US20230160148A1 - Equipment foundation and mine rock bolt system - Google Patents
Equipment foundation and mine rock bolt system Download PDFInfo
- Publication number
- US20230160148A1 US20230160148A1 US18/054,893 US202218054893A US2023160148A1 US 20230160148 A1 US20230160148 A1 US 20230160148A1 US 202218054893 A US202218054893 A US 202218054893A US 2023160148 A1 US2023160148 A1 US 2023160148A1
- Authority
- US
- United States
- Prior art keywords
- rod
- thru
- hole
- block
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000011435 rock Substances 0.000 title description 2
- 238000000034 method Methods 0.000 claims description 14
- 238000005553 drilling Methods 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 claims description 2
- 239000002023 wood Substances 0.000 description 9
- 238000012360 testing method Methods 0.000 description 6
- 102100040428 Chitobiosyldiphosphodolichol beta-mannosyltransferase Human genes 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 235000015855 Capsicum pubescens Nutrition 0.000 description 1
- 240000000533 Capsicum pubescens Species 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 239000011121 hardwood Substances 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 230000000414 obstructive effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/086—Temporary pavings made of concrete, wood, bitumen, rubber or synthetic material or a combination thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Definitions
- the present invention relates to components for anchoring mine roofs and temporary equipment foundations such as crane mats.
- Temporary equipment foundations such as crane mats can be made of various materials, including wood and plastic, which traditionally are formed by joining planks using headed or threaded fasteners, such as bolts or screws, or they can be pre-formed modules.
- the planks are fastened in side-by-side relation to form a block or mat.
- U.S. Pat. No. 9,435,097 to Locotos shows a method for assembling a foundation mat, using multiple, plastic, un-drilled blocks which are stacked in side-by-side relation.
- a fastener is power-driven through the system, and the blocks are tensioned.
- the invention generally comprehends an assembly method and resulting ground-disposed mat product including the steps of power-driving a smooth fastener through wood either with a hydraulic force or pneumatic (air), mechanical, or by any other power assisted means, after having first pre-drilled therein a hole.
- the outer surface of the fastener is preferably, entirely smooth, even through its head.
- a method for assembling a ground-disposed foundation mat for equipment comprising the steps of: pre-drilling multiple, wooden blocks with a plurality of thru-holes, each thru-hole defined by a thru-hole inner surface and a hole diameter, each wooden block having an outer surface; stacking the wooden blocks in side-by-side relation with the thru-holes generally aligned; using a mechanical press, power-driving a rod into the thru-holes through the wooden blocks, the rod having a smooth outer surface, the rod having an outer diameter equal to or slightly greater than the hole diameter of each of the thru holes, wherein each rod is held in place by significant friction between the thru-hole inner surface and the smooth outer surface of the rod.
- the head top surface of the rod is left flush with the outer surface of the block.
- the head top surface of the rod is slightly counter-sunk in relation to the outer surface of the block.
- the significant friction equates to pressure in the range of 2-4 tons.
- a ground-disposed foundation mat comprises: a pre-drilled, wooden block with a thru-hole, the thru-hole defined by a thru-hole inner surface and a hole diameter, the wooden block having an outer surface; a rod power-driven through the thru-hole, the rod having a head top surface and a smooth outer surface, the rod having a lead end, the rod having an outer diameter equal to or slightly greater than the hole diameter of each of the thru holes, wherein each rod is held in place by significant friction between the thru-hole inner surface and the smooth outer surface of the rod.
- the rod is adapted to remain held in place within the block even when subjected to a pull force of at least 3 tons.
- FIG. 1 shows a side view in elevation of the bolt and block system in relation to a single block example.
- FIG. 2 shows a perspective view of blocks in stacked relation with the bolt top flush with the surface of the block.
- a ground-disposed foundation mat 1 is assembled for equipment, wherein generally a thru-hole 2 is pre-drilled into a block 2 extending the width of the block 2 .
- the blocks 2 are planks that can be stacked ( FIG. 2 ) in “stacked relation” and/or be individually sized to make up various support structures for any type of heavy equipment such as cranes, although use other than crane mats or equipment foundations is possible.
- the use of the term block 2 is therefore meant to represent one section of a ground-disposed mat, such as a crane mat, thus the drawings show truncated versions of planks.
- the plank or block 2 at least as tested, has a depth of eight inches for example.
- “Stacked relation” as used herein and as claimed means preferably side-by-side disposition as would comprise a ground-disposed mat 1 , although various formations and shapes can be deployed such as the blocks 2 being vertically stacked. Therefore, “a” as used in the claims means one or more.
- the preferred material of the block 2 is wood although that would not apply in the instant the system is used for penetration into a mine rib and not used as a foundation mat 1 .
- the block 2 in this embodiment (as compared to that of U.S. Pat. No. 9,435,097) is considered “un-solid”.
- multiple, wooden blocks 2 are pre-drilled with a plurality of thru-holes 3 , with the thru-holes 3 generally aligned (not exact, but close enough to maintain the functionality of being connected).
- the thru-holes 3 within the blocks 2 are defined by a thru-hole inner surface 5 and a hole diameter 11 .
- functionality was maintained and was ideal where the hole diameter 11 was 7 / 8 ′′ but this is an example only and not meant to be limiting.
- Rod 8 is power-driven into the thru-hole 3 of the block 2 to join the blocks 2 .
- Rod 8 can be solid or hollow.
- Power-driven means the fasteners 2 are forcefully inserted through the blocks 1 using a mechanical press such as a pneumatic or hydraulic press.
- a hydraulic press is utilized to drive the fastener 2 .
- a mounted, 20 -ton hydraulic cylinder was used and successful at less than maximum capacity and hand-controlled.
- a power-assisted pump can also be employed to actuate the hydraulic cylinder. In testing, pressure in the range of 2 - 4 tons was applied to a rod 8 of the type of # 8 SAS continuous thread bar.
- the rod 8 has a head portion (not shown) with head top surface 6 , a rod body 8 a and a lead end 10 as shown.
- the lead end 10 can be tapered as shown.
- Rod 8 has a smooth outer surface 7 .
- “Smooth” here means unthreaded as would be a screw or bolt. Smooth could be roughened slightly by an additive or may include surface imperfections, but critically, would not include helical components. “Smooth” may also mean a corrugated rod such used in the testing example below. Again, critical is that there is no helical, screw-like surface and function.
- rod 8 is defined by its rod diameter 9 (through the rod body 8 a ). The rod diameter 9 is equal to or slightly greater than the hole diameter 11 of thru-hole 3 .
- rod diameter 9 is 1′′ when the thru-hole hole diameter 11 is 7 ⁇ 8′′, thus “slightly” in relation to the rod diameter 9 difference versus the hole diameter is preferably no greater than 1 ⁇ 8′′. Accordingly, when rod 8 is power-driven, the rod 8 is held in place within thru-hole 3 and thus block 2 with significant friction.
- “Significant” in this context means with pressures indicated in the below tables, e.g. friction at a level where the rod 8 remains in place with the block 2 even when subject to a pull force of at least 3 tons, as determined from experimentation. Accordingly, the wood does not split while concurrently achieving good anchorage and holding strength.
- block means a mass of wood.
- the “mass” as used herein could be another material such as rock, coal or other mineral substance, for instance which would act as an anchorage point within a mine roof or rib.
- a head portion is not separately formed on the bolt, or rod 8 , because in the preferred embodiment, head portion is co-planar with rod body 8 a so as to be one, integral piece with no larger-diameter, actual head. Head portion may contain some form of head having a diameter greater than rod body 8 a if used in combination with a bearing plate.
- the ground-disposed foundation mat 1 In use then and to assemble the ground-disposed foundation mat 1 : multiple, wooden blocks 2 are pre-drilled with a plurality of thru-holes 3 , each thru-hole 3 defined by a thru-hole 3 inner surface 5 and a hole diameter 11 , each wooden block having an block surface 4 ; the wooden blocks are stacked in side-by-side relation with the thru-holes 3 generally aligned; using a mechanical press, the rods 8 are power-driven into the thru-holes 3 of the blocks 2 , wherein each rod 8 is held in place by significant friction between the thru-hole 3 inner surface 5 and the smooth outer surface 7 of the rod 8 .
- the head top surface 6 of head portion of rod 8 can be flush with block surface 4 .
- head top surface 6 can be counter-sunk in relation to the block surface 4 . Table 1 below shows the improvements and savings that are incurred.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
A ground-disposed foundation mat. A pre-drilled, wooden block has a thru-hole, the thru-hole defined by a thru-hole inner surface and a hole diameter, the wooden block having an outer surface; a rod is power-driven through the thru-hole, the rod having a head top surface and a smooth outer surface, the rod having a lead end, the rod having an outer diameter equal to or slightly greater than the hole diameter of each of the thru holes, wherein each rod is held in place by significant friction between the thru-hole inner surface and the smooth outer surface of the rod. As such, the rod is adapted to remain held in place within the block even when subjected to a pull force of at least 3 tons.
Description
- The present application claims benefit of provisional application serial no. 63/263,949, filed Nov. 12, 2022, the contents of which are incorporated herein by reference.
- The present invention relates to components for anchoring mine roofs and temporary equipment foundations such as crane mats.
- Temporary equipment foundations such as crane mats can be made of various materials, including wood and plastic, which traditionally are formed by joining planks using headed or threaded fasteners, such as bolts or screws, or they can be pre-formed modules. The planks are fastened in side-by-side relation to form a block or mat.
- The prior art teaches a wide variety of ground cover mats and rig mats. Most of these temporary foundation systems use some form of mechanism for edge-to-edge fastening, such as by tongue-and-groove or interlock. See for example U.S. Pat. No. 8,545,127 to Bleile et al. and U.S. Pat. No. 8,936,073 to Phillips. This is understandable being the mats are temporary. However, such “snapping” systems are not suitable for supporting heavy equipment. The more the ease as which such mats are assembled is enhanced, the less strong and durable the mats often become.
- The prior art including U.S. Patent Publication No. 2014/0341649 to Bryan et al. teaches using a nut at a lead end for a variety of fasteners, thus a bolt can be driven through plastic and the system tightened. Bolt-fastened temporary foundations are much more durable and can support considerably more weight because the planks themselves are large and solid. Here, however, because the planks must be drilled to accommodate the fasteners, the assembly process can be time-consuming, which is not desirable for temporary systems.
- U.S. Pat. No. 9,435,097 to Locotos shows a method for assembling a foundation mat, using multiple, plastic, un-drilled blocks which are stacked in side-by-side relation. A fastener is power-driven through the system, and the blocks are tensioned.
- Common practice, however, is that wooden platforms are easy to assembly and cost-effective as compared to plastic. Traditionally, however, as above, their assembly time is complex, requiring threaded screws and bolts. There is a need then for a crane mat system and assembly method which provides the benefits and strength of being securely bolt-driven, but through wooden planks and in a more efficient manner than screw-through systems, using smooth bolts with optimized, pre-drilled holes, as follows.
- The invention generally comprehends an assembly method and resulting ground-disposed mat product including the steps of power-driving a smooth fastener through wood either with a hydraulic force or pneumatic (air), mechanical, or by any other power assisted means, after having first pre-drilled therein a hole. The outer surface of the fastener is preferably, entirely smooth, even through its head.
- More particularly, comprehended is a method for assembling a ground-disposed foundation mat for equipment, comprising the steps of: pre-drilling multiple, wooden blocks with a plurality of thru-holes, each thru-hole defined by a thru-hole inner surface and a hole diameter, each wooden block having an outer surface; stacking the wooden blocks in side-by-side relation with the thru-holes generally aligned; using a mechanical press, power-driving a rod into the thru-holes through the wooden blocks, the rod having a smooth outer surface, the rod having an outer diameter equal to or slightly greater than the hole diameter of each of the thru holes, wherein each rod is held in place by significant friction between the thru-hole inner surface and the smooth outer surface of the rod. In one embodiment, the head top surface of the rod is left flush with the outer surface of the block. Alternatively, the head top surface of the rod is slightly counter-sunk in relation to the outer surface of the block. For the step of power-driving the rod, the significant friction equates to pressure in the range of 2-4 tons.
- For the mat itself, a ground-disposed foundation mat, comprises: a pre-drilled, wooden block with a thru-hole, the thru-hole defined by a thru-hole inner surface and a hole diameter, the wooden block having an outer surface; a rod power-driven through the thru-hole, the rod having a head top surface and a smooth outer surface, the rod having a lead end, the rod having an outer diameter equal to or slightly greater than the hole diameter of each of the thru holes, wherein each rod is held in place by significant friction between the thru-hole inner surface and the smooth outer surface of the rod. As such, the rod is adapted to remain held in place within the block even when subjected to a pull force of at least 3 tons.
-
FIG. 1 shows a side view in elevation of the bolt and block system in relation to a single block example. -
FIG. 2 shows a perspective view of blocks in stacked relation with the bolt top flush with the surface of the block. - Referencing then
FIGS. 1 and 2 , shown is the instant system and method. A ground-disposedfoundation mat 1 is assembled for equipment, wherein generally a thru-hole 2 is pre-drilled into ablock 2 extending the width of theblock 2. Depicted herein asblocks 2, theblocks 2 are planks that can be stacked (FIG. 2 ) in “stacked relation” and/or be individually sized to make up various support structures for any type of heavy equipment such as cranes, although use other than crane mats or equipment foundations is possible. The use of theterm block 2 is therefore meant to represent one section of a ground-disposed mat, such as a crane mat, thus the drawings show truncated versions of planks. In the preferred embodiment, the plank orblock 2, at least as tested, has a depth of eight inches for example. “Stacked relation” as used herein and as claimed means preferably side-by-side disposition as would comprise a ground-disposedmat 1, although various formations and shapes can be deployed such as theblocks 2 being vertically stacked. Therefore, “a” as used in the claims means one or more. - Herein, the preferred material of the
block 2 is wood although that would not apply in the instant the system is used for penetration into a mine rib and not used as afoundation mat 1. Because theblock 2 is pre-drilled, theblock 2 in this embodiment (as compared to that of U.S. Pat. No. 9,435,097) is considered “un-solid”. Thus, multiple,wooden blocks 2 are pre-drilled with a plurality of thru-holes 3, with the thru-holes 3 generally aligned (not exact, but close enough to maintain the functionality of being connected). - The thru-
holes 3 within theblocks 2 are defined by a thru-hole inner surface 5 and ahole diameter 11. In this embodiment, through experimentation it was shown functionality was maintained and was ideal where thehole diameter 11 was 7/8″ but this is an example only and not meant to be limiting. - Next, a
rod 8 is power-driven into the thru-hole 3 of theblock 2 to join theblocks 2.Rod 8 can be solid or hollow. “Power-driven” means thefasteners 2 are forcefully inserted through theblocks 1 using a mechanical press such as a pneumatic or hydraulic press. In the preferred embodiment, a hydraulic press is utilized to drive thefastener 2. For example, a mounted, 20-ton hydraulic cylinder was used and successful at less than maximum capacity and hand-controlled. A power-assisted pump can also be employed to actuate the hydraulic cylinder. In testing, pressure in the range of 2-4 tons was applied to arod 8 of the type of #8 SAS continuous thread bar. - The
rod 8 has a head portion (not shown) withhead top surface 6, a rod body 8 a and alead end 10 as shown. Thelead end 10 can be tapered as shown.Rod 8 has a smoothouter surface 7. “Smooth” here means unthreaded as would be a screw or bolt. Smooth could be roughened slightly by an additive or may include surface imperfections, but critically, would not include helical components. “Smooth” may also mean a corrugated rod such used in the testing example below. Again, critical is that there is no helical, screw-like surface and function. In addition,rod 8 is defined by its rod diameter 9 (through the rod body 8 a ). Therod diameter 9 is equal to or slightly greater than thehole diameter 11 of thru-hole 3. In the tested, preferred embodiment,rod diameter 9 is 1″ when the thru-hole hole diameter 11 is ⅞″, thus “slightly” in relation to therod diameter 9 difference versus the hole diameter is preferably no greater than ⅛″. Accordingly, whenrod 8 is power-driven, therod 8 is held in place within thru-hole 3 and thus block 2 with significant friction. “Significant” in this context means with pressures indicated in the below tables, e.g. friction at a level where therod 8 remains in place with theblock 2 even when subject to a pull force of at least 3 tons, as determined from experimentation. Accordingly, the wood does not split while concurrently achieving good anchorage and holding strength. It should be further understood that in the preferred embodiment “block” means a mass of wood. However, the “mass” as used herein could be another material such as rock, coal or other mineral substance, for instance which would act as an anchorage point within a mine roof or rib. - Again, a head portion is not separately formed on the bolt, or
rod 8, because in the preferred embodiment, head portion is co-planar with rod body 8 a so as to be one, integral piece with no larger-diameter, actual head. Head portion may contain some form of head having a diameter greater than rod body 8 a if used in combination with a bearing plate. - In use then and to assemble the ground-disposed foundation mat 1: multiple,
wooden blocks 2 are pre-drilled with a plurality of thru-holes 3, each thru-hole 3 defined by a thru-hole 3 inner surface 5 and ahole diameter 11, each wooden block having anblock surface 4; the wooden blocks are stacked in side-by-side relation with the thru-holes 3 generally aligned; using a mechanical press, therods 8 are power-driven into the thru-holes 3 of theblocks 2, wherein eachrod 8 is held in place by significant friction between the thru-hole 3 inner surface 5 and the smoothouter surface 7 of therod 8. Upon insertion, the headtop surface 6 of head portion ofrod 8 can be flush withblock surface 4. Alternatively, headtop surface 6 can be counter-sunk in relation to theblock surface 4. Table 1 below shows the improvements and savings that are incurred. -
TABLE 1 1. Eliminates need to: a. Form a head on the bolt on one end b. Thread the opposite end c. Use a nut and washer on any threaded end d. Counter-drill the end with the nut and washer e. Tighten bolt f. System stays tight as it grips the wood the full length of the hole. Bolts do not come loose as threaded bolts do from use. g. Large, obstructive head of bolt is eliminated so it does not appear sticking out on the side of the crane mat. h. Labor cost should be lower. 2. This system could be used as an anchor bolt in a mine to secure the roof and or sidewalls. The bolts would be shoved through the slightly smaller diameter hole (relative to bolt). This would eliminate the need for: a. Resin cartridges for anchorage b. Mechanical anchors c. Threading of anchor bolt - Location: Nowak Machine, Finleyville, Pa.;
-
Rod diameter 1″-#8 SAS continuous thread bar; - Wood—maple (hardwood), 8″×8″×8″ hole diameter ⅞
-
Depth of push Pressure to puncture 4″ 2½ tons 5″ 3 tons 6″ 2 tons 7″ 2½ tons 8″ 2½ tons Pull test right after push Depth of rod Pull 8″ 4½ tons 7¼″ 7 tons 6½″ 7 tons - Set another 8″×8″×8″ block with predrilled hole below first block and started to push rod through it.
- Took 4 tons to push all the way through the second block.
-
Pull test of rods through 2 blocks Movement Pull ½″ 8½ tons 1¼″ 6 tons 2⅜″ 4 tons *3¾″ 3½ tons 4″ 3 tons *Popping sound of rod loosening then catching again - Trying to shove thru 3-8 thick blocks of wood with a 1 continuous thread bar:
- 1. Had to cut off about 1¼″ to fit in the hydraulic press, piece is now exactly 36″;
- 2. Pushing through—1st piece the split in wood did not get larger;
- 3. Pushing through—2nd piece started to studder because of threads on bar, half way through
- 4. Pushing through—3rd piece started to studder when starting.
- 5. Half-way through broke machine
- 6. Fixed machine, pushed all way through easier this time
-
-
- a. Start—10 tons no movement; going up to 13 tons, ¼″; 15 no movement; 17 ton started to move in from opposite side.
Claims (17)
1. A method for assembling a ground-disposed foundation mat for equipment, comprising the steps of:
pre-drilling multiple, wooden blocks with a plurality of thru-holes, each said thru-hole defined by a thru-hole inner surface and a hole diameter, each said wooden block having an outer surface;
stacking said wooden blocks in side-by-side relation with said thru-holes generally aligned;
using a mechanical press, power-driving a rod into said thru-holes through said wooden blocks, said rod having a smooth outer surface, said rod having an outer diameter slightly equal to or slightly greater than said hole diameter of each of said thru holes, wherein each said rod is held in place solely by friction between said thru-hole inner surface and said smooth outer surface of said rod.
2. The method of claim 1 , further comprising the step of leaving a head top surface of said rod flush with said outer surface of said block.
3. The method of claim 1 , further comprising the step of leaving a head top surface of said rod slightly counter-sunk in relation to said outer surface of said block.
4. The method of claim 1 , wherein for the step of power-driving said rod, pressure in the range of 2-4 tons is applied to said rod.
5. A ground-disposed foundation mat, comprising:
a pre-drilled, wooden block with a thru-hole, said thru-hole defined by a thru-hole inner surface and a hole diameter, said wooden block having an outer surface;
a rod power-driven driving through said thru-hole, said rod having a head top surface and a smooth outer surface, said rod having a lead end, said rod having an outer diameter equal to or slightly greater than said hole diameter of each of said thru holes, wherein each said rod is held in place solely by friction between said thru-hole inner surface and said smooth outer surface of said rod.
6. The ground-disposed foundation mat of claim 5 , further comprising said head top surface of said rod being flush with said outer surface of said block.
7. The ground-disposed foundation mat of claim 5 , further comprising said head top surface of said rod slightly counter-sunk in relation to said outer surface of said block.
8. The ground-disposed foundation mat of claim 5 , wherein said lead end is tapered.
9. The ground-disposed foundation mat of claim 5 , wherein said head top surface is co-planar with said smooth outer surface.
10. The ground-disposed foundation mat of claim 5 , wherein said wooden block has a depth of eight inches.
11. The ground-disposed foundation mat of claim 10 , wherein said rod is adapted to remain held in place within said block even when subjected to a pull force of at least 3 tons.
12. The ground-disposed foundation mat of claim 5 , wherein said rod is hollow.
13. The ground-disposed foundation mat of claim 5 , wherein said outer diameter is no more than ⅛ inches greater than said thru-hole inner surface.
14. A method for anchoring through a mass, comprising the steps of:
pre-drilling a plurality of thru-holes through said mass, each said thru-hole defined by a thru-hole inner surface and a hole diameter, each said mass having an outer surface;
using a mechanical press, power-driving a rod into said thru-holes through said mass, said rod having a smooth outer surface, said rod having an outer diameter slightly equal to or slightly greater than said hole diameter of each of said thru holes, wherein each said rod is held in place solely by friction between said thru-hole inner surface and said smooth outer surface of said rod.
15. The method of claim 14 , further comprising the step of leaving a head top surface of said rod flush with said outer surface of said block.
16. The method of claim 14 , further comprising the step of leaving a head top surface of said rod slightly counter-sunk in relation to said outer surface of said block.
17. The method of claim 14 , wherein for the step of power-driving said rod, pressure in the range of 2-4 tons is applied to said rod.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/054,893 US20230160148A1 (en) | 2021-11-12 | 2022-11-12 | Equipment foundation and mine rock bolt system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US202163263949P | 2021-11-12 | 2021-11-12 | |
| US18/054,893 US20230160148A1 (en) | 2021-11-12 | 2022-11-12 | Equipment foundation and mine rock bolt system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20230160148A1 true US20230160148A1 (en) | 2023-05-25 |
Family
ID=86384433
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US18/054,893 Abandoned US20230160148A1 (en) | 2021-11-12 | 2022-11-12 | Equipment foundation and mine rock bolt system |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20230160148A1 (en) |
Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US64959A (en) * | 1867-05-21 | Yhe graphic co | ||
| US1275165A (en) * | 1914-01-17 | 1918-08-06 | Hassam Paving Company | Pavement. |
| US4235464A (en) * | 1979-06-20 | 1980-11-25 | Cantley Richard E | Door lock construction |
| US4932178A (en) * | 1989-05-05 | 1990-06-12 | Mozingo Ralph R | Compound timber-metal stressed decks |
| US5097558A (en) * | 1990-06-14 | 1992-03-24 | The University Of Connecticut | Prestress retention system for stress laminated timber bridge |
| US5580514A (en) * | 1994-06-24 | 1996-12-03 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Composite material and method for production of improved composite material |
| US5589015A (en) * | 1994-06-07 | 1996-12-31 | Foster-Miller, Inc. | Method and system for inserting reinforcing elements in a composite structure |
| US20070056228A1 (en) * | 2002-07-10 | 2007-03-15 | Penland Joe E Sr | Interlocking laminated support mat |
| US7217453B2 (en) * | 2001-04-06 | 2007-05-15 | Ebert Compoistes Corporation | Composite laminate structure |
| CA2637470A1 (en) * | 2008-07-10 | 2010-01-10 | Tomas Kunkel | Interlocking crane mat apparatus and system |
| US7818929B2 (en) * | 2004-12-14 | 2010-10-26 | Anthony Hardwood Composites, Inc. | Laminated support mat |
| US20110084184A1 (en) * | 2009-10-09 | 2011-04-14 | David Lee Wells | Adjustable height system for wooden legged furniture |
| US8066447B2 (en) * | 2006-08-03 | 2011-11-29 | Randel Brandstrom | Wood mat and apparatus and method for assembling same |
| US20140183319A1 (en) * | 2013-01-02 | 2014-07-03 | The Modern Group, Ltd. | Synthetic Laminated Mat |
| US9435097B2 (en) * | 2014-12-22 | 2016-09-06 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| US20160355993A1 (en) * | 2015-06-03 | 2016-12-08 | The Modern Group, Ltd. | Crane mat |
| US20170175341A1 (en) * | 2014-12-22 | 2017-06-22 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| US20180313107A1 (en) * | 2015-04-23 | 2018-11-01 | Newpark Mats & Integrated Services Llc | Methods of supporting upright items from a support surface |
| US10392234B2 (en) * | 2013-05-16 | 2019-08-27 | Axion Structural Innovations, Llc | Nut and a method of use of the nut in a fastener system for crane mats |
| US20200157747A1 (en) * | 2018-11-21 | 2020-05-21 | Quality Mat Company | Interlocking of mats having staggered elongated components |
| US11280079B2 (en) * | 2017-11-03 | 2022-03-22 | Axion Structural Innovations | Structural reinforced composite construction mat |
-
2022
- 2022-11-12 US US18/054,893 patent/US20230160148A1/en not_active Abandoned
Patent Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US64959A (en) * | 1867-05-21 | Yhe graphic co | ||
| US1275165A (en) * | 1914-01-17 | 1918-08-06 | Hassam Paving Company | Pavement. |
| US4235464A (en) * | 1979-06-20 | 1980-11-25 | Cantley Richard E | Door lock construction |
| US4932178A (en) * | 1989-05-05 | 1990-06-12 | Mozingo Ralph R | Compound timber-metal stressed decks |
| US5097558A (en) * | 1990-06-14 | 1992-03-24 | The University Of Connecticut | Prestress retention system for stress laminated timber bridge |
| US5589015A (en) * | 1994-06-07 | 1996-12-31 | Foster-Miller, Inc. | Method and system for inserting reinforcing elements in a composite structure |
| US5580514A (en) * | 1994-06-24 | 1996-12-03 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Composite material and method for production of improved composite material |
| US7217453B2 (en) * | 2001-04-06 | 2007-05-15 | Ebert Compoistes Corporation | Composite laminate structure |
| US20070056228A1 (en) * | 2002-07-10 | 2007-03-15 | Penland Joe E Sr | Interlocking laminated support mat |
| US7818929B2 (en) * | 2004-12-14 | 2010-10-26 | Anthony Hardwood Composites, Inc. | Laminated support mat |
| US8066447B2 (en) * | 2006-08-03 | 2011-11-29 | Randel Brandstrom | Wood mat and apparatus and method for assembling same |
| CA2637470A1 (en) * | 2008-07-10 | 2010-01-10 | Tomas Kunkel | Interlocking crane mat apparatus and system |
| US20110084184A1 (en) * | 2009-10-09 | 2011-04-14 | David Lee Wells | Adjustable height system for wooden legged furniture |
| US20140183319A1 (en) * | 2013-01-02 | 2014-07-03 | The Modern Group, Ltd. | Synthetic Laminated Mat |
| US10392234B2 (en) * | 2013-05-16 | 2019-08-27 | Axion Structural Innovations, Llc | Nut and a method of use of the nut in a fastener system for crane mats |
| US9435097B2 (en) * | 2014-12-22 | 2016-09-06 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| US20170175341A1 (en) * | 2014-12-22 | 2017-06-22 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| US20180313107A1 (en) * | 2015-04-23 | 2018-11-01 | Newpark Mats & Integrated Services Llc | Methods of supporting upright items from a support surface |
| US20160355993A1 (en) * | 2015-06-03 | 2016-12-08 | The Modern Group, Ltd. | Crane mat |
| US11280079B2 (en) * | 2017-11-03 | 2022-03-22 | Axion Structural Innovations | Structural reinforced composite construction mat |
| US20200157747A1 (en) * | 2018-11-21 | 2020-05-21 | Quality Mat Company | Interlocking of mats having staggered elongated components |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6367205B2 (en) | Anchor for a structural tie-down apparatus | |
| CA2301755C (en) | Reinforcement device for supporting structures | |
| US7832173B2 (en) | Screw fastener in multiple floor truss and wood-to-wood shear connection | |
| US4133155A (en) | Joist structure | |
| US20140215956A1 (en) | Brick veneer header bracket | |
| US7707785B2 (en) | Variable girder tie | |
| US20120315081A1 (en) | Connector devices and assemblies for construction and support of buildings and structures, and methods of making and using them | |
| KR102051005B1 (en) | Plastic anchor | |
| KR102051008B1 (en) | Heat insulator integrated deck plate using the plastic anchor | |
| US20230160148A1 (en) | Equipment foundation and mine rock bolt system | |
| US6343453B1 (en) | Composite wooden beam and method for producing said beam | |
| US5927035A (en) | Panel fastening system | |
| HUP0004229A2 (en) | On a connecting element, two or more longitudinally overlapping wooden beams connected to each other, as well as a fastening element for connecting the overlapping end regions of wooden beams at a connecting element | |
| US3442482A (en) | Form clamp | |
| US9435097B2 (en) | Method for joining plastic parts and foundation mat product therefor | |
| US9989080B1 (en) | Substrate anchoring device | |
| US20170175341A1 (en) | Method for joining plastic parts and foundation mat product therefor | |
| US5114278A (en) | Mining bolt apparatus and method | |
| PL187082B1 (en) | Panel-type load-carrying member made of wood for use in floor structure and building bridges as well as a bolt used to integrate wooden boards into a panel-like structure | |
| US20070025827A1 (en) | Hollow self-drilling fastener | |
| WO2018039724A1 (en) | A connection system | |
| JPH06294210A (en) | Connecting device of beams for concrete formwork | |
| RU233149U1 (en) | SCREW PILE COMPOSITE | |
| US20020152706A1 (en) | Structural timber floor assembly | |
| RU2737757C1 (en) | Clamping anchor support of mine workings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: F.M. LOCOTOS CO., INC., PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LOCOTOS, FRANK M.;REEL/FRAME:062578/0901 Effective date: 20230201 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |