[go: up one dir, main page]

WO2003011500A2 - Sintering process and tools for use in metal injection molding of large parts - Google Patents

Sintering process and tools for use in metal injection molding of large parts Download PDF

Info

Publication number
WO2003011500A2
WO2003011500A2 PCT/US2002/015224 US0215224W WO03011500A2 WO 2003011500 A2 WO2003011500 A2 WO 2003011500A2 US 0215224 W US0215224 W US 0215224W WO 03011500 A2 WO03011500 A2 WO 03011500A2
Authority
WO
WIPO (PCT)
Prior art keywords
sintering
flowbody
preform
tools
temperature range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2002/015224
Other languages
French (fr)
Other versions
WO2003011500A3 (en
Inventor
Jyh-Woei J. Lu
John N. Tervo
Dwayne M. Benson
Donald M. Olson
Kenneth J. Bartone
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/142,330 external-priority patent/US6838046B2/en
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Priority to JP2003516723A priority Critical patent/JP2004536967A/en
Priority to AU2002339840A priority patent/AU2002339840A1/en
Priority to CA002447688A priority patent/CA2447688A1/en
Priority to EP02778187A priority patent/EP1414605A2/en
Publication of WO2003011500A2 publication Critical patent/WO2003011500A2/en
Anticipated expiration legal-status Critical
Publication of WO2003011500A3 publication Critical patent/WO2003011500A3/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/22Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces for producing castings from a slip
    • B22F3/225Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces for producing castings from a slip by injection molding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/10Sintering only
    • B22F3/1017Multiple heating or additional steps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/10Sintering only
    • B22F2003/1042Sintering only with support for articles to be sintered
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2998/00Supplementary information concerning processes or compositions relating to powder metallurgy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2998/00Supplementary information concerning processes or compositions relating to powder metallurgy
    • B22F2998/10Processes characterised by the sequence of their steps

Definitions

  • the present invention relates to the art of sintering metal injection molded preforms or flowbodies, and more particularly to a two-step sintering process and related tools for controlling flowbody deformation which typically occurs during the sintering process.
  • Metal injection molding is a well known technique for the cost effective production of complex multidimensional parts. Typically such parts are of comparatively small size with a weight within a range of about 25 to about 250 grams and are often made in high production volumes. Metal injection molding is most commonly used in the automotive, firearms, and medical industries.
  • the MJJVI process involves mixing a powder metal, water and a binder.
  • the binder is typically composed of an organic aqueous based gel.
  • the mixed powder metal and binder composition produces a generally flowable mixture at relatively low temperature and pressure.
  • the proportion of binder to powder metal is typically about 40-60% binder by volume.
  • the goal is to produce a flowable mixture with a viscosity such that the mixture will fill all of the crevices and small dimensional features of a mold.
  • the flowable mixture is typically transferred to the mold, via an injection molding machine. Injection molding machines are known in the art and are typically capable of applying several hundred tons of pressure to a mold.
  • the mold is typically constructed with internal cooling passages to solidify the flowable material prior to removal.
  • the mold cavity ' typically is larger than that of the desired finished part to account for the shrinkage that occurs after binder removal.
  • the mold structure may be formed from either a rigid or a flexible material, such as metal, plastic, or rubber.
  • the mold is equipped with vents or bleeder lines to allow air to escape from the mold during the molding process.
  • the mold may be equipped with a porous metal or ceramic insert to allow air to escape from the mold.
  • pressure is applied to the mold/mixture to form the molded part, otherwise known as the preform.
  • Typical injection mold pressures for a preform are in the range of about 10-12 ksi.
  • the as molded preforms may be referred to as "green" parts.
  • the green preform may be dried by oven heating to a temperature sufficient to vaporize most of the remaining water.
  • Sintering is an elevated temperature process whereby a powder metal preform may be caused to coalesce into an essentially solid form having the same or nearly the same mechanical properties as the material in casted or wrought form.
  • sintering refers to raising the temperature of the powder metal preform to a temperature close to, but not exceeding, the melting point of the material, and holding it there for a defined period of time. Under these conditions, interparticulate melting occurs and the material densifies to become solid.
  • preforms of certain configurations such as tubular or other shapes
  • preforms of certain configurations have less strength to resist deforming influences and it is a recognized challenge in sintering such metal parts to achieve final geometries congruent to the preform. See, e.g., U.S. Patent No. 5,710,969.
  • This problem is particularly apparent when sintering preforms with large cylindrical sections and irregular high mass protrusions. For example, a large cylindrical preform section will deform under the influence of gravity to a densified section in the form of an oval.
  • the invention provides a process and/or tools that can be used to make dimensionally accurate MJJVI parts of a size and/or complexity heretofore unachievable and includes improved drying, binder removal, and sintering processes which may be used in conjunction with specialized sintering tools to provide for the geometrically stable sintering of large, complex, MEVI parts.
  • the improved processes include a four-stage drying process, a single stage binder removal process, and a two-stage sintering process. Drying of wet green preforms is particularly important as cracks often form during the drying process, resulting in a large number of scrap parts. This problem is particularly prevalent with large MM parts.
  • the novel two stage sintering process includes a first fixing stage where the MEVI molded preform may be densified to about 60% to 80% of its maximum density at a first sintering temperature, and then allowed to cool.
  • the sintering temperature used in the first sintering stage is sufficiently below the melting point of the powder metal material used in the molding process to prevent the preform from taking an improper set due to the force of gravity acting over any large unsupported surfaces. It may prove desirable to keep the first sintering temperature below the solidus temperature of the alloy (i.e., the temperature at which the alloy begins to melt). This first stage serves to fix the overall shape of the preform.
  • the preform is heated to a second sintering temperature near the melting point of the powdered metal material at which a denser part density is developed.
  • heat resistant sintering tools such as inserts of predetermined sizes may be used in both the first and second sintering stages.
  • Heat resistant materials such as aluminum oxide ceramic may be used for the inserts.
  • the inserts are used to support the preform and control the diameter of any small cylindrical features, hi the second sintering stage, the larger cylindrical features may be fitted with a second set of inserts to prevent undue deformation of these features due to the force of gravity that otherwise would cause the features to take an oval or other undesired shape during the sintering.
  • FIG. 1 is a perspective view of a valve flowbody prepared for first stage sintering with sintering tools in accordance with the present invention.
  • FIG. 2 is another perspective view of the flowbody of FIG.1 prepared for second stage sintering with additional sintering tools in accordance with the present invention.
  • FIG. 3 is a perspective view showing the sintering tools of FIG. 1 in more detail.
  • FIG. 4 is a perspective view showing the sintering tools of FIG. 2 in more detail.
  • FIG. 5 is a flow chart illustrating the steps of the present invention drying, binder evaporation, and sintering processes.
  • preform is meant to include conventional powder metal preforms where the powder metal is compacted without the use of a binder.
  • preform is also meant to include MJM flowbodies where the flowbody is produced from a mixture of a powder metal, water and a binder.
  • a flowbody is a structure or part with a flow passage formed therein, such as the portion of a valve assembly having the fluid flow passage formed therein.
  • the various temperatures and heating times are applicable to any Inconel alloy composition.
  • Those skilled in the art will understand that the sintering process of the present invention may be applied to virtually any metal alloy, including but not limited to iron, nickel, and titanium based alloys. Sintering temperatures and times for alloys other than Inconel 718 will of course vary from those described. Further, the processes of the present invention may be used with virtually any preform or MJJVI flowbody configuration and the tools of the invention may be used with any preform or flowbody having large and small cylindrical features.
  • the flowbody 26 is a butterfly valve housing having a large cylindrical bore 30 with an inside diameter of about 8.8 cm and a pair of smaller cylindrical bores 28 having an inside diameter of about 3.0 cm.
  • the typical wall thickness of the flowbody's features is about 3 mm.
  • the flowbody has a weight of about 1000 grams or substantially in excess of parts typically made by MIM processes.
  • the flowbody includes a diaphragm 20 which is formed during the molding process and which helps provide support for roundness of the flowbody. The diaphragm, however, is not required for all applications and is removed before or after sintering, as desired.
  • the flowbody is produced using the processes and tools of the present invention and is dimensionally and geometrically representative of the type of large flowbodies which may be successfully produced using the present invention processes.
  • the processes and tools can also be used to make other large complex MJJVI parts. It is believed that the present invention processes are suitable for sintering flowbodies with weights of up to at least 1500 grams and with cylindrical features having diameters in excess of 8 cm.
  • each small bore is placed a ceramic insert, e.g., a cylinder 34 (see also FIG. 3).
  • a ceramic insert e.g., a cylinder 34 (see also FIG. 3).
  • Each cylinder functions to maintain the geometry of the respective bore in which it is placed, and to support, via a ceramic rod 32, the flowbody during first stage sintering.
  • Each of the cylinders includes a throughbore 35 (FIG. 3) which slidably receives the ceramic rod 32.
  • the ceramic rod which may be solid or tubular, rests in a ceramic support structure 40, such as a firebrick support structure.
  • the support structure may include a base 42 and a pair of V-notch blocks 41 (FIG. 3) for receipt of the ceramic rod.
  • the configuration of the first stage sintering tools 32, 34, 41, and 42 are shown with more particularity in FIG. 3.
  • the flowbody 26 is supported by the ceramic rod 32, through the cylinders 34 such that the flowbody is spaced from
  • the cylinders 34 may be removed and the part supported by the ceramic rod 32 only, hi this case, the ceramic rod may or may not be used to insure roundness of the bore.
  • the rod may be used to support the part, but is not needed to maintain roundness of a relatively small bore.
  • the orientation of the flowbody relative to the support structure may be varied as desired.
  • FIG. 1 depicts the large cylindrical bore 30 having a horizontal axis.
  • the part may be rotated on the ceramic rod, however, such that the bore 30 has a vertical axis.
  • the flowbody 26 is shown prepared for second stage sintering.
  • two large diameter ceramic inserts e.g., cylinders 38 (see also FIG. 4).
  • these cylinders serve to maintain the geometry of the bore and to support the flowbody during sintering, via a ceramic rod 36.
  • the ceramic rod can be the same rod as used in the first stage sintering.
  • FIG. 4 the second stage sintering tools are shown in more detail.
  • the cylinders 38 each have a throughbore 37 for slidable receipt of the rod 36.
  • the rod 36 supports the cylinders and consequently the flowbody in the firebrick support structure 40.
  • the same support structure can be used for the first and second sintering stages.
  • the flowbody is also supported by the ceramic rod through the cylinders such that the flowbody is spaced from the base.
  • the sintering tools are preferably produced from commercially available aluminum oxide ceramic.
  • Aluminum oxide is a durable material that will neither deform nor stick to the
  • the sintering tools may be made by machining aluminum oxide bar stock or by an injection molding process known in the art.
  • the outside diameter of the cylinders 34 and 38 is machined to the desired inside diameter of the final dimensions of the bores in which they are placed.
  • the desired final dimensions of the flowbody cylindrical features may be more easily controlled as the flowbody shrinks around the cylinders during sintering.
  • the inserts could instead be of any shape needed to form the bore during the sintering process, as may be required by the geometry of the desired end part.
  • Steps 12-18 comprise the wet green MJJVI part drying process.
  • Prior art drying processes call for quickly drying MJJVI parts at an elevated temperature. This procedure is effective with small parts.
  • large MJJVI parts with comparatively large cylindrical features tend to crack during a quick drying process leading to an unacceptably high number of scrap parts. It is believed that this is due to the rapid vaporization of water from the flowbody binder causing differential shrinkage between thick and thin flowbody sections and between drier outer (external) portions and wetter internal portions.
  • an important step in successfully producing large MTJVI parts is removing the water from the parts without producing cracks.
  • step 12 one or more of the freshly-molded green flowbodies are sealed in containers or bags, which may be made of plastic or any other suitable material.
  • the sealed containers are stored for a 2-3 day period at room temperature and atmospheric pressure. During this time water vapor evaporates from each flowbody and condenses on the container or bag walls.
  • step 14 the sealed container or bag is vented to the atmosphere to initiate a slow drying rate.
  • the flowbody is then stored in this state for a period of three to five days. During this period, water evaporates from the formerly sealed container or bag and water vapor continues to evaporate from the flowbody.
  • each flowbody is removed from the vented container and is allowed to dry on a shelf or other support for an additional two to three days.
  • testing has revealed that it is important to slowly dry the green flowbody to prevent crack formation.
  • the duration of time the flowbody is dried in the sealed and vented container and on the shelf may vary considerably depending upon factors such as the size and wall thickness of the particular flowbody. Therefore, the drying times mentioned are meant to be examples only.
  • step 18 the flowbody is baked at 60° ⁇ 5°C in an oven at atmospheric pressure for about 24 hours.
  • the low temperature oven baking vaporizes any remaining water in the flowbody.
  • a dry green flowbody typically loses about 7% of its "as molded" weight.
  • step 20 the flowbody is heated in a furnace to about 275°C ⁇ 5°C for about two hours. This step vaporizes the non-aqueous portion of binder from the flowbody. At this point, the dry green flowbody is ready for sintering.
  • the flowbody is setup with the ceramic tools 32, 34, 41 and 42 as described above.
  • the flowbody is placed in a high-vacuum furnace and is heated preferably to about 1235°C for a period of about thirty minutes.
  • the goal of first stage sintering is to substantially fix the overall shape of the part.
  • 1235°C for a duration of thirty minutes some inter-particulate melting will occur in the flowbody.
  • this melting occurs on the exterior surfaces of the flowbody.
  • the typical density of an Inconel 718 flowbody after first stage sintering is about 60% to 80% of the maximum obtainable density.
  • the flowbody is not heated close enough to the melting point of the metal alloy to become sufficiently plastic such that gravity acting on the flowbody can cause significant deformation of the flowbody.
  • temperature control during the sintering process is important, some variation in temperature is permissible.
  • 1100°C to 1240°C is an acceptable working range for the flowbody.
  • a temperature range of 1230°C to 1240°C may also be used.
  • the duration for which the flowbody is heated may also vary depending upon the geometry of the flowbody. Flowbodies with thin walls may require less sintering time, and correspondingly, flowbodies with thick walled sections may require longer sintering times.
  • the flowbody is removed from the high- vacuum furnace and allowed to cool for a period of several hours between first and second stage sintering. This cooling period is not critical to the process and primarily allows the first stage sintering tools to be removed from the flowbody and the second stage sintering tools to be installed in the flowbody.
  • One or more flowbodies may be processed simultaneously using the process and tools described herein.
  • step 24 the second stage sintering tools 36, 38, 41, and 42 are installed in the flowbody which is again placed in the high- vacuum furnace.
  • the flowbody is now heated to a temperature of about 1280°C ⁇ 5°C for a period of about thirty minutes. A temperature above about 1270°C may also be used.
  • the goal of second stage sintering is to achieve increased or even maximum densification of the flowbody. Temperature control is more critical in second stage sintering as the flowbody is heated to a temperature near the melting point of the alloy composition. In this regard, the sintering temperature should not exceed the melting point of the alloy. Test results reveal that using the 1280°C ⁇ 5°C second stage sintering, the densification approaches 99% of the density of the alloy in its wrought form.
  • the flowbody may be machined and/or heat treated as desired.
  • the flowbody is solution heat treated and further treated by precipitation hardening to reach the desired mechanical property. This procedure is known in the art.
  • a cast flowbody and an MJJVI flowbody typically have different surface characteristics.
  • a cast flowbody has a surface roughness of about 250 micro inches, while an MW flowbody has a surface roughness of less than about 30 micro inches. Less material is wasted in the MEVI process and less machining is required as compared to casting, and therefore it is less expensive to make parts with the MEVI process.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Powder Metallurgy (AREA)

Abstract

Improved drying, binder evaporation, and sintering processes which may be used in conjunction with specialized sintering tools to provide for the geometrically stable sintering of large, complex, metal injection molded preform parts or flowbodies. The improved process includes a three-stage drying process, a single stage binder evaporation process, and a two-stage sintering process.

Description

SINTERING PROCESS AND TOOLS FOR USE IN
METAL INJECTION MOLDING OF LARGE PARTS
BACKGROUND OF THE INVENTION The present invention relates to the art of sintering metal injection molded preforms or flowbodies, and more particularly to a two-step sintering process and related tools for controlling flowbody deformation which typically occurs during the sintering process.
Metal injection molding (MJJVI) is a well known technique for the cost effective production of complex multidimensional parts. Typically such parts are of comparatively small size with a weight within a range of about 25 to about 250 grams and are often made in high production volumes. Metal injection molding is most commonly used in the automotive, firearms, and medical industries.
In general, the MJJVI process involves mixing a powder metal, water and a binder.
The binder is typically composed of an organic aqueous based gel. The mixed powder metal and binder composition produces a generally flowable mixture at relatively low temperature and pressure. The proportion of binder to powder metal is typically about 40-60% binder by volume. The goal is to produce a flowable mixture with a viscosity such that the mixture will fill all of the crevices and small dimensional features of a mold. The flowable mixture is typically transferred to the mold, via an injection molding machine. Injection molding machines are known in the art and are typically capable of applying several hundred tons of pressure to a mold. The mold is typically constructed with internal cooling passages to solidify the flowable material prior to removal. The mold cavity ' typically is larger than that of the desired finished part to account for the shrinkage that occurs after binder removal. The mold structure may be formed from either a rigid or a flexible material, such as metal, plastic, or rubber. Preferably, the mold is equipped with vents or bleeder lines to allow air to escape from the mold during the molding process. Alternatively, the mold may be equipped with a porous metal or ceramic insert to allow air to escape from the mold. After the mold has been filled with the flowable mixture, pressure is applied to the mold/mixture to form the molded part, otherwise known as the preform. Typical injection mold pressures for a preform are in the range of about 10-12 ksi. The as molded preforms may be referred to as "green" parts. The green preform may be dried by oven heating to a temperature sufficient to vaporize most of the remaining water. Then, the preform is placed in a furnace to vaporize the binder. To achieve a part with high density and thus a sufficient working strength, the preform is subsequently sintered. Sintering is an elevated temperature process whereby a powder metal preform may be caused to coalesce into an essentially solid form having the same or nearly the same mechanical properties as the material in casted or wrought form. Generally, sintering refers to raising the temperature of the powder metal preform to a temperature close to, but not exceeding, the melting point of the material, and holding it there for a defined period of time. Under these conditions, interparticulate melting occurs and the material densifies to become solid.
In general, complete solidification does not occur, but sintered density can approach 99% with some materials. As the densification process occurs, the interstitial voids in the preform shrink in size and decrease in number. As a result, the bulk volume of the sintered preform is considerably less than that of the pre-sintered preform. As the preform shrinks, geometric deformation of the preform may occur. This deformation is relatively minor in small parts and can be easily remedied by secondary machining operations. However, in large parts, those with net weights over 250 grams, undesired deformation is more problematic.
In general, during the period of densification, while the preform is subjected to high temperature, preforms of certain configurations, such as tubular or other shapes, have less strength to resist deforming influences and it is a recognized challenge in sintering such metal parts to achieve final geometries congruent to the preform. See, e.g., U.S. Patent No. 5,710,969. This problem is particularly apparent when sintering preforms with large cylindrical sections and irregular high mass protrusions. For example, a large cylindrical preform section will deform under the influence of gravity to a densified section in the form of an oval. For this reason, the use of MIM and sintering technology has not expanded to the production of comparatively large parts weighing in excess of about 250 grams, or to parts having cylindrical sections with diameters in excess of about 3.8 cm. What is needed therefore is a sintering method and tools which will allow for comparatively larger parts to be sintered while maintaining the geometric stability of the parts.
SUMMARY OF THE INVENTION
The invention provides a process and/or tools that can be used to make dimensionally accurate MJJVI parts of a size and/or complexity heretofore unachievable and includes improved drying, binder removal, and sintering processes which may be used in conjunction with specialized sintering tools to provide for the geometrically stable sintering of large, complex, MEVI parts.
By way of example only, the improved processes include a four-stage drying process, a single stage binder removal process, and a two-stage sintering process. Drying of wet green preforms is particularly important as cracks often form during the drying process, resulting in a large number of scrap parts. This problem is particularly prevalent with large MM parts. The novel two stage sintering process includes a first fixing stage where the MEVI molded preform may be densified to about 60% to 80% of its maximum density at a first sintering temperature, and then allowed to cool. Generally, the sintering temperature used in the first sintering stage is sufficiently below the melting point of the powder metal material used in the molding process to prevent the preform from taking an improper set due to the force of gravity acting over any large unsupported surfaces. It may prove desirable to keep the first sintering temperature below the solidus temperature of the alloy (i.e., the temperature at which the alloy begins to melt). This first stage serves to fix the overall shape of the preform.
In the second stage, the preform is heated to a second sintering temperature near the melting point of the powdered metal material at which a denser part density is developed.
Typically, in a preform part containing both large and small cylindrical features, heat resistant sintering tools such as inserts of predetermined sizes may be used in both the first and second sintering stages. Heat resistant materials, such as aluminum oxide ceramic may be used for the inserts. In the first sintering stage, the inserts are used to support the preform and control the diameter of any small cylindrical features, hi the second sintering stage, the larger cylindrical features may be fitted with a second set of inserts to prevent undue deformation of these features due to the force of gravity that otherwise would cause the features to take an oval or other undesired shape during the sintering.
These and other features of the invention will become more apparent from the following detailed description of the invention, when taken in conjunction with the accompanying exemplary drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a perspective view of a valve flowbody prepared for first stage sintering with sintering tools in accordance with the present invention.
FIG. 2 is another perspective view of the flowbody of FIG.1 prepared for second stage sintering with additional sintering tools in accordance with the present invention. FIG. 3 is a perspective view showing the sintering tools of FIG. 1 in more detail.
FIG. 4 is a perspective view showing the sintering tools of FIG. 2 in more detail. FIG. 5 is a flow chart illustrating the steps of the present invention drying, binder evaporation, and sintering processes.
DETAILED DESCRIPTION OF THE INVENTION
In this specification the term "preform" is meant to include conventional powder metal preforms where the powder metal is compacted without the use of a binder. The term "preform" is also meant to include MJM flowbodies where the flowbody is produced from a mixture of a powder metal, water and a binder. A flowbody is a structure or part with a flow passage formed therein, such as the portion of a valve assembly having the fluid flow passage formed therein.
Throughout this specification the process and tools of the present invention will be referred to in reference to a particular flowbody produced from a commercially available hiconel 718 powder metal composition witfi a nominal chemistry composition of 52.5M- 18.5Fe-18.5Cr-5.1Nb-3Mo-0.9Ti-0.5Al-0.4C (% by weight) mixed with a binder comprising an aqueous agar solution.
Li general, the various temperatures and heating times are applicable to any Inconel alloy composition. Those skilled in the art will understand that the sintering process of the present invention may be applied to virtually any metal alloy, including but not limited to iron, nickel, and titanium based alloys. Sintering temperatures and times for alloys other than Inconel 718 will of course vary from those described. Further, the processes of the present invention may be used with virtually any preform or MJJVI flowbody configuration and the tools of the invention may be used with any preform or flowbody having large and small cylindrical features.
With reference to FIG. 1, there is shown an exemplary flowbody 26 prepared for first stage sintering. The flowbody is a butterfly valve housing having a large cylindrical bore 30 with an inside diameter of about 8.8 cm and a pair of smaller cylindrical bores 28 having an inside diameter of about 3.0 cm. The typical wall thickness of the flowbody's features is about 3 mm. The flowbody has a weight of about 1000 grams or substantially in excess of parts typically made by MIM processes. The flowbody includes a diaphragm 20 which is formed during the molding process and which helps provide support for roundness of the flowbody. The diaphragm, however, is not required for all applications and is removed before or after sintering, as desired.
The flowbody is produced using the processes and tools of the present invention and is dimensionally and geometrically representative of the type of large flowbodies which may be successfully produced using the present invention processes. The processes and tools can also be used to make other large complex MJJVI parts. It is believed that the present invention processes are suitable for sintering flowbodies with weights of up to at least 1500 grams and with cylindrical features having diameters in excess of 8 cm.
As shown in FIG. 1, supporting the flowbody are specialized sintering tools. In particular, within each small bore is placed a ceramic insert, e.g., a cylinder 34 (see also FIG. 3). Each cylinder functions to maintain the geometry of the respective bore in which it is placed, and to support, via a ceramic rod 32, the flowbody during first stage sintering. Each of the cylinders includes a throughbore 35 (FIG. 3) which slidably receives the ceramic rod 32. The ceramic rod, which may be solid or tubular, rests in a ceramic support structure 40, such as a firebrick support structure. The support structure may include a base 42 and a pair of V-notch blocks 41 (FIG. 3) for receipt of the ceramic rod. The configuration of the first stage sintering tools 32, 34, 41, and 42 are shown with more particularity in FIG. 3. The flowbody 26 is supported by the ceramic rod 32, through the cylinders 34 such that the flowbody is spaced from the base 42.
It will be appreciated that for smaller parts having smaller bores, the cylinders 34 may be removed and the part supported by the ceramic rod 32 only, hi this case, the ceramic rod may or may not be used to insure roundness of the bore. For example, the rod may be used to support the part, but is not needed to maintain roundness of a relatively small bore. In addition, the orientation of the flowbody relative to the support structure may be varied as desired. For example, FIG. 1 depicts the large cylindrical bore 30 having a horizontal axis.
The part may be rotated on the ceramic rod, however, such that the bore 30 has a vertical axis.
Referring now to FIG. 2, the flowbody 26 is shown prepared for second stage sintering. Placed within the large bore 30 are two large diameter ceramic inserts, e.g., cylinders 38 (see also FIG. 4). Like the smaller ceramic cylinders used during the first stage sintering, these cylinders serve to maintain the geometry of the bore and to support the flowbody during sintering, via a ceramic rod 36. The ceramic rod can be the same rod as used in the first stage sintering. Referring now to FIG. 4, the second stage sintering tools are shown in more detail. The cylinders 38 each have a throughbore 37 for slidable receipt of the rod 36. The rod 36 supports the cylinders and consequently the flowbody in the firebrick support structure 40. The same support structure can be used for the first and second sintering stages. In the second sintering stage, the flowbody is also supported by the ceramic rod through the cylinders such that the flowbody is spaced from the base.
The sintering tools are preferably produced from commercially available aluminum oxide ceramic. Aluminum oxide is a durable material that will neither deform nor stick to the
Inconel 718 metallic flowbody during sintering. The sintering tools may be made by machining aluminum oxide bar stock or by an injection molding process known in the art. Preferably, the outside diameter of the cylinders 34 and 38 is machined to the desired inside diameter of the final dimensions of the bores in which they are placed. In this manner, the desired final dimensions of the flowbody cylindrical features may be more easily controlled as the flowbody shrinks around the cylinders during sintering. In many instances it will be desirable to machine the diameter of the cylinders 34 and 38 to a diameter smaller than the final inside diameter of the flowbody's cylindrical features to provide a small amount of excess material for secondary machining operations. It should be appreciated that the inserts could instead be of any shape needed to form the bore during the sintering process, as may be required by the geometry of the desired end part.
With reference to FIG. 5, the present invention sintering process will be described in detail. Steps 12-18 comprise the wet green MJJVI part drying process. Prior art drying processes call for quickly drying MJJVI parts at an elevated temperature. This procedure is effective with small parts. However, large MJJVI parts with comparatively large cylindrical features tend to crack during a quick drying process leading to an unacceptably high number of scrap parts. It is believed that this is due to the rapid vaporization of water from the flowbody binder causing differential shrinkage between thick and thin flowbody sections and between drier outer (external) portions and wetter internal portions. Thus, an important step in successfully producing large MTJVI parts is removing the water from the parts without producing cracks.
In step 12, one or more of the freshly-molded green flowbodies are sealed in containers or bags, which may be made of plastic or any other suitable material. The sealed containers are stored for a 2-3 day period at room temperature and atmospheric pressure. During this time water vapor evaporates from each flowbody and condenses on the container or bag walls. In step 14, the sealed container or bag is vented to the atmosphere to initiate a slow drying rate. The flowbody is then stored in this state for a period of three to five days. During this period, water evaporates from the formerly sealed container or bag and water vapor continues to evaporate from the flowbody.
In step 16, each flowbody is removed from the vented container and is allowed to dry on a shelf or other support for an additional two to three days. In general, testing has revealed that it is important to slowly dry the green flowbody to prevent crack formation. However, the duration of time the flowbody is dried in the sealed and vented container and on the shelf may vary considerably depending upon factors such as the size and wall thickness of the particular flowbody. Therefore, the drying times mentioned are meant to be examples only.
The time periods stated above were used to produce crack free flowbodies of the type shown in FIG. 1. In step 18, the flowbody is baked at 60° ± 5°C in an oven at atmospheric pressure for about 24 hours. The low temperature oven baking vaporizes any remaining water in the flowbody. At the completion of the drying process, a dry green flowbody typically loses about 7% of its "as molded" weight. In step 20, the flowbody is heated in a furnace to about 275°C ± 5°C for about two hours. This step vaporizes the non-aqueous portion of binder from the flowbody. At this point, the dry green flowbody is ready for sintering.
Further testing has indicated that the addition of one or more additives to the binder may permit a quicker drying process, which does not require placing the green flowbody in a container or bag, and which, for some applications, may result in a product that is ready for sintering after drying the green flowbody at room temperature for 2-3 days or less. This quicker drying method, however, appears to adversely affect surface finish, e.g., pitting. Testing is not complete and it has not been determined whether this addition of additives to the binder to reduce drying time is preferred for any particular application. While the drying method depicted in FIG. 5 is believed to be an acceptable method, it should be appreciated that other drying methods are contemplated and that the sintering method to be described may be used with any suitably dried green MJM part.
For first stage sintering, the flowbody is setup with the ceramic tools 32, 34, 41 and 42 as described above. In step 22, the flowbody is placed in a high-vacuum furnace and is heated preferably to about 1235°C for a period of about thirty minutes. The goal of first stage sintering is to substantially fix the overall shape of the part. Thus, at 1235°C for a duration of thirty minutes, some inter-particulate melting will occur in the flowbody. Generally, this melting occurs on the exterior surfaces of the flowbody. The typical density of an Inconel 718 flowbody after first stage sintering is about 60% to 80% of the maximum obtainable density. During the first stage sintering, the flowbody is not heated close enough to the melting point of the metal alloy to become sufficiently plastic such that gravity acting on the flowbody can cause significant deformation of the flowbody.
Although temperature control during the sintering process is important, some variation in temperature is permissible. For example, for first stage sintering 1100°C to 1240°C is an acceptable working range for the flowbody. A temperature range of 1230°C to 1240°C may also be used. The duration for which the flowbody is heated may also vary depending upon the geometry of the flowbody. Flowbodies with thin walls may require less sintering time, and correspondingly, flowbodies with thick walled sections may require longer sintering times.
Generally, after first stage sintering, the flowbody is removed from the high- vacuum furnace and allowed to cool for a period of several hours between first and second stage sintering. This cooling period is not critical to the process and primarily allows the first stage sintering tools to be removed from the flowbody and the second stage sintering tools to be installed in the flowbody. One or more flowbodies may be processed simultaneously using the process and tools described herein.
In step 24, the second stage sintering tools 36, 38, 41, and 42 are installed in the flowbody which is again placed in the high- vacuum furnace. The flowbody is now heated to a temperature of about 1280°C ± 5°C for a period of about thirty minutes. A temperature above about 1270°C may also be used. The goal of second stage sintering is to achieve increased or even maximum densification of the flowbody. Temperature control is more critical in second stage sintering as the flowbody is heated to a temperature near the melting point of the alloy composition. In this regard, the sintering temperature should not exceed the melting point of the alloy. Test results reveal that using the 1280°C ± 5°C second stage sintering, the densification approaches 99% of the density of the alloy in its wrought form.
Conducting the second stage sintering at temperatures below 1275°C is entirely possible. At lower second stage sintering temperatures, less flowbody densification is achieved in a given time and correspondingly the finished part has a higher porosity and somewhat reduced working strength. This is entirely acceptable for parts where maximum strength is not required. After the second stage sintering, the flowbody may be machined and/or heat treated as desired. For example, the flowbody is solution heat treated and further treated by precipitation hardening to reach the desired mechanical property. This procedure is known in the art. A cast flowbody and an MJJVI flowbody typically have different surface characteristics. A cast flowbody has a surface roughness of about 250 micro inches, while an MW flowbody has a surface roughness of less than about 30 micro inches. Less material is wasted in the MEVI process and less machining is required as compared to casting, and therefore it is less expensive to make parts with the MEVI process.
It will be appreciated that a new multi-stage MEVI part drying and sintering process has been presented. These new processes allow for comparatively large MEVI parts to be sintered while maintaining good dimensional control of the part's geometry. In addition, specialized aluminum oxide ceramic sintering tools which assist in maintaining precise dimensions of large cylindrical features have also been presented. While only the presently preferred embodiments have been described in detail, as will be apparent to those skilled in the art, modifications and improvements may be made to the system and method disclosed herein without departing from the scope of the invention. Accordingly, it is not intended that the invention be limited except by the appended claims.

Claims

WHAT IS CLAIMED IS :
1. A method for sintering a powdered metal preform (26), comprising: sintering the preform within a first sintering temperature range for a predetermined time period, wherein the preform shrinks; and sintering the preform within a second sintering temperature range for a predetermined time period, wherein the maximum desired density of the preform is obtained at the second sintering temperature range.
2. The method of claim 1 wherein the first sintering temperature range is about
1100°C to about 1240°C.
3. The method of claim 2 wherein the second sintering temperature range is about 1280°C ± 5°C.
4. The method of claim 1, wherein sintering within the first temperature range continues until interparticulate melting of the preform occurs to fix the shape of the preform.
5. The method of claim 1 wherein the preform achieves about 60% to about 80% of its maximum density at the first sintering temperature range.
6. A sintering tool assembly for supporting a metal injection molded preform with a surface defining an internal passage, the tool assembly comprising: a support structure (40): a rod structure (32) having a first end and a second end, the ends of the rod structure mounted on the support structure; wherein the rod structure is located in the passage and supports the preform.
7. A sintering tool assembly for supporting a metal injection molded preform with a surface defining an internal passage, the tool assembly comprising: an insert (34) located in the passage, the insert having at least one surface of predetermined shape; a support structure (40); a rod structure (32) having a first end and a second end, the ends of the rod structure mounted on the support structure; wherein the rod structure (32) supports the insert (34); and wherein at least a portion of the surface of predetermined shape of the insert contacts at least a portion of the surface defining the internal passage of the preform to support the preform.
8. The sintering tool assembly of claim 7, wherein the rod structure and insert are made of aluminum oxide ceramic.
9. The sintering tools of claim 7, wherein the support structure includes a pair of blocks (41) and the insert is supported between the pair of blocks.
10. The sintering tools of claim 9, wherein each of the pair of blocks has a V- notch and the ends of the rod structure are mounted in the N-notch on respective ones of the pair of blocks.
11. The sintering tools of claim 9, wherein each of the pair of blocks is made of firebrick.
12. The method for sintering a powdered metal flowbody, comprising: providing a flowbody (26) having one or more small cylindrical features (28) and one or more large cylindrical features (30); sintering the flowbody within a first sintering temperature range for a predetermined time period, wherein the flowbody shrinks; and sintering the flowbody within a second sintering temperature range for a predetermined time period, wherein the maximum desired density of the flowbody is obtained at the second sintering temperature range.
13. The method of claim 12, further comprising: providing a first set of generally cylindrical sintering tools (32, 34) for maintaining the geometry of the small cylindrical features of the flowbody during sintering at the first sintering temperature; providing a second set of generally cylindrical sintering tools for maintaining the geometry of the large cylindrical features of the flowbody during sintering at the second sintering temperature;
14. The method of claim 13, wherein the first set of sintering tools comprises a rod (32) and one or more cylinders (34), wherein the cylinders have a throughbore (35) for slidable receipt of the rod.
15. The method of claim 14, wherein the second set of sintering tools comprises a rod (36) and one or more cylinders (38), wherein the cylinders have a throughbore (37) for slidable receipt of the rod.
16. A method for drying a metal preform in preparation for sintering, where the preform (26) is made from a composition comprising powdered metal and a binder, the method comprising the steps of: drying the preform in a sealed container; drying the preform in a vented container; vaporizing water from the preform by heating the preform at predetermined temperature for a predetermined period of time; and vaporizing binder from the preform by heating the preform to a predetermined temperature for a predetermined period of time.
17. The method of claim 16, wherein the preform is dried in the sealed container for a period of about two to three days.
18- The method of claim 16, wherein the preform is dried in the vented container for a period of about two to three days.
19. The method of claim 16, wherein water is vaporized from the preform by heating the preform at a temperature of 60°C ± 5°C for a period of 24 hours.
20. The method of claim 16, wherein binder is vaporized from the preform by heating the preform at a temperature of 275°C ± 5°C for a period of two hours.
21. The method of claim 16 further comprising the steps of: sintering the preform at a first predetermined temperature for a predetermined time period; and sintering the preform at a second predetermined temperature for a predetermined time period.
! 22. A sintered flowbody (26) having at least i..ey in EStf ^f8 iδiQ ,!iw rein the flowbody has a weight greater than about 250 grams.
23. The flowbody of claim 22, wherein the flowbody is made of Inconel 718.
5
24. The flowbody of claim 22, wherein the flowbody has a weight greater than about 300 grams.
10 25. The flowbody of claim 22, wherein the flowbody has a weight greater than about 1000 grams.
26. The flowbody of claim 22, wherein the bore has a diameter greater than about 8 cm.
15
27. The flowbody of claim 22, wherein the bore has a diameter greater than about 5 cm.
20
28. The flowbody of claim 22, wherein the bore has a diameter greater than about
3.8 cm.
29. The flowbody of claim 22, wherein the flowbody has at least two cylindrical 5 bores (28, 30).
30. The flowbody of claim 29, wherein one (30) of the at least two cylindrical bores is larger than another (28) of the at least two cylindrical bores.
0
31. The flowbody of claim 22, wherein the flowbody has a surface roughness of less than about 30 micro inches.
5 433808
PCT/US2002/015224 2001-05-14 2002-05-14 Sintering process and tools for use in metal injection molding of large parts Ceased WO2003011500A2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2003516723A JP2004536967A (en) 2001-05-14 2002-05-14 Sintering methods and tools used for metal injection molding of large parts
AU2002339840A AU2002339840A1 (en) 2001-05-14 2002-05-14 Sintering process and tools for use in metal injection molding of large parts
CA002447688A CA2447688A1 (en) 2001-05-14 2002-05-14 Sintering process and tools for use in metal injection molding of large parts
EP02778187A EP1414605A2 (en) 2001-05-14 2002-05-14 Sintering process and tools for use in metal injection molding of large parts

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US29085301P 2001-05-14 2001-05-14
US60/290,853 2001-05-14
US10/142,330 2002-05-09
US10/142,330 US6838046B2 (en) 2001-05-14 2002-05-09 Sintering process and tools for use in metal injection molding of large parts

Publications (2)

Publication Number Publication Date
WO2003011500A2 true WO2003011500A2 (en) 2003-02-13
WO2003011500A3 WO2003011500A3 (en) 2004-03-04

Family

ID=26839993

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2002/015224 Ceased WO2003011500A2 (en) 2001-05-14 2002-05-14 Sintering process and tools for use in metal injection molding of large parts

Country Status (4)

Country Link
JP (1) JP2004536967A (en)
AU (1) AU2002339840A1 (en)
CA (1) CA2447688A1 (en)
WO (1) WO2003011500A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6838046B2 (en) 2001-05-14 2005-01-04 Honeywell International Inc. Sintering process and tools for use in metal injection molding of large parts

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3888663A (en) * 1972-10-27 1975-06-10 Federal Mogul Corp Metal powder sintering process
JPS6196008A (en) * 1984-10-17 1986-05-14 Shintou Kogyo Kk Production of porous forming mold
JPS644814Y2 (en) * 1985-06-14 1989-02-07
DE3527367A1 (en) * 1985-07-31 1987-02-12 Mtu Muenchen Gmbh COMPONENTS PRODUCED ON A POWDER METALLURGICAL WAY
DE3644871A1 (en) * 1986-04-04 1987-10-15 Licentia Gmbh Method for controlling the sintering of metal shaped parts produced by diecasting powdered metal
US4964907A (en) * 1988-08-20 1990-10-23 Kawasaki Steel Corp. Sintered bodies and production process thereof
DE3841902C1 (en) * 1988-12-13 1989-11-02 Degussa Ag, 6000 Frankfurt, De
JP2922248B2 (en) * 1990-03-20 1999-07-19 川崎製鉄株式会社 Manufacturing method of sintered alloy with excellent corrosion resistance
JPH0445205A (en) * 1990-06-12 1992-02-14 Kobe Steel Ltd Manufacture of powder molded body
JPH05171218A (en) * 1991-12-24 1993-07-09 Toyota Motor Corp Production of sintered titanium alloy member having hollow part
JPH07113102A (en) * 1993-10-12 1995-05-02 Sumitomo Heavy Ind Ltd Production of sintered compact
JPH07150287A (en) * 1993-12-01 1995-06-13 Kawasaki Steel Corp Steel pipe coupling coupling element pipe manufacturing method and iron powder used therefor
ES2146686T3 (en) * 1994-09-15 2000-08-16 Basf Ag PROCEDURE FOR OBTAINING METALLIC MOLDED PARTS THROUGH POWDER INJECTION MOLDING.
JPH08120307A (en) * 1994-10-20 1996-05-14 Janome Sewing Mach Co Ltd Production of powder sintered impeller
US5710969A (en) * 1996-03-08 1998-01-20 Camax Tool Co. Insert sintering
US5905937A (en) * 1998-01-06 1999-05-18 Lockheed Martin Energy Research Corporation Method of making sintered ductile intermetallic-bonded ceramic composites

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6838046B2 (en) 2001-05-14 2005-01-04 Honeywell International Inc. Sintering process and tools for use in metal injection molding of large parts

Also Published As

Publication number Publication date
WO2003011500A3 (en) 2004-03-04
JP2004536967A (en) 2004-12-09
AU2002339840A1 (en) 2003-02-17
CA2447688A1 (en) 2003-02-13

Similar Documents

Publication Publication Date Title
US7635405B2 (en) Sintering process and tools for use in metal injection molding of large parts
US4113480A (en) Method of injection molding powder metal parts
EP1244524B1 (en) Ceramic core and method of making
EP0371895A2 (en) Method of making ceramic cores and other articles
KR20010099702A (en) Low oxygen refractory metal powder for powder metallurgy
JPH0669608B2 (en) Lost foam casting method for casting metal objects
JP2002523630A (en) Powder metal injection molding method for manufacturing products from nickel-based superalloy "Hastelloy X"
WO2010080064A1 (en) Multilevel parts from agglomerated spherical metal powder
US5625861A (en) Porous metal body and process for producing same
CN104609867A (en) Densifying method for selective laser sintered ceramic parts
CN102725083B (en) Method for producing a one-piece hollow body by casting or injection molding process
JP2001522722A (en) Static pressure processing method for gas
JP2002527625A (en) Rapid production of metal or ceramic tools by injection molding.
US6494250B1 (en) Impregnated alumina-based core and method
CN110394450B (en) A method for promoting the densification of metal blanks by utilizing metal hydrogen absorption expansion
WO2003011500A2 (en) Sintering process and tools for use in metal injection molding of large parts
EP1414605A2 (en) Sintering process and tools for use in metal injection molding of large parts
US5174952A (en) Process for the powder-metallurgical production of a workpiece
JP2849508B2 (en) High differential pressure ultra-fine casting method for light specific gravity metals
CN107737902B (en) The high-densit compression molding process of magnesium alloy for automobile support part
RU2319580C2 (en) Method for producing thin-wall articles or articles with inner cavity of composite material on base of carbide
CN111283203B (en) A method for promoting densification of green body by utilizing hydrogen absorption expansion of titanium-containing substances
EP3135399B1 (en) Method of manufactruring precision cast parts for vehicle exhaust systems
RU2657668C2 (en) Method for controlling process of aluminium alloys crystalization during injection moulding
US8312913B2 (en) Casting process

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BY BZ CA CH CN CO CR CU CZ DE DM DZ EC EE ES FI GB GD GE GH HR HU ID IL IN IS JP KE KG KP KR LC LK LR LS LT LU LV MA MD MG MN MW MX MZ NO NZ OM PH PL PT RU SD SE SG SI SK SL TJ TM TN TR TZ UA UG UZ VN YU ZA ZM

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ UG ZM ZW AM AZ BY KG KZ RU TJ TM AT BE CH CY DE DK FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2447688

Country of ref document: CA

Ref document number: 2003516723

Country of ref document: JP

Ref document number: 1020037014903

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2002778187

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWP Wipo information: published in national office

Ref document number: 2002778187

Country of ref document: EP