US20220243458A1 - Reinforced building wall - Google Patents
Reinforced building wall Download PDFInfo
- Publication number
- US20220243458A1 US20220243458A1 US17/672,976 US202217672976A US2022243458A1 US 20220243458 A1 US20220243458 A1 US 20220243458A1 US 202217672976 A US202217672976 A US 202217672976A US 2022243458 A1 US2022243458 A1 US 2022243458A1
- Authority
- US
- United States
- Prior art keywords
- tie rod
- wall
- reinforced building
- building wall
- end portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B2001/268—Connection to foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B2001/268—Connection to foundations
- E04B2001/2684—Connection to foundations with metal connectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B2001/268—Connection to foundations
- E04B2001/2684—Connection to foundations with metal connectors
- E04B2001/2688—Connection to foundations with metal connectors self adjusting, e.g. for compensation of shrinkage
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B2001/2692—End to end connections of elongated members along their common longitudinal axis
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3583—Extraordinary methods of construction, e.g. lift-slab, jack-block using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure
Definitions
- the present invention is generally directed to reinforced frame construction walls employing ties rods for connecting the walls to the foundation.
- the present invention provides a reinforced building wall comprising a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second threaded end portions, the first end portion is operably connected to the anchor rod; a second tie rod including third and fourth threaded end portions, the third end portion is operably connected to the second end portion of the first tie rod; the second tie rod including an outer end portion operably attached to the second stud wall; an intermediate portion of the first tie rod is unthreaded and comprises at least about 75% of the length of the first tie rod; and an intermediate portion of the second tie rod is unthreaded and comprises at least about 75% of the length of the second tie rod.
- FIG. 1 is a perspective fragmentary view of a building stud wall, showing a tie rod connected to the wall and the foundation.
- FIG. 2 is an enlarged perspective view of the anchor rod and anchor assembly shown in FIG. 1 .
- FIG. 3 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown in FIG. 1 , showing a connection of the tie rod to the bottom plate of the upper wall.
- FIG. 4 is an enlarged perspective view of a section of the wall shown in FIG. 1 , showing the connection of the tie rod at the top plate of the upper wall.
- FIG. 5 is an enlarged perspective view of the anchor rod and anchor assembly shown in FIG. 1 , showing another embodiment of the anchor rod.
- FIG. 6 is a perspective fragmentary view of a building stud wall similar to FIG. 1 , showing another embodiment of the tie rod.
- FIG. 7 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown in FIG. 6 , showing details of the tie rod within the floor joist section of the wall and connection to the bottom plate of the upper wall.
- FIG. 8 is an enlarged perspective view of a section of the wall shown in FIG. 6 , showing the connection of the tie rod at the top plate of the upper wall.
- FIG. 9 is a perspective fragmentary view of a building stud wall similar to FIG. 6 , showing reinforcement blockings within the wall.
- FIG. 10 is an enlarged perspective view of a section of the building wall shown in FIG. 9 .
- FIG. 11 is a perspective fragmentary view of the upper wall shown in FIG. 6 , showing blockings near the top plate.
- FIG. 12 is an enlarged perspective view of a section of the wall shown in FIG. 11 .
- FIG. 13 is a perspective fragmentary view of a building stud wall similar to FIG. 1 , showing another embodiment of the tie rod.
- FIG. 14 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown in FIG. 13 , showing details of the tie rod within the floor joist section of the wall.
- FIG. 15 is a perspective fragmentary view of a building stud wall similar to FIG. 1 , showing another embodiment of the tie rod.
- FIG. 16 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown in FIG. 15 , showing details of the tie rod within the floor joist section of the wall.
- FIG. 17 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown in FIG. 6 , showing details of the tie rod within the floor joist section of the wall and connection to the bottom plate of the upper wall including an expanding connector for taking up slack in the tie rod.
- FIG. 18 is an enlarged perspective view of a section of the wall shown in FIG. 6 , showing the connection of the tie rod at the top plate of the upper wall including an expanding connector for taking up slack in the tie rod.
- FIG. 19 is a perspective fragmentary view of a building stud wall, showing another embodiment of connecting the wall to the foundation with a tie rod and using an expanding connector for taking up slack in the tie rod.
- FIG. 20 is an enlarged perspective view of a section of the wall shown in FIG. 19 , showing the connection of the tie rod to a cross-member at the upper wall and including an expanding connector for taking up slack in the tie rod.
- FIG. 21 is a perspective fragmentary view of a building stud wall similar to FIG. 19 , showing another embodiment of the tie rod.
- FIG. 22 is a perspective fragmentary view of a building stud wall showing an electrical box and electrical wiring strung from stud to stud.
- FIG. 23 is a perspective fragmentary view of a building stud wall showing a batt of insulation installed in the wall behind a tie rod.
- FIG. 24 is front elevational view of a number of tie rods used in the present invention, shown in various relative lengths.
- FIG. 25 is a perspective fragmentary view of a building stud wall similar to FIG. 1 , showing another embodiment of the tie rod.
- FIG. 26 is an enlarged perspective view of a portion of the wall shown in FIG. 25 , showing the tie rod in cross-section.
- FIG. 27 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown in FIG. 25 , showing another embodiment of the tie rod in cross-section.
- FIG. 28 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown in FIG. 25 , showing yet another embodiment of the tie rod in cross-section.
- FIG. 29 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown in FIG. 25 , showing still another embodiment of the tie rod in cross-section.
- FIG. 30 is a perspective fragmentary view of a building stud wall similar to FIG. 25 , showing another embodiment of the tie rod in cross-section.
- FIGS. 31 and 32 show a perspective fragmentary view of a one-story building stud wall, showing a tie rod connected to the wall and the foundation.
- FIG. 33 is an enlarged cross-sectional view of a threaded end portion of a tie rod used in the present invention.
- FIG. 34 shows a perspective fragmentary view of a one-story building stud wall similar to FIG. 31 , showing another embodiment of the tie rod.
- FIGS. 35 and 36 are enlarged perspective views of a section of the wall shown in FIG. 34 , showing the tie rod in cross-section to reveal multiple diameter threaded bores.
- FIG. 37 is an enlarged perspective view of a section of the wall shown in FIG. 34 , showing a tubular embodiment of the tie rod in cross-section.
- FIGS. 38 and 39 are enlarged perspective views of a section of the wall shown in FIG. 34 , showing the tubular tie rod with multiple diameter threaded bores in cross-section.
- a reinforced frame construction building wall 2 is disclosed.
- the building wall 2 is disposed above a foundation 4 , and includes a lower stud wall 6 and an upper stud wall 8 disposed above the lower stud wall 6 .
- the framing members of the stud walls disclosed herein may be made of wood or metal or other suitable materials.
- the lower stud wall 6 has a bottom plate 10 supported by the foundation 4 , a plurality of studs 12 and a double top plate 14 .
- a plurality of floor joists 16 are supported by the top plate 14 .
- a sub-floor 18 is supported by the floor joists 16 .
- the upper stud wall 8 includes a bottom plate 20 , a plurality of studs 22 and a double top plate 24 .
- the foundation 4 may be made of poured concrete or other suitable materials.
- the foundation refers generally to any structure that is used to anchor or tie a wall or building to the ground. Examples are post tension deck (PTD), slab on grade (SOG), slab drilled and epoxy studs inserted (Epoxy), coupler welded to beam (Steelbeam), drilled and secured from the bottom of the woodbeam (Woodbeam) foundation walls, and any substantial structure solidly anchored in the ground.
- a foundation can be any structure that is capable of transferring the load of the wall or building to the ground.
- An anchor rod 26 is attached to an anchor assembly 28 , which is operably attached to the foundation 4 , such as being embedded within the foundation 4 made of poured concrete.
- the anchor rod 26 extends outside the foundation 4 and through the base plate 10 .
- a coupling 30 connects the anchor rod 26 to a lower tie rod 32 , which extends through the top plate 14 and the bottom plate 20 .
- Another coupling 34 connects the tie rod 32 to an upper tie rod 36 , which extends through the top plate 24 .
- the coupling 34 is disposed in the stud wall 8 above the bottom plate 20 .
- the anchor assembly 28 includes an anchor rod support 38 and an anchor body 40 threaded to the anchor rod 26 .
- the anchor rod 26 extends through an opening 27 in the bottom plate 10 .
- the anchor assembly 28 is similar to that disclosed in co-pending application Ser. Nos. 12/656,623 and 12/656,624, incorporated herein by reference. Other anchor assemblies of standard design may be used.
- the anchor rod 26 is disclosed as being all-thread, but it should understood that a smooth rod with only its end portions being threaded for screwing to the anchor body 40 and the coupling 30 may also be used.
- the tie rod 32 is operably attached to the wall 2 with a bearing plate 42 (shown in cross-section) and a nut 44 threaded to the end portion 48 .
- the nut 44 is tightened against the bearing plate 42 to advantageously place the anchor rod 32 under tension.
- the upper end portion 48 extends through the double top plate 14 into the floor joist space and the through the bottom plate 20 through openings 31 and 33 , respectively.
- the lower end portion 46 and the upper end portion 48 of the tie rod 32 are threaded while the rest or intermediate portion 50 of the tie rod is smooth and unthreaded.
- the combined length of the threaded end portions 56 and 48 is about 25% or less of the length of the tie rod 32 .
- the upper tie rod 36 also has a lower threaded end portion 52 , an upper threaded portion 54 and a smooth unthreaded intermediate portion 56 .
- the combined length of the threaded end portions 52 and 54 is about 25% or less of the length of the tie rod 36 .
- the smooth portions 50 and 56 are preferably at least about 75% of the length of the respective tie rod.
- the 75% ratio means that at least a majority portion of the tie rod within the stud wall space where insulation, wiring, plumbing, etc. would be installed is smooth and unthreaded, thereby making for relatively easy installation of insulation, wiring, plumbing, etc. as compared to an all-thread tie rod.
- An all-thread tie rod provides sharp edges of the threads to building components that would hamper the installation of these components in the wall space and cause the tie rod to bow. If the threads of an all-thread tie rod were caught in the other building components during installation and became bowed, the tie rod would not return to its original straight position.
- the upper tie rod 36 is attached to the building wall 2 to with a bearing plate 58 (shown in cross-section) and a nut 60 threaded to the upper end portion 54 .
- the nut 60 is tightened against the bearing plate 58 to advantageously place the tie rod 36 under tension.
- the threaded upper end portion 54 extends through the double plate 24 through an opening 62 .
- Anchoring the upper wall 8 to the top plate 24 advantageously ties the top plate 24 directly to the foundation 4 , affording the top plate and any structure attached to it, such as roof trusses, relatively more strength against uplifting forces caused by storms, winds, tornadoes, etc.
- an anchor rod 64 has a lower threaded portion 66 , a threaded upper portion 68 and a smooth and unthreaded intermediate portion 68 .
- the intermediate smooth portion 68 comprises about 75% or more of the length of the rod.
- An opening 70 is provided in the bottom plate 10 for the rod 64 to extend through.
- a lower tie rod 72 is disclosed as being longer than the lower tie rod 32 shown in FIG. 1 .
- the tie rod 72 has a longer smooth unthreaded intermediate portion 74 that extends through the floor joists space between the double top plate 14 and the bottom plate 20 .
- the smooth and unthreaded portion 74 makes up at least about 75% of the length of the tie rod.
- the combined length of the threaded end portions of the tie rod 72 is about 25% or less of the length of the tie rod.
- the smooth unthreaded intermediate portion 74 extends through the opening 31 and the opening 33 .
- a portion 35 of the smooth unthreaded intermediate portion 74 abutting the threaded end portion 48 extends substantially through the entire depth of the opening 33 .
- the portion 35 may extend above the top surface 37 of the bottom plate 20 into part of the thickness of the bearing plate 42 .
- the smooth unthreaded portion 74 that goes through the openings 31 and 33 advantageously facilitates the threading of the tie rod 72 through the openings 31 and 33 due to reduced friction as compared to an all-threaded tie rod.
- the smooth unthreaded portion 74 facilitates relative movement of the tie rod with respect to the double top plate 14 and the bottom plate 20 due to lesser friction with the wood when the walls 2 shifts due to settling, uplift, etc. and facilitates taking up any slack from the tie rod 72 when an expanding connector, such as a spring disposed between the nut 44 and the bearing plate 42 , is used, as will be explained below.
- the openings 33 and 31 are larger than the diameter of the intermediate unthreaded portion 74 , since the threaded end portions of the tie rod are larger in diameter than the intermediate unthreaded portion (see FIG. 33 ).
- the smooth unthreaded intermediate portion 56 of the upper tie rod 36 may extend through the opening 62 in the double top plate 24 .
- a portion 63 of the smooth unthreaded intermediate portion 56 abutting the threaded end portion 54 extends substantially through the entire depth of the opening 62 .
- the portion 63 may extend above the top surface 65 of the double top plate 24 into part of the thickness of the bearing plate 58 (shown in cross-section). Minimizing the amount of thread within the opening 62 means that the tie rod will have reduced friction against the wall of the opening 62 and can thereby move upwardly relatively easily when the upper wall 8 settles down.
- An expanding connector may be a spring urging the nut 60 upwardly and the bearing plate 58 downwardly.
- reinforcement blockings 76 and 78 are added to the respective stud walls 6 and 8 shown in FIG. 6 . Reinforcement blockings are used to provide rigidity and additional nailing surfaces.
- the blockings 76 and 78 include respective openings 80 and 82 through which the smooth unthreaded intermediate portions 74 and 56 of the tie rods 72 and 36 , respectively, pass through.
- the blocking 78 is shown in greater detail. The addition of the blockings 76 and 78 add more difficulty to installing the tie rods 72 and 36 , since the openings 80 and 82 are made in the field and may be off from the vertical and may not line up along a common axis with the openings 31 , 33 and 62 .
- the installation of the tie rods 72 and 36 is thereby facilitated due to reduced friction afforded by the smooth unthreaded intermediate portions of the tie rods as compared to all-thread tie rods.
- movement of the tie rods through the respective openings 31 , 33 and 62 when slack develops in the tie rods is relatively unhindered.
- the openings 80 and 82 have larger diameter than the intermediate portions 74 and 36 since the diameter of the threaded end portions of the tie rods are larger than the diameter of the intermediate unthreaded portion (see FIG. 33 ).
- the upper stud wall 8 is provided with heavier blocking 84 , measuring for example 4 in. by 4 in, to provide additional rigidity to the upper portion of the stud wall.
- the intermediate portion 56 of the tie rod 36 extends through an opening 86 in the blocking 84 .
- the smooth unthreaded intermediate portion 56 advantageously allows relatively easy installation of the tie rod 36 , allowing the tie rod 36 to pass through the opening 86 , even though the length of the opening 86 is longer that an opening through a standard stud, which is nominally 2 in. thick.
- the diameter of the opening 86 is larger than the diameter of the intermediate portion 56 , since the diameter of the threaded end portion of the tie rod is larger than the diameter of the intermediate portion (see FIG. 33 ).
- the opening 62 may be made larger than the outer diameter of the threaded end portion to allow relatively easy passing of the tie rod through the opening 62 .
- a shorter tie rod 88 is shown associated with the lower stud wall 6 .
- the tie rod 88 is disclosed as all-thread.
- Another tie rod 90 also all-thread, is associated with the stud wall 8 .
- a short tie rod 92 is used to connect the lower tie rod 88 with the upper tie rod 90 .
- the tie rod 92 has a lower threaded portion 94 and an upper threaded portion 96 .
- An intermediate smooth unthreaded portion 98 is disposed between the lower and upper threaded portions 94 and 96 .
- Couplings 100 and 102 attach the short tie rod 92 to the lower tie rod 88 and to the upper tie rod 90 .
- the use of the short tie rod 92 advantageously makes the installation of the lower tie rod 88 much simpler, since only the shorter tie rod 92 has to go through the double top plate opening 31 and the bottom plate opening 33 , whereas in the embodiment shown in FIG. 6 , the lower tie rod 72 has to go through the openings 31 and 33 .
- portions of the smooth unthreaded intermediate portion 98 of the short tie rod 92 are disposed within and past the openings 31 and 33 , thereby allowing relatively unhindered movement through the opening, as compared to an all-thread tie rod, when the wall shifts down due to settlement. This is advantageous when an expanding connector is used to tie the wall to the tie rods, as will be explained below.
- a shorter tie rod 103 is shown associated with the lower stud wall 6 .
- a short tie rod 92 is used to connect the lower tie rod 103 with the upper tie rod 36 .
- the tie rod 92 has a lower threaded portion 94 and an upper threaded portion 96 .
- a smooth unthreaded intermediate portion 98 is disposed between the lower and upper threaded portions 94 and 96 .
- Couplings 100 and 102 attach the short tie rod 92 to the lower tie rod 103 and to the upper tie rod 36 .
- the use of the short tie rod 92 advantageously makes the installation of the upper and lower tie rods much simpler, since only the short tie rod 92 has to go through the double top plate opening 31 and the bottom plate opening 33 .
- the tie rods 103 and 36 have smooth unthreaded intermediate portions to facilitate installation of other building components within the stud wall space where the tie rods are located, such as for example insulation batts, electrical wiring, water lines, waste lines, etc.
- the smooth unthreaded intermediate portions of the tie rods present reduced friction, as compared to all-thread tie rods, to the other building components as they are pulled and shoved past the tie rods.
- the smooth unthreaded intermediate portions of the tie rods also reduce bowing of the tie rods when the other building components are being installed inside the wall space occupied by the tie rods. Less bowing means that the tie rods remain vertical and aligned with the common axis of the openings 31 , 33 and 62 and can, therefore, move freely through the openings during wall settlement.
- portions of the smooth unthreaded intermediate portion 98 of the short tie rod 92 are disposed within and past the openings 31 and 33 , thereby allowing relatively unhindered movement through the openings, as compared to an all-thread tie rod, when the wall shifts down due to settlement. This is advantageous when an expanding connector is used to tie the wall to the tie rods, as will be explained below.
- an expanding connector 164 (shown in cross-section) is disposed between the bearing plate 42 (shown in cross-section) and the nut 44 .
- the expanding connector 164 is of standard manufacture, such as the one disclosed in U.S. Pat. Nos. 7,762,030 and 8,186,924, hereby incorporated by reference.
- the connector 164 has an inner cylindrical body 166 disposed within an outer cylindrical body 168 .
- a spring 170 urges the inner cylindrical body upwardly against the nut 44 and urges the outer cylinder body 168 downwardly against the bearing plate 42 .
- the spring 166 moves the inner cylindrical body 166 upwardly and locks with the outer cylindrical body 168 in the downward direction to take up the slack.
- the smooth unthreaded portion of the tie rod disposed within the openings 31 and 33 advantageously makes the movement relatively unhindered, as compared to an all-thread tie rod with threads disposed within the openings and rubbing against the wall of the opening. With an all-thread tie rod, the threads can jam against the wall of the opening when the walls settles down, causing the tie rod to bow rather than extending through the opening in the form of a slack.
- another expanding connector 164 (shown in cross-section), as described in FIG. 17 , is disposed between the nut 60 and the bearing plate 58 (shown in cross-section).
- the expanding connector 164 is used to take up slack that may develop in the tie rod 36 .
- the smooth unthreaded portion 56 of the tie rod 36 is disposed within the opening 62 to facilitate movement of the tie rod through the opening when the wall moves down due to settlement. It should be understood that the smooth unthreaded portion of the tie rod sliding through the opening 62 is relatively easier than if threaded portions are within the opening.
- the opening 62 may not necessarily be vertical but could be off from the vertical, since it is made onsite with hand tools.
- having the smooth unthreaded portion of the tie rod 36 disposed within the opening 62 helps in the downward movement of the wall during settlement, thereby allowing the expanding connector 164 to take up the resulting slack. If the tie rod gets stuck within the opening during the downward movement of the wall, as when using an all-thread tie rod, the tie rod would bow within the wall space, causing a slack not to appear at the expanding connector 164 .
- the tie rod 72 extends through the double top plate 14 and the bottom plate 20 .
- An expanding connector 164 (shown in cross-section) is disposed between the nut 44 and the bearing plate 42 (shown in cross-section), as in FIG. 17 .
- Reinforcement studs 172 are securely attached to the respective studs 174 .
- a cross member 176 is supported on the top edges of the respective reinforcement studs 172 .
- a tie rod 178 is connected to the lower tie rod 72 with a coupling 180 .
- the tie rod 178 extends through an opening 179 in the cross member 176 .
- An expanding connector 164 connects the tie rod 178 to the stud wall 8 .
- the connector 164 is disposed between a bearing plate 182 and a nut 184 as shown in FIG. 20 .
- a portion of the smooth unthreaded portion 181 of the tie rod 178 is disposed within the opening 179 to facilitate the downward movement of the cross-member 176 during settlement of the wall. This in turn advantageously allows the expanding connector 164 to take up the resulting slack in the tie rod 178 .
- the diameter of the opening 179 is larger than the diameter of the intermediate portion 181 , since the diameter of the threaded end portion of the tie rod is larger than the diameter of the intermediate portion (see FIG. 33 ).
- a tie rod 186 extends from the stud wall 6 into the stud wall 8 .
- the tie rod 186 has threaded end portions 188 and 190 and a smooth unthreaded intermediate portion 192 as also shown in FIG. 19 .
- Reinforcement studs 172 are attached to respective studs 174 and a cross-member 176 is supported on the top edges of the respective reinforcement studs 172 .
- An expanding connector 164 is disposed between a nut 184 and a bearing plate 182 (see FIG. 20 ).
- the expanding connectors 164 may be left out, leaving only the nuts 44 and 184 and the bearing plates 42 and 182 , if slack on the tie rods is not a concern. Such a structure will provide a reinforced wall, although without the slack compensating function of the expanding connectors.
- FIG. 22 the upper stud wall 8 as shown in FIG. 6 is depicted.
- An electrical junction box 194 is shown attached to a stud 196 .
- Electrical wire 198 is strung from stud to stud and terminated in the junction box 197 .
- the electrical wire When the electrical wire is pulled past the tie rod 36 during installation, the wire would easily slide past the smooth unthreaded portion 56 of the tie rod. Snagging of the wire on the tie rod is reduced or avoided, thereby avoiding any bowing of the tie rod. Pulling stress on the tie rod that can cause bowing is reduced or eliminated. If an all-thread tie rod is used, the electrical wire can easily get caught in the threads and cause bowing when the wire is pulled from stud to stud.
- insulation batt 200 is shown installed behind the tie rod 36 .
- the insulation batt 200 is compressed behind the tie rod 36 .
- the insulation batt 200 is typically inserted behind the tie rod at one side and pulled to the other side.
- the tie rods 32 and 36 each having at least a majority of their intermediate portions being smooth and unthreaded, installation of insulation batt is relatively made easier, since the insulation simply slides past the tie rod as the insulation batts are forced behind the tie rods at one side and pulled to at other side. If an all-thread tie rod were used, the insulation batt could get caught in the threads, thereby causing the insulation batts to bunch behind the tie rod and cause the tie rod to bow out, which is undesirable.
- tie rod bows during installation, it will spring back to its original straight position, since the smooth unthreaded intermediate portion of the tie rod will simply slide past the insulation batt. On the other hand, if an all-thread tie rod had been used, the threads will be jammed against the insulation back which would prevent the tie rod from straightening up.
- Each tie rod has threaded end portions 202 and 204 and smooth unthreaded intermediate portion 206 .
- the ratio of the smooth unthread intermediate portion 206 is preferably about 75% or more of the length of the tie rod.
- the combined length of the threaded end portions 202 and 204 is about 25% or less of the length of the tie rod.
- the short tie rods 208 may be used as anchor rods as shown in FIG. 5 , for example, or to extend across the height of the floor joists, as shown in FIG. 14 , for example.
- the intermediate length tie rod 201 may be used within a wall without extending into the upper wall, such as for example within the lower stud wall 6 or the upper stud wall 8 , as shown in FIG. 15 .
- the longer tie rod 212 may be used to extend from a lower wall to an upper wall as shown in FIG. 1 , for example.
- the building wall 2 is disclosed with a different embodiment of a tie rod 214 with lower threaded bore 216 and upper threaded bore 218 .
- the lower threaded bore 216 is screwed to the anchor rod 64 while the upper threaded bore 218 is screwed to the short tie rod 92 .
- the anchor rod 26 may also be used.
- the exterior surface of the tie rod 214 is smooth and unthreaded and is substantially co-extensive with the length of the tie rod.
- the tie rod 214 is in effect a long coupling.
- the threaded bores 216 and 218 are preferably limited to about 25% or less of the length of the tie rod 214 . Since the threaded bores are sized to receive a standard tie rod, the diameter or cross-sectional area of the tie rod 214 will be larger than the diameter of the standard all-thread tie rod. Accordingly, the tension stress along the tie rod 214 will be advantageously decreased and will experience less stretch at load. Further, the stiffness of the assembly of tie rods shown in FIG. 25 will be advantageously greater than the assembly using outside threaded rods exclusively, as shown in FIG. 1 , for example, since the tie rod 214 has a larger diameter than the other tie rod. Greater stiffness advantageously provides for less bowing.
- the tie rod 214 may be square in cross-section, as shown in FIG. 27 , hexagonal as shown in FIG. 28 or circular, as shown in FIG. 29 .
- the lower threaded bore 216 and the upper threaded bore 216 each includes a radial inspection hole 220 to allow physical checking that the threaded portion 94 is at or past the hole 220 , thus insuring that the threaded portion 94 is deep enough into the threaded bores 218 and 216 for proper load capacity.
- tie rod 214 with the appropriate length may extend through the top plate 14 and the bottom plate 20 , similar to the tie rod 36 shown in FIG. 1 , or the tie rod 192 shown in FIG. 21 and then operably attached to the stud wall 8 with a tie rod such as the tie rod 36 with the appropriate length and secured to the top plate 24 or the cross member 176 with a nut and bearing plate, as disclosed herein with the other tie rods.
- the tie rod 214 shown in FIG. 25 may be made in two or more sections 222 .
- Each section 222 has the lower and upper threaded bores 216 and 218 .
- a threaded rod 226 connects the two sections 222 together.
- the tie rods 222 advantageously make the whole assembly stiffer due to the larger cross-sectional area of the tie rods 22 .
- the threaded bores 216 and 218 are preferably limited to about 25% or less of the length of the tie rods 222 .
- a one-story stud wall 224 is shown. Similar to FIG. 1 , the wall 224 is supported by the foundation the foundation 4 .
- the wall 224 has studs 12 , bottom plate 10 and double top plate 14 .
- a blocking 226 is attached between studs to provide additional rigidity and nailing surface to the wall 224 .
- the anchor rod 26 is attached to the anchor assembly 28 , which is operably attached to the foundation 4 , such as being embedded within the foundation 4 made of poured concrete.
- the anchor rod 26 extends outside the foundation 4 and through the base plate 10 .
- the coupling 30 connects the anchor rod 26 to a tie rod 228 , which extends through the top plate 14 .
- the lower end portion 230 and the upper end portion 240 of the tie rod 228 are threaded while the rest or intermediate portion 242 of the tie rod is smooth and unthreaded.
- the intermediate portion 242 extends through an opening 244 in the blocking 226 .
- the opening 244 is larger than the diameter of the intermediate portion 242 to advantageously permit the tie rod 228 easily move through the opening during installation.
- a nut 246 screwed to the upper end portion 240 of the tie rod and tightened against a bearing plate 248 secures the tie rod 228 to the wall 224 , thereby holding the wall 224 to the foundation 4 .
- An expanding connector 164 may be installed between the nut 246 and the bearing plate 248 to take up any slack that may develop in the tie rod 228 due to wall shrinkage, settlement, etc.
- the opening 244 which is larger than the diameter of the intermediate portion 242 , provides space and less friction for the tie rod when it moves through the opening 244 during vertical movement of the wall 224 .
- the wall 224 is shown with reinforcement studs 250 and a cross member 252 .
- the reinforcement studs are securely attached to the respective studs 12 with nails, screws or other standard hardware.
- a shorter tie rod 254 having threaded end portions 256 and 258 and smooth unthreaded intermediate portion 260 is used.
- the lower end portion 256 is attached to the anchor rod 26 with the coupling 30 .
- the upper end portion 258 extends through an opening in the cross member 252 and attached thereto with the nut 246 and the bearing plate 248 .
- the cross member is supported on the top edges of the reinforcement studs 250 .
- An expanding connector 164 may be installed in FIG. 32 between the nut 246 and the bearing plate 248 to take up any slack that may develop in the tie rod 254 due to wall shrinkage, settlement, etc.
- each of the tie rods used in the present invention is made by rolling the threads 262 at each end of a smooth rod. This results in making the diameter 264 of the threaded end portions larger than the diameter 266 of the smooth unthreaded intermediate portion 268 .
- the threaded end portion is about 10% larger in diameter than the diameter of the intermediate portion 264 .
- the larger diameter threaded end portions means that openings drilled in the bottom plates and top plates of the stud walls when installing the tie rods will be sized to the larger diameter threaded end portions instead of the smaller diameter intermediate portion, thereby providing a larger opening through with which the intermediate portion will slide during vertical movement of the wall during settlement, shrinkage, etc.
- a larger opening advantageously provides less friction for the intermediate portion of the tie rods.
- a one-story stud wall 270 is shown. Similar to FIG. 1 , the wall 270 is supported by the foundation the foundation 4 .
- the wall 270 has studs 12 , bottom plate 10 and double top plate 14 .
- the anchor rod 26 is attached to the anchor assembly 28 , which is operably attached to the foundation 4 , such as being embedded within the foundation 4 made of poured concrete.
- the anchor rod 26 extends outside the foundation 4 and through the base plate 10 .
- the lower threaded bore 274 is screwed to the anchor rod 26 while the upper threaded bore 276 is screwed to a short threaded rod 278 .
- the exterior surface of the tie rod 272 is smooth and unthreaded and is substantially co-extensive with the length of the tie rod.
- An expanding connector 164 may be installed between the nut 280 and the bearing plate 282 to take up any slack that may develop in the tie rod 272 due to wall shrinkage, settlement, etc.
- the tie rod 272 may be square in cross-section as shown in FIG. 27 , hexagonal as in shown in FIG. 28 , or circular as shown in FIG. 29 .
- the threaded bores 274 and 276 may be of one diameter, as shown in FIG. 27 , for example, or multiple diameters, as shown in FIGS. 35 and 36 .
- the threaded bore 274 includes a larger diameter threaded bore 284 and a smaller diameter threaded bore 286 .
- a larger diameter anchor rod 26 is shown screwed to the larger diameter threaded bore 284 .
- Inspection openings 288 and 290 are associated with respective threaded bores 284 and 286 .
- the threaded bore 276 includes a larger diameter threaded bore 292 and a smaller diameter threaded bore 294 .
- a smaller diameter rod 278 is shown screwed to the smaller diameter threaded bore 294 .
- Inspection openings 296 and 298 are associated with the respective threaded bores 292 and 294 .
- the tie rod 272 may be tubular with single diameter threaded bores 274 and 276 , as shown in FIG. 37 (the tie rod 272 shown in cross-section) or multiple diameter threaded bores 284 and 286 as shown in FIG. 38 (the tie rod 272 shown in cross-section) and multiple diameter threaded bores 292 and 294 as shown in FIG. 39 (the tie rod 272 shown in cross-section). It should be understood that the tubular embodiment of the tie rod 272 may be square, hexagonal or circular in cross-section. The tubular embodiment of the tie rod 272 may also be used in a two-story wall, as shown in FIG. 25 .
- the various reinforced walls disclosed above are shown with tie rods installed within the first stud bay from the end of a shear wall using standard wood framing construction.
- the reinforced walls are not limited to these locations or type of construction.
- Metal studs or other materials may also be used.
- the reinforced walls may be used in any stud wall construction to resist uplift caused by high winds or earthquake conditions.
- the tie rods used in the reinforced walls may be installed in the first stud bay at the first bay after a window or door opening. Generally, the reinforced walls may be used as the application dictates.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
- The present invention is generally directed to reinforced frame construction walls employing ties rods for connecting the walls to the foundation.
- The present invention provides a reinforced building wall comprising a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second threaded end portions, the first end portion is operably connected to the anchor rod; a second tie rod including third and fourth threaded end portions, the third end portion is operably connected to the second end portion of the first tie rod; the second tie rod including an outer end portion operably attached to the second stud wall; an intermediate portion of the first tie rod is unthreaded and comprises at least about 75% of the length of the first tie rod; and an intermediate portion of the second tie rod is unthreaded and comprises at least about 75% of the length of the second tie rod.
-
FIG. 1 is a perspective fragmentary view of a building stud wall, showing a tie rod connected to the wall and the foundation. -
FIG. 2 is an enlarged perspective view of the anchor rod and anchor assembly shown inFIG. 1 . -
FIG. 3 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown inFIG. 1 , showing a connection of the tie rod to the bottom plate of the upper wall. -
FIG. 4 is an enlarged perspective view of a section of the wall shown inFIG. 1 , showing the connection of the tie rod at the top plate of the upper wall. -
FIG. 5 is an enlarged perspective view of the anchor rod and anchor assembly shown inFIG. 1 , showing another embodiment of the anchor rod. -
FIG. 6 is a perspective fragmentary view of a building stud wall similar toFIG. 1 , showing another embodiment of the tie rod. -
FIG. 7 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown inFIG. 6 , showing details of the tie rod within the floor joist section of the wall and connection to the bottom plate of the upper wall. -
FIG. 8 is an enlarged perspective view of a section of the wall shown inFIG. 6 , showing the connection of the tie rod at the top plate of the upper wall. -
FIG. 9 is a perspective fragmentary view of a building stud wall similar toFIG. 6 , showing reinforcement blockings within the wall. -
FIG. 10 is an enlarged perspective view of a section of the building wall shown inFIG. 9 . -
FIG. 11 is a perspective fragmentary view of the upper wall shown inFIG. 6 , showing blockings near the top plate. -
FIG. 12 is an enlarged perspective view of a section of the wall shown inFIG. 11 . -
FIG. 13 is a perspective fragmentary view of a building stud wall similar toFIG. 1 , showing another embodiment of the tie rod. -
FIG. 14 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown inFIG. 13 , showing details of the tie rod within the floor joist section of the wall. -
FIG. 15 is a perspective fragmentary view of a building stud wall similar toFIG. 1 , showing another embodiment of the tie rod. -
FIG. 16 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown inFIG. 15 , showing details of the tie rod within the floor joist section of the wall. -
FIG. 17 is an enlarged perspective view of a portion of the tie rod through the floor joist section of the wall shown inFIG. 6 , showing details of the tie rod within the floor joist section of the wall and connection to the bottom plate of the upper wall including an expanding connector for taking up slack in the tie rod. -
FIG. 18 is an enlarged perspective view of a section of the wall shown inFIG. 6 , showing the connection of the tie rod at the top plate of the upper wall including an expanding connector for taking up slack in the tie rod. -
FIG. 19 is a perspective fragmentary view of a building stud wall, showing another embodiment of connecting the wall to the foundation with a tie rod and using an expanding connector for taking up slack in the tie rod. -
FIG. 20 is an enlarged perspective view of a section of the wall shown inFIG. 19 , showing the connection of the tie rod to a cross-member at the upper wall and including an expanding connector for taking up slack in the tie rod. -
FIG. 21 is a perspective fragmentary view of a building stud wall similar toFIG. 19 , showing another embodiment of the tie rod. -
FIG. 22 is a perspective fragmentary view of a building stud wall showing an electrical box and electrical wiring strung from stud to stud. -
FIG. 23 is a perspective fragmentary view of a building stud wall showing a batt of insulation installed in the wall behind a tie rod. -
FIG. 24 is front elevational view of a number of tie rods used in the present invention, shown in various relative lengths. -
FIG. 25 is a perspective fragmentary view of a building stud wall similar toFIG. 1 , showing another embodiment of the tie rod. -
FIG. 26 is an enlarged perspective view of a portion of the wall shown inFIG. 25 , showing the tie rod in cross-section. -
FIG. 27 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown inFIG. 25 , showing another embodiment of the tie rod in cross-section. -
FIG. 28 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown inFIG. 25 , showing yet another embodiment of the tie rod in cross-section. -
FIG. 29 is an enlarged perspective and cross-sectional view of a portion of the tie rod shown inFIG. 25 , showing still another embodiment of the tie rod in cross-section. -
FIG. 30 is a perspective fragmentary view of a building stud wall similar toFIG. 25 , showing another embodiment of the tie rod in cross-section. -
FIGS. 31 and 32 show a perspective fragmentary view of a one-story building stud wall, showing a tie rod connected to the wall and the foundation. -
FIG. 33 is an enlarged cross-sectional view of a threaded end portion of a tie rod used in the present invention. -
FIG. 34 shows a perspective fragmentary view of a one-story building stud wall similar toFIG. 31 , showing another embodiment of the tie rod. -
FIGS. 35 and 36 are enlarged perspective views of a section of the wall shown inFIG. 34 , showing the tie rod in cross-section to reveal multiple diameter threaded bores. -
FIG. 37 is an enlarged perspective view of a section of the wall shown inFIG. 34 , showing a tubular embodiment of the tie rod in cross-section. -
FIGS. 38 and 39 are enlarged perspective views of a section of the wall shown inFIG. 34 , showing the tubular tie rod with multiple diameter threaded bores in cross-section. - Referring to
FIG. 1 , a reinforced frameconstruction building wall 2 is disclosed. Thebuilding wall 2 is disposed above afoundation 4, and includes alower stud wall 6 and anupper stud wall 8 disposed above thelower stud wall 6. The framing members of the stud walls disclosed herein may be made of wood or metal or other suitable materials. - The
lower stud wall 6 has abottom plate 10 supported by thefoundation 4, a plurality ofstuds 12 and adouble top plate 14. A plurality offloor joists 16 are supported by thetop plate 14. Asub-floor 18 is supported by thefloor joists 16. Theupper stud wall 8 includes abottom plate 20, a plurality ofstuds 22 and adouble top plate 24. - The
foundation 4 may be made of poured concrete or other suitable materials. The foundation refers generally to any structure that is used to anchor or tie a wall or building to the ground. Examples are post tension deck (PTD), slab on grade (SOG), slab drilled and epoxy studs inserted (Epoxy), coupler welded to beam (Steelbeam), drilled and secured from the bottom of the woodbeam (Woodbeam) foundation walls, and any substantial structure solidly anchored in the ground. Accordingly, a foundation can be any structure that is capable of transferring the load of the wall or building to the ground. - An
anchor rod 26 is attached to ananchor assembly 28, which is operably attached to thefoundation 4, such as being embedded within thefoundation 4 made of poured concrete. Theanchor rod 26 extends outside thefoundation 4 and through thebase plate 10. Acoupling 30 connects theanchor rod 26 to alower tie rod 32, which extends through thetop plate 14 and thebottom plate 20. Anothercoupling 34 connects thetie rod 32 to anupper tie rod 36, which extends through thetop plate 24. Thecoupling 34 is disposed in thestud wall 8 above thebottom plate 20. - Referring to
FIG. 2 , theanchor assembly 28 includes ananchor rod support 38 and ananchor body 40 threaded to theanchor rod 26. Theanchor rod 26 extends through an opening 27 in thebottom plate 10. Theanchor assembly 28 is similar to that disclosed in co-pending application Ser. Nos. 12/656,623 and 12/656,624, incorporated herein by reference. Other anchor assemblies of standard design may be used. Theanchor rod 26 is disclosed as being all-thread, but it should understood that a smooth rod with only its end portions being threaded for screwing to theanchor body 40 and thecoupling 30 may also be used. - Referring to
FIG. 3 , thetie rod 32 is operably attached to thewall 2 with a bearing plate 42 (shown in cross-section) and anut 44 threaded to theend portion 48. Thenut 44 is tightened against the bearingplate 42 to advantageously place theanchor rod 32 under tension. Theupper end portion 48 extends through the doubletop plate 14 into the floor joist space and the through thebottom plate 20 through 31 and 33, respectively.openings - Referring back to
FIG. 1 , thelower end portion 46 and theupper end portion 48 of thetie rod 32 are threaded while the rest orintermediate portion 50 of the tie rod is smooth and unthreaded. The combined length of the threaded 56 and 48 is about 25% or less of the length of theend portions tie rod 32. Theupper tie rod 36 also has a lower threadedend portion 52, an upper threadedportion 54 and a smooth unthreadedintermediate portion 56. The combined length of the threaded 52 and 54 is about 25% or less of the length of theend portions tie rod 36. The 50 and 56 are preferably at least about 75% of the length of the respective tie rod. The 75% ratio means that at least a majority portion of the tie rod within the stud wall space where insulation, wiring, plumbing, etc. would be installed is smooth and unthreaded, thereby making for relatively easy installation of insulation, wiring, plumbing, etc. as compared to an all-thread tie rod. An all-thread tie rod provides sharp edges of the threads to building components that would hamper the installation of these components in the wall space and cause the tie rod to bow. If the threads of an all-thread tie rod were caught in the other building components during installation and became bowed, the tie rod would not return to its original straight position.smooth portions - Referring to
FIG. 4 , theupper tie rod 36 is attached to thebuilding wall 2 to with a bearing plate 58 (shown in cross-section) and anut 60 threaded to theupper end portion 54. Thenut 60 is tightened against the bearingplate 58 to advantageously place thetie rod 36 under tension. The threadedupper end portion 54 extends through thedouble plate 24 through anopening 62. Anchoring theupper wall 8 to thetop plate 24 advantageously ties thetop plate 24 directly to thefoundation 4, affording the top plate and any structure attached to it, such as roof trusses, relatively more strength against uplifting forces caused by storms, winds, tornadoes, etc. - Referring to
FIG. 5 , ananchor rod 64 has a lower threadedportion 66, a threadedupper portion 68 and a smooth and unthreadedintermediate portion 68. The intermediatesmooth portion 68 comprises about 75% or more of the length of the rod. Anopening 70 is provided in thebottom plate 10 for therod 64 to extend through. The use of theanchor rod 64, with 75% or more being smooth and unthreaded, provides for providing a generally smooth and unthreaded tie rod within the stud wall space to facilitate the installation of insulation batts, electrical wiring, plumbing pipes, etc. within the wall. - Referring to
FIG. 6 , alower tie rod 72 is disclosed as being longer than thelower tie rod 32 shown inFIG. 1 . Thetie rod 72 has a longer smooth unthreadedintermediate portion 74 that extends through the floor joists space between the doubletop plate 14 and thebottom plate 20. The smooth andunthreaded portion 74 makes up at least about 75% of the length of the tie rod. The combined length of the threaded end portions of thetie rod 72 is about 25% or less of the length of the tie rod. - Referring to
FIG. 7 , it is shown that the smooth unthreadedintermediate portion 74 extends through theopening 31 and theopening 33. Aportion 35 of the smooth unthreadedintermediate portion 74 abutting the threadedend portion 48 extends substantially through the entire depth of theopening 33. Theportion 35 may extend above thetop surface 37 of thebottom plate 20 into part of the thickness of the bearingplate 42. Thesmooth unthreaded portion 74 that goes through the 31 and 33 advantageously facilitates the threading of theopenings tie rod 72 through the 31 and 33 due to reduced friction as compared to an all-threaded tie rod. Further, the smooth unthreadedopenings portion 74 facilitates relative movement of the tie rod with respect to the doubletop plate 14 and thebottom plate 20 due to lesser friction with the wood when thewalls 2 shifts due to settling, uplift, etc. and facilitates taking up any slack from thetie rod 72 when an expanding connector, such as a spring disposed between thenut 44 and the bearingplate 42, is used, as will be explained below. The 33 and 31 are larger than the diameter of the intermediate unthreadedopenings portion 74, since the threaded end portions of the tie rod are larger in diameter than the intermediate unthreaded portion (seeFIG. 33 ). - Contact of the jagged threaded
end portion 48 with the wall of the 31 and 33 is avoided to reduce friction. Reduced friction causes the tie rod to remain straight and not bowed. Theopenings smooth unthreaded portion 74 also reduces friction especially when the 31 and 33 do not align up perfectly. Binding of the tie rod against theopenings 31 and 33 is not desirable since it may cause bowing of the tie rod during wall movement rather than presenting a slack to an expanding connector when used. It should be understood that if the portion of the tie rod disposed within theopenings 31 and 33 were threaded, then it is clear that sharp edges of the threads can easily bind and get stuck against the wall of the openings, causing bowing of the tie rod which will then prevent the presentation of a slack for the expanding connector to absorb.openings - Referring to
FIG. 8 , the smooth unthreadedintermediate portion 56 of theupper tie rod 36 may extend through theopening 62 in the doubletop plate 24. Aportion 63 of the smooth unthreadedintermediate portion 56 abutting the threadedend portion 54 extends substantially through the entire depth of theopening 62. Theportion 63 may extend above thetop surface 65 of the doubletop plate 24 into part of the thickness of the bearing plate 58 (shown in cross-section). Minimizing the amount of thread within theopening 62 means that the tie rod will have reduced friction against the wall of theopening 62 and can thereby move upwardly relatively easily when theupper wall 8 settles down. When an expanding connector, as will be explained below, is disposed between thenut 60 and the bearingplate 58 to take up any slack that develops, the ability of thetie rod 56 to move past theopening 62 ensures that the slack will be absorbed by the expanding connector. An expanding connector may be a spring urging thenut 60 upwardly and the bearingplate 58 downwardly. - Referring to
FIGS. 9 and 10 , 76 and 78 are added to thereinforcement blockings 6 and 8 shown inrespective stud walls FIG. 6 . Reinforcement blockings are used to provide rigidity and additional nailing surfaces. The 76 and 78 includeblockings 80 and 82 through which the smooth unthreadedrespective openings 74 and 56 of theintermediate portions 72 and 36, respectively, pass through. Referring totie rods FIG. 10 , the blocking 78 is shown in greater detail. The addition of the 76 and 78 add more difficulty to installing theblockings 72 and 36, since thetie rods 80 and 82 are made in the field and may be off from the vertical and may not line up along a common axis with theopenings 31, 33 and 62. With the use of theopenings 72 and 36 with their smooth unthreaded intermediate portions, the installation of thetie rods 72 and 36 is thereby facilitated due to reduced friction afforded by the smooth unthreaded intermediate portions of the tie rods as compared to all-thread tie rods. Further, when slack expanding connectors are used with the nuts 44 and 60, movement of the tie rods through thetie rods 31, 33 and 62 when slack develops in the tie rods is relatively unhindered. Still further, therespective openings 80 and 82 have larger diameter than theopenings 74 and 36 since the diameter of the threaded end portions of the tie rods are larger than the diameter of the intermediate unthreaded portion (seeintermediate portions FIG. 33 ). - Referring to
FIGS. 11 and 12 , theupper stud wall 8 is provided with heavier blocking 84, measuring for example 4 in. by 4 in, to provide additional rigidity to the upper portion of the stud wall. Theintermediate portion 56 of thetie rod 36 extends through anopening 86 in the blocking 84. The smooth unthreadedintermediate portion 56 advantageously allows relatively easy installation of thetie rod 36, allowing thetie rod 36 to pass through theopening 86, even though the length of theopening 86 is longer that an opening through a standard stud, which is nominally 2 in. thick. The diameter of theopening 86 is larger than the diameter of theintermediate portion 56, since the diameter of the threaded end portion of the tie rod is larger than the diameter of the intermediate portion (seeFIG. 33 ). Note that theopening 62 may be made larger than the outer diameter of the threaded end portion to allow relatively easy passing of the tie rod through theopening 62. - Referring to
FIGS. 13 and 14 , the 6 and 8 are shown. Asame stud walls shorter tie rod 88 is shown associated with thelower stud wall 6. Thetie rod 88 is disclosed as all-thread. Anothertie rod 90, also all-thread, is associated with thestud wall 8. Ashort tie rod 92 is used to connect thelower tie rod 88 with theupper tie rod 90. Thetie rod 92 has a lower threadedportion 94 and an upper threadedportion 96. An intermediate smooth unthreadedportion 98 is disposed between the lower and upper threaded 94 and 96.portions 100 and 102 attach theCouplings short tie rod 92 to thelower tie rod 88 and to theupper tie rod 90. The use of theshort tie rod 92 advantageously makes the installation of thelower tie rod 88 much simpler, since only theshorter tie rod 92 has to go through the double top plate opening 31 and the bottom plate opening 33, whereas in the embodiment shown inFIG. 6 , thelower tie rod 72 has to go through the 31 and 33.openings - Note that portions of the smooth unthreaded
intermediate portion 98 of theshort tie rod 92 are disposed within and past the 31 and 33, thereby allowing relatively unhindered movement through the opening, as compared to an all-thread tie rod, when the wall shifts down due to settlement. This is advantageous when an expanding connector is used to tie the wall to the tie rods, as will be explained below.openings - Referring to
FIGS. 15 and 16 , the 6 and 8 are shown. Asame stud walls shorter tie rod 103 is shown associated with thelower stud wall 6. Ashort tie rod 92 is used to connect thelower tie rod 103 with theupper tie rod 36. Thetie rod 92 has a lower threadedportion 94 and an upper threadedportion 96. A smooth unthreadedintermediate portion 98 is disposed between the lower and upper threaded 94 and 96.portions 100 and 102 attach theCouplings short tie rod 92 to thelower tie rod 103 and to theupper tie rod 36. The use of theshort tie rod 92 advantageously makes the installation of the upper and lower tie rods much simpler, since only theshort tie rod 92 has to go through the double top plate opening 31 and thebottom plate opening 33. In this embodiment, the 103 and 36 have smooth unthreaded intermediate portions to facilitate installation of other building components within the stud wall space where the tie rods are located, such as for example insulation batts, electrical wiring, water lines, waste lines, etc. The smooth unthreaded intermediate portions of the tie rods present reduced friction, as compared to all-thread tie rods, to the other building components as they are pulled and shoved past the tie rods. The smooth unthreaded intermediate portions of the tie rods also reduce bowing of the tie rods when the other building components are being installed inside the wall space occupied by the tie rods. Less bowing means that the tie rods remain vertical and aligned with the common axis of thetie rods 31, 33 and 62 and can, therefore, move freely through the openings during wall settlement.openings - Note that portions of the smooth unthreaded
intermediate portion 98 of theshort tie rod 92 are disposed within and past the 31 and 33, thereby allowing relatively unhindered movement through the openings, as compared to an all-thread tie rod, when the wall shifts down due to settlement. This is advantageous when an expanding connector is used to tie the wall to the tie rods, as will be explained below.openings - Referring to
FIG. 17 , an expanding connector 164 (shown in cross-section) is disposed between the bearing plate 42 (shown in cross-section) and thenut 44. The expandingconnector 164 is of standard manufacture, such as the one disclosed in U.S. Pat. Nos. 7,762,030 and 8,186,924, hereby incorporated by reference. Generally, theconnector 164 has an innercylindrical body 166 disposed within an outercylindrical body 168. Aspring 170 urges the inner cylindrical body upwardly against thenut 44 and urges theouter cylinder body 168 downwardly against the bearingplate 42. When slack develops in the tie rod below thenut 44, thespring 166 moves the innercylindrical body 166 upwardly and locks with the outercylindrical body 168 in the downward direction to take up the slack. During the short movement of the tie rod through the 31 and 33 due to wall settlement, the smooth unthreaded portion of the tie rod disposed within theopenings 31 and 33 advantageously makes the movement relatively unhindered, as compared to an all-thread tie rod with threads disposed within the openings and rubbing against the wall of the opening. With an all-thread tie rod, the threads can jam against the wall of the opening when the walls settles down, causing the tie rod to bow rather than extending through the opening in the form of a slack.openings - Referring to
FIG. 18 , another expanding connector 164 (shown in cross-section), as described inFIG. 17 , is disposed between thenut 60 and the bearing plate 58 (shown in cross-section). The expandingconnector 164 is used to take up slack that may develop in thetie rod 36. Note that the smooth unthreadedportion 56 of thetie rod 36 is disposed within theopening 62 to facilitate movement of the tie rod through the opening when the wall moves down due to settlement. It should be understood that the smooth unthreaded portion of the tie rod sliding through theopening 62 is relatively easier than if threaded portions are within the opening. Theopening 62 may not necessarily be vertical but could be off from the vertical, since it is made onsite with hand tools. Accordingly, having the smooth unthreaded portion of thetie rod 36 disposed within theopening 62 helps in the downward movement of the wall during settlement, thereby allowing the expandingconnector 164 to take up the resulting slack. If the tie rod gets stuck within the opening during the downward movement of the wall, as when using an all-thread tie rod, the tie rod would bow within the wall space, causing a slack not to appear at the expandingconnector 164. - Referring to
FIGS. 19 and 20 , thetie rod 72 extends through the doubletop plate 14 and thebottom plate 20. An expanding connector 164 (shown in cross-section) is disposed between thenut 44 and the bearing plate 42 (shown in cross-section), as inFIG. 17 .Reinforcement studs 172 are securely attached to therespective studs 174. Across member 176 is supported on the top edges of therespective reinforcement studs 172. Atie rod 178 is connected to thelower tie rod 72 with acoupling 180. Thetie rod 178 extends through anopening 179 in thecross member 176. An expandingconnector 164 connects thetie rod 178 to thestud wall 8. Theconnector 164 is disposed between abearing plate 182 and anut 184 as shown inFIG. 20 . Note that a portion of the smoothunthreaded portion 181 of thetie rod 178 is disposed within theopening 179 to facilitate the downward movement of the cross-member 176 during settlement of the wall. This in turn advantageously allows the expandingconnector 164 to take up the resulting slack in thetie rod 178. The diameter of theopening 179 is larger than the diameter of theintermediate portion 181, since the diameter of the threaded end portion of the tie rod is larger than the diameter of the intermediate portion (seeFIG. 33 ). - Referring to
FIG. 21 , atie rod 186 extends from thestud wall 6 into thestud wall 8. As with all the other tie rods, thetie rod 186 has threaded 188 and 190 and a smooth unthreadedend portions intermediate portion 192 as also shown inFIG. 19 .Reinforcement studs 172 are attached torespective studs 174 and a cross-member 176 is supported on the top edges of therespective reinforcement studs 172. An expandingconnector 164 is disposed between anut 184 and a bearing plate 182 (seeFIG. 20 ). - In the embodiments shown in
FIGS. 19-21 , the expandingconnectors 164 may be left out, leaving only the nuts 44 and 184 and the bearing 42 and 182, if slack on the tie rods is not a concern. Such a structure will provide a reinforced wall, although without the slack compensating function of the expanding connectors.plates - Referring to
FIG. 22 , theupper stud wall 8 as shown inFIG. 6 is depicted. Anelectrical junction box 194 is shown attached to astud 196.Electrical wire 198 is strung from stud to stud and terminated in the junction box 197. When the electrical wire is pulled past thetie rod 36 during installation, the wire would easily slide past the smooth unthreadedportion 56 of the tie rod. Snagging of the wire on the tie rod is reduced or avoided, thereby avoiding any bowing of the tie rod. Pulling stress on the tie rod that can cause bowing is reduced or eliminated. If an all-thread tie rod is used, the electrical wire can easily get caught in the threads and cause bowing when the wire is pulled from stud to stud. Bowing of the tie rod is to be reduced or avoided since bowing would cause the tie rod to deviate from the vertical and lose its alignment with the openings in the bottom plates and top plates, resulting in the tie rods getting jammed in the openings and slack in the tie rods will not be presented to and taken up by the expanding connectors. - Referring to
FIG. 23 ,insulation batt 200 is shown installed behind thetie rod 36. Theinsulation batt 200 is compressed behind thetie rod 36. During installation, theinsulation batt 200 is typically inserted behind the tie rod at one side and pulled to the other side. With the 32 and 36 each having at least a majority of their intermediate portions being smooth and unthreaded, installation of insulation batt is relatively made easier, since the insulation simply slides past the tie rod as the insulation batts are forced behind the tie rods at one side and pulled to at other side. If an all-thread tie rod were used, the insulation batt could get caught in the threads, thereby causing the insulation batts to bunch behind the tie rod and cause the tie rod to bow out, which is undesirable. Further, if the tie rod bows during installation, it will spring back to its original straight position, since the smooth unthreaded intermediate portion of the tie rod will simply slide past the insulation batt. On the other hand, if an all-thread tie rod had been used, the threads will be jammed against the insulation back which would prevent the tie rod from straightening up.tie rods - Referring to
FIG. 24 , a number of tie rods of varying lengths are disclosed for use in the present invention. Each tie rod has threaded 202 and 204 and smooth unthreadedend portions intermediate portion 206. The ratio of the smooth unthreadintermediate portion 206 is preferably about 75% or more of the length of the tie rod. The combined length of the threaded 202 and 204 is about 25% or less of the length of the tie rod. The short tie rods 208 may be used as anchor rods as shown inend portions FIG. 5 , for example, or to extend across the height of the floor joists, as shown inFIG. 14 , for example. The intermediate length tie rod 201 may be used within a wall without extending into the upper wall, such as for example within thelower stud wall 6 or theupper stud wall 8, as shown inFIG. 15 . Thelonger tie rod 212 may be used to extend from a lower wall to an upper wall as shown inFIG. 1 , for example. - Referring to
FIGS. 25 and 26 , thebuilding wall 2 is disclosed with a different embodiment of atie rod 214 with lower threadedbore 216 and upper threadedbore 218. The lower threadedbore 216 is screwed to theanchor rod 64 while the upper threaded bore 218 is screwed to theshort tie rod 92. Theanchor rod 26 may also be used. The exterior surface of thetie rod 214 is smooth and unthreaded and is substantially co-extensive with the length of the tie rod. - The
tie rod 214 is in effect a long coupling. The threaded bores 216 and 218 are preferably limited to about 25% or less of the length of thetie rod 214. Since the threaded bores are sized to receive a standard tie rod, the diameter or cross-sectional area of thetie rod 214 will be larger than the diameter of the standard all-thread tie rod. Accordingly, the tension stress along thetie rod 214 will be advantageously decreased and will experience less stretch at load. Further, the stiffness of the assembly of tie rods shown inFIG. 25 will be advantageously greater than the assembly using outside threaded rods exclusively, as shown inFIG. 1 , for example, since thetie rod 214 has a larger diameter than the other tie rod. Greater stiffness advantageously provides for less bowing. - Referring to
FIGS. 27, 28 and 29 , thetie rod 214 may be square in cross-section, as shown inFIG. 27 , hexagonal as shown inFIG. 28 or circular, as shown inFIG. 29 . The lower threadedbore 216 and the upper threaded bore 216 each includes aradial inspection hole 220 to allow physical checking that the threadedportion 94 is at or past thehole 220, thus insuring that the threadedportion 94 is deep enough into the threaded bores 218 and 216 for proper load capacity. - It should be understood that the
tie rod 214 with the appropriate length may extend through thetop plate 14 and thebottom plate 20, similar to thetie rod 36 shown inFIG. 1 , or thetie rod 192 shown inFIG. 21 and then operably attached to thestud wall 8 with a tie rod such as thetie rod 36 with the appropriate length and secured to thetop plate 24 or thecross member 176 with a nut and bearing plate, as disclosed herein with the other tie rods. - Referring to
FIG. 30 , thetie rod 214 shown inFIG. 25 may be made in two ormore sections 222. Eachsection 222 has the lower and upper threaded bores 216 and 218. A threadedrod 226 connects the twosections 222 together. Thetie rods 222 advantageously make the whole assembly stiffer due to the larger cross-sectional area of thetie rods 22. The threaded bores 216 and 218 are preferably limited to about 25% or less of the length of thetie rods 222. - Referring to
FIG. 31 , a one-story stud wall 224 is shown. Similar toFIG. 1 , thewall 224 is supported by the foundation thefoundation 4. Thewall 224 hasstuds 12,bottom plate 10 and doubletop plate 14. A blocking 226 is attached between studs to provide additional rigidity and nailing surface to thewall 224. - The
anchor rod 26 is attached to theanchor assembly 28, which is operably attached to thefoundation 4, such as being embedded within thefoundation 4 made of poured concrete. Theanchor rod 26 extends outside thefoundation 4 and through thebase plate 10. Thecoupling 30 connects theanchor rod 26 to atie rod 228, which extends through thetop plate 14. Thelower end portion 230 and theupper end portion 240 of thetie rod 228 are threaded while the rest orintermediate portion 242 of the tie rod is smooth and unthreaded. - The
intermediate portion 242 extends through anopening 244 in the blocking 226. Theopening 244 is larger than the diameter of theintermediate portion 242 to advantageously permit thetie rod 228 easily move through the opening during installation. Anut 246 screwed to theupper end portion 240 of the tie rod and tightened against abearing plate 248 secures thetie rod 228 to thewall 224, thereby holding thewall 224 to thefoundation 4. An expandingconnector 164, as shown inFIG. 17 , may be installed between thenut 246 and thebearing plate 248 to take up any slack that may develop in thetie rod 228 due to wall shrinkage, settlement, etc. Theopening 244, which is larger than the diameter of theintermediate portion 242, provides space and less friction for the tie rod when it moves through theopening 244 during vertical movement of thewall 224. - Referring to
FIG. 32 , thewall 224 is shown withreinforcement studs 250 and across member 252. The reinforcement studs are securely attached to therespective studs 12 with nails, screws or other standard hardware. Ashorter tie rod 254 having threadedend portions 256 and 258 and smooth unthreadedintermediate portion 260 is used. The lower end portion 256 is attached to theanchor rod 26 with thecoupling 30. Theupper end portion 258 extends through an opening in thecross member 252 and attached thereto with thenut 246 and thebearing plate 248. The cross member is supported on the top edges of thereinforcement studs 250. - An expanding
connector 164, as shown inFIG. 17 , may be installed inFIG. 32 between thenut 246 and thebearing plate 248 to take up any slack that may develop in thetie rod 254 due to wall shrinkage, settlement, etc. - Referring to
FIG. 33 , each of the tie rods used in the present invention is made by rolling thethreads 262 at each end of a smooth rod. This results in making thediameter 264 of the threaded end portions larger than thediameter 266 of the smooth unthreadedintermediate portion 268. The threaded end portion is about 10% larger in diameter than the diameter of theintermediate portion 264. The larger diameter threaded end portions means that openings drilled in the bottom plates and top plates of the stud walls when installing the tie rods will be sized to the larger diameter threaded end portions instead of the smaller diameter intermediate portion, thereby providing a larger opening through with which the intermediate portion will slide during vertical movement of the wall during settlement, shrinkage, etc. A larger opening advantageously provides less friction for the intermediate portion of the tie rods. - Referring to
FIG. 34 , a one-story stud wall 270 is shown. Similar toFIG. 1 , thewall 270 is supported by the foundation thefoundation 4. Thewall 270 hasstuds 12,bottom plate 10 and doubletop plate 14. Theanchor rod 26 is attached to theanchor assembly 28, which is operably attached to thefoundation 4, such as being embedded within thefoundation 4 made of poured concrete. Theanchor rod 26 extends outside thefoundation 4 and through thebase plate 10. Atie rod 272 with lower threadedbore 274 and upper threadedbore 276. The lower threadedbore 274 is screwed to theanchor rod 26 while the upper threaded bore 276 is screwed to a short threadedrod 278. The exterior surface of thetie rod 272 is smooth and unthreaded and is substantially co-extensive with the length of the tie rod. - A
nut 280 screwed to the upper end portion of the threadedrod 278 and tightened against abearing plate 282 secures thetie rod 272 to thewall 270, thereby holding thewall 270 to thefoundation 4. An expandingconnector 164, as shown inFIG. 17 , may be installed between thenut 280 and thebearing plate 282 to take up any slack that may develop in thetie rod 272 due to wall shrinkage, settlement, etc. - The
tie rod 272 may be square in cross-section as shown inFIG. 27 , hexagonal as in shown inFIG. 28 , or circular as shown inFIG. 29 . - The threaded bores 274 and 276 may be of one diameter, as shown in
FIG. 27 , for example, or multiple diameters, as shown inFIGS. 35 and 36 . - Referring to
FIG. 35 , with thetie rod 272 shown in cross-section, the threadedbore 274 includes a larger diameter threadedbore 284 and a smaller diameter threadedbore 286. A largerdiameter anchor rod 26 is shown screwed to the larger diameter threadedbore 284. 288 and 290 are associated with respective threadedInspection openings 284 and 286.bores - Referring to
FIG. 36 , with thetie rod 272 shown in cross-section, the threadedbore 276 includes a larger diameter threadedbore 292 and a smaller diameter threadedbore 294. Asmaller diameter rod 278 is shown screwed to the smaller diameter threadedbore 294. 296 and 298 are associated with the respective threadedInspection openings 292 and 294.bores - The
tie rod 272 may be tubular with single diameter threaded 274 and 276, as shown inbores FIG. 37 (thetie rod 272 shown in cross-section) or multiple diameter threaded 284 and 286 as shown inbores FIG. 38 (thetie rod 272 shown in cross-section) and multiple diameter threaded 292 and 294 as shown inbores FIG. 39 (thetie rod 272 shown in cross-section). It should be understood that the tubular embodiment of thetie rod 272 may be square, hexagonal or circular in cross-section. The tubular embodiment of thetie rod 272 may also be used in a two-story wall, as shown inFIG. 25 . - Providing multiple diameter threaded bores advantageously allows the use of larger or smaller diameter threaded rod for different load loads.
- The various reinforced walls disclosed above are shown with tie rods installed within the first stud bay from the end of a shear wall using standard wood framing construction. However, the reinforced walls are not limited to these locations or type of construction. Metal studs or other materials may also be used. The reinforced walls may be used in any stud wall construction to resist uplift caused by high winds or earthquake conditions. The tie rods used in the reinforced walls may be installed in the first stud bay at the first bay after a window or door opening. Generally, the reinforced walls may be used as the application dictates.
- While this invention has been described as having preferred design, it is understood that it is capable of further modification, uses and/or adaptations following in general the principle of the invention and including such departures from the present disclosure as come within known or customary practice in the art to which the invention pertains, and as may be applied to the essential features set forth, and fall within the scope of the invention or the limits of the appended claims.
Claims (44)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/672,976 US20220243458A1 (en) | 2013-05-23 | 2022-02-16 | Reinforced building wall |
Applications Claiming Priority (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201361826839P | 2013-05-23 | 2013-05-23 | |
| PCT/US2014/038967 WO2014190054A1 (en) | 2013-05-23 | 2014-05-21 | Reinforced building wall |
| US201514891449A | 2015-11-16 | 2015-11-16 | |
| US15/843,992 US10480178B2 (en) | 2013-05-23 | 2017-12-15 | Reinforced building wall |
| US16/674,600 US11268273B2 (en) | 2013-05-23 | 2019-11-05 | Reinforced building wall |
| US17/672,976 US20220243458A1 (en) | 2013-05-23 | 2022-02-16 | Reinforced building wall |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/674,600 Continuation US11268273B2 (en) | 2013-05-23 | 2019-11-05 | Reinforced building wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20220243458A1 true US20220243458A1 (en) | 2022-08-04 |
Family
ID=51934096
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/891,449 Active US9874009B2 (en) | 2013-05-23 | 2014-05-21 | Reinforced building wall |
| US15/843,992 Active US10480178B2 (en) | 2013-05-23 | 2017-12-15 | Reinforced building wall |
| US16/674,600 Active 2034-05-24 US11268273B2 (en) | 2013-05-23 | 2019-11-05 | Reinforced building wall |
| US17/672,976 Pending US20220243458A1 (en) | 2013-05-23 | 2022-02-16 | Reinforced building wall |
Family Applications Before (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/891,449 Active US9874009B2 (en) | 2013-05-23 | 2014-05-21 | Reinforced building wall |
| US15/843,992 Active US10480178B2 (en) | 2013-05-23 | 2017-12-15 | Reinforced building wall |
| US16/674,600 Active 2034-05-24 US11268273B2 (en) | 2013-05-23 | 2019-11-05 | Reinforced building wall |
Country Status (3)
| Country | Link |
|---|---|
| US (4) | US9874009B2 (en) |
| CA (2) | CA3028668C (en) |
| WO (1) | WO2014190054A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240076867A1 (en) * | 2021-01-17 | 2024-03-07 | 1284343 B.C. Ltd. | System and method for forming a wall |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7762030B2 (en) * | 2006-09-12 | 2010-07-27 | Espinosa Thomas M | Hold down system |
| CA3028668C (en) * | 2013-05-23 | 2021-05-18 | Thomas M. Espinosa | Reinforced building wall |
| US9394706B2 (en) | 2013-10-08 | 2016-07-19 | Simpson Strong-Tie Company, Inc. | Concrete anchor |
| US9163655B2 (en) | 2014-01-14 | 2015-10-20 | Kaoru Taneichi | Thrust nut |
| US9464427B2 (en) * | 2015-01-23 | 2016-10-11 | Columbia Insurance Company | Light gauge steel beam-to-column joint with yielding panel zone |
| US10337185B2 (en) * | 2015-09-15 | 2019-07-02 | Cetres Holdings, Llc | Hold down system with distributed loading for building walls |
| JP6282709B1 (en) * | 2016-10-18 | 2018-02-21 | 株式会社シェルター | Restraint hardware and structural housing restraint method |
| EP3545146A4 (en) * | 2016-11-26 | 2019-11-06 | Armour Wall Group Pty Limited | BUILDING PANEL IMPROVED |
| CA3100542A1 (en) * | 2018-05-17 | 2019-11-21 | Cetres Holdings, Llc | Compression and tension reinforced wall |
| KR102033150B1 (en) * | 2019-02-01 | 2019-10-17 | 주식회사 트라움목조주택 | Construction Method of Seismic Retrofit and Seismic Retrofit Structures |
| US12345289B2 (en) | 2019-07-24 | 2025-07-01 | Ceteres Holdings, Llc | Coupler for connecting a rebar to a threaded rod or another rebar |
| EP4045723A4 (en) * | 2019-10-14 | 2022-11-23 | Cetres Holdings, LLC | REINFORCED BUILDING WALL USING COMPRESSION ROD |
| KR102136077B1 (en) * | 2020-03-19 | 2020-07-21 | 주식회사 엔알비 | Construction method of movable building using modules |
| US10883263B1 (en) * | 2020-09-04 | 2021-01-05 | Keiko Tsuru | Reinforcing structure for wooden building |
| US20220195718A1 (en) * | 2020-12-23 | 2022-06-23 | Cetres Holdings, Llc | Anchor for connecting to a rod |
| IT202100009686A1 (en) * | 2021-04-16 | 2022-10-16 | Besd Tech S R L | KIT FOR THE CONSTRUCTION OF PREFABRICATED WALLS |
| CN113550572B (en) * | 2021-07-09 | 2022-06-24 | 南京坤佳防水防腐保温工程有限公司 | Basement outer wall post-cast strip structure and construction method thereof |
| US11629501B1 (en) * | 2022-05-18 | 2023-04-18 | Prefabricated Design Systems, LLC | Modular construction connection mechanism |
Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5531054A (en) * | 1992-11-20 | 1996-07-02 | Ramirez; Jose G. | Reinforced wooden wall |
| US6161339A (en) * | 1998-08-26 | 2000-12-19 | Hurri-Bolt Inc. | Structural tie-down apparatus |
| US6161350A (en) * | 1996-11-04 | 2000-12-19 | Espinosa; Thomas M. | Fastener assembly serving as a product, or combined with other components as a product allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US6367205B2 (en) * | 1998-10-05 | 2002-04-09 | Hurri-Bolt, Inc. | Anchor for a structural tie-down apparatus |
| US20030182875A1 (en) * | 2002-03-26 | 2003-10-02 | Hill Kenneth A. | High wind roof securement device |
| US6688058B2 (en) * | 1996-11-04 | 2004-02-10 | Thomas M. Espinosa | Fastener assembly serving as a product, or combined with other components as a product, allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US20050055897A1 (en) * | 2003-08-12 | 2005-03-17 | Commins Alfred D. | Continuously threaded hold-down system |
| US20070175167A1 (en) * | 2006-01-13 | 2007-08-02 | Allen Paul B | Reinforcing bar splice with threaded collars |
| US7762030B2 (en) * | 2006-09-12 | 2010-07-27 | Espinosa Thomas M | Hold down system |
| US7878730B2 (en) * | 2008-01-16 | 2011-02-01 | Weaver Jason M | Bar coupling apparatus and methods |
| US20110041449A1 (en) * | 2009-02-04 | 2011-02-24 | Espinosa Thomas M | Concrete anchor |
| US7985041B2 (en) * | 2008-10-08 | 2011-07-26 | Simpson Strong-Tie Company, Inc. | Symmetrically stepped bore coupler nut |
| US20120304589A1 (en) * | 2011-06-01 | 2012-12-06 | Commins Alfred D | Double-duty, hold-down system |
| US9097001B2 (en) * | 2009-02-04 | 2015-08-04 | Thomas M. Espinosa | Concrete anchor |
| US9097000B2 (en) * | 2008-10-03 | 2015-08-04 | Thomas M. Espinosa | Hold down system using hollow bearing members |
| US9222251B2 (en) * | 2011-03-18 | 2015-12-29 | Thomas M. Espinosa | Concrete anchor coupling assembly and anchor rod holder |
| US9874009B2 (en) * | 2013-05-23 | 2018-01-23 | Cetres Holdings, Llc | Reinforced building wall |
Family Cites Families (52)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US518793A (en) * | 1894-04-24 | Lightning-rod and coupling | ||
| US1375402A (en) | 1919-01-09 | 1921-04-19 | Mcavoy Charles Frederick | Sectional building |
| US2011018A (en) * | 1934-06-18 | 1935-08-13 | Harold E Smith | Chimney construction |
| US3369334A (en) | 1965-09-28 | 1968-02-20 | Ralph R. Berg | Building system |
| US3415552A (en) * | 1966-11-29 | 1968-12-10 | Howlett Machine Works | Splicing metallic reinforcing rods with a threaded coupling sleeve |
| US3537220A (en) * | 1969-05-22 | 1970-11-03 | James P Ellis | Masonry wall brace |
| US3756635A (en) * | 1971-02-17 | 1973-09-04 | H Beers | Improved apparatus for forming dowel-type joints |
| US4452028A (en) * | 1980-09-19 | 1984-06-05 | Willard S. Norton | Structure and method for reinforcing a wall |
| US4457118A (en) | 1981-08-14 | 1984-07-03 | Bowen Alfred J | Integral foundation and floor frame system and method of building construction |
| US4525972A (en) | 1982-09-24 | 1985-07-02 | Gang Nail Systems, Inc. | Truss assembly and bracing clip and attachment member for use with trusses |
| US4875314A (en) | 1987-01-06 | 1989-10-24 | Boilen Kenneth T | Connection system for preventing uplift of shear walls |
| US4812096A (en) | 1987-12-11 | 1989-03-14 | Peterson Peter O | Self-tightening nut |
| US5168681A (en) * | 1990-08-20 | 1992-12-08 | Horsel Plc | Prestressed wood floor system |
| CA2081650A1 (en) * | 1992-01-24 | 1993-07-25 | Geoffrey M. Bowmer | High dynamic strength reinforcing bar splice and method of making |
| US5303520A (en) | 1992-12-08 | 1994-04-19 | George Gozdziak | Brace for reinforcing roof attachment |
| US5537786A (en) | 1993-08-06 | 1996-07-23 | Orage Corporation | Hurricane-resisting building roof structure tie-down |
| US5384993A (en) * | 1993-11-15 | 1995-01-31 | Phillips; Belton R. | Tie down for building structures |
| US5491935A (en) | 1994-04-08 | 1996-02-20 | Coxum; Thomas | Roof anchor system |
| US5570549A (en) * | 1994-07-15 | 1996-11-05 | Lung; Jimmy R. | Building anchoring system |
| US5448861A (en) | 1994-07-19 | 1995-09-12 | Lawson; Donald L. | Method and apparatus for securing parts of a building to each other and to a foundation |
| US5535561A (en) | 1994-08-30 | 1996-07-16 | Schuyler; Peter W. | Cable hold down and bracing system |
| US5673883A (en) * | 1995-02-03 | 1997-10-07 | Figueroa, Jr.; Oscar E. | Bar device for installing a protective sheet over a window |
| US5740643A (en) * | 1995-08-24 | 1998-04-21 | Huntley; Henry | Fireproof building |
| US5746555A (en) * | 1996-02-06 | 1998-05-05 | Mcevoy; William Richard | Connector with engagement indicator |
| US5761863A (en) | 1996-11-27 | 1998-06-09 | Clemson University | Method of reinforcing a building |
| US6073642A (en) * | 1998-11-10 | 2000-06-13 | Huang; Jung-Chang | Connector assembly for an upright shaft of a beach umbrella |
| US6390747B1 (en) * | 1999-09-24 | 2002-05-21 | Alfred Commins | Shrinkage compensator for building tiedowns |
| US6625945B2 (en) * | 2000-08-08 | 2003-09-30 | Alfred D. Commins | Balanced, multi-stud hold-down |
| US20040118053A1 (en) | 2000-11-09 | 2004-06-24 | Huppert Norman K. | Truss anchoring assembly for buildings |
| US20020100226A1 (en) | 2000-11-09 | 2002-08-01 | Huppert Norman K. | Truss anchoring assembly for buildings |
| US6553736B2 (en) | 2000-12-26 | 2003-04-29 | Antonio Montanaro | Interlocking truss system |
| US20030136075A1 (en) | 2002-01-18 | 2003-07-24 | Brackett Charles T | Construction brace for use against seismic and high wind conditions |
| US20030230032A1 (en) * | 2002-06-13 | 2003-12-18 | George Shahnazarian | Take-up devices for use in building structure |
| US20060133912A1 (en) * | 2003-06-23 | 2006-06-22 | Commins Alfred D | Circumferentially balanced, take-up device |
| US6880224B2 (en) * | 2003-06-25 | 2005-04-19 | Erico International Corporation | Deformed reinforcing bar splice and method |
| US20050193681A1 (en) | 2004-02-21 | 2005-09-08 | Brackett Charles T. | Threaded rod wind and seismic resistance system |
| US7621085B2 (en) | 2005-01-03 | 2009-11-24 | Commins Alfred D | Racheting take-up device |
| HUE026437T2 (en) * | 2006-06-01 | 2016-06-28 | Hardoor Top Design & Tech Ltd | System and device for stiffening a door |
| US7905066B2 (en) * | 2007-04-06 | 2011-03-15 | Simpson Strong-Tie Co., Inc. | Automatic take-up device and in-line coupler |
| US8387313B2 (en) | 2007-06-15 | 2013-03-05 | Henry Lee Hamlin, III | Stretched cable membrane attachment system |
| US20100031607A1 (en) * | 2008-08-11 | 2010-02-11 | Oliva Michael G | Splice System for Fiber-Reinforced Polymer Rebars |
| US8448406B2 (en) | 2009-01-16 | 2013-05-28 | Mark Shepard | Hybrid top chord bearing framing system |
| US20110072732A1 (en) | 2009-09-29 | 2011-03-31 | Schilling Larry E | Roof Panel Tie Down System |
| US20110192111A1 (en) * | 2010-02-05 | 2011-08-11 | Sam White | Cast-in Shear Wall Anchor |
| US20120240495A1 (en) * | 2011-02-10 | 2012-09-27 | Craig Eychaner | Data Center Ceiling Systems |
| US8950130B2 (en) * | 2011-09-30 | 2015-02-10 | John Daines Chadwick | Techniques for building construction using fabricated timbers |
| US20140010590A1 (en) * | 2012-07-03 | 2014-01-09 | Erico International Corporation | Thermal treated reinforcing bar splice and method |
| CA2918189C (en) * | 2012-08-06 | 2018-03-27 | Thomas M. Espinosa | Holder and concrete anchor assemblies |
| WO2015112872A1 (en) * | 2014-01-23 | 2015-07-30 | Crumley Harvel K | Load indicating washer |
| US9619899B2 (en) | 2014-12-23 | 2017-04-11 | Ricoh Co., Ltd. | Distinguishing between stock keeping units using hough voting methodology |
| DE102015219265A1 (en) * | 2015-10-06 | 2017-04-06 | Mahle International Gmbh | piston pin |
| USD813023S1 (en) * | 2016-08-08 | 2018-03-20 | Reigstad & Associates, Inc. | Post-tension concrete splicing device |
-
2014
- 2014-05-21 CA CA3028668A patent/CA3028668C/en active Active
- 2014-05-21 CA CA2949950A patent/CA2949950C/en active Active
- 2014-05-21 US US14/891,449 patent/US9874009B2/en active Active
- 2014-05-21 WO PCT/US2014/038967 patent/WO2014190054A1/en not_active Ceased
-
2017
- 2017-12-15 US US15/843,992 patent/US10480178B2/en active Active
-
2019
- 2019-11-05 US US16/674,600 patent/US11268273B2/en active Active
-
2022
- 2022-02-16 US US17/672,976 patent/US20220243458A1/en active Pending
Patent Citations (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5531054A (en) * | 1992-11-20 | 1996-07-02 | Ramirez; Jose G. | Reinforced wooden wall |
| US6951078B2 (en) * | 1996-11-04 | 2005-10-04 | Espinosa Thomas M | Fastener assembly serving as a product, or combined with other components as a product, allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US6161350A (en) * | 1996-11-04 | 2000-12-19 | Espinosa; Thomas M. | Fastener assembly serving as a product, or combined with other components as a product allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US7159366B2 (en) * | 1996-11-04 | 2007-01-09 | Espinosa Thomas M | Fastener assembly serving as a product, or combined with other components as a product, allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US6688058B2 (en) * | 1996-11-04 | 2004-02-10 | Thomas M. Espinosa | Fastener assembly serving as a product, or combined with other components as a product, allows automatic controlled movements in one direction and prevents movements in the opposite direction when forces are applied |
| US6161339A (en) * | 1998-08-26 | 2000-12-19 | Hurri-Bolt Inc. | Structural tie-down apparatus |
| US6367205B2 (en) * | 1998-10-05 | 2002-04-09 | Hurri-Bolt, Inc. | Anchor for a structural tie-down apparatus |
| US20030182875A1 (en) * | 2002-03-26 | 2003-10-02 | Hill Kenneth A. | High wind roof securement device |
| US20050055897A1 (en) * | 2003-08-12 | 2005-03-17 | Commins Alfred D. | Continuously threaded hold-down system |
| US7150132B2 (en) * | 2003-08-12 | 2006-12-19 | Commins Alfred D | Continuous hold-down system |
| US20070175167A1 (en) * | 2006-01-13 | 2007-08-02 | Allen Paul B | Reinforcing bar splice with threaded collars |
| US7762030B2 (en) * | 2006-09-12 | 2010-07-27 | Espinosa Thomas M | Hold down system |
| US8136318B2 (en) * | 2006-09-12 | 2012-03-20 | Thomas M Espinosa | Hold down system |
| US8511019B2 (en) * | 2006-09-12 | 2013-08-20 | Thomas M. Espinosa | Hold down system |
| US7878730B2 (en) * | 2008-01-16 | 2011-02-01 | Weaver Jason M | Bar coupling apparatus and methods |
| US9097000B2 (en) * | 2008-10-03 | 2015-08-04 | Thomas M. Espinosa | Hold down system using hollow bearing members |
| US7985041B2 (en) * | 2008-10-08 | 2011-07-26 | Simpson Strong-Tie Company, Inc. | Symmetrically stepped bore coupler nut |
| US20110041449A1 (en) * | 2009-02-04 | 2011-02-24 | Espinosa Thomas M | Concrete anchor |
| US8943777B2 (en) * | 2009-02-04 | 2015-02-03 | Thomas M. Espinosa | Concrete anchor |
| US9097001B2 (en) * | 2009-02-04 | 2015-08-04 | Thomas M. Espinosa | Concrete anchor |
| US9222251B2 (en) * | 2011-03-18 | 2015-12-29 | Thomas M. Espinosa | Concrete anchor coupling assembly and anchor rod holder |
| US20120304589A1 (en) * | 2011-06-01 | 2012-12-06 | Commins Alfred D | Double-duty, hold-down system |
| US9874009B2 (en) * | 2013-05-23 | 2018-01-23 | Cetres Holdings, Llc | Reinforced building wall |
| US10480178B2 (en) * | 2013-05-23 | 2019-11-19 | Cetres Holdings, Llc | Reinforced building wall |
| US11268273B2 (en) * | 2013-05-23 | 2022-03-08 | Cetres Holdings, Llc | Reinforced building wall |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240076867A1 (en) * | 2021-01-17 | 2024-03-07 | 1284343 B.C. Ltd. | System and method for forming a wall |
Also Published As
| Publication number | Publication date |
|---|---|
| US9874009B2 (en) | 2018-01-23 |
| US11268273B2 (en) | 2022-03-08 |
| US10480178B2 (en) | 2019-11-19 |
| US20180202146A1 (en) | 2018-07-19 |
| CA2949950A1 (en) | 2014-11-27 |
| US20160076239A1 (en) | 2016-03-17 |
| CA3028668A1 (en) | 2014-11-27 |
| CA3028668C (en) | 2021-05-18 |
| US20200131757A1 (en) | 2020-04-30 |
| CA2949950C (en) | 2019-02-19 |
| WO2014190054A1 (en) | 2014-11-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20220243458A1 (en) | Reinforced building wall | |
| CN101755133B (en) | Automatic take-up device and in-line coupler | |
| Mortazavi et al. | Lateral behaviour of hybrid cold-formed and hot-rolled steel wall systems: Experimental investigation | |
| US10364569B2 (en) | Guide device for retaining ties in masonry walls | |
| US11572686B2 (en) | Building with roof trusses directly connected to the foundation | |
| US20250270837A1 (en) | Reinforced building wall using compression rod | |
| US11603656B2 (en) | Compression and tension reinforced wall | |
| US8919060B1 (en) | Connector and foundation for manufactured building | |
| US20170009477A1 (en) | Retrofitting structure for existing building | |
| AU2020260386A1 (en) | Connection system | |
| JP2019119990A (en) | Joint metal for woody wall panel, and wooden building using joint metal for woody wall panel | |
| CN115977245B (en) | High-energy-consumption high-bearing-capacity self-resetting beam column node | |
| KR101168670B1 (en) | Seismic reinforcement structure | |
| JP5891982B2 (en) | Bearing wall joint structure | |
| DE202010002026U1 (en) | Device for attaching a cantilevered from a building support beam | |
| Buchanan et al. | Log house performance in the 2016 Kaikoura earthquake | |
| US20200173163A1 (en) | System and method for anchoring air separation unit structures to concrete foundations | |
| KR101712430B1 (en) | Beam-Slab Pannel Joint Structure | |
| KR20150035060A (en) | Reinforcing structure for concrete box-type body and reinforcing method | |
| KR102619646B1 (en) | Non-structured earthquake-resistant device for installing stud bolt | |
| CN104878857B (en) | A kind of lightweight prefabricated combined wall body | |
| JP5756659B2 (en) | Anchor bolt advance yield type attracting metal and method for seismic reinforcement of large-scale wooden buildings using the attracted metal | |
| US20220380997A1 (en) | Soil nail/micropile comprising dissimilar bars connected with transition coupler | |
| KR20200068270A (en) | Seismic reinforcement method of In-wall, out-of-wall and joint of Masonry building using steel bars | |
| US20160237674A1 (en) | Rim Board Connector Rod |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| AS | Assignment |
Owner name: CETRES HOLDINGS, LLC, WYOMING Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ESPINOSA, THOMAS M.;REEL/FRAME:062185/0840 Effective date: 20160208 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION COUNTED, NOT YET MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |