US568673A - Concrete bridge - Google Patents

Concrete bridge Download PDF

Info

Publication number
US568673A
US568673A US568673DA US568673A US 568673 A US568673 A US 568673A US 568673D A US568673D A US 568673DA US 568673 A US568673 A US 568673A
Authority
US
United States
Prior art keywords
arch
bridge
walls
concrete
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US568673A publication Critical patent/US568673A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Definitions

  • My invention relates to an improved concrete arch-bridge; and'it consists in the novel construction, combination, and arrangement of parts hereinafter described and claimed.
  • Figure 1 is a side elevation of my improved arch-bridge.
  • Fig. 2 is a longitudinal sectional View of the bridge shown in Fig. 1.
  • Fig. 3 is a horizontal sectional view on the line 3 3 of Fig. 1.
  • Fig. 4 is a vertical transverse sectional view on the line 4 4 of Fig. 1, the view beingbroken away at approximately the center of the bridge.
  • Fig. 5 is a vertical transverse sectional View on the line 5 5 of Fig. 1, the view being broken away at approximately the center of the bridge.
  • Fig. 6 is an enlarged longitudinal sectional detail of the arch used in my bridge.
  • the water 1 of the river rests on the bed 2, be tween the banks 3 and 4.
  • an excavation is made for the abutments 5 and 6 and the wingwalls 7, 8, 9, and 10 of the bridge.
  • Piles 11 and 12 are sunk in these excavations until a solid foundation is reached.
  • the upper ends of these piles are sawed off on a horizontal line about one foot above the bottom of the excavation.
  • the ground plan of the abutments and wingwalls is shown in Fig. 3, the piling being shown in dotted lines.
  • the facing-walls of the abutments 5 and 6 are surfaces 13 and 14, upon which the ends of the arch 15 are seated, the lines of said surfaces corresponding to the radial lines of the arch.
  • the arch is in three pieces when the bridge is complete, and consists of the two sides 15 and 15 and the keystone 15.
  • the surfaces 13 and 14 are covered with tarpaper or other suitable substance to prevent the arch from forming a bond with the abutment.
  • the side pieces 15 and 15 are each constructed in five sections 15, 15, 15, 15 15 15 15 15 15 and 15 In constructing the arch I work from each end toward the center. The end section is cast and before it has time to set the next section is cast and a bond forms between them, and so on until the pieces 15 and 15 are complete. At the boundary-line between the second and third sections from the outer ends of the pieces 15 and 15 the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends.
  • the inner ends of pieces 15 and 15 are covered with tar-paper or other suitable material to'prevent abond with the keystone.
  • the keystone 15 is then cast in posi tion.
  • the center of the arch should be elevated slightly above a true center (about one inch to forty feet) in order that it may form a true are of a circle after the bridge is completed and settled.
  • the false work used in casting the arch should be left in position about twenty days after the arch'is closed or long enough to allow the concrete to set.
  • I omit the usual hannchings on top of the arch and in their place I insert concrete walls 16 in the form of right-angled triangles.
  • the short side of the triangle rests against the vertical face of the abutment and the hypotenuse rests upon the upper surface of the arch, thus bringing the long side of the right angle in a horizontal plane for the purpose of forming ribs to support the superstructure of the bridge.
  • Similar walls 17 join with the wing-walls and the edges of the arch. There is no bond between the walls 16 and l7 and the arch. The space between these walls is filled with clean clay and rammed solid, after which the sidewalks and road-bed are laid in the usual way.
  • the iron railing is embedded in the coping and parapets, which are cast of concrete and integral with the walls 17.
  • Several coats of plastering are applied to the face of the arch and the wing-walls, the finishing coat showing an imitation of alternate smooth and rock face stonework.
  • the distinguishingfeatures of my concrete arch-bridge are the joints in the arch and the substitution of the walls 16 and 17 for the usual haunchings,t11us leaving the pieces of the arch free to expand or contract Without cracking or breaking the arch and will also allow a settlement of the support of the arch without cracking the arch.
  • a concrete bridge consisting of abuthaunchcs, and walls on top of said haunchcs,

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

(No Modh) 2 Shets-Sheet 1.
A. GEISEL.
UONORETE BRIDGE.
Patented Sept. 29, 1896.
0 4 I (ii/Z 6 THE NORRIS warms co, moniuwmwAsmm-uou, o c.
2 Sheets-Sheei 2 (No Model.)
A. GEISEL. CONCRETE BRIDGE.
N0.568,673. Patented Sept-Z9, 1896.
THE NORRIS Perms co. Pnoro-L'rrno, wA'snluorom me.
NITED STAT S PATENT rricn.
ADAM GEISEL, OF ST. LOUIS, MISSOURI.
CONCRETE BRIDGE.
SPECIFICATION forming part of Letters Patent No. 568,673, dated September 29, 1396.
. Application filed March 23, 1896.
To all whom it may concern.-
Be it known'that I, ADAM GEISEL, of the city of St. Louis, State of Missouri, have invented certain new and useful Improvements in Concrete Bridges, of which the following is a full, clear, and exact description, reference being had to the accompanying drawings, forming a part hereof.
My invention relates to an improved concrete arch-bridge; and'it consists in the novel construction, combination, and arrangement of parts hereinafter described and claimed.
In the drawings, Figure 1 is a side elevation of my improved arch-bridge. Fig. 2 is a longitudinal sectional View of the bridge shown in Fig. 1. Fig. 3 is a horizontal sectional view on the line 3 3 of Fig. 1. Fig. 4 is a vertical transverse sectional view on the line 4 4 of Fig. 1, the view beingbroken away at approximately the center of the bridge. Fig. 5 is a vertical transverse sectional View on the line 5 5 of Fig. 1, the view being broken away at approximately the center of the bridge. Fig. 6 is an enlarged longitudinal sectional detail of the arch used in my bridge.
Referring by numerals to the drawings, the water 1 of the river rests on the bed 2, be tween the banks 3 and 4. In each of the banks 3 and 4 an excavation is made for the abutments 5 and 6 and the wingwalls 7, 8, 9, and 10 of the bridge. Piles 11 and 12 are sunk in these excavations until a solid foundation is reached. The upper ends of these piles are sawed off on a horizontal line about one foot above the bottom of the excavation. The ground plan of the abutments and wingwalls is shown in Fig. 3, the piling being shown in dotted lines. After the piles have been driven and sawed off the excavations are cleaned out to the virgin earth. Alayer of concrete about one foot in thickness is then placed in the excavation and thoroughly to form a thorough bond between the layers.
When completed, the whole mass of each abutment and its wing-walls is a solid body of concrete. When the abutments and wing- Serial No. 584,439. on model.)
walls get above the surface of the ground, suitable false work is erected to mold said abutments and wing-walls into the desired shape. After the concrete-work has been finished, the false work is left in position about three days, or until the concrete has become sufficiently hardened to stand.
011 the facing-walls of the abutments 5 and 6 are surfaces 13 and 14, upon which the ends of the arch 15 are seated, the lines of said surfaces corresponding to the radial lines of the arch. The arch is in three pieces when the bridge is complete, and consists of the two sides 15 and 15 and the keystone 15.
The surfaces 13 and 14 are covered with tarpaper or other suitable substance to prevent the arch from forming a bond with the abutment. The side pieces 15 and 15 are each constructed in five sections 15, 15, 15, 15 15 15 15 15 15 and 15 In constructing the arch I work from each end toward the center. The end section is cast and before it has time to set the next section is cast and a bond forms between them, and so on until the pieces 15 and 15 are complete. At the boundary-line between the second and third sections from the outer ends of the pieces 15 and 15 the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends. The inner ends of pieces 15 and 15 are covered with tar-paper or other suitable material to'prevent abond with the keystone. The keystone 15is then cast in posi tion. The center of the arch should be elevated slightly above a true center (about one inch to forty feet) in order that it may form a true are of a circle after the bridge is completed and settled. The false work used in casting the arch should be left in position about twenty days after the arch'is closed or long enough to allow the concrete to set.
I omit the usual hannchings on top of the arch and in their place I insert concrete walls 16 in the form of right-angled triangles. The short side of the triangle rests against the vertical face of the abutment and the hypotenuse rests upon the upper surface of the arch, thus bringing the long side of the right angle in a horizontal plane for the purpose of forming ribs to support the superstructure of the bridge. Similar walls 17 join with the wing-walls and the edges of the arch. There is no bond between the walls 16 and l7 and the arch. The space between these walls is filled with clean clay and rammed solid, after which the sidewalks and road-bed are laid in the usual way.
The iron railing is embedded in the coping and parapets, which are cast of concrete and integral with the walls 17. Several coats of plastering are applied to the face of the arch and the wing-walls, the finishing coat showing an imitation of alternate smooth and rock face stonework.
Aside from the process of construction and the details of composition used, the distinguishingfeatures of my concrete arch-bridge are the joints in the arch and the substitution of the walls 16 and 17 for the usual haunchings,t11us leaving the pieces of the arch free to expand or contract Without cracking or breaking the arch and will also allow a settlement of the support of the arch without cracking the arch.
1. A concrete bridge consisting of abuthaunchcs, and walls on top of said haunchcs,
said walls being unbonded to said haunchcs and to said abutments, substantially as specilied.
In testimony whereof I ailix my signature in presence of two witnesses.
ADAM HEISE'L. \Vitncsses:
E. E. LONGAN, MAUD GRIFFIN.
US568673D Concrete bridge Expired - Lifetime US568673A (en)

Publications (1)

Publication Number Publication Date
US568673A true US568673A (en) 1896-09-29

Family

ID=2637379

Family Applications (1)

Application Number Title Priority Date Filing Date
US568673D Expired - Lifetime US568673A (en) Concrete bridge

Country Status (1)

Country Link
US (1) US568673A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3981038A (en) * 1975-06-26 1976-09-21 Vidal Henri C Bridge and abutment therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3981038A (en) * 1975-06-26 1976-09-21 Vidal Henri C Bridge and abutment therefor

Similar Documents

Publication Publication Date Title
US571225A (en) Concrete bridge
US597281A (en) Concrete bridge
US568673A (en) Concrete bridge
US1083289A (en) Method of building concrete dock-walls.
US1063672A (en) Process of constructing sewers, aqueducts, &c.
Brees et al. Railway practice
US468871A (en) Construction of fire-proof buildings
US852970A (en) Bridge of concrete or other analogous material.
US370625A (en) jackson
US1066020A (en) Bonded concrete construction.
Williams Highland Boulevard Viaduct, Milwaukee, Wisconsin
US317338A (en) goodridg-e
Crowell et al. Discussion on Lonesome Valley Viaduct
US209757A (en) Improvement in the construction of cement vats for tanning and other purposes
US263579A (en) Ernest l
US901040A (en) Sea-wall.
US398074A (en) Combined curb and gutter
Tyrrell Concrete Bridges and Culverts: For Both Railroads and Highways
US1007299A (en) Bridge.
USRE11889E (en) Bridge or wharf floor construction
US748247A (en) Method of laying asphalt or bituminous roadways.
Mackenzie et al. ACCOUNT OF THE BRIDGE OVER THE SEVERN, NEAR THE TOWN OF TEWKESBURY, IN THE COUNTY OF GLOUCESTER, DESIGNED BY THOMAS TELFORD, AND ERECTED UNDER HIS SUPERINTENDENCE.(INCLUDING PLATES).
Harper et al. Construction of Concrete Dam in Hudson River at Troy, NY, 1916
Francis et al. Discussion on Bridge Substructure
Jee DESCRIPTION OF THE DINTING VALE VIADUCT, ON THE LINE OF THE SHEFFIELD & MANCHESTER RAILWAY.(INCLUDES PLATES).