WO2003095749A1 - Systeme de confinement a asphalte modifiee par un polymere - Google Patents
Systeme de confinement a asphalte modifiee par un polymere Download PDFInfo
- Publication number
- WO2003095749A1 WO2003095749A1 PCT/US2003/015165 US0315165W WO03095749A1 WO 2003095749 A1 WO2003095749 A1 WO 2003095749A1 US 0315165 W US0315165 W US 0315165W WO 03095749 A1 WO03095749 A1 WO 03095749A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- shall
- modified asphalt
- panel
- asphalt
- containment system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/002—Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/004—Sealing liners
Definitions
- This invention relates to a method and system for waste containment and environmental applications, and more particularly, to a seamless cap or liner system constructed of a polymer-modified asphalt designed for waste and environmental containment.
- the Environmental Protection Agency has strict regulations for these waste containment and environmental cleanup sites.
- SITE Superfund innovative Technology Evaluation
- the EPA has developed a standard of containment that not only includes installations requirements, but also maintenance, monitoring and longevity. Further considerations of the waste site include the cost of installing and maintaining a system, future ability to reuse the site and ongoing inspection considerations.
- Most landfill covers in the U.S. are required to meet the minimum regulatory performance standards set forth under the EPA'S Resource
- the basic soil cover used with Subtitle D also has its problems, as the barrier layer is subject to deterioration due to freeze/thaw cycles.”
- GCL geosynthetic clay liners
- waste containment system that meets or exceeds EPA containment requirements, including permeability, longevity, and resilience; allows rapid installation; is easy to maintain; cost effective and provides additional uses for the site once containment is complete, is needed.
- the present invention is directed to a waste or environmental containment system that includes polymer-modified asphalt specifically designed for containment, and a system of installation that provides a seamless cap over the area to be contained.
- the specifically designed modified asphalt has a permeability less than 1 x 10 "7 cm/sec and an air void content less than 3 percent.
- cold and hot joint designs provide a seamless containment cap.
- the present invention advantageously provides a system of containment that is cost-effective, meets stringent EPA standards, is resistant to erosion, remains stable on slopes and conforms to settlement, is resilient over a wide range of temperature variations and is not subject to damage under UV light exposure, offers longevity, ease of maintenance and inspection, provides a thinner cross-section requiring less material import and more storage space, fast installation with conventional construction equipment, and allows reuse of the site for a variety of potential alternative uses: parking, equipment storage, truck/train intermodal facilities, multi-use sports facilities, and the like.
- Figure 1 illustrates a plan view of a waste containment site partially covered with the seamless cap according to principles of the present invention.
- Figure 2 is a cross sectional view along line 2-2 of Figure 1 of a cold joint of the seamless cap according to principles of the present invention.
- Figure 3 is a cross sectional view along line 3-3 of Figure 1 of a cold joint tie-in for membrane material according to principles of the present invention.
- Figure 4 is a plan view of the membrane tie-in along line 4-4 of Figure 3 according to principles of the present invention.
- Figure 5 is a chart of exemplary binder properties according to principles of the present invention.
- Figure 6 is a chart of exemplary binder formula and blending parameters according to principles of the present invention.
- Figure 7 is a chart of an exemplary aggregate gradation for dense-graded and open-graded polymer-modified asphalt according to principles of the present invention.
- Figure 8 is a Temperature ⁇ /iscosity Graph for conventional asphalt and the polymer-modified asphalt of the present invention according to principles of the present invention.
- Figure 9A and 9B are graphs of flexural tests and deflection curves according to principles of the present invention.
- Figure 10 is a graph of temperature versus tensile strength illustrating the resistance to thermal cracking of conventional asphalt and the modified asphalt of the present invention according to principles of the present invention.
- the present invention is directed to a waste or environmental containment system to contain hazardous wastes at RCRA and Superfund sites.
- the system includes polymer-modified asphalt specifically designed for containment, and a system of installation that provides a seamless cap over the area to be contained.
- the polymer-modified asphalt contains high quality, specifically sized mineral aggregate and a highly modified binder using additives beneficial to environmental applications.
- the specifically designed modified asphalt has a permeability less than 1 x 10 "7 cm/sec and an air void content less than 3 percent.
- cold and hot joint designs provide a seamless containment cap.
- the polymer-modified asphalt of the present invention has met EPA guidelines for use in waste containment applications.
- the permeabilities, flexural properties, load capacity, tensile strength, thermal crack resistance, fuel resistance and aging and weathering resistance that are detailed below combine to provide a material that when installed according to aspects of the present invention, yields a seamless containment system.
- a waste site 100 receives the seamless cap or containment liner upon a prepared subgrade 120 as detailed further below.
- the polymer-modified asphalt 110 is laid over the subgrade 120.
- Cold joints and perimeter joints tying asphalt to membranes 130 are further illustrated in Figures 2, 3 and 4.
- Figure 2 illustrates a cross-section of Figure 1 along line 2-2.
- the pavement section 200 represents a cold joint 210 or stopping point for various construction reasons.
- the joint 210 must be tied into in order to provide a seamless impervious cap or liner.
- a cold joint panel 115 of approximate length L of 10' is placed against the cold panel 110.
- Conventional tacking means are used along the joint 210.
- a milled area 220 is removed from the cold panel 110 to a depth of adjacent joint cold panel 115. In the exemplary example, the thickness T of the milling is approximately 1", and the depth D of the asphalt is approximately 4".
- the milled surface 225 is broomed clean and the surface of all cleaned cold panels are heavily tacked with modified asphalt.
- a final hot panel 230 is paved and compacted against the milled edge 225.
- the surface seam 240 is further sealed with modified asphalt.
- Figure 3 illustrates a cross-section of an optional edge detail along line 3-3 of Figure 1.
- the joint illustrated in Figure 3 allows for the polymer-modified asphalt system to be tied into a membrane.
- the joint is prepared similarly to the cold joint of Figure 2, however, after the milled section 220 is removed, a membrane 310 is placed on the cold panel 115 prior to placement of the final hot panel 320.
- the hot panel 320 may be optionally sloped 330 to provide drainage.
- the membrane 310 further includes openings or windows 340 cut therein.
- the windows 310 may include various shapes as illustrated in the top view of the membrane opening shown in Figure 4.
- the openings 340 may be round 342, square 344 or any other geometric shape to allow ample contact between cold and hot panels.
- the windows allow bonding of the cold and hot panels.
- the combination of cold joints, hot joints (described below) and the interface between membrane and asphalt provides a continuous, seamless mat of polymer-modified asphalt capable of providing a cap or liner sufficiently impervious to be used for hazardous waste confinement. Further aspects of the polymer-modified asphalt and installation process is described below.
- the polymer-modified asphalt of the present invention will leach fewer constituents than traditional asphalt concrete pavement.
- the polymer-modified asphalt is formulated, blended in asphalt plants, and installed at temperature ranges above those common to traditional asphalt cement. At these temperatures, the limited amount of lower molecular weight (leachable) organic compounds in asphalt cement are more rapidly volatilized, and the spectrum of heavier molecular weight organic compounds subject to volatilization is expanded. As a result, the polymer- modified asphalt materials produced in an asphalt plant will contain even fewer volatile organic compounds than traditional asphalt cement and placed asphalt concrete.
- the polymer-modified asphalt is manufactured using traditional high quality asphalt cement by blending with modifiers that have a molecular weight in excess of 80X asphalt cement molecules. Blending at elevated temperatures that decrease viscosity in high shear mixing conditions initiates the physical and chemical reactions between the modifier molecules and the asphalt cement molecules yielding longer-chained and heavier molecules than traditional asphalt concrete molecules at ambient temperatures. Both physical binding mechanisms and chemical bonding kinetics create a more stable end product with higher intermolecular stability, a higher melting point, an enhanced dielectric constant, and decreased molecular chain- branching.
- the polymer-modified asphalt modifiers do not contain heavy metals or other hazardous material constituents. Further, the physical binding and chemical bonding characteristics provided by the supplemental modifier enhances the ability of the host the polymer-modified asphalt end product matrix to retain such components if present in the conventional asphalt cement and, more importantly, aggregates added in the mix.
- the decreased permeability of the polymer-modified asphalt ( ⁇ 1 x10 "8 cm/sec) will prevent the intrusion and pass-through of potential carrier fluids. Without the ability of a fluid to pass through the polymer- modified asphalt matrix, only surfaces of the matrix will be subjected to leachable conditions.
- Analytical testing performed on the polymer-modified asphalt pavement samples examined teachability of various analytes to various aqueous extraction fluids including deonized water, solid waste landfill leachate, and methyl ethyl ketone. Results from that testing indicate that USEPA SW- 846, Method 8270 organics, and the RCRA metals did not leach from the polymer-modified asphalt pavement specimens after being rigorously agitated for 96 hours.
- modified asphalt containment binder is due to several features that combine to provide the properties needed. Properties of the binder are further shown in Figure 5. Most conventional asphalt binders or cements are not modified. If they are modified (usually with polymers), it is to upgrade a poor quality asphalt to meet the Performance Grade (PG) requirements of Superpave (superior performing pavements). The Standard Specification for Performance Graded Asphalt Binder is covered in ASTM D 6373. Modified asphalt containment binder is not dependent on PG requirements, but is targeted to approximate a PG 82-22 for most applications. For cold climates, a PG 76-28 may be used. In order to meet these requirements and the additional requirements listed below, the base asphalt cement must be highly modified in a specific manner. Desirable properties include at least the following:
- the binder may be heated to high temperature (500 F) during mixing and handling, and must maintain its properties without undue aging. Also, the binder may be allowed to cool in a tank, and then be re-heated. • Ease of preparation. Blending of the base asphalt and polymers generally requires a high shear mixer, but with the proper selection of materials, this may not be required.
- Neat asphalt is soluble in most hydrocarbon fuels such as gasoline. Components in the modifiers should be used that will reduce this solubility. • Improved weathering. Oxidation and volatilization are the primary actions that degrade asphalt over long time periods. Any material additives or modifiers and processes that will reduce this aging are desirable.
- the preferred modifier is based on optimizing the desirable properties listed above. Although there are myriad polymers on the market, they do not all work equally well, and often not at all with some asphalts. A series of formulations are tried in the laboratory until the optimum blend of asphalts and modifiers is achieved, based on the properties required. As a guide, the Superpave PG binder requirements shown in Figure 5 are used. Modifiers include elastomers, plastomers and waxes, and various combinations of these.
- Exemplary elastomers, plastomers and waxes include: ESI, ethylene-styrene-interpolymer; SBS, Styrene Butadiene Styrene; SEBS, Styrene Ethylene Butadiene Styrene; EVA, Ethylene Vinyl Acetate; Wax, Sasobit; and Hydrocarbon resin, in various combinations.
- the mineral aggregate makes up about 93 percent of the mass and the binder about 7 percent, so the aggregate plays a significant role.
- the source of aggregate is local, to reduce hauling costs, but if high quality material is not locally available, it may need to be imported.
- Aggregate Gradation is illustrated in Figure 7. 5. Samples of the aggregate from each stockpile are sent to the laboratory for evaluation. Tests include physical properties as well as evaluation in the mix design or Job Mix Formula (JMF). Controlled properties are as follows:
- JMF Job Mix Formula
- the process used in the Mix Design is to heat pre-weighed binder and aggregates over a range of binder contents, compact (using the Marshall procedure) each sample into 4-in. diam. briquettes, and then perform several tests on these specimens. The results are compared to criteria established for modified asphalt containment HMA.
- the key properties include:
- Tensile strength ratio (TSR) (AASHTO T-283) to determine need for anti-strip additive (lime preferred). This ratio should be less than 80%.
- the optimum binder content is a compromise among several properties, including:
- VMA Mineral Aggregate
- Resilient Modulus (ASTM D 4123) This value replaces the conventional Marshall Stability because it is useful not only in comparing mix combinations, but also is used in computing the load carrying capacity. A value of greater than 250,000 psi is desirable.
- the construction of the modified asphalt for containment includes several actions, including the actual construction, QC/QA, test strips (may be optional), connection to other environmental covers/caps such as membranes, hot and cold joints, etc.
- QC/QA chemical vapor deposition
- test strips may be optional
- connection to other environmental covers/caps such as membranes, hot and cold joints, etc.
- a test strip may be required to finalize and fine-tune the JMF, to develop appropriate rolling patterns to get the low air voids required.
- this test strip is constructed at least one day prior to construction in order to provide sufficient time to sample and test the modified asphalt containment HMA.
- the first paving pass in a non critical area may be used for the test strip if time or other circumstances do not permit a full test strip. Note that all standard dense (low permeability) modified asphalt for containment is nominally 4 in. thick.
- a QC engineer/technician is on site to receive and accept each truckload of polymer-modified asphalt HMA as it arrives on the jobsite. Temperature is an important issue, and each load is tested, and accepted or rejected. Also, the location of the modified asphalt for containment HMA from each truck is noted and coordinated with the ongoing nuclear density testing, resulting in a grid of paving passes, truckloads, and density readings that will accurately represent the modified asphalt in place. • A technician using a non-destructive nuclear density gauge will test and monitor each truckload of polymer-modified asphalt as it is being compacted. Rolling will continue until the specifications are met, with all modified asphalt containment HMA compacted to a final condition of less than 3% air voids. • A core sample (or replicates) may optionally be cut and tested to assure that the density/voids requirement was achieved. Note that it may not be advisable to cut core sample from an environmental cap, even though it can be back-filled satisfactorily.
- a modified asphalt containment system of liners and caps may consist of one or more layers.
- a liner or cap typically is 4 in. thick and is constructed with the modified asphalt containment binder and dense- graded aggregate to make a mat that has less than 3% air voids and has low permeability (k ⁇ IxlO "8 cm/sec).
- the liner or cap may be in the range of 2"-10" thick depending on design considerations. Further, multiple mats of polymer-modified asphalt may be used.
- an open-graded version is also typically 4 in. thick, but is made with modified asphalt containment binder and open-graded aggregate, resulting in about 20% air voids and permeability of about 1 x 10 "1 to 3 cm/sec (very free flowing), and is used for leachate collection and transport as well as leak detection.
- a typical "double liner” might consist of a 4 in. open- graded layer sandwiched between two 4 in. dense-graded layers.
- FIG. 2 illustrates an exemplary cold joint.
- This finaMO- ft. wide panel is stepped down 1 in. at the hot joint side and then tapered from 3 in. thick to 2 in. thick over the 10 ft. wide panel.
- a sketch of this cross- section is shown in Figure 2.
- the area adjacent to the 1-in. step is milled or planed off, removing the modified asphalt containment surface 1-in. deep and 12-in. wide. This milled surface, and the surface of the 10-ft. wide cold panel is heavily tacked with asphalt just prior to paving with a new overlay on top of the cold panel.
- the present invention offers numerous advantages over conventional geosynthetic, membrane, multi-layer or clay liners.
- a system of containment is provided that is cost-effective, meets stringent EPA standards, is resistant to erosion, remains stable on slopes and conforms to minor site settlement, is resilient over a wide range of temperature variations and is not subject to damage under UV light exposure, offers longevity, ease of maintenance and inspection, provides a thinner cross-section requiring less material import and more storage space, fast installation with conventional construction equipment, and allows reuse of the site for a variety of potential alternative uses: parking, equipment storage, truck/train intermodal facilities, multi-use sports facilities, and the like. Installation of the present system involves conventional construction equipment and conventional hot mix facilities. Material mixing and placement costs are therefore significantly reduced over other novel containment systems requiring specialized equipment.
- the permeability of the present system is less than 1 x 10 "7 cm/sec.
- the present system achieves this low permeability by reducing air voids to a level where the air voids do not interconnect.
- Impermeable asphalt can be made simply by increasing the binder content to reduce air voids, but this results in a mix that is too soft to bear loads. Further, this "hydraulic" asphalt is subject to ultra-violet light and oxidative degradation.
- the present system optimizes the polymer-modified binder both in volume and in content, thus providing a load bearing system that is resistive to UV light, oxidative degradation and permeability.
- the modified asphalt of the instant invention is resistance to a much larger range of temperature fluctuation than conventional asphalt.
- conventional asphalt is a liquid at 300°F when it is mixed, but at very low temperatures it can be as brittle as glass.
- asphalt would look like the solid line, with the same viscosity or stiffness at all temperatures below that required for mixing. While that is not possible, the dotted line shows how the polymer-modified asphalt of the present invention both increases stiffness in hot weather and elasticity in arctic climates.
- the differential settlement test was conducted with a beam 910 measuring 4 inches wide, 4 inches high, and 36 inches long which was sawed from a polymer-modified asphalt cap of the present invention. It was carefully placed on a sand bed 920 in a testing frame 950 as shown in Figure 9A. The sand bed 920 was supported by a wood frame 940.
- the test set-up 900 is designed to simulate differential settlement by permitting removal of sand very slowly over time.
- a "valve" 930 at the bottom allows the dry sand to flow, as in an hour-glass.
- a single test may take a month or more. It appears that a rate of about one (1 ) mm per day at room temperature (about 75° F) is appropriate.
- the test was designed to incorporate a surcharge weight (bricks) 960, it was discovered that the dead weight of the polymer-modified asphalt beam ( ⁇ 150 lb. /cubic foot) was adequate.
- Figure 9B shows a beam at the beginning of the test and again near the conclusion. During the testing period of three months, no cracks occurred, even up to a total center deflection D of 1.5 inches.
- Figure 9C shows the test results.
- Figure 10 illustrates a graph of thermal cracking by graphing tensile stress versus temperature.
- the polymer-modified asphalt fails at a higher stress (stronger) and at a lower temperature. This temperature difference (see A) indicates that a lower temperature is required to break the specimen and thus higher resistance to low temperature cracking. However, all binders eventually approach the very low "glass transition temperature”.
- the mixtures can also fail by cracking due to repeated temperature changes, such as diurnal temperature change in high desert areas.
- This temperature region is often over a wider range, indicating that the polymer-modified asphalt mixture is more resistant to cracking because of its higher tensile strength.
- the greater difference between the conventional asphalt and the polymer-modified asphalt in the B range further indicates that the polymer-modified asphalt is more effective in resisting cracking because the curve is flatter in this range.
- the resilient modulus of the polymer-modified asphalt cap of the present invention has been tested at 2,048 megapascals (Mpa) comparted to 3,200 Mpa for the conventional asphalt cover at cold temperatures (-20°C). This reduced modulus suggests that the modified asphalt of the present invention is more flexible and less susceptible to cracking at cold temperatures.
- Mpa 2,048 megapascals
- 20°C cold temperatures
- This reduced modulus suggests that the modified asphalt of the present invention is more flexible and less susceptible to cracking at cold temperatures.
- the practical consequence of these structural properties is that the polymer-modified asphalt for containment caps has the ability to perform within a wide range of temperatures and loadings by resisting deformation under extremes of these parameters.
- This work shall consist of one or more courses of open or dense graded modified asphalt placed on a prepared foundation or base in accordance with these Specifications and in conformity with the lines, grades, thicknesses, and typical cross-sections shown in the Plans or established by the Engineer for a given site
- the modified asphalt shall be composed of the modified asphalt binder and aggregate which, with or without the addition of mineral filler and blending sand as may be required, shall be mixed in the proportions specified to provide a homogeneous, stable, and workable mixture.
- Blending Sand 301.1(4) Mineral Filler 301.1(5) The binder will be pumped into empty storage tanks meeting the requirements of Section 2.01 -(3)A 3.
- Mineral materials include coarse and fine aggregates, blending sand, and mineral filler.
- Sufficient storage space shall be provided for each size of aggregate.
- the different aggregate sizes shall be kept separated until they have been delivered to the cold elevator feeding the plant except that aggregates produced meeting the requirements of Section 3-01.8 need not be separated.
- the storage yard shall be maintained neat and orderly and the separate stockpiles shall be readily accessible for sampling.
- Plants used for the preparation of the modified asphalt shall conform to all requirements of Section 2-01.3(I)A except that scale requirements shall apply only where weight proportioning is used.
- batch plants shall conform to the requirements of Section 2-01.3(1 )B; and rotary drum plants shall conform to the requirements of Section 2-01.3(1 )C.
- the plant shall meet the following requirements: 1.
- the asphalt plant shall have a minimum capacity rating by the manufacture as follows: For projects involving 5,000 tons or more: Batch plants - 2,000 lbs. per batch. Continuous mix and rotary drum plants - 100 tons per hour. For projects involving less than 5,000 tons: Batch plants - 1 ,000 lbs. per batch.
- Tanks for the storage modified asphalt material shall be equipped to heat and hold the material at the required temperatures. Typical storage temperatures for the modified asphalt binder range between 310 F and 345 F. Steam coils, electricity, other approved means, shall accomplish the heating so that no flame shall be in contact with the tank.
- the circulating system for the binder material shall be designed to ensure proper and continuous circulation during the operating period. Provision shall be made for measuring the binder in the storage tank and a valve shall be placed in the supply line to the mixer for sampling the material.
- Feeder for drier or drum mixer The plant shall be provided with accurate mechanical means for uniformly feeding the aggregate into the drier so that uniform production and uniform temperature will be obtained.
- the feeder for blending sand, when required shall be capable of providing a consistent, uniform flow in the amount designated by the Engineer.
- Plant screens capable of screening all aggregates to the specified sizes and proportions and having normal capacities in excess of the full capacity of the mixer, shall be provided when batch plants are used.
- Bins The plant shall include storage bins of sufficient capacity to supply the mixer when it is operating at full capacity. Bins shall be arranged to ensure separate and adequate storage of appropriate fractions of the aggregates. Separate dry storage shall be provided for mineral filler when used and the plant shall be equipped to feed such material into the mixer. Each bin shall be provided with overflow pipes, sized and located to prevent material backing up into other compartments or bins. Each compartment shall be provided with an outlet gate, constructed so there shall be no leakage when closed. The gates shall close quickly and completely. Bins shall be constructed so samples can be readily obtained. Bins shall be equipped with adequate telltale devices to indicate the level of the aggregates in the bins at the lower quarter points.
- Binder control unit Satisfactory means, either by weighing or metering, shall be provided to obtain the proper amount of the modified asphalt binder in the mix. Means shall be provided for checking the quantity or rate of flow of the modified asphalt binder into the mixer.
- the binder may also be proportioned by a device which sprays the material into the mixer through six or more nozzles, and which weighs or proportions the material for each batch by a positive rotating meter which is calibrated in pounds.
- the metering device shall have an established background of service and shall be approved by the Engineer.
- thermometric equipment An armored thermometer of adequate range in temperature reading shall be fixed in the modified asphalt binder feed line at a suitable location near the charging valve at the mixer unit.
- the plant shall also be equipped with either an approved dial-scale, a mercury actuated thermometer, an electric pyrometer, or other approved thermometric instrument placed at the discharge chute of the drier to automatically register or indicate the temperature of the heated aggregates.
- This device shall be in full view of the plant operator.
- the Engineer may require replacement of any thermometer with an approved temperature-recording apparatus for better regulation of the temperature of aggregates.
- Dust collector The plant shall be equipped with a dust collector constructed to waste or return uniformly to the hot elevator all or any part of the material collected. 10.
- the Contractor When a baghouse is used for dust control, the Contractor shall be able to introduce the material returned from the baghouse into the mixture at a uniform and continuous rate. Accurate mechanical means shall be provided for uniformly feeding the fines into the aggregate stream. To accomplish this, the Contractor shall provide a surge hopper with a holding capacity sufficient to accumulate the baghouse fines or shall have a variable speed mechanical feed interlocked to the plant which will prevent any variance in feed into the aggregate stream. Either method shall provide uniform and continuous return of the well-graded fine materials and be provided with a method of withdrawing the surplus fines independently for disposal.
- Burner fuel The plant burner fuel shall be restricted to the use of propane, butane, natural gas, methane, coal, No. 1 or No. 2 fuel oil, or other acceptable burner fuel as determined by the Engineer.
- Hot-mix asphalt plants shall be in compliance with all local, state, and federal operating permits, licenses, air quality and other applicable regulations.
- batch plants optimally have the following requirements: 1.
- the plant shall include a dryer or dryers which continuously agitate the aggregate during the heating and drying process, and be capable of preparing aggregates to specification requirements.
- the equipment shall include a means for accurately weighing each size of aggregate in a weigh box or hopper suspended on scales and of ample size to hold a full batch without hand raking or running over.
- the gate shall close tightly so that no material is allowed to leak into the mixer while a batch is being weighed.
- the modified asphalt binder control The equipment used to measure the binder shall be accurate to plus or minus 0.5 percent.
- the binder bucket shall be a non-tilting type with a loose sheet metal cover.
- the length of the discharge opening or spray bar shall be not less than 75 percent of the length of the mixer and it shall discharge directly into the mixer.
- the binder bucket, its discharge valve or valves and spray bar shall be adequately heated. Steam jackets, if used, shall be efficiently drained and all connections shall be constructed so they will not interfere with the efficient operation of the asphalt scales.
- the capacity of the binder bucket shall be at least 15 percent in excess of the weight of binder material required in any batch.
- the plant shall have an adequately heated quick-acting, non-drip, charging valve located directly over the asphalt material bucket.
- the indicator dial shall have a capacity of at least 15 percent in excess of the quantity of binder material used in a batch.
- the controls shall be constructed so they may be locked at any dial setting and will automatically reset to that reading after the addition of binder material to each batch.
- the dial shall be in full view of the mixer operator.
- the flow of binder material shall be automatically controlled so it will begin when the dry mixing period is over. All of the binder material required for one batch shall be discharged in not more than 15 seconds after the flow has started.
- the size and spacing of the spray bar openings shall provide a uniform application of binder material the full length of the mixer.
- the section of the binder line between the charging valve and the spray bar shall be provided with a valve and outlet for checking the meter when a metering device is substituted for a binder material bucket.
- the batch mixer shall be an approved type capable of producing a uniform mixture meeting the requirements of these Specifications. If not enclosed, the mixer box shall be equipped with a dust hood to prevent loss of dust.
- the mixing plant shall be equipped with automatic weight proportioning devices to monitor and control the weights of the several components of aggregates and of the asphalt.
- the mixing plant shall also contain timing lock devices to monitor and control the position of the aggregate weigh hopper dump gate, the asphalt bucket discharge valve, and the mixer discharge gate.
- the weigh hopper may be a single compartment, individual weight control type, or of the divided compartment, preset volume type.
- the automatic scale weight system shall discharge and weigh material from one bin at a time.
- the preset volume weigh hopper shall check the total weight of each aggregate batch and provision shall be made to allow the Engineer to check easily and quickly the individual aggregate weights at any time.
- the opening of the aggregate weigh hopper dump gate shall actuate the timing lock devices. They shall lock the asphalt bucket discharge valve until preset dry mixing time is expired and shall lock the mixer discharge gate throughout the preset dry and wet mixing periods.
- the control of the timing shall be flexible and capable of being set at intervals of not more than 5 seconds throughout cycles up to 60 seconds.
- the dials of the timing locks and automatic weighing controls shall be so arranged that the time interval and mass proportion controls may be locked by the Engineer.
- the plant shall have a feeder capable of uniformly introducing the aggregate into the drum.
- the aggregate feeder shall be synchronized with the modified asphalt binder material feed. Satisfactory means shall be provided to afford positive interlocking control between each aggregate cold feed bin, aggregate feed, and the asphalt feed so the plant will automatically activate a warning device if the feed of either aggregate or asphalt is interrupted.
- the plant shall have the mixing capability to provide a uniform mixture meeting the requirements of these Specifications.
- the asphalt material feed shall have positive recording capabilities so the amount of asphalt incorporated into the mix during any given period of time may be read directly.
- Hauling Eguipment Trucks used for hauling the modified asphalt mixtures shall have tight, clean, smooth metal beds which have been thinly coated with a minimum amount of paraffin oil, or other approved material to prevent the mixture from adhering to the beds.
- Each truck shall have a cover of canvas or other suitable material of sufficient size to protect the mixture from the weather.
- the conveyer shall be in operation during the process of oiling the bed.
- the modified asphalt pavers shall be self-contained, power-propelled units, provided with an activated screed or strike-off assembly, heated if necessary, and capable of spreading and finishing courses of the modified asphalt in panel widths applicable to the specified typical section and thicknesses shown in the Plans.
- the screed or strike-off assembly shall effectively produce a finished surface of the required evenness and texture without tearing, shoving, segregating, or gouging the mixture. Any bolt on or hydraulic extensions shall produce the same results including ride, density, and surface texture as the screed or strike off assembly. Hydraulic extenders without screeds, augers, and vibration shall not be used.
- the paver When laying mixtures, the paver shall be operated at a uniform forward speed consistent with the plant production rate and roller train capacity to result in a continuous operation.
- the auger speed and flight gate opening shall be adjusted to coordinate with the operation.
- the transverse slope controller shall be capable of maintaining the screed at the desired slope within plus or minus 0.1 percent.
- the paver shall be equipped with automatic feeder controls, properly adjusted to maintain a uniform depth of material ahead of the screed.
- Rollers shall be of the steel wheel, vibratory, or pneumatic tire type, in good condition, capable of reversing without backlash, and shall be operated at speeds slow enough to avoid displacement of the mixture.
- the number and weight of rollers shall be sufficient to compact the mixture as required in Section 2.01.3(12).
- the use of equipment, which results in excessive crushing of the aggregate, will not be permitted. Rollers producing pickup, washboard, uneven compaction of the surface or other undesirable results will be rejected. Compaction, in areas too small for the use of conventional sized rollers, shall be achieved using vibratory plate compactors or other approved equipment.
- Vibratory Rollers a. Variable amplitude will be required, with at least 2 settings. b. A variable frequency with a 2,000 VPM minimum. c. The maximum rate of travel under vibration shall be limited to 3 mph. d. Pneumatic propulsion on surface courses shall be limited to smooth tires that will not leave visible tracks.
- Pneumatic Tired Rollers a. The maximum rate of travel shall be limited to 5 mph. b. Skirts shall be firmly affixed to the perimeter of the roller and shall uniformly extend to within 1 inch of the pavement surface.
- the existing surface Before construction of a modified asphalt liner or cap system, the existing surface will be constructed to plan subgrade elevations with a tolerance of +/- one half inch, and brought to a firm and unyielding condition as evidenced by proof rolling with a loaded tandem rear-axle dump truck. Further, the surface must be capable of maintaining its smooth and unyielding condition when loaded repeatedly by the modified asphalt mixture delivery trucks. 2-01.3(6) Heating of the Modified Asphalt Material
- the modified asphalt binder shall be heated to a range between 310°F and 360°F as determined by the mix design.
- the asphalt shall be heated in a manner that will avoid local overheating and provide a continuous supply of asphalt material to the mixer at a uniform temperature plus or minus 10°F from the mix design temperature.
- the aggregates shall be removed from stockpiles) in a manner to ensure a minimum of segregation when being moved to the modified asphalt plant for processing into the final mixture.
- the Contractor shall obtain representative samples from mineral aggregate stockpiles and blend sand sources to be used for the modified asphalt production, submitting them for development of a mix design and job mix formula.
- the Contractor shall allow 20 working days for approval of the mix design once the material has been received. Additional time may be required if the proportions will not make an adequate design. The Contractor is also advised that production of the modified asphalt shall not commence until the job mix design has been established.
- the modified asphalt open graded mixtures will be evaluated for quality of gradation only based on samples taken from the cold feed.
- Sampling and testing for acceptance shall be performed on a random basis at a minimum frequency of one sample for each sublot of 400 tons or each day's production, whichever is least.
- sublot size shall be determined to the nearest 100 tons to provide not less than three uniform sized sublots, based on proposed quantities, with a maximum sublot size of 800 tons.
- the prepared aggregates shall be combined in the mixer in the amount of each fraction of aggregates as specified or as directed by the Engineer.
- the asphalt material shall be measured or gauged and introduced into the mixer in the amount determined by the Engineer.
- the materials shall be mixed until a complete and uniform coating of the particles and a thorough distribution of the asphalt material throughout the aggregate is ensured. Wet mixing time shall be sufficient to produce 95 percent coated particles.
- the temperature of the mix shall not exceed the mix design temperature. A maximum water content of 2 percent in the mix, at discharge, will be allowed providing the water causes no problems with handling, stripping, or flushing, in this case, the moisture content shall be reduced as directed by the Engineer.
- Storing or holding of the asphalt concrete mixture in approved storage facilities will be permitted during the daily operation but in no event shall the materials be held for more than 2 hours. Materials held for more than 2 hours after mixing shall be rejected and disposed of by the Contractor at no expense to the Contracting Agency.
- the storage facility shall have a visible device located at the top of the cone or about the third point to indicate the amount of material in storage. No material shall be accepted from the storage facility when the material in storage is below the top of the cone of the storage facility, except at the end of the working day.
- the mixture shall be laid upon an approved surface, spread, and struck off to the grade and elevation established.
- Asphalt pavers complying with Section 2-01.3(3) shall be used to distribute the mixture.
- the nominal compacted depth of any layer of any course shall not be less than the following depths:
- Modified Asphalt Open Graded 4 inches On areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the paving may be done with other equipment or by hand.
- the modified asphalt mixture When the modified asphalt mixture is being produced by more than one plant, the material produced by each, plant shall be placed by separate spreading and compacting equipment.
- Compaction shall take place when the mixture is in the proper condition so that no undue displacement, cracking, or shoving occurs. All compaction units shall be operated at the speed, within specification limits, that will produce the required compaction. Areas inaccessible to large compaction equipment shall be compacted by mechanical or hand tampers. Any modified asphalt that becomes loose, broken, contaminated, shows an excess or deficiency of the modified asphalt binder, or is in any way defective, shall be removed and replaced at no additional cost with fresh modified asphalt which shall be immediately compacted to conform with the surrounding area.
- the type of rollers to be used and their relative position in the compaction sequence shall generally be the Contractor's option, provided specification densities are attained. Coverages with a vibratory or steel wheel roller may proceed pneumatic tired rolling.
- Vibratory rollers shall not be operated in the vibratory mode when the internal temperature of the mix is less than 225°F without permission of the Engineer. In no case shall a vibratory roller be operated in a vibratory mode when checking or cracking of the mat occurs at a greater temperature. 2-01.3(12)B Control
- each density lot will be no greater than a single day's production or approximately 400 tons, whichever is less.
- a compaction test section shall be constructed, as directed by the Engineer, to determine the compactability of the mix design.
- Compactability shall be evaluated as the ability of the mix to attain a quality level of 97 percent of the maximum density determined by AASHTO T 209.
- the Contractor is responsible for the control of the compaction effort. If the Contractor does not request a test section, the mix will be considered compactable.
- the cold joint panel When a prolonged break is anticipated, such as the end of a work shift, the cold joint panel will have the following configuration (see Figure 2).
- the inside of the panel which is adjacent to the previously laid hot panel will be approximately, three (3) inches compacted; however the outer edge of this last (cold joint) panel will be approximately two (2) inches thick after compaction.
- a tack coat Prior to placing the overlay panel a tack coat shall be applied at the rate of 0.1 gallons per square yard, or at a rate determined by the Engineer.
- the overlay panel will be laid a minimum of one (1) foot wider than the cold joint panel.
- the Engineer reserves the right to have samples cut or cored from the completed project or as the modified asphalt is being placed. Additionally, the Engineer may take samples of the uncompressed modified asphalt mixtures as well as all materials incorporated in the work. Where samples have been taken from the uncompressed modified asphalt, new material shall be placed and compacted to conform with the surrounding area.
- the completed dense modified asphalt surface shall be of uniform texture, smooth, uniform as to crown and grade, and free from defects of all kinds.
- the modified asphalt shall not be placed on any wet surface, or when the average surface temperatures are less than those specified in the following table, or when weather conditions otherwise prevent the proper handling or finishing of the bituminous mixtures:
- an anti-stripping additive shall be added to the modified asphalt binder in accordance with Section 4-01. If anti- strip is normally specified for local mixes made from the same aggregate, the modified asphalt will also include anti-strip.
- Aggregates used in the modified asphalt shall be manufactured from ledge rock, talus, or gavel.
- the material from which they are produced shall meet the following test requirements: ASTM C 131 LA Wear 30% max loss
- Aggregates shall be uniform in quality, substantially free from wood, roots, bark, extraneous materials, and adherent coatings.
- the presence of a thin, firmly adhering film of weathered rock will not be considered as coating unless it exists on more than 50 percent of the surface area of any size between consecutive laboratory sieves.
- Aggregate removed from deposits contaminated with various types of wood waste shall be washed, processed, selected, or otherwise treated to remove sufficient wood waste, so that the oven-dried material retained on a 1/4-inch square sieve shall not contain more than 0.1 percent by weight of material with a specific gravity less than 1.
- the fracture requirements are at least one fractured face on 75 percent of the material retained on each specification sieve size U.S. No. 10 and above, if that sieve retains more than 5 percent of the total sample.
- the fracture and sand equivalent requirements shall apply at the time of stockpiling.
- the requirements for fracture and sand equivalents shall apply at the time of its introduction to the cold feed of the mixing plant.
- the properties of the aggregate in a preliminary mix design for the modified asphalt shall be such that, when it is combined within the limits set forth in Section 3-01.1 (6) and mixed in the laboratory with the modified asphalt binder, mixtures with the following test values can be produced: Permeability Coefficient, k ⁇ 1x10 "8 cm/sec*
- the Contractor may furnish aggregates for use on the same contract from a single stockpile or from multiple stockpiles.
- the gradation of the aggregates shall be such that the completed mixture complies in all respects with the pertinent requirements of Section 3-01.1 (6). Acceptance of the aggregate gradation shall be based on samples taken from the final mix.
- Blending sand shall be clean, hard, sound material, either naturally occurring sand or crusher fines, and must be material which will readily accept a modified asphalt binder coating.
- the exact grading requirements for the blending sand shall be such that, when it is mixed with an aggregate, the combined product shall meet the requirements of Section 3-01.1 (6).
- Blending sand shall meet the following quality requirement: Sand Equivalent 40 min. The materials laboratory shall test blending sand before it will be approved for use. 3-01.5 Mineral Filler
- Mineral filler when used in the modified asphalt mix, shall conform to the requirements of AASHTO M 17.
- the materials of which the modified asphalt is composed shall be of such sizes, gradings, and quantities that, when proportioned and mixed together, they will produce a well-graded dense impermeable mixture or an open graded very permeable drainage layer within the requirements listed in the table that follows. All sieve testing shall be in accordance with ASTM C 136 Sieve Analysis of Fine and Course Aggregates. See Table 3 for an exemplary aggregate gradation for dense and open graded modified asphalt mixture.
- the modified asphalt mixture will be accepted based on its conformance to the project job mix formula (JMF).
- JMF project job mix formula
- the Contractor shall submit to the Engineer, representative samples of the various aggregate and blend sand, to be used along with the gradation data showing the various aggregate stockpile averages and the proposed combining ratios and the average gradation of the completed mix.
- the Engineer will determine the modified asphalt binder content, anti-strip requirement, and the modified asphalt binder retention factor in the mix design process. Using the representative samples submitted and proposed proportion of each, trial mix tests will be run to determine the percentage of the modified asphalt binder, by weight, to be added.
- the JMF thus established shall be changed only upon order of the Engineer.
- Each paver path of the modified asphalt mixture placed during a working shift shall conform to a single job mix formula established for the class of the modified asphalt mixture specified unless there is a need to make an adjustment in the JMF.
- the Contractor may furnish aggregates for use on the same contract from a single stockpile or from multiple stockpiles.
- the gradation of the aggregates shall be such that the completed mixture complies in all respects with the pertinent requirements 3-01.6.
- This work shall consist of placing the specified aggregates in the stockpiles at the sites and in the amounts as shown in the Plans or as approved by the Engineer. This section also includes the requirements pertaining to the removal of aggregates from stockpiles.
- Stockpiles in excess of 200 cubic yards shall be built up in layers not more than 4 feet in depth.
- Stockpile layers shall be constructed by trucks, clamshells, or other methods approved by the Engineer. Pushing aggregates into piles with a bulldozer will not be permitted. Each layer shall be completed over the entire area of the pile before depositing aggregates in the succeeding layer. The aggregate shall not be dumped so that any part of it runs down and over the lower layers in the stockpile. The method of dropping from a bucket or spout in one location to form a cone shaped pile will not be permitted. Any method of placing aggregates in stockpiles, which in the opinion of the Engineer, breaks, degrades, or otherwise damages the aggregate, will not be permitted. Stockpiles of less than 200 cubic yards shall be piled in a manner to prevent segregation of the various sizes of material.
- No equipment other than pneumatic tired equipment shall be used in constructing the stockpiles of processed or manufactured aggregates.
- Stockpiles of different types or sizes of aggregate shall be spaced far enough apart, or separated by suitable walls or partitions, to prevent the mixing of the aggregates.
- Aggregate shall not be deposited where traffic, vehicles, or Contractor's equipment will either run over or through the piles, or in any way cause foreign matter to become mixed with the aggregates.
- Aggregates shall be removed from stockpile in a manner to avoid separation of sizes or admixture of dirt or foreign material.
- the Engineer will approve the method and equipment used for loading.
- No equipment other than pneumatic tired equipment shall be used on stockpiles of processed or manufactured aggregates in removing the materials from the stockpiles.
- the equipment When removing materials from the face of the stockpile, the equipment shall be operated in a manner to face-load from the floor to the top of the stockpile to obtain maximum uniformity of material.
- liquid anti-stripping additive When liquid anti-stripping additive is added to the liquid asphalt, the amount will be designated by the Engineer, but shall not exceed I percent by weight of the liquid asphalt. When polymer additives are sprayed on the aggregate, the amount will be designated by the Engineer, but shall not exceed 0.67 percent by weight of the aggregate.
- Scales shall:
- the Contractor shall have available not less than 10 standard 50-pound weights for scale calibration and testing. If the Engineer has approved other calibration and testing equipment, the Contractor may substitute it for these weights. 5-01.2 Specific Reguirements for Batching Scales
- Each scale shall be designed to support a weighing hopper. The arrangement shall make it convenient for the operator to remove material from the hopper while watching readout devices. Any hopper mounted on a platform scale shall have its center of gravity directly over the platform centerline.
- Marked intervals on the readout device shall be spaced evenly throughout and shall be based on the scale's nominal rated capacity. These intervals shall be at least 1 pound, but shall not exceed one-tenth of 1 percent of nominal rated capacity.
- An agent of the scale manufacturer shall test and service any batch scale before its use at each new site and then at 6-month intervals.
- the Contractor shall provide the Engineer a copy of the final results after each test. Whenever the Engineer requests, the Contractor's operator(s) shall test the scale while the inspector observes.
- the modified asphalt binder shall be weighed on a scale not used for other materials.
- Each weigh or load ticket shall contain gross, net, and tare weight. It shall also identify the weighed material. A tare weight shall be taken of each hauling vehicle at least twice a day.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2003234562A AU2003234562A1 (en) | 2002-05-10 | 2003-05-12 | Polymer-modified asphalt containment system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US37995902P | 2002-05-10 | 2002-05-10 | |
| US60/379,959 | 2002-05-10 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2003095749A1 true WO2003095749A1 (fr) | 2003-11-20 |
Family
ID=29420587
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2003/015165 Ceased WO2003095749A1 (fr) | 2002-05-10 | 2003-05-12 | Systeme de confinement a asphalte modifiee par un polymere |
Country Status (2)
| Country | Link |
|---|---|
| AU (1) | AU2003234562A1 (fr) |
| WO (1) | WO2003095749A1 (fr) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2912413A1 (fr) * | 2007-02-14 | 2008-08-15 | Total France Sa | Composition bitumineuse resistante au vieillissement |
| CN115691711A (zh) * | 2022-10-06 | 2023-02-03 | 哈尔滨工业大学 | 一种沥青混合料拌合站溢料预测与稳定性的评价方法 |
| CN116026125A (zh) * | 2023-03-24 | 2023-04-28 | 河北四正北方新型材料科技有限公司 | 一种防水卷材胎体用节能效果好的烘干设备 |
| CN117051638A (zh) * | 2023-08-23 | 2023-11-14 | 昆山市交通工程集团有限公司 | 一种沥青下面层施工工艺 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1035879A (en) * | 1964-11-06 | 1966-07-13 | Lloyd French Bramble | Asphalt lining |
| FR2495664A1 (fr) * | 1980-08-28 | 1982-06-11 | Meple Materiaux Etancheite Ent | Nouveaux materiaux d'etancheite assurant l'independance de la premiere couche des revetements d'etancheite |
| FR2625243A1 (fr) * | 1987-12-24 | 1989-06-30 | Soprema Sa | Systeme d'etancheisation des toitures |
| EP0420747A2 (fr) * | 1989-09-29 | 1991-04-03 | Societe De Pavage Et Des Asphaltes De Paris,Societe Anonyme Dite S P A P A | Feuille bitumineuse d'étanchéité destinée à recevoir une couche d'asphalte coulé |
-
2003
- 2003-05-12 AU AU2003234562A patent/AU2003234562A1/en not_active Abandoned
- 2003-05-12 WO PCT/US2003/015165 patent/WO2003095749A1/fr not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1035879A (en) * | 1964-11-06 | 1966-07-13 | Lloyd French Bramble | Asphalt lining |
| FR2495664A1 (fr) * | 1980-08-28 | 1982-06-11 | Meple Materiaux Etancheite Ent | Nouveaux materiaux d'etancheite assurant l'independance de la premiere couche des revetements d'etancheite |
| FR2625243A1 (fr) * | 1987-12-24 | 1989-06-30 | Soprema Sa | Systeme d'etancheisation des toitures |
| EP0420747A2 (fr) * | 1989-09-29 | 1991-04-03 | Societe De Pavage Et Des Asphaltes De Paris,Societe Anonyme Dite S P A P A | Feuille bitumineuse d'étanchéité destinée à recevoir une couche d'asphalte coulé |
Non-Patent Citations (1)
| Title |
|---|
| SCHOENIAN E: "ASPHALTBETON - DICHTUNGEN IM DEPONIEBAU", MUELL UND ABFALL, SCHMIDT VERLAG, BERLIN, DE, vol. 23, no. 1, 1991, pages 12,14 - 19, XP000176961, ISSN: 0027-2957 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2912413A1 (fr) * | 2007-02-14 | 2008-08-15 | Total France Sa | Composition bitumineuse resistante au vieillissement |
| WO2008101809A1 (fr) * | 2007-02-14 | 2008-08-28 | Total Raffinage Marketing | Composition bitumineuse resistante au vieillissement |
| CN115691711A (zh) * | 2022-10-06 | 2023-02-03 | 哈尔滨工业大学 | 一种沥青混合料拌合站溢料预测与稳定性的评价方法 |
| CN116026125A (zh) * | 2023-03-24 | 2023-04-28 | 河北四正北方新型材料科技有限公司 | 一种防水卷材胎体用节能效果好的烘干设备 |
| CN116026125B (zh) * | 2023-03-24 | 2023-05-30 | 河北四正北方新型材料科技有限公司 | 一种防水卷材胎体用烘干设备 |
| CN117051638A (zh) * | 2023-08-23 | 2023-11-14 | 昆山市交通工程集团有限公司 | 一种沥青下面层施工工艺 |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2003234562A1 (en) | 2003-11-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100482742C (zh) | 重建道路路面的方法 | |
| Perkins | Synthesis of warm mix asphalt paving strategies for use in Montana highway construction | |
| Series | Designing and Constructing SMA Mixtures—State-of-the-practice | |
| US7077602B2 (en) | Method and system for containment, such as a containment cap for solid waste constructed of modified asphalt | |
| Williams et al. | Sources, measurements, and effects of segregated hot mix asphalt pavement | |
| WO2003095749A1 (fr) | Systeme de confinement a asphalte modifiee par un polymere | |
| Putman et al. | Laboratory evaluation of anti-strip additives in hot mix asphalt | |
| Jones et al. | Warm-Mix Asphalt Study: Test Track Construction and FirstLevel Analysis of Phase 3b HVS and Laboratory Testing (Rubberized Asphalt, Mix Design# 2) | |
| Cross et al. | Cold-in-place recycling in New York State. | |
| Potgieiter | Bitumen Rubber Asphalt: Year 2003. Design and Construction Procedure in South Africa | |
| Congress | Recommended practice for recycling of bituminous pavements | |
| Jackson et al. | Quieter Pavements Survey | |
| Baskandi | Bituminous Pavement Recycling–Effective Utilization of Depleting Non-Renewable Resources | |
| Chan et al. | New Mix Design Method for Hot-Mix Cold-Laid Mixtures | |
| Noferini | Performances and durability of asphalt mixtures made with reclaimed asphalt Pavement | |
| Graham | Pavement Preservation Best Practices Technical Briefs | |
| Myers | Stone Matrix Asphalt, the Washington Experience | |
| Miller | Maintenance and Performance Study of Porous Asphalt in Northern Climates at the Randolph Park & Ride | |
| Nordcbeck | Construction of Cold Central Plant Recycling and Cold In-Place Recycling of Asphalt Pavements | |
| Fager | Asphalt-rubber overlay on rubblized concrete pavement on I-135 | |
| Maupin | Field trials of asphalt rubber hot mix in Virginia. | |
| Hajj et al. | State-of-the-practice in chip seal, slurry seal, micro surfacing, and thin lift asphalt overlay construction quality assurance | |
| Reckard et al. | Asphalt pavement inspector's manual | |
| Sivasubramaniam | Validation of Superpave mixture design and analysis procedures using the NCAT test track | |
| Prowell | Design, construction, and early performance of hot-mix asphalt stabilizer and modifier test sections. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NI NO NZ OM PH PL PT RO RU SC SD SE SG SK SL TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| 122 | Ep: pct application non-entry in european phase | ||
| NENP | Non-entry into the national phase |
Ref country code: JP |
|
| WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |