WO1995015428A1 - Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes - Google Patents

Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes Download PDF

Info

Publication number
WO1995015428A1
WO1995015428A1 PCT/NO1993/000182 NO9300182W WO9515428A1 WO 1995015428 A1 WO1995015428 A1 WO 1995015428A1 NO 9300182 W NO9300182 W NO 9300182W WO 9515428 A1 WO9515428 A1 WO 9515428A1
Authority
WO
WIPO (PCT)
Prior art keywords
silo
separator
module
underwater station
scrubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NO1993/000182
Other languages
English (en)
Inventor
Kjell O. Stinessen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kvaerner Energy AS
Original Assignee
Kvaerner Energy AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kvaerner Energy AS filed Critical Kvaerner Energy AS
Priority to PCT/NO1993/000182 priority Critical patent/WO1995015428A1/fr
Priority to AU59802/94A priority patent/AU5980294A/en
Publication of WO1995015428A1 publication Critical patent/WO1995015428A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/36Underwater separating arrangements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/037Protective housings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations

Definitions

  • the invention relates to a procedure in the development of a hydrocarbon field offshore and an underwater station for use in exploiting a hydrocarbon field offshore, including a silo embedded into the seabed.
  • Production wells are drilled from a platform down into the hydrocarbon reservoir.
  • the platform is positioned above the height of the waves on a substructure resting on the seabed or floating at sea level.
  • the well-head valves which shut off the reservoir pressure, are situated on the platform, usually straight above the production wells.
  • the oil which is present at high pressure in the hydro- carbon reservoir contains large quantities of dissolved gas.
  • the capacity of the oil to retain the dissolved gas will decrease with subsiding pressure and rising tempera ⁇ ture.
  • gas will thus be released from the oil. It will consequently be a mixture of oil and gas (in actual fact a mixture of liquid (oil/water) and gas) which emerges from the top of the well-head valve.
  • This mixture of liquid and gas is carried to a processing plant which usually stands on the platform.
  • the function of the processing plant is chiefly to separate oil and gas and make the oil suited for transportation and the gas suited for transportation or for being returned to the reservoir.
  • a number of auxiliary functions and emergency systems will need to be constructed round the processing plant.
  • operation of the processing, auxiliary and emergency systems requires a crew, who will in turn need to be accommodated, and a number of additional functions.
  • As a result plants tend to be large and costly both as investments and in operation. At greater ocean depths the problem of costs is aggravated when the platform with the plant has to stand on an expensive substructure anchored to the seabed or afloat.
  • the production wells in an underwater production plant are drilled from floating or jack-up drilling vessels. Oil and gas from the hydrocarbon reservoir flow upwards and past the the well-head valves on the seabed and then pass as a two-phase flow (oil and gas admixed) in a pipeline which connects the underwater production plant to the platform. Such two-phase flows will entail the formation of slugs of liquid resulting in hard impacts of liquid, uncontrolled flow conditions, and a large pressure drop in the pipeline. The distance from the underwater production plant to the platform, therefore, must not be great. A practical limit today is considered to be about 5 km.
  • the production from several wells may be collected and conveyed onwards in a common flow.
  • One problem in this connection is the dissimilar well flow pressures which may occur. This may be resolved by conducting the well flows via separate stations where the well flow pressure will be adapted to one common value, whereupon the well flow is gathered in a manifold station for onwards transportation.
  • underwater pumping stations may be used for the transportation of a well flow across large dist- ances to the shore or to existing processing platforms with spare capacity some distance away. Placing these on the seabed offers many advantages. Compressors and pumps will be surrounded by a cooling medium (the sea water) of approximately constant temperature. The danger of explosion has been eliminated, and the plant will not be affected by wind and waves, nor be covered with ice. Major savings can be obtained on the platform costs, accommodation costs and transport of personnel and equipment to and from the shore.
  • a cooling medium the sea water
  • Underwater pumping stations are, however, at the outset encumbered by a number of disadvantages and problems. Thus, daily simple inspection and maintenance will be precluded.
  • the system and components for controlling and monitoring remote underwater stations are still relatively untried technology. The necessary electrical energy needs to be transferred across large distances, and connecting it to the equipment at the underwater station must be done in a satisfactory manner.
  • an underwater station which comprises a separator for separating the well flow into liquid (oil/water) and gas, a pump assembly comprising a pump and a motor, and a compressor unit comprising a compressor motor, as well as fluid carrying conduits between separator and pump and compressor, respectively.
  • the components of the underwater station i.e. separator, pump assembly, and compressor unit are built as a compact unit with the three components arranged in a columnar structure where the pump unit is at the bottom, followed by the separator, and with the compressor assembly at the top.
  • the fluid carrying conduits are designed to be connected to the bottom of the columnar structure.
  • they are gathered into a common connector unit.
  • the known underwater station constitutes a compact unit which contains a simple separator, a pump and a compressor which may be placed on the seabed.
  • the unit splits the hydrocarbon flow from one or more underwater wells into gas and liquid phases. After that, the pressure in the gas and the liquid increases, enabling the production flow to be transported across large distances. Transport from the unit may be done either in a common pipeline or in separate pipelines for oil and gas.
  • the compact unit may be installed by means of a drilling rig or as an example, by a modified diving vessel with a large moon-pool.
  • the compact design means that long fluid carrying conduits in the station are obviated, which in turn means that it is possible to avoid pressure drops in these conduits. The number of valves and couplings required is thus reduced. Because to a large extent fluid conduit connections in the station are avoided, undesirable effects resulting from so- called slugs, i.e. liquid trains and gas bubbles, will also be avoided.
  • the compressor By having the compressor as the topmost unit, self-draining of the gas is achieved. Any liquid forming in the compressor section will run downwards from the compressor or the gas section. The gas will often be at dew point, and consequently, con ⁇ densation will readily form in the gas carrying sections.
  • the pump unit lying below is self-draining in the same way as the compressor unit which lies above. In the same manner that condensate gas trickles down from the upper compressor unit, any gas in the pump unit below will bubble upwards into the separator.
  • the underwater station utilises fully its favourable ambient environment, namely the sea water, for cooling of the compressor and pump.
  • the underwater station is surrounded by a sturdy frame which serves to protect the station from damage in transit and during installation.
  • the compact, vertical embodiment of the station it may be a case of a station of a height of for example 12 m, could also suitably be placed in a seabed silo. A location in a silo will provide additional good protection, and will be particularly advantageous in arctic waters and on or in the vicinity of fishing grounds.
  • the invention takes hold of the said aspect of time, the cost aspect, and the safety and security aspect.
  • the invention thus provides a system which may be extended / complemented according to relevant needs, in step with the field production, while at the same time the safety and security will be greatly increased. Costs will be reduced due to the underwater station being built as required, and the safety and security of the entire plant drastically increased in that the silo technique is utilised.
  • proposed according to the invention is a procedure in the development of a hydrocarbon field off ⁇ shore, characterised in that embedded into the seabed is an upwardly open silo which is prepared to receive, or which already contains, a separator and/or mechanically rotating equipment requiring cooling, the equipment being placed in the silo in step with the relevant need, the silo being prepared for sequential placement of equipment as stated.
  • the initial equipment will be a separator, but the sequence will depend on the need in each case.
  • separator With regard to an expected normal progression it would be advantageous to let the separator be part of a separator- cooler-scrubber-module, because the cooler will be necessary in the subsequent positioning of and operation of mechanically rotating equipment (compressor) providing energy to the gases.
  • An advantageous procedure according to the invention is one where a separator-cooler-scrubber-module is first placed in the silo, and in step with the need in each case additional modules are placed in the silo, e.g. pump, compressor modules etc.
  • the equipment in the silo may be complemented by a pump module and/or a compressor module.
  • a pump module and/or a compressor module.
  • arrangements are made for prepared interfaces between the separator and the pump, the separator and the compressor, and between the individual fluid conduits and pump as well as compressor. It is this, plus the fact that the silo is dimensioned to receive modules by degrees as they are needed, which is inherent in the expression that the silo is prepared.
  • an underwater station for use in exploiting a hydrocarbon field offshore, comprising a silo embedded into the seabed and characterised in that the silo is intended for successive receipt/placing of equipment in modular form in step with the need for such equipment in each case, and is prepared for placing/receipt as stated.
  • Such an underwater station may be built up step by step from modular components, so that it is made possible to build an underwater plant in step with the production of the field.
  • the underwater station in the silo may advantageously contain a separator-cooler-scrubber-module.
  • the said module may be designed so that the cooler (gas cooler) is arranged with continuous drop without substantial low points, towards the scrubber so that condensate released will flow into the scrubber which is arranged above the separator.
  • separator-cooler-scrubber-module is considered to be of independent inventive significance. Also outside a silo embedded into the seabed constructing this module thus will entail major advantages. The design ensures that condensate released in the cooler will flow into the scrubber. In addition to avoiding gathering of liquid at unwanted points, a possibility will at the same time be obtained of maintaining a low flow rate in the cooler and hence slight pressure drop. This in turn entails that the scrubber may be mounted at comparatively slight extra elevation above the separator which helps provide as compact an installation as possible.
  • the underwater station according to the invention may be provided with or complemented by a pump module.
  • This pump module is arranged below the separator in the silo.
  • the underwater station according to the invention may also advantageously contain or be complemented in that the silo arranged in connection with the separator-cooler-scrubber- module contains a compressor module arranged above the separator.
  • the underwater station may thus consist of the separator-cooler-scrubber-module with a compressor module attached, or the underwater station may fully developed contain the separator-cooler-scrubber-module arranged in connection with the said pump module below the separator, and a compressor module arranged above the separator.
  • the silo constitutes an efficient protection of the installation. Also when placed in a silo submerged into the seabed, the sea water may be utilised in cooling the various components. ith suitable measures there may be a possibility of achieving regulation of the sea water temperature round the installation in the silo.
  • the silo may advantageously have a cover device for closing the top of the silo wholly or partially. This will affect the convector flows which result from the heat exchange.
  • the silo may be seen as a potential thermos flask, and the thermos effect can for instance advantageously be utilised in a possible inter- ruption of operations, because the silo can be closed off, and thus the amount of heat around the installation be conserved, something which could also be an advantage e.g. in connection with the unwanted formation of hydrates and precipitation of wax. Keeping the temperature as high as possible in the silo can delay/prevent the formation of hydrates and precipitation of wax.
  • the wall of the silo may advantageously be designed with an upper wall band, with openings for water to flow through.
  • an upper wall area protruding above the seabed, thus enabling surrounding sea water to flow into the silo.
  • suitable particle deflectors may advantageously be arranged in order thereby to prevent mud and such like from entering to an undesired extent.
  • Such particle deflectors may for instance be in the shape of simple elements re ⁇ sembling Venetian blind slats in the openings.
  • the cold water may also be let in through the actual top of the silo or opening.
  • the cover arrangement may be utilised/designed to facilitate this, so that the water inlet may be throttled.
  • the cover arrangement can also be designed to throttle the water outlet (the upwards rising heated cooling water) , instead of or in combination with the throttling of the inlet.
  • the upper side openings, if any, can of course also comprise throttling means.
  • the silo should have an inner cylinder to surround the equipment placed in the silo.
  • the said inner cylinder will be open at the bottom to allow water to flow from the ring shaped space between the inner cylinder and the surrounding silo wall into and upwards in the inner cylinder.
  • the inner cylinder may advantageously have a perforated shell.
  • the openings thus formed are positioned exactly so as to lead the water to the greatest extent possible past those components requiring the most cooling.
  • the water flow may also be affected by an appropriate design of the silo top where according to the invention a perforated protective cover or a grate may advantageously rest.
  • a mud trap may advantageously be arranged round the top of the silo.
  • a mud trap as stated may for instance be realised in the form of a surrounding ditch in the seabed.
  • the cooler of the separator-cooler-scrubber-module may advantageously be of a spiral tube shape and pass round (make room for) compressor modules above the separator.
  • Any mud penetrating into the silo can be removed by suction points being arranged in the silo and connected to a suction device (pump) , and likewise flushing equipment may advantageously be arranged in the silo with which mud can be stirred up and more readily be able to follow the rising water flow and/or pass out at the suction points.
  • a suction device pump
  • Fig. l shows a schematic section through a silo embedded into the seabed
  • fig. 2 shows the silo with a separator-cooler-scrubber- module arranged therein
  • fig. 3 shows the underwater station of fig. 2 supplemented by a pump-module attached to the separator
  • fig. 4 shows a complete underwater station where, in addition to the pum -module, a compressor module is attached to provide energy to the gas separated off in the separator.
  • the silo 1 shown in schematic section in fig. 1 is designed as a cylindrical beaker, with a silo wall 2 and a silo bottom 3.
  • the silo 1 is shown embedded into a seabed 4.
  • the silo may be embedded into the seabed by means of known technology. Indicated in a broken line in fig. 1 is thus at the bottom a skirt 5. In the silo bottom 3, flow valves 6 are indicated. The positioning of the silo is done in the manner that the silo body, shaped as a cylindrical beaker, is lowered towards the seabed, and the skirt 5 caused to penetrate the seabed. During the lowering, the valves 6 are open, to avoid unwanted air pockets underneath the silo bottom 3. The silo is made to enter the seabed 4 until the position shown in fig. 1. The positioning of the silo may be facilitated by using known technology and known means for instance providing an underpressure underneath the silo bottom 3. Equipment used in this connection may for instance comprise flushing and suction devices etc. well known to someone skilled in the art.
  • the silo may also be realised in that at the outset it only has the shape of a shell, i.e. with an open bottom. When the shell has been positioned, its contents can be dug out or flushed out, thereby realising a silo of the type shown schematically in fig. l.
  • a mud trap has been realised as shown, in the form of a ditch 7 in the seabed 4, round the upper part of the silo.
  • the silo wall 2 is in this upper wall band provided with openings 8 which make it possible for the sea water to pass through the silo wall there.
  • 9 indicates particle deflectors in the openings. The purpose of these is to prevent that for instance mud particles enter unimpeded into the silo through the openings 8.
  • the particle deflectors 9 are in fig. I indicated in the form of horizontal elements resembling Venetian blind slats.
  • the silo is at its top fitted with a protective cover 10.
  • This protective cover is perforated or made as a grate 11 across an area corresponding to the cross section of an inner cylinder 12 in the silo 1.
  • the said inner cylinder 12 has perforations in the cylinder shell, indicated by 13.
  • the dimensioning and location of these perforations 13 are determined by the influence it is desired to lend to the flowing water, to obtain the desired cooling of the equip ⁇ ment in the underwater station which is inside the silo, surrounded by the inner cylinder 13.
  • the inner cylinder 13 extends as is shown only to some distance above the silo bottom 3, allowing for a large opening at the bottom where water may flow from the ring-shaped compartment 14 between the inner cylinder 12 and the surrounding silo wall 2.
  • the top of the silo has, optionally as an integrated part of the protective cover 10, a schematically shown cover or shut-off device 15 with which complete or partial closure of the silo top may be provided (the grate 11) .
  • Shown in fig. 2 is purely schematically an underwater station ready to receive a well flow.
  • the underwater station comprises a module 16 placed in the silo 1 and comprising a separator 17, a cooler 18 and a scrubber 19.
  • the separator 17 is as shown in the form of a container of which the lower part forms a liquid compartment and the upper part forms a gas compartment. From the separator's gas compartment a pipe 20 passes which is at its top, at 21 flanged to the scrubber 19. The pipe 20 is closed at its upper end, but from the scrubber 19, as indicated by the broken line 22, a condensate conduit passes from the scrubber 19 back to the separator 17. From the upper sec ⁇ tion of the pipe 22, an insulated pipe 23 passes to the top of a cooler 18, in this instance helically winded, of which the lowest point at 24 is connected to the scrubber 19.
  • conduit 25 leads to a connector 26.
  • the said connector 26 advantageously constitutes an inter ⁇ face between the underwater station and the production flow not shown, respectively the receiving terminals not shown for oil and gas.
  • the connector 26 also comprises a connection to a conduit 27 which passes to the separator
  • a well flow conduit 30 extends which is carried into the lower part of the silo and linked to the connector 26. Furthermore the connector 26 is attached to a gas export conduit 31 and an oil export conduit 32.
  • the separator-cooler-scrubber assembly shown and described is presumed as stated above to have independent inventive significance, i.e. irrespective of its position in the silo.
  • the main idea behind the special unit is the vertical arrangement of the scrubber above the separator and the gas cooler between separator and scrubber, the gas cooler being arranged as a cooler where the inlet is the highest point and the outlet is connected to the scrubber as the cooler's lowest point. This means that all the way the gas cooler slopes downwards, i.e. it has no low point of any significance, as shown by the pipe spiral indicated. This will ensure that condensate flows continuously out of the cooler into the scrubber, and from there to the separator. In this way, build-up of liquid plugs is avoided, with pulsating build-up of pressure and sudden influx to the scrubber, and smooth operation of the cooler is achieved at slight pressure drop.
  • the cooler 18 has heat exchange with the surrounding sea water.
  • the inner cylinder 12 which surrounds the separator module 16, causes a favourable water flow as the sea water will enter through the openings 8 in the upper silo wall band, and down into the ring shaped compartment 14, and then upwards through the inner cylinder 12 and out through the grate 11 at the top of the silo 1.
  • the perforations or openings 13 it is possible in an advantageous manner to affect the water flow so that it may be caused to flow advantageously past precisely that component which needs cooling, i.e. the cooler 18.
  • the perforations or openings 13 may be adjusted by using means not shown, or may optionally be omitted, always depending on conditions.
  • the water flow/temperature may also be influenced by means of the cover arrangement 15 with which the grate area of the grate 11 may be adjusted.
  • Fig. 3 shows the underwater station complemented by a pumping module 33 of which the pum part is connected to the liquid compartment of the separator 17, the pump outlet being connected to the conduit 28.
  • the pumping module is shown in a horizontal position, but it is naturally also possible to use a pumping module with vertical orientation i.e. with the motor section 34 of the pumping module arranged vertically below the pump part 35 of the module, the essential point being that the pumping part is arranged as shown below the separator.
  • the underwater station according to the invention is shown complemented by a compressor module 36.
  • the compressor part is defined as 37 and the motor part is defined as 38.
  • the inlet of the compressor part 37 is, in a manner not shown in greater detail, connected to the outlet 25' of the scrubber 19, and the outlet from the compressor part 37 is connected to the conduit 25" which passes to the connector 26 and is thereby attached to the gas conduit 31.
  • fig. 4 works in the same manner as described above in connection with fig.s 2 and 3, the compressor now in addition providing energy to the gas.
  • the compressor module is cooled in the same manner as the pumping module by the sea water in the silo.
  • the underwater station may also be envisaged complemented by just a compressor module, the pumping module thus then being omitted, there being no need for it.
  • the silo 1 is embedded into the seabed 4. This is, however, only the preferred version. It ought to be clear that the silo may also rest on the seabed, since it will then naturally also offer the requisite protection for the equipment, and the desired cooling of the components in the silo will then also be achieved. Placing the silo on the seabed does, however, require that a frame or such like be built round the silo so that ice, fishing tackle and other objects in the sea will be guided/lead away from the silo. Such frames are known from the common bottom frames.
  • the underwater station may have one or several suitable connectors for simple and efficient attachment of signal and power lines.
  • Throttling of the water into and out of the silo may be arranged for by simple means, not just in connection with the upper side openings shown, but also in connection with water outlet in the actual silo top and down into the ring shaped compartment.
  • the silo may have suction and flushing devices for controlling mud conditions. These devices are not shown. They may for instance be realised as suction openings in the silo wall, connected to a separate pump, respectively as flushing nozzles through which water jets may be directed which may cause any mud to be stirred up.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

Dans le but d'exploiter un gisement d'hydrocarbures au large des côtes, on a prévu la mise en place dans le fond marin d'un caisson (1) ouvert vers le haut et adapté pour recevoir/accueillir une unité de séparation et/ou un matériel mécanique rotatif que l'on doit refroidir. Le matériel nécessaire peut être mis en place dans le caisson ainsi obtenu à mesure que l'exploitation du gisement d'hydrocarbures évolue. De manière tout particulièrement avantageuse, le matériel peut être modulaire, et par exemple composé d'un module de séparation, de refroidissement et d'épuration (16), d'un module de pompage (33) et/ou d'un module compresseur (36).
PCT/NO1993/000182 1993-12-03 1993-12-03 Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes Ceased WO1995015428A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/NO1993/000182 WO1995015428A1 (fr) 1993-12-03 1993-12-03 Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes
AU59802/94A AU5980294A (en) 1993-12-03 1993-12-03 Method for developing an offshore hydrocarbon reservoir and an underwater station for use in exploring an offshore hydrocarbon reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/NO1993/000182 WO1995015428A1 (fr) 1993-12-03 1993-12-03 Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes

Publications (1)

Publication Number Publication Date
WO1995015428A1 true WO1995015428A1 (fr) 1995-06-08

Family

ID=19907718

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO1993/000182 Ceased WO1995015428A1 (fr) 1993-12-03 1993-12-03 Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes

Country Status (2)

Country Link
AU (1) AU5980294A (fr)
WO (1) WO1995015428A1 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007110378A1 (fr) * 2006-03-24 2007-10-04 Siemens Aktiengesellschaft Groupe compresseur et son procédé de montage
WO2009047521A2 (fr) 2007-10-10 2009-04-16 Petróleo Brasileiro S A - Petrobras Système et module de pompage
GB2493749A (en) * 2011-08-17 2013-02-20 Statoil Petroleum As Subsea well stream processing
WO2013187771A1 (fr) * 2012-06-14 2013-12-19 Aker Subsea As Utilisation d'un échangeur de chaleur de débit de forage pour le maintien de l'écoulement
US8967273B2 (en) 2013-03-13 2015-03-03 Conocophillips Company System for detecting, containing and removing hydrocarbon leaks in a subsea environment
US10428287B2 (en) 2014-12-29 2019-10-01 Aker Solutions As Subsea fluid processing system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2047934A1 (fr) * 1969-06-25 1971-03-19 Acf Ind Inc
NO141226B (no) * 1973-05-23 1979-10-22 Texaco Development Corp Broennkonstruksjon for en produksjonsbroenn
GB2226776A (en) * 1989-01-06 1990-07-11 Kvaerner Subsea Contracting Pumping station
WO1991018182A1 (fr) * 1990-05-11 1991-11-28 Jp Kenny Caledonia Ltd. Systemes de production pour puits sous-marins

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2047934A1 (fr) * 1969-06-25 1971-03-19 Acf Ind Inc
NO141226B (no) * 1973-05-23 1979-10-22 Texaco Development Corp Broennkonstruksjon for en produksjonsbroenn
GB2226776A (en) * 1989-01-06 1990-07-11 Kvaerner Subsea Contracting Pumping station
WO1991018182A1 (fr) * 1990-05-11 1991-11-28 Jp Kenny Caledonia Ltd. Systemes de production pour puits sous-marins

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007110378A1 (fr) * 2006-03-24 2007-10-04 Siemens Aktiengesellschaft Groupe compresseur et son procédé de montage
US8714910B2 (en) 2006-03-24 2014-05-06 Siemens Aktiengesellschaft Compressor unit and assembly method
EP2336486A3 (fr) * 2007-10-10 2011-10-26 Petróleo Brasileiro S.A. Petrobras Module de pompe et système
WO2009047521A3 (fr) * 2007-10-10 2009-06-25 Petroleo Brasileiro Sa Système et module de pompage
US8511386B2 (en) 2007-10-10 2013-08-20 Petroleo Brasileiro S.A.—Petrobras Pumping module and system
US8607877B2 (en) 2007-10-10 2013-12-17 Petroleo Brasileiro S.A.-Petrobras Pumping module and system
WO2009047521A2 (fr) 2007-10-10 2009-04-16 Petróleo Brasileiro S A - Petrobras Système et module de pompage
GB2493749A (en) * 2011-08-17 2013-02-20 Statoil Petroleum As Subsea well stream processing
WO2013023948A3 (fr) * 2011-08-17 2013-08-29 Statoil Petroleum As Perfectionnements à la compression sous-marine
US9303498B2 (en) 2011-08-17 2016-04-05 Statoil Petroleum As Subsea compression
GB2493749B (en) * 2011-08-17 2016-04-13 Statoil Petroleum As Improvements relating to subsea compression
NO346316B1 (no) * 2011-08-17 2022-05-30 Statoil Petroleum As Forbedringer knyttet til undervannskompresjon
WO2013187771A1 (fr) * 2012-06-14 2013-12-19 Aker Subsea As Utilisation d'un échangeur de chaleur de débit de forage pour le maintien de l'écoulement
US8967273B2 (en) 2013-03-13 2015-03-03 Conocophillips Company System for detecting, containing and removing hydrocarbon leaks in a subsea environment
US10428287B2 (en) 2014-12-29 2019-10-01 Aker Solutions As Subsea fluid processing system

Also Published As

Publication number Publication date
AU5980294A (en) 1995-06-19

Similar Documents

Publication Publication Date Title
US5382141A (en) Compressor system and method of operation
US4982794A (en) Apparatus for oil/gas separation at an underwater well-head
US3366173A (en) Subsea production system
EP0570455B1 (fr) Systeme de compression dans une station de forage offshore utilise pour transporter un produit d'hydrocarbure
US7520989B2 (en) Subsea separation apparatus for treating crude oil comprising a separator module with a separator tank
CA1291945C (fr) Systeme modulaire de completion voisin de la surface
EP2185784B1 (fr) Pompe montée sur ligne de retour pour système de retour de boue sans colonne de montée
US3261398A (en) Apparatus for producing underwater oil fields
US3504741A (en) Underwater production satellite
US4478586A (en) Buoyed moonpool plug for disconnecting a flexible flowline from a process vessel
US4506735A (en) Operating system for increasing the recovery of fluids from a deposit, simplifying production and processing installations, and facilitating operations with enhanced safety
US3292695A (en) Method and apparatus for producing underwater oil fields
US4934871A (en) Offshore well support system
GB2226776A (en) Pumping station
US20030138299A1 (en) Cooling water system
US10253471B2 (en) Hydrocarbon production and storage facility
GB2177372A (en) Preventing hydrate formation in a pipeline system
GB2341875A (en) Multiphase production system suitable for deep water
WO2002076816A2 (fr) Systeme de soutirage et de stockage de petrole au fond de la mer
US7914266B2 (en) Submersible pumping system and method for boosting subsea production flow
WO2011154733A1 (fr) Appareil et procédé pour le confinement d'hydrocarbures sous-marins et d'autres émissions
WO1995015428A1 (fr) Procede d'exploitation d'un gisement d'hydrocarbures au large des cotes et installation sous-marine utilisable dans la prospection d'un gisement d'hydrocarbures au large des cotes
US3401746A (en) Subsea production satellite system
US20120315096A1 (en) Rigless intervention
RU2017933C1 (ru) Подводное устьевое оборудование для эксплуатации куста скважин

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AT AU BB BG BR BY CA CH CZ DE DK ES FI GB HU JP KP KR KZ LK LU MG MN MW NL NO NZ PL PT RO RU SD SE SK UA US VN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WA Withdrawal of international application
122 Ep: pct application non-entry in european phase
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: CA