WO1995026483A1 PCT/SE1995/000322 SE9500322W WO9526483A1 WO 1995026483 A1 WO1995026483 A1 WO 1995026483A1 SE 9500322 W SE9500322 W SE 9500322W WO 9526483 A1 WO9526483 A1 WO 9526483A1
Authority
WO
WIPO (PCT)
Prior art keywords
bed
fluidized
tube
heat
tube system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/SE1995/000322
Other languages
French (fr)
Inventor
Mats Andersson
Rolf Hellbeck
Martin Olsson
Sven-Olof ÖSTMAN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Power Carbon AB
Original Assignee
ABB Carbon AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Carbon AB filed Critical ABB Carbon AB
Priority to EP95914650A priority Critical patent/EP0795108B1/en
Priority to DE69513039T priority patent/DE69513039T2/en
Publication of WO1995026483A1 publication Critical patent/WO1995026483A1/en
Anticipated expiration legal-status Critical
Priority to FI970559A priority patent/FI970559A7/en
Ceased legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D13/00Heat-exchange apparatus using a fluidised bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements or dispositions of combustion apparatus
    • F22B31/0007Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements or dispositions of combustion apparatus with combustion in a fluidized bed
    • F22B31/0015Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements or dispositions of combustion apparatus with combustion in a fluidized bed for boilers of the water tube type
    • F22B31/0023Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements or dispositions of combustion apparatus with combustion in a fluidized bed for boilers of the water tube type with tubes in the bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/28Control devices specially adapted for fluidised bed, combustion apparatus

Definitions

  • a PFBC power plant Pressure Fluidized Bed Combustion
  • a steam turbine for utilizing steam energy generated in a tube system immersed into a fluidized bed.
  • a gas turbine is employed at the same time for utilizing the energy contents in flue gases formed during combustion in the bed.
  • the invention relates to the problem of dimensioning the heat-transferring tube area of the tube system.
  • particulate fuel usually coal
  • the bed is supplied with combustion air in the form of compressed air from the pressure vessel which surrounds a bed vessel, wherein the fluidized bed is stored, via fluidization nozzles below the bed.
  • the combustion gases which are formed during the combustion process are passed through a freeboard above the bed surface, whereupon they are cleaned and passed to a gas turbine.
  • the combustion gases drive the gas turbine, which in turn drive a generator as well as a compressor which provides the pressure vessel with compressed air.
  • a steam generator in the form of a tube bundle which constitutes a component in a steam system, is placed in the bed.
  • steam is generated, energy thus being obtained from the bed via the steam turbines to which the steam is led in the steam system.
  • the entire tube bundle is situated within the bed.
  • the cooling capacity of the tube bundle must be dimensioned to the power output from the bed to be able to maintain the correct bed tempera- ture.
  • both the steam turbine and the gas turbine are supplied with nominal power values for the respective turbine type, dimen ⁇ sioned for the plant.
  • the steam turbine it is a difficult technical problem to dimension the steam turbine to the exactly nominally correct power value when designing a PFBC plant, that is, the design of the steam turbine.
  • the dimen ⁇ sioning of the steam turbine is dependent on the fuel fine ⁇ ness, the moisture content of the fuel, the type of fuel, etc. , whereby the dimensioning of the steam turbine entails an adaptation to each individual plant taking into consideration, inter alia, the properties of the fuel.
  • a fundamental and difficult question to answer is how large a heat-transfer area is required in the tube bundle to achieve a certain desired steam production.
  • the heat transfer to the tube bundle shall be designed such that the calculated desired nominal temperature of the combustion gases, which are to drive the gas turbine, at full bed height at the same time provides a nominal steam production in the tube bundle such that a 100 per cent power output from the gas turbine is obtained while at the same time a 100 per cent power output is obtained at the steam turbine.
  • the heat absorption " .in the bed is performed by the generation of steam in the steam generator shaped as a tube bundle.
  • the steam production is controlled by the relationship
  • ⁇ T is the locally driving temperature difference
  • A is the installed area of the steam generator k is the heat-transfer coefficient
  • A constitutes the installed area of the steam generator in the PFBC plant and cannot be influenced without interfering in the plant.
  • the third parameter k can be influenced to a certain extent.
  • the parameter k or that part of the parameter k which is related to the external heat- transfer coefficient is - from the engineering point of view - a difficult parameter to calculate with satisfactory accuracy and thus to take into account when dimensioning the steam generator.
  • the dimensioning of the steam generator requires that variation in the steam produc ⁇ tion due to, for example, the quality of the fuel is taken into consideration.
  • Another problem which should be observed is the uncertainty which arises because of the properties of the bed, over which technicians have moderate control. This includes, for example, variation of particle fineness or particle properties when the quality or composition of the fuel fluctuates, or when changing to firing of a somewhat different type of coal than what was originally intended when firing, for example, parti- culate coal, all of these examples resulting in a changed k- value with an ensuing incorrectly dimensioned heat transfer.
  • the surplus steam is discharged from the steam system downstream of the bed and is supplied to a preheater in the form of a heat exchanger, which the combustion air flows through upstream of the bed, a higher temperature thus being imparted to the combustion air inclu ⁇ ded, which results in the power output from the gas turbine increasing.
  • a preheater in the form of a heat exchanger, which the combustion air flows through upstream of the bed, a higher temperature thus being imparted to the combustion air inclu ⁇ ded, which results in the power output from the gas turbine increasing.
  • an incorrectly dimensioned tube system may be corrected by transferring a variable quantity of energy to a gas system in which the gas turbine is included.
  • a disadvantage of such a solution is that it entails installation of additional components and associated control equipment and thus makes the plant more complicated.
  • the present invention is characterized in that the heat- transfer area of the steam generator is designed somewhat oversized in the bed in a PFBC power plant. By then creating one or more non-fluidized zones in the bed during operation, the active heat-transfer tube area may be adjusted. A certain part of the tube area is rendered passive as regards heat transfer.
  • Defluidization is achieved in a very simple manner by shutting off the fluidizing air to the bed below a vertical channel where a defluidized zone is to be created.
  • a barrier in the form of a shelf or a stop plate is installed near the lower ⁇ most level of the tube bundle, thus preventing fluidizing air from reaching the bed above the barrier. This results in the creation of an almost vertically standing defluidized zone above the barrier.
  • the cross-section area of the zone in the horizontal direction is determined by the horizontal area of the barrier.
  • these defluidized zones are created • nearest the walls of the combustor by shutting off the flui ⁇ dizing air as mentioned above and installing stop plates at the boiler walls in the vicinity of the lower level of a tube bundle.
  • An additional advantage of the invention is that the risks of erosion on tube surfaces and boiler walls are reduced.
  • Experience has shown a tendency to erosion in vertical channels in a fluidized wall, where no obstacles to a bed material flow in the vertical direction occur, as is the case precisely at a gap between tubes in a tube bundle and an adjacent boiler wall.
  • the upwardly-rising flows of fluidizing gas and the flows of bed material may in these gaps reach high velocities, which results in a higher erosion effect on the wall and tube material close to the path of the flow.
  • Still another advantage of the method according to the inven- tion can be understood when considering the construction of the walls in the room which surrounds the bed.
  • These walls consist of tube panels, which at the same time constitute a part of the walls of the combustor.
  • These tube panels are traversed by water, included in the steam system of the plant.
  • the water is usually heated in an economizer and is thereafter preheated further in the tube panels around the bed before the water is supplied to a steam generator in the bed. From the point of view of manufacturing, it is an advantage to be able to heat the water in the economizer to a high degree. If the heating is driven too far in the economizer, on the other hand, a risk of boiling of the water in the panel walls of the combustor arises.
  • Figure 1 schematically illustrates a view of a pressurized fluidized bed where the positions of the defluidizing devices according to the invention are shown.
  • Figure 2 shows the same view as Figure 1 with regions where non-fluidized zones are created between the tube bundle and the boiler wall by means of devices according to the invention marked as regions in the figure with heavier shading.
  • Figure 3 schematically shows a view of a pressurized fluidized bed where the positions of the defluidizing devices according to the invention are shown in a bed where two tube bundles create an intermediate gap and where a non-fluidized zone is created between two tube bundles by means of devices according to the invention, the non-fluidized region being marked in the figure as a region with heavier shading in the gap created between the tube bundles.
  • FIG. 1 the central units of a PFBC power plant are represented, wherein a combustor 1 is housed in a pressure vessel 2. Air from a compressor (not shown) is supplied to the pressure vessel 2 via the air inlet 3 for pressurization of the pressure vessel 2 and hence also the combustor 1. The compressed air 4 is supplied to the combustor 1 via fluidization nozzles 5 at the bottom of the combustor for fluidization of a bed 6 accommodated in the combustor.
  • the bed consists of bed material and of particulate fuel which is burnt in the fluidizing air 4 supplied to the bed 6.
  • Combus ⁇ tion gases from the bed 6 pass through a freeboard above the surface of the bed and are forwarded via the outlet 8 for cleaning in dust separators, whereafter the combustion gases are expanded in a gas turbine (not shown) , where the energy contents in the gases are transformed into useful energy.
  • a tube bundle 10 which is completely immersed into the bed at full-load operation, is also shown. Water is supplied to the tube bundle 10 at 11 for cooling the bed 10 and further for generating steam in the tubes in the tube bundle. The steam is forwarded at 12 to a steam turbine (not shown) in a steam cycle in the plant.
  • the heat-transfer area of the tubes in the tube bundle 10 is made somewhat larger than what is justified to achieve a cooling of the bed which is suffi ⁇ cient to maintain the bed at an optimum working temperature.
  • the heat-transfer area of the tubes of the tube bundle 10 can then be reduced by installing a barrier or shield in the form of - in the simplest case - a shelf 15 near the lowermost level 14 of the tube bundle.
  • the shelf is suitably located horizontally or almost horizontally and is connected to the boiler wall 16, that is, in this case to the wall of the combustor 1 and will thus block the inlet for a flow of fluidized bed material to a gap 17 shown between the tube bundle 10 and the boiler wall 16.
  • an almost vertical channel 18 of non-fluidized bed material thus arises along the boiler wall 16.
  • the shelf 15 consists of a plate which is attached to the boiler wall 16, for example by welding thereto.
  • Other materials and other forms than a plate shelf plane may, of course, be used.
  • other geometries of the barrier may be desirable. For example, shapes with triangular cross sections may be preferable.
  • a defluidizing member 15 instead of a shelf 15 there may be arranged a low, prefe ⁇ rably vertical, fixedly mounted partition which is applied near the lowermost tubes of the tube system (10), between the gap 17 and the tube system 10, while at the same time fluidi ⁇ zing air is not supplied below the gap 17 in the bed.
  • a low, prefe ⁇ rably vertical, fixedly mounted partition which is applied near the lowermost tubes of the tube system (10), between the gap 17 and the tube system 10, while at the same time fluidi ⁇ zing air is not supplied below the gap 17 in the bed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The invention is characterized in that the heat-transfer area of a steam generator (10) is designed somewhat oversized in a fluidized bed (6) in a PFBC power plant. By thereafter creating one or a plurality of non-fluidized zones (18) in the bed (6) during operation, the active heat-transfer area of tubes in the steam generator (10) may be adjusted. A certain proportion of the installed tube area is made passive as regards heat transfer. Defluidization is accomplished by shutting off fluidizing air (4) to the bed (6) below a vertical channel where a non-fluidized zone (18) is to be created. A barrier (15) in the form of a shelf or a stop plate is installed near the lowermost level (14) of the tube bundle (10), thus preventing fluidizing air (4) from reaching the bed (6) above the barrier (15). This results in the creation of an almost vertically standing non-fluidized zone (18) above the barrier (15). The cross-section area of the zone (18) in the horizontal direction is determined by the horizontal area of the barrier (15).

Description

Method and device for readjusting the heat transfer surface of a fluidized bed
TECHNICAL FIELD
A PFBC power plant (Pressurized Fluidized Bed Combustion) is provided with a steam turbine for utilizing steam energy generated in a tube system immersed into a fluidized bed. A gas turbine is employed at the same time for utilizing the energy contents in flue gases formed during combustion in the bed. The invention relates to the problem of dimensioning the heat-transferring tube area of the tube system.
BACKGROUND ART
During combustion of particulate fuel, usually coal, in a pressurized fluidized bed of a PFBC power plant, the bed is supplied with combustion air in the form of compressed air from the pressure vessel which surrounds a bed vessel, wherein the fluidized bed is stored, via fluidization nozzles below the bed. The combustion gases which are formed during the combustion process are passed through a freeboard above the bed surface, whereupon they are cleaned and passed to a gas turbine. The combustion gases drive the gas turbine, which in turn drive a generator as well as a compressor which provides the pressure vessel with compressed air.
For cooling the bed to a temperature of the order of magnitude of 850°C, a steam generator in the form of a tube bundle, which constitutes a component in a steam system, is placed in the bed. In the tube bundle steam is generated, energy thus being obtained from the bed via the steam turbines to which the steam is led in the steam system. At full load, the entire tube bundle is situated within the bed. The cooling capacity of the tube bundle must be dimensioned to the power output from the bed to be able to maintain the correct bed tempera- ture. At full load output from the plant, it is desired that both the steam turbine and the gas turbine are supplied with nominal power values for the respective turbine type, dimen¬ sioned for the plant. On the other hand, it is a difficult technical problem to dimension the steam turbine to the exactly nominally correct power value when designing a PFBC plant, that is, the design of the steam turbine. The dimen¬ sioning of the steam turbine is dependent on the fuel fine¬ ness, the moisture content of the fuel, the type of fuel, etc. , whereby the dimensioning of the steam turbine entails an adaptation to each individual plant taking into consideration, inter alia, the properties of the fuel. A fundamental and difficult question to answer is how large a heat-transfer area is required in the tube bundle to achieve a certain desired steam production. At full load, the heat transfer to the tube bundle shall be designed such that the calculated desired nominal temperature of the combustion gases, which are to drive the gas turbine, at full bed height at the same time provides a nominal steam production in the tube bundle such that a 100 per cent power output from the gas turbine is obtained while at the same time a 100 per cent power output is obtained at the steam turbine.
The heat absorption".in the bed is performed by the generation of steam in the steam generator shaped as a tube bundle. The steam production is controlled by the relationship
Q = k * A * ΔT
where Q is the transferred quantity of heat
ΔT is the locally driving temperature difference A is the installed area of the steam generator k is the heat-transfer coefficient
For the steam cycle in a PFBC power plant, the temperature difference cannot be freely influenced. The reason for this resides in factors associated with combustion engineering and especially environmental factors.
A constitutes the installed area of the steam generator in the PFBC plant and cannot be influenced without interfering in the plant.
The third parameter k can be influenced to a certain extent. However, it must be pointed out that the parameter k or that part of the parameter k which is related to the external heat- transfer coefficient is - from the engineering point of view - a difficult parameter to calculate with satisfactory accuracy and thus to take into account when dimensioning the steam generator. This means that when designing the steam generator for a PFBC plant, a certain inaccuracy in the area dimen¬ sioning must be accepted. In addition, the dimensioning of the steam generator requires that variation in the steam produc¬ tion due to, for example, the quality of the fuel is taken into consideration.
Another problem which should be observed is the uncertainty which arises because of the properties of the bed, over which technicians have moderate control. This includes, for example, variation of particle fineness or particle properties when the quality or composition of the fuel fluctuates, or when changing to firing of a somewhat different type of coal than what was originally intended when firing, for example, parti- culate coal, all of these examples resulting in a changed k- value with an ensuing incorrectly dimensioned heat transfer.
When adjusting a correct heat-transfer area in a fluidized bed, it has previously been necessary to increase or reduce the already-installed tube area, when it is found afterwards that the tube area is inaccurately dimensioned. This is costly. Another way of solving the problem with dimensioning of the tube area of the tube system is disclosed in SE 91018820. According to this publication, the heat-transfer area of the steam generator is designed somewhat oversized in the bed of a PFBC power plant. In this way, a surplus of steam is generated in the steam system of the power plant. The surplus steam is discharged from the steam system downstream of the bed and is supplied to a preheater in the form of a heat exchanger, which the combustion air flows through upstream of the bed, a higher temperature thus being imparted to the combustion air inclu¬ ded, which results in the power output from the gas turbine increasing. In this connection, an incorrectly dimensioned tube system may be corrected by transferring a variable quantity of energy to a gas system in which the gas turbine is included. A disadvantage of such a solution is that it entails installation of additional components and associated control equipment and thus makes the plant more complicated.
SUMMARY OF THE INVENTION
The present invention is characterized in that the heat- transfer area of the steam generator is designed somewhat oversized in the bed in a PFBC power plant. By then creating one or more non-fluidized zones in the bed during operation, the active heat-transfer tube area may be adjusted. A certain part of the tube area is rendered passive as regards heat transfer.
Defluidization is achieved in a very simple manner by shutting off the fluidizing air to the bed below a vertical channel where a defluidized zone is to be created. A barrier in the form of a shelf or a stop plate is installed near the lower¬ most level of the tube bundle, thus preventing fluidizing air from reaching the bed above the barrier. This results in the creation of an almost vertically standing defluidized zone above the barrier. The cross-section area of the zone in the horizontal direction is determined by the horizontal area of the barrier.
In the non-fluidized zones, no significant combustion takes place, since no, or a very limited, particle movement occurs. No, or very little, power is thus absorbed by tubes disposed in these non-fluidized zones. Tube surfaces which, by the actions described according to the invention, end up in non- fluidized zones will thereby not be heat-transfer areas. By creating non-fluidized zones with an adapted area, the too large heat-transfer area of the tube system may be compensated for by means of non-fluidized zones in the bed.
Most appropriately, these defluidized zones are created nearest the walls of the combustor by shutting off the flui¬ dizing air as mentioned above and installing stop plates at the boiler walls in the vicinity of the lower level of a tube bundle.
Some of the advantages of readjusting the heat-transfer area of the tube system according to the invention are the following:
- the non-fluidized zones are achieved in a very simple manner, as already mentioned, for example by installing stop plates according to the embodiments,
- the extent of the defluidization and the reduction of the heat-transfer area, dependent thereon, of the tube system can be easily changed, and
- the actions described can be realized at low costs.
An additional advantage of the invention is that the risks of erosion on tube surfaces and boiler walls are reduced. Experience has shown a tendency to erosion in vertical channels in a fluidized wall, where no obstacles to a bed material flow in the vertical direction occur, as is the case precisely at a gap between tubes in a tube bundle and an adjacent boiler wall. The upwardly-rising flows of fluidizing gas and the flows of bed material may in these gaps reach high velocities, which results in a higher erosion effect on the wall and tube material close to the path of the flow. By placing the defluidized barriers according to the invention, for example in the form of stop plates, at the boiler walls near the lower level of the tube system, the occurrence of erosion-promoting gaps is prevented between tubes and boiler wall.
Still another advantage of the method according to the inven- tion can be understood when considering the construction of the walls in the room which surrounds the bed. These walls consist of tube panels, which at the same time constitute a part of the walls of the combustor. These tube panels are traversed by water, included in the steam system of the plant. The water is usually heated in an economizer and is thereafter preheated further in the tube panels around the bed before the water is supplied to a steam generator in the bed. From the point of view of manufacturing, it is an advantage to be able to heat the water in the economizer to a high degree. If the heating is driven too far in the economizer, on the other hand, a risk of boiling of the water in the panel walls of the combustor arises. To overcome this problem, it has previously been necessary to insulate the walls of the bed in the com¬ bustor, for example by means of ceramics, to prevent too much heat from being transferred from the bed to the water in the tube panels around the bed. With the method according to the invention, an insulating layer is achieved by means of the non-fluidized zones along the walls of the bed, which layer provides the same effect as the above-mentioned installed extra ceramic insulation on the insides of the bed walls. If desired, this extra insulation may be excluded. BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 schematically illustrates a view of a pressurized fluidized bed where the positions of the defluidizing devices according to the invention are shown.
Figure 2 shows the same view as Figure 1 with regions where non-fluidized zones are created between the tube bundle and the boiler wall by means of devices according to the invention marked as regions in the figure with heavier shading.
Figure 3 schematically shows a view of a pressurized fluidized bed where the positions of the defluidizing devices according to the invention are shown in a bed where two tube bundles create an intermediate gap and where a non-fluidized zone is created between two tube bundles by means of devices according to the invention, the non-fluidized region being marked in the figure as a region with heavier shading in the gap created between the tube bundles.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
A number of embodiments of the invention will be described with reference to the accompanying drawings.
In an overall figure (Figure 1) , the central units of a PFBC power plant are represented, wherein a combustor 1 is housed in a pressure vessel 2. Air from a compressor (not shown) is supplied to the pressure vessel 2 via the air inlet 3 for pressurization of the pressure vessel 2 and hence also the combustor 1. The compressed air 4 is supplied to the combustor 1 via fluidization nozzles 5 at the bottom of the combustor for fluidization of a bed 6 accommodated in the combustor. The bed consists of bed material and of particulate fuel which is burnt in the fluidizing air 4 supplied to the bed 6. Combus¬ tion gases from the bed 6 pass through a freeboard above the surface of the bed and are forwarded via the outlet 8 for cleaning in dust separators, whereafter the combustion gases are expanded in a gas turbine (not shown) , where the energy contents in the gases are transformed into useful energy.
In the fluidized bed 6, a tube bundle 10, which is completely immersed into the bed at full-load operation, is also shown. Water is supplied to the tube bundle 10 at 11 for cooling the bed 10 and further for generating steam in the tubes in the tube bundle. The steam is forwarded at 12 to a steam turbine (not shown) in a steam cycle in the plant.
According to the invention, the heat-transfer area of the tubes in the tube bundle 10 is made somewhat larger than what is justified to achieve a cooling of the bed which is suffi¬ cient to maintain the bed at an optimum working temperature.
According to the invention, the heat-transfer area of the tubes of the tube bundle 10 can then be reduced by installing a barrier or shield in the form of - in the simplest case - a shelf 15 near the lowermost level 14 of the tube bundle. The shelf is suitably located horizontally or almost horizontally and is connected to the boiler wall 16, that is, in this case to the wall of the combustor 1 and will thus block the inlet for a flow of fluidized bed material to a gap 17 shown between the tube bundle 10 and the boiler wall 16. As illustrated in Figure 2, an almost vertical channel 18 of non-fluidized bed material thus arises along the boiler wall 16. In this channel 18 no significant combustion takes place, since no transfer of fuel to the non-fluidized region takes place, which means that the tube surfaces which are situated within the vertical non- fluidized channel 18 will not function as heat-transfer areas to any significant extent. In this way, a reduction of an actively heat-transferring area in the tube bundle is achieved. The reduction of this heat-transfer area of the tube bundle 10 may then be chosen by means of adaptation of the area of the shelf 15 which shields off the region above the shelf from access to fluidizing air and thus creates a non- fluidized channel 18 of the desired magnitude.
To improve the function of the shielding by means of the shelf 15, the supply of fluidizing air 4 to fluidization nozzles 19, located below the shelf 15, is shut off.
In the simplest case, the shelf 15 consists of a plate which is attached to the boiler wall 16, for example by welding thereto. Other materials and other forms than a plate shelf plane may, of course, be used. For reasons of flow charac¬ teristics, other geometries of the barrier may be desirable. For example, shapes with triangular cross sections may be preferable.
In those cases where more than one tube bundle 10 occurs in a combustor 1, it may be justified to create defluidized zones in a similar manner as above in vertical gaps which occur between the various tube bundles. In this case, a shelf 15 is installed in a corresponding manner below the gap which occurs between two tube bundles. This leads to the creation of a non- fluidized zone 18 in the gap between the adjacent tube bundles.
In another, alternative embodiment of a defluidizing member 15, instead of a shelf 15 there may be arranged a low, prefe¬ rably vertical, fixedly mounted partition which is applied near the lowermost tubes of the tube system (10), between the gap 17 and the tube system 10, while at the same time fluidi¬ zing air is not supplied below the gap 17 in the bed. Through this arrangement, non-fluidized ash and bed material will accumulate in a pocket between the partition and the boiler wall 16, whereby the accumulated material will serve as a defluidizing shelf similar to the shelf 15 described above.

Claims

1. A method for readjusting the heat-transferring tube area in a tube system (10) immersed into a fluidizing bed (6) in a power plant which comprises a combustor (1) with a fluidized bed (6) enclosed therein, wherein a fuel is burnt, where the bed is fluidized by means of air (4) which is supplied to the bottom of the bed via nozzles (5) and where the bed is cooled by means of a coolant which traverses the tube system (10), characterized in that the heat-transfer area of the tube system (10) is reduced to an optimum level by arranging, at the lowermost level of the tube system (10), fixedly mounted members (15) in order to constantly prevent fluidization of the bed (6) in non-fluidized, essentially vertical channels (18) downstream of the member (15), whereby the tube surfaces which are located within the non-fluidized channel (18) are not supplied with any heat and are thus made passive from the point of view of heat transfer.
2. A method according to claim 1, characterized in that the cross-section area of the vertical non-fluidized channels (18) , and hence the reduction of the heat-transfer area of the tube system, are determined by the area of the fluidization- preventing members (15) .
3. A method according to claim 2, characterized in that fluidizing air to the bed (6) is shut off at fluidization nozzles (19) located upstream of the fluidization-preventing members (15) .
4. A device for readjusting the heat-transferring tube area in a tube system (10) immersed into a fluidizing bed (6) in a power plant which comprises a combustor (1) with a fluidized bed (6) enclosed therein, wherein a fuel is burnt, where the bed is fluidized by means of air (4) which is supplied to the bottom of the bed via nozzles (5) and where the bed is cooled by means of a coolant which traverses the tube system (10), ■ characterized in that the heat-transfer area of this tube system (10) is reduced to an optimum level by means of members (15) fixedly mounted at the lowermost level of the tube system (10) , said members constantly prevent fluidization of the bed (6) in non-fluidized, essentially vertical channels (18) down¬ stream of the member (15), whereby the tube surfaces which are located within the non-fluidized channel (18) are not supplied with any heat and are then made passive from the point of view of heat transfer.
5. A device according to claim 4, characterized in that the fluidization-preventing member (15) consists of a shield or shelf which is applied essentially horizontally or essentially vertically at the lowermost level of the tube system (10) .
6. A device according to claim 5, characterized in that the member (15) is applied against the boiler wall (16) and hence creates a non-fluidized channel (18) in a gap (17) exhibited between the tube system (10) and the boiler wall (16) .
7. A device according to claim 5, characterized in that the member (15) is applied essentially horizontally at the lower¬ most level of the tube system (10) at a gap which occurs between two tube bundles in the tube system (10) and hence creates a non-fluidized channel (18) in said gap.
8. A device according to claim 5, characterized in that the member (15) consists of a shield which is applied vertically between the tube system (10) and the gap (17) between the tube system (10) and the boiler wall (16) .
9. A device according to any of the preceding claims, characterized in that the fluidization-preventing member (15) consists of a plate.
PCT/SE1995/000322 1994-03-28 1995-03-27 Method and device for readjusting the heat transfer surface of a fluidized bed Ceased WO1995026483A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP95914650A EP0795108B1 (en) 1994-03-28 1995-03-27 Method and device for readjusting the heat transfer surface of a fluidized bed
DE69513039T DE69513039T2 (en) 1994-03-28 1995-03-27 METHOD AND DEVICE FOR CHANGING THE HEAT TRANSFER SURFACE OF A FLUID BED
FI970559A FI970559A7 (en) 1994-03-28 1997-02-10 Method and device for readjusting the heat transfer area of a fluidized bed

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE9401032A SE9401032L (en) 1994-03-28 1994-03-28 Method and apparatus for adjusting the tube surface in a fluidized bed
SE9401032-9 1994-03-28

Publications (1)

Publication Number Publication Date
WO1995026483A1 true WO1995026483A1 (en) 1995-10-05

Family

ID=20393443

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE1995/000322 Ceased WO1995026483A1 (en) 1994-03-28 1995-03-27 Method and device for readjusting the heat transfer surface of a fluidized bed

Country Status (6)

Country Link
EP (1) EP0795108B1 (en)
DE (1) DE69513039T2 (en)
ES (1) ES2141345T3 (en)
FI (1) FI970559A7 (en)
SE (1) SE9401032L (en)
WO (1) WO1995026483A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000043713A1 (en) 1999-01-21 2000-07-27 Kvaerner Pulping Oy Method in connection with a pipe grate for fluidized bed boiler and a pipe grate
DE102016225338A1 (en) * 2016-12-16 2018-06-21 Deutsches Zentrum für Luft- und Raumfahrt e.V. Heat exchanger for heat transfer between a particulate heat transfer medium and a second medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2842102A (en) * 1954-11-18 1958-07-08 Combustion Eng Steam generation
US3387590A (en) * 1967-03-16 1968-06-11 Interior Usa System for regulating the total heat output in a burning fluidized bed heat exchanger or boiler
US3542523A (en) * 1967-09-08 1970-11-24 Dorr Oliver Inc Reactor design
GB1525222A (en) * 1973-05-05 1978-09-20 Pearce A Fluidised beds
US4177765A (en) * 1978-08-14 1979-12-11 The Babcock & Wilcox Co. Output control for fluidized bed boilers
DE3030215A1 (en) * 1980-08-09 1982-03-18 Bergwerksverband Gmbh, 4300 Essen Fluid bed firing
US4396056A (en) * 1980-11-19 1983-08-02 Hodges James L Apparatus and method for controlling heat transfer between a fluidized bed and tubes immersed therein
US4436507A (en) * 1981-07-16 1984-03-13 Foster Wheeler Energy Corporation Fluidized bed reactor utilizing zonal fluidization and anti-mounding air distributors
US4453494A (en) * 1982-03-22 1984-06-12 Combustion Engineering, Inc. Fluidized bed boiler having a segmented grate
SE457661B (en) * 1986-06-12 1989-01-16 Lars Axel Chambert SEAT AND REACTOR FOR FLUIDIZED BOTTOM

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2842102A (en) * 1954-11-18 1958-07-08 Combustion Eng Steam generation
US3387590A (en) * 1967-03-16 1968-06-11 Interior Usa System for regulating the total heat output in a burning fluidized bed heat exchanger or boiler
US3542523A (en) * 1967-09-08 1970-11-24 Dorr Oliver Inc Reactor design
GB1525222A (en) * 1973-05-05 1978-09-20 Pearce A Fluidised beds
US4177765A (en) * 1978-08-14 1979-12-11 The Babcock & Wilcox Co. Output control for fluidized bed boilers
DE3030215A1 (en) * 1980-08-09 1982-03-18 Bergwerksverband Gmbh, 4300 Essen Fluid bed firing
US4396056A (en) * 1980-11-19 1983-08-02 Hodges James L Apparatus and method for controlling heat transfer between a fluidized bed and tubes immersed therein
US4436507A (en) * 1981-07-16 1984-03-13 Foster Wheeler Energy Corporation Fluidized bed reactor utilizing zonal fluidization and anti-mounding air distributors
US4453494A (en) * 1982-03-22 1984-06-12 Combustion Engineering, Inc. Fluidized bed boiler having a segmented grate
SE457661B (en) * 1986-06-12 1989-01-16 Lars Axel Chambert SEAT AND REACTOR FOR FLUIDIZED BOTTOM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN, Vol. 7, No. 291, M-265; & JP,A,58 164 914 (KAWASAKI JUKOGYO KK), 29 Sept 1983. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000043713A1 (en) 1999-01-21 2000-07-27 Kvaerner Pulping Oy Method in connection with a pipe grate for fluidized bed boiler and a pipe grate
US6571746B1 (en) 1999-01-21 2003-06-03 Kvaerner Pulping Oy Method in connection with a pipe grate for fluidized bed boiler and a pipe grate
US6782848B2 (en) 1999-01-21 2004-08-31 Kvaerner Power Oy Method in connection with a pipe grate for fluidized bed boiler and a pipe grate
DE102016225338A1 (en) * 2016-12-16 2018-06-21 Deutsches Zentrum für Luft- und Raumfahrt e.V. Heat exchanger for heat transfer between a particulate heat transfer medium and a second medium

Also Published As

Publication number Publication date
EP0795108A1 (en) 1997-09-17
FI970559A0 (en) 1997-02-10
ES2141345T3 (en) 2000-03-16
EP0795108B1 (en) 1999-10-27
SE9401032L (en) 1995-09-29
DE69513039D1 (en) 1999-12-02
DE69513039T2 (en) 2000-06-29
FI970559A7 (en) 1997-02-10
SE9401032D0 (en) 1994-03-28

Similar Documents

Publication Publication Date Title
US8511258B2 (en) Coal boiler and coal boiler combustion method
US4823740A (en) Thermal reactor
EP0574176A1 (en) Fluidized bed reactor system and method having a heat exchanger
RU2104442C1 (en) Circulating fluidized bed reactor
EP0640199B1 (en) Method and apparatus for providing a gas seal in a return duct and/or controlling the circulating mass flow in a circulating fluidized bed reactor
US5946901A (en) Method and apparatus for improving gas flow in heat recovery steam generators
JPS5837402A (en) Boiler
KR20010030643A (en) Fluid bed ash cooler
EP0795108B1 (en) Method and device for readjusting the heat transfer surface of a fluidized bed
JPH04503095A (en) System and method for reheat steam temperature control in circulating fluidized bed boiler
WO2004048849A1 (en) Tower boiler including a stationary supporting structure
KR19990071571A (en) Circulating fluidized bed reactor with multiple furnace outlets
GB2049134A (en) Fluidized bed fuel burning
EP0214538B1 (en) Power plant with a fluidized bed combustion chamber
EP3877697B1 (en) A combustor air bar grid for use within a fluidized bed reactor, and a fluidized bed reactor
EP1149257B1 (en) Pipe grate for a fluidized bed boiler
CA1311395C (en) Fluidized bed steam generating system including a steam cooled cyclone separator
JPS6324201B2 (en)
EP0243156A1 (en) A fluid-bed reactor
CN1204391A (en) Method and apparatus for controlling temp. of bed of bubbling bed boiler
Sheng et al. Heat-transfer study of external superheater of CFB incinerator
EA000099B1 (en) Steam generator with supercharged circulating fluidized bed combustion
Goidich et al. The pressurized combustor
RU2041419C1 (en) Steam generator
Follett et al. Plant start-up of an atmospheric fluidized bed boiler retrofit

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): FI JP KR US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref country code: US

Ref document number: 1996 836806

Date of ref document: 19960928

Kind code of ref document: A

Format of ref document f/p: F

WWE Wipo information: entry into national phase

Ref document number: 1995914650

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 970559

Country of ref document: FI

WWP Wipo information: published in national office

Ref document number: 1995914650

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 1995914650

Country of ref document: EP