[go: up one dir, main page]

US704181A - Method of building dams. - Google Patents

Method of building dams. Download PDF

Info

Publication number
US704181A
US704181A US9850102A US1902098501A US704181A US 704181 A US704181 A US 704181A US 9850102 A US9850102 A US 9850102A US 1902098501 A US1902098501 A US 1902098501A US 704181 A US704181 A US 704181A
Authority
US
United States
Prior art keywords
dams
dam
finer
building
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US9850102A
Inventor
Arthur D Foote
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US9850102A priority Critical patent/US704181A/en
Application granted granted Critical
Publication of US704181A publication Critical patent/US704181A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Definitions

  • 902. A. D. FOUTE.
  • My invention relates to a method of building dams of rock, gravel, sand, and finer material; and it consists, essentially, in the separation of a mass of material into larger rock or cobbles, smaller gravel, sand, earth, and silt and in depositing them successively so as to form, first, the front, then a layer of finer material, then a deposit of silt or fine material upon the inner back surface of the dam, whereby it is made tight.
  • Figure 1 is a view of the structu re for building a dam.
  • Fig. 2 is a longitudinal section of the same.
  • Fig. 3 is a plan view.
  • I employ a flume or sluice A, through which the material is transported in conjunction with a body of water sufficient for the purpose.
  • a flume or sluice A through which the material is transported in conjunction with a body of water sufficient for the purpose.
  • this grating having a mesh of such size that the smaller material will fall through and the larger cobbles and rocks Will be retained andA delivered into a chute 3.
  • This chute extends, as here shown, at right angles or in equivalent direction from the sluice A and may be of any desired length and preferably of such inclination that the cobbles or coarse material will roll or slide down by gravitation and be discharged from the outer end of the chute.
  • the water and finer material pass throu gh the grating 2 into another sluice 4, which in turn discharges this material upon another grating, located as shown atp.
  • This grating arrests the next larger grade of gravel or like material and delivers it into a chute 6, which is essentially parallel with the chute 3 and also stands at such an angle as to discharge its contents by gravitation.
  • This chute 6 may be sufficiently shorter than the chute 3 so that it will form an independent bank of the material discharged by it adjacent to and lying upon the larger material ydischarged by the first chute.
  • the still finer material which passes through the grating 5, falls into another sluice 7,'and from this it is delivered upon the still nner grating, as at 8, which separates the next larger grade of material and delivers it into a chute 9, parallel With the chutes 3 and 6 and also shorter, so that this grade of material will be discharged upon the back of the second grade.
  • the material will be graded automatically, so that the coarse rock or cobbles form the outer face of the dam, the next finer gravel is piled upon the first layer to form a backing therefor, then the finer silt, and finally the finest silt may be discharged from the end of the sluice, as at 10, into what will be the interior ofthe dam or reservoir, and this silt piling upon theback of what has already been deposited will serve to seal and make the dam tight.
  • the sluice A is so disposed that it may be lengthened as occasion requires, and after the piles of material have been raised to the desired height at one spot by lengthening the sluice and changing the discharge chutes IOO other piles are formed contiguous to the first and extending across the space Where the dam is to be formed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

Patented IuIy 8, |902. A. D. FOUTE.
METHOD 0F BUILDING DAMS.
(Application filed Max'. 17, 1902.)
2 Sheets-Sheet I.
(No Model.,
ru: mums PETERS cq. wom-uwe.. wunwrmw, u c
No. 704,|8|y Patented July 8, |902.
A. D. FOUTE.
METHDD DF BUILDING DAMS.
(Application filed Mar. 17, 1902.) (No Model.) 2 Sheets-Sheet 2.
l TH; mms uns co, Fuorouwo.. wAsmNamN, o. c.
UNTTED STATES PATENT OFFICE.
4ARTHUR D. FOOTE, OF GRASS VALLEY, CALIFORNIA. Y
METHOD OF BUILDING DAMS.
SPECIFICATION forming part of Letters Fatent No. 704,181, dated July 8, 1902.
Application filed March 17, 1902. Serial No. 98,501. (No model.)
To all whom it muy concern.-
Be it known that I, ARTHUR D. Foorn, a citizen of the United States, residing at Grass Valley, county of Nevada, State of California, have invented an Improvement in Methods of Building Dams; and I hereby declare the following to be a full, clear, and exact description of the same.
My invention relates to a method of building dams of rock, gravel, sand, and finer material; and it consists, essentially, in the separation of a mass of material into larger rock or cobbles, smaller gravel, sand, earth, and silt and in depositing them successively so as to form, first, the front, then a layer of finer material, then a deposit of silt or fine material upon the inner back surface of the dam, whereby it is made tight.
It also comprises details of construction which Will be more fully explained by refer- 'ence to the accompanying drawings, in which-'e Figure 1 is a view of the structu re for building a dam. Fig. 2 is a longitudinal section of the same. Fig. 3 is a plan view.
In mining for gold and the like where the material to be saved is mixed with gravel and other material, forming what is known as placer mining, it has been customary to wash down the banks of auriferous earth and to separate the finer particles from the coarser and nally to recover the gold. In this process large quantities of Worthless material or tailings must be provided for in the form of dumps or with impounding-dams to prevent the material being washed into the rivers and impeding navigation or carried out over previously-fertile land,which would be destroyed thereby. It is therefore necessary in the same manner to form these impounding-dams, which is usually done by building them at some narrow place, so as to include above them a large settling-reservoir, into whichthe most of the silt will be deposited, while the water is allowed to run off and eventually nd its way into the rivers without doing damage. It is the object of my invention t utilize this waste material in the construction of dams, and it will also be manifest that any material containing the gravel and finer earth vmay be employed to build dams or like structures at any point where it may be desired.
In carrying out my invention I employ a flume or sluice A, through which the material is transported in conjunction with a body of water sufficient for the purpose. At the point where I desire to commence my dam or structure I cause the material to pass over a grating, as at 2, this grating having a mesh of such size that the smaller material will fall through and the larger cobbles and rocks Will be retained andA delivered into a chute 3. This chute extends, as here shown, at right angles or in equivalent direction from the sluice A and may be of any desired length and preferably of such inclination that the cobbles or coarse material will roll or slide down by gravitation and be discharged from the outer end of the chute. The water and finer material pass throu gh the grating 2 into another sluice 4, which in turn discharges this material upon another grating, located as shown atp. This grating arrests the next larger grade of gravel or like material and delivers it into a chute 6, which is essentially parallel with the chute 3 and also stands at such an angle as to discharge its contents by gravitation. This chute 6 may be sufficiently shorter than the chute 3 so that it will form an independent bank of the material discharged by it adjacent to and lying upon the larger material ydischarged by the first chute. The still finer material, which passes through the grating 5, falls into another sluice 7,'and from this it is delivered upon the still nner grating, as at 8, which separates the next larger grade of material and delivers it into a chute 9, parallel With the chutes 3 and 6 and also shorter, so that this grade of material will be discharged upon the back of the second grade. In this way the material will be graded automatically, so that the coarse rock or cobbles form the outer face of the dam, the next finer gravel is piled upon the first layer to form a backing therefor, then the finer silt, and finally the finest silt may be discharged from the end of the sluice, as at 10, into what will be the interior ofthe dam or reservoir, and this silt piling upon theback of what has already been deposited will serve to seal and make the dam tight.
The sluice A is so disposed that it may be lengthened as occasion requires, and after the piles of material have been raised to the desired height at one spot by lengthening the sluice and changing the discharge chutes IOO other piles are formed contiguous to the first and extending across the space Where the dam is to be formed.
If any water be running in a channel Where the dam is being built,a Wasteway of any suitable construction may be employed to carry away this Water and dispose of it While the dam is being built.
In this manner I am able to automatically separate material Whichmay be found intermixed and to automatically deposit it in proper relative positions to form successive layers, commencing With the coarsest and heaviest material for the outside face of the dam, with successively smaller and finer material until the silt is finally deposited, which serves to cement and make the dam tight, this being all done with the minimum of labor.
Having thus described my invention, What I claim, and desire to secure by Letters Patent, is-
l. The method herein described of building dams and like structures consisting in first separating and grading the material from the coarser to the ner While said material is in motion,and then depositing the separated materials successively from the front to the back of the structure.
2. The method herein described of building dams and like structures, consisting in rst separating associated material into its coarser and successively finer elements, then delivering these separated materials by chutes or the like to form successive embankments, commencing with the coarser and terminating With the liner material.
In witness whereof I have hereunto set my hand.
ARTHUR D. FOOTE.
Witnesses:
S. H. NoURsE, JEssIE vC. BRODIE.
US9850102A 1902-03-17 1902-03-17 Method of building dams. Expired - Lifetime US704181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US9850102A US704181A (en) 1902-03-17 1902-03-17 Method of building dams.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US9850102A US704181A (en) 1902-03-17 1902-03-17 Method of building dams.

Publications (1)

Publication Number Publication Date
US704181A true US704181A (en) 1902-07-08

Family

ID=2772712

Family Applications (1)

Application Number Title Priority Date Filing Date
US9850102A Expired - Lifetime US704181A (en) 1902-03-17 1902-03-17 Method of building dams.

Country Status (1)

Country Link
US (1) US704181A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3253416A (en) * 1962-10-25 1966-05-31 Frank J Madison Material handling conveyer
US3731492A (en) * 1971-04-01 1973-05-08 Vg Method of forming structures by deposition
US6220792B1 (en) * 1999-10-25 2001-04-24 Claude Bedard Slurry distributor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3253416A (en) * 1962-10-25 1966-05-31 Frank J Madison Material handling conveyer
US3731492A (en) * 1971-04-01 1973-05-08 Vg Method of forming structures by deposition
US6220792B1 (en) * 1999-10-25 2001-04-24 Claude Bedard Slurry distributor

Similar Documents

Publication Publication Date Title
Walker Facies model-3. Sandy fluvial systems
Pérez-Garcı́a et al. Tertiary and Quaternary alluvial gold deposits of Northwest Spain and Roman mining (NW of Duero and Bierzo Basins)
US704181A (en) Method of building dams.
Eyles et al. Glaciolacustrine sedimentation during advance and retreat of the Cordilleran Ice Sheet in central British Colombia
US1864926A (en) Method of producing from natural gravel deposits a gravel aggregate for use in concrete
Pain Characteristics and geomorphic effects of earthquake-initiated landslides in the Adelbert Range, Papua New Guinea
Bain The northern area of Connecticut Valley Triassic
US878575A (en) Ore dredging and separating apparatus.
Milana The sieve lobe paradigm: Observations of active deposition
Raistrick The glaciation of Wharfedale, Yorkshire
Wilson Hydraulic and placer mining
Jewtuchowicz Description of eskers and kames in Gåshamnöyra and on Bungebreen, south of Hornsund, Vestspitsbergen
Kostromin et al. Industrial technology facilitation for the dredging of highland placers
Longridge Hydraulic Mining: Classification, Test and Valuation of Alluvials--water Supply--methods of Working Alluvials, &c. With Supplements on Roads for Mining Purposes and Motor Traction, and Appendix
US263652A (en) Beauman butlee
Min Tin mining in Malaysia-is there any revival
Argimbaev et al. Erection methods and constructions of primary tailing dike
RU2230192C1 (en) Method for reconstructing quarry with two proximate ore bodies
US2727623A (en) Material distributing system for mining dredges
US1621694A (en) Placer-deposit washer and method of washing
US1261198A (en) Method of hydraulic mining and the like.
US1650239A (en) Hydraulic classifier and separating process
Ferguson Placer deposits of the Manhattan district, Nevada
US1032746A (en) Black-sand and gold saving machine and undercurrent.
US397070A (en) Ore-separator