WO1986003253A1 - Procede d'etablissement d'une jonction entre le fond marin et un tunnel positionne sous ce dernier - Google Patents
Procede d'etablissement d'une jonction entre le fond marin et un tunnel positionne sous ce dernier Download PDFInfo
- Publication number
- WO1986003253A1 WO1986003253A1 PCT/NO1985/000073 NO8500073W WO8603253A1 WO 1986003253 A1 WO1986003253 A1 WO 1986003253A1 NO 8500073 W NO8500073 W NO 8500073W WO 8603253 A1 WO8603253 A1 WO 8603253A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- drilling
- tunnel
- sea bed
- template
- vessel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/08—Underwater guide bases, e.g. drilling templates; Levelling thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/043—Directional drilling for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/30—Energy from the sea, e.g. using wave energy or salinity gradient
Definitions
- the present invention relates to a method for estab ⁇ lishing a connection from the sea bed to a tunnel which is provided in advance by blasting or drilling. Such tunnel connections are necessary in so called ocean
- thermical energy plants producing energy by utilizing the temperature difference between the surface water and water on great depth.
- the diameter of the pipeline is insignificant in relation to the diameter of the tunnel.
- the object of this invention is to provide a safe method of establishing a connection of the kind stated introductory, said connection having a flow cross, section, in hydraulic respect substantially correspon ⁇ ding to the cross section of the tunnel.
- the purpose of this invention is obtained by drilling from the sea
- bed surface a plurality of drilling holes ending in the tunnel and having a total flow cross section which in hydrodynamic respect is corresponding at least to the cross section of the tunnel.
- the tunnel is filled with water before establish ⁇ ing the through-flow-connection.
- the drilling operation is carried out preferably from a floating or semi- submergeable drilling vessel or the like and drilling templates are used to line.
- method according to the invention is applicable for vertical drilling as well as for inclined drilling.
- the invention solves the problems in a simple and safe manner in the previously known flow communication establishing methods. Instead of carrying out the
- Fig. 1 is illustrating diagramatically a vertical
- fig. 2 is illustrating inclined drilling
- fig. 3 is illustrating mounting of the drilling line for a inclined drilling operation
- fig. 4 is showing diagramatically a drilling template
- Fig. 1 shows a vertical cross section formation 3 . 00073
- a cold water tunnel for an ocean thermal energy plant.
- an energy plant e.g. of 5 MW, it can be suitable to provide a tunnel for receiving cold water
- the number of drilling holes 8 is determined by the necessary cross section. A cave for rock drilled out and blasting rock rest if any, is shown at 9. The normal maximum diameter in crude oil industry is at the present
- the hole length will depend on the geometry of the rock surface (sea bed) and the geography of the tunnel.
- Fig. 2 is illustrating an alternative method.
- the drill holes 8 are drilled obliquely in order to obtain better flowing conditions at the inlet to the tunnel 3
- the drilling template 6 is provided with a guide funnel 10 which is pivotably journaled at 11.
- the drilling string is extending along an arcuade path from the drilling vessel 5 to the guide funnel 10
- the template can be made with as many guides as necessary for drilling holes in the sea bed, however, it can also be provided
- the guide funnel 10 may also be arranged for rotary movement so that ar..
- Fig. 3 illustrates a method for adapting the drilling string for inclined drilling.
- the drilling template 6 is provided with a guide funnel 10 for accomodating the lowermost portion of the drilling string (see also fig.
- Fig. 4 shows diagramatically a drilling template
- frame 6 shaped as a sledge (sled) for moving across a sea bed and provided with a pivotable guide funnel 10 as also shown in fig. 2.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Building Environments (AREA)
Abstract
Procédé pour établir une jonction "intégrale" entre le fond marin (1) et un tunnel (3) ou une partie de celui-ci, situé sous le fond marin. Le tunnel est creusé à l'explosif ou foré depuis la formation de roches et le percement du tunnel s'arrête le plus près possible de la surface du fond marin sans mettre en danger le personnel et le matériel. La jonction entre le fond marin et le tunnel est réalisée en forant depuis le fond marin (1) un certain nombre de trous (8) débouchant dans le tunnel (3) et possédant une section traversante totale qui, dans le domaine hydrodynamique, correspond au moins à la section du tunnel.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO844729 | 1984-11-28 | ||
| NO844729A NO844729L (no) | 1984-11-28 | 1984-11-28 | Fremgangsmaate for aa etablere en forbindelse fra havbunnen til en underliggnede tunnel. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO1986003253A1 true WO1986003253A1 (fr) | 1986-06-05 |
Family
ID=19887963
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/NO1985/000073 Ceased WO1986003253A1 (fr) | 1984-11-28 | 1985-11-27 | Procede d'etablissement d'une jonction entre le fond marin et un tunnel positionne sous ce dernier |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP0202310A1 (fr) |
| AU (1) | AU5194086A (fr) |
| CU (1) | CU21793A3 (fr) |
| NO (1) | NO844729L (fr) |
| WO (1) | WO1986003253A1 (fr) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO139063B (no) * | 1976-02-13 | 1978-09-18 | Norske Stats Oljeselskap | Fremgangsmaate og roerkonstruksjon for aa etablere en forbindelse mellom en fralandsroerledning og en tunnel under havbunnen |
| US4129010A (en) * | 1977-08-25 | 1978-12-12 | Montreal Engineering Company, Limited | Tunnel |
-
1984
- 1984-11-28 NO NO844729A patent/NO844729L/no unknown
-
1985
- 1985-11-27 EP EP85906091A patent/EP0202310A1/fr not_active Withdrawn
- 1985-11-27 AU AU51940/86A patent/AU5194086A/en not_active Abandoned
- 1985-11-27 WO PCT/NO1985/000073 patent/WO1986003253A1/fr not_active Ceased
- 1985-11-28 CU CU1985213A patent/CU21793A3/es unknown
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO139063B (no) * | 1976-02-13 | 1978-09-18 | Norske Stats Oljeselskap | Fremgangsmaate og roerkonstruksjon for aa etablere en forbindelse mellom en fralandsroerledning og en tunnel under havbunnen |
| US4129010A (en) * | 1977-08-25 | 1978-12-12 | Montreal Engineering Company, Limited | Tunnel |
Also Published As
| Publication number | Publication date |
|---|---|
| EP0202310A1 (fr) | 1986-11-26 |
| AU5194086A (en) | 1986-06-18 |
| NO844729L (no) | 1986-05-29 |
| CU21793A3 (fr) | 1993-10-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1930361B (zh) | 用于建立地下井钻孔并在该钻孔中设置可膨胀的壳体或砂筛及完井管的方法和作业设备 | |
| US2783027A (en) | Method and apparatus for submerged well drilling | |
| US2906500A (en) | Completion of wells under water | |
| US4136996A (en) | Directional drilling marine structure | |
| US4223737A (en) | Method for well operations | |
| US3004612A (en) | Submerged elevated well head structure | |
| US2669431A (en) | Earth drilling apparatus | |
| US3015360A (en) | Method and apparatus for underwater drilling | |
| CN105370208A (zh) | 一种水下钻爆船及其钻孔施工方法 | |
| US4401397A (en) | Method and device for installing a shaft lining in shafts through an aquiferous formation | |
| US4626136A (en) | Pressure balanced buoyant tether for subsea use | |
| CN110439463A (zh) | 采空区处理注浆孔造孔工艺 | |
| CN110924864A (zh) | 海上输水管道定向钻牵引施工方法 | |
| US6431285B2 (en) | Apparatus for drilling an offshore underwater well | |
| WO1986003253A1 (fr) | Procede d'etablissement d'une jonction entre le fond marin et un tunnel positionne sous ce dernier | |
| US2850271A (en) | Method of mining sulfur located underneath bodies of water | |
| KR19990041078A (ko) | 토운선을 이용한 수중암반의 천공장치와 발파공법 | |
| US4326595A (en) | Method for drilling deviated wells into an offshore substrate | |
| US4249619A (en) | Deviated drilling apparatus | |
| US4129010A (en) | Tunnel | |
| CN109538148A (zh) | 一种软金属膨胀管补贴煤层气井倒吸层方法 | |
| US20040141811A1 (en) | Ballast deployment apparatus and method for installing and retrieving said apparatus | |
| JPS634193A (ja) | 深水位置における石油の堀削及び製産方法 | |
| US3760889A (en) | Apparatus and method to modify and service a subaqueous strata drilling system | |
| CN215408669U (zh) | 地层垂深段短的羽状分支注浆孔装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A1 Designated state(s): AU BR JP US |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CF CG CH CM DE FR GA GB IT LU ML MR NL SE SN TD TG |