WO2006001675A1 - Steam tube for pavement works - Google Patents

Steam tube for pavement works Download PDF

Info

Publication number
WO2006001675A1
WO2006001675A1 PCT/KR2005/002000 KR2005002000W WO2006001675A1 WO 2006001675 A1 WO2006001675 A1 WO 2006001675A1 KR 2005002000 W KR2005002000 W KR 2005002000W WO 2006001675 A1 WO2006001675 A1 WO 2006001675A1
Authority
WO
WIPO (PCT)
Prior art keywords
paved
steam
bottom material
chips
steam tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2005/002000
Other languages
French (fr)
Inventor
Sang-Hyun Kim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2006001675A1 publication Critical patent/WO2006001675A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/42Machines for imparting a smooth finish to freshly-laid paving courses other than by rolling, tamping or vibrating
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/14Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces for heating or drying foundation, paving, or materials thereon, e.g. paint

Definitions

  • the present invention relates to an apparatus for a pavement flattening work, and in particular to a stream tube for pavement works which can be adapted for a flattening work of a bottom material in a pavement work, with the bottom material being paved on a road or a floor surface of a pedestrian way which has been already paved using concrete or asphalt, and with the bottom material being made in such a manner that rubber chips used as a main material are mixed with urethane binder, with the rubber chips being selected among waste tire chips, urethane chips, EPDM chips, NBR, NR, BR, and SBR.
  • the bottom material for a pavement work made of waste tire chips, urethane chips, EPDM chips or rubber chips, which are added as a main material, is mixed with urethane binder in such a manner that chips each having a size of 1 ⁇ 8 mm are mixed with urethane binder of 15 ⁇ 35weight%.
  • the bottom material is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, and a flattening work is performed using a flattening tool.
  • urethane binder is a moisture hardening type adhesive and has a very stable adhering force.
  • an ironing heat apparatus irons a flattened work surface of the bottom material in a pressing and hardening work, so that a pavement work is finished.
  • a pavement bottom material in which waste tire chips, urethane chips, EPDM chips, or rubber chips are adapted as a main material, is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, and a flattening work is performed using a flattening tool, and then the bottom material is pressed and hardened using an ironing heat apparatus, a certain physical property should be assured.
  • the chips should be surely hardened at the upper surface of the bottom material on which urethane binder mixed with heated chips is paved, and pedestrian can stably walk on the finished road.
  • the urethane binder mixed with the chips heated by the ironing heat apparatus are disadvantageously melted and penetrated from the upper surface of the bottom material paved with heat through an ironing work into the ground, so that the engaging forces between the chips positioned on the upper surface of the paved bottom material are decreased, whereby the chips of the upper surface of the paved bottom material may be easily broken after the pavement work is finished.
  • a steam tube for pavement works comprising a steam injection port formed at a certain portion of an upper surface of the steam tube; a holding member provided at an upper surface of the same for easier transfer of the steam tube; a plurality of sand pockets provided along a rim of the same; and a plurality of steam discharge holes which are formed on a lower surface in certain patterns for discharging the steam, which is inputted through the steam injection port, to the outside.
  • Figure 1 is a perspective view illustrating a stream tube for a pavement work according to a first embodiment of the present invention
  • Figure 2 is a perspective view illustrating a steam tube for a pavement work according to a second embodiment of the present invention
  • Figure 3 is a bottom view illustrating a steam tube for a pavement work according to the first and second embodiments of the present invention
  • Figure 4 is a view of a flattening work process of a bottom material using a steam tube for a pavement work according to a first embodiment of the present invention.
  • a pavement work steam tubes 10, 10a includes a stem injection port 11 formed at an upper surface of the same.
  • a plurality of ring-shaped handle straps 12 are formed at an edge of the upper surface or a plurality of pulling straps 13 are connected at a circular ring 13a, with each vertical end of the pulling straps 13 being connected at the circular ring 13a.
  • a plurality of sand pockets 14 are connected along a rim of the same.
  • a plurality of steam discharge holes 15 are formed at a lower surface in certain patterns.
  • a steam supply hose 21 of a steam generator 20 is connected with the steam injection port 11.
  • the sand pockets 14 operates as weights so that it is possible to prevent the steam inputted into the steam tubes 10, 10a from being discharged through a side surface of the steam tube 10, 10a.
  • the steam inputted into the interior of the steam tube 10, 10a is all discharged through the steam discharge holes 15 formed at the lower surface of the steam tube 10, 10a.
  • the pavement work steam tube according to the present invention is used in a flattening work of the pavement work for a road pavement or a pedestrian way.
  • Figure 4 is a view illustrating a flattening work process of a bottom material using a pavement work steam tube 10 in which a plurality of ring shaped handle straps 12 are connected at an edge of an upper surface of the same.
  • a pavement work bottom material 30 is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, with the bottom material 30 being made in such a manner that waste tire chips, urethane chips, EPDM chips or rubber chips used as main materials are mixed with urethane binder.
  • the steam tube 10 having a certain weight is placed on the upper surface of the paved bottom material 30. Steam are inputted into the interior of the steam tube 10 through the steam injection port 11 connected with the steam supply hose 21 of the steam generator 20 for about 15 seconds through 10 minutes, so that the paved bottom material 30 is pressed for thereby performing the flattening work.
  • the size of the steam tube 10 is set so that it can fully cover the paved bottom material 30.
  • the steam inputted into the interior of the steam tube 10 is discharged toward the upper surface of the paved bottom material through the steam discharge holes 15 formed at the lower surface of the steam tube 10, so that the paved bottom material 30 is hardened.
  • the steam inputted into the interior of the steam tube 10, 10a is all discharged through the steam discharge holes 15 based on the weight of the sand pocket 14 and is supplied toward the upper surface of the paved bottom material 30, not being leaked through the side surface of the steam tube 10.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A steam tube, in which a pavement work bottom material is paved on a road paved with concrete or asphalt or a floor surface of a pedestrian way, is disclosed, with the bottom material being made in such a manner that waste tire chips, urethane chips, EPDM chips or rubber chips used as main materials are mixed with urethane binder, and the upper surface of the paved bottom material are pressed and flattened, and a hardening work of the paved bottom material is performed as steam is provided on an upper surface of the paved bottom material during a certain time period.

Description

Title: STEAM TUBE FOR PAVEMENT WORKS
Technical Field The present invention relates to an apparatus for a pavement flattening work, and in particular to a stream tube for pavement works which can be adapted for a flattening work of a bottom material in a pavement work, with the bottom material being paved on a road or a floor surface of a pedestrian way which has been already paved using concrete or asphalt, and with the bottom material being made in such a manner that rubber chips used as a main material are mixed with urethane binder, with the rubber chips being selected among waste tire chips, urethane chips, EPDM chips, NBR, NR, BR, and SBR.
Background Art The bottom material for a pavement work made of waste tire chips, urethane chips, EPDM chips or rubber chips, which are added as a main material, is mixed with urethane binder in such a manner that chips each having a size of 1 ~8 mm are mixed with urethane binder of 15~35weight%. The bottom material is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, and a flattening work is performed using a flattening tool. In particular, urethane binder is a moisture hardening type adhesive and has a very stable adhering force. When the flattening work is finished, an ironing heat apparatus irons a flattened work surface of the bottom material in a pressing and hardening work, so that a pavement work is finished. In a process that a pavement bottom material, in which waste tire chips, urethane chips, EPDM chips, or rubber chips are adapted as a main material, is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, and a flattening work is performed using a flattening tool, and then the bottom material is pressed and hardened using an ironing heat apparatus, a certain physical property should be assured. Namely, the chips should be surely hardened at the upper surface of the bottom material on which urethane binder mixed with heated chips is paved, and pedestrian can stably walk on the finished road. However, the urethane binder mixed with the chips heated by the ironing heat apparatus are disadvantageously melted and penetrated from the upper surface of the bottom material paved with heat through an ironing work into the ground, so that the engaging forces between the chips positioned on the upper surface of the paved bottom material are decreased, whereby the chips of the upper surface of the paved bottom material may be easily broken after the pavement work is finished. In particular, even when the paved bottom material is ironed using the ironing heat apparatus in the pressing and hardening process, In the summer season, 72 hours need until the bottom material paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved is fully hardened. In the winter season, more time period, about double time period, is needed. The paved road cannot be used until the above hardening time has passed, so that pedestrian may have many conveniences.
Disclosure of Invention Accordingly, it is an object of the present invention to overcome the above-described problems encountered in the conventional art. It is another object of the present invention to provide a steam tube in which a pavement work bottom material is paved on a road paved with concrete or asphalt or a floor surface of a pedestrian way, with the bottom material being made in such a manner that waste tire chips, urethane chips, EPDM chips or rubber chips used as main materials are mixed with urethane binder, and the upper surface of the paved bottom material are pressed and flattened, and a hardening work of the paved bottom material is performed as steam is provided on an upper surface of the paved bottom material during a certain time period. To achieve the above objects, there is provided a steam tube for pavement works, comprising a steam injection port formed at a certain portion of an upper surface of the steam tube; a holding member provided at an upper surface of the same for easier transfer of the steam tube; a plurality of sand pockets provided along a rim of the same; and a plurality of steam discharge holes which are formed on a lower surface in certain patterns for discharging the steam, which is inputted through the steam injection port, to the outside. Brief Description of Drawings The present invention will become better understood with reference to the accompanying drawings which are given only by way of illustration and thus are not limitative of the present invention, wherein; Figure 1 is a perspective view illustrating a stream tube for a pavement work according to a first embodiment of the present invention; Figure 2 is a perspective view illustrating a steam tube for a pavement work according to a second embodiment of the present invention; Figure 3 is a bottom view illustrating a steam tube for a pavement work according to the first and second embodiments of the present invention; and Figure 4 is a view of a flattening work process of a bottom material using a steam tube for a pavement work according to a first embodiment of the present invention.
Best Mode for Carrying Out the Invention The preferred embodiments of the present invention will be described with reference to the accompanying drawings. As shown in Figures 1 through 4, a pavement work steam tubes 10, 10a includes a stem injection port 11 formed at an upper surface of the same. As a holding member, a plurality of ring-shaped handle straps 12 are formed at an edge of the upper surface or a plurality of pulling straps 13 are connected at a circular ring 13a, with each vertical end of the pulling straps 13 being connected at the circular ring 13a. A plurality of sand pockets 14 are connected along a rim of the same. A plurality of steam discharge holes 15 are formed at a lower surface in certain patterns. A steam supply hose 21 of a steam generator 20 is connected with the steam injection port 11. Here, the sand pockets 14 operates as weights so that it is possible to prevent the steam inputted into the steam tubes 10, 10a from being discharged through a side surface of the steam tube 10, 10a. With the above constructions, the steam inputted into the interior of the steam tube 10, 10a is all discharged through the steam discharge holes 15 formed at the lower surface of the steam tube 10, 10a. The pavement work steam tube according to the present invention is used in a flattening work of the pavement work for a road pavement or a pedestrian way. Figure 4 is a view illustrating a flattening work process of a bottom material using a pavement work steam tube 10 in which a plurality of ring shaped handle straps 12 are connected at an edge of an upper surface of the same. As shown in Figure 14, in a flattening work, a pavement work bottom material 30 is paved on a road or a floor surface of a pedestrian way on which concrete or asphalt has been already paved, with the bottom material 30 being made in such a manner that waste tire chips, urethane chips, EPDM chips or rubber chips used as main materials are mixed with urethane binder. The steam tube 10 having a certain weight is placed on the upper surface of the paved bottom material 30. Steam are inputted into the interior of the steam tube 10 through the steam injection port 11 connected with the steam supply hose 21 of the steam generator 20 for about 15 seconds through 10 minutes, so that the paved bottom material 30 is pressed for thereby performing the flattening work. Here, the size of the steam tube 10 is set so that it can fully cover the paved bottom material 30. The steam inputted into the interior of the steam tube 10 is discharged toward the upper surface of the paved bottom material through the steam discharge holes 15 formed at the lower surface of the steam tube 10, so that the paved bottom material 30 is hardened. Here, the steam inputted into the interior of the steam tube 10, 10a is all discharged through the steam discharge holes 15 based on the weight of the sand pocket 14 and is supplied toward the upper surface of the paved bottom material 30, not being leaked through the side surface of the steam tube 10. When the pressurizing and flattening operations with respect to the upper surface of the paved bottom material 30 are all finished, the workers holds the pulling handle straps 12 of the steam tube 10 and lift up the steam tube 10 and move in a certain direction. The above processes are repeatedly performed. Industrial Applicability As described above, in the pavement work steam tube according to the present invention, since the flattening, pressurizing and hardening works of the paved bottom material are concurrently performed using the steams outputted from the steam tube. With the above construction, it is possible to overcome the problems encountered in the conventional art in which when the urethane binder mixed with the chips of the paved bottom material is heated using a conventional ironing heat apparatus, the engaging forces between the chips positioned on the upper surfaces of the paved material are weakened as the urethane binder is melted and flown in the direction of the ground surface, so that the chips positioned on the upper surface of the paved bottom material may be broken after the construction is finished. In particular, in the present invention, since the paved bottom material can be quickly hardened after the work is finished, so that the paved road or pedestrian way can be used within a short time period. As the present invention may be embodied in several forms without departing from the spirit or essential characteristics thereof, it should also be understood that the above-described examples are not limited by any of the details of the foregoing description, unless otherwise specified, but rather should be construed broadly within its spirit and scope as defined in the appended claims, and therefore all changes and modifications that fall within the meets and bounds of the claims, or equivalences of such meets and bounds are therefore intended to be embraced by the appended claims.

Claims

Claims: 1. A steam tube for pavement works, comprising: a steam injection port formed at a certain portion of an upper surface of the steam tube; a holding means provided at an upper surface of the same for easier transfer of the steam tube; a plurality of sand pockets provided along a rim of the same; and a plurality of steam discharge holes which are formed on a lower surface in certain patterns for discharging the steam, which is inputted through the steam injection port, to the outside.
PCT/KR2005/002000 2004-06-25 2005-06-25 Steam tube for pavement works Ceased WO2006001675A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20-2004-0018080 2004-06-25
KR20-2004-0018080U KR200361751Y1 (en) 2004-06-25 2004-06-25 Steam tube for pavement works

Publications (1)

Publication Number Publication Date
WO2006001675A1 true WO2006001675A1 (en) 2006-01-05

Family

ID=35782044

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2005/002000 Ceased WO2006001675A1 (en) 2004-06-25 2005-06-25 Steam tube for pavement works

Country Status (2)

Country Link
KR (1) KR200361751Y1 (en)
WO (1) WO2006001675A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9483228B2 (en) 2013-08-26 2016-11-01 Dolby Laboratories Licensing Corporation Live engine

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101306087B1 (en) * 2010-08-31 2013-09-09 주식회사쿡웰 Security repair system for asphalt road

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63176110U (en) * 1987-02-05 1988-11-15
JPH02236304A (en) * 1989-03-10 1990-09-19 Dainippon Ink & Chem Inc steam compactor
US5096331A (en) * 1990-09-04 1992-03-17 Carlson Paving Products, Inc. Method and apparatus for heating a paving screed via liquid circuit heat transfer
US5417516A (en) * 1993-07-20 1995-05-23 Universal Screed Inc. Electrically heated paving screed
KR950014587B1 (en) * 1993-03-15 1995-12-09 서일수 Heating device & repair, re-pavement method of asphalt concrete road
US5899630A (en) * 1993-07-20 1999-05-04 Astec Industries, Inc. Paving machine employing exhaust heat exchanger for screed heating

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63176110U (en) * 1987-02-05 1988-11-15
JPH02236304A (en) * 1989-03-10 1990-09-19 Dainippon Ink & Chem Inc steam compactor
US5096331A (en) * 1990-09-04 1992-03-17 Carlson Paving Products, Inc. Method and apparatus for heating a paving screed via liquid circuit heat transfer
KR950014587B1 (en) * 1993-03-15 1995-12-09 서일수 Heating device & repair, re-pavement method of asphalt concrete road
US5417516A (en) * 1993-07-20 1995-05-23 Universal Screed Inc. Electrically heated paving screed
US5899630A (en) * 1993-07-20 1999-05-04 Astec Industries, Inc. Paving machine employing exhaust heat exchanger for screed heating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9483228B2 (en) 2013-08-26 2016-11-01 Dolby Laboratories Licensing Corporation Live engine

Also Published As

Publication number Publication date
KR200361751Y1 (en) 2004-09-13

Similar Documents

Publication Publication Date Title
KR101522505B1 (en) Overall repairing method for concrete and asphalt road after repairing cracks by using the overall pavement products
KR101323022B1 (en) Method of road repairing by using urethane sealant for repairing broken concrete near expansion joint
JP4758639B2 (en) Manhole repair method and filler outflow prevention member fixture used therefor
US10131773B2 (en) Permeable material
KR101552698B1 (en) Repair material for road and construction method thereof
WO2006001675A1 (en) Steam tube for pavement works
US20020136607A1 (en) Support element for underground underworkings
KR101597933B1 (en) Resistance method of sliding slope using flexible pipe without slip for soil-cement layer
KR100765459B1 (en) Elastic permeable packaging material and construction method of this packaging material
KR20080088049A (en) Floor construction method and floor laminate using the same
KR100821320B1 (en) Permeable Elastic Packaging Method and Permeable Elastic Packaging Structure
KR101044172B1 (en) Repairing of India using permeable concrete with fine-grained porosity
CN204940039U (en) Plant stone Bridge Surface Paving by Cement structure for one kind
KR100604212B1 (en) Construction method of elastic packaging material with permeability
JP2004076527A (en) Construction method of pavement
KR100636704B1 (en) Elastic packaging method with improved permeability and elastic packaging layer
KR100926779B1 (en) Composite waterproof sheet and its construction method using sheet-like improved asphalt seal coating layer
KR102279318B1 (en) Height adjustable manholde
JPH10325104A (en) Elastic pavement bed and its manufacture
JP6006667B2 (en) Dirt Course Baba Construction Method
CN206693053U (en) A kind of deck installation structure
JP5326048B2 (en) Design method for elastic pavement
KR20120115195A (en) Water permeable track and pavement method
KR20150075153A (en) method of pavement in road
KR100553241B1 (en) Elastic Permeable Mat and Manufacturing Method Thereof

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NG NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 69(1)EPC

122 Ep: pct application non-entry in european phase

Ref document number: 05756779

Country of ref document: EP

Kind code of ref document: A1