[go: up one dir, main page]

WO2007034011B1 - Método de montaje de elementos en el interior de la torre de un aerogenerador - Google Patents

Método de montaje de elementos en el interior de la torre de un aerogenerador

Info

Publication number
WO2007034011B1
WO2007034011B1 PCT/ES2006/000516 ES2006000516W WO2007034011B1 WO 2007034011 B1 WO2007034011 B1 WO 2007034011B1 ES 2006000516 W ES2006000516 W ES 2006000516W WO 2007034011 B1 WO2007034011 B1 WO 2007034011B1
Authority
WO
WIPO (PCT)
Prior art keywords
tower
fixed
elements
wind turbine
elements inside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/ES2006/000516
Other languages
English (en)
French (fr)
Other versions
WO2007034011A1 (es
Inventor
Gonzalez Jose Ignacio Llorente
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gamesa Eolica SA
Original Assignee
Gamesa Eolica SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gamesa Eolica SA filed Critical Gamesa Eolica SA
Priority to US11/992,076 priority Critical patent/US8033078B2/en
Priority to EP06807948A priority patent/EP1933029A1/en
Priority to CN2006800334824A priority patent/CN101263301B/zh
Publication of WO2007034011A1 publication Critical patent/WO2007034011A1/es
Publication of WO2007034011B1 publication Critical patent/WO2007034011B1/es
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • F03D80/80Arrangement of components within nacelles or towers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • F03D80/50Maintenance or repair
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • F03D80/80Arrangement of components within nacelles or towers
    • F03D80/82Arrangement of components within nacelles or towers of electrical components
    • F03D80/85Cabling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

Método de montaje de elementos en el interior de Ia torre de un aerogenerador realizada en varias secciones (4) de material metálico, según el cual elementos tales como escaleras (3), plataformas (9) y cables eléctricos se fijan en soportes auxiliares tales como vigas (2; 1, 1 ') o anillos (10) que a su vez se fijan a dichas secciones (4) de manera que no disminuyan su resistencia a Ia fatiga.

Claims

8REIVINDICACIONES MODIFICADAS recibidas por Ia oficina Internacional el 19 Marzo 2007
1. Método de montaje de elementos en el interior de Ia torre de un aerogenerador realizada en varias secciones (4) que se unen a través de bridas (5, 6) y que comprende en su interior una escalera (3) y una plataforma (9), caracterizado porque dichos elementos (3, 9) se fijan en soportes auxiliares (2; 1 , 1'; 10) que comprenden al menos una viga (2; 1 , 1') fijada a las bridas (5, 6) de cada sección (4) de Ia torre de manera que no disminuya su resistencia a fatiga.
2. Método de montaje de elementos en el interior de Ia torre de un aerogenerador según Ia reivindicación 1 , caracterizado porque dicha viga o vigas (2; 1 , 1') se fijan a Ia brida superior (5) de manera rígida y a Ia brida inferior (6) de manera que se permita su movimiento en Ia dirección longitudinal de Ia viga pero se impida el movimiento en dirección horizontal.
3. Método de montaje de elementos en el interior de Ia torre de un aerogenerador según Ia reivindicación 2, caracterizado porque Ia escalera (3) se fija a dicha viga ó vigas (2; 1 , 1').
4. Método de montaje de elementos (9) en el interior de Ia torre de un aerogenerador según Ia reivindicación 1 , caracterizado porque dichos soportes auxiliares comprenden al menos un anillo (10) fijado circunferencialmente a una sección (4) de Ia torre en zonas cercanas a Ia brida superior (5).
5. Método de montaje de elementos en el interior de Ia torre de un aerogenerador según Ia reivindicación 1 , caracterizado porque dichos soportes auxiliares comprenden al menos un anillo (10) soportado por Ia brida superior (5).
6. Método de montaje de elementos en el interior de Ia torre de un aerogenerador según las reivindicaciones 4 ó 5, caracterizado porque dichos elementos incluyen una plataforma (9) que se fija a dicho anillo (10).
7. Método de montaje de elementos en el interior de Ia torre de un aerogenerador según cualquiera de las reivindicaciones anteriores, caracterizado porque dichos elementos también incluyen cables eléctricos con conectores fijados a dichos soportes auxiliares (2; 1 , 1'; 10).
PCT/ES2006/000516 2005-09-16 2006-09-14 Método de montaje de elementos en el interior de la torre de un aerogenerador Ceased WO2007034011A1 (es)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US11/992,076 US8033078B2 (en) 2005-09-16 2006-09-14 Method of mounting elements inside a wind generator tower
EP06807948A EP1933029A1 (en) 2005-09-16 2006-09-14 Method of mounting elements inside a wind generator tower
CN2006800334824A CN101263301B (zh) 2005-09-16 2006-09-14 在风力发电机塔内部安装元件的方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES200502259A ES2283192B1 (es) 2005-09-16 2005-09-16 Metodo de montaje de elementos en el interior de la torre de un aerogenerador.
ESP200502259 2005-09-16

Publications (2)

Publication Number Publication Date
WO2007034011A1 WO2007034011A1 (es) 2007-03-29
WO2007034011B1 true WO2007034011B1 (es) 2007-05-18

Family

ID=37888575

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/ES2006/000516 Ceased WO2007034011A1 (es) 2005-09-16 2006-09-14 Método de montaje de elementos en el interior de la torre de un aerogenerador

Country Status (5)

Country Link
US (1) US8033078B2 (es)
EP (1) EP1933029A1 (es)
CN (1) CN101263301B (es)
ES (1) ES2283192B1 (es)
WO (1) WO2007034011A1 (es)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT2163256E (pt) 2001-05-11 2015-11-20 Ludwig Inst For Cancer Res Ltd Proteínas de ligação específica e suas utilizações
DK200200178A (da) 2002-02-06 2003-08-07 Vestas Wind Sys As Ophængningsmidler til vindturbinetårne
CN101484698A (zh) 2006-06-29 2009-07-15 维斯塔斯风力系统有限公司 用于风轮机的塔体构造
ES2609094T3 (es) * 2007-01-25 2017-04-18 Dana-Farber Cancer Institute, Inc. Uso de anticuerpos anti-EGFR en el tratamiento de enfermedades mediadas por un EGFR mutante
CA2680854C (en) * 2007-03-15 2017-02-14 Ludwig Institute For Cancer Research Treatment method using egfr antibodies and src inhibitors and related formulations
US20100006710A1 (en) * 2008-07-08 2010-01-14 General Electric Company Cable bridge for a wind turbine tower
CN101737273A (zh) * 2008-11-17 2010-06-16 维斯塔斯风力系统集团公司 塔架、风力发电机组以及在塔架内设置平台的方法
DK2218917T3 (da) 2009-02-12 2013-07-08 Ebm Papst Mulfingen Gmbh & Co Radial- eller diagonal-ventilatorhjul
ES2373495B2 (es) * 2009-06-09 2012-09-25 Gamesa Innovation & Technology, S.L. Método y sistema de fijación de cables eléctricos.
US8615965B2 (en) 2009-09-15 2013-12-31 Andresen Towers A/S Tubular building structure with hingedly connected platform segment
DE102009041982A1 (de) * 2009-09-17 2011-04-14 Schuler Pressen Gmbh & Co. Kg Verfahren zur Leitungsmontage im Turm einer Windkraftanlage
US20110076232A1 (en) * 2009-09-29 2011-03-31 Ludwig Institute For Cancer Research Specific binding proteins and uses thereof
US8707656B2 (en) * 2009-11-02 2014-04-29 Vestas Wing Systems A/S Safety blanket
DE102010008639A1 (de) 2010-02-15 2011-08-18 Spehr, Thorsten, 14548 Befestigungskonstruktion der Turmeinbauten von Windkraftanlagen
ES2381833B1 (es) * 2010-04-08 2013-06-11 Gamesa Innovation & Technology, S.L. Montaje de elementos en el interior de un gran aerogenerador
DE102010015075A1 (de) * 2010-04-15 2011-10-20 Repower Systems Ag Windenergieanlage mit modularem Turmsystem
EP2574779B1 (en) * 2011-09-30 2016-05-04 Siemens Aktiengesellschaft Arrangement for fixing a component inside of a wind turbine
GB2496129B (en) * 2011-10-31 2013-09-25 Technip France Cable installation apparatus for mounting on a flanged structure
ES2578272T3 (es) 2012-04-19 2016-07-22 Nordex Energy Gmbh Torre para una instalación de energía eólica, así como procedimiento para la erección de la misma
DE102012008120A1 (de) 2012-04-25 2013-10-31 Nordex Energy Gmbh Verfahren zum Errichten eines Turmeinbaus in einem Windenergieanlagenturm
US20130299277A1 (en) * 2012-05-11 2013-11-14 Clipper Windpower, Inc. Optimized Wind Turbine Tower with Mountings for Tower Internals
SE1251245A1 (sv) 2012-11-02 2014-05-03 Sapa Ab Plattform och metoder för montering i vindturbintorn
EP2746577A1 (en) * 2012-12-21 2014-06-25 Areva Wind GmbH Wind generator, section of a supporting structure of a wind generator and method of assembling a section
WO2014122767A1 (ja) * 2013-02-08 2014-08-14 三菱重工業株式会社 風力発電装置のタワー
EP2784310B1 (en) 2013-03-25 2017-11-22 Alstom Renovables España, S.L. Wind turbine tower section, a wind turbine having such tower section and method for forming such tower section
DE202013005197U1 (de) 2013-06-07 2013-08-23 E.N.O. Energy Systems Gmbh Befestigungskonstruktion für Einbauelemente in einem Turm einer Windenergieanlage
US20150027068A1 (en) * 2013-07-24 2015-01-29 General Electric Company Tower base assembly for a wind turbine
DE102013217088A1 (de) * 2013-08-27 2015-03-05 Senvion Se Verfahren zur Montage von Turmeinbauten
CN103527424B (zh) * 2013-10-25 2016-08-31 北京金风科创风电设备有限公司 风力发电机组预制混凝土塔架
US9487960B2 (en) 2014-06-17 2016-11-08 One Energy Enterprises Llc Suspended deck systems, kits, and methods of installing, inspecting, and repairing a suspended deck system
ES2982788T3 (es) * 2017-01-10 2024-10-17 Keystone Tower Systems Inc Accesorio para torre de un aerogenerador
CN108005454B (zh) * 2017-11-24 2019-10-29 安徽电通通信工程有限公司 一种组合式通信塔
CN110374817B (zh) * 2019-08-16 2021-01-26 太原重工股份有限公司 无附加焊接件的风力发电机组塔筒
EP3916221A1 (en) * 2020-05-27 2021-12-01 Siemens Gamesa Renewable Energy Innovation & Technology S.L. Adaptable tower platform arrangement
CN117823352B (zh) * 2024-01-26 2024-06-11 上海勘测设计研究院有限公司 一种风机机舱与塔筒吊装对接的辅助装置及对接方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3768016A (en) * 1972-06-01 1973-10-23 Pittsburgh Des Moines Steel Modular, prefabricated, integrated communications relay tower
US5533640A (en) * 1993-05-14 1996-07-09 Hmt, Inc. Floating roof
US5557893A (en) * 1995-07-27 1996-09-24 Bowls; George A. Adjustable pitch spiral stairway kit
US6108988A (en) * 1998-12-07 2000-08-29 Soft Play, L.L.C. Spiral climb in surrounding enclosure
AU1772400A (en) * 1998-12-17 2000-07-03 Dancontrol Engineering A/S Wind mill with a suspension for cables and the like, such suspension for cables and the like and a holder for such suspension
US6467233B1 (en) * 2000-11-09 2002-10-22 Beaird Industries, Inc Wind tower
AU2002225600A1 (en) * 2000-11-09 2002-05-21 Beaird Industries, Inc. Wind tower with ladders and platforms
US6470645B1 (en) * 2000-11-09 2002-10-29 Beaird Industries, Inc. Method for making and erecting a wind tower
DK200200178A (da) * 2002-02-06 2003-08-07 Vestas Wind Sys As Ophængningsmidler til vindturbinetårne
JP4209635B2 (ja) * 2002-06-05 2009-01-14 大王製紙株式会社 塔槽体の内壁面作業用足場装置及び該足場装置を用いた内壁面作業方法
US7198134B2 (en) * 2004-06-14 2007-04-03 General Electric Company Method and apparatus for assisting multiple climbers
EP1834088B1 (en) * 2004-11-23 2018-10-10 Vestas Wind Systems A/S A wind turbine, a method for assembling and handling the wind turbine and uses hereof
US7600610B2 (en) * 2005-08-31 2009-10-13 Deuer Joseph F Climb assist system
US7762037B2 (en) * 2005-11-18 2010-07-27 General Electric Company Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof

Also Published As

Publication number Publication date
ES2283192A1 (es) 2007-10-16
EP1933029A1 (en) 2008-06-18
US20090031668A1 (en) 2009-02-05
WO2007034011A1 (es) 2007-03-29
US8033078B2 (en) 2011-10-11
CN101263301A (zh) 2008-09-10
CN101263301B (zh) 2012-02-15
ES2283192B1 (es) 2008-09-16

Similar Documents

Publication Publication Date Title
WO2007034011B1 (es) Método de montaje de elementos en el interior de la torre de un aerogenerador
ATE345430T1 (de) Windkraftanlage
EP2385250A3 (en) A tower of a wind turbine and a method for arranging a platform inside a tower
ES2696506T3 (es) Una construcción de torre para una turbina eólica
JP2009209938A (ja) 風力エネルギータービンのタワー内の構成要素を組み立てる方法及びシステム
US10233662B2 (en) Strut linkage for a steel construction, and steel construction having a strut linkage
EP1262614A3 (de) Turmbauwerk aus Spannbeton
WO2004081373A3 (de) Wartungsplattform
US20110248506A1 (en) Assembly of components inside a large wind turbine
WO2013113494A3 (de) Kletterroboter für masten
DK2909470T3 (en) WORKING PLATFORM TO CHECK SCREW CONNECTIONS ON WINDOW ENERGY INSTALLATION SEGMENT PARTS
ATE390542T1 (de) Stützstruktur in einer turbinen- oder verdichtervorrichtung und verfahren zur montage der struktur
CA2760799A1 (en) Offshore wind turbine installation
WO2013083802A3 (en) Support structure for wind turbine and method of mounting such support structure
WO2009155934A8 (en) A nacelle travelling crane
JP2015004351A (ja) 洋上風力発電設備の基礎頂部、及び、洋上風力発電設備の基礎構造部材
JP2012067603A (ja) 風車タワー内の部品搭載構造
JP2003500575A (ja) 風力装置の塔
GB201218511D0 (en) Method of installation of an offshore structure
EP2369096A3 (en) Wind generator tower and process for assembly thereof
CN108026899A (zh) 用于风力发电机的塔
US9151437B2 (en) Stand structure
CN104564533A (zh) 风力涡轮机的加强孔
WO2010048959A3 (en) A wind turbine generator with extended blade support
WO2005076762A3 (en) A wind power generation apparatus

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 200680033482.4

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2006807948

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 11992076

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWP Wipo information: published in national office

Ref document number: 2006807948

Country of ref document: EP