US3380714A - Correction system for use in carrying out line-operations in an underwater borehole - Google Patents
Correction system for use in carrying out line-operations in an underwater borehole Download PDFInfo
- Publication number
- US3380714A US3380714A US598023A US59802366A US3380714A US 3380714 A US3380714 A US 3380714A US 598023 A US598023 A US 598023A US 59802366 A US59802366 A US 59802366A US 3380714 A US3380714 A US 3380714A
- Authority
- US
- United States
- Prior art keywords
- line
- correction
- borehole
- pulley
- operations
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B19/09—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string
Definitions
- a floatable rig for carrying out line-operations in an underwater borehole the rig being provided with a correction system for the borehole-line, the system having a correction line connected to a point fixed relative to the earth and to a correction pulley in engagement with the borehole-line, by which the length of borehole cable payed out in response to the rise and fall of the tide and wave action, is adjusted to correct for the vertical motion of the floating rig.
- This invention relates to a correction system for use in carrying out line-operations in an underwater borehole.
- the work can be carried out from a platform equipped with retractable legs.
- the legs stand on the sea bed and hold the platform clear of the surface of the water and this enables drilling operations to be carried out in a similar manner to land operations.
- deeper water e.g., 20 fathoms, it becomes necessary to carry out operations from a vessel which is floating on the water and which is therefore subject to the rise and fall of tide and wave action.
- a correction system for use during line-operations carried out from a floating vessel which has a winch for unwinding borehole-line and a series of one or more pulleys for directing the boreholeline into a borehole, comprises a correction line connected to a point fixed relative to the earth and to a correction pulley in engagement with the borehole line, the connection to the fixed point being such that a downward motion of the vessel tightens, and an upward motion slackens, the correction line and the connection to the correction pulley being such that the tightening of the correction line is transferred to the borehole line so as to take it in, and the slackening so as to pay it out, whereby the length of borehole cable payed out is ad justed to correct for the vertical motion of the floating vessel.
- the correction line is secured to the floating vessel after passing around a secondary correction pulley which is attached to the correction pulley.
- the borehole line is unwound from a winch at deck level, passed from a deck pulley over a travelling block which can be lowered to the bottom or" the drilling mast to rig the system and then hauled to the top to guide the borehole line into the borehole.
- a correction system according to the invention may he rigged so that the correction passes line over the travelling block followed by the secondary correction pulley after which it is secured to the travelling block; the borehole line is passed over the deck pulley and then over the correction pulley which is attached the secondary correction pulley.
- FIGURE 1 illustrates a correction system according to the invention
- FIGURE 2 illustrates a modification in which the correction is applied at an alternative position in the borehole line.
- Both figures illustrate a correction system according to the invention arranged for use in the carrying out of a line-operation in a borehole which is being drilled in the sea bed and a conductor pipe runs from this equipment to the surface.
- the conductor pipe is secured to the sea bed and therefore it forms a convenient reference point fixed relative to earth.
- a borehole line 11 is unwound from a winch 12 passes around deck pulley 13 and over correction pulley 14 which guides the borehole line 11 into the conductor pipe and therefore into the borehole.
- the correction system comprises the correction line 16 which is made fast to the fixed point 1 7 situated near the top of the conductor pipe 1%).
- the correction line 16 passes around the adjustment pulley 18 over travelling block 15 (which is positioned near the top of the drilling mast during the operation), is looped around secondary correction pulley 19 and is passed back to the mounting of travelling block 15 where it is secured.
- the secondary correction pulley 19 is connected to the correction pulley 14 so that tension in the borehole line 11 is applied to the correction line 16.
- FIGURE 1 When a vessel at sea is engaged in line-operations the whole of FIGURE 1 rises and falls under the influence of tide and wave action except the conductor pipe 10.
- the operation of the correction system to eliminate this motion from the borehole line 11 will be explained by considering a downward motion of the vessel. This downward motion is equivalent to an upward motion of the point 17 while all other points remain stationary and the mode of operation will be explained from this point of view since this is easier to follow.
- FIGURE 2 shows a modification in which the borehole line 11 passes over the deck pulley 13 and around correction pulley 14 and then over the travelling block which guides the borehole line 11 into the conductor pipe and therefore into the borehole.
- the correction system comprises the correction line 16 which is made fast to fixed point 17 on conductor pipe 10.
- the correction line 16 passes around the adjustment pulley 18, is looped round the secondary correction pulley 19 and passed back to the mounting of the adjustment pulley 18 Where it is secured.
- the secondary correction pulley 19 is connected to correction pulley 14 so that the tension in the borehole line 11 is applied to the correction line 16.
- the correction pulley 14 is situated below deck and funcan underwater borehole, said rig comprising a boreholeline, a winch for unwinding the borehole-line and at least one pulley for directing the borehole-line into the borehole, a correction system which comprises a correction line connected to a point fixed relative to said rig and to a point fixed relative to earth, a correction pulley which engages with the borehole-line, and a secondary correction pulley which is connected to said correction pulley and engages with said correction line between said points such that a downward motion of the floatable rig tightens, and an upward motion slackens, the correction line and said tightening and slackening are transferred to the borehole-line by the correction pulley so as to take it in and pay it out whereby the length of borehole-line payed out is adjusted to correct for the vertical motion of the iloatable rig
- said correction system includes a conductor pipe which provides the point fixed relative to the earth to which said correction
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Description
April 30, 1968 -rm 3,380,714
CORRECTION SYSTEM FOR USE IN CARRYING OUT LINE"OPERATIONS IN AN UNDERWATER BORBHOLE Filed Nov. 30, 1966 2 Sheets-Sheet 1 INVENTOR LEONARD ROY MARTIN BY MORGAN, FINNEGAN, DURHAM 8 PINE ATTORNEYS April 30, 1968 L- R- MARTIN 3,380,714
CORRECTION SYSTEM FOR USE IN CARRYING OUT LINE-OPERATIONS IN AN UNDERWATER BOREHOLE Filed Nov. 30, 1966 2 Sheets-Sheet 2 ":IVENTOR LEONARD ROY MARTlN MORGAN. FINNEGAN, DURHAM 8 PINE ATTORNEYS United States Patent ABSTRACT DISCLGSURE A floatable rig for carrying out line-operations in an underwater borehole, the rig being provided with a correction system for the borehole-line, the system having a correction line connected to a point fixed relative to the earth and to a correction pulley in engagement with the borehole-line, by which the length of borehole cable payed out in response to the rise and fall of the tide and wave action, is adjusted to correct for the vertical motion of the floating rig.
This invention relates to a correction system for use in carrying out line-operations in an underwater borehole.
In recent years the search for petroleum has extended to underwater rock formations and this has necessitated drilling underwater boreholes and the carrying out of well surveying and servicing operations in underwater boreholes.
In shallow water, e.g., about 5 fathoms, the work can be carried out from a platform equipped with retractable legs. The legs stand on the sea bed and hold the platform clear of the surface of the water and this enables drilling operations to be carried out in a similar manner to land operations. In deeper water, e.g., 20 fathoms, it becomes necessary to carry out operations from a vessel which is floating on the water and which is therefore subject to the rise and fall of tide and wave action.
From time to time it may be necessary to carry out an operation in which a tool is lowered into the borehole by means of a flexible cable which is unwound from a winch. In this specification these operations will be called line-operations and as an example of such a line-operation we quote the lowering of a sonde into a borehole to collect information about the composition and nature of the surrounding strata. In carrying out a line-operation it is necessary to maintain a predetermined rate of descent or ascent of the tool in the borehole and accurately to known the depth position of the tool relative to a fixed datum. It is an object of the present invention to achieve these conditions in line-operations from a floating vessel irrespective of the vertical motion of the vessel.
According to the invention a correction system for use during line-operations carried out from a floating vessel which has a winch for unwinding borehole-line and a series of one or more pulleys for directing the boreholeline into a borehole, comprises a correction line connected to a point fixed relative to the earth and to a correction pulley in engagement with the borehole line, the connection to the fixed point being such that a downward motion of the vessel tightens, and an upward motion slackens, the correction line and the connection to the correction pulley being such that the tightening of the correction line is transferred to the borehole line so as to take it in, and the slackening so as to pay it out, whereby the length of borehole cable payed out is ad justed to correct for the vertical motion of the floating vessel.
3,33%,714 Patented Apr. 30, 1958 In most underwater drilling operations a conductor pipe passes from the surface and is rigidly attached to well head equipment situated at the sea bed so as to provide a return for the mud circulation. The top of this conductor pipe is fixed relative to the earth thereby forming a suitable reference point for a correction system according to the invention. In a convenient arrangement the correction line is secured to the top of the conductor pipe and is passed to the floating vessel via a pulley (hereinatter called the adjustment pulley) secured to the vessel at a point which is always below the level at which the correction line is secured to the conductor pipe whereby a downward motion of the vessel and hence the pulley tightens, and an upward motion slackens, the correction line.
convenientry the correction line is secured to the floating vessel after passing around a secondary correction pulley which is attached to the correction pulley.
In a conventional arrangement for carrying out lineoperations from a floating vessel, the borehole line is unwound from a winch at deck level, passed from a deck pulley over a travelling block which can be lowered to the bottom or" the drilling mast to rig the system and then hauled to the top to guide the borehole line into the borehole. With this arrangement a correction system according to the invention may he rigged so that the correction passes line over the travelling block followed by the secondary correction pulley after which it is secured to the travelling block; the borehole line is passed over the deck pulley and then over the correction pulley which is attached the secondary correction pulley.
The invention will now be further described by way of example with reference to the drawings which accompanying the instant specification and in which:
FIGURE 1 illustrates a correction system according to the invention, and
FIGURE 2 illustrates a modification in which the correction is applied at an alternative position in the borehole line.
Both figures illustrate a correction system according to the invention arranged for use in the carrying out of a line-operation in a borehole which is being drilled in the sea bed and a conductor pipe runs from this equipment to the surface. The conductor pipe is secured to the sea bed and therefore it forms a convenient reference point fixed relative to earth.
For reasons of scale most of the items mentioned above were omitted from the drawings and only the upper portion of the conductor pipe, designated by the numeral 19, will be shown.
In the arrangement shown in FIGURE 1 a borehole line 11 is unwound from a winch 12 passes around deck pulley 13 and over correction pulley 14 which guides the borehole line 11 into the conductor pipe and therefore into the borehole.
The correction system comprises the correction line 16 which is made fast to the fixed point 1 7 situated near the top of the conductor pipe 1%). The correction line 16 passes around the adjustment pulley 18 over travelling block 15 (which is positioned near the top of the drilling mast during the operation), is looped around secondary correction pulley 19 and is passed back to the mounting of travelling block 15 where it is secured. The secondary correction pulley 19 is connected to the correction pulley 14 so that tension in the borehole line 11 is applied to the correction line 16.
When a vessel at sea is engaged in line-operations the whole of FIGURE 1 rises and falls under the influence of tide and wave action except the conductor pipe 10. The operation of the correction system to eliminate this motion from the borehole line 11 will be explained by considering a downward motion of the vessel. This downward motion is equivalent to an upward motion of the point 17 while all other points remain stationary and the mode of operation will be explained from this point of view since this is easier to follow.
An upward motion of the point 17 through a distance 2x pulls this quantity of the correction line 16 out of the loop 21 so that the secondary correction pulley 19 is pulled upwards through a distance x. The upward motion of the secondary correction pulley 19 is transferred to the upper borehole line pulley 14, that is, a correction pulley, and this 'has the efiect of increasing the size of the loop 2% to take in a quantity 2x of the borehole line 11. The borehole line is restrained from paying out by the Winch and therefore a quantity 2X of 'borehole line is taken in on the borehole side of loop 29. Thus the borehole line 11 on the borehole side of loop 26 shares the motion of the point 17.
We will now consider a downward motion of the point 17 (actually an upward motion of the vessel) through a distance of 2x. The tension in the borehole line 11 due to the weight of the tool in the borehole maintains the tension in correction line 16 so that the amount of correct ion line paid into the correction system istaken into loop 21: this allows pulleys 19 and 14 to fall through a distance x, thus paying out a quantity 2x on the borehole side of loop 29. Again the borehole line 11 shares the motion of the point 17.
Reverting to the more conventional view point (in which the point 17 is fixed and all other points move) it can be seen that the correction system has the effect of correcting the borehole line 11 for the motion of the floating vessel.
FIGURE 2 shows a modification in which the borehole line 11 passes over the deck pulley 13 and around correction pulley 14 and then over the travelling block which guides the borehole line 11 into the conductor pipe and therefore into the borehole.
The correction system comprises the correction line 16 which is made fast to fixed point 17 on conductor pipe 10. The correction line 16 passes around the adjustment pulley 18, is looped round the secondary correction pulley 19 and passed back to the mounting of the adjustment pulley 18 Where it is secured. The secondary correction pulley 19 is connected to correction pulley 14 so that the tension in the borehole line 11 is applied to the correction line 16. With this arrangement the correction pulley 14 is situated below deck and funcan underwater borehole, said rig comprising a boreholeline, a winch for unwinding the borehole-line and at least one pulley for directing the borehole-line into the borehole, a correction system which comprises a correction line connected to a point fixed relative to said rig and to a point fixed relative to earth, a correction pulley which engages with the borehole-line, and a secondary correction pulley which is connected to said correction pulley and engages with said correction line between said points such that a downward motion of the floatable rig tightens, and an upward motion slackens, the correction line and said tightening and slackening are transferred to the borehole-line by the correction pulley so as to take it in and pay it out whereby the length of borehole-line payed out is adjusted to correct for the vertical motion of the iloatable rig said correction system includes a conductor pipe which provides the point fixed relative to the earth to which said correction line is connected and wherein an adjustment pulley is secured to the rig at a point which is always below the level at which the correction line is secured to the conductor pipe, said correction system includes a traveling block connected to said rig and providing the point fixed relative to said rig to which said correction line is connected, the correction line passing, in sequence from the conductor pipe, over the adjustment pulley, the traveling block and the secondary correction pulley before being connected to the traveling block, whereby a downward motion of the rig and hence the pulley tightens, and an upward motion slackens, the correction line.
References Cited UNITED STATES PATENTS 2,809,435 10/ 1957 Nicolson 73-52 3,001,396 9/1961 Cleveland 254-172 3,208,728 9/1965 Parks 254172 3,276,746 10/ 1966 Berne 254172 EDWARD A. SROKA, Primary Examiner.
EVON C. BLUNK, Examiner.
H. C. HORNSBY, Assistant Examiner.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB5164465 | 1965-12-06 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US3380714A true US3380714A (en) | 1968-04-30 |
Family
ID=10460837
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US598023A Expired - Lifetime US3380714A (en) | 1965-12-06 | 1966-11-30 | Correction system for use in carrying out line-operations in an underwater borehole |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US3380714A (en) |
| BE (1) | BE690773A (en) |
| DE (1) | DE1251705B (en) |
| DK (1) | DK112791B (en) |
| FR (1) | FR1502515A (en) |
| NL (1) | NL6617110A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4252190A (en) * | 1979-02-22 | 1981-02-24 | Standard Oil Company (Indiana) | Wireline stabilization method and apparatus |
| US20150316679A1 (en) * | 2014-05-05 | 2015-11-05 | Vale S.A. | Method and system for density correction for geophysical well logging inside drilling rods |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2128057A1 (en) * | 1971-03-02 | 1972-10-20 | Petroles Cie Francaise | Cable tension compensator - for rise and fall of vessel eg oil drilling rig, due to wave motion |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2809435A (en) * | 1955-12-19 | 1957-10-15 | California Research Corp | Apparatus for maintaining proper depth correlation in well logging apparatus |
| US3001396A (en) * | 1958-02-14 | 1961-09-26 | James L Cleveland | Apparatus for maintaining proper depth correlation in well logging apparatus |
| US3208728A (en) * | 1962-11-19 | 1965-09-28 | Exxon Production Research Co | Apparatus for use on floating drilling platforms |
| US3276746A (en) * | 1963-10-10 | 1966-10-04 | Inst Francais Du Petrole | Stabilizing device |
-
0
- DE DENDAT1251705D patent/DE1251705B/en active Pending
-
1966
- 1966-11-30 US US598023A patent/US3380714A/en not_active Expired - Lifetime
- 1966-11-30 FR FR85646A patent/FR1502515A/en not_active Expired
- 1966-12-02 DK DK625766AA patent/DK112791B/en unknown
- 1966-12-06 BE BE690773D patent/BE690773A/xx unknown
- 1966-12-06 NL NL6617110A patent/NL6617110A/xx unknown
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2809435A (en) * | 1955-12-19 | 1957-10-15 | California Research Corp | Apparatus for maintaining proper depth correlation in well logging apparatus |
| US3001396A (en) * | 1958-02-14 | 1961-09-26 | James L Cleveland | Apparatus for maintaining proper depth correlation in well logging apparatus |
| US3208728A (en) * | 1962-11-19 | 1965-09-28 | Exxon Production Research Co | Apparatus for use on floating drilling platforms |
| US3276746A (en) * | 1963-10-10 | 1966-10-04 | Inst Francais Du Petrole | Stabilizing device |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4252190A (en) * | 1979-02-22 | 1981-02-24 | Standard Oil Company (Indiana) | Wireline stabilization method and apparatus |
| US20150316679A1 (en) * | 2014-05-05 | 2015-11-05 | Vale S.A. | Method and system for density correction for geophysical well logging inside drilling rods |
| CN105089621A (en) * | 2014-05-05 | 2015-11-25 | 淡水河谷公司 | Method and system for density correction for geophysical well logging inside drilling rods |
| US9778393B2 (en) * | 2014-05-05 | 2017-10-03 | Vale S.A. | Method and system for density correction for geophysical well logging inside drilling rods |
| US10401530B2 (en) | 2014-05-05 | 2019-09-03 | Vale S.A. | Method and system for quality control in gamma-gamma data during mineral exploration |
| CN105089621B (en) * | 2014-05-05 | 2020-06-16 | 淡水河谷公司 | Method and system for density correction of geophysical logs inside a drill pipe |
Also Published As
| Publication number | Publication date |
|---|---|
| BE690773A (en) | 1967-06-06 |
| DK112791B (en) | 1969-01-20 |
| NL6617110A (en) | 1967-06-07 |
| DE1251705B (en) | 1967-10-12 |
| FR1502515A (en) | 1967-11-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3540396A (en) | Offshore well apparatus and system | |
| US3996755A (en) | Tension leg structure with riser stabilization | |
| US3891038A (en) | Device for measuring the position and speed of a boring tool | |
| US4047579A (en) | Sea drilling jig | |
| US3780685A (en) | Tension leg offshore marine apparatus | |
| GB1086881A (en) | Method and apparatus for offshore drilling and well completion | |
| GB1523014A (en) | Self-supported drilling riser pipe | |
| GB994997A (en) | Method of laying a pipe line from a floating vessel on the floor of a body of water | |
| US3001396A (en) | Apparatus for maintaining proper depth correlation in well logging apparatus | |
| FR2274499B1 (en) | ||
| US3204708A (en) | Method and apparatus for submarine well drilling, using a flexible tubing as drill string | |
| US3968656A (en) | Marine structure with hydraulic tensioner | |
| US3380714A (en) | Correction system for use in carrying out line-operations in an underwater borehole | |
| WO2023159406A1 (en) | Sub-bottom profiling seismic data collection auxiliary equipment and construction method therefor | |
| US2570707A (en) | Seismic surveying | |
| US2809435A (en) | Apparatus for maintaining proper depth correlation in well logging apparatus | |
| GB1285600A (en) | Apparatus to facilitate drilling and working in offshore wells | |
| NO166050B (en) | PROCEDURE FOR HANDLING A BROWN HEAD CONSTRUCTION. | |
| US10240407B2 (en) | Method and system for wireline intervention in a subsea well from a floating vessel | |
| US3502143A (en) | Marine riser support system | |
| US4382718A (en) | Vertically movable marine working platform structure having vertically movable groundable support frames | |
| USRE20665E (en) | Method of and apparatus for laying | |
| US2738750A (en) | Anchor | |
| USRE21297E (en) | Depth recorder for a well dkul | |
| US3550549A (en) | Tension anchor system for offshore apparatus |