WO2008002172A1 - Complex for developing undersea mineral deposits - Google Patents
Complex for developing undersea mineral deposits Download PDFInfo
- Publication number
- WO2008002172A1 WO2008002172A1 PCT/RU2006/000320 RU2006000320W WO2008002172A1 WO 2008002172 A1 WO2008002172 A1 WO 2008002172A1 RU 2006000320 W RU2006000320 W RU 2006000320W WO 2008002172 A1 WO2008002172 A1 WO 2008002172A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- complex
- underwater
- equipment
- transport system
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C11/00—Equipment for dwelling or working underwater; Means for searching for underwater objects
- B63C11/52—Tools specially adapted for working underwater, not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63G—OFFENSIVE OR DEFENSIVE ARRANGEMENTS ON VESSELS; MINE-LAYING; MINE-SWEEPING; SUBMARINES; AIRCRAFT CARRIERS
- B63G8/00—Underwater vessels, e.g. submarines; Equipment specially adapted therefor
- B63G8/001—Underwater vessels adapted for special purposes, e.g. unmanned underwater vessels; Equipment specially adapted therefor, e.g. docking stations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
Definitions
- the technical field to which the invention relates The invention relates to the field of designing equipment for the development of such natural resources of the oceans as oil and gas from wells, as well as tin, gold, platinum, zirconium, rutile, ilmenite, nickel, cobalt, copper, manganese, ferrous sands and many other minerals from alluvial underwater deposits.
- pipeline transport was widely used in the development of subsea deposits of the North Sea. In the second half of the seventies of the 20th century, pipeline transport was used at the largest North Sea field - EcoFix, associated with six other fields in the area. There is a pipeline with a length of 440 kilometers with a wall thickness in the offshore part of 22.2 millimeters, and in the coastal part - 25 millimeters. - -
- the mechanical system provided for lowering dredges - drags on the cable, scooping nodules from the bottom of the ocean and lifting the filled bucket to the surface.
- the hydraulic system required a bottom device designed to collect nodules from the adjacent bottom area and pump along with water through pipelines to a production vessel.
- the design of nodules could also be carried out from autonomous vehicles (such as submarines).
- Metallic sludge was supposed to be mined air-lift and pump types. According to rough estimates, profitable production can be provided by an enterprise that annually produces 3 million tons of dry nodules.
- the Russian joint-stock company “Lazyrit” has developed the “Method for integrated field underwater development of offshore fields), for which the patent RU N ° 2014243 was published, published on June 15, 1994 in the Bulletin of the Russian Federation Patent and Trademark Committee NsI 1.
- This invention relates to the development of deposits at sea depths under difficult meteorological conditions, including the ice regions of the Arctic, for example, the Shtokman offshore gas condensate field with a sea depth of 300-350 meters in this region.
- a bottom plate should be installed on the seabed, in which wells are developed using an offshore drilling platform or a drilling vessel. Wellhead equipment, fountain fittings, pipelines are installed on the bottom plate.
- fishing processing units are installed at anchor links, which, depending on the state of the sea and ice conditions, are maintained at the required depth.
- the processing fishery blocks are connected to the bottom plate by the production line for supplying the production product to them and with the transport line for supplying the production product to the consumer.
- Constant integrated support for underwater fishing is carried out using a supporting vessel and underwater vehicles.
- the displacement of the submarine supply vessel is about 5000 tons, length 119 meters, width 11 meters, autonomy of its work 40 days, immersion depth 500 meters.
- the ship has a bell for delivery of service personnel under water, as well as life support equipment, autonomous apparatus for inspection of underwater structures and communications, for transportation -O- divers, staff evacuation.
- the vessel is equipped with an inhabited working underwater apparatus for installation and repair work, a gripping device for lifting and transporting goods, as well as a diving complex for operations at depths of up to 500 meters.
- a gripping device for which patent RU 2166065 was issued in 2001
- a diving complex for operations at depths of up to 500 meters.
- patent RU 2166065 developed a technological complex for underwater mining of minerals, which contains a bottom base plate, on which there are seats for installing an underwater technological module, made in the form of an underwater vessel, equipped with a drilling and / or production (fountain) equipment.
- the subsea drilling technology module may not be self-propelled, but for this option vehicles should be provided for delivering the module and installing it on the bottom base plate. Delivery of consumables, items of equipment and crew to underwater technological modules is carried out using an underwater support vessel. Minerals are transported from underwater technological modules to the shore of the reservoir and further to the consumer through trunk pipelines using pumping stations located on the underwater drilling module and / or on the base stationary technological platform and / or onshore technological station.
- the basic stationary technological platform can be installed at the bottom of the reservoir in the immediate vicinity of the coast.
- the base stationary technological platform is installed at the bottom of the reservoir between the location of the bottom base plates of the underwater technological modules and the location of the coastal technological station, selected from the condition of minimizing the wave and ice load on its body and the shortest total distance to the bottom base plates.
- the basic stationary technological platform is carried out by the underwater and surface parts, and their parameters are selected from the condition that it is possible to maneuver and process the underwater drilling technological modules, underwater support vessels, as well as surface ships.
- the complex for the development of subsea mineral deposits includes an assembly building designed for the gradual build-up of corrosion-protected pipelines, inside of which sealed capsules will be moved with the materials required for the equipment to operate in the head of the complex, and during the operation of the field, they will also be used to transport extracted minerals fossils on the coast.
- the covers for power cables are designed to supply electricity to the equipment in the head of the complex, to all life support systems of people who will work in the head of the complex, and to each pontoon unit, as well as covers for the remote cables management of all equipment.
- Moving in the underwater position of the head of the complex along with pontoon blocks and casings for pipelines and cables from the location of the mounting case on land or at the floating base to the planned landing site of the head of the complex to the bottom is carried out by controlling the operation of the thrusters available on each pontoon block, or submarines docked with the head of the complex through the docking nodes.
- On fit. 1 shows a block diagram of the placement of modules of the complex for development of submarine mineral deposits.
- the mounting case 1 is shown in a variant of its placement on land.
- the head part 2 of the complex with equipment for drilling and construction of wells, as well as a supply of pipes, couplings, drill bits and other consumable products and materials in the case of oil, gas, or with equipment for sucking water together with nodules or silt in the case of solid minerals has tight connections with all pipelines of the transport system 3.
- pontoon Loki 5 Throughout the transport system 3 from its exit from the mounting housing to the landing site of the head part 2 on the bottom 4 are pontoon Loki 5, with ties 6, designed for reliable connection of pontoon blocks 5 with casings of pipelines of the transport system 3.
- At least two submarines 7 are constantly docked with the head part of the complex 2, designed to accommodate people who are free from shift, as well as to ensure all equipment the underwater part of the complex with electricity during periods of termination of power supply of equipment from the installation complex.
- the head part 2 has at least four lock devices for docking submarines with it.
- Placing the mounting case 1 on land allows you to create conditions for the exploration of underwater mineral deposits, as well as for their subsequent development during any meteorological processes over water all year round, as the head of the complex and the transport system 3 connected to it are promoted together with control and power cables in the bottom layers of water.
- the head part 2 of the complex for the development of submarine mineral deposits is built, tested and submerged in a special pool located inside the mounting building 1.
- the structures of the transport system 3 are connected to the head part 2, and shrouds with power and control cables.
- the estimated number of pontoon blocks 5 is connected to it.
- the buoyancy control of the head part of the complex 2 and connected to of the constructions of the transport system 3, as well as the casings with power and control cables, are provided by applying the method of dosed pumping of liquid from pinto tankless tanks 5 blocks to the guitarist tanks of these blocks and vice versa.
- each pontoon unit 5 makes it possible to lift the head part 2 and the entire transport system 3 of the complex for the development of an underwater mineral deposit with its subsequent movement to a new landing site for the head part 2 to the bottom.
- the delivery of pipes and other products and materials necessary for drilling and equipping next wells is carried out in capsules, which are moved inside the pipes of the transport system 3 by creating a difference in air pressure from different sides of the sealing cuffs, on the surface of the capsules.
- Air supply to the pipes is always carried out from the side of the mounting case I 5, and to move the capsule from the mounting case 1 to the head part 2 of the complex, air is injected under pressure into the tube in which the capsule is located, and to move the capsule from the head part 2 of the complex to the mounting case 1 compressed air is introduced into the capsule-free pipe so that after the air stream enters the head of the complex, it can be directed into the pipe with the capsule from the side of the head part 2 of the complex.
- To reduce the resistance to movement of the capsule on its outer surface place supports in contact with the guide rails inside the pipe. After the development of the underwater mineral deposit is completed, all the equipment of the complex can be returned to the mounting case 1 by gradually pulling into the mounting case 1 the next sections of the transport system 3 together with the pontoon blocks 5.
- the complex for the development of submarine mineral deposits will be widely used in many countries of the world for the following reasons: 1) the process of moving all the equipment of the complex to the place of landing of its head part to the bottom does not depend on hurricanes, waves, “waves”, “wave-waves”, and also from ice conditions on the surface of the water, which will allow to carry out these works year-round, that is, without downtime of equipment and people; 2) the arrangement of the transport system simultaneously with the movement of the head to the desired area of the sea creates conditions for the year-round delivery of any extracted minerals to consumers on the coast immediately after the start of the operation of the head of the complex; 3) the use of specialized submarines with nuclear reactors on board, designed at the stage of moving all the equipment of the complex to maintain the direction of this movement by docking with the head of the complex at least two submarines, allows you to deliver the head of the complex to the desired area of the sea, and shift-free shift workers will be able to rest in comfortable landscaped boat compartments during the field development process; after completion of the shift, they
- Patent RU 2014243 Cl 5 ⁇ 63 ⁇ 35/44, ⁇ 63 G 8/00 was published on June 15, 1994 in the Bulletin of the Committee of the Russian Federation for Patents and Trademarks JVs 11.
- Patent RU 2166065 C2 E 21 In 43/01 published on 04/27/2001 by the Russian Agency for Patents and Trademarks.
- Patent RU 2246421 C2 ⁇ 63 ⁇ 7/08 was published on February 20, 2005 in the Bulletin of the Federal Service for Intellectual Property, Patents and Trademarks N ° 5.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Earth Drilling (AREA)
- Pipeline Systems (AREA)
Abstract
Description
КОМПЛЕКС ДЛЯ РАЗРАБОТКИ ПОДВОДНЫХ МЕСТОРОЖДЕНИЙ ПОЛЕЗНЫХ ИСКОПАЕМЫХ. COMPLEX FOR THE DEVELOPMENT OF UNDERWATER DEPOSITS OF USEFUL FOSSILS.
Область техники, к которой относится изобретение. Изобретение относится к области конструирования оборудования для освоения таких природных ресурсов Мирового океана, как нефть и газ из скважин, а также олова, золота, платины, циркония, рутила, ильменита, никеля, кобальта, меди, марганца, железистых песков и многих других полезных ископаемых из россыпных подводных месторождений.The technical field to which the invention relates. The invention relates to the field of designing equipment for the development of such natural resources of the oceans as oil and gas from wells, as well as tin, gold, platinum, zirconium, rutile, ilmenite, nickel, cobalt, copper, manganese, ferrous sands and many other minerals from alluvial underwater deposits.
Уровень техники. Известно, что к концу семидесятых годов двадцатого века из морей извлекалось более 20 процентов всей добываемой на Земле нефти и около 10 процентов природного газа. Пионерами добычи нефти из-под дна моря считаются специалисты Соединенных Штатов Америки, которые после нефтяного кризиса семидесятых годов двадцатого века начали осваивать морские месторождения у мексиканского побережья. В офшорном бурении (это разведка и добыча нефти и газа на нефтяных «пoляx», так называемых офшорных зонах) используют в основном морские буровые установки, которые условно разделяют на два класса — плавучие и стационарные (фиксированные). Одна морская платформа строится два-три года и стоимость ее в зависимости от класса доходит до 500 миллионов долларов США. Сооружение платформы, предназначенной для разведки и добычи углеводородов из-под дна морей, на поверхности которых образуются ледовые поля, обойдется заказчику уже в 700 миллионов долларов США. Для добычи и транспортирования нефти и газа из подводных месторождений требуется создание сложного многоотраслевого хозяйства. Кроме бурового оборудования оно включает нефтегазозаборные, транспортные и складские устройства. Нефть и газ из подводных месторождений добывают с использованием серийного нефтегазозаборного оборудования. Однако, по мере увеличения глубины разработки, а также в акваториях морей с движущимися ледовыми полями более предпочтительным оказывается метод расположения устьевого оборудования на дне. Такой метод впервые был применен в 1943 году при бурении нефтяной скважины на озере Эри. В настоящее время метод подводного устьевого оборудования используют до глубин в 150 метров, но обнаружены месторождения нефти и газа на глубинах 1000 метров, разработка которых целесообразна только подводным способом. Метод освоения нефтегазовых месторождений при расположении устьевого оборудования на дне позволяет снизить затраты, а это означает, что можно разрабатывать месторождения с небольшими запасами. Подводное оборудование, размещаемое на дне, защищено от неблагоприятных метеорологических явлений на поверхности воды, а также оно не может быть повреждено движущимися айсбергами. Уменьшается возможность утечек нефти и газа, а, следовательно, улучшается решение проблемы предотвращения загрязнения воды. Метод- устьевого оборудования на дне позволяет определить эксплуатационные параметры и характеристики месторождения на ранних стадиях разработки, что создает условия для принятия решения о вводе месторождения в эксплуатацию очередями. Для транспортирования нефти и газа, извлеченных из подводного месторождения, на небольшие расстояния, особенно в ледовых условиях арктических морей, предпочтительно использование трубопроводных систем. Одним из главных преимуществ трубопроводных систем является непрерывность процесса транспортирования и независимость от погодных условий. Широкое распространение трубопроводный транспорт получил при разработке подводных месторождений Северного моря. Во второй половине семидесятых годов 20 века трубопроводный транспорт был применен на крупнейшем месторождении Северного моря - «Экoфикc», связанном с шестью другими месторождениями этого района. Здесь действует трубопровод длиной 440 километров с толщиной стенок в морской части 22,2 миллиметра, а в прибрежной части - 25 миллиметров. - -The prior art. It is known that by the end of the seventies of the twentieth century, more than 20 percent of all oil extracted on Earth and about 10 percent of natural gas were recovered from the seas. Specialists of the United States of America are considered to be pioneers of oil production from under the sea. After the oil crisis of the seventies of the twentieth century, they began to develop offshore fields off the Mexican coast. Offshore drilling (this is the exploration and production of oil and gas in the oil fields, the so-called offshore zones) mainly uses offshore drilling rigs, which are conventionally divided into two classes - floating and stationary (fixed). One offshore platform is under construction for two to three years and its cost, depending on the class, reaches up to 500 million US dollars. The construction of a platform designed for the exploration and production of hydrocarbons from under the bottom of the seas, on the surface of which ice fields form, will cost the customer as much as 700 million US dollars. The production and transportation of oil and gas from subsea deposits requires the creation of a complex diversified economy. In addition to drilling equipment, it includes oil and gas intake, transport and storage devices. Oil and gas from subsea fields are produced using serial oil and gas intake equipment. However, as the depth of development increases, as well as in the waters of seas with moving ice fields the preferred method is the location of the wellhead equipment at the bottom. This method was first applied in 1943 when drilling an oil well on Lake Erie. Currently, the method of underwater wellhead equipment is used to depths of 150 meters, but oil and gas deposits have been discovered at depths of 1000 meters, the development of which is only advisable underwater. The method of developing oil and gas fields with the wellhead equipment at the bottom allows you to reduce costs, which means that it is possible to develop fields with small reserves. Underwater equipment located at the bottom is protected from adverse weather events on the surface of the water, and also it cannot be damaged by moving icebergs. The possibility of oil and gas leaks is reduced, and, therefore, the solution to the problem of preventing water pollution is improved. The method of wellhead equipment at the bottom allows you to determine the operational parameters and characteristics of the field in the early stages of development, which creates the conditions for making a decision on putting the field into operation in stages. For transporting oil and gas extracted from the subsea field over short distances, especially in the ice conditions of the Arctic seas, the use of pipeline systems is preferred. One of the main advantages of pipeline systems is the continuity of the transportation process and independence from weather conditions. Pipeline transport was widely used in the development of subsea deposits of the North Sea. In the second half of the seventies of the 20th century, pipeline transport was used at the largest North Sea field - EcoFix, associated with six other fields in the area. There is a pipeline with a length of 440 kilometers with a wall thickness in the offshore part of 22.2 millimeters, and in the coastal part - 25 millimeters. - -
По трубопроводу ежесуточно пропускают 40 миллионов кубометров газа. От коррозии трубопровод предохраняют антикоррозионная изоляция и катодная защита. Необходимую отрицательную плавучесть трубопровода обеспечивает бетонное покрытие, которое также предназначено для дополнительной изоляции трубопровода от механических повреждений. Горизонтальный участок трубопровода, расположенный на дне моря, соединен с вертикальным стояком на платформе с использованием камер, погружаемых с платформы. Вертикальные участки трубопровода, расположенные на платформе, защищены от коррозии и механических повреждений стальными кожухами, заполненными цементным раствором. В шестидесятые годы 20 века внимание человечества привлекли руды Мирового океана и особенно два типа их месторождений, имеющих многометальный состав — залежи конкреций в центральных районах океанов и металлоносные илы в некоторых разломах коры морского дна. Удивительные минеральные образования были обнаружены в пробах грунта, поднятых со дна океана в последней четверти 20 века. Честь этого открытия принадлежит сотрудникам английской океанографической экспедиции на корвете «Чeллeнджep». По форме эти образования были похожи на картофелины, имели темную окраску, слоистое строение, малую прочность. Химическими анализами конкреций установлено повышенное содержание железа, марганца, меди, никеля и многих других редких и рассеянных элементов. Глубины, на которых были обнаружены конкреции, равны нескольким тысячам метров. Наиболее богатые участки найдены на глубинах от 4000 до 6000 метров в Атлантическом, Тихом и Индийском океанах. Американские исследователи выявили залежи конкреций вблизи берегов США на глубинах всего в 500 - 1000 метров, но эти конкреции бедны.по составу ценными элементами. На основании геологических и океанологических данных о плотностях залегания конкреций в различных районах океанов были установлены общие площади их распространения и подсчитаны ориентировочные запасы. На одном квадратном метре дна может находиться от нескольких граммов до нескольких десятков килограммов конкреций. Содержание в залежах, перспективных для разработки, составляет в среднем 10 килограммов конкреций на одном квадратном метре дна. Первая в международной практике заявка на разработку полезных ископаемых в открытом океане за пределами юрисдикции государства была подана в 1974 году фирмой «Дипcи вeнчypc». Были представлены документы об открытии в Тихом океане на глубине от 3500 до 5500 метров месторождения площадью 60 тысяч квадратных километров с координатами: 15 градусов северной широты и 127 градусов западной долготы. Исследования показали, что перспективными для разработки могут считаться залежи конкреций и металлоносных илов в глубоководных впадинах. Для разработки выбирают месторождение конкреций, залегающих на поверхности дна в виде монослоя, и металлоносные илы, заполнившие донные трещины и впадины слоем в несколько десятков метров. Эти отличия в характере залегания месторождений двух типов влияют на выбор конструкции добычных установок. Одновременно также учитывают, что конкреции и металлоносные илы залегают в грунтах, которые сравнительно легко подвергаются рыхлению и черпанию. Принципиальные технические решения по созданию установок для добычи конкреций начали предлагать с шестидесятых годов 20 века. Механическая система предусматривала опускание на тросе драги - волокуши, черпание со дна океана конкреций и подъем заполненного ковша на поверхность. Гидравлическая система требовала наличия придонного устройства, предназначенного для сбора конкреций с прилегающей площади дна и перекачивания вместе с водой по трубопроводам на добычное судно. Добычу конкреций по замыслу конструкторов можно было также вести из автономных аппаратов (типа подводных лодок). Металлосодержащие илы предполагалось добывать установками эрлифтного и насосного типов. По ориентировочным подсчетам рентабельная добыча может быть обеспечена предприятием, ежегодно добывающим 3 миллиона тонн сухих конкреций. Российским акционерным обществом «Лaзypит» разработан «Cпocoб промысловой комплексной подводной разработки морских месторождению), на который был выдан патент RU N°2014243, опубликованный 15 июня 1994 года в Бюллетене Комитета Российской Федерации по патентам и товарным знакам NsI 1. Это изобретение относится к разработке месторождений на морских глубинах в условиях сложной метеорологической обстановки, включая ледовые районы Арктики, например морского Штокмановского газоконденсатного месторождения при глубине моря в этом районе 300 - 350 метров. В районе предполагаемой добычи на морском дне должна быть установлена донная плита, в которой с помощью морской буровой платформы или бурового судна производят разработку скважин. На донной плите устанавливают устьевое оборудование, фонтанную арматуру, трубопроводы. На минимально допустимом расстоянии от донной плиты на якорных связях устанавливают блоки промысловой обработки, которые в зависимости от состояния моря и ледовых условий поддерживают на необходимой глубине. Блоки промысла обработки соединяют с донной плитой эксплуатационной магистралью для подачи в них продукта добычи и с транспортной магистралью для подачи продукта промысла потребителю. Постоянное комплексное обеспечение подводного промысла осуществляют с помощью обеспечивающего судна и подводных аппаратов. Водоизмещение подводного судна обеспечения около 5000 тонн, длина 119 метров, ширина 11 метров, автономность его работы 40 суток, глубина погружения 500 метров. На судне имеется колокол для доставки под водой обслуживающего персонала, а также предусмотрены средства жизнеобеспечения, автономные аппараты для инспекции подводных сооружений и коммуникаций, для транспортировки -O- водолазов, эвакуации персонала. Кроме этого судно оснащено обитаемым рабочим подводным аппаратом для монтажных и ремонтных работ, грузозахватным устройством для подъема и транспортировки грузов, а также водолазным комплексом для работ на глубинах до 500 метров. Однако, как отмечают авторы «Cпocoбa подводной добычи полезных ископаемых)), на который выдан в 2001 году патент RU 2166065, к числу недостатков технического решения по патенту RU 2014243 относится то, что надводные плавучие составляющие технологического комплекса обладают недостаточной надежностью при взаимодействии с мощным ледовым покровом вследствие необходимой их якорной привязки ко дну водоема, а также низкой функциональной возможностью вследствие отсутствия средств непосредственного технологического взаимодействия с береговыми техническими службами. Для устранения отмеченных недостатков авторы изобретения по патенту RU 2166065 разработали технологический комплекс подводной добычи полезных ископаемых, который содержит донную опорную плиту, на которой имеются посадочные места для установки подводного технологического модуля, выполненного в виде подводного судна, снабженного буровым и/или эксплуатационным (фонтанным) оборудованием. Подводный буровой технологический модуль может быть несамоходным, но для этого варианта должны предусматриваться транспортные средства для доставки модуля и установки его на донную опорную плиту. Доставку расходных материалов, элементов оборудования и экипажа на подводные технологические модули осуществляют с помощью подводного судна обеспечения. Транспортировку полезных ископаемых с подводных технологических модулей на берег водоема и далее к потребителю осуществляют по магистральным трубопроводам с помощью насосных станций, располагаемых на подводном буровом модуле и/или на базовой стационарной технологической платформе и/или на береговой технологической станции. Базовая стационарная технологическая платформа может быть установлена на дне водоема в непосредственной близости от берега. В предпочтительном варианте базовую стационарную технологическую платформу устанавливают на дне водоема между местом расположения донных опорных плит подводных технологических модулей и местом расположения береговой технологической станции, выбираемым из условия минимизации волновой и ледовой нагрузки на ее корпус и кратчайшего суммарного расстояния до донных опорных плит. При этом базовую стационарную технологическую платформу выполняютс подводной и надводной частями, причем их параметры выбирают из условия обеспечения возможности маневрирования и обработки подводных буровых технологических модулей, подводных судов обеспечения, а также надводных кораблей. Первоначальную доставку расходных материалов, элементов оборудования и экипажа на базовую стационарную технологическую платформу и/или береговую технологическую станцию, а также транспортировку между ними осуществляют подводными и/или надводными кораблями, воздушными и/или наземными, а также и подземными транспортными средствами. Первичная промышленная обработка и хранение полезных ископаемых, а также переработка или уничтожение сопутствующих газов с учетом экологических требований может осуществляться как на базовой стационарной технологической платформе, так и на береговой технологической станции. При всей привлекательности технических решений, осуществленных в изобретении по патенту RU 2166065, приходится констатировать, что авторам не удалось решить проблему изоляции всего оборудования промысла от воздействия неблагоприятных метеорологических процессов над поверхностью моря из-за наличия базовой стационарной технологической платформы, конструкции которой должны выдерживать воздействие на них обширных ледовых полей, а .40 million cubic meters of gas are passed through the pipeline daily. Corrosion insulation and cathodic protection protect the pipeline from corrosion. The necessary negative buoyancy of the pipeline is provided by the concrete coating, which is also intended for additional isolation of the pipeline from mechanical damage. A horizontal section of the pipeline located at the bottom of the sea is connected to a vertical riser on the platform using cameras immersed from the platform. Vertical sections of the pipeline, located on the platform, are protected from corrosion and mechanical damage by steel casings filled with cement mortar. In the sixties of the 20th century, the attention of mankind was attracted by the ores of the oceans and especially two types of deposits with a multimetal composition - nodule deposits in the central regions of the oceans and metal-bearing silts in some faults of the seabed. Amazing mineral formations were found in soil samples raised from the bottom of the ocean in the last quarter of the 20th century. The honor of this discovery belongs to the employees of the English oceanographic expedition on the Challenger corvette. In shape, these formations were similar to potatoes, had a dark color, layered structure, low strength. Chemical analyzes of nodules revealed an increased content of iron, manganese, copper, nickel and many other rare and trace elements. The depths at which nodules were discovered are several thousand meters. The richest sites are found at depths from 4000 to 6000 meters in the Atlantic, Pacific and Indian oceans. American researchers have identified deposits of nodules near the US coast at depths of only 500 - 1000 meters, but these nodules are poor in composition with valuable elements. Based on geological and oceanological data on the density of nodules in various regions of the oceans, general areas of their distribution and estimated reserves. On one square meter of the bottom, there can be from several grams to several tens of kilograms of nodules. The content in prospective deposits is an average of 10 kilograms of nodules per square meter of bottom. The first application in international practice for the development of minerals in the open ocean outside the jurisdiction of the state was submitted in 1974 by the company Deep Ventures. Documents were presented on the discovery in the Pacific Ocean at a depth of 3,500 to 5,500 meters of a field with an area of 60 thousand square kilometers with coordinates: 15 degrees north latitude and 127 degrees west longitude. Studies have shown that deposits of nodules and metal-bearing silts in deep-sea trenches can be considered promising for development. For development, a deposit of nodules lying on the bottom surface in the form of a monolayer, and metal-bearing silts that fill the bottom cracks and depressions with a layer of several tens of meters are selected. These differences in the nature of the occurrence of deposits of two types affect the choice of design of production facilities. At the same time, it is also taken into account that nodules and metal-bearing silts occur in soils, which are relatively easily subjected to loosening and scooping. Fundamental technical solutions for the creation of installations for the extraction of nodules began to offer in the sixties of the 20th century. The mechanical system provided for lowering dredges - drags on the cable, scooping nodules from the bottom of the ocean and lifting the filled bucket to the surface. The hydraulic system required a bottom device designed to collect nodules from the adjacent bottom area and pump along with water through pipelines to a production vessel. The design of nodules, according to the designers, could also be carried out from autonomous vehicles (such as submarines). Metallic sludge was supposed to be mined air-lift and pump types. According to rough estimates, profitable production can be provided by an enterprise that annually produces 3 million tons of dry nodules. The Russian joint-stock company “Lazyrit” has developed the “Method for integrated field underwater development of offshore fields), for which the patent RU N ° 2014243 was published, published on June 15, 1994 in the Bulletin of the Russian Federation Patent and Trademark Committee NsI 1. This invention relates to the development of deposits at sea depths under difficult meteorological conditions, including the ice regions of the Arctic, for example, the Shtokman offshore gas condensate field with a sea depth of 300-350 meters in this region. In the area of the proposed production, a bottom plate should be installed on the seabed, in which wells are developed using an offshore drilling platform or a drilling vessel. Wellhead equipment, fountain fittings, pipelines are installed on the bottom plate. At the minimum permissible distance from the bottom plate, fishing processing units are installed at anchor links, which, depending on the state of the sea and ice conditions, are maintained at the required depth. The processing fishery blocks are connected to the bottom plate by the production line for supplying the production product to them and with the transport line for supplying the production product to the consumer. Constant integrated support for underwater fishing is carried out using a supporting vessel and underwater vehicles. The displacement of the submarine supply vessel is about 5000 tons, length 119 meters, width 11 meters, autonomy of its work 40 days, immersion depth 500 meters. The ship has a bell for delivery of service personnel under water, as well as life support equipment, autonomous apparatus for inspection of underwater structures and communications, for transportation -O- divers, staff evacuation. In addition, the vessel is equipped with an inhabited working underwater apparatus for installation and repair work, a gripping device for lifting and transporting goods, as well as a diving complex for operations at depths of up to 500 meters. However, as noted by the authors of the “Method for underwater mining of minerals)), for which patent RU 2166065 was issued in 2001, one of the disadvantages of the technical solution according to patent RU 2014243 is that surface floating components of the technological complex have insufficient reliability when interacting with powerful ice due to their necessary anchoring to the bottom of the reservoir, as well as low functionality due to the lack of means of direct technological interaction with coastal technical E services. To eliminate these shortcomings, the inventors according to patent RU 2166065 developed a technological complex for underwater mining of minerals, which contains a bottom base plate, on which there are seats for installing an underwater technological module, made in the form of an underwater vessel, equipped with a drilling and / or production (fountain) equipment. The subsea drilling technology module may not be self-propelled, but for this option vehicles should be provided for delivering the module and installing it on the bottom base plate. Delivery of consumables, items of equipment and crew to underwater technological modules is carried out using an underwater support vessel. Minerals are transported from underwater technological modules to the shore of the reservoir and further to the consumer through trunk pipelines using pumping stations located on the underwater drilling module and / or on the base stationary technological platform and / or onshore technological station. The basic stationary technological platform can be installed at the bottom of the reservoir in the immediate vicinity of the coast. In a preferred embodiment, the base stationary technological platform is installed at the bottom of the reservoir between the location of the bottom base plates of the underwater technological modules and the location of the coastal technological station, selected from the condition of minimizing the wave and ice load on its body and the shortest total distance to the bottom base plates. In this case, the basic stationary technological platform is carried out by the underwater and surface parts, and their parameters are selected from the condition that it is possible to maneuver and process the underwater drilling technological modules, underwater support vessels, as well as surface ships. The initial delivery of consumables, items of equipment and crew to the base stationary technological platform and / or onshore technological station, as well as transportation between them is carried out by submarine and / or surface ships, air and / or land, as well as underground vehicles. The primary industrial processing and storage of minerals, as well as the processing or destruction of associated gases, taking into account environmental requirements, can be carried out both on the base stationary technological platform and on the coastal technological station. Despite the attractiveness of the technical solutions implemented in the invention according to the patent RU 2166065, it has to be stated that the authors were not able to solve the problem of isolating all fishing equipment from the effects of adverse meteorological processes above the sea surface due to the presence of a basic stationary technological platform, the designs of which must withstand extensive ice fields, and .
-8- также и айсбергов. Кроме этого, ни в изобретении по патенту RU 2014243, ни в изобретении по патенту RU 2166065 не решена проблема доставки и установки на морское .дно опорных донных плит. С целью устранения отмеченных недостатков предложен комплекс для разработки подводных месторождений полезных ископаемых, на конструкции которого не могут воздействовать движущиеся ледовые поля, айсберги, а также тайфуны, ураганы, смерчи, волны цунами, «вoлны-yбийцы» над поверхностью воды.-8- also icebergs. In addition, neither the invention of the patent RU 2014243, nor the invention of the patent RU 2166065 solved the problem of delivery and installation of support bottom plates on the sea. In order to eliminate the noted drawbacks, a complex has been proposed for the development of underwater mineral deposits, the design of which cannot be affected by moving ice fields, icebergs, as well as typhoons, hurricanes, tornadoes, tsunami waves, “wave-ybits” above the surface of the water.
Раскрытие изобретения.Disclosure of the invention.
Комплекс для разработки подводных месторождений полезных ископаемых включает монтажный корпус, предназначенный для постепенного наращивания защищенных от коррозии трубопроводов, внутри которых будут перемещать герметичные капсулы с материалами, требующимися для функционирования оборудования в головной части комплекса, а в процессе эксплуатации месторождения также использовать их для транспортирования добытых полезных ископаемых на побережье. Одновременно с наращиванием технологических трубопроводов производят наращивание кожухов для силовых кабелей, предназначенных для подачи электроэнергии к оборудованию в головной части комплекса, ко всем системам жизнеобеспечения людей, которые будут работать в головной части комплекса, и к каждому понтонному блоку, а также и кожухов для кабелей дистанционного управления работой всего оборудования. Перемещение в подводном положении головной части комплекса вместе с понтонными блоками и кожухами для трубопроводов и кабелей от места нахождения монтажного корпуса на суше или на плавбазе до запланированного места посадки головной части комплекса на дно осуществляют за счет управления работой подруливающих устройств, имеющихся на каждом понтонном блоке, либо подводными лодками, состыкованными с головной частью комплекса через стыковочные узлы. На фит. 1 изображена блок-схема размещения модулей комплекса для разработки подводных месторождений полезных ископаемых. Монтажный корпус 1 показан в варианте размещения его на суше. Головная часть 2 комплекса с оборудованием для бурения и обустройства скважин, а также запасом труб, соединительных муфт, бурильных коронок и других расходуемых изделий и материалов в случае добычи нефти, газа, либо с оборудованием для засасывания воды вместе с конкрециями или илом в случае добычи твердых полезных ископаемых имеет герметичные соединения со всеми трубопроводами транспортной системы 3. На всем протяжении транспортной системы 3 от ее выхода из монтажного корпуса до места посадки головной части 2 на дно 4 размещены понтонные блоки 5, имеющие стяжки 6, предназначенные для надежного соединения понтонных блоков 5 с кожухами трубопроводов транспортной системы 3. С головной частью 2 комплекса постоянно состыкованы не менее двух подводных лодок 7, предназначенных для размещения людей, свободных от вахты, а также для обеспечения всего оборудования подводной части комплекса электроэнергией в периоды прекращения энергоснабжения оборудования из монтажного комплекса. Головная часть 2 имеет не менее четырех шлюзовых устройств для состыковки с ней подводных лодок. Лучший вариант осуществления изобретения. Размещение монтажного корпуса 1 на суше позволяет создать условия для разведки подводных месторождений полезных ископаемых, а также для последующего освоения их при любых метеорологических процессах над водой круглогодично, так как продвижение головной части комплекса и соединенной с ней транспортной системы 3 вместе с управляющими и силовыми кабелями осуществляют в придонных слоях воды. Головную часть 2 комплекса для разработки подводных месторождений полезных ископаемых строят, испытывают и спускают под воду в специальном бассейне, размещенном внутри монтажного корпуса 1. Там же к головной части 2 присоединяют конструкции транспортной системы 3, а также кожухи с силовыми и управляющими кабелями. Для обеспечения плавучести головной части 2 комплекса к ней присоединяют расчетное количество понтонных блоков 5. По мере наращивания длины транспортной системы 3 в бассейн спускают очередные понтонные блоки и надежно соединяют их с кожухами трубопроводов с использованием стяжек 6. Управление плавучестью головной части комплекса 2 и соединенных с ней конструкций транспортной системы 3, а также кожухов с силовыми и управляющими кабелями обеспечивают путем применения метода дозированной перекачки жидкости из безкингстонных цистерн понтонных блоков 5 в кингстонные цистерны этих блоков и обратно. Этот метод раскрыт в описании изобретения к патенту RU N°2246421, которое опубликовано 20 февраля 2005 года в Бюллетене Федеральной службы по интеллектуальной собственности, патентам и товарным знакам Российской Федерации N°5. Конструкция понтонных блоков 5, показанная в описании изобретения к патенту RU JNi-2246421, обеспечивает размещение в батискафах акванавтов, либо дистанционное управление оборудованием каждого понтонного блока. При применении указанных понтонных блоков для управления плавучестью головной части 2 комплекса для разработки подводных месторождений полезных ископаемых, а также всей транспортной системы 3 дистанционное управление оборудованием каждого понтонного блока из монтажного корпуса 1 и из состыкованных с головной частью комплекса подводных лодок 7 позволяет в любой момент времени работы комплекса послать в каждый понтонный блок 5 команду в виде электрических импульсов на перекачку жидкости из одних цистерн в другие с целью изменения плавучести этого понтонного блока, что приведет к изменению его отметки относительно поверхности воды. Многократным дозированием количества перекачиваемой жидкости внутри понтонных блоков достигают поддержания экономически выгодного профиля всей транспортной системы 3, что позволит избежать резких прогибов кожухов и трубопроводов при пересечении ими понижений и возвышений дна. Применение дистанционной системы управления плавучестью каждого понтонного блока 5 обеспечивает возможность подъема головной части 2 и всей транспортной системы 3 комплекса для разработки подводного месторождения полезных ископаемых с последующим перемещением его к новому месту посадки головной части 2 на дно. Доставку труб и других изделий и материалов, необходимых для бурения и обустройства очередных скважин осуществляют в капсулах, которые перемещают внутри труб транспортной системы 3 за счет создания разности давлений воздуха с разных сторон уплотняющих манжет, на поверхности капсул. Подачу воздуха в трубы осуществляют всегда со стороны монтажного корпуса I5 причем для перемещения капсулы от монтажного корпуса 1 к головной части 2 комплекса воздух под давлением вводят в ту трубу, в которой находится капсула, а для перемещения капсулы от головной части 2 комплекса к монтажному корпусу 1 сжатый воздух вводят в свободную от капсул трубу для того, чтобы после попадания воздушного потока в головную часть комплекса его можно было бы направить в трубу с капсулой со стороны головной части 2 комплекса. Для уменьшения сопротивления движению капсулы на ее внешней поверхности размещают опоры, контактирующие с направляющими рельсами внутри трубы. После завершения разработки подводного месторождения полезных ископаемых все оборудование комплекса можно возвратить в монтажный корпус 1 за счет постепенного втягивания в монтажный корпус 1 очередных секций транспортной системы 3 вместе с понтонными блоками 5. Для того чтобы втягиваемые в монтажный корпус 1 очередные секции транспортной системы 3 и понтонные блоки 5 не были повреждены ограждающими конструкциями подводных ворот монтажного корпуса 1 , дистанционно управляют работой подруливающих систем на понтонных блоках. Промышленная применимость изобретения. Комплекс для разработки подводных месторождений полезных ископаемых будет широко применяться во многих странах мира по следующим причинам: 1) процесс перемещения всего оборудования комплекса к месту посадки его головной части на дно не зависит от ураганов, волн «цyнaми», «вoлн-yбийц», а также от ледовой обстановки на поверхности воды, что позволит осуществлять эти работы круглогодично, то есть без простоев оборудования и людей; 2) устройство транспортной системы одновременно с перемещением головной части в нужный район моря создает условия для круглогодичной доставки любых добытых полезных ископаемых потребителям на побережье немедленно после начала работы головной части комплекса; 3) использование специализированных подводных лодок с ядерными реакторами на борту, предназначенных на этапе перемещения всего оборудования комплекса для сохранения направления этого перемещения за счет состыковки с головной частью комплекса не менее двух подводных лодок, позволяет осуществить доставку головной части комплекса в нужный район моря, а в процессе разработки месторождения свободные от работы вахтовики смогут отдыхать в благоустроенных специализированных отсеках лодок, после завершения вахты их доставят на берег в одной из лодок, оставляя состыкованными с головной частью комплекса не менее двух лодок;The complex for the development of subsea mineral deposits includes an assembly building designed for the gradual build-up of corrosion-protected pipelines, inside of which sealed capsules will be moved with the materials required for the equipment to operate in the head of the complex, and during the operation of the field, they will also be used to transport extracted minerals fossils on the coast. At the same time as the technological pipelines are being built up, the covers for power cables are designed to supply electricity to the equipment in the head of the complex, to all life support systems of people who will work in the head of the complex, and to each pontoon unit, as well as covers for the remote cables management of all equipment. Moving in the underwater position of the head of the complex along with pontoon blocks and casings for pipelines and cables from the location of the mounting case on land or at the floating base to the planned landing site of the head of the complex to the bottom is carried out by controlling the operation of the thrusters available on each pontoon block, or submarines docked with the head of the complex through the docking nodes. On fit. 1 shows a block diagram of the placement of modules of the complex for development of submarine mineral deposits. The mounting case 1 is shown in a variant of its placement on land. The head part 2 of the complex with equipment for drilling and construction of wells, as well as a supply of pipes, couplings, drill bits and other consumable products and materials in the case of oil, gas, or with equipment for sucking water together with nodules or silt in the case of solid minerals has tight connections with all pipelines of the transport system 3. Throughout the transport system 3 from its exit from the mounting housing to the landing site of the head part 2 on the bottom 4 are pontoon Loki 5, with ties 6, designed for reliable connection of pontoon blocks 5 with casings of pipelines of the transport system 3. At least two submarines 7 are constantly docked with the head part of the complex 2, designed to accommodate people who are free from shift, as well as to ensure all equipment the underwater part of the complex with electricity during periods of termination of power supply of equipment from the installation complex. The head part 2 has at least four lock devices for docking submarines with it. The best embodiment of the invention. Placing the mounting case 1 on land allows you to create conditions for the exploration of underwater mineral deposits, as well as for their subsequent development during any meteorological processes over water all year round, as the head of the complex and the transport system 3 connected to it are promoted together with control and power cables in the bottom layers of water. The head part 2 of the complex for the development of submarine mineral deposits is built, tested and submerged in a special pool located inside the mounting building 1. In the same place, the structures of the transport system 3 are connected to the head part 2, and shrouds with power and control cables. To ensure the buoyancy of the head part 2 of the complex, the estimated number of pontoon blocks 5 is connected to it. As the length of the transport system 3 increases, the next pontoon blocks are lowered into the pool and reliably connected to the pipe covers using couplers 6. The buoyancy control of the head part of the complex 2 and connected to of the constructions of the transport system 3, as well as the casings with power and control cables, are provided by applying the method of dosed pumping of liquid from pinto tankless tanks 5 blocks to the Kingston tanks of these blocks and vice versa. This method is disclosed in the description of the invention to patent RU N ° 2246421, which was published on February 20, 2005 in the Bulletin of the Federal Service for Intellectual Property, Patents and Trademarks of the Russian Federation N ° 5. The design of the pontoon blocks 5, shown in the description of the invention to the patent RU JNi-2246421, provides placement in bathyscaphes of aquanauts, or remote control of the equipment of each pontoon block. When using these pontoon blocks to control the buoyancy of the head part 2 of the complex for the development of submarine mineral deposits, as well as the entire transport system 3, remote control of the equipment of each pontoon block from the mounting building 1 and from the submarines 7 docked with the head part allows at any time work of the complex to send to each pontoon unit 5 a command in the form of electrical pulses for pumping liquid from one tank to another in order to change the melt esti this pontoon unit, causing a change in its relative level of the water surface. By repeatedly dosing the amount of pumped liquid inside the pontoon blocks, it is possible to maintain a cost-effective profile of the entire transport system 3, which will avoid sharp deflections of the casings and pipelines when they cross the lowerings and elevations of the bottom. The use of a remote buoyancy control system for each pontoon unit 5 makes it possible to lift the head part 2 and the entire transport system 3 of the complex for the development of an underwater mineral deposit with its subsequent movement to a new landing site for the head part 2 to the bottom. The delivery of pipes and other products and materials necessary for drilling and equipping next wells is carried out in capsules, which are moved inside the pipes of the transport system 3 by creating a difference in air pressure from different sides of the sealing cuffs, on the surface of the capsules. Air supply to the pipes is always carried out from the side of the mounting case I 5, and to move the capsule from the mounting case 1 to the head part 2 of the complex, air is injected under pressure into the tube in which the capsule is located, and to move the capsule from the head part 2 of the complex to the mounting case 1 compressed air is introduced into the capsule-free pipe so that after the air stream enters the head of the complex, it can be directed into the pipe with the capsule from the side of the head part 2 of the complex. To reduce the resistance to movement of the capsule on its outer surface place supports in contact with the guide rails inside the pipe. After the development of the underwater mineral deposit is completed, all the equipment of the complex can be returned to the mounting case 1 by gradually pulling into the mounting case 1 the next sections of the transport system 3 together with the pontoon blocks 5. In order for the next sections of the transport system 3 and the pontoon to be pulled into the mounting case 1 blocks 5 were not damaged by the enclosing structures of the underwater gates of the mounting case 1, remotely control the operation of the steering systems on the pontoon blocks. Industrial applicability of the invention. The complex for the development of submarine mineral deposits will be widely used in many countries of the world for the following reasons: 1) the process of moving all the equipment of the complex to the place of landing of its head part to the bottom does not depend on hurricanes, waves, “waves”, “wave-waves”, and also from ice conditions on the surface of the water, which will allow to carry out these works year-round, that is, without downtime of equipment and people; 2) the arrangement of the transport system simultaneously with the movement of the head to the desired area of the sea creates conditions for the year-round delivery of any extracted minerals to consumers on the coast immediately after the start of the operation of the head of the complex; 3) the use of specialized submarines with nuclear reactors on board, designed at the stage of moving all the equipment of the complex to maintain the direction of this movement by docking with the head of the complex at least two submarines, allows you to deliver the head of the complex to the desired area of the sea, and shift-free shift workers will be able to rest in comfortable landscaped boat compartments during the field development process; after completion of the shift, they will be delivered ashore in one from boats, leaving at least two boats docked with the head of the complex;
4) возможность перемещения головной части комплекса вместе со всем оборудованием транспортной системы за счет регулирования плавучести понтонных блоков с дистанционным управлением их работой позволяет осуществить добычу всего намеченного объема полезных ископаемых в заданном районе моря одним комплексом, после чего возвратить все подводное оборудование комплекса в монтажный корпус и хранить его до использования в новых районах моря или перевезти в другое место;4) the ability to move the head of the complex along with all the equipment of the transport system by controlling the buoyancy of the pontoon blocks with remote control of their work allows the extraction of the entire intended volume of minerals in a given area of the sea by one complex, and then return all the underwater equipment of the complex to the installation building and store it before use in new areas of the sea or transport it to another place;
5) отсутствие необходимости иметь корабли или платформы над точками размещения подводного оборудования позволит добывать полезные ископаемые с таких глубин, на которых работа известной техники не возможна.5) no need to have ships or platforms above points placement of underwater equipment will allow to extract minerals from such depths at which the work of known equipment is not possible.
Источники информации:' 1. Патент RU 2014243 Cl 5 В 63 В 35/44, В 63 G 8/00 опубликован 15.06.1994 года в Бюллетене Комитета Российской Федерации по патентам и товарным знакам JVs 11.Sources of information: '1. Patent RU 2014243 Cl 5 В 63 В 35/44, В 63 G 8/00 was published on June 15, 1994 in the Bulletin of the Committee of the Russian Federation for Patents and Trademarks JVs 11.
2. Патент RU 2166065 C2 E 21 В 43/01 опубликован 27.04.2001 года Российским агентством по патентам и товарным знакам. 3. Патент RU 2246421 C2 В 63 С 7/08 опубликован 20.02.2005 года в Бюллетене Федеральной службы по интеллектуальной собственности, патентам и товарным знакам N°5. 2. Patent RU 2166065 C2 E 21 In 43/01 published on 04/27/2001 by the Russian Agency for Patents and Trademarks. 3. Patent RU 2246421 C2 В 63 С 7/08 was published on February 20, 2005 in the Bulletin of the Federal Service for Intellectual Property, Patents and Trademarks N ° 5.
Claims
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EA200801955A EA011648B1 (en) | 2006-06-20 | 2006-06-20 | Complex for developing undersea mineral deposits |
| PCT/RU2006/000320 WO2008002172A1 (en) | 2006-06-20 | 2006-06-20 | Complex for developing undersea mineral deposits |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/RU2006/000320 WO2008002172A1 (en) | 2006-06-20 | 2006-06-20 | Complex for developing undersea mineral deposits |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2008002172A1 true WO2008002172A1 (en) | 2008-01-03 |
Family
ID=38845838
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/RU2006/000320 Ceased WO2008002172A1 (en) | 2006-06-20 | 2006-06-20 | Complex for developing undersea mineral deposits |
Country Status (2)
| Country | Link |
|---|---|
| EA (1) | EA011648B1 (en) |
| WO (1) | WO2008002172A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2532280A (en) * | 2014-11-17 | 2016-05-18 | Leslie Chappell Alan | Deep sea mining system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2108264C1 (en) * | 1996-01-31 | 1998-04-10 | Кораблев Юрий Дмитриевич | Underwater drilling platform |
| RU2166065C2 (en) * | 1999-05-20 | 2001-04-27 | ОАО "Газпром" | Method of underwater mining of mineral resources |
| JP2001260982A (en) * | 2000-03-23 | 2001-09-26 | Hitachi Zosen Corp | Floating oil storage and dispensing equipment |
| JP2004204562A (en) * | 2002-12-25 | 2004-07-22 | Kajima Corp | Offshore gas hydrate mining method and system |
| RU2261818C2 (en) * | 2003-04-29 | 2005-10-10 | Ярославский государственный технический университет | Floating platform for marine structures and raising of sunken vessels |
-
2006
- 2006-06-20 WO PCT/RU2006/000320 patent/WO2008002172A1/en not_active Ceased
- 2006-06-20 EA EA200801955A patent/EA011648B1/en not_active IP Right Cessation
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2108264C1 (en) * | 1996-01-31 | 1998-04-10 | Кораблев Юрий Дмитриевич | Underwater drilling platform |
| RU2166065C2 (en) * | 1999-05-20 | 2001-04-27 | ОАО "Газпром" | Method of underwater mining of mineral resources |
| JP2001260982A (en) * | 2000-03-23 | 2001-09-26 | Hitachi Zosen Corp | Floating oil storage and dispensing equipment |
| JP2004204562A (en) * | 2002-12-25 | 2004-07-22 | Kajima Corp | Offshore gas hydrate mining method and system |
| RU2261818C2 (en) * | 2003-04-29 | 2005-10-10 | Ярославский государственный технический университет | Floating platform for marine structures and raising of sunken vessels |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2532280A (en) * | 2014-11-17 | 2016-05-18 | Leslie Chappell Alan | Deep sea mining system |
Also Published As
| Publication number | Publication date |
|---|---|
| EA011648B1 (en) | 2009-04-28 |
| EA200801955A1 (en) | 2008-12-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3366173A (en) | Subsea production system | |
| Chandrasekaran et al. | Ocean structures: Construction, materials, and operations | |
| EP1303681A1 (en) | Well management system | |
| AU2001275890A1 (en) | Well management system | |
| GB2341875A (en) | Multiphase production system suitable for deep water | |
| RU2014243C1 (en) | Method of industrial complex underwater exploitation of sea fields | |
| RU2349489C2 (en) | Complex for development of sub-sea deposits of minerals | |
| Abdalla et al. | The technical challenges of designing oil and gas pipelines in the arctic | |
| Palmer et al. | Design and installation of an offshore flowline for the Canadian Arctic Islands | |
| Bax et al. | Underwater inspection | |
| WO2008002172A1 (en) | Complex for developing undersea mineral deposits | |
| Britton et al. | Advancements in Cathodic Protection of offshore structures | |
| Wheaton et al. | The Solan Field Subsea Oil Storage Tank after One Year's Operation West of Shetland, UK-is it a Concept that has Delivered? | |
| Prescott et al. | Shallow water subsea drilling and production structure to resist sand and ice keel intrusion in arctic environments | |
| Adams et al. | The development of the Maui gas and condensate field | |
| Blume et al. | Rincon offshore island and open causeway | |
| Li et al. | An Overiew of in-Service Deep-Water Compliant Tower Platforms Worldwide | |
| Aldossary | Manifa oil field development program–onshore and offshore shallow water development | |
| CN106368229A (en) | Coral reef oil storage system construction method | |
| Patten | Future trends in offshore engineering | |
| Atmer et al. | Dredging, trenching and rock placement works for the Sakhalin-1 project, Russian Far East | |
| Yang et al. | The Current Status and Prospects of Global Deepwater Oil and Gas Development Technologies | |
| RU2408764C1 (en) | Sea stationary platform for extraction of hydrocarbons | |
| Mahmoud | Underwater Precast Reinforced Concrete Silo For Oil Drilling and Production Applications | |
| Milz | Marine Pipelines-Past, Present and Future |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 2007113797 Country of ref document: RU |
|
| DPE2 | Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101) | ||
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 06843945 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 200801955 Country of ref document: EA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 06843945 Country of ref document: EP Kind code of ref document: A1 |