the left and right through-holes of the upper ends of the support frames 230 and 230' in a state in which a lower end of the lift drive means 400 is inserted into the vertical through-hole 211 of the upper frame 210.
- the lower frame 220 of the first lift operation means 200 also has a vertical through-hole 221, into which the upper end of the lift drive means 400 can be inserted, and lower ends of the support frames 230 and 230' also have left and right through-holes 232 and 232', into which the coupling pin is inserted, the first lift operation means 200 can be compatible with the second lift operation means 300. That is, as shown in FIG.
- the second lift operation means 300 is coupled to the lift drive means 400 by inserting the coupling pin 340 into left and right through-holes of lower ends of support frames 330 and 330'.
- a structure for loading heavy goods can be installed at an upper frame 310 of the second lift operation means 300 to raise the heavy goods.
- Guide arms 250 are formed at the upper frame 210 and the lower frame 220 of the first lift operation means 200 to be coupled to the vertical member 100, respectively.
- the guide arms 250 partially surround the channels 110 and 120 of the vertical member 100 such that the first lift operation means 200 is smoothly raised or lowered along the vertical member 100.
- the second lift operation means 300 also has the same structure of the guide arms 250.
- Operation piece 260 having an oval shape with a major axis in a direction perpendicular to the pair of support frames 230 and 230' is installed between the pair of support frames 230 and 230'.
- the operation piece 260 is configured to be rotated between the support frames 230 and 230' by a rotary support pin 270 passing through the support frames 230 and 230'. That is, the operation piece 260 is rotated by the locking members 130 of the vertical member 100 upon lift of the first lift operation member 200, and is put on the locking members 130 upon stop of the lifting operation.
- a portion of the operation piece 260 put on the locking member 130 has a curved-shaped seating groove 261.
- the portion of the operation piece 260 may have only a circular cross-section.
- the seating groove 261 of the operation piece 260 may have a larger radius of curvature than that of the locking member 130 such that the operation piece 260 is stably put on the locking member 130.
- An anti-rotation pin 280 is installed at the support frames 230 and 230' through anti- rotation pin insertion holes 235 and 235' (see FIGS. 11 and 3) to stop rotation of the operation piece 260. As shown in FIG. 6, the anti-rotation pin 280 functions to prevent the operation piece 260 from being rotated clockwise to a predetermined angle or more. That is, in a state in which one end of the operation piece 260 is put on the locking member 130, the anti-rotation pin 280 supports the other end of the operation piece 260.
- the anti-rotation pin 280 has a rectangular cross-section, which is installed at the support frames 230 and 230' such that corners of the anti-rotation pin 280 are directed in upper, lower, left and right directions thereof and thus the outer surfaces of the anti-rotation pin 280 are sloped with respect to the operation piece 260. For this reason, portions of the operation piece 260 in contact with the left slope surfaces 280a and 280b of the anti-rotation pin 280 upon rotation of the operation piece 260 also have slope surfaces 260a and 260b. As shown in FIGS. 1 and 3, the anti- rotation pin 280 may have an eyebolt 281 acting as a handle.
- the support frame 230 disposed at an insertion side of the anti-rotation pin 280 may include a bracket 233 for spacing an insertion distance of the anti-rotation pin 280.
- a resilient member 290 is installed around a rotation support pin 270. The resilient member 290 provides a resilient force to be recovered in a direction in which the slope surfaces 260a and 260b of the operation piece 260 are always in contact with the slope surfaces 280b and 280a of the anti-rotation pin 280 when the operation piece 260 is rotated by an external force. In particular, as shown in FIG.
- the resilient member 290 provides a resilient force such that the lower slope surface 260b of the operation piece 260 is rotated clockwise to be put on the left upper slope surface 280a of the anti-rotation pin 280.
- the resilient member 290 may be conventional torsion springs, which are stably installed at both sides of the operation piece 260.
- one end of each resilient member 290 is fixed to the operation piece 260, and the other end of the resilient member 290 is fixed to the support frames 230 and 230'.
- the operation piece 260 is rotated together with the rotation support pin 270.
- a lever 271 is installed at the rotation support pin 270 to manually rotate the rotation support pin 270 to a desired angle. Adjusting the lever 271, the operation pin 260 is rotated with the rotation support pin 270.
- the fixing pin 234 is inserted into the fixing holes 230a and 230'a.
- the operation piece 260 can be installed without any interference with the locking members 130 of the vertical member 100.
- the fixing pin 234 is removed such that the operation piece 260 can be properly operated.
- the second lift operation means 300 also has the same constitution as the first lift operation means 200, except for a coupling position of the lift drive means 400.
- FIGS. 7 to 10 are side views of a vertical member and the lift operation means, showing a raising operation process of the vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention.
- An operation sequence of the vertical transferring device performed when a heavy load is raised to a predetermined height will be described with reference to the drawings as follows.
- the first lift operation means 200 is fixed on the vertical member 100 by putting both ends of the operation piece 260 on the locking member 131 and the anti-rotation pin 280, respectively.
- the second lift operation means 300 is also fixed on the vertical member 100 by putting both ends of an operation piece 360 on a locking member 133 and an anti-rotation pin 380, respectively.
- the lift drive means 400 connecting the first lift operation means 200 and the second lift operation means 300 is operated.
- the operation piece 360 is rotated to its original state by a recovering force of the resilient member.
- both ends of the operation piece 360 are put on the locking member 134 and the anti-rotation pin 380 to fix the second lift operation means 300 at a raised height.
- the first lift operation means 200 is raised on the vertical member 100 as the hydraulic cylinder 410 and the piston rod 420 are contracted by removing the hydraulic pressure of the lift drive means 400.
- the first lift operation means 200 has the same structure as the second lift operation means 300, in which the operation piece 260 of the first lift operation means 200 is rotated with respect to the locking members 131 and 132 and then put on the locking member 132 and the anti-rotation pin 280 to be fixed thereto.
- elongation and contraction of the lift drive means 400 alternately pass the operation pieces 260 and 360 of the first lift operation means 200 and the second lift operation means 300 through the locking members 131, 132, 133 and 124 of the vertical member 100 step by step, and then, fix the operation pieces 260 and 360 on the locking members 131, 132, 133 and 134 and the anti-rotation pins 280 and 380 to raise the lift operation means 200 and 300 to a predetermined height.
- FIGS. 11 to 14 are side views of the vertical member and the lift operation means, showing a lowering operation process of the vertical transferring device for a heavy load in accordance with an exemplary embodiment of the present invention.
- An operation sequence of the vertical transferring device performed when a heavy load is lowered to a predetermined height will be described with reference to the drawings as follows.
- the second lift operation means 300 is lowered along the vertical member 100 as the hydraulic cylinder 410 and the piston rod 420 are contracted by removing a hydraulic pressure of the lift drive means 400.
- the lift drive means 400 is operated.
- the operation piece 360 of the second lift operation means 300 is separated from the locking member 134 to be freely rotated to lower the second lift operation means 300.
- the second lift operation means 300 arrives at a target height, like the first lift operation means 200, the operation piece 360 is rotated using the lever, and then, the removed anti-rotation pin 380 is coupled thereto again.
- both ends of the operation piece 360 are locked by the lock member 133 and the anti-rotation pin 380 to fix the second lift operation means 300 to the vertical member 100.
- the lift drive means 400 can be elongated or contracted.
- the anti-rotation pins 280 and 380 are coupled at an expected height to stop rotation of the operation pieces 260 and 360, the lift operation means 200 and 300 are fixed to the vertical member 100 to complete a lowering operation thereof.
- the lift operation means 200 and 300 installed at the vertical member 100 are alternately lifted and lowered along the vertical member 100 as a lift shaft to lift a heavy load.
- the lift operation means 200 and 300 in accordance with the present invention may be installed at an external structure such as a construction frame installed at an outer wall of a building to lift the vertical member 100.
- like reference numerals designate like elements in the above embodiment, which will also be described in detail.
- the vertical member 100 is formed of a structural frame including a plurality of locking members 130, 131, 132, 133 and 134 longitudinally disposed in a vertical direction thereof.
- the vertical member 100 is formed of two channels 110 and 120, which are connected to each other by the locking members 130, 131, 132, 133 and 134.
- a loading means for lifting a heavy load, and so on, may be separately coupled to the vertical member 100.
- the lift operation means 200 and 300 have the same constitution as the aforementioned embodiment. However, one of the first lift operation means 200 and the second lift operation means 300 is fixed to an external structure such as a construction frame installed at an outer wall of a building.
- FIGS. 15 to 19 illustrate the second lift operation means 300 fixed to an external structure 500, and the first lift operation means 200 configured to lift the vertical member 100.
- the first lift operation means 200 may be fixed to the external structure 500, and the second lift operation means 300 may be configured to raise and lower the vertical frame 100.
- an upper end of the second lift operation means 300 is fixed to the external structure 500 by the coupling pin 240, and both the first lift operation means 200 and the second lift operation means 300 are opposite to the vertical member 100.
- the vertical member 100 is located on the ground.
- the operation pieces 260 and 360 of the first lift operation means 200 and the second lift operation means 300 are put on the locking members 132 and 134 of the vertical member 100, respectively.
- the operation pieces 260 and 360 receive a force to be rotated clockwise by a resilient member 290 (see FIG. 6), but the operation pieces 260 and 360 are fixed by the anti-rotation pins 280 and 380, and not rotated.
- the vertical member 100 is raised by a height to which the first lift operation means 260 is raised. Then, when the lift drive means 400 is repeatedly elongated and contracted to raise and lower the first lift operation means 200, the vertical member 100 can be raised to a desired height.
- a vertical transferring device for a heavy load is provided to raise and lower various heavy goods to desired heights in construction sites, loading docks, or the like.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
L'invention concerne un dispositif de transfert vertical pour une charge lourde, qui peut lever et abaisser diverses marchandises lourdes jusqu'à des hauteurs souhaitées dans des sites de construction, des entrepôts de chargement, ou analogues. Le dispositif de transfert vertical pour une charge lourde comprend un élément vertical ayant une hauteur plus grande qu'une hauteur de levage de la charge lourde, et comprenant des éléments de verrouillage disposés au niveau des sections de levage; une paire de moyens d'actionnement de levage supérieur et inférieur, dont un premier est relié à la charge lourde, installé au niveau de l'élément vertical pour être levé et abaissé le long de l'élément vertical sous la forme d'un arbre de levage pour lever et abaisser la charge lourde, et les deux étant mis en place sur les éléments de verrouillage à une hauteur prédéterminée, et fixés dessus pendant une élévation et un abaissement sans interférence avec les éléments de verrouillage; et un moyen d'entraînement de levage couplé entre les moyens d'actionnement de levage supérieur et inférieur pour transmettre une force d'entraînement de levage aux moyens d'actionnement de levage.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2007-0035352 | 2007-04-11 | ||
| KR1020070035352A KR100841011B1 (ko) | 2007-04-11 | 2007-04-11 | 중량물 승강장치 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2008126999A1 true WO2008126999A1 (fr) | 2008-10-23 |
Family
ID=39772371
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2008/001869 WO2008126999A1 (fr) | 2007-04-11 | 2008-04-03 | Dispositif de transfert vertical pour une charge lourde |
Country Status (2)
| Country | Link |
|---|---|
| KR (1) | KR100841011B1 (fr) |
| WO (1) | WO2008126999A1 (fr) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2518239A1 (fr) * | 2011-04-28 | 2012-10-31 | ULMA C y E, S. COOP. | Tête d'escalade pour lever un système de protection d'escalade pour les travaux de construction de bâtiments |
| CN113482369A (zh) * | 2021-07-14 | 2021-10-08 | 涡阳县新源泡沫夹心板有限公司 | 一种钢结构安装用辅助装置 |
| WO2025172055A1 (fr) * | 2024-02-16 | 2025-08-21 | Peri Se | Dispositif de maintien, chausson d'ancrage et chausson d'escalade |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101524760B1 (ko) * | 2014-01-29 | 2015-06-01 | 케이씨코트렐 주식회사 | 전기 집진기용 타격장치 |
| KR101458203B1 (ko) * | 2014-05-18 | 2014-11-04 | 임돈빈 | 레일 프레임 구조의 싱글 액추에이터를 이용한 크레인 조종석 승강장치 |
| ITUB20154872A1 (it) * | 2015-10-27 | 2017-04-27 | Despe S P A | Impianto di scalata e metodo per la costruzione di edifici |
| KR102599080B1 (ko) * | 2021-07-28 | 2023-11-07 | 주식회사 선진알씨에스 | 건설용 클라이밍 시스템 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3973885A (en) * | 1973-03-07 | 1976-08-10 | Enor Nominees Pty. Limited | Apparatus for progressively constructing a wall of cementitious material |
| JPH08144514A (ja) * | 1994-11-17 | 1996-06-04 | Hory Corp | 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法 |
| US6557817B2 (en) * | 2000-01-18 | 2003-05-06 | Wilian Holding Company | Wall climbing form hoist |
| EP1698746A1 (fr) * | 2003-11-27 | 2006-09-06 | ULMA C y E, S. COOP. | Système de fixation pour coffrages, échafaudages et charges en général |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100609726B1 (ko) | 2004-04-23 | 2006-08-09 | 금강공업 주식회사 | 상승식 가설대용 안내장치 |
| KR100666212B1 (ko) | 2005-04-11 | 2007-01-09 | 금강공업 주식회사 | 상승식 가설대용 안내장치의 안내 걸림 슈 |
| KR100704720B1 (ko) | 2006-05-19 | 2007-04-23 | 금강공업 주식회사 | 가설대 승강장치 및 이를 이용한 가설대 승강방법 |
-
2007
- 2007-04-11 KR KR1020070035352A patent/KR100841011B1/ko active Active
-
2008
- 2008-04-03 WO PCT/KR2008/001869 patent/WO2008126999A1/fr active Application Filing
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3973885A (en) * | 1973-03-07 | 1976-08-10 | Enor Nominees Pty. Limited | Apparatus for progressively constructing a wall of cementitious material |
| JPH08144514A (ja) * | 1994-11-17 | 1996-06-04 | Hory Corp | 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法 |
| US6557817B2 (en) * | 2000-01-18 | 2003-05-06 | Wilian Holding Company | Wall climbing form hoist |
| EP1698746A1 (fr) * | 2003-11-27 | 2006-09-06 | ULMA C y E, S. COOP. | Système de fixation pour coffrages, échafaudages et charges en général |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2518239A1 (fr) * | 2011-04-28 | 2012-10-31 | ULMA C y E, S. COOP. | Tête d'escalade pour lever un système de protection d'escalade pour les travaux de construction de bâtiments |
| CN113482369A (zh) * | 2021-07-14 | 2021-10-08 | 涡阳县新源泡沫夹心板有限公司 | 一种钢结构安装用辅助装置 |
| WO2025172055A1 (fr) * | 2024-02-16 | 2025-08-21 | Peri Se | Dispositif de maintien, chausson d'ancrage et chausson d'escalade |
Also Published As
| Publication number | Publication date |
|---|---|
| KR100841011B1 (ko) | 2008-06-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2008126999A1 (fr) | Dispositif de transfert vertical pour une charge lourde | |
| KR101040033B1 (ko) | 가설대 승강장치 | |
| CN102656089B (zh) | 飞机发动机单元体运输托架 | |
| JP5368109B2 (ja) | 建築分野で利用するためのガイドシュー及び昇降システム | |
| JP4307235B2 (ja) | 架線吊り上げ装置 | |
| US10273129B2 (en) | Method and apparatus for raising a structure | |
| KR100774883B1 (ko) | 반자동 상승장치 | |
| KR100927259B1 (ko) | 가설대 승강장치 | |
| KR20120106264A (ko) | 쇽업쇼바를 구비한 서포터 구조 | |
| CN111424954A (zh) | 一种附着式升降脚手架及其附墙导向座、使用方法 | |
| KR102022044B1 (ko) | 고소작업차량의 전복방지장치 | |
| EP1336026B1 (fr) | Structure support de pinces pour elements tubulaires | |
| EP2286045B1 (fr) | Mât télescopique | |
| CN210480590U (zh) | 吊具及起重装置 | |
| KR101177072B1 (ko) | 갱폼 탈착 장치와 이를 갖춘 갱폼 탈착 시스템 | |
| JP6830513B2 (ja) | 補助吊上装置および油圧シリンダ | |
| EP2415704A1 (fr) | Plateforme auto-élévatrice pour la construction. | |
| JP2011225336A (ja) | クライミングエレベータの機械台装置 | |
| KR200394923Y1 (ko) | 타워크레인의 고정장치 | |
| RU2322558C2 (ru) | Поворотное основание для подъемного приспособления | |
| KR101011811B1 (ko) | 중량물 승강장치 | |
| KR100461633B1 (ko) | 콘크리트 플레이싱 붐의 오토 크라이밍 장치 | |
| KR101032717B1 (ko) | 중량물 승강장치 | |
| CN223034498U (zh) | 一种适用于复杂外墙施工的吊篮装置 | |
| EP2517999A1 (fr) | Dispositif stabilisateur pour véhicules de travail |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08741119 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 08741119 Country of ref document: EP Kind code of ref document: A1 |