[go: up one dir, main page]

US9919774B2 - Systems and methods for treatment of LNG cargo tanks - Google Patents

Systems and methods for treatment of LNG cargo tanks Download PDF

Info

Publication number
US9919774B2
US9919774B2 US13/697,939 US201113697939A US9919774B2 US 9919774 B2 US9919774 B2 US 9919774B2 US 201113697939 A US201113697939 A US 201113697939A US 9919774 B2 US9919774 B2 US 9919774B2
Authority
US
United States
Prior art keywords
lng
vessel
receiving vessel
supply vessel
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related, expires
Application number
US13/697,939
Other versions
US20130118185A1 (en
Inventor
Jonathan W. Cook
Mark K. Lane
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Excelerate Energy LP
Original Assignee
Excelerate Energy LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Excelerate Energy LP filed Critical Excelerate Energy LP
Priority to US13/697,939 priority Critical patent/US9919774B2/en
Assigned to EXCELERATE ENERGY LIMITED PARTNERSHIP reassignment EXCELERATE ENERGY LIMITED PARTNERSHIP ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COOK, JONATHAN, LANE, MARK K.
Publication of US20130118185A1 publication Critical patent/US20130118185A1/en
Application granted granted Critical
Publication of US9919774B2 publication Critical patent/US9919774B2/en
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines

Definitions

  • Embodiments of the invention described herein pertain to the field of shipboard transportation of liquefied natural gas (“LNG”). More particularly, but not by way of limitation, one or more embodiments of the invention describe systems and methods of gas-up and cool down of LNG cargo tanks located in a waterway location.
  • LNG liquefied natural gas
  • Natural gas is often carried onboard special cryogenic tanker ships from the location of its origin to the location of consumption. In this way, natural gas may be transported to areas with a higher demand for natural gas. Since LNG occupies only about 1/600th of the volume that the same amount of natural gas does in its gaseous state, liquefying the natural gas for transport facilitates the transportation process and improves the economics of the system. LNG is produced in onshore liquefaction plants by cooling natural gas below its boiling point ( ⁇ 259° F. ( ⁇ 162° C.) at ambient pressures). The LNG may be stored in cryogenic cargo tanks located on special cryogenic tanker ships, either at or slightly above atmospheric pressure. Typically, the LNG will be regasified prior to its distribution to end users.
  • tanks on a cryogenic tanker ship are full of fresh air which allows maintenance on the tank and pumps.
  • the tanks are full of fresh air when the cryogenic tanker ship comes out of the yard, after dry docking or repairs, if the ship has been sitting idle, or has burned off all of the remaining natural gas in the take (for example, burning off a heel).
  • the cryogenic cargo cannot be loaded directly into the tanks until the fresh air (for example, oxygen) is replaced with an inert gas to inhibit explosions within the tanks.
  • the tanks may be filled with inert gas (for example, carbon dioxide) until the atmosphere in the tanks contains less than 4% oxygen.
  • Carbon dioxide freezes at temperatures used to store liquefied natural gas, thus the carbon dioxide must be removed prior to filling the tanks with liquefied natural gas.
  • the tanks under go a gas-up and cool down procedure.
  • the cryogenic tank ship is docked at a port and connected to a gas-up and cool down system that includes cryogenic loading arms (hard arms) and/or rigid pipe suitable for handling cryogenic fluids.
  • a gas-up and cool down system that includes cryogenic loading arms (hard arms) and/or rigid pipe suitable for handling cryogenic fluids.
  • the inert gas atmosphere in the cargo tanks and piping systems of the cryogenic tanker ship is displaced with natural gas.
  • the cargo tanks are cooled down by slowly reducing the temperature of the cargo tank atmosphere and surrounding containment to temperatures of about ⁇ 140° C.
  • LNG may be loaded into the cargo tanks without subjecting the tanks to cold shock.
  • the gas-up and cool down operation takes approximately 34 to 72 hours before the LNG cargo may be loaded onto the cryogenic tank ship.
  • a method for treating of LNG cargo tanks includes connecting a supply vessel and a receiving vessel using a manifold conduit, wherein the supply vessel is in a waterway location and wherein the receiving vessel is in the waterway location; gassing-up a cargo tank onboard the receiving vessel using natural gas from the supply vessel; cooling down the cargo tank onboard the receiving vessel using LNG from the supply vessel; transferring LNG from the supply vessel to the receiving vessel using ship-to-ship transfer; and disconnecting the supply vessel and the receiving vessel.
  • a method for treating one or more liquefied natural gas (LNG) cargo tanks includes coupling a supply vessel to one or more LNG cargo tanks onboard a receiving vessel using a manifold system, wherein the supply vessel and the receiving vessel are in a waterway location; providing natural gas from the supply vessel to at least one of the LNG cargo tanks such that inert gas is substantially displaced from at least one of the LNG cargo tanks; providing cooled natural gas from the supply vessel to at least one of the LNG cargo tanks containing natural gas to cool the LNG cargo tank to an average temperature of than about ⁇ 100° C.; and transferring LNG from the supply vessel through the manifold conduit to the cooled LNG cargo tank on the receiving vessel.
  • LNG liquefied natural gas
  • the waterway location is in open water. In certain embodiments, the supply vessel and/or the receiving vessel are at anchor. In further embodiments, the waterway location is alongside a jetty. In some embodiments, the waterway location is offshore.
  • a system for treatment of one or more LNG cargo tanks includes a manifold conduit, wherein the manifold conduit mechanically couples a supply vessel to a receiving vessel, wherein the receiving vessel is located in a waterway location, wherein the supply vessel is located in a waterway location and the supply vessel transfers natural gas to the receiving vessel using the manifold conduit such that inert gas in one or more LNG cargo tanks on the receiving vessel is substantially displaced and the LNG cargo tank is cooled, and wherein the supply vessel transfers additional LNG to the receiving vessel using the manifold conduit.
  • features from specific embodiments may be combined with features from other embodiments.
  • features from one embodiment may be combined with features from any of the other embodiments.
  • additional features may be added to the specific embodiments described herein.
  • FIG. 1 is a flowchart of an embodiment of a method for gas-up and cool down of LNG cargo tanks located in a waterway location.
  • FIGS. 2A and 2B are schematic representations of an embodiment of fendering-up a receiving vessel and a supply vessel using ship-to-ship transfer equipment.
  • FIG. 3 is a schematic of an embodiment of a manifold system for gas-up and cool down of LNG cargo tanks and ship-to-ship transfer of LNG.
  • FIG. 4 is a schematic of an embodiment of a system to initiate quick release of a manifold conduit.
  • FIG. 5 is a schematic of an embodiment of a system to provide a radio communication and pneumatic actuation system to trigger emergency shut down and emergency release couplings.
  • Coupled refers to either a direct connection or an indirect connection (for example, at least one intervening connections) between one or more objects or components.
  • Gas-up refers to the displacement of an inert gas atmosphere in a cargo tank and piping systems with natural gas.
  • “Cool down” refers to reducing the temperature of the cargo tank atmosphere and surrounding containment after gas-up and prior to loading LNG.
  • Waterway location refers to any location in a navigable body of water, including but not limited to, offshore, alongside a jetty, at anchor or in open water.
  • “Jetty” refers to a structure extending into a sea, lake, river or other navigable body of water.
  • gas-up and cool down of LNG cargo tanks may be performed without the need for the LNG vessel to dock at port and/or a conventional LNG terminal.
  • Gas-up and cool down of LNG cargo tanks in a waterway location makes ports and/or conventional LNG terminals available for shipping and transporting operations as compared to conventional a gas-up and cool down operation which occupies dock space.
  • the economics of port operations and availability of ports are enhanced.
  • gassing-up and cooling down of the LNG cargo tanks may take place in open water, at anchor, alongside a jetty, at a fixed floating facility or at any other waterway location. In certain embodiments, gassing-up and cooling down of the LNG cargo tanks takes place immediately prior to ship-to-ship transfer of LNG.
  • any vessel or platform capable of transporting or storing LNG such as a regasification vessel, LNG carrier, LNG barge, coaster or floating platform may be used as either a supply vessel or receiving vessel.
  • the supply and/or receiving vessel may be capable of onboard regasification of LNG. Examples of suitable systems for regasification of LNG are described in U.S. Pat. No. 7,484,371 to Nierenberg; U.S. Pat.
  • FIG. 1 depicts a flowchart of an embodiment of a method for conducting gas-up and cool down of LNG cargo tanks in a waterway location.
  • vessel identification step 11 a supply vessel and a receiving vessel may be identified.
  • the supply vessel may contain an LNG and/or gaseous natural gas cargo, and the receiving vessel may have LNG cargo tanks that require gassing-up and cooling down, and/or be in need of LNG cargo.
  • the supply vessel and/or receiving vessel may be an LNG regasification vessel, an LNG carrier, an LNG barge, an LNG coaster, a floating platform or some other platform or vessel capable of storing and/or transporting LNG and well known to those of skill in the art.
  • the supply vessel and/or receiving vessel may be double hulled and include at least one insulated cryogenic LNG cargo tank, which may store LNG at about ⁇ 162° C. Pressure in the cargo tank(s) may be kept constant by allowing boil off gas to escape from the storage tank.
  • cargo tanks include, but are not limited to, reinforced No. 96 type membrane tanks (Gaztransport & Technigaz SA of Saint-Rémy-les-Chevreuse, France).
  • vessel identification step 11 may include a compatibility study to determine whether the supply vessel and receiving vessel are compatible with each other for the floating gas-up and cool down procedures.
  • a suitable site location may be established.
  • the suitable site location may be a waterway location, such as offshore, in open water, at anchor, alongside a jetty or at a fixed floating facility.
  • a suitable site may be a waterway inland of a port.
  • Supply vessel location, receiving vessel location, vessel size, LNG delivery and pickup locations, water depth and/or any required permissions or permits may be taken into consideration in determining a suitable site location.
  • FIGS. 2A and 2B depict schematics of an embodiment of fendering two ships.
  • Supply vessel 12 includes fenders 16 .
  • Fenders 16 may be floating pneumatic fenders, floating foam elastomeric fenders or other fenders suitable to prevent damage to the vessels to be coupled.
  • Receiving vessel 10 may approach supply vessel 12 until fenders 16 are positioned between the two vessels and the vessels are fendered-up with ship-to-ship transfer gear 18 .
  • the supply vessel and receiving vessel may be moored.
  • the vessels are moored at anchor, at open water, alongside a jetty, or at a fixed facility.
  • supply vessel and receiving vessel are moored together.
  • Supply vessel and/or receiving vessel may be fastened using ropes, mooring lines, hawsers, fenders, anchors, and/or buoys. Additional safety features may also be included in the mooring systems.
  • the mooring system may include mooring line hooks with load sensors, automated mooring strain gauge systems with alarms, remote release capabilities and/or quick release capabilities.
  • a manifold system may be rigged and connected, linking supply vessel and receiving vessel.
  • the manifold system may include cryogenic manifold conduits and saddles.
  • Various arrangements of manifold conduits such as piping, hard arms, hoses, rigid connections and/or flexible connections may be used.
  • the manifold conduits may be liquid or vapor flexible or rigid hoses or piping suitable for transferring LNG or gaseous natural gas, as appropriate.
  • the number of liquid and vapor manifold may depend upon the amount of LNG to be transferred. In certain embodiments, one vapor and two liquid hoses may be used.
  • FIG. 3 depicts an embodiment of a manifold system described herein, which may be used during connection step 19 .
  • the manifold system linking the supply vessel and receiving vessel may include one or more systems for quick release of the manifold conduit(s) between the two vessels, which may be tested at testing step 21 .
  • Systems for quick release of the connection are described herein (for example, FIGS. 4 and 5 ).
  • the LNG on the supply vessel may be measured prior to any transfer taking place, using a custody transfer measuring system well known to those of skill in the art.
  • Gas-up of the cargo tanks on the receiving vessel may be performed at gas-up step 25 .
  • natural gas from the supply vessel in either a gaseous phase or liquid phase, may be used to displace the inert gas atmosphere (for example, carbon dioxide) in the cargo tanks and piping systems of the receiving vessel.
  • the natural gas from the supply vessel may be stored as gaseous natural gas on the supply vessel, may be stored as LNG and regasified onboard the supply vessel prior to transfer, or may be regasified onboard the receiving vessel prior to transfer. Pumps or a pressure differential may be used to transfer the gaseous natural gas between vessels.
  • the inert gas may be captured and treated, stored, and/or sequestered.
  • Cool down of the cargo tanks after the inert gas is displaced may occur at cool down step 27 .
  • the temperature of cargo tank containment systems onboard the receiving vessel may be reduced to less than about ⁇ 100° C., less than about ⁇ 140° C., or lower using LNG or cooled natural gas from the supply vessel, which has been transferred to the receiving vessel using a manifold system, such as the manifold system 20 and/or equipment described in connection step 19 .
  • Ship-to-ship transfer of LNG may take place at ship-to-ship transfer step 29 .
  • LNG transfer may be completed using the manifold system of connection step 19 and/or manifold system 20 and/or pumps.
  • Nitrogen purging may occur at purging step 31 .
  • the final measuring of LNG onboard the supply and/or receiving vessel may take place at final measuring step 33 using a custody transfer measuring system well known to those of skill in the art.
  • This final measurement of LNG may be used along with the initial measurement obtained in initial measuring step 23 to determine the volume of LNG transferred from the supply ship to the receiving ship.
  • the ships may then be disconnected and unmoored at disconnecting step 35 and unmooring step 37 .
  • FIG. 3 depicts a representation of an embodiment of a manifold system for ship-to-ship transfer, which may be used for floating gas-up and cool down procedures, as well as for ship-to-ship transfer of LNG.
  • LNG may flow from an LNG storage tank on supply vessel 12 through liquid conduits 22 .
  • Liquid conduits 22 may be coupled to liquid hoses 24 .
  • the LNG may be transferred from liquid conduits 22 to liquid hoses 24 and flows to receiving vessel 10 via liquid conduit 22 ′.
  • Deck 26 supports liquid hoses 24 and vapor hoses 28 .
  • Vapor hoses 28 may be coupled to vapor conduits 30 and 30 ′. Vapor conduits 30 and 30 ′ and vapor hoses 28 help manage boil-off gas generated as LNG may be transferred through liquid conduits 22 .
  • Liquid hoses 24 may contain stainless steel end fittings, be epoxy filled and swaged, and type approved by class for ship-to-ship transfer of LNG. Liquid hoses 24 may also contain layers of synthetic (for example, polyethylene) films and fabrics and be configured to withstand cryogenic cycles and to leak before failure. In some embodiments, liquid hoses 24 may be composite hoses of a nominal 8 inches (about 20.32 cm) in diameter, 15 meters in length, and have a 0.65 meter to 0.9 meter bend radius. Liquid hoses 24 may be supported by hose support saddles 32 on each of vessels 10 and 12 .
  • Liquid hoses 24 and vapor hoses 28 may be positioned in hose support saddles 32 .
  • Saddles 32 may provide protection and support for liquid hoses 24 and vapor hoses 28 and maintain the minimum bend radius of the hoses.
  • saddles 32 may transfer static and dynamic loads from liquid hoses 24 and vapor hoses 28 to the manifold deck structure on vessels 10 and 12 and provide chafe protection for the hoses.
  • Liquid hoses 24 may connect to liquid conduits 22 , 22 ′ using spool pieces 34 , 34 ′.
  • vapor hoses 28 may connect to vapor conduits 30 , 30 ′ using spool pieces 34 , 34 ′.
  • Spool pieces 34 , 34 ′ may reduce the diameter of the pipe to match the diameter of the hose connections as compared connections made using conventional pipe and hose connectors.
  • liquid hoses 24 may be connected to liquid conduits 22 , 22 ′ and/or vapor hoses 28 may be connected to vapor conduits 30 , 30 ′ at angles less than 45 degrees.
  • Using spool pieces 34 , 34 ′ may allow an increased number of hoses and/or conduits to be used in manifold system 20 as compared to conventional LNG manifold systems.
  • Release couplings 36 may be positioned between liquid hoses 24 and spool pieces 34 ′ and/or between vapor hoses 28 and spool pieces 34 ′. Release couplings 36 may allow for liquid hoses 24 and/or vapor hoses 28 to quickly disconnect in emergency situations. Release couplings 36 may be operated remotely and/or automatically and provide for a ‘dry break’ designed to minimize a LNG leak or release upon actuation of the release coupling. Release couplings 36 may be actuated by a dry break actuator 50 , shown in FIG. 5 .
  • a mechanical/hydraulic system may be used to detect the need and trigger a release or separation.
  • a radio communication and pneumatic stored pressure actuation system may be used to detect the need and trigger a release or separation, such as the system shown in FIG. 4 .
  • Manifold system 20 may include water bath systems 78 , 78 ′.
  • Water bath system 78 may protect trunk decks and cargo tanks of vessels 10 and 12 from cryogenic damage to steel works caused by accidental release of LNG.
  • Water bath systems 78 , 78 ′ may include a water bath on the main deck of the vessels under the manifold area and an additional water curtain under each manifold to protect the slopes of the proximal cargo tanks.
  • FIG. 4 depicts a schematic of an embodiment of a system to initiate quick release of a manifold conduit.
  • the supply vessel 12 and/or the receiving vessel 10 may be equipped with an alarm set point to warn of an excursion of supply vessel 12 or receiving vessel 10 from the approved operating envelop of the two vessels when moored.
  • Receiving vessel 10 , supply vessel 12 and/or a manifold conduit may also be equipped with manual or automated quick release capabilities to close valves on a manifold conduit and decouple receiving vessel 10 from supply vessel 12 if either moves past the alarm set points.
  • a mechanical or hydraulic system may be used to trigger a separation in such an emergency.
  • physical connections, radio, laser or ultrasonic transponders may be used to measure the distance between a sending location (for example, supply vessel 12 ) and a receiving location (for example, receiving vessel 10 ) and thereby detect abnormal motion between the vessels.
  • transponders 40 may be battery powered and/or attached to receiving vessel 10 and/or supply vessel 12 using heavy duty magnets, vacuum suction cups or some other attachment mechanism that can withstand seawater, wind, cold or other extreme conditions.
  • Backup battery 48 may also be included.
  • multiple pairs of transponders that implement a voting system may be used to determine whether there has been abnormal movement of the ship.
  • fender 16 may also assist in keeping receiving vessel 10 and/or supply vessel 12 within normal parameters.
  • transponders 40 send information to computer 42 onboard receiving and/or supply vessel 10 or to a programmable logic controller (“PLC”) on a portable or fixed control console using low power radio transmitter 44 .
  • PLC programmable logic controller
  • Computer 42 or a PLC may then analyze the data from the transponders, including the distance between hulls, rate of change, degree of rolling, yaw and pitching to determine whether abnormal motion is occurring, and trigger an audible and/or visual alarm in a control room, on a control console and/or on the open decks of receiving vessel 10 and/or supply vessel 12 , for example alarm 46 , when it receives the appropriate input.
  • Computer 42 may communicate with alarm 46 using a wireless or wired connection.
  • the computer or PLC may be programmed to understand the parameters for normal movement of a ship and unacceptable deviation from those parameters.
  • computer 42 may determine that a distance between hulls has deviated from one or more preset parameters for a preset duration of time.
  • Transponders 40 and other equipment in the field or on deck of receiving vessel 10 and/or supply vessel 12 used for detection and triggering of a need for emergency shutdown and decoupling of gas conduit 52 described herein are significantly safer than conventional methods.
  • Conventional methods require mechanical and/or hydraulic connections which may be unwieldy and can present safety and/or environmental hazards.
  • emergency release couplings on receiving vessel 10 and/or supply vessel 12 may be used alone or in conjunction with emergency shutdown and quick release connections on the manifold conduit (for example, release coupling 36 ).
  • a physical or hydraulic system may be used on the deck of receiving vessel 10 or supply vessel 12 for this purpose.
  • radio communication and pneumatic or stored pressure actuation systems may be used on emergency shut down and dry break actuator 50 , which may be release coupling 36 .
  • FIG. 4 depicts a schematic of an embodiment of a system to provide radio communication and pneumatic actuation systems to trigger emergency shut down and emergency release couplings on the deck of a vessel or on a manifold conduit.
  • an operator can choose to send one or more radio signals or other type of signal to one or more dry break ERC actuators, such as dry break actuator 50 , which may be attached to the manifold.
  • the signal may be sent by a computer in a control room, such as computer 42 , or on a fixed or portable control cart.
  • One or more radio frequencies may be used to trigger one or more dry break ERC actuators individually, consecutively or simultaneously, as needed.
  • Dry break actuator 50 receives the signal with receiver 52 and may use a stored-pressure pneumatic system to trigger the release of dry break actuator 50 between receiving vessel 10 and supply vessel 12 .
  • the system may be programmed to automatically signal the emergency shut down and/or dry break actuator 50 to release if alarm 46 remains activated for a predetermined amount of time, for example 20 seconds, 30 seconds or one minute.
  • the release process may occur in two steps. First, cargo transfer may be shut down. Second, if the alarm continues, there may be a second signal to trigger dry break actuator 50 on each hose, pipe, high pressure arm and/or manifold conduit. Receiver 52 may require receipt of multiple signals from the PLC or computer 42 before triggering release, in order to first confirm that cargo transfer is shut down prior to initiating the release on the couplings. Alternatively, the communication equipment attached to dry break actuator 50 may engage in two way communications with the PLC or computer 42 . The radio communication and pneumatic actuation method and system described herein increases the safety as compared to conventional methods.
  • receiver 52 may also include a solenoid valve and blowdown.
  • the change in pressure causes pneumatic cylinder 60 with a piston to move and coupling 54 to open, disconnecting from ERC collar 62 and allowing separation of the connections between receiving vessel 10 and supply vessel transfer piping 64 (for example, liquid hoses 24 and vapor hoses 28 shown in FIG. 3 ).
  • the quick release/emergency release system described herein may also be used in connection with rigid or flexible piping, hoses, loading/unloading gas arms, high pressure arms, and/or liquid arms between two vessels, between a LNG carrier and a dock, or between any vessels, vehicles or structures used for cargo transfers such as transfers of high pressure gas or LNG.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

Systems and methods for gas-up and cool down of LNG cargo tanks are described herein. A system includes a supply vessel located at a waterway location, a receiving vessel moored to the supply vessel, and a manifold conduit. The supply vessel is configured to transfer natural gas to the receiving vessel using the manifold conduit for gas-up and cool down of one or more LNG cargo tanks onboard the receiving vessel.

Description

BACKGROUND
1. Field of the Invention
Embodiments of the invention described herein pertain to the field of shipboard transportation of liquefied natural gas (“LNG”). More particularly, but not by way of limitation, one or more embodiments of the invention describe systems and methods of gas-up and cool down of LNG cargo tanks located in a waterway location.
2. Description of the Related Art
Natural gas is often carried onboard special cryogenic tanker ships from the location of its origin to the location of consumption. In this way, natural gas may be transported to areas with a higher demand for natural gas. Since LNG occupies only about 1/600th of the volume that the same amount of natural gas does in its gaseous state, liquefying the natural gas for transport facilitates the transportation process and improves the economics of the system. LNG is produced in onshore liquefaction plants by cooling natural gas below its boiling point (−259° F. (−162° C.) at ambient pressures). The LNG may be stored in cryogenic cargo tanks located on special cryogenic tanker ships, either at or slightly above atmospheric pressure. Typically, the LNG will be regasified prior to its distribution to end users.
In a conventional cryogenic cargo cycle, tanks on a cryogenic tanker ship are full of fresh air which allows maintenance on the tank and pumps. For example, the tanks are full of fresh air when the cryogenic tanker ship comes out of the yard, after dry docking or repairs, if the ship has been sitting idle, or has burned off all of the remaining natural gas in the take (for example, burning off a heel). The cryogenic cargo cannot be loaded directly into the tanks until the fresh air (for example, oxygen) is replaced with an inert gas to inhibit explosions within the tanks. The tanks may be filled with inert gas (for example, carbon dioxide) until the atmosphere in the tanks contains less than 4% oxygen. Carbon dioxide, however, freezes at temperatures used to store liquefied natural gas, thus the carbon dioxide must be removed prior to filling the tanks with liquefied natural gas. To remove the carbon dioxide from the tanks and the tanks conditioned to receive a cold fluid, the tanks under go a gas-up and cool down procedure.
The cryogenic tank ship is docked at a port and connected to a gas-up and cool down system that includes cryogenic loading arms (hard arms) and/or rigid pipe suitable for handling cryogenic fluids. During gas-up, the inert gas atmosphere in the cargo tanks and piping systems of the cryogenic tanker ship is displaced with natural gas. Next, the cargo tanks are cooled down by slowly reducing the temperature of the cargo tank atmosphere and surrounding containment to temperatures of about −140° C. Once the cargo tanks are cooled, LNG may be loaded into the cargo tanks without subjecting the tanks to cold shock. The gas-up and cool down operation takes approximately 34 to 72 hours before the LNG cargo may be loaded onto the cryogenic tank ship.
During the gas-up and cool down operation, the portion of the dock involved in the operation is not available for shipping operation (for example, unloading and loading LNG, and/or the use of liquefaction trains) and/or terminal access is limited. Thus, there is a need for more efficient systems and methods for treating of LNG cargo tanks.
SUMMARY
One or more embodiments of the invention describe systems and methods for gas-up and cool down of LNG cargo tanks while positioned in a waterway location. In some embodiments, a method for treating of LNG cargo tanks includes connecting a supply vessel and a receiving vessel using a manifold conduit, wherein the supply vessel is in a waterway location and wherein the receiving vessel is in the waterway location; gassing-up a cargo tank onboard the receiving vessel using natural gas from the supply vessel; cooling down the cargo tank onboard the receiving vessel using LNG from the supply vessel; transferring LNG from the supply vessel to the receiving vessel using ship-to-ship transfer; and disconnecting the supply vessel and the receiving vessel.
In certain embodiments, a method for treating one or more liquefied natural gas (LNG) cargo tanks, includes coupling a supply vessel to one or more LNG cargo tanks onboard a receiving vessel using a manifold system, wherein the supply vessel and the receiving vessel are in a waterway location; providing natural gas from the supply vessel to at least one of the LNG cargo tanks such that inert gas is substantially displaced from at least one of the LNG cargo tanks; providing cooled natural gas from the supply vessel to at least one of the LNG cargo tanks containing natural gas to cool the LNG cargo tank to an average temperature of than about −100° C.; and transferring LNG from the supply vessel through the manifold conduit to the cooled LNG cargo tank on the receiving vessel.
In some embodiments, the waterway location is in open water. In certain embodiments, the supply vessel and/or the receiving vessel are at anchor. In further embodiments, the waterway location is alongside a jetty. In some embodiments, the waterway location is offshore.
In some embodiments, a system for treatment of one or more LNG cargo tanks includes a manifold conduit, wherein the manifold conduit mechanically couples a supply vessel to a receiving vessel, wherein the receiving vessel is located in a waterway location, wherein the supply vessel is located in a waterway location and the supply vessel transfers natural gas to the receiving vessel using the manifold conduit such that inert gas in one or more LNG cargo tanks on the receiving vessel is substantially displaced and the LNG cargo tank is cooled, and wherein the supply vessel transfers additional LNG to the receiving vessel using the manifold conduit.
In further embodiments, features from specific embodiments may be combined with features from other embodiments. For example, features from one embodiment may be combined with features from any of the other embodiments. In further embodiments, additional features may be added to the specific embodiments described herein.
BRIEF DESCRIPTION OF THE DRAWINGS
The above and other aspects, features and advantages of the invention will be more apparent from the following more particular description thereof, presented in conjunction with the following drawings wherein:
FIG. 1 is a flowchart of an embodiment of a method for gas-up and cool down of LNG cargo tanks located in a waterway location.
FIGS. 2A and 2B are schematic representations of an embodiment of fendering-up a receiving vessel and a supply vessel using ship-to-ship transfer equipment.
FIG. 3 is a schematic of an embodiment of a manifold system for gas-up and cool down of LNG cargo tanks and ship-to-ship transfer of LNG.
FIG. 4 is a schematic of an embodiment of a system to initiate quick release of a manifold conduit.
FIG. 5 is a schematic of an embodiment of a system to provide a radio communication and pneumatic actuation system to trigger emergency shut down and emergency release couplings.
While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and may herein be described in detail. The drawings may not be to scale. It should be understood, however, that the drawings and detailed description thereto are not intended to limit the invention to the particular form disclosed, but on the contrary, the intention is to cover all modifications, equivalents and alternatives falling within the spirit and scope of the present invention as defined by the appended claims.
DETAILED DESCRIPTION
Systems and methods for gas-up and cool down of LNG cargo tanks floating in a waterway location are described herein. The LNG cargo tanks may be onboard a ship located in the waterway location. In other instances, specific features, quantities, or measurements well known to those of ordinary skill in the art have not been described in detail so as not to obscure the invention.
“Coupled” refers to either a direct connection or an indirect connection (for example, at least one intervening connections) between one or more objects or components.
“Gas-up” refers to the displacement of an inert gas atmosphere in a cargo tank and piping systems with natural gas.
“Cool down” refers to reducing the temperature of the cargo tank atmosphere and surrounding containment after gas-up and prior to loading LNG.
“Waterway location” refers to any location in a navigable body of water, including but not limited to, offshore, alongside a jetty, at anchor or in open water.
“Jetty” refers to a structure extending into a sea, lake, river or other navigable body of water.
Using the systems and methods described herein, gas-up and cool down of LNG cargo tanks may be performed without the need for the LNG vessel to dock at port and/or a conventional LNG terminal. Gas-up and cool down of LNG cargo tanks in a waterway location makes ports and/or conventional LNG terminals available for shipping and transporting operations as compared to conventional a gas-up and cool down operation which occupies dock space. Thus, the economics of port operations and availability of ports are enhanced.
In some embodiments, gassing-up and cooling down of the LNG cargo tanks may take place in open water, at anchor, alongside a jetty, at a fixed floating facility or at any other waterway location. In certain embodiments, gassing-up and cooling down of the LNG cargo tanks takes place immediately prior to ship-to-ship transfer of LNG. In some embodiments, any vessel or platform capable of transporting or storing LNG, such as a regasification vessel, LNG carrier, LNG barge, coaster or floating platform may be used as either a supply vessel or receiving vessel. The supply and/or receiving vessel may be capable of onboard regasification of LNG. Examples of suitable systems for regasification of LNG are described in U.S. Pat. No. 7,484,371 to Nierenberg; U.S. Pat. No. 7,293,600 to Nierenberg; U.S. Pat. No. 7,219,502 to Nierenberg; U.S. Pat. No. 6,688,114 to Nierenberg; and U.S. Pat. No. 6,598,408 to Nierenberg.
FIG. 1 depicts a flowchart of an embodiment of a method for conducting gas-up and cool down of LNG cargo tanks in a waterway location. In vessel identification step 11, a supply vessel and a receiving vessel may be identified. The supply vessel may contain an LNG and/or gaseous natural gas cargo, and the receiving vessel may have LNG cargo tanks that require gassing-up and cooling down, and/or be in need of LNG cargo. The supply vessel and/or receiving vessel may be an LNG regasification vessel, an LNG carrier, an LNG barge, an LNG coaster, a floating platform or some other platform or vessel capable of storing and/or transporting LNG and well known to those of skill in the art. The supply vessel and/or receiving vessel may be double hulled and include at least one insulated cryogenic LNG cargo tank, which may store LNG at about −162° C. Pressure in the cargo tank(s) may be kept constant by allowing boil off gas to escape from the storage tank. Examples of cargo tanks include, but are not limited to, reinforced No. 96 type membrane tanks (Gaztransport & Technigaz SA of Saint-Rémy-les-Chevreuse, France). SPB prismatic tanks (IHI Corporation of Tokyo, Japan, Moss), spherical tanks (Moss Maritime AS of Lysaker, Norway), GTT MKIII tanks (Gaztransport & Technigaz SA of Saint-Rémy-les-Chevreuse, France), and/or cylindrical bullet tanks. In some embodiments, vessel identification step 11 may include a compatibility study to determine whether the supply vessel and receiving vessel are compatible with each other for the floating gas-up and cool down procedures.
In location establishment step 13, a suitable site location may be established. The suitable site location may be a waterway location, such as offshore, in open water, at anchor, alongside a jetty or at a fixed floating facility. For example, a suitable site may be a waterway inland of a port. Supply vessel location, receiving vessel location, vessel size, LNG delivery and pickup locations, water depth and/or any required permissions or permits may be taken into consideration in determining a suitable site location.
In fendering step 15, fenders are positioned between the vessels to inhibit the vessels from damaging each other. FIGS. 2A and 2B depict schematics of an embodiment of fendering two ships. Supply vessel 12 includes fenders 16. Fenders 16 may be floating pneumatic fenders, floating foam elastomeric fenders or other fenders suitable to prevent damage to the vessels to be coupled. Receiving vessel 10 may approach supply vessel 12 until fenders 16 are positioned between the two vessels and the vessels are fendered-up with ship-to-ship transfer gear 18.
In mooring step 17, the supply vessel and receiving vessel may be moored. In some embodiments, the vessels are moored at anchor, at open water, alongside a jetty, or at a fixed facility. In certain embodiments, supply vessel and receiving vessel are moored together. Supply vessel and/or receiving vessel may be fastened using ropes, mooring lines, hawsers, fenders, anchors, and/or buoys. Additional safety features may also be included in the mooring systems. For example, the mooring system may include mooring line hooks with load sensors, automated mooring strain gauge systems with alarms, remote release capabilities and/or quick release capabilities. In addition, provisions for tug boat assistance during mooring and timely access to tugs during periods of bad weather may be incorporated and improve the safety of the mooring system. Recommendations from Hazard Operability Studies (HAZOP) and Hazard Identification (HAZID) risk assessments may also be included in the mooring systems.
At connection step 19, a manifold system may be rigged and connected, linking supply vessel and receiving vessel. The manifold system may include cryogenic manifold conduits and saddles. Various arrangements of manifold conduits such as piping, hard arms, hoses, rigid connections and/or flexible connections may be used. The manifold conduits may be liquid or vapor flexible or rigid hoses or piping suitable for transferring LNG or gaseous natural gas, as appropriate. The number of liquid and vapor manifold may depend upon the amount of LNG to be transferred. In certain embodiments, one vapor and two liquid hoses may be used. FIG. 3 depicts an embodiment of a manifold system described herein, which may be used during connection step 19.
Emergency shut down tests may be made in testing step 21. The manifold system linking the supply vessel and receiving vessel may include one or more systems for quick release of the manifold conduit(s) between the two vessels, which may be tested at testing step 21. Systems for quick release of the connection are described herein (for example, FIGS. 4 and 5).
At initial measuring step 23, the LNG on the supply vessel may be measured prior to any transfer taking place, using a custody transfer measuring system well known to those of skill in the art.
Gas-up of the cargo tanks on the receiving vessel may be performed at gas-up step 25. At gas-up step 25, natural gas from the supply vessel, in either a gaseous phase or liquid phase, may be used to displace the inert gas atmosphere (for example, carbon dioxide) in the cargo tanks and piping systems of the receiving vessel. The natural gas from the supply vessel, may be stored as gaseous natural gas on the supply vessel, may be stored as LNG and regasified onboard the supply vessel prior to transfer, or may be regasified onboard the receiving vessel prior to transfer. Pumps or a pressure differential may be used to transfer the gaseous natural gas between vessels. The inert gas may be captured and treated, stored, and/or sequestered.
Cool down of the cargo tanks after the inert gas is displaced may occur at cool down step 27. During cool down step 27, the temperature of cargo tank containment systems onboard the receiving vessel may be reduced to less than about −100° C., less than about −140° C., or lower using LNG or cooled natural gas from the supply vessel, which has been transferred to the receiving vessel using a manifold system, such as the manifold system 20 and/or equipment described in connection step 19.
Ship-to-ship transfer of LNG may take place at ship-to-ship transfer step 29. LNG transfer may be completed using the manifold system of connection step 19 and/or manifold system 20 and/or pumps.
Nitrogen purging may occur at purging step 31. The final measuring of LNG onboard the supply and/or receiving vessel may take place at final measuring step 33 using a custody transfer measuring system well known to those of skill in the art. This final measurement of LNG may be used along with the initial measurement obtained in initial measuring step 23 to determine the volume of LNG transferred from the supply ship to the receiving ship. The ships may then be disconnected and unmoored at disconnecting step 35 and unmooring step 37.
FIG. 3 depicts a representation of an embodiment of a manifold system for ship-to-ship transfer, which may be used for floating gas-up and cool down procedures, as well as for ship-to-ship transfer of LNG. In manifold system 20, LNG may flow from an LNG storage tank on supply vessel 12 through liquid conduits 22. Liquid conduits 22 may be coupled to liquid hoses 24. The LNG may be transferred from liquid conduits 22 to liquid hoses 24 and flows to receiving vessel 10 via liquid conduit 22′. Deck 26 supports liquid hoses 24 and vapor hoses 28. Vapor hoses 28 may be coupled to vapor conduits 30 and 30′. Vapor conduits 30 and 30′ and vapor hoses 28 help manage boil-off gas generated as LNG may be transferred through liquid conduits 22.
Liquid hoses 24 may contain stainless steel end fittings, be epoxy filled and swaged, and type approved by class for ship-to-ship transfer of LNG. Liquid hoses 24 may also contain layers of synthetic (for example, polyethylene) films and fabrics and be configured to withstand cryogenic cycles and to leak before failure. In some embodiments, liquid hoses 24 may be composite hoses of a nominal 8 inches (about 20.32 cm) in diameter, 15 meters in length, and have a 0.65 meter to 0.9 meter bend radius. Liquid hoses 24 may be supported by hose support saddles 32 on each of vessels 10 and 12.
Liquid hoses 24 and vapor hoses 28 may be positioned in hose support saddles 32. Saddles 32 may provide protection and support for liquid hoses 24 and vapor hoses 28 and maintain the minimum bend radius of the hoses. In addition, saddles 32 may transfer static and dynamic loads from liquid hoses 24 and vapor hoses 28 to the manifold deck structure on vessels 10 and 12 and provide chafe protection for the hoses.
Liquid hoses 24 may connect to liquid conduits 22, 22′ using spool pieces 34, 34′. In addition, vapor hoses 28 may connect to vapor conduits 30, 30′ using spool pieces 34, 34′. Spool pieces 34, 34′ may reduce the diameter of the pipe to match the diameter of the hose connections as compared connections made using conventional pipe and hose connectors. For example, using spool pieces 34 liquid hoses 24 may be connected to liquid conduits 22, 22′ and/or vapor hoses 28 may be connected to vapor conduits 30, 30′ at angles less than 45 degrees. Using spool pieces 34, 34′ may allow an increased number of hoses and/or conduits to be used in manifold system 20 as compared to conventional LNG manifold systems.
Release couplings 36 may be positioned between liquid hoses 24 and spool pieces 34′ and/or between vapor hoses 28 and spool pieces 34′. Release couplings 36 may allow for liquid hoses 24 and/or vapor hoses 28 to quickly disconnect in emergency situations. Release couplings 36 may be operated remotely and/or automatically and provide for a ‘dry break’ designed to minimize a LNG leak or release upon actuation of the release coupling. Release couplings 36 may be actuated by a dry break actuator 50, shown in FIG. 5. In some embodiments, a mechanical/hydraulic system may be used to detect the need and trigger a release or separation. In some embodiments a radio communication and pneumatic stored pressure actuation system may be used to detect the need and trigger a release or separation, such as the system shown in FIG. 4.
Manifold system 20 may include water bath systems 78, 78′. Water bath system 78 may protect trunk decks and cargo tanks of vessels 10 and 12 from cryogenic damage to steel works caused by accidental release of LNG. Water bath systems 78, 78′ may include a water bath on the main deck of the vessels under the manifold area and an additional water curtain under each manifold to protect the slopes of the proximal cargo tanks.
FIG. 4 depicts a schematic of an embodiment of a system to initiate quick release of a manifold conduit. To improve safety, the supply vessel 12 and/or the receiving vessel 10, may be equipped with an alarm set point to warn of an excursion of supply vessel 12 or receiving vessel 10 from the approved operating envelop of the two vessels when moored. Receiving vessel 10, supply vessel 12 and/or a manifold conduit may also be equipped with manual or automated quick release capabilities to close valves on a manifold conduit and decouple receiving vessel 10 from supply vessel 12 if either moves past the alarm set points. In some embodiments a mechanical or hydraulic system may be used to trigger a separation in such an emergency. In certain embodiments, physical connections, radio, laser or ultrasonic transponders may be used to measure the distance between a sending location (for example, supply vessel 12) and a receiving location (for example, receiving vessel 10) and thereby detect abnormal motion between the vessels.
As shown in FIG. 4, transponders 40 may be battery powered and/or attached to receiving vessel 10 and/or supply vessel 12 using heavy duty magnets, vacuum suction cups or some other attachment mechanism that can withstand seawater, wind, cold or other extreme conditions. Backup battery 48 may also be included. In some embodiments, multiple pairs of transponders that implement a voting system may be used to determine whether there has been abnormal movement of the ship. In some embodiments, fender 16 may also assist in keeping receiving vessel 10 and/or supply vessel 12 within normal parameters. As shown in FIG. 3, in some embodiments, transponders 40 send information to computer 42 onboard receiving and/or supply vessel 10 or to a programmable logic controller (“PLC”) on a portable or fixed control console using low power radio transmitter 44. Computer 42 or a PLC may then analyze the data from the transponders, including the distance between hulls, rate of change, degree of rolling, yaw and pitching to determine whether abnormal motion is occurring, and trigger an audible and/or visual alarm in a control room, on a control console and/or on the open decks of receiving vessel 10 and/or supply vessel 12, for example alarm 46, when it receives the appropriate input. Computer 42 may communicate with alarm 46 using a wireless or wired connection. In some embodiments, the computer or PLC may be programmed to understand the parameters for normal movement of a ship and unacceptable deviation from those parameters. In some embodiments, computer 42 may determine that a distance between hulls has deviated from one or more preset parameters for a preset duration of time. Transponders 40 and other equipment in the field or on deck of receiving vessel 10 and/or supply vessel 12 used for detection and triggering of a need for emergency shutdown and decoupling of gas conduit 52 described herein are significantly safer than conventional methods. Conventional methods require mechanical and/or hydraulic connections which may be unwieldy and can present safety and/or environmental hazards.
In some embodiments, emergency release couplings on receiving vessel 10 and/or supply vessel 12 may be used alone or in conjunction with emergency shutdown and quick release connections on the manifold conduit (for example, release coupling 36). In some embodiments, a physical or hydraulic system may be used on the deck of receiving vessel 10 or supply vessel 12 for this purpose. In certain embodiments, radio communication and pneumatic or stored pressure actuation systems may be used on emergency shut down and dry break actuator 50, which may be release coupling 36. FIG. 4 depicts a schematic of an embodiment of a system to provide radio communication and pneumatic actuation systems to trigger emergency shut down and emergency release couplings on the deck of a vessel or on a manifold conduit. When audible and/or visual alarm 46 is activated, an operator (if present) can choose to send one or more radio signals or other type of signal to one or more dry break ERC actuators, such as dry break actuator 50, which may be attached to the manifold. The signal may be sent by a computer in a control room, such as computer 42, or on a fixed or portable control cart. One or more radio frequencies may be used to trigger one or more dry break ERC actuators individually, consecutively or simultaneously, as needed. Dry break actuator 50 receives the signal with receiver 52 and may use a stored-pressure pneumatic system to trigger the release of dry break actuator 50 between receiving vessel 10 and supply vessel 12. If an operator is not present, then the system may be programmed to automatically signal the emergency shut down and/or dry break actuator 50 to release if alarm 46 remains activated for a predetermined amount of time, for example 20 seconds, 30 seconds or one minute. The release process may occur in two steps. First, cargo transfer may be shut down. Second, if the alarm continues, there may be a second signal to trigger dry break actuator 50 on each hose, pipe, high pressure arm and/or manifold conduit. Receiver 52 may require receipt of multiple signals from the PLC or computer 42 before triggering release, in order to first confirm that cargo transfer is shut down prior to initiating the release on the couplings. Alternatively, the communication equipment attached to dry break actuator 50 may engage in two way communications with the PLC or computer 42. The radio communication and pneumatic actuation method and system described herein increases the safety as compared to conventional methods.
As shown in FIG. 5, once receiver 52 obtains a signal to commence a release on coupling 54, receiver 52 with antenna 56, punctures attached compressed nitrogen gas cylinder 58. Receiver 52 may also include a solenoid valve and blowdown. In this embodiment, the change in pressure causes pneumatic cylinder 60 with a piston to move and coupling 54 to open, disconnecting from ERC collar 62 and allowing separation of the connections between receiving vessel 10 and supply vessel transfer piping 64 (for example, liquid hoses 24 and vapor hoses 28 shown in FIG. 3). The quick release/emergency release system described herein may also be used in connection with rigid or flexible piping, hoses, loading/unloading gas arms, high pressure arms, and/or liquid arms between two vessels, between a LNG carrier and a dock, or between any vessels, vehicles or structures used for cargo transfers such as transfers of high pressure gas or LNG.
Further modifications and alternative embodiments of various aspects of the invention may be apparent to those skilled in the art in view of this description. Accordingly, this description is to be construed as illustrative only and is for the purpose of teaching those skilled in the art the general manner of carrying out the invention. It is to be understood that the forms of the invention shown and described herein are to be taken as the presently preferred embodiments. Elements and materials may be substituted for those illustrated and described herein, parts and processes may be reversed, and certain features of the invention may be utilized independently, all as would be apparent to one skilled in the art after having the benefit of this description of the invention. Changes may be made in the elements described herein without departing from the spirit and scope of the invention as described in the following claims. In addition, it is to be understood that features described herein independently may, in certain embodiments, be combined.

Claims (7)

The invention claimed is:
1. A method for treating one or more liquefied natural gas (LNG) cargo tanks comprising:
connecting a supply vessel and a receiving vessel using a manifold conduit, wherein the supply vessel is in an open water location and the receiving vessel is in the open water location;
gassing-up at least one cryogenic cargo tank onboard the receiving vessel using the manifold conduit and natural gas from the supply vessel at a pressure differential, wherein the natural gas for gassing-up is in a liquid phase when transferred through the manifold conduit, is regasified onboard the receiving vessel and used in a gaseous phase during gassing-up;
cooling down the gassed-up at least one cryogenic cargo tank onboard the receiving vessel using LNG transferred from the supply vessel;
transferring LNG cargo from the supply vessel to the cooled down at least one cryogenic cargo tank onboard the receiving vessel using ship-to-ship transfer; and
disconnecting one of the supply vessel, the receiving vessel or a combination thereof from the manifold conduit.
2. The method of claim 1, wherein the supply vessel and the receiving vessel are at anchor.
3. The method of claim 1, further comprising regasifying a portion of the LNG cargo onboard the receiving vessel.
4. A method for treating one or more liquefied natural gas (LNG) cargo tanks comprising:
coupling a supply vessel to at least one LNG cargo tank onboard a receiving vessel using a manifold conduit, wherein the supply vessel and the receiving vessel are in an open water location;
gassing up the at least one LNG cargo tank on the receiving vessel using LNG from the supply vessel, the LNG from the supply vessel regasified onboard the receiving vessel for use in gassing up, and employing a pressure differential such that inert gas in the at least one LNG cargo tank is displaced by the regasified LNG;
cooling down the at least one LNG cargo tank using LNG from the supply vessel until the at least one LNG cargo tank is cooled to an average temperature of less than about −100 ° C.; and
transferring a remainder of LNG from the supply vessel through the manifold conduit to the cooled down at least one LNG cargo tank on the receiving vessel.
5. A system for treating one or more liquefied natural gas (LNG) cryogenic cargo tanks, comprising:
a manifold conduit, wherein the manifold conduit mechanically couples a supply vessel to a receiving vessel, the manifold conduit comprising at least one flexible liquid hose extending between the supply vessel and the receiving vessel;
a releasable coupling system configured to trigger emergency shutdown and release couplings, the release couplings coupled to the manifold conduit such that the release couplings are positioned between the at least one flexible liquid hose and a spool piece;
one or more LNG cargo tanks on the receiving vessel containing an inert gas;
a regasification system on the receiving vessel;
wherein the supply vessel transfers LNG to the receiving vessel using the at least one flexible liquid hose such that inert gas in the one or more LNG cargo tanks on the receiving vessel is displaced by transferred LNG regasified on the receiving vessel to gas up the one or more LNG cargo tanks,
wherein the supply vessel transfers LNG to the receiving vessel using the at least one flexible liquid hose such that boil-off gas is generated;
the manifold conduit further comprising at least one vapor hose extending between the supply vessel and the receiving vessel, the at least one vapor hose removing boil-off gas generated as the one or more LNG cargo tanks are cooled down, the at least one vapor hose also connected to the releasable coupling system; and
wherein the receiving vessel and the supply vessel are located in an open water location, and wherein the supply vessel transfers additional LNG to the receiving vessel using the manifold conduit.
6. The system of claim 5, wherein the releasable coupling system further comprises a dry break actuator.
7. The system of claim 5, wherein the releasable coupling system is tested before transferring LNG to the receiving vessel.
US13/697,939 2010-05-20 2011-05-19 Systems and methods for treatment of LNG cargo tanks Expired - Fee Related US9919774B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/697,939 US9919774B2 (en) 2010-05-20 2011-05-19 Systems and methods for treatment of LNG cargo tanks

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US34668310P 2010-05-20 2010-05-20
PCT/US2011/037228 WO2011146763A2 (en) 2010-05-20 2011-05-19 Systems and methods for treatment of lng cargo tanks
US13/697,939 US9919774B2 (en) 2010-05-20 2011-05-19 Systems and methods for treatment of LNG cargo tanks

Publications (2)

Publication Number Publication Date
US20130118185A1 US20130118185A1 (en) 2013-05-16
US9919774B2 true US9919774B2 (en) 2018-03-20

Family

ID=44992348

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/697,939 Expired - Fee Related US9919774B2 (en) 2010-05-20 2011-05-19 Systems and methods for treatment of LNG cargo tanks

Country Status (7)

Country Link
US (1) US9919774B2 (en)
EP (1) EP2547580A4 (en)
AR (1) AR081213A1 (en)
AU (1) AU2011255490B2 (en)
PH (1) PH12012502068A1 (en)
SG (1) SG185008A1 (en)
WO (1) WO2011146763A2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112015032676A2 (en) * 2013-06-28 2018-04-24 Stolt Nielsen Tm B V method for constructing segregated tanker, segregated tanker, cargo vessel to provide segregated tanker, and independent tank module for providing segregated tanker
US9810478B2 (en) 2014-03-05 2017-11-07 Excelerate Energy Limited Partnership Floating liquefied natural gas commissioning system and method
NL2015422B1 (en) 2015-09-10 2017-03-27 European Intelligence B V Safety link for ship to shore-, shore to ship- and/or ship to ship-communications.
CN106314703A (en) * 2016-08-30 2017-01-11 成都华气厚普机电设备股份有限公司 Dragging type fuel ship gas supply mode
CN115370954B (en) * 2022-07-11 2023-06-30 沪东中华造船(集团)有限公司 Method for single cabin replacement, cooling and filling in LNG transport ship

Citations (190)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2795937A (en) 1955-03-31 1957-06-18 Phillips Petroleum Co Process and apparatus for storage or transportation of volatile liquids
US2938359A (en) 1955-07-21 1960-05-31 Phillips Petroleum Co Method and apparatus for storage and transportation of acetylene
US2940268A (en) 1954-05-10 1960-06-14 Constock Liquid Methane Corp Apparatus for transporting, storing and using natural gas
US2975607A (en) 1958-06-11 1961-03-21 Conch Int Methane Ltd Revaporization of liquefied gases
US3034309A (en) 1955-01-19 1962-05-15 Otto H Muck Method for transporting gas
US3068659A (en) 1960-08-25 1962-12-18 Conch Int Methane Ltd Heating cold fluids with production of energy
US3177936A (en) 1963-06-05 1965-04-13 Walter Gustave Fluted heat exchange tube with internal helical baffle
US3197972A (en) 1961-11-27 1965-08-03 Union Tank Car Co Liquified gas transferring system
US3350876A (en) 1966-01-19 1967-11-07 Roy W P Johnson Internal combustion engine plant
US3362898A (en) 1966-11-03 1968-01-09 Bell Telephone Labor Inc Eutectic separation using an electric field
US3438216A (en) 1967-05-09 1969-04-15 Texas Eastern Trans Corp Cryogenic recovery vaporizer
US3535885A (en) 1965-02-05 1970-10-27 Shell Oil Co Method of transporting natural gas
US3561524A (en) 1969-10-08 1971-02-09 Satterthwaite James G Marine keel cooler
US3724229A (en) 1971-02-25 1973-04-03 Pacific Lighting Service Co Combination liquefied natural gas expansion and desalination apparatus and method
US3755142A (en) 1971-05-21 1973-08-28 W Whipple Process and apparatus for the purification of a natural body of water
US3834174A (en) 1969-06-02 1974-09-10 W Strumbos Cryogenic transportation method and apparatus therefor
US3850001A (en) 1973-06-15 1974-11-26 Chicago Bridge & Iron Co Lng ship tank inert gas generation system
US3864918A (en) 1972-05-27 1975-02-11 Sulzer Ag Powered mobile liquefied gas carriers
US3886887A (en) 1972-02-04 1975-06-03 Secr Defence Brit System for controlling the position of a floating vessel
US3897754A (en) 1974-10-16 1975-08-05 Ransome Gas Ind Inc LPG vaporizer
US3974794A (en) 1973-11-06 1976-08-17 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Vacuum actuated ship mooring devices
US3975167A (en) 1975-04-02 1976-08-17 Chevron Research Company Transportation of natural gas as a hydrate
US3978663A (en) 1974-01-11 1976-09-07 Sulzer Brothers Limited Process and apparatus for evaporating and heating liquified natural gas
US3986340A (en) 1975-03-10 1976-10-19 Bivins Jr Henry W Method and apparatus for providing superheated gaseous fluid from a low temperature liquid supply
JPS5210911A (en) 1975-07-16 1977-01-27 Sumitomo Precision Prod Co Ltd System for evaporating liquefied natural gas
JPS5210910A (en) 1975-07-16 1977-01-27 Sumitomo Precision Prod Co Ltd System for evaporating liquefied natural gas
US4033135A (en) 1975-02-07 1977-07-05 Sulzer Brothers Limited Plant and process for vaporizing and heating liquid natural gas
US4036028A (en) 1974-11-22 1977-07-19 Sulzer Brothers Limited Process and apparatus for evaporating and heating liquified natural gas
US4040476A (en) 1975-07-09 1977-08-09 The Johnson Rubber Company Keel cooler with spiral fluted tubes
US4041721A (en) 1975-07-07 1977-08-16 The Lummus Company Vessel having natural gas liquefaction capabilities
US4043289A (en) 1975-08-22 1977-08-23 The Walter Machine Company, Inc. Marine keel cooler
US4106424A (en) 1977-05-26 1978-08-15 General Dynamics Corporation Insulated marine container for liquefied gas
JPS53115666A (en) 1977-03-18 1978-10-09 Jgc Corp Liquefied gas evaporator
DE2717135A1 (en) 1977-04-19 1978-10-26 Knut Wiese Marine tanker quick release pipe coupling - has rip cord to disconnect loading valves when loading pipe is stretched excessively (NL 23.10.78)
JPS53126003A (en) 1977-04-11 1978-11-02 Osaka Gas Co Ltd Equipment for gasifying liquefied natural gas (lng)
JPS5422404A (en) 1977-07-21 1979-02-20 Chiyoda Chem Eng & Constr Co Ltd Method of regasfication liquefied petroleum gas
GB2007832A (en) 1977-11-10 1979-05-23 Chevalier L P Plane solar engergy collector with milicellutar transparent cover
US4170115A (en) 1976-07-05 1979-10-09 Osaka Gas Company, Limited Apparatus and process for vaporizing liquefied natural gas
JPS54136413A (en) 1978-03-28 1979-10-23 Osaka Gas Co Ltd Liquefied natural gas gasifier
JPS54136414A (en) 1978-03-28 1979-10-23 Osaka Gas Co Ltd Liquefied natural gas gasifier
JPS5520321A (en) 1978-07-27 1980-02-13 Mitsubishi Heavy Ind Ltd Keel cooler
JPS5525659A (en) 1978-08-15 1980-02-23 Gadelius Kk Explosion-proof inert gas producing method in tanker
US4202648A (en) 1977-09-06 1980-05-13 Moss Rosenberg Verft A/S Floating plant for offshore liquefaction, temporary storage and loading of LNG
US4219725A (en) 1978-08-01 1980-08-26 The Dow Chemical Company Heating apparatus for vaporizing liquefied gases
US4224802A (en) 1978-03-28 1980-09-30 Osaka Gas Company, Limited Apparatus and process for vaporizing liquefied natural gas
US4231226A (en) 1975-05-28 1980-11-04 Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft Method and apparatus for vaporizing liquid natural gases
JPS5615801A (en) 1979-07-17 1981-02-16 Tokyo Electric Power Co Inc:The Evaporator for liquefied natural gas
US4255646A (en) 1978-03-03 1981-03-10 Sam Dick Industries, Inc. Electric liquefied petroleum gas vaporizer
JPS5674190A (en) 1979-11-20 1981-06-19 Hitachi Ltd Vaporization of liquefied gas
US4292062A (en) 1980-03-20 1981-09-29 Dinulescu Horia A Cryogenic fuel tank
US4315407A (en) 1979-06-26 1982-02-16 British Gas Corporation Gas storage and transmission systems
EP0048316A1 (en) 1980-09-19 1982-03-31 Uhde GmbH Process and installation for the revaporization of liquefied natural gas
US4329842A (en) 1980-07-02 1982-05-18 Hans D. Linhardt Power conversion system utilizing reversible energy of liquefied natural gas
US4331129A (en) 1979-07-05 1982-05-25 Columbia Gas System Service Corporation Solar energy for LNG vaporization
US4338993A (en) 1980-02-22 1982-07-13 R. W. Fernstrum & Co. Underwater outboard marine heat exchanger
JPS585598A (en) 1981-07-01 1983-01-12 Chiyoda Chem Eng & Constr Co Ltd Power recovering method from liquefied natural gas aiming at low-load stabilization
US4402350A (en) 1979-11-12 1983-09-06 Fmc Corporation System for the control of a marine loading arm
US4408943A (en) 1981-02-27 1983-10-11 Fmc Corporation Ship-to-ship fluid transfer system
US4417878A (en) 1980-03-31 1983-11-29 Moss Rosenberg Verft A/S Propulsion machinery for LNG ships
DE3225299A1 (en) 1982-07-07 1984-01-12 Drago Dipl.-Ing. 5020 Frechen Kober Heat exchanger, in particular for the cargo medium of a liquid tanker
US4429536A (en) 1977-12-29 1984-02-07 Reikichi Nozawa Liquefied natural gas-refrigerant electricity generating system
US4464904A (en) 1983-05-19 1984-08-14 Union Carbide Corporation Process for the transfer of refrigeration
JPS59166799A (en) 1983-03-11 1984-09-20 Tokyo Gas Co Ltd Liquefied natural gas vaporization equipment
US4519213A (en) 1983-08-01 1985-05-28 Zwick Energy Research Organization, Inc. Ambient air heated electrically assisted cryogen vaporizer
JPS60149599A (en) 1983-10-11 1985-08-07 アドミニストレ−タ−ズ・オブ・ザ・ツ−レイン・エデユケイシヨナル・フアンド Peptide
US4557319A (en) 1982-07-02 1985-12-10 Arnold Alanson J Marine keel cooler
JPS6124697A (en) 1984-07-11 1986-02-03 Tanaka Kikai Sangyo Kk Pressure fluid cooling system for vessel
JPS6138300A (en) 1984-07-31 1986-02-24 Mitsubishi Heavy Ind Ltd Liquefied gas vaporizer
US4622997A (en) 1984-07-27 1986-11-18 Bridon P.L.C. Emergency release couplers
US4632622A (en) 1983-02-28 1986-12-30 Robinson James S Marine cargo transfer device
JPS62141398A (en) 1985-12-13 1987-06-24 Tokyo Gas Co Ltd Method and device for bringing low-temperature LPG to room temperature
US4716737A (en) 1986-03-20 1988-01-05 Sulzer Brothers Limited Apparatus and process for vaporizing a liquified hydrocarbon
US4718459A (en) * 1986-02-13 1988-01-12 Exxon Production Research Company Underwater cryogenic pipeline system
JPS6376700A (en) 1986-09-19 1988-04-06 Matsushita Electric Ind Co Ltd wireless speaker system
JPS6469898A (en) 1987-09-11 1989-03-15 Tokyo Gas Co Ltd Lng gasification apparatus
US4819454A (en) 1988-01-22 1989-04-11 Zwick Energy Research Organization, Inc. Liquid cryogenic vaporizer utilizing ambient air and a nonfired heat source
US4867211A (en) 1985-12-12 1989-09-19 British Aerospace Public Limited Company Open sea transfer of fluids
GB2216972A (en) 1988-03-31 1989-10-18 Tecnomarine Systems Limited Umbilical connectors
US4881495A (en) 1987-09-22 1989-11-21 Cryomec Ag Device for vaporizing a cryogenic fluid
US4924822A (en) 1987-06-02 1990-05-15 Mitsubishi Jukogyo Kabushiki Kaisha Gas feed system for a gas-fired diesel engine
US4998560A (en) 1988-11-09 1991-03-12 Fmc Corporation Fluid loading arm emergency disconnection system
US5154561A (en) 1990-04-11 1992-10-13 Lee Donald E Automated all-weather cargo transfer system
JPH05332499A (en) 1992-06-03 1993-12-14 Tokyo Gas Co Ltd Liquid natural gas vaporizer
JPH06173710A (en) 1992-11-05 1994-06-21 Chiyoda Corp Air cooling device for gas turbine
US5375580A (en) 1992-01-23 1994-12-27 Air Products And Chemicals, Inc. Internal combustion engine with cooling of intake air using refrigeration of liquefied fuel gas
US5400588A (en) 1992-10-16 1995-03-28 Kabushiki Kaisha Kobe Seiko Sho Mechanism for firing gas turbines with liquefied natural gas
US5457951A (en) 1993-12-10 1995-10-17 Cabot Corporation Improved liquefied natural gas fueled combined cycle power plant
US5564957A (en) 1991-11-27 1996-10-15 Den Norske Stats Oljeselskap A.S. System for offshore loading/unloading of a flowable medium, especially oil
JPH0914869A (en) 1995-06-23 1997-01-17 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
US5762119A (en) 1996-11-29 1998-06-09 Golden Spread Energy, Inc. Cryogenic gas transportation and delivery system
JPH11117766A (en) 1997-10-16 1999-04-27 Chiyoda Corp Air cooling system and cooling method for gas turbine
JPH11125397A (en) 1997-10-22 1999-05-11 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
JPH11148599A (en) 1997-11-17 1999-06-02 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
JPH11208574A (en) 1998-01-21 1999-08-03 Mitsubishi Heavy Ind Ltd Mid-oceanic cling method and device of fluid transferring hose
WO1999038762A1 (en) 1998-01-30 1999-08-05 Den Norske Stats Oljeselskap A.S Lng load transfer system
WO1999047869A1 (en) 1998-03-18 1999-09-23 Mobil Oil Corporation Regasification of lng aboard a transport vessel
US5990272A (en) 1996-05-21 1999-11-23 Mitsui Chemicals, Inc. Method of treating polyolefin
US6003603A (en) 1994-12-08 1999-12-21 Den Norske Stats Ol Jesel Skap A.S. Method and system for offshore production of liquefied natural gas
JP2000062665A (en) 1998-08-20 2000-02-29 Suzuki Motor Corp Body front part structure of motorcycle
US6079222A (en) 1997-04-24 2000-06-27 Asea Brown Boveri Ag Method for preparing deep-frozen liquid gas
US6089028A (en) 1998-03-27 2000-07-18 Exxonmobil Upstream Research Company Producing power from pressurized liquefied natural gas
US6116031A (en) 1998-03-27 2000-09-12 Exxonmobil Upstream Research Company Producing power from liquefied natural gas
US6164247A (en) 1999-02-04 2000-12-26 Kabushiki Kaishi Kobe Seiko Sho Intermediate fluid type vaporizer, and natural gas supply method using the vaporizer
WO2001003793A1 (en) 1999-07-09 2001-01-18 Moss Maritime A.S. Device for evaporation of liquefied natural gas
WO2001034460A1 (en) 1999-10-27 2001-05-17 Statoil Asa A system for offshore transfer of liquefied natural gas
US6250244B1 (en) 1995-10-05 2001-06-26 Bhp Petroleum Pty Ltd Liquefaction apparatus
JP2001206282A (en) 2000-01-27 2001-07-31 Ishikawajima Harima Heavy Ind Co Ltd LNG ship
EP1120596A1 (en) 2000-01-24 2001-08-01 Giorgio Bormioli Emergency release coupling in response to strong axial traction
JP2001263592A (en) 2000-03-23 2001-09-26 Ishikawajima Harima Heavy Ind Co Ltd LNG vaporization method and apparatus
CN2451873Y (en) 2000-06-20 2001-10-03 王庆国 Marine loading arm emergency disengaging apparatus
US6298671B1 (en) 2000-06-14 2001-10-09 Bp Amoco Corporation Method for producing, transporting, offloading, storing and distributing natural gas to a marketplace
US6336316B1 (en) 1998-12-21 2002-01-08 Japan Science And Technology Corp. Heat engine
GB2367049A (en) 2000-09-21 2002-03-27 Ocean Technologies Ltd Ship to ship LNG transfer system
US6367429B2 (en) 2000-01-18 2002-04-09 Kabushiki Kaisha Kobe Seiko Sho Intermediate fluid type vaporizer
US6367258B1 (en) 1999-07-22 2002-04-09 Bechtel Corporation Method and apparatus for vaporizing liquid natural gas in a combined cycle power plant
US6374591B1 (en) 1995-02-14 2002-04-23 Tractebel Lng North America Llc Liquified natural gas (LNG) fueled combined cycle power plant and a (LNG) fueled gas turbine plant
US20020073619A1 (en) 2000-12-14 2002-06-20 William Perkins Method and apparatus for delivering natural gas to remote locations
US6435124B1 (en) 2000-02-08 2002-08-20 Brovig Rds Limited Mooring and flowline system
US20020134455A1 (en) 2001-03-23 2002-09-26 Leif Hoegh & Co. Asa Vessel and unloading system
US6460350B2 (en) 2000-02-03 2002-10-08 Tractebel Lng North America Llc Vapor recovery system using turboexpander-driven compressor
CN2515185Y (en) 2001-11-22 2002-10-09 连云港远洋流体装卸设备有限公司 Wharf liquid loading and unloading arm emergency release device
US6519944B2 (en) 2000-10-18 2003-02-18 General Electric Company Method of generating a transient plant power boost in a gas turbine apparatus
US6546739B2 (en) 2001-05-23 2003-04-15 Exmar Offshore Company Method and apparatus for offshore LNG regasification
US6598408B1 (en) 2002-03-29 2003-07-29 El Paso Corporation Method and apparatus for transporting LNG
WO2003064245A1 (en) 2002-02-01 2003-08-07 Ihc Gusto Engineering B.V. Multi hull barge
US6644041B1 (en) 2002-06-03 2003-11-11 Volker Eyermann System in process for the vaporization of liquefied natural gas
US6659703B1 (en) 1998-04-28 2003-12-09 Oceantech Plc Stabilized ship-borne access apparatus and control method for the same
US6688114B2 (en) 2002-03-29 2004-02-10 El Paso Corporation LNG carrier
US6805598B2 (en) 2002-09-06 2004-10-19 Dorob International Ltd. Liquid natural gas transfer station
US6816669B2 (en) 2001-06-08 2004-11-09 Algas-Sdi International Llc Vaporizer with capacity control valve
US6829901B2 (en) 2001-12-12 2004-12-14 Exxonmobil Upstream Research Company Single point mooring regasification tower
US6832875B2 (en) 2000-09-11 2004-12-21 Shell Oil Company Floating plant for liquefying natural gas
US20040261681A1 (en) 2002-12-20 2004-12-30 Oyvind Jordanger System for converting existing tankers to shuttle tankers
US6851994B2 (en) 2002-03-08 2005-02-08 Fmc Technologies, Inc. Disconnectable mooring system and LNG transfer system and method
GB2406887A (en) 2003-10-01 2005-04-13 Tanker Solutions Ltd Locking coupling with fluid sensing.
WO2005032942A1 (en) 2003-09-19 2005-04-14 Single Buoy Moorings, Inc. Gas offloading system
JP2005104200A (en) 2003-09-29 2005-04-21 Nishishiba Electric Co Ltd Energy system of liquefied gas carrier
US6886611B2 (en) 2000-10-06 2005-05-03 Societe Europeenne D'ingenierie Mecanioue-Eurodim System for transferring a fluid product between a carrying vessel and a shore installation
US20050115248A1 (en) 2003-10-29 2005-06-02 Koehler Gregory J. Liquefied natural gas structure
US6910435B2 (en) 2000-02-26 2005-06-28 Mooring Systems Limited Mooring device
US20050254901A1 (en) 2002-11-12 2005-11-17 Lovie Peter M Offshore oil transportation system
US6973948B2 (en) 2003-09-19 2005-12-13 Sbm-Imodco, Inc. Gas offloading system
US6976443B2 (en) 2002-12-20 2005-12-20 Narve Oma Crude oil transportation system
US6979147B1 (en) 2003-10-30 2005-12-27 Single Buoy Moorings, Inc. Enhanced LNG tanker offloading in shallow waters
WO2006020107A2 (en) 2004-07-18 2006-02-23 Mustang Engineering, L.P. Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification units
US20060048850A1 (en) 2002-11-19 2006-03-09 Philippe Espinasse Liquefied gas transfer installation and use thereof
US20060053806A1 (en) * 2004-09-13 2006-03-16 Argent Marine Operations, Inc. System and process for transporting LNG by non-self-propelled marine LNG carrier
US20060081166A1 (en) 2002-07-30 2006-04-20 Mooring Systems Limited Mooring system with active control
US7073457B2 (en) 2002-08-06 2006-07-11 Fmc Technologies, Inc. Duplex yoke mooring system
US20060156744A1 (en) * 2004-11-08 2006-07-20 Cusiter James M Liquefied natural gas floating storage regasification unit
US7080673B2 (en) 2004-04-30 2006-07-25 Sbm-Imodco, Inc. Quick LNG offloading
US7107925B2 (en) 2001-12-12 2006-09-19 Single Buoy Moorings Inc. Weathervaning LNG offloading system
KR20060130825A (en) 2005-06-08 2006-12-20 삼성중공업 주식회사 Means for transferring liquefied natural gas between floating liquefied gas reservoirs and liquefied natural gas carriers
KR100676615B1 (en) 2006-06-21 2007-01-30 대우조선해양 주식회사 System and Method for Regasification of LAN Using Offshore Floating Structures
US7219502B2 (en) 2003-08-12 2007-05-22 Excelerate Energy Limited Partnership Shipboard regasification for LNG carriers with alternate propulsion plants
US20070144184A1 (en) 2005-12-22 2007-06-28 Wijingaarden Wim V Enhanced LNG regas
US20070175377A1 (en) 2003-02-18 2007-08-02 Remora Technology As Ocean-based device for loading and unloading of ships
US20070214804A1 (en) 2006-03-15 2007-09-20 Robert John Hannan Onboard Regasification of LNG
US7293600B2 (en) 2002-02-27 2007-11-13 Excelerate Energy Limited Parnership Apparatus for the regasification of LNG onboard a carrier
US20070267061A1 (en) * 2004-09-21 2007-11-22 Ola Ravndal Volume-Displacing Device In Containers, Especially Tanks In Lpg Ships, And A Method Of Using Same
US7299760B2 (en) 2004-03-05 2007-11-27 Sofec, Inc. Floating LNG import terminal and method for docking
JP2007534556A (en) 2004-04-29 2007-11-29 シングル・ブイ・ムーリングス・インコーポレイテッド Side-by-side hydrocarbon transfer system
US7308863B2 (en) 2003-08-22 2007-12-18 De Baan Jaap Offshore LNG regasification system and method
US20080148740A1 (en) 2006-12-20 2008-06-26 Chevron U.S.A. Inc. Apparatus for transferring a cryogenic fluid
US20080153369A1 (en) 2006-12-20 2008-06-26 Chevron U.S.A. Inc. Method for loading lng on a floating vessel
US20080190117A1 (en) * 2007-02-12 2008-08-14 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Lng tank and operation of the same
US20080236703A1 (en) 2007-03-29 2008-10-02 Chevron U.S.A. Inc. System for transferring fluids between floating vessels using flexible conduit and releasable mooring system
US7484404B2 (en) 2005-02-22 2009-02-03 Mustang Sampling Llc Liquid gas vaporization and measurement system and method
US7543613B2 (en) 2005-09-12 2009-06-09 Chevron U.S.A. Inc. System using a catenary flexible conduit for transferring a cryogenic fluid
WO2009071591A2 (en) 2007-12-03 2009-06-11 Single Buoy Moorings Inc. Connector with an integrated quick/connect disconnect and emergency release system
WO2009073383A1 (en) 2007-11-30 2009-06-11 Novozymes A/S Polypeptides having arabinofuranosidase activity and polynucleotides encoding same
WO2009087237A2 (en) 2008-01-10 2009-07-16 Exmar Emergency release system
US20090193780A1 (en) * 2006-09-11 2009-08-06 Woodside Energy Limited Power Generation System for a Marine Vessel
US20090272126A1 (en) 2006-09-11 2009-11-05 Mathews William S Transporting and Managing Liquefield Natural Gas
US20100000252A1 (en) 2008-06-20 2010-01-07 Ian Morris Comprehensive system for the storage and transportation of natural gas in a light hydrocarbon liquid medium
US7644676B2 (en) 2008-02-11 2010-01-12 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Storage tank containing liquefied natural gas with butane
US7681511B2 (en) 2006-05-22 2010-03-23 Statoilhydro Asa System for loading and unloading of hydrocarbons in ice prone waters
US20100074692A1 (en) 2006-09-11 2010-03-25 Mark E Ehrhardt Open-Sea Berth LNG Import Terminal
US7726359B2 (en) 2006-12-20 2010-06-01 Chevron U.S.A. Inc. Method for transferring a cryogenic fluid
WO2010069910A2 (en) 2008-12-15 2010-06-24 Shell Internationale Research Maatschappij B.V. Method for cooling a hydrocarbon stream and a floating vessel therefor
US20100229573A1 (en) 2007-11-30 2010-09-16 Ehrstroem Markus Floating lng storage and re-gasification unit and method for re-gasification of lng on said unit
US20100263389A1 (en) 2009-04-17 2010-10-21 Excelerate Energy Limited Partnership Dockside Ship-To-Ship Transfer of LNG
US20110066290A1 (en) 2008-05-22 2011-03-17 Fmc Technologies Sa Control device for fluid loading and/or unloading system
US20110232767A1 (en) 2008-11-20 2011-09-29 Single Buoy Moorings Inc. Multi-function unit for the offshore transfer of hydrocarbons
US8141645B2 (en) 2009-01-15 2012-03-27 Single Buoy Moorings, Inc. Offshore gas recovery
US8181662B2 (en) 2006-03-30 2012-05-22 Single Buoy Moorings Inc. Hydrocarbon transfer system with vertical rotation axis
US8186170B2 (en) 2007-05-29 2012-05-29 Sofec, Inc. Floating LNG regasification facility with LNG storage vessel
AU2012209046A1 (en) 2005-03-22 2012-08-23 Single Buoy Moorings Inc Enhanced side-by-side mooring construction
US8448673B2 (en) 2006-11-15 2013-05-28 Exxonmobil Upstream Research Company Transporting and transferring fluid
JP5332499B2 (en) 2008-10-23 2013-11-06 富士電機株式会社 Product carrying device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4052406B2 (en) * 1998-08-24 2008-02-27 独立行政法人石油天然ガス・金属鉱物資源機構 Offshore transfer equipment

Patent Citations (207)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2940268A (en) 1954-05-10 1960-06-14 Constock Liquid Methane Corp Apparatus for transporting, storing and using natural gas
US3034309A (en) 1955-01-19 1962-05-15 Otto H Muck Method for transporting gas
US2795937A (en) 1955-03-31 1957-06-18 Phillips Petroleum Co Process and apparatus for storage or transportation of volatile liquids
US2938359A (en) 1955-07-21 1960-05-31 Phillips Petroleum Co Method and apparatus for storage and transportation of acetylene
US2975607A (en) 1958-06-11 1961-03-21 Conch Int Methane Ltd Revaporization of liquefied gases
US3068659A (en) 1960-08-25 1962-12-18 Conch Int Methane Ltd Heating cold fluids with production of energy
US3197972A (en) 1961-11-27 1965-08-03 Union Tank Car Co Liquified gas transferring system
US3177936A (en) 1963-06-05 1965-04-13 Walter Gustave Fluted heat exchange tube with internal helical baffle
US3535885A (en) 1965-02-05 1970-10-27 Shell Oil Co Method of transporting natural gas
US3350876A (en) 1966-01-19 1967-11-07 Roy W P Johnson Internal combustion engine plant
US3362898A (en) 1966-11-03 1968-01-09 Bell Telephone Labor Inc Eutectic separation using an electric field
US3438216A (en) 1967-05-09 1969-04-15 Texas Eastern Trans Corp Cryogenic recovery vaporizer
US3834174A (en) 1969-06-02 1974-09-10 W Strumbos Cryogenic transportation method and apparatus therefor
US3561524A (en) 1969-10-08 1971-02-09 Satterthwaite James G Marine keel cooler
US3724229A (en) 1971-02-25 1973-04-03 Pacific Lighting Service Co Combination liquefied natural gas expansion and desalination apparatus and method
US3755142A (en) 1971-05-21 1973-08-28 W Whipple Process and apparatus for the purification of a natural body of water
US3886887A (en) 1972-02-04 1975-06-03 Secr Defence Brit System for controlling the position of a floating vessel
US3864918A (en) 1972-05-27 1975-02-11 Sulzer Ag Powered mobile liquefied gas carriers
US3850001A (en) 1973-06-15 1974-11-26 Chicago Bridge & Iron Co Lng ship tank inert gas generation system
US3974794A (en) 1973-11-06 1976-08-17 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Vacuum actuated ship mooring devices
US3978663A (en) 1974-01-11 1976-09-07 Sulzer Brothers Limited Process and apparatus for evaporating and heating liquified natural gas
US3897754A (en) 1974-10-16 1975-08-05 Ransome Gas Ind Inc LPG vaporizer
US4036028A (en) 1974-11-22 1977-07-19 Sulzer Brothers Limited Process and apparatus for evaporating and heating liquified natural gas
US4033135A (en) 1975-02-07 1977-07-05 Sulzer Brothers Limited Plant and process for vaporizing and heating liquid natural gas
US3986340A (en) 1975-03-10 1976-10-19 Bivins Jr Henry W Method and apparatus for providing superheated gaseous fluid from a low temperature liquid supply
US3975167A (en) 1975-04-02 1976-08-17 Chevron Research Company Transportation of natural gas as a hydrate
US4231226A (en) 1975-05-28 1980-11-04 Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft Method and apparatus for vaporizing liquid natural gases
US4041721A (en) 1975-07-07 1977-08-16 The Lummus Company Vessel having natural gas liquefaction capabilities
US4040476A (en) 1975-07-09 1977-08-09 The Johnson Rubber Company Keel cooler with spiral fluted tubes
JPS5210911A (en) 1975-07-16 1977-01-27 Sumitomo Precision Prod Co Ltd System for evaporating liquefied natural gas
JPS5210910A (en) 1975-07-16 1977-01-27 Sumitomo Precision Prod Co Ltd System for evaporating liquefied natural gas
US4043289A (en) 1975-08-22 1977-08-23 The Walter Machine Company, Inc. Marine keel cooler
US4170115A (en) 1976-07-05 1979-10-09 Osaka Gas Company, Limited Apparatus and process for vaporizing liquefied natural gas
JPS53115666A (en) 1977-03-18 1978-10-09 Jgc Corp Liquefied gas evaporator
JPS53126003A (en) 1977-04-11 1978-11-02 Osaka Gas Co Ltd Equipment for gasifying liquefied natural gas (lng)
DE2717135A1 (en) 1977-04-19 1978-10-26 Knut Wiese Marine tanker quick release pipe coupling - has rip cord to disconnect loading valves when loading pipe is stretched excessively (NL 23.10.78)
US4106424A (en) 1977-05-26 1978-08-15 General Dynamics Corporation Insulated marine container for liquefied gas
JPS5422404A (en) 1977-07-21 1979-02-20 Chiyoda Chem Eng & Constr Co Ltd Method of regasfication liquefied petroleum gas
US4202648A (en) 1977-09-06 1980-05-13 Moss Rosenberg Verft A/S Floating plant for offshore liquefaction, temporary storage and loading of LNG
GB2007832A (en) 1977-11-10 1979-05-23 Chevalier L P Plane solar engergy collector with milicellutar transparent cover
US4429536A (en) 1977-12-29 1984-02-07 Reikichi Nozawa Liquefied natural gas-refrigerant electricity generating system
US4255646A (en) 1978-03-03 1981-03-10 Sam Dick Industries, Inc. Electric liquefied petroleum gas vaporizer
JPS54136413A (en) 1978-03-28 1979-10-23 Osaka Gas Co Ltd Liquefied natural gas gasifier
JPS54136414A (en) 1978-03-28 1979-10-23 Osaka Gas Co Ltd Liquefied natural gas gasifier
US4224802A (en) 1978-03-28 1980-09-30 Osaka Gas Company, Limited Apparatus and process for vaporizing liquefied natural gas
JPS5520321A (en) 1978-07-27 1980-02-13 Mitsubishi Heavy Ind Ltd Keel cooler
US4219725A (en) 1978-08-01 1980-08-26 The Dow Chemical Company Heating apparatus for vaporizing liquefied gases
JPS5525659A (en) 1978-08-15 1980-02-23 Gadelius Kk Explosion-proof inert gas producing method in tanker
US4315407A (en) 1979-06-26 1982-02-16 British Gas Corporation Gas storage and transmission systems
US4331129A (en) 1979-07-05 1982-05-25 Columbia Gas System Service Corporation Solar energy for LNG vaporization
JPS5615801A (en) 1979-07-17 1981-02-16 Tokyo Electric Power Co Inc:The Evaporator for liquefied natural gas
US4402350A (en) 1979-11-12 1983-09-06 Fmc Corporation System for the control of a marine loading arm
JPS5674190A (en) 1979-11-20 1981-06-19 Hitachi Ltd Vaporization of liquefied gas
US4338993A (en) 1980-02-22 1982-07-13 R. W. Fernstrum & Co. Underwater outboard marine heat exchanger
US4292062A (en) 1980-03-20 1981-09-29 Dinulescu Horia A Cryogenic fuel tank
US4417878A (en) 1980-03-31 1983-11-29 Moss Rosenberg Verft A/S Propulsion machinery for LNG ships
US4329842A (en) 1980-07-02 1982-05-18 Hans D. Linhardt Power conversion system utilizing reversible energy of liquefied natural gas
EP0048316A1 (en) 1980-09-19 1982-03-31 Uhde GmbH Process and installation for the revaporization of liquefied natural gas
US4408943A (en) 1981-02-27 1983-10-11 Fmc Corporation Ship-to-ship fluid transfer system
JPS585598A (en) 1981-07-01 1983-01-12 Chiyoda Chem Eng & Constr Co Ltd Power recovering method from liquefied natural gas aiming at low-load stabilization
US4557319A (en) 1982-07-02 1985-12-10 Arnold Alanson J Marine keel cooler
DE3225299A1 (en) 1982-07-07 1984-01-12 Drago Dipl.-Ing. 5020 Frechen Kober Heat exchanger, in particular for the cargo medium of a liquid tanker
US4632622A (en) 1983-02-28 1986-12-30 Robinson James S Marine cargo transfer device
JPS59166799A (en) 1983-03-11 1984-09-20 Tokyo Gas Co Ltd Liquefied natural gas vaporization equipment
US4464904A (en) 1983-05-19 1984-08-14 Union Carbide Corporation Process for the transfer of refrigeration
US4519213A (en) 1983-08-01 1985-05-28 Zwick Energy Research Organization, Inc. Ambient air heated electrically assisted cryogen vaporizer
JPS60149599A (en) 1983-10-11 1985-08-07 アドミニストレ−タ−ズ・オブ・ザ・ツ−レイン・エデユケイシヨナル・フアンド Peptide
JPS6124697A (en) 1984-07-11 1986-02-03 Tanaka Kikai Sangyo Kk Pressure fluid cooling system for vessel
US4622997A (en) 1984-07-27 1986-11-18 Bridon P.L.C. Emergency release couplers
JPS6138300A (en) 1984-07-31 1986-02-24 Mitsubishi Heavy Ind Ltd Liquefied gas vaporizer
US4867211A (en) 1985-12-12 1989-09-19 British Aerospace Public Limited Company Open sea transfer of fluids
JPS62141398A (en) 1985-12-13 1987-06-24 Tokyo Gas Co Ltd Method and device for bringing low-temperature LPG to room temperature
US4718459A (en) * 1986-02-13 1988-01-12 Exxon Production Research Company Underwater cryogenic pipeline system
US4716737A (en) 1986-03-20 1988-01-05 Sulzer Brothers Limited Apparatus and process for vaporizing a liquified hydrocarbon
JPS6376700A (en) 1986-09-19 1988-04-06 Matsushita Electric Ind Co Ltd wireless speaker system
US4924822A (en) 1987-06-02 1990-05-15 Mitsubishi Jukogyo Kabushiki Kaisha Gas feed system for a gas-fired diesel engine
JPS6469898A (en) 1987-09-11 1989-03-15 Tokyo Gas Co Ltd Lng gasification apparatus
US4881495A (en) 1987-09-22 1989-11-21 Cryomec Ag Device for vaporizing a cryogenic fluid
US4819454A (en) 1988-01-22 1989-04-11 Zwick Energy Research Organization, Inc. Liquid cryogenic vaporizer utilizing ambient air and a nonfired heat source
GB2216972A (en) 1988-03-31 1989-10-18 Tecnomarine Systems Limited Umbilical connectors
US4998560A (en) 1988-11-09 1991-03-12 Fmc Corporation Fluid loading arm emergency disconnection system
US5154561A (en) 1990-04-11 1992-10-13 Lee Donald E Automated all-weather cargo transfer system
US5564957A (en) 1991-11-27 1996-10-15 Den Norske Stats Oljeselskap A.S. System for offshore loading/unloading of a flowable medium, especially oil
US5375580A (en) 1992-01-23 1994-12-27 Air Products And Chemicals, Inc. Internal combustion engine with cooling of intake air using refrigeration of liquefied fuel gas
JPH05332499A (en) 1992-06-03 1993-12-14 Tokyo Gas Co Ltd Liquid natural gas vaporizer
US5400588A (en) 1992-10-16 1995-03-28 Kabushiki Kaisha Kobe Seiko Sho Mechanism for firing gas turbines with liquefied natural gas
JPH06173710A (en) 1992-11-05 1994-06-21 Chiyoda Corp Air cooling device for gas turbine
US5457951A (en) 1993-12-10 1995-10-17 Cabot Corporation Improved liquefied natural gas fueled combined cycle power plant
US6003603A (en) 1994-12-08 1999-12-21 Den Norske Stats Ol Jesel Skap A.S. Method and system for offshore production of liquefied natural gas
US6374591B1 (en) 1995-02-14 2002-04-23 Tractebel Lng North America Llc Liquified natural gas (LNG) fueled combined cycle power plant and a (LNG) fueled gas turbine plant
JPH0914869A (en) 1995-06-23 1997-01-17 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
US6250244B1 (en) 1995-10-05 2001-06-26 Bhp Petroleum Pty Ltd Liquefaction apparatus
US5990272A (en) 1996-05-21 1999-11-23 Mitsui Chemicals, Inc. Method of treating polyolefin
US5762119A (en) 1996-11-29 1998-06-09 Golden Spread Energy, Inc. Cryogenic gas transportation and delivery system
US6079222A (en) 1997-04-24 2000-06-27 Asea Brown Boveri Ag Method for preparing deep-frozen liquid gas
JPH11117766A (en) 1997-10-16 1999-04-27 Chiyoda Corp Air cooling system and cooling method for gas turbine
JPH11125397A (en) 1997-10-22 1999-05-11 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
JPH11148599A (en) 1997-11-17 1999-06-02 Ishikawajima Harima Heavy Ind Co Ltd Liquefied gas vaporizer
JPH11208574A (en) 1998-01-21 1999-08-03 Mitsubishi Heavy Ind Ltd Mid-oceanic cling method and device of fluid transferring hose
US6434948B1 (en) 1998-01-30 2002-08-20 Den Norske Stats Oljeselskap A.S. And Navion As LNG load transfer system
WO1999038762A1 (en) 1998-01-30 1999-08-05 Den Norske Stats Oljeselskap A.S Lng load transfer system
JP2002501861A (en) 1998-01-30 2002-01-22 デン ノルスケ スタッツ オルジェセルスカプ エイ.エス LNG transport system
WO1999047869A1 (en) 1998-03-18 1999-09-23 Mobil Oil Corporation Regasification of lng aboard a transport vessel
US6089022A (en) 1998-03-18 2000-07-18 Mobil Oil Corporation Regasification of liquefied natural gas (LNG) aboard a transport vessel
US6116031A (en) 1998-03-27 2000-09-12 Exxonmobil Upstream Research Company Producing power from liquefied natural gas
US6089028A (en) 1998-03-27 2000-07-18 Exxonmobil Upstream Research Company Producing power from pressurized liquefied natural gas
US6659703B1 (en) 1998-04-28 2003-12-09 Oceantech Plc Stabilized ship-borne access apparatus and control method for the same
JP2000062665A (en) 1998-08-20 2000-02-29 Suzuki Motor Corp Body front part structure of motorcycle
US6336316B1 (en) 1998-12-21 2002-01-08 Japan Science And Technology Corp. Heat engine
US6164247A (en) 1999-02-04 2000-12-26 Kabushiki Kaishi Kobe Seiko Sho Intermediate fluid type vaporizer, and natural gas supply method using the vaporizer
WO2001003793A1 (en) 1999-07-09 2001-01-18 Moss Maritime A.S. Device for evaporation of liquefied natural gas
US6578366B1 (en) 1999-07-09 2003-06-17 Moss Maritime As Device for evaporation of liquefied natural gas
US6367258B1 (en) 1999-07-22 2002-04-09 Bechtel Corporation Method and apparatus for vaporizing liquid natural gas in a combined cycle power plant
US6637479B1 (en) 1999-10-27 2003-10-28 Statoil Asa System for offshore transfer of liquefield natural gas
WO2001034460A1 (en) 1999-10-27 2001-05-17 Statoil Asa A system for offshore transfer of liquefied natural gas
US6367429B2 (en) 2000-01-18 2002-04-09 Kabushiki Kaisha Kobe Seiko Sho Intermediate fluid type vaporizer
EP1120596A1 (en) 2000-01-24 2001-08-01 Giorgio Bormioli Emergency release coupling in response to strong axial traction
JP2001206282A (en) 2000-01-27 2001-07-31 Ishikawajima Harima Heavy Ind Co Ltd LNG ship
US6460350B2 (en) 2000-02-03 2002-10-08 Tractebel Lng North America Llc Vapor recovery system using turboexpander-driven compressor
US6435124B1 (en) 2000-02-08 2002-08-20 Brovig Rds Limited Mooring and flowline system
US6910435B2 (en) 2000-02-26 2005-06-28 Mooring Systems Limited Mooring device
JP2001263592A (en) 2000-03-23 2001-09-26 Ishikawajima Harima Heavy Ind Co Ltd LNG vaporization method and apparatus
US6298671B1 (en) 2000-06-14 2001-10-09 Bp Amoco Corporation Method for producing, transporting, offloading, storing and distributing natural gas to a marketplace
CN2451873Y (en) 2000-06-20 2001-10-03 王庆国 Marine loading arm emergency disengaging apparatus
US6832875B2 (en) 2000-09-11 2004-12-21 Shell Oil Company Floating plant for liquefying natural gas
GB2367049A (en) 2000-09-21 2002-03-27 Ocean Technologies Ltd Ship to ship LNG transfer system
US6886611B2 (en) 2000-10-06 2005-05-03 Societe Europeenne D'ingenierie Mecanioue-Eurodim System for transferring a fluid product between a carrying vessel and a shore installation
US6519944B2 (en) 2000-10-18 2003-02-18 General Electric Company Method of generating a transient plant power boost in a gas turbine apparatus
US20080110091A1 (en) 2000-12-14 2008-05-15 Small Ventures Usa Llc Method and apparatus for delivering natural gas to remote locations
US20020073619A1 (en) 2000-12-14 2002-06-20 William Perkins Method and apparatus for delivering natural gas to remote locations
US20020134455A1 (en) 2001-03-23 2002-09-26 Leif Hoegh & Co. Asa Vessel and unloading system
US6546739B2 (en) 2001-05-23 2003-04-15 Exmar Offshore Company Method and apparatus for offshore LNG regasification
US6816669B2 (en) 2001-06-08 2004-11-09 Algas-Sdi International Llc Vaporizer with capacity control valve
CN2515185Y (en) 2001-11-22 2002-10-09 连云港远洋流体装卸设备有限公司 Wharf liquid loading and unloading arm emergency release device
US7107925B2 (en) 2001-12-12 2006-09-19 Single Buoy Moorings Inc. Weathervaning LNG offloading system
US6829901B2 (en) 2001-12-12 2004-12-14 Exxonmobil Upstream Research Company Single point mooring regasification tower
WO2003064245A1 (en) 2002-02-01 2003-08-07 Ihc Gusto Engineering B.V. Multi hull barge
US7293600B2 (en) 2002-02-27 2007-11-13 Excelerate Energy Limited Parnership Apparatus for the regasification of LNG onboard a carrier
US6851994B2 (en) 2002-03-08 2005-02-08 Fmc Technologies, Inc. Disconnectable mooring system and LNG transfer system and method
US6688114B2 (en) 2002-03-29 2004-02-10 El Paso Corporation LNG carrier
US6598408B1 (en) 2002-03-29 2003-07-29 El Paso Corporation Method and apparatus for transporting LNG
US6644041B1 (en) 2002-06-03 2003-11-11 Volker Eyermann System in process for the vaporization of liquefied natural gas
US20100012009A1 (en) 2002-07-30 2010-01-21 Cavotec Msl Holdings Limited Mooring system with active control
US7293519B2 (en) 2002-07-30 2007-11-13 Cavotec Msl Holdings Limited Mooring system with active control
US20080156244A1 (en) 2002-07-30 2008-07-03 Cavotec Msl Holdings Limited Mooring system with active control
US20060081166A1 (en) 2002-07-30 2006-04-20 Mooring Systems Limited Mooring system with active control
US7073457B2 (en) 2002-08-06 2006-07-11 Fmc Technologies, Inc. Duplex yoke mooring system
US6805598B2 (en) 2002-09-06 2004-10-19 Dorob International Ltd. Liquid natural gas transfer station
US20050254901A1 (en) 2002-11-12 2005-11-17 Lovie Peter M Offshore oil transportation system
US20060048850A1 (en) 2002-11-19 2006-03-09 Philippe Espinasse Liquefied gas transfer installation and use thereof
US20040261681A1 (en) 2002-12-20 2004-12-30 Oyvind Jordanger System for converting existing tankers to shuttle tankers
US6976443B2 (en) 2002-12-20 2005-12-20 Narve Oma Crude oil transportation system
US20070175377A1 (en) 2003-02-18 2007-08-02 Remora Technology As Ocean-based device for loading and unloading of ships
US7484371B2 (en) 2003-08-12 2009-02-03 Excelerate Energy Limited Partnership Shipboard regasification for LNG carriers with alternate propulsion plants
US7219502B2 (en) 2003-08-12 2007-05-22 Excelerate Energy Limited Partnership Shipboard regasification for LNG carriers with alternate propulsion plants
US20070277534A1 (en) 2003-08-12 2007-12-06 Excelerate Energy Limited Shipboard regasification for LNG carriers with alternate propulsion plants
US7308863B2 (en) 2003-08-22 2007-12-18 De Baan Jaap Offshore LNG regasification system and method
US6973948B2 (en) 2003-09-19 2005-12-13 Sbm-Imodco, Inc. Gas offloading system
WO2005032942A1 (en) 2003-09-19 2005-04-14 Single Buoy Moorings, Inc. Gas offloading system
JP2005104200A (en) 2003-09-29 2005-04-21 Nishishiba Electric Co Ltd Energy system of liquefied gas carrier
GB2406887A (en) 2003-10-01 2005-04-13 Tanker Solutions Ltd Locking coupling with fluid sensing.
US20050115248A1 (en) 2003-10-29 2005-06-02 Koehler Gregory J. Liquefied natural gas structure
US6979147B1 (en) 2003-10-30 2005-12-27 Single Buoy Moorings, Inc. Enhanced LNG tanker offloading in shallow waters
US7478975B2 (en) 2004-02-19 2009-01-20 Wood Group Advanced Parts Manufacture A.G. Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification unit connected by shuttle vessel, and cryogenic fluid methods
US7299760B2 (en) 2004-03-05 2007-11-27 Sofec, Inc. Floating LNG import terminal and method for docking
US7793605B2 (en) 2004-04-29 2010-09-14 Single Buoy Moorings Inc. Side-by-side hydrocarbon transfer system
JP2007534556A (en) 2004-04-29 2007-11-29 シングル・ブイ・ムーリングス・インコーポレイテッド Side-by-side hydrocarbon transfer system
US7080673B2 (en) 2004-04-30 2006-07-25 Sbm-Imodco, Inc. Quick LNG offloading
WO2006020107A2 (en) 2004-07-18 2006-02-23 Mustang Engineering, L.P. Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification units
US7318319B2 (en) 2004-07-18 2008-01-15 Wood Group Advanced Parts Manufacture Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification unit connected by shuttle vessel, and cryogenic fluid methods
US20060053806A1 (en) * 2004-09-13 2006-03-16 Argent Marine Operations, Inc. System and process for transporting LNG by non-self-propelled marine LNG carrier
US20070267061A1 (en) * 2004-09-21 2007-11-22 Ola Ravndal Volume-Displacing Device In Containers, Especially Tanks In Lpg Ships, And A Method Of Using Same
JP2008519221A (en) * 2004-11-08 2008-06-05 シエル・インターナシヨネイル・リサーチ・マーチヤツピイ・ベー・ウイ Liquefied natural gas floating storage regasifier
US20060156744A1 (en) * 2004-11-08 2006-07-20 Cusiter James M Liquefied natural gas floating storage regasification unit
US7484404B2 (en) 2005-02-22 2009-02-03 Mustang Sampling Llc Liquid gas vaporization and measurement system and method
AU2012209046A1 (en) 2005-03-22 2012-08-23 Single Buoy Moorings Inc Enhanced side-by-side mooring construction
KR20060130825A (en) 2005-06-08 2006-12-20 삼성중공업 주식회사 Means for transferring liquefied natural gas between floating liquefied gas reservoirs and liquefied natural gas carriers
KR100730701B1 (en) 2005-06-08 2007-06-21 삼성중공업 주식회사 Means for transferring liquefied natural gas between floating liquefied gas reservoirs and liquefied natural gas carriers
US7543613B2 (en) 2005-09-12 2009-06-09 Chevron U.S.A. Inc. System using a catenary flexible conduit for transferring a cryogenic fluid
US20070144184A1 (en) 2005-12-22 2007-06-28 Wijingaarden Wim V Enhanced LNG regas
US20070214804A1 (en) 2006-03-15 2007-09-20 Robert John Hannan Onboard Regasification of LNG
US8181662B2 (en) 2006-03-30 2012-05-22 Single Buoy Moorings Inc. Hydrocarbon transfer system with vertical rotation axis
US7681511B2 (en) 2006-05-22 2010-03-23 Statoilhydro Asa System for loading and unloading of hydrocarbons in ice prone waters
KR100676615B1 (en) 2006-06-21 2007-01-30 대우조선해양 주식회사 System and Method for Regasification of LAN Using Offshore Floating Structures
US20100074692A1 (en) 2006-09-11 2010-03-25 Mark E Ehrhardt Open-Sea Berth LNG Import Terminal
US20090193780A1 (en) * 2006-09-11 2009-08-06 Woodside Energy Limited Power Generation System for a Marine Vessel
US20090272126A1 (en) 2006-09-11 2009-11-05 Mathews William S Transporting and Managing Liquefield Natural Gas
US8448673B2 (en) 2006-11-15 2013-05-28 Exxonmobil Upstream Research Company Transporting and transferring fluid
US7726359B2 (en) 2006-12-20 2010-06-01 Chevron U.S.A. Inc. Method for transferring a cryogenic fluid
US20080148740A1 (en) 2006-12-20 2008-06-26 Chevron U.S.A. Inc. Apparatus for transferring a cryogenic fluid
US20080153369A1 (en) 2006-12-20 2008-06-26 Chevron U.S.A. Inc. Method for loading lng on a floating vessel
US7726358B2 (en) 2006-12-20 2010-06-01 Chevron U.S.A. Inc. Method for loading LNG on a floating vessel
US20080190117A1 (en) * 2007-02-12 2008-08-14 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Lng tank and operation of the same
US20080236703A1 (en) 2007-03-29 2008-10-02 Chevron U.S.A. Inc. System for transferring fluids between floating vessels using flexible conduit and releasable mooring system
US8186170B2 (en) 2007-05-29 2012-05-29 Sofec, Inc. Floating LNG regasification facility with LNG storage vessel
US20100229573A1 (en) 2007-11-30 2010-09-16 Ehrstroem Markus Floating lng storage and re-gasification unit and method for re-gasification of lng on said unit
WO2009073383A1 (en) 2007-11-30 2009-06-11 Novozymes A/S Polypeptides having arabinofuranosidase activity and polynucleotides encoding same
WO2009071591A2 (en) 2007-12-03 2009-06-11 Single Buoy Moorings Inc. Connector with an integrated quick/connect disconnect and emergency release system
WO2009087237A2 (en) 2008-01-10 2009-07-16 Exmar Emergency release system
US7644676B2 (en) 2008-02-11 2010-01-12 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Storage tank containing liquefied natural gas with butane
US20110066290A1 (en) 2008-05-22 2011-03-17 Fmc Technologies Sa Control device for fluid loading and/or unloading system
US20100000252A1 (en) 2008-06-20 2010-01-07 Ian Morris Comprehensive system for the storage and transportation of natural gas in a light hydrocarbon liquid medium
JP5332499B2 (en) 2008-10-23 2013-11-06 富士電機株式会社 Product carrying device
US20110232767A1 (en) 2008-11-20 2011-09-29 Single Buoy Moorings Inc. Multi-function unit for the offshore transfer of hydrocarbons
WO2010069910A2 (en) 2008-12-15 2010-06-24 Shell Internationale Research Maatschappij B.V. Method for cooling a hydrocarbon stream and a floating vessel therefor
US8141645B2 (en) 2009-01-15 2012-03-27 Single Buoy Moorings, Inc. Offshore gas recovery
US20100263389A1 (en) 2009-04-17 2010-10-21 Excelerate Energy Limited Partnership Dockside Ship-To-Ship Transfer of LNG

Non-Patent Citations (69)

* Cited by examiner, † Cited by third party
Title
Baldwin, John, Excelerate Energy—Offshore LNG Teesside GasPort and Beyond, Presentation at Safety & Loss Prevention and Oil & Natural Gas Subject Group (SONG), England, Jun. 2008, 18 pages.
Bottomley, Leslie, FLNG Key to Global Energy Supply, Offshore, vol. 62, issue 10, Oct. 1, 2002, 3 pages.
Boylston, Concept Proposal for the Transportation and Regasification of Liquid Natural Gas, 1996, 13 pages.
Bryngelson, Robert, Changing Patterns of the LNG Trade, Presentation at 13th International Gas Summit, Le Meridien Etoile Hotel, Oct. 22, 2008, 9 pages.
Bryngelson, Robert, Creating a Flexible LNG Trading Model from the Ground (or Sea) Up, Presentation at Gastech 2008, Bangkok, Mar. 11, 2008, 15 pages.
Bryngelson, Robert, Excelerate Energy Booth Receiption, Presentation at Gastech 2009, Abu Dhabi, U.A.E., May 26, 2009, 15 pages.
Bryngelson, Robert, Excelerate Energy Corporate Overview, Presentation at World Gas Conference, Buenos Aires, Argentina, Oct. 2009, 31 pages.
Bryngelson, Robert, Excelerate Energy Corporate Overview, Presentation to Congressman Kevin Brady 8th District of Texas, Apr. 24, 2009, 19 pages.
Bryngelson, Robert, Flexible Offshore and Dockside Facilities, Presentation at Platt's 8th Annual Liquefied Natural Gas Conference, Feb. 27, 2009, 12 pages.
Bryngelson, Robert, Floating Liquefaction: Excelerate Energy's Advantage, Presentation, Location Unknown, Feb. 2008, 17 pages.
Bryngelson, Robert, Gulf Gateway Energy Bridge: The World's First Offshore LNG Receiving Terminal, Presentation, Arendal, Norway, APL Technology Conference, Jul. 29, 2005, 22 pages.
Bryngelson, Robert, Lessons Learned from Permitting, Building, and Operating The Gulf Gateway Energy Bridge Deepwater Port, Presentation at Oil & Gas IQ Conference, Costa Mesa, CA Sep. 14, 2005, 25 pages.
Bryngelson, Robert, LNG Global Market Dynamics: Entry Points, Flexibility, and Optionality, Presentation, 22nd Annual European Autumn Gas Conference, Oct. 2007, 6 pages.
Bryngelson, Robert, Market Access and Flexibility Afforded by Excelerate Energy's Technology Infrastructure, Presentation at 12th International Gas Summit, Location Unknown, Oct. 18, 2007, 8 pages.
Bryngelson, Robert, New Developments and Advances in the LNG Industry: Excelerate Energy's Perspective, Presentation at Houston Producers Forum, Jan. 15, 2008, 19 pages.
Bryngelson, Robert, North American Terminal Progress Reports, North American Projects: Overview, issues Encountered, and Lessons Learned, Presentation at Houston, TX, May 18, 2006, 22 pages.
Bryngelson, Robert, Northeast Gateway Deepwater Port and Other Developments at Excelerate, Presentation at Platts 6th Annual Liquefied Natural Gas Conference, Houston, TX, May 22, 2007, 16 pages.
Bryngelson, Robert, Speed to Market: Expansion of Excelerate's Network and Asset Base and Direction for the Next Decade, Presentation, Atlantic Basin LNG: The Next Decade, Palm Beach, Florida, Nov. 8, 2007, 14 pages.
Byngelson, Robert, Presentation to the Federal Energy Regulatory Commission, Dec. 1, 2007, 30 pages.
California Coastal Commission, Offshore LNG Terminal Study, Sep. 15, 1978.
Cook, Jonathan, et al., Presentation to U.S. Department of Commerce, SABIT Group Program Liquefied Natural Gas Storage and Transport for Russia, Aug. 31, 2006, 72 pages.
Eisbrenner, Kathleen, on Board Regasification Implications for Security of Supply, Presentation at CERA LNG Summit, Houston, TX, Feb. 12, 2007, 32 pages.
Eisbrenner, Kathleen, Preparing for Short and Long Term Arbitrage Opportunities: Bringing Continents of Energy Together Energy Bridge, Presentation at CWC Sixth Annual World Lng Summit, Rome, Italy, 2005, 18 pages.
EMCO WHEATON, "Marine Loading Arms", taken from http://www.emcowheaton.com/marine-loading-arms/, Date unknown, 12 pages.
EMCO WHEATON, "Quick release system for bottom loading arms (Pneumatic)". Taken from http://www.emcowheaton.com/en-en/products/safety_release_systems/pneumatic/ as uploaded Nov. 17, 2008.
European Patent Office, "Supplementary European Search Report" for EP Application No. 11784269.0 dated May 23, 2017, 8 pages.
Ewans, Kevin, et al., Oceanographic and Motion Response Statistics for the Operation of a Weathervaning LNG FPSO, Proceedings of OMAE '03: 22nd International Conference on Offshore Mechanics and Artic Engineering, Cancun, Mexico, Jun. 8-13, 2003, 7 pages.
Excelerate Energy Limited Partnership, Breaking the Traditional Model: Bringing Continents of Energy Together Energy Bridge, Presentation at CWC Sixth Annual World LNG Summit, Rome, Italy, 2005, 12 pages.
Excelerate Energy Limited Partnership, Excelerate Energy Northeast Gateway and Gulf Gateway Deepwater Port Update, Presentation at Northeast Energy and Commerce Assocation 11th Annual Conference on Natural Gas Issues, Boston, MA, Sep. 19, 2005, 13 pages.
Excelerate Energy Limited Partnership, LNG Ship-To-Ship Transfer, Presentation at SIGTTO, Location Unknown, Nov. 18, 2005, 21 pages.
Excelerate Energy, LLC, Excelerate Energy Announces Successful Delivery of First LNG Cargo to South America's First-Ever LNG Import Facility, Jun. 9, 2008, Press Release, The Woodlands, TX and Buenos Aires, Argentina, 2 pages.
Floating LNG Plants can be Built, Marine Talk Website, Mar. 15, 2001, 2 pages.
Han, Hans Y.S. et al., Design Development of FSRU from LNG Carrier and FSPO Construction Experiences, Offshore Technology Conference, Houston, Texas May 6-9, 2002, 8 pages.
Hungarian Intellectual Property Office, "Written Opinion" for Singapore Patent Application No. 201207871-3, dated Jan. 16, 2014, 7 pages.
Intellectual Property Office of Singapore, "Examination Report" for Singapore Patent Application No. 201207871-3, dated Sep. 25, 2014, 12 pages.
Intellectual Property Office of Singapore, "Invitation to Respond to Written Opinion" for Singapore Patent Application No. 201207871-3, dated Jan. 29, 2014, 9 pages.
International Preliminary Report on Patentability for PCT Application No. PCT/US2011/037228, dated Sep. 5, 2012, 5 pages.
International Search Report. *
IP Australia, "Notice of Acceptance" for Australia Patent Application No. 2011255490, dated Jul. 10, 2015, 2 pages.
IP Australia, "Patent Examination Report No. 1" for Australia Patent Application No. 2011255490, dated Sep. 1, 2014, 3 pages.
Janssens, Patrick, Energy Bridge: The World's First LNG Offshore Solution, Paper for Presentation at Gastech, 2005, 19 pages.
Japanese Patent Office, Japan Platform for Patent Information, Machine Translation of Japanese Patent Application Publication 2002-501861 A, 47 pages.
JP 2008-519221 Translation. *
Kanon Loading Equipment, "Kanon Marine Loading Systems". Taken from http://www.brasten.com/media/productBrochure/KANON_Loading_Arms1.pdf, Google cached date of Mar. 16, 2007, 7 pages.
Lakey, Robert, The Teesside GasPort Project, Presentation, Unknown Location, Jan. 23, 2007, 54 pages.
Lane, Mark K., LNG Ship-To-Ship Transfer, Presentation at Stasco, Antwerp, Mar. 25, 2008, 70 pages.
Lane, Mark K., Ship-to-Ship LNG Transfer, Sep. 28, 2009, Information Sheet, Recepient and Location Unknown, 11 pages.
Lane, Mark K., Ship-to-Ship Transfer: Bahia Blanca Gasport, Presentation to KNPC, Kuwait, Nov. 12, 2007 & Feb. 5, 2008, 97 pages.
Lane, Mark K., Ship-to-Ship Transfer: K-Line LNG Shipping, Presentation, London, Dec. 18, 2008, 83 pages.
Lane, Mark, LNG Ship-To-Ship Transfer, Presentation at KNPC, Kuwait, Sep. 2, 2007, 97 pages.
Lane, Mark, LNG Ship-To-Ship Transfer, Presentation at SIGTTO 9th Pan American Regional Forum, Nov. 7, 2007, 65 pages.
Lane, Mark, LNG Ship-To-Ship Transfer, Presentation to Fendercare, Abu Dhabi, UAE, Nov. 14, 2008, 69 pages.
Lane, Mark, LNG Ship-To-Ship Transfer, Presentation to Orkney Harbour Authority, Scapa Flow, Scotland, Dec. 4, 2006, 50 pages.
Lane, Mark, LNG Ship-To-Ship Transfer, Presentations at Scapa Flow, Kirkwall and Orkney Islands, Scottland, Jan. 29, 2009, 69 pages.
Lane, Mark, Ship-To-Ship Transfer: LNGC Excalibur—EBRV Excelsior, Presentation at Scapa Flow, Scotland, Feb. 8-10, 2007, 13 pages.
McDonald, David, et al., Comprehensive Evaluations of LNG Transfer Technology for Offshore LNG Development, LNG 14 Conference, Doha, Qata, Mar. 19-24, 2004, 24 pages.
Northeast Gateway Energy Bridge, L.L.C., Application to the U.S. Maritime Administration and the U.S. Guard for the Construction of the Northeast Gateway Deepwater Port, Jun. 13, 2005, 148 pages.
Patent Office of the Cooperation Council for the Arab States of the Gulf, "(1st) Examination Report" for GC 2011-18446, dated Jan. 28, 2016, 4 pages.
Patent Office of the Cooperation Council for the Arab States of the Gulf, "(2nd) Examination Report" for GC 2011-18446, dated Jun. 23, 2016, 4 pages.
Scott, Edward, et al., Offshore LNG Value Chain Optimization, Presentation at Offshore Technology Conference, Houston, Texas, May 7, 2009, 29 pages.
Scott, Edward, et al., Offshore Value Chain Optimization, Offshore Technology Conference, Houston, Texas, May 4-7, 2009, 17 pages.
Shell, Dubai to Build LNG Regasification Terminal and Appoints Shell As Advisor and Main LNG Supplier, Press Release, Apr. 20, 2008, 1 page.
Standy Import Terminals: Right Technology, Right Time, Mar. 25, 2009, Zeus Liquefied Natural Gas Report, Zeus Virtual Energy Library, 1 page.
SUEZ LNG NA, Neptune, Date Unknown, 3 pages.
Translation by Samuel James Henderson "English Translation of Korean Patent No. 10-0676616", translation dated Jan. 23, 2014, 13 pages.
Translator Unknown, Partial English Translation of Japanese Patent No. 6376700, translation dated Mar. 5, 2014, 1 page.
Van Wijngaarden, Wim et al., Loading and Offloading of LNG in Open Seas, Overview, Gastech Doha, 2002, 1 page.
Young, Paul C., et al., LNG STS—A Reality, Presentation at Global LNG Shipping Symposium, Sep. 19, 2006, 63 pages.
Zednik, "Shipboard Regasification Terminal," Hydrocarbon Engineering, Oct. 1998, 3 pages.

Also Published As

Publication number Publication date
WO2011146763A3 (en) 2012-03-15
AU2011255490B2 (en) 2015-07-23
EP2547580A2 (en) 2013-01-23
WO2011146763A2 (en) 2011-11-24
EP2547580A4 (en) 2017-05-31
SG185008A1 (en) 2012-11-29
AU2011255490A1 (en) 2012-11-08
PH12012502068A1 (en) 2016-09-23
AR081213A1 (en) 2012-07-04
US20130118185A1 (en) 2013-05-16

Similar Documents

Publication Publication Date Title
US11204117B2 (en) Dockside ship-to-ship transfer of LNG
US8186170B2 (en) Floating LNG regasification facility with LNG storage vessel
US10359229B2 (en) Floating liquefied natural gas commissioning system and method
US7318319B2 (en) Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification unit connected by shuttle vessel, and cryogenic fluid methods
US10549820B2 (en) Method and system for heading control during ship-to-ship transfer of LNG
JP2005512883A (en) Single point mooring regasification tower
US9919774B2 (en) Systems and methods for treatment of LNG cargo tanks
KR20140025700A (en) Compatible loading system for lng carrier
KR100775528B1 (en) Operational test method of LNB regasification ship using simulated buoy for LNK regasification ship
KR100676615B1 (en) System and Method for Regasification of LAN Using Offshore Floating Structures
KR101239335B1 (en) Test facility for lng regasification unit and vessel having the same test facility
KR20080070412A (en) NNG Regasification vessel simulation buoy
KR102130715B1 (en) Gas Test Method Of Ship On Near-shore
KR102535973B1 (en) FSU Bidirectional Mooring And ESD Operation Method
KR102130714B1 (en) Test Method Of Liquefaction Process For Ship
KR102117377B1 (en) Gas Supply Module For Liquefaction Process Test Of Ship

Legal Events

Date Code Title Description
AS Assignment

Owner name: EXCELERATE ENERGY LIMITED PARTNERSHIP, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:COOK, JONATHAN;LANE, MARK K.;REEL/FRAME:029706/0473

Effective date: 20110516

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20220320