[go: up one dir, main page]

WO2008037582A1 - Building having a spatially separated façade, and façade - Google Patents

Building having a spatially separated façade, and façade Download PDF

Info

Publication number
WO2008037582A1
WO2008037582A1 PCT/EP2007/059416 EP2007059416W WO2008037582A1 WO 2008037582 A1 WO2008037582 A1 WO 2008037582A1 EP 2007059416 W EP2007059416 W EP 2007059416W WO 2008037582 A1 WO2008037582 A1 WO 2008037582A1
Authority
WO
WIPO (PCT)
Prior art keywords
building
building according
facade
functional elements
floor slabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2007/059416
Other languages
German (de)
French (fr)
Inventor
Stefan Behling
Andreas Fuchs
Konrad Kaiser
Frank Zimmermann
Jürgen Meyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schueco International KG
Original Assignee
Schueco International KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schueco International KG filed Critical Schueco International KG
Priority to EP07803348.7A priority Critical patent/EP2069584B1/en
Priority to DK07803348.7T priority patent/DK2069584T3/en
Priority to ES07803348.7T priority patent/ES2471377T3/en
Publication of WO2008037582A1 publication Critical patent/WO2008037582A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Definitions

  • the invention relates to a building with a facade according to the preamble of claim 1.
  • a particular problem is the placement of functional elements in particular - but not only - the building system technology in such buildings.
  • the invention solves this problem by the subject matter of claim 1. It also provides the object also solving the subject of claim 25th
  • the functional elements for the system engineering directly between the facade and at least one or more actual outer - are defined by the outer sides of the floor ceilings - levels of the building.
  • "Direct" means, in particular, that no further façade plane, for example a double façade, is arranged between the functional elements and the floor slabs, which would make the construction more expensive.
  • the installable functional elements include in particular those of building systems engineering (in particular electrics, ventilation, heating, cooling), but also sun protection devices such as blinds and shutters.
  • the functional elements are particularly advantageously designed and arranged in the receiving space such that they adjoin the storey ceilings flush upwards and downwards.
  • In the facade can as surface elements and opening elements such.
  • the advantageous functional integration also opens up new design possibilities for the overall view of the façade.
  • curtain walls which are located directly or at a small distance in front of the outer levels of a building, which are generally formed by the closing surfaces of the floor slabs and parapets, are known per se from the prior art.
  • Curtain facades are used e.g. mounted at a certain distance to these levels in order to arrange insulation material between the facade and the building.
  • the distance of the curtain wall increases slightly z.
  • ventilated facades where in addition to the thermal insulation, such as mineral wool, rooms are provided that allow an exchange of air.
  • the decisive factor here is that the thermal insulation level of the façade according to the prior art is located directly in front of the outer levels of the building or slightly in front of it, so that there is no space for accommodating functional elements of the installation technology.
  • Double façades which in addition to a curtain facade have a second shell, which has a greater distance from the heat insulation layer forming facade. For example, this distance can be so great that it can be walked on.
  • Double façades are used for temperature control (heat recovery - cooling).
  • functional components for the air conditioning of the building between the facade forming the thermal insulation layer and the outer shell.
  • a double façade is required, which increases the investment costs.
  • the invention avoids this additional expense by the direct arrangement of the functional elements in the receiving space in connection to the outside of the floor slabs before preferably only a single closed facade level.
  • the Plant technology is thus "inside" the building spaces, which simplifies the accessibility for maintenance and the like.
  • the invention takes a clear step further, since it uses the receiving space specified particularly advantageously in the subclaims directly for accommodating the functional elements, thereby improving the overall appearance of the building.
  • FIG. 1 shows a detail of a multi-storey building shown schematically; and FIG. 2 shows a detail section of a building ceiling with a facade.
  • Figure 1 shows symbolically a section of a multi-storey building 17 with at least two or more floors or floors 18, 19, which are separated by floor slabs, consisting of a concrete floor 1, 2 and possibly a floor 12 and / or a ceiling panel (the latter not shown here) exist.
  • a front wall 3 forming the outer front of the building is arranged.
  • this facade 3 forms at least part of at least one outer wall or else the entire outer shell of the building 1, which thermally closes the building in its area in the manner of a closed surface to the outside.
  • the building itself may be a building of any intended use, for example an office building.
  • the facade 3 is preferably formed from a rung of profiles. These profiles may be formed as Metallprof ⁇ le, especially as aluminum or steel profiles.
  • the lattice work preferably has bolt profiles 4 and post profiles 5, between which insulating glass panes 6 are arranged as surface elements. Panels, solar panels, such as thermal or photovoltaic collectors, and functional elements, such as sliding windows, can also be used as surface elements.
  • the facade 3 is preferably arranged wholly or in any case in partial areas spaced from the outer surface, which is predetermined by the outer end faces of the floor slabs.
  • a receiving space 20 is formed between the facade and the outer end faces of the floor slabs, which accommodates functional elements of at least one building system technology 7 as a functional space.
  • the facade 3 as a whole on its entire surface or at least more than 60%, preferably more than 80% of its surface spaced from the end faces of the floor slabs 1, 2 is arranged. It is essential that not only recesses are formed in the floor slabs 1, 2, but that a large-volume receiving space 20 over a substantial area of the facade is formed, which really take a large part of the building equipment, especially in extension of the front sides of the floor slabs 1, 2 so that a real gain in transparency, especially when used on office buildings with transparent surface elements.
  • FIG. 2 shows a detail section of a building ceiling 1 with the facade 3, wherein the facade 3 is so spaced from the floor slab 1 that between the floor Schossdecke 1 and the facade 3 twice functional elements at least the system technology 7 and 8, are arranged.
  • a suspended ceiling can be arranged below the floor ceiling.
  • the receiving space 20 receives a Geschosentrennung 11 and insulating material 10.
  • the functional elements preferably include ventilation devices for air conditioning of the rooms and associated air ducts (baffles, flaps, filters). Since these ele- ments of the system technology 7 and 8 (in particular ventilation units for ventilation, heating and cooling) usually record a width of, for example, 400 mm, it is advantageous if the width of the receiving space, ie the distance between the facade 3 and the End faces of the floor slabs 1, 2 is preferably 400 mm or more. Between the systems 7 and 8, which can be coupled together, there is a plate-like partition 11, which acts soundproofing and meets fire safety requirements. The storey separation can also be arranged above or below the installation techniques 7, 8.
  • Front side to the functional elements of the system technology 7 and 8, opposite the floor slab 1, can e.g. an insulating layer 10 are arranged for thermal insulation. Following this are e.g. the bar profiles 4, which form the rung of the facade with the surface elements 3.
  • the functional elements may also include sun protection elements, such as blinds and shutters, which can be arranged within the width 14 in front of the system technology 7 and 8 in the sun protection chamber 9 (not shown here).
  • sun protection elements such as blinds and shutters
  • a building with the width 14, which forms the functional space according to the invention between the actual outer level of the building and the facade, can be designed, for example, between 200 and 800 mm.
  • the width 14 is approximately 550 mm.
  • minimum widths of 500-700 mm are preferred. Further advantageous minimum dimensions are 200 mm, 300 mm, 400 mm, 500 mm or even 600 mm.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

Two-storey or multi-storey building comprising at least two or more levels (18, 19) which are separated from one another by intermediate floors (1, 2; 12); a façade (3) which is arranged at the front outside the intermediate floors (1, 2; 12), said façade forming part of the outer shell of the building and, in the region occupied by said façade, thermally closing off the building to the outside in the manner of a closed surface; and functional elements of at least one building installation system, wherein the façade (3) is arranged, completely or in certain regions, with a spatial separation from an outer surface, which is defined by the outer end faces of the intermediate floors (1, 2; 12), such that a space (20) which accommodates at least the functional elements of the building installation system (7) is formed between the outer end faces of the intermediate floors (1, 2; 12) and the façade (3).

Description

Gebäude mit Fassade und Fassade Building with facade and facade

Die Erfindung betrifft ein Gebäude mit einer Fassade nach dem Oberbegriff des An- Spruchs 1.The invention relates to a building with a facade according to the preamble of claim 1.

Derartige Gebäude sind an sich in verschiedensten Ausgestaltungen bekannt.Such buildings are known per se in a variety of configurations.

Ein besonderes Problem stellt die Unterbringung von Funktionselementen insbesonde- re - aber nicht nur - der Gebäudeanlagentechnik an derartigen Gebäuden dar.A particular problem is the placement of functional elements in particular - but not only - the building system technology in such buildings.

Die Lösung dieses Problem ist die Aufgabe der Erfindung.The solution to this problem is the object of the invention.

Die Erfindung löst diese Aufgabe durch den Gegenstand des Anspruchs 1. Sie schafft zudem den die Aufgabe ebenfalls lösenden Gegenstand des Anspruchs 25.The invention solves this problem by the subject matter of claim 1. It also provides the object also solving the subject of claim 25th

Vorteilhafte Ausgestaltungen sind den Unteransprüchen zu entnehmen.Advantageous embodiments can be found in the dependent claims.

Durch den Gegenstand des Anspruchs 1 wird erreicht, das Funktionselemente für die Anlagentechnik direkt zwischen der Fassade und wenigstens einer oder mehreren eigentlichen äußeren - durch die Außenseiten der Geschossdecken definierten - Ebenen des Gebäudes angeordnet sind. „Direkt" bedeutet insbesondere, dass zwischen den Funktionselementen und den Geschossdecken keine weitere Fassadenebene z.B. einer Doppelfassade angeordnet ist, was die Konstruktion verteuern würde.By the subject matter of claim 1 is achieved, the functional elements for the system engineering directly between the facade and at least one or more actual outer - are defined by the outer sides of the floor ceilings - levels of the building. "Direct" means, in particular, that no further façade plane, for example a double façade, is arranged between the functional elements and the floor slabs, which would make the construction more expensive.

Zu den installierbaren Funktionselementen gehören insbesondere solche der Gebäudeanlagentechnik (insbesondere Elektrik, Lüftung, Heizung, Kühlung), aber auch Sonnenschutzvorrichtungen wie z.B. Jalousien und Rollläden. Besonders vorteilhaft sind die Funktionselemente derart ausgelegt und im Aufnahme- raum angeordnet, dass sie sich nach oben und nach unten bündig an die Geschoßdecken anschließen.The installable functional elements include in particular those of building systems engineering (in particular electrics, ventilation, heating, cooling), but also sun protection devices such as blinds and shutters. The functional elements are particularly advantageously designed and arranged in the receiving space such that they adjoin the storey ceilings flush upwards and downwards.

Durch die bündige Anordnung der Funktionselemente quasi in „Verlängerung" zu den Geschossdecken zwischen der Fassade und den Geschossdecken wird eine maximal transparente Außenansicht realisierbar, insbesondere, wenn als Flächenelemente zwischen den Geschossdecken Glasscheiben verwendet werden. Diese Optik wird durch keine Lüftungskästen, keine Brüstung oder sonst irgendwie angeordneten Funktions- elemente gestört, denn da keine Brüstung für die Anlagentechnik vorhanden ist, sind die Anlagentechnik und sonstige Funktionselemente von außen nicht mehr sichtbar. Zusätzlich vergrößert sich die Raumfläche vor der Fassade.The flush arrangement of the functional elements virtually in "extension" to the floor slabs between the façade and the floor slabs creates a maximally transparent exterior view, in particular if glass panels are used as area elements between the floor slabs.These optics are not provided by ventilation boxes, parapets or otherwise Because there is no parapet for the system technology, the system technology and other functional elements are no longer visible from the outside, and the room area in front of the façade increases.

In die Fassade können als Flächenelemente auch Öffnungselemente, wie z. B. Schiebe- fenster, Drehkipp-, Dreh- oder Klappfenster, integriert werden.In the facade can as surface elements and opening elements such. As sliding window, tilt-turn, turn or folding windows, are integrated.

Durch die vorteilhafte Funktionsintegration ergeben sich zudem neue Designmöglichkeiten für die Gesamtansicht der Fassade.The advantageous functional integration also opens up new design possibilities for the overall view of the façade.

Neben Isolierglasscheiben, welche den Vorteil maximaler Transparenz bieten, ist es vorteilhaft, so genannte Solarpaneele in die Fassade einzusetzen, da die Leitungsperipherie für die Solaranlagen (Wasser-/Stromleitungen) optimal mit den Funktionselementen gekoppelt werden können.In addition to insulating glass panes, which offer the advantage of maximum transparency, it is advantageous to use so-called solar panels in the facade, since the line periphery for the solar systems (water / power lines) can be optimally coupled with the functional elements.

Geradezu ideal ist daher die Anordnung von Funktionselementen für die Solarfassaden in den Aufnahmeräumen möglich (Dezentrale Anlagentechnik, solare Energiegewinnung). Die erfindungsgemäßen Gebäude mit den beabstandeten Fassaden können so auch zu einer hohen Energieeffizienz durch eine dezentrale Anlagentechnik beitragen, wobei die Anlagentechnik die für die Solarfassade nutzbaren Flächen auch nicht ver- ringert. Es ergeben sich zudem deutliche Montagevorteile, da zunächst die Anlagentechnik und dann die Fassade oder beides gemeinsam montiert werden können.Almost ideal, therefore, the arrangement of functional elements for the solar façades in the receiving spaces possible (decentralized system technology, solar energy). The buildings according to the invention with the spaced facades can thus also contribute to a high energy efficiency through a decentralized system technology, wherein the system technology does not reduce the usable surfaces for the solar façade. There are also clear assembly advantages, since first the plant engineering and then the facade or both can be mounted together.

Zusammengefasst wird derart ein hochintegratives Fassadensystem geschaffen, dass zudem die Möglichkeit dazu bietet, die Investitions- und Betriebskosten zu senken.In summary, this creates a highly integrated façade system that also offers the possibility of reducing investment and operating costs.

Aus dem Stand der Technik sind zwar vorgehängte Fassaden, die sich unmittelbar oder in einem geringen Abstand vor den äußeren Ebenen eines Gebäudes befinden, die in der Regel durch die abschließenden Flächen der Geschossdecken und Brüstungen ge- bildet werden, an sich bekannt. Vorgehängte Fassaden werden z.B. in einem gewissen Abstand zu diesen Ebenen montiert, um Dämmmaterial zwischen der Fassade und dem Gebäude anordnen zu können. Der Abstand der vorgehängten Fassade vergrößert sich geringfügig z. B. bei hinterlüfteten Fassaden, wo neben der Wärmedämmung, wie Mineralwolle, auch Räume zur Verfügung gestellt werden, die einen Luftaustausch er- möglichen.Although curtain walls which are located directly or at a small distance in front of the outer levels of a building, which are generally formed by the closing surfaces of the floor slabs and parapets, are known per se from the prior art. Curtain facades are used e.g. mounted at a certain distance to these levels in order to arrange insulation material between the facade and the building. The distance of the curtain wall increases slightly z. For example, in ventilated facades, where in addition to the thermal insulation, such as mineral wool, rooms are provided that allow an exchange of air.

Maßgeblich ist hier aber, dass sich die Wärmedämmebene der Fassade nach dem Stand der Technik direkt vor den äußeren Ebenen des Gebäudes oder geringfügig davon beabstandet davor befindet, so dass kein Raum zur Aufnahme von Funktionsele- menten der Anlagentechnik besteht.The decisive factor here, however, is that the thermal insulation level of the façade according to the prior art is located directly in front of the outer levels of the building or slightly in front of it, so that there is no space for accommodating functional elements of the installation technology.

Ebenso bekannt sind so genannte Doppelfassaden, die zusätzlich zu einer vorgehängten Fassade eine zweite Hülle aufweisen, die einen größeren Abstand zu der die Wärmedämmebene bildenden Fassade aufweist. Dieser Abstand kann z.B. so groß sein, dass er begehbar ist. Doppelfassaden werden zur Temperaturregelung (Wärmegewinnung - Kühlung) genutzt. So ist es auch bekannt, zwischen der die Wärmedämmebene bildenden Fassade und der äußeren Hülle Funktionsbauteile für die Klimatisierung des Gebäudes anzuordnen. Hier ist aber eine Doppelfassade erforderlich, welche die Investitionskosten erhöht. Die Erfindung vermeidet diesen Mehraufwand durch die direkte Anordnung der Funktionselemente im Aufnahmeraum im Anschluss außen an die Geschossdecken vor vorzugsweise nur einer einzelnen geschlossenen Fassadenebene. Die Anlagetechnik befindet sich also „innerhalb" der Gebäuderäume,, was die Zugäng- lichkeit zur Wartung u.dgl. deutliche vereinfacht.Also known are so-called double façades, which in addition to a curtain facade have a second shell, which has a greater distance from the heat insulation layer forming facade. For example, this distance can be so great that it can be walked on. Double façades are used for temperature control (heat recovery - cooling). Thus, it is also known to arrange functional components for the air conditioning of the building between the facade forming the thermal insulation layer and the outer shell. Here, however, a double façade is required, which increases the investment costs. The invention avoids this additional expense by the direct arrangement of the functional elements in the receiving space in connection to the outside of the floor slabs before preferably only a single closed facade level. The Plant technology is thus "inside" the building spaces, which simplifies the accessibility for maintenance and the like.

Allen bekannten Gebäuden mit Funktionselementen für die Anlagentechnik aufwei- senden Fassaden ist aber gemeinsam, dass sich die Wärmedämmebene in unmittelbarer Nähe zur eigentlichen äußeren Ebenen des Gebäudes befindet und dass sie den Wunsch nach hoher Transparenz der Gebäude nicht gerecht werden.However, all the well-known buildings with functional elements for the plant engineering façades have in common that the thermal insulation level is in direct proximity to the actual outer levels of the building and that they do not meet the desire for high transparency of the buildings.

Die Erfindung geht demgegenüber einen deutlichen Schritt weiter, denn sie nutzt den in den Unteransprüchen besonders vorteilhaft spezifizierten, Aufnahmeraum direkt zur Unterbringung der Funktionselemente und verbessert dabei die gesamte Optik des Gebäudes.In contrast, the invention takes a clear step further, since it uses the receiving space specified particularly advantageously in the subclaims directly for accommodating the functional elements, thereby improving the overall appearance of the building.

Nachfolgend wird die Erfindung unter Bezug auf die Zeichnung anhand eines Ausfüh- rungsbeispiels näher beschrieben. Es zeigt:The invention will be described in more detail below with reference to the drawing with reference to an exemplary embodiment. It shows:

Figur 1 einen Ausschnitt eines schematisch dargestellten mehrstöckigen Gebäudes; und Figur 2 zeigt einen Detailschnitt einer Gebäudedecke mit einer Fassade.Figure 1 shows a detail of a multi-storey building shown schematically; and FIG. 2 shows a detail section of a building ceiling with a facade.

Figur 1 zeigt symbolisch einen Ausschnitt eines mehrstöckigen Gebäudes 17 mit wenigstens zwei oder mehr Etagen bzw. Geschossen 18, 19, die durch Geschossdecken voneinander getrennt sind, die aus einer Betondecke 1, 2 und ggf. einem Boden 12 und/oder einer Deckenverkleidung (letztere hier nicht dargestellt) bestehen.Figure 1 shows symbolically a section of a multi-storey building 17 with at least two or more floors or floors 18, 19, which are separated by floor slabs, consisting of a concrete floor 1, 2 and possibly a floor 12 and / or a ceiling panel (the latter not shown here) exist.

Stirnseitig bzw. außen zu den Geschossdecken 1 und 2 ist eine die Außenfront des Gebäudes bildende Fassade 3 angeordnet. Diese Fassade 3 bildet erfmdungsgemäß zumindest einen Teil wenigstens einer Außenwand oder aber die ganze Außenhülle des Gebäudes 1 aus, welche das Gebäude in ihrem Bereich nach Art einer geschlossenen Fläche thermisch nach außen abschließt. Bei dem Gebäude kann es sich bis auf die Fassade an sich um ein Gebäude mit einem beliebigen Verwendungszweck, beispielsweise um ein Bürogebäude handeln.At the front side or outside to the floor slabs 1 and 2, a front wall 3 forming the outer front of the building is arranged. According to the invention, this facade 3 forms at least part of at least one outer wall or else the entire outer shell of the building 1, which thermally closes the building in its area in the manner of a closed surface to the outside. Apart from the facade, the building itself may be a building of any intended use, for example an office building.

Die Fassade 3 ist vorzugsweise aus einem Sprossenwerk von Profilen gebildet. Diese Profile können als Metallprofϊle, insbesondere als Aluminium- oder Stahlprofile ausgebildet sein. Das Sprossenwerk weist vorzugsweise Riegelprofile 4 und Pfostenprofilen 5 auf, zwischen denen als Flächenelemente Isolierglasscheiben 6 angeordnet sind. Als Flächenelemente können auch Paneele, Solarpaneele, wie Thermie- oder Photo- voltaikkollektoren, und Funktionselemente, wie Schiebefenster, eingesetzt werden.The facade 3 is preferably formed from a rung of profiles. These profiles may be formed as Metallprofϊle, especially as aluminum or steel profiles. The lattice work preferably has bolt profiles 4 and post profiles 5, between which insulating glass panes 6 are arranged as surface elements. Panels, solar panels, such as thermal or photovoltaic collectors, and functional elements, such as sliding windows, can also be used as surface elements.

Die Fassade 3 ist vorzugsweise ganz oder jedenfalls in Teilbereichen beabstandet zu der Außenfläche angeordnet, welche durch die äußeren Stirnseiten der Geschossdecken vorgegeben ist.The facade 3 is preferably arranged wholly or in any case in partial areas spaced from the outer surface, which is predetermined by the outer end faces of the floor slabs.

Derart wird zwischen der Fassade und den äußeren Stirnseiten der Geschossdecken ein Aufnahmeraum 20 ausgebildet, der als Funktionsraum Funktionselemente zumindest einer Gebäudeanlagentechnik 7 aufnimmt.In this way, a receiving space 20 is formed between the facade and the outer end faces of the floor slabs, which accommodates functional elements of at least one building system technology 7 as a functional space.

Besonders vorteilhaft ist, wenn die Fassade 3 als Ganzes auf ihrer gesamten Fläche oder auf wenigstens mehr als 60%, vorzugsweise mehr als 80% ihrer Fläche beabstandet zu den Stirnseiten der Geschossdecken 1, 2 angeordnet ist. Wesentlich ist, dass nicht nur Aussparungen in den Geschossdecken 1, 2 gebildet werden, sondern dass ein großvolumiger Aufnahmeraum 20 über einen wesentlichen Bereich der Fassade entsteht, der wirklich einen großen Teil der Gebäudeanlagentechnik insbesondere in Ver- längerung der Stirnseiten der Geschossdecken 1, 2 aufnehmen kann, so dass ein echter Gewinn an Transparenz insbesondere beim Einsatz an Bürogebäuden mit transparenten Flächenelementen entsteht.It is particularly advantageous if the facade 3 as a whole on its entire surface or at least more than 60%, preferably more than 80% of its surface spaced from the end faces of the floor slabs 1, 2 is arranged. It is essential that not only recesses are formed in the floor slabs 1, 2, but that a large-volume receiving space 20 over a substantial area of the facade is formed, which really take a large part of the building equipment, especially in extension of the front sides of the floor slabs 1, 2 so that a real gain in transparency, especially when used on office buildings with transparent surface elements.

Figur 2 zeigt einen Detailschnitt einer Gebäudedecke 1 mit der Fassade 3, wobei die Fassade 3 dergestalt von der Geschossdecke 1 beabstandet ist, dass zwischen der Ge- schossdecke 1 und der Fassade 3 zweifach Funktionselemente zumindest der Anlagentechnik 7 und 8, angeordnet sind.FIG. 2 shows a detail section of a building ceiling 1 with the facade 3, wherein the facade 3 is so spaced from the floor slab 1 that between the floor Schossdecke 1 and the facade 3 twice functional elements at least the system technology 7 and 8, are arranged.

Mit 1 ist eine der Betondecken des Gebäudes gekennzeichnet, die eine beliebige Breite 13 in horizontaler Ebene aufweist und vertikal an ihrer äußeren Stirnseite eine äußere Ebene X des Gebäudes definiert.1 with one of the concrete ceilings of the building is characterized, which has an arbitrary width 13 in the horizontal plane and defines vertically on its outer end side an outer plane X of the building.

Auf der Betondecke 1 befindet sich ein aufgeständerter Boden 12, so dass die gesamte Geschossdecke hier beispielhaft eine vertikale Dicke - hier als Höhe H bezeichnet - von circa 400 mm aufweist. Anstelle oder zusätzlich zu einem aufgeständerten Boden 12 kann unterhalb der Geschossdecke eine abgehängte Geschossdecke angeordnet sein.On the concrete floor 1 is an elevated floor 12, so that the entire floor ceiling here by way of example a vertical thickness - here referred to as height H - of about 400 mm. Instead of or in addition to a raised floor 12, a suspended ceiling can be arranged below the floor ceiling.

Nahezu bündig abschließend mit der Oberseite 15 und der Unterseite 16 der gesamten Geschossdecke schließt sich der Aufnahmeraum 20 an, der eine horizontale Breite 14 und eine Höhe H aufweist. In dem Raum sind Funktionselemente, z.B. für die Anlagentechnik, aufgenommen. Zusätzlich nimmt der Aufnahmeraum 20 eine Geschosstrennung 11 und Dämmmaterial 10 auf.Almost flush with the top 15 and the bottom 16 of the entire floor ceiling closes the receiving space 20, which has a horizontal width 14 and a height H. In the room are functional elements, e.g. for the systems engineering, added. In addition, the receiving space 20 receives a Geschosentrennung 11 and insulating material 10.

Durch eine bündige Anordnung wird eine maximale Transparenz des Gebäudes erreicht (siehe auch Figur 1). Vorzugsweise sind keine der Funktionselemente höher als die Höhe H der Geschossdecke ist, so dass die Durchsicht nicht behindert wird.By a flush arrangement a maximum transparency of the building is achieved (see also Figure 1). Preferably, none of the functional elements are higher than the height H of the floor slab, so that the review is not hindered.

Zu den Funktionselementen gehören vorzugsweise Lüftungsgeräte zur Klimatisierung der Räume und dazugehörende Luftkanäle (Leitbleche, Klappen, Filter). Da diese E- lemente der Anlagentechnik 7 und 8 (insbesondere Lüftungsgeräte zur Lüftung, Heizung und Kühlung) in der Regel eine Breite von beispielsweise 400 mm aufnehmen, ist es vorteilhaft, wenn die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der Fassade 3 und den Stirnseiten der Geschossdecken 1, 2 vorzugsweise 400 mm oder mehr beträgt. Zwischen den Anlagentechniken 7 und 8, die miteinander gekoppelt sein können, befindet sich eine plattenartige Geschosstrennung 11, die schalldämmend wirkt und Brandschutzanforderungen erfüllt. Die Geschosstrennung kann auch oberhalb oder unterhalb der Anlagentechniken 7, 8 angeordnet sein.The functional elements preferably include ventilation devices for air conditioning of the rooms and associated air ducts (baffles, flaps, filters). Since these ele- ments of the system technology 7 and 8 (in particular ventilation units for ventilation, heating and cooling) usually record a width of, for example, 400 mm, it is advantageous if the width of the receiving space, ie the distance between the facade 3 and the End faces of the floor slabs 1, 2 is preferably 400 mm or more. Between the systems 7 and 8, which can be coupled together, there is a plate-like partition 11, which acts soundproofing and meets fire safety requirements. The storey separation can also be arranged above or below the installation techniques 7, 8.

Stirnseitig zu den Funktionselementen der Anlagentechnik 7 und 8, gegenüberliegend der Geschossdecke 1, kann z.B. eine Dämmschicht 10 zur Wärmeisolierung angeordnet werden. Daran anschließend befinden sich z.B. die Riegelprofile 4, die das Sprossenwerk der Fassade mit den Flächenelementen 3 bilden.Front side to the functional elements of the system technology 7 and 8, opposite the floor slab 1, can e.g. an insulating layer 10 are arranged for thermal insulation. Following this are e.g. the bar profiles 4, which form the rung of the facade with the surface elements 3.

Zu den Funktionselementen können auch Sonnenschutzelemente, wie Jalousien und Rollladen, gehören, die innerhalb der Breite 14 vor der Anlagentechnik 7 und 8 in der Sonnenschutzkammer 9 angeordnet sein können (hier nicht dargestellt).The functional elements may also include sun protection elements, such as blinds and shutters, which can be arranged within the width 14 in front of the system technology 7 and 8 in the sun protection chamber 9 (not shown here).

Als Flächenelemente können Festfelder (Isolierglasscheiben) oder Öffhungselemente, wie z. B. Schiebe- oder Klappfenster, eingesetzt werden. Ebenso ist es möglich und besonders vorteilhaft, z.B. Solarpaneele einzusetzen (sowohl Photovoltaik wie auch Thermie), da die gesamte Leitungsperipherie - insbesondere Wasserleitungen für die Heizung oder Strom für Lüftungsgebläse oder Wärmetauscher - direkt mit der AnIa- gentechnik 7 und 8 koppelbar ist.As surface elements fixed fields (insulating glass panes) or Öffhungselemente, such. As sliding or folding windows are used. It is also possible and particularly advantageous, e.g. Solar panels (both photovoltaic as well as Thermie), as the entire line periphery - especially water pipes for heating or electricity for ventilation fans or heat exchangers - can be coupled directly to the Angegentechnik 7 and 8.

Ein Gebäude mit der Breite 14, die den erfindungsgemäßen Funktionsraum zwischen der eigentlichen äußeren Ebene des Gebäudes und der Fassade bildet, kann z.B. zwischen 200 und 800 mm ausgelegt sein. In einem besonderen Ausführungsfall beträgt die Breite 14 circa 550 mm. Vorzugsweise werden Mindestbreiten von 500 - 700 mm bevorzugt. Weitere vorteilhafte Mindestmaße sind 200 mm, 300 mm, 400 mm, 500 mm oder auch 600 mm. BEZUGSZIFFERNA building with the width 14, which forms the functional space according to the invention between the actual outer level of the building and the facade, can be designed, for example, between 200 and 800 mm. In a particular embodiment, the width 14 is approximately 550 mm. Preferably, minimum widths of 500-700 mm are preferred. Further advantageous minimum dimensions are 200 mm, 300 mm, 400 mm, 500 mm or even 600 mm. REFERENCE NUMBER

1 Geschossdecke 2 Geschossdecke1 storey ceiling 2 storey ceiling

3 Fassade3 facade

4 Riegel4 bars

5 Pfosten5 posts

6 Isolierglasscheibe 7 Anlagentechnik6 Insulating glass pane 7 Plant engineering

8 Anlagentechnik8 plant engineering

9 Sonnenschutzkammer9 sun protection chamber

10 Dämmschicht10 insulation layer

11 Geschosstrennung11 storey separation

12 Boden12 floor

13 Deckenbreite13 ceiling width

14 Breite14 width

15 Oberseite 16 Unterseite15 top 16 bottom

17 Gebäude17 buildings

18 Geschoß18 storeys

19 Geschoß19 storey

20 Aufnahmeraum20 recording room

X Äußere Gebäudeebene X exterior building level

Claims

Ansprüche claims 1. Zwei- oder Mehrstöckiges Gebäude mit a. wenigstens zwei oder mehr Geschossen (18, 19) die durch Geschossdecken (1, 2; 12), voneinander getrennt sind, b. einer stirnseitig außerhalb der Geschossdecken (1, 2; 12) angeordneten Fassade (3), welche einen Teil der Außenhülle des Gebäudes ausbildet und welche das Gebäude in ihrem Bereich nach Art einer geschlossenen Fläche thermisch nach außen abschließt, und c. Funktionselementen zumindest einer Gebäudeanlagentechnik, dadurch gekennzeichnet, dass d. die Fassade (3) ganz oder in Teilbereichen derart beabstandet zu einer Außenfläche angeordnet ist, welche durch die äußeren Stirnseiten der Geschossdecken (1, 2; 12) vorgegeben ist, dass zwischen den äußeren1. Two- or multi-storey building with a. at least two or more projectiles (18, 19) separated by floor slabs (1, 2, 12), b. a facade (3) arranged on the front side outside the floor slabs (1, 2, 12), which forms part of the outer shell of the building and which thermally closes the building in its area in the manner of a closed surface, and c. Functional elements of at least one building system technology, characterized in that d. the façade (3) is arranged wholly or in some areas at a distance from an outer surface which is defined by the outer end faces of the floor slabs (1, 2; Stirnseiten der Geschossdecken (1, 2; 12) und der Fassade (3) ein Aufnahmeraum (20) ausgebildet ist, der zumindest die Funktionselemente der Gebäudeanlagentechnik (7) aufnimmt.End faces of the floor slabs (1, 2, 12) and the facade (3) a receiving space (20) is formed, which accommodates at least the functional elements of the building system technology (7). 2. Gebäude nach Anspruch 1, dadurch gekennzeichnet, dass die Geschossdecken eine Betondecke (1, 2) aufweisen.2. Building according to claim 1, characterized in that the floors have a concrete ceiling (1, 2). 3. Gebäude nach Anspruch 2, dadurch gekennzeichnet, dass die Geschossdecken neben der Betondecke (1, 2) einen Boden (12) und/oder eine Deckenver- kleidung aufweisen.3. Building according to claim 2, characterized in that the floor slabs next to the concrete floor (1, 2) have a bottom (12) and / or a ceiling cladding. 4. Gebäude nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die Fassade (3) ein Sprossenwerk von Riegelprofilen (4) und Pfostenprofilen (5) aufweist, zwischen denen Flächenelemente ausgebildet sind. 4. Building according to claim 2 or 3, characterized in that the facade (3) has a rung of bolt profiles (4) and post profiles (5), between which surface elements are formed. 5. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Flächenelemente als Isolierglasscheiben, Paneele, Solarpaneele, wie Thermie- oder Photovoltaikkollektoren und/oder Fenster ausgebildet sind.5. Building according to one of the preceding claims, characterized in that the surface elements are designed as insulating glass panes, panels, solar panels, such as thermal or photovoltaic panels and / or windows. 6. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass jede Geschossdecke (1) eine vertikale Höhe (X) aufweist, wobei die Funktionselemente nicht größer sind als die Höhe.6. Building according to one of the preceding claims, characterized in that each floor slab (1) has a vertical height (X), wherein the functional elements are not greater than the height. 7. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass keines der Funktionselemente außerhalb der Ebene angeordnet ist, in welcher die Geschossdecke (1, 2) liegt.7. Building according to one of the preceding claims, characterized in that none of the functional elements is arranged outside the plane in which the floor slab (1, 2) is located. 8. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass sich die Funktionselemente für die Anlagentechnik sich an der Decke und an dem Boden der Geschossdecken bündig oder im Wesentlichen bündig anschließen.8. Building according to one of the preceding claims, characterized in that connect the functional elements for the system technology flush or substantially flush to the ceiling and at the bottom of the floor slabs. 9. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Geschossdecke eine vertikale Dicke von circa 400 mm aufweist.9. Building according to one of the preceding claims, characterized in that the floor slab has a vertical thickness of about 400 mm. 10. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass der Aufnahmeraum (20) neben Funktionselementen insbesondere der Anlagentechnik eine plattenartige Geschosstrennung (11) aufnimmt.10. Building according to one of the preceding claims, characterized in that the receiving space (20) in addition to functional elements in particular of the system technology, a plate-like projectile separation (11) receives. 11. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass der Aufnahmeraum (20) neben Funktionselementen insbesondere der Anlagentechnik ein Dämmmaterial aufnimmt.11. Building according to one of the preceding claims, characterized in that the receiving space (20) in addition to functional elements in particular of the system technology absorbs an insulating material. 12. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der FassadeA building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) und den Stirnseiten der Geschossdecken (1, 2) 200 mm oder mehr beträgt. (3) and the end faces of the floor slabs (1, 2) is 200 mm or more. 13. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der Fassade (3) und den Stirnseiten der Geschossdecken (1, 2) 300 mm oder mehr beträgt.A building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) and the front sides of the floor slabs (1, 2) is 300 mm or more. 14. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der Fassade (3) und den Stirnseiten der Geschossdecken (1, 2), 400 mm oder mehr beträgt.A building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) and the front sides of the floor slabs (1, 2) is 400 mm or more. 15. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der Fassade (3) und den Stirnseiten der Geschossdecken (1, 2), 500 mm oder mehr beträgt.A building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) and the front sides of the floors (1, 2) is 500 mm or more. 16. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der FassadeA building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) und den Stirnseiten der Geschossdecken (1, 2), 600 mm oder mehr beträgt.(3) and the end faces of the floor slabs (1, 2), 600 mm or more. 17. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen derA building according to any one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the 18. Fassade (3) und den Stirnseiten der Geschossdecken (1, 2) kleiner als 800 mm ist.18. Facade (3) and the front sides of the floor slabs (1, 2) is smaller than 800 mm. 19. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Breite des Aufnahmeraumes, d.h. der Abstand zwischen der FassadeBuilding according to one of the preceding claims, characterized in that the width of the receiving space, i. the distance between the facade (3) und den Stirnseiten der Geschossdecken (1, 2) zwischen 500 mm und 700 mm liegt.(3) and the end faces of the floor slabs (1, 2) is between 500 mm and 700 mm. 20. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Fassade (3) als Ganzes auf ihrer gesamten Fläche oder auf einem wesentlichen Teil ihrer Fläche, d.h. wenigstens mehr als 60%, vorzugsweise mehr als 80% ihrer Fläche, beabstandet zu den Stirnseiten der Geschossdecken (1, 2) angeordnet ist.20. Building according to one of the preceding claims, characterized in that the facade (3) as a whole on its entire surface or on a substantial part of its surface, ie at least more than 60%, preferably more as 80% of its surface, spaced from the end faces of the floor slabs (1, 2) is arranged. 21. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Funktionselemente Lüftungsgeräte zur Klimatisierung der Räume und dazugehörende Luftkanäle (Leitbleche, Klappen, Filter) aufweisen.21. Building according to one of the preceding claims, characterized in that the functional elements have ventilation devices for air conditioning of the rooms and associated air ducts (baffles, flaps, filters). 22. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Funktionselemente Sonnenschutzelemente, wie Jalousien und Rollla- den umfassen, die im Aufnahmeraum (20) angeordnet sind.22. Building according to one of the preceding claims, characterized in that the functional elements include sun protection elements, such as blinds and shutters, which are arranged in the receiving space (20). 23. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Funktionselemente elektrische Leitungen umfassen.23. Building according to one of the preceding claims, characterized in that the functional elements comprise electrical lines. 24. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Funktionselemente Solartechnikelemente wie elektrische Leitungen oder Wandler umfassen.24. Building according to one of the preceding claims, characterized in that the functional elements comprise solar engineering elements such as electrical lines or transducers. 25. Gebäude nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Funktionselemente Fluidleitungen und/oder Wärmetauscher umfassen.25. Building according to one of the preceding claims, characterized in that the functional elements comprise fluid lines and / or heat exchangers. 26. Geschlossene Fassade für ein Gebäude, insbesondere nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Fassade derart ausgelegt ist, dass sie im montierten Zustand an dem Gebäude über einen wesentli- chen Teil ihrer Fläche derart beabstandet zu den Stirnseiten eines Gebäudes angeordnet ist, dass außerhalb der Stirnseiten der Geschossdecken (1, 2) wenigstens ein Aufnahmeraum (20) zur Aufnahme von Funktionselementen entsteht. 26. Closed facade for a building, in particular according to one of the preceding claims, characterized in that the facade is designed such that it is arranged in the mounted state on the building over a substantial part of its surface so spaced from the end faces of a building in that at least one receiving space (20) for receiving functional elements arises outside the end faces of the floor slabs (1, 2).
PCT/EP2007/059416 2006-09-28 2007-09-07 Building having a spatially separated façade, and façade Ceased WO2008037582A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP07803348.7A EP2069584B1 (en) 2006-09-28 2007-09-07 Building having a spatially separated façade
DK07803348.7T DK2069584T3 (en) 2006-09-28 2007-09-07 Building with spatially separated facade
ES07803348.7T ES2471377T3 (en) 2006-09-28 2007-09-07 Building with separate facade

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE202006015015.3 2006-09-28
DE200620015015 DE202006015015U1 (en) 2006-09-28 2006-09-28 Building with facade and facade

Publications (1)

Publication Number Publication Date
WO2008037582A1 true WO2008037582A1 (en) 2008-04-03

Family

ID=38857921

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2007/059416 Ceased WO2008037582A1 (en) 2006-09-28 2007-09-07 Building having a spatially separated façade, and façade

Country Status (5)

Country Link
EP (1) EP2069584B1 (en)
DE (1) DE202006015015U1 (en)
DK (1) DK2069584T3 (en)
ES (1) ES2471377T3 (en)
WO (1) WO2008037582A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202009004141U1 (en) 2008-10-13 2009-06-25 Pluggit International B.V. Modular and façade-integrated ventilation and air conditioning system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE547039C2 (en) * 2023-01-31 2025-04-08 Balco Group Ab System for a balcony arrangement and a building using such system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2025507A (en) 1978-06-27 1980-01-23 Stoakes R L Curtain walling
DE19635466A1 (en) * 1996-08-31 1998-03-19 Fsl Fenster System Lueftung Double-glazed glass curtain wall for building
US20060016133A1 (en) * 2004-07-05 2006-01-26 Speck Juan A Hybrid window wall/curtain wall system and method of installation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10123319C2 (en) * 2001-05-14 2003-07-10 Werner Sobek Ingenieure Gmbh & Edge termination on building ceilings
DE10204727A1 (en) * 2002-02-05 2003-08-14 Ingo Gruen Ventilation facade, has channels for incoming and outgoing air incorporated onto inner side of facade sections

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2025507A (en) 1978-06-27 1980-01-23 Stoakes R L Curtain walling
DE19635466A1 (en) * 1996-08-31 1998-03-19 Fsl Fenster System Lueftung Double-glazed glass curtain wall for building
US20060016133A1 (en) * 2004-07-05 2006-01-26 Speck Juan A Hybrid window wall/curtain wall system and method of installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202009004141U1 (en) 2008-10-13 2009-06-25 Pluggit International B.V. Modular and façade-integrated ventilation and air conditioning system
DE102008051032A1 (en) 2008-10-13 2010-04-15 Pluggit International B.V. Modular, facade-integrated ventilation and air conditioning system for being installed at inner side of facade of building, has units formed as modular units arranged removably from each other and integrated in segment of building

Also Published As

Publication number Publication date
DE202006015015U1 (en) 2008-02-21
EP2069584A1 (en) 2009-06-17
DK2069584T3 (en) 2014-07-14
ES2471377T3 (en) 2014-06-26
EP2069584B1 (en) 2014-04-16

Similar Documents

Publication Publication Date Title
DE202009004141U1 (en) Modular and façade-integrated ventilation and air conditioning system
DE202009002800U1 (en) Fire-resistant glazing
DE4322653C2 (en) Balustrade element
AT506044B1 (en) BUILDING
EP2069584B1 (en) Building having a spatially separated façade
DE102021118086A1 (en) building services element
DE3611539C2 (en)
AT513265B1 (en) Multifunctional façade module system
DE19733075C1 (en) Insulation system for building facade
EP1045945B1 (en) Use of support elements for attaching furring
EP1205715A2 (en) Heating and/or cooling system for buildings
DE2519658A1 (en) Double-skinned external wall for sterile-air interior - with inner closed airtight skin at interval behind facade with demountable elements
DE29512867U1 (en) facade
DE29615672U1 (en) Large plaster base plate with a prefabricated concealed layer for a self-buildable thermal insulation system
DE102016117228A1 (en) Non-load-bearing interior perforated brick, brick, manufacturing process, mounting frame profile, prefabricated building wall and manufacturing process
DE102016117032A1 (en) Covering layer component and drywall system
DE102020110338A1 (en) Ventilation module
DE3147632A1 (en) Facade absorber
DE102021122014A1 (en) Separate building technology and shaft elements
AT410456B (en) Multi-storey high building wit metal profiles
DE102004001162B4 (en) Glass facade system and glass box for integration into the glass facade system
EP1467157A1 (en) Façade element
DE102010026477A1 (en) Connection profile element for use in installation system for installation of window or door in building, particularly low-energy building, is made of thermoplastic plastic foam on basis of polystyrene
EP4464851A2 (en) Building
WO2025093647A1 (en) Structure building for self-construction

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07803348

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007803348

Country of ref document: EP