US2997001A - Method of repairing railway tracks and an installation for carrying out the same - Google Patents

Method of repairing railway tracks and an installation for carrying out the same Download PDF

Info

Publication number
US2997001A
US2997001A US643023A US64302357A US2997001A US 2997001 A US2997001 A US 2997001A US 643023 A US643023 A US 643023A US 64302357 A US64302357 A US 64302357A US 2997001 A US2997001 A US 2997001A
Authority
US
United States
Prior art keywords
rails
installation
ballast
track
sleepers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US643023A
Inventor
Scheuchzer Alfred
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US2997001A publication Critical patent/US2997001A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components

Definitions

  • each particle of material must traverse a relatively long path. Further, it meets resistance from the whole mass of material which it meets up to the end of its path. This resistance 1s very appreciable, particularly when the soil is well rammed; it becomes even much greater when the end beyond the sleepers is compressed, for example, between walls.
  • the various known means of operation for conveying the ballast beyond the end of the sleepers require a space of at least a number of tens of centimeters which although it may be available on a whole track, is not so everywhere, for example at narrow portions, in a large number of cuttings, in which are located walls which are very close to the ends of the sleepers, on
  • the present invention has for its subject a repairing method of railway tracks, wherein the used ballast is excavated and clean ballast is deposited, these operations being elected in a continuous manner along the railway track.
  • the method according to the invention is characterised in that the excavation operation is eifected by dragging the ballast in a vertical plane parallel to the rails.
  • the present linvention also has for its subject an installation for repairing railway tracks comprising like other known installations, at least one endless band excavator.
  • Said installation is characterised in that the excavator is arranged in such a manner as to operate in a vertical plane parallel to the rails.
  • FIG. 1 is a view in elevation of the complete installation.
  • FIG. 2 is a plan view.
  • FIG. 3 is a view in Isection on the line III--III of FIG. 2.
  • FIG. 4 is a view in section on the line IV--IV of the same FIG. 2.
  • FIG. 5 is a view of a detail of the installation.
  • FIG. 6 shows the preliminary phase of the repair of a section of a railway track according to the method form ing the subject of the invention.
  • the method of repairing railway tracks according to the invention includes, in this instance known methods of repair, the excavation of the ballast used and the supply of clean ballast on to the track, these operations being carried out in a continuous manner along a section of the track. Further, this method is distinguished by the fact that the operations of evacuating the ballast is eiected by dredging this in a vertical plane parallel to the rails.
  • FIGS. 1 to 5 of the accompanying drawings One form of construction of an installation enabling the above mentioned method to be carried out is shown in FIGS. 1 to 5 of the accompanying drawings.
  • said instal- 2,997,001 Patented Aug. 22, 1961 ICC lation comprises a primary vehicle 1 in the form of an arch, located longitudinally relatively to the rails. Said vehicle is provided with wheels 2 secured respectively to each end of said arch. In this particular case said wheels are grouped in such a manner as to constitute two trucks or bogies.
  • Said excavators 3, 4, 5, 6 are located in proximity to the front end of the vehicle in the form of the arch 1. Said excavators 3 to 6 are hinged independently of one another at their upper end 7, in such a manner as to be capable of following the soil whilst avoiding obstacles such las, for example, boulders R (see FIG. 3), which may project from the tracks. Said excavators 3 to 6 are set in operation by a motor 8.
  • a transverse conveyor band 9 collects all the materials which are brought along by the excavators 3 to 6 on to a common conveyor 10 adapted to conduct the ballast which is excavated into a vehicle 11 carrying a sieve 12.
  • Said vehicle 11 itself carries a conveyor 14 for' eliminating the Sittings. In fact, these are discharged into one or more Waggons 15 by means of auxiliary conveyors 16 and 17.
  • the ballast proper is taken up at the lower end of the sieve 12 by a conveyor 18 which brings it to the top of the vehicle 1 and discharges it on to a conveyor 19 which discharges the ballast proper into a receptacle 20 contained in the rear part of the vehicle of arched shape 1. Passages 21, which leave the receptacle 20, allow of the distribution of ballast proper along the track. Further, the rear part of the vehicle 1 in the form of an arch is provided with a support or platform 22 adapted for the reception of new sleepers supplied by a truck litted with a crane 26.
  • said support or platform 22 is constituted by an inclined plane provided with rollers for facilitating the movement of the sleepers 23 towards the centre of the arch.
  • the vehicle 1 is also provided with two rails of the type known as tourtelier arranged longitudinally under the arch.
  • the guide rails 27 serve as rolling tracks for two tackles 28 provided for the transport of the sleepers 23 from the support 22 to the point of their setting under the arch, that is to say between the excavators 3 to 6 and the support 22.
  • the operation of the repairing installation for railway tracks described Wi-th reference to FIGS. l to 5 of the accompanying drawing is effected according to the following method of use: when it is desired to proceed with the repair of a predetermined section of the railway track, the iirst operation is to remove all the sleepers 23 of said section, for example by means of a vehicle 29 provided with a crane 30, such as is shown in FIG. 6. Said sleepers 23, when once removed, are replaced in part by removable spacing bars 31 and provided with means for the rapid securing of the rails 32.
  • Such means for example, may be constituted by handles 33 of whi-ch the rotation produces the movement of the clamps 34 for gripping the foot of the rails 32.
  • the repairing installation proper comprising the vehicles 1, 11 and 15, is moved to one end of this section of the track.
  • a workman located near the front bogie of .the vehicle 1 removes the spacing sleepers 31 gradually as they appear between said bogie and the excavators 3 to 6. These can then operate freely between the rails 32, the excavated ballast being conveyed towards the waggon sieve 11, 12 for its cleaning.
  • the sieves are emptied on the waggon or Waggons 15 and the ballast itself is conducted by the conveyors 18 and 19 into the receptacle 20.
  • new sleepers 23 are conveyed from the waggon 25 under the arch of the vehicle 1, by means of the ramp 22 and the tackles 28.
  • Each sleeper 23 is brought longitudinally between the rails 32, then lowered between these and turned through 90 so as to be placed transversely under the rails 32 (see FIGS. 1 and 4).
  • Said method may be used for treating sections .of a narrow track, where other means cannot be put into operation.
  • An installation for repairing railway track from which the ties have been removed from beneath the rails comprising, in combination, spacing bars connecting said rails Where the ties have been removed to maintain them in gauge relationship, a machine including a body runnable on said rails including those from which the ties have been removed, at least one endless belt ballastconveyor at the front end of the machine, a plurality Vof endless belt type excavators for picking up the ballast from the bed and moving this ballast toward said conveyor, said excavators having their iiights disposed longitudinally and parallel to each other, a transversely disposed horizontal axle common to and supporting said excavators at their upper ends independently of each other, whereby, their lower ends will be free to oscillate in vertical planes parallel to the rails, certain of said excavators arranged to Work between the inner gauge sides of the rails and other excavators arranged to Work r at the outer field sides of said rails.
  • At least one supplementary conveyor carries screened ballast over the arch from the front to the rear of the machine, at least one conduit distributes the said clean ballast in the track bed just in front of the rear axle.
  • An exacavation process characterized by the follow- ⁇ ing steps, removing the crossties of the track, placing spacing bars between the rails, rolling an excavating machine onto the rails without crossties but keeping their original distance normalized by the spacing bars, removing the bars behind ⁇ an axle of the machine and ahead .of a group of excavators carried by the machine, excavating the ballast by longitudinal dredging between the gauge sides of adjacent rails and also on the field sides of said rails for obtaining an excavated space under the rails, bringing crossties in said excavated space, moving them in said space in such a manner that at the end of the movement they are disposed transversely under the rails, and then securing them under the rails.
  • An excavationprocess characterized by the following steps, removing the crossties of the track, placing spacing bars between the rails, rolling an excavating machine onto the rails Without crossties but keeping their original distance normalized by the spacing bars, removing the bars behind an axle of the machine and ahead of a group of excavators carried by the machine, exeavating the ballast by longitudinal dredging between the gauge sides of the rails and also adjacent the field sides of the rails to obtain an excavated space under the rails, bringing crossties in said excavated space, moving them in said space in a manner that ⁇ at the end of the movement they are transversely disposed under the rails, then securing said cross ties under the rails, and supplying cleaned ballast to the trackbed in front of the rear axle of the machine.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

Aug- 22, 1961 A. scHEUcHzE-R METHOD OR REPAIRING RAILWAY TRACKS ANO AN INSTALLATION FOR CARRYING OUT THE SAME: Flled Feb 28, 1957 2 sheets-sheet 1 Allg 22, 1961 A. scHl-:UcHZER 2,997,001
METHOD OF REPAIRING RAILWAY TRACKS AND AN INSTALLATION FOR CARRYING OUT THE SAME Filed Feb. 28, 1957 2 Sheets-Sheet 2 /lVt/EN TD e ,Q @een 50;/ EUC HZ 5 QJ nted States Patent O AND AN INSTALLATION FOR CARRYING OUT THE SAME Alfred Scheuchzer, 35 Blvd. de Grancy, Lausanne, Switzerland, assignor of fifty percent to Andre Scheuchzer,
Lausanne, Switzerland Filed Feb. 28, 1957, Ser. No. 643,023 Claims priority, application Switzerland Mar. 3, 1956 Claims. (Cl. 104-2) In the course of repairing `operations of railway tracks, the various known methods of clearing away of ballast (with or without sifting) consist in pushing laterally, that is the say in a direction transversely to the track, the material to be treated, beyond the end of the sleepers so that it can be collected and removed.
In these methods, for the same reason, each particle of material must traverse a relatively long path. Further, it meets resistance from the whole mass of material which it meets up to the end of its path. This resistance 1s very appreciable, particularly when the soil is well rammed; it becomes even much greater when the end beyond the sleepers is compressed, for example, between walls.
Further, the various known means of operation for conveying the ballast beyond the end of the sleepers require a space of at least a number of tens of centimeters which although it may be available on a whole track, is not so everywhere, for example at narrow portions, in a large number of cuttings, in which are located walls which are very close to the ends of the sleepers, on
bridges, in stations and in tunnels.
In these cases the known machines cannot be used.
The present invention has for its subject a repairing method of railway tracks, wherein the used ballast is excavated and clean ballast is deposited, these operations being elected in a continuous manner along the railway track.
The method according to the invention is characterised in that the excavation operation is eifected by dragging the ballast in a vertical plane parallel to the rails.
The present linvention also has for its subject an installation for repairing railway tracks comprising like other known installations, at least one endless band excavator. Said installation is characterised in that the excavator is arranged in such a manner as to operate in a vertical plane parallel to the rails.
In the accompanying drawings is shown diagrammatically and by way of example, one form of construction of an installation according to the invention. A
FIG. 1 is a view in elevation of the complete installation.
FIG. 2 is a plan view.
FIG. 3 is a view in Isection on the line III--III of FIG. 2.
FIG. 4 is a view in section on the line IV--IV of the same FIG. 2.
FIG. 5 is a view of a detail of the installation.
FIG. 6 shows the preliminary phase of the repair of a section of a railway track according to the method form ing the subject of the invention. v
The method of repairing railway tracks according to the invention includes, in this instance known methods of repair, the excavation of the ballast used and the supply of clean ballast on to the track, these operations being carried out in a continuous manner along a section of the track. Further, this method is distinguished by the fact that the operations of evacuating the ballast is eiected by dredging this in a vertical plane parallel to the rails. One form of construction of an installation enabling the above mentioned method to be carried out is shown in FIGS. 1 to 5 of the accompanying drawings. AS Will be seen particularly in FIGS. 1 and 2, said instal- 2,997,001 Patented Aug. 22, 1961 ICC lation comprises a primary vehicle 1 in the form of an arch, located longitudinally relatively to the rails. Said vehicle is provided with wheels 2 secured respectively to each end of said arch. In this particular case said wheels are grouped in such a manner as to constitute two trucks or bogies.
Four excavators 3, 4, 5, 6 are located in proximity to the front end of the vehicle in the form of the arch 1. Said excavators 3 to 6 are hinged independently of one another at their upper end 7, in such a manner as to be capable of following the soil whilst avoiding obstacles such las, for example, boulders R (see FIG. 3), which may project from the tracks. Said excavators 3 to 6 are set in operation by a motor 8. A transverse conveyor band 9 collects all the materials which are brought along by the excavators 3 to 6 on to a common conveyor 10 adapted to conduct the ballast which is excavated into a vehicle 11 carrying a sieve 12. Said vehicle 11 itself carries a conveyor 14 for' eliminating the Sittings. In fact, these are discharged into one or more Waggons 15 by means of auxiliary conveyors 16 and 17.
The ballast proper is taken up at the lower end of the sieve 12 by a conveyor 18 which brings it to the top of the vehicle 1 and discharges it on to a conveyor 19 which discharges the ballast proper into a receptacle 20 contained in the rear part of the vehicle of arched shape 1. Passages 21, which leave the receptacle 20, allow of the distribution of ballast proper along the track. Further, the rear part of the vehicle 1 in the form of an arch is provided with a support or platform 22 adapted for the reception of new sleepers supplied by a truck litted with a crane 26.
In the example shown, said support or platform 22 is constituted by an inclined plane provided with rollers for facilitating the movement of the sleepers 23 towards the centre of the arch.
` The vehicle 1 is also provided with two rails of the type known as tourtelier arranged longitudinally under the arch. The guide rails 27 serve as rolling tracks for two tackles 28 provided for the transport of the sleepers 23 from the support 22 to the point of their setting under the arch, that is to say between the excavators 3 to 6 and the support 22.
The operation of the repairing installation for railway tracks described Wi-th reference to FIGS. l to 5 of the accompanying drawing is effected according to the following method of use: when it is desired to proceed with the repair of a predetermined section of the railway track, the iirst operation is to remove all the sleepers 23 of said section, for example by means of a vehicle 29 provided with a crane 30, such as is shown in FIG. 6. Said sleepers 23, when once removed, are replaced in part by removable spacing bars 31 and provided with means for the rapid securing of the rails 32. Such means, for example, may be constituted by handles 33 of whi-ch the rotation produces the movement of the clamps 34 for gripping the foot of the rails 32. Once a particular section of the track has been detached from its' sleepers 23 and provided with spacing bars 31, the repairing installation proper, comprising the vehicles 1, 11 and 15, is moved to one end of this section of the track. A workman located near the front bogie of .the vehicle 1 removes the spacing sleepers 31 gradually as they appear between said bogie and the excavators 3 to 6. These can then operate freely between the rails 32, the excavated ballast being conveyed towards the waggon sieve 11, 12 for its cleaning. The sieves are emptied on the waggon or Waggons 15 and the ballast itself is conducted by the conveyors 18 and 19 into the receptacle 20. In proportion to the excavation of the track, new sleepers 23 are conveyed from the waggon 25 under the arch of the vehicle 1, by means of the ramp 22 and the tackles 28. Each sleeper 23 is brought longitudinally between the rails 32, then lowered between these and turned through 90 so as to be placed transversely under the rails 32 (see FIGS. 1 and 4).
As the new sleepers 23 are secured under the rails 32, clean ballast is `directed by the passages' 21 towards `the excavated space and thus under the newly positioned sleepers. As will be readily understood from the foregoing, a repairing installation, as' above described, can operate in a continuous manner with considerable efficiency and for this reason only renders the track inoperative for a very short period of time. Further, one oi the most marked advantages of said installation resides in the fact that this is of very restricted size in width, which permits of its use for the repairing of sleepers of tracks located, for example, in a tunnel, on a bridge, or when necessary along the platforms of a station, or even for the repair of tracks bordered by walls, for example.
Numerous modiiications may be provided in the inst-allation hereinbefore described. For example, instead of providing four independent excavators, it is possible to provide only three, the central excavator having the width of the space comprised between the rails 32. It is also possible to use only one central excavator travelling between the rails 32. The ballast located on the outside of the rails 32 is, in this case, urged towards the inside of the rails by accessory apparatus, for example of the fraise type. Further, some conveyors, such as .theconveyor 9, may be replaced by passages of smooth sheet metal provided with agitators ensuring the flow of material on their inclined base.
The advantages of the new method described above and of the installation enabling it to be set in operation are as follows:
(1) Said method may be used for treating sections .of a narrow track, where other means cannot be put into operation.
(2) By dredging longitudinally and from the bottom upwards', the material is removed towards the line of least resistance.
Further, by acting simultaneously over the entire width or over a large portion of the width of the ground` tobe treated, there is ensured a forward movement considerably superior to that obtained by other methods. This great superiority of output compensates very considerably the slight inconvenience sometimes resultingfrom the necessity of removing the sleepers, the more so as the removal of the ballast and its purification occursmore frequently when replacing the material, that is to say when changing the sleepers.
(3) It is to be observed that the positioning of the excavators is Very simple and very rapid; it suices to allow the rear portion of these to descend on to the track.
l claim:
1. An installation for repairing railway track from which the ties have been removed from beneath the rails, comprising, in combination, spacing bars connecting said rails Where the ties have been removed to maintain them in gauge relationship, a machine including a body runnable on said rails including those from which the ties have been removed, at least one endless belt ballastconveyor at the front end of the machine, a plurality Vof endless belt type excavators for picking up the ballast from the bed and moving this ballast toward said conveyor, said excavators having their iiights disposed longitudinally and parallel to each other, a transversely disposed horizontal axle common to and supporting said excavators at their upper ends independently of each other, whereby, their lower ends will be free to oscillate in vertical planes parallel to the rails, certain of said excavators arranged to Work between the inner gauge sides of the rails and other excavators arranged to Work r at the outer field sides of said rails.
least one supplementary conveyor carries screened ballast over the arch from the front to the rear of the machine, at least one conduit distributes the said clean ballast in the track bed just in front of the rear axle.
4. An exacavation process characterized by the follow- `ing steps, removing the crossties of the track, placing spacing bars between the rails, rolling an excavating machine onto the rails without crossties but keeping their original distance normalized by the spacing bars, removing the bars behind `an axle of the machine and ahead .of a group of excavators carried by the machine, excavating the ballast by longitudinal dredging between the gauge sides of adjacent rails and also on the field sides of said rails for obtaining an excavated space under the rails, bringing crossties in said excavated space, moving them in said space in such a manner that at the end of the movement they are disposed transversely under the rails, and then securing them under the rails.
5. An excavationprocess characterized by the following steps, removing the crossties of the track, placing spacing bars between the rails, rolling an excavating machine onto the rails Without crossties but keeping their original distance normalized by the spacing bars, removing the bars behind an axle of the machine and ahead of a group of excavators carried by the machine, exeavating the ballast by longitudinal dredging between the gauge sides of the rails and also adjacent the field sides of the rails to obtain an excavated space under the rails, bringing crossties in said excavated space, moving them in said space in a manner that `at the end of the movement they are transversely disposed under the rails, then securing said cross ties under the rails, and supplying cleaned ballast to the trackbed in front of the rear axle of the machine.
References Cited in the tile of this patent UNITED STATES PATENTS 2,309,712 Philbrick Feb. 2, 1943 2,737,901 Y Drouard et al Mar. 13, 1956 2,775,438 Bach et ral. Dec. 25, 1956 FOREIGN PATENTS 173,045 Austria Nov. 10, 1952 l1,042,314 France June 3, 1953 601,243 Germany Aug. 11, 1934 316,081 Great Britain July 25, 1929
US643023A 1956-03-03 1957-02-28 Method of repairing railway tracks and an installation for carrying out the same Expired - Lifetime US2997001A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH2997001X 1956-03-03

Publications (1)

Publication Number Publication Date
US2997001A true US2997001A (en) 1961-08-22

Family

ID=4573288

Family Applications (1)

Application Number Title Priority Date Filing Date
US643023A Expired - Lifetime US2997001A (en) 1956-03-03 1957-02-28 Method of repairing railway tracks and an installation for carrying out the same

Country Status (1)

Country Link
US (1) US2997001A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3521565A (en) * 1967-06-29 1970-07-21 Plasser Bahnbaumasch Franz Apparatus for replacing an old track by a new track
US3604358A (en) * 1968-09-05 1971-09-14 Plasser Bahnbaumasch Franz Maintenance apparatus
US3613598A (en) * 1968-10-16 1971-10-19 Plasser Bahnbaumasch Franz Mobile apparatus for laying track ties
US3654868A (en) * 1968-10-16 1972-04-11 Plasser Bahnbaumasch Franz Mobile track maintenance apparatus
US3685456A (en) * 1969-10-07 1972-08-22 Plasser Bahnbaumasch Franz Method and apparatus for the continuous replacement of an old track by a new track
US3691957A (en) * 1970-06-01 1972-09-19 Plasser Bahnbaumasch Franz Mobile apparatus for laying and removing track ties along a right of way
US3699894A (en) * 1969-10-07 1972-10-24 Plasser Bahnbaumasch Franz Movable apparatus for replacing an old track by a new track
US3722423A (en) * 1969-12-17 1973-03-27 Plasser Bahnbaumasch Franz Mobile ballast treating and rail fastening element engaging tool unit
DE2612536A1 (en) * 1975-03-28 1976-10-14 Matisa Materiel Ind Sa TRACK BED CLEANING MACHINE
US4047486A (en) * 1975-07-21 1977-09-13 A/S Hymas Excavator blade for replacing railroad sleepers
US4307667A (en) * 1978-04-19 1981-12-29 Les Fils D'auguste Scheuchzer, S.A. Railroad track relaying train
US4850752A (en) * 1987-02-03 1989-07-25 Kango Wolf Power Tools Limited Tool for stone-blowing
EP0348585A1 (en) * 1988-06-28 1990-01-03 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Arrangement of machines moving along a track for laying or removing sleepers
US5109775A (en) * 1990-09-28 1992-05-05 Knox Kershaw, Inc. Ballast reconditioning apparatus with multiple excavating wheels and independent cleaning stations for increased operating speed

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB316081A (en) * 1928-06-18 1929-07-25 Paul Guilbert Improved means for relaying railway tracks
DE601243C (en) * 1932-01-28 1934-08-11 Otto Neddermeyer Dipl Ing Pulling device for a device for tearing open and picking up old trackless bedding
US2309712A (en) * 1940-03-22 1943-02-02 Frank H Philbrick Apparatus for handling ballast in railway roadbeds
AT173045B (en) * 1949-05-30 1952-11-10 Matisa Materiel Ind Sa Method of laying reinforced concrete sleepers for rails and devices for carrying out the method
FR1042314A (en) * 1951-09-19 1953-10-30 Entpr A Dehe Et Cie Improvements made to means for mechanical renewal of railways
US2737901A (en) * 1950-11-17 1956-03-13 Drouard Jacques Machine for clearing away the ballast from under the railway track sleepers
US2775438A (en) * 1951-09-06 1956-12-25 Harold H Bach Method and apparatus for processing ballast

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB316081A (en) * 1928-06-18 1929-07-25 Paul Guilbert Improved means for relaying railway tracks
DE601243C (en) * 1932-01-28 1934-08-11 Otto Neddermeyer Dipl Ing Pulling device for a device for tearing open and picking up old trackless bedding
US2309712A (en) * 1940-03-22 1943-02-02 Frank H Philbrick Apparatus for handling ballast in railway roadbeds
AT173045B (en) * 1949-05-30 1952-11-10 Matisa Materiel Ind Sa Method of laying reinforced concrete sleepers for rails and devices for carrying out the method
US2737901A (en) * 1950-11-17 1956-03-13 Drouard Jacques Machine for clearing away the ballast from under the railway track sleepers
US2775438A (en) * 1951-09-06 1956-12-25 Harold H Bach Method and apparatus for processing ballast
FR1042314A (en) * 1951-09-19 1953-10-30 Entpr A Dehe Et Cie Improvements made to means for mechanical renewal of railways

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3521565A (en) * 1967-06-29 1970-07-21 Plasser Bahnbaumasch Franz Apparatus for replacing an old track by a new track
US3604358A (en) * 1968-09-05 1971-09-14 Plasser Bahnbaumasch Franz Maintenance apparatus
US3613598A (en) * 1968-10-16 1971-10-19 Plasser Bahnbaumasch Franz Mobile apparatus for laying track ties
US3654868A (en) * 1968-10-16 1972-04-11 Plasser Bahnbaumasch Franz Mobile track maintenance apparatus
US3699894A (en) * 1969-10-07 1972-10-24 Plasser Bahnbaumasch Franz Movable apparatus for replacing an old track by a new track
US3685456A (en) * 1969-10-07 1972-08-22 Plasser Bahnbaumasch Franz Method and apparatus for the continuous replacement of an old track by a new track
US3722423A (en) * 1969-12-17 1973-03-27 Plasser Bahnbaumasch Franz Mobile ballast treating and rail fastening element engaging tool unit
US3691957A (en) * 1970-06-01 1972-09-19 Plasser Bahnbaumasch Franz Mobile apparatus for laying and removing track ties along a right of way
DE2612536A1 (en) * 1975-03-28 1976-10-14 Matisa Materiel Ind Sa TRACK BED CLEANING MACHINE
US4047486A (en) * 1975-07-21 1977-09-13 A/S Hymas Excavator blade for replacing railroad sleepers
US4307667A (en) * 1978-04-19 1981-12-29 Les Fils D'auguste Scheuchzer, S.A. Railroad track relaying train
US4850752A (en) * 1987-02-03 1989-07-25 Kango Wolf Power Tools Limited Tool for stone-blowing
EP0348585A1 (en) * 1988-06-28 1990-01-03 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Arrangement of machines moving along a track for laying or removing sleepers
US5109775A (en) * 1990-09-28 1992-05-05 Knox Kershaw, Inc. Ballast reconditioning apparatus with multiple excavating wheels and independent cleaning stations for increased operating speed

Similar Documents

Publication Publication Date Title
US2997001A (en) Method of repairing railway tracks and an installation for carrying out the same
CA1206807A (en) Mobile arrangement and method for improving a track bed
US4854243A (en) Mobile track renewal machine
RU2106451C1 (en) Device for recovering ballast layer base of railway track
US4307667A (en) Railroad track relaying train
CA1177694A (en) Track work train
RU2087610C1 (en) Machine for taking out crushed stone from railway track ballast layer
US3872929A (en) Method and apparatus for stablizing the sub-grade of a railroad ballast bed
US4004524A (en) Method of renewal of a railroad track and train therefor
US5090483A (en) Ballast separating device for ballast cleaning machine
US5090484A (en) Mobile ballast cleaning machine arrangement
US4094249A (en) Apparatus for laying track
HU177251B (en) Movable apparatus for continuous laying sleepers
US2734730A (en) talboys
US4000699A (en) Apparatus for replacement of rail tracks
GB2261455A (en) An arrangement for creating a railway track formation protection layer
GB2172326A (en) A travelling on-track machine for taking up ballast from a ballast bed under suction
US5513452A (en) Installation for the rehabilitation of a ballast bed
CA2114489C (en) Machine for renewing or cleaning a ballast bed
AU617191B2 (en) A travelling on-track machine arrangement for placing and removing sleepers
EP0512075A1 (en) METHOD AND DEVICE FOR CLEANING BED MATERIAL.
RU2119001C1 (en) Track-laying machine for removing ballast material
US4774890A (en) Mobile track renewal installation
US10385517B2 (en) Method for track renewal
US4316416A (en) Mobile apparatus for replacing old track ties by new track ties