US20220228487A1 - Npr anchor rod - Google Patents
Npr anchor rod Download PDFInfo
- Publication number
- US20220228487A1 US20220228487A1 US17/622,948 US202017622948A US2022228487A1 US 20220228487 A1 US20220228487 A1 US 20220228487A1 US 202017622948 A US202017622948 A US 202017622948A US 2022228487 A1 US2022228487 A1 US 2022228487A1
- Authority
- US
- United States
- Prior art keywords
- npr
- spiral
- steel bar
- bolt
- spiral steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000011435 rock Substances 0.000 claims abstract description 35
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 239000002184 metal Substances 0.000 claims description 7
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 230000008093 supporting effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000001066 destructive effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/02—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection having means for indicating tension
Definitions
- the present disclosure relates to the technical field of concrete-related new materials, in particular to an NPR rock bolt.
- rock bolts are the most used support equipment in terms of both scope and quantity.
- the roadway-surrounding rock often shows the characteristics of large deformation, such as large deformation of soft rock, large deformation of rock burst, large deformation of impact, large deformation of gas outburst.
- the bolt body has a low elongation and is not suitable for the nonlinear large-scale deformation and failure characteristics of surrounding rock in deep roadways.
- the rock bolt Under the action of impact loads, the rock bolt may reach its yield strength instantaneously, then fracture and failure occur, and its bearing and protection capabilities are lost, which leads to destructive situations such as repeated repairation of the roadway, distortion of the steel frame, and cracking of the poured concrete.
- An embodiment of the present disclosure provides an NPR rock bolt to solve the problem in the prior art that the conventional rock bolts have a low elongation and cannot meet the requirement of large deformation of the surrounding rock.
- an NPR rock bolt comprising a bolt body, a tray and a lock;
- the bolt body is an NPR spiral steel bar, an outer surface of the NPR spiral steel bar is provided with a number of convex spiral ribs, and the spiral ribs have a spiral structure; and the tray and the lock are directly sleeved on a tail of the NPR spiral steel bar.
- the tail of the NPR spiral steel bar is untreated.
- the NPR spiral steel bar has a yield strength of 800-950 MPa and a tensile strength of 900-1050 MPa, and a deformation displacement of the NPR spiral steel bar is 200-350 mm/m.
- a nominal diameter of the NPR bolt is 14-26 mm.
- the tray is a metal butterfly tray.
- the lock comprises a metal lock piece and a lock sleeve that cooperate with each other.
- spiral ribs extend along an axial direction of the NPR spiral steel bar.
- the quantity of the spiral ribs is 3-6.
- a number of the spiral ribs are evenly disposed along a circumferential direction of the NPR spiral steel bar.
- the NPR rock bolt according to the present disclosure can achieve uniform elongation (200-350 mm/m) when the roadway-surrounding rock deforms greatly, and maintain a substantially stable working resistance. Therefore, the NPR bolt according to the present disclosure can absorb the energy of the surrounding rock by means of transverse resistance and large deformation, so as to still have a good supporting effect under the condition of large deformation of the surrounding rock to ensure the stability of the roadway.
- FIG. 1 is a schematic diagram of the structure of an NPR rock bolt according to an embodiment of the present disclosure.
- FIG. 2 is a schematic diagram of a stress-strain curve of the NPR rock bolt according to an embodiment of the present disclosure.
- a NPR rock bolt with constant resistance and large deformation comprises a bolt body 1 , a tray 2 and a lock 3 .
- the bolt body 1 is an NPR spiral steel bar
- an outer surface of the NPR spiral steel bar is provided with a number of convex spiral ribs, and the spiral ribs have a spiral structure.
- the tray 2 and the lock 3 are directly sleeved on a tail of the NPR spiral steel bar.
- the NPR rock bolt according to the present disclosure can achieve uniform elongation (200-350 mm/m) when the roadway-surrounding rock deforms greatly, and maintain a substantially stable working resistance. Therefore, the NPR bolt according to the present disclosure can absorb the energy of the surrounding rock by means of transverse resistance and large deformation, so as to still have a good supporting effect under the condition of large deformation of the surrounding rock to ensure the stability of the roadway.
- the tail of the NPR spiral steel bar is untreated.
- the tail of the NPR spiral steel bar is not subject to any treatment such as thread rolling.
- Such structure has the advantage of avoiding the stress concentration at the tail thread, thereby avoiding the occurrence of tail thread cracking, and effectively improving the elongation of the rock bolt.
- the NPR spiral steel bar has a yield strength of 800-950 MPa and a tensile strength of 900-1050 MPa, and the deformation displacement of the NPR spiral steel bar is 200-350 mm/m.
- the maximum stress of bolt body is >210 KN, the elongation is >20%, the anchoring force of bolt body is >200 KN, the anchoring length is >1 m, the bearing capacity of bolt lock is >210 KN, and the bearing capacity of tray is >210 KN.
- the nominal diameter of the NPR bolt is 14-26 mm.
- the tray 2 is a metal butterfly tray.
- the lock 3 comprises a metal lock piece and a lock sleeve that cooperate with each other. A hole is formed at the center part of the tray 2 for the bolt body 1 to pass through.
- the metal lock piece is sleeved on the tail of the bolt body and cooperates with the lock sleeve to form a lock 3 .
- the structure of the bolt body 1 is as follows.
- the spiral ribs extend along the axial direction of the NPR spiral steel bar.
- the quantity of spiral ribs is 3-6.
- a number of spiral ribs are evenly disposed along the circumferential direction of the NPR spiral steel bar.
- the NPR bolt according to the present disclosure can realize constant resistance and large deformation, and in the roadway where the NPR bolt according to the present disclosure is used as a supporting equipment, when the roadway-surrounding rock is subject to a certain deformation, the NPR bolt will be evenly stretched and the deformation energy in the surrounding rock can be released, and when there is large tensile deformation, the relatively stable working resistance can be maintained, the stability of the roadway can be realized, and the hidden safety hazards such as roof fall and collapse can be eliminated.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Piles And Underground Anchors (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Road Paving Structures (AREA)
Abstract
Description
- The present disclosure relates to the technical field of concrete-related new materials, in particular to an NPR rock bolt.
- In the prior art, in the support of coal mine roadways and tunnels, rock bolts are the most used support equipment in terms of both scope and quantity. With the continuous increase of coal mining depth, the roadway-surrounding rock often shows the characteristics of large deformation, such as large deformation of soft rock, large deformation of rock burst, large deformation of impact, large deformation of gas outburst. In the current supporting rock bolts, the bolt body has a low elongation and is not suitable for the nonlinear large-scale deformation and failure characteristics of surrounding rock in deep roadways. Under the action of impact loads, the rock bolt may reach its yield strength instantaneously, then fracture and failure occur, and its bearing and protection capabilities are lost, which leads to destructive situations such as repeated repairation of the roadway, distortion of the steel frame, and cracking of the poured concrete.
- An embodiment of the present disclosure provides an NPR rock bolt to solve the problem in the prior art that the conventional rock bolts have a low elongation and cannot meet the requirement of large deformation of the surrounding rock.
- In order to achieve the above object, the present disclosure provides an NPR rock bolt, comprising a bolt body, a tray and a lock; the bolt body is an NPR spiral steel bar, an outer surface of the NPR spiral steel bar is provided with a number of convex spiral ribs, and the spiral ribs have a spiral structure; and the tray and the lock are directly sleeved on a tail of the NPR spiral steel bar.
- Further, the tail of the NPR spiral steel bar is untreated.
- Further, the NPR spiral steel bar has a yield strength of 800-950 MPa and a tensile strength of 900-1050 MPa, and a deformation displacement of the NPR spiral steel bar is 200-350 mm/m.
- Further, a nominal diameter of the NPR bolt is 14-26 mm.
- Further, the tray is a metal butterfly tray.
- Further, the lock comprises a metal lock piece and a lock sleeve that cooperate with each other.
- Further, the spiral ribs extend along an axial direction of the NPR spiral steel bar.
- Further, the quantity of the spiral ribs is 3-6.
- Further, a number of the spiral ribs are evenly disposed along a circumferential direction of the NPR spiral steel bar.
- The NPR rock bolt according to the present disclosure can achieve uniform elongation (200-350 mm/m) when the roadway-surrounding rock deforms greatly, and maintain a substantially stable working resistance. Therefore, the NPR bolt according to the present disclosure can absorb the energy of the surrounding rock by means of transverse resistance and large deformation, so as to still have a good supporting effect under the condition of large deformation of the surrounding rock to ensure the stability of the roadway.
-
FIG. 1 is a schematic diagram of the structure of an NPR rock bolt according to an embodiment of the present disclosure; and -
FIG. 2 is a schematic diagram of a stress-strain curve of the NPR rock bolt according to an embodiment of the present disclosure. - The present disclosure will be described in further detail below with reference to the drawings and specific embodiments, but they are not intended to limit the present disclosure.
- Referring to
FIG. 1 andFIG. 2 , according to an embodiment of the present disclosure, a NPR rock bolt with constant resistance and large deformation is provided. The NPR rock bolt comprises abolt body 1, atray 2 and alock 3. Thebolt body 1 is an NPR spiral steel bar, an outer surface of the NPR spiral steel bar is provided with a number of convex spiral ribs, and the spiral ribs have a spiral structure. Thetray 2 and thelock 3 are directly sleeved on a tail of the NPR spiral steel bar. - The NPR rock bolt according to the present disclosure can achieve uniform elongation (200-350 mm/m) when the roadway-surrounding rock deforms greatly, and maintain a substantially stable working resistance. Therefore, the NPR bolt according to the present disclosure can absorb the energy of the surrounding rock by means of transverse resistance and large deformation, so as to still have a good supporting effect under the condition of large deformation of the surrounding rock to ensure the stability of the roadway.
- Preferably, the tail of the NPR spiral steel bar is untreated. For example, the tail of the NPR spiral steel bar is not subject to any treatment such as thread rolling. Such structure has the advantage of avoiding the stress concentration at the tail thread, thereby avoiding the occurrence of tail thread cracking, and effectively improving the elongation of the rock bolt.
- Refer to the schematic diagram of stress-strain curve shown in
FIG. 2 , in the present embodiment, the NPR spiral steel bar has a yield strength of 800-950 MPa and a tensile strength of 900-1050 MPa, and the deformation displacement of the NPR spiral steel bar is 200-350 mm/m. The maximum stress of bolt body is >210 KN, the elongation is >20%, the anchoring force of bolt body is >200 KN, the anchoring length is >1 m, the bearing capacity of bolt lock is >210 KN, and the bearing capacity of tray is >210 KN. - Preferably, the nominal diameter of the NPR bolt is 14-26 mm. As shown in
FIG. 1 , thetray 2 is a metal butterfly tray. Thelock 3 comprises a metal lock piece and a lock sleeve that cooperate with each other. A hole is formed at the center part of thetray 2 for thebolt body 1 to pass through. The metal lock piece is sleeved on the tail of the bolt body and cooperates with the lock sleeve to form alock 3. - The structure of the
bolt body 1 is as follows. The spiral ribs extend along the axial direction of the NPR spiral steel bar. The quantity of spiral ribs is 3-6. A number of spiral ribs are evenly disposed along the circumferential direction of the NPR spiral steel bar. - The NPR bolt according to the present disclosure can realize constant resistance and large deformation, and in the roadway where the NPR bolt according to the present disclosure is used as a supporting equipment, when the roadway-surrounding rock is subject to a certain deformation, the NPR bolt will be evenly stretched and the deformation energy in the surrounding rock can be released, and when there is large tensile deformation, the relatively stable working resistance can be maintained, the stability of the roadway can be realized, and the hidden safety hazards such as roof fall and collapse can be eliminated.
- It should be noted that the terminology used herein is only for describing specific embodiments and is not intended to limit the exemplary embodiments according to the present disclosure. As used herein, the singular forms are intended to include the plural forms as well, unless the context clearly indicates otherwise. It should also be understood that when the terms “include” and/or “comprise” are used in this specification, they indicate there are features, steps, operations, devices, components, and/or combinations thereof.
- It should be noted that the terms “first” and “second” in the specification, claims and drawings of the present disclosure are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way are interchangeable under appropriate circumstances so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
- Of course, the above are only preferable embodiments of the present disclosure. It should be noted that those skilled in the art can make improvements and modifications without departing from the basic principles of the present disclosure, and these improvements and modifications shall also fall within the protection scope of the present disclosure.
Claims (9)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921859383.2U CN211038693U (en) | 2019-10-31 | 2019-10-31 | NPR anchor rod |
| CN201921859383.2 | 2019-10-31 | ||
| PCT/CN2020/117971 WO2021082839A1 (en) | 2019-10-31 | 2020-09-27 | Npr anchor rod |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20220228487A1 true US20220228487A1 (en) | 2022-07-21 |
Family
ID=71531456
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/622,948 Abandoned US20220228487A1 (en) | 2019-10-31 | 2020-09-27 | Npr anchor rod |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20220228487A1 (en) |
| EP (1) | EP3954862B1 (en) |
| JP (1) | JP7274669B2 (en) |
| CN (1) | CN211038693U (en) |
| WO (1) | WO2021082839A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12037904B1 (en) * | 2023-05-06 | 2024-07-16 | China University Of Mining And Technology—Beijing | Rock burst active prevention and control mechanism |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN211038693U (en) * | 2019-10-31 | 2020-07-17 | 何满潮 | NPR anchor rod |
| CN114382520B (en) * | 2022-03-25 | 2022-06-17 | 中国矿业大学(北京) | NPR anchor rod active supporting method suitable for hard rock tunnel |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5984588A (en) * | 1997-03-07 | 1999-11-16 | Marcegaglia S.P.A. | Method for the stabilization of rock masses and related stabilization element |
| US6447228B1 (en) * | 1998-05-22 | 2002-09-10 | Industrial Roll Formers Pty Ltd. | Rock bolt and method of forming a rock bolt |
| US6881015B2 (en) * | 2002-10-16 | 2005-04-19 | Dywidag-Systems International, U.S.A., Inc. | Wedge barrel for a mine roof cable bolt |
| US6886384B2 (en) * | 2000-03-15 | 2005-05-03 | Peter Andrew Gray | Process for forming a threaded member |
| US20060216190A1 (en) * | 2004-11-08 | 2006-09-28 | Beaven Robert W | Pump |
| US20100202838A1 (en) * | 2007-08-31 | 2010-08-12 | Steven Weaver | Rock bolt |
| US20100310323A1 (en) * | 2008-01-31 | 2010-12-09 | Fci Holdings Delaware, Inc. | Rock bolt assembly |
| US20110206468A1 (en) * | 2010-02-23 | 2011-08-25 | Hilti Aktiengesellschaft | Reinforcement and/or anchor bolt |
| US20120251765A1 (en) * | 2009-12-03 | 2012-10-04 | Cristiano Bonomi | Method and plant for producing a fiberglass profile to be used as reinforcing element for strengthening an excavation wall |
| US8807877B1 (en) * | 2008-09-19 | 2014-08-19 | Rhino Technologies Llc | Tensionable spiral bolt with resin nut and related methods |
| US9677399B2 (en) * | 2013-07-12 | 2017-06-13 | Minova International Limited | Yieldable rock anchor |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201212399Y (en) * | 2008-05-09 | 2009-03-25 | 周钢 | Fiber-reinforced plastic anchor rod fastening device |
| CN101858225B (en) * | 2010-06-10 | 2011-10-12 | 北京中矿深远能源环境科学研究院 | constant-resistance large-deformation anchor rod |
| CN203008237U (en) | 2012-12-07 | 2013-06-19 | 天津银龙预应力材料股份有限公司 | Ultra-large-diameter high-strength spiral fin pre-stressed steel bar |
| DE102013002734B4 (en) * | 2013-02-19 | 2015-03-05 | Firep Rebar Technology Gmbh | Anchor head for a tie rod and anchor nut for an anchor head of a tie rod |
| CN104343460A (en) * | 2014-09-26 | 2015-02-11 | 徐州矿务集团有限公司 | Surrounding rock support method adopting tensioning type pre-tightening anchor rod |
| CN206418498U (en) * | 2016-12-07 | 2017-08-18 | 山东太极龙塑胶科技有限公司 | A kind of cage cone section expanded anchor rod |
| CN108754339B (en) | 2018-05-23 | 2020-06-19 | 何满潮 | Production method of NPR anchor rod steel material |
| CN211038693U (en) * | 2019-10-31 | 2020-07-17 | 何满潮 | NPR anchor rod |
-
2019
- 2019-10-31 CN CN201921859383.2U patent/CN211038693U/en active Active
-
2020
- 2020-09-27 EP EP20881138.0A patent/EP3954862B1/en active Active
- 2020-09-27 JP JP2022519528A patent/JP7274669B2/en active Active
- 2020-09-27 WO PCT/CN2020/117971 patent/WO2021082839A1/en not_active Ceased
- 2020-09-27 US US17/622,948 patent/US20220228487A1/en not_active Abandoned
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5984588A (en) * | 1997-03-07 | 1999-11-16 | Marcegaglia S.P.A. | Method for the stabilization of rock masses and related stabilization element |
| US6447228B1 (en) * | 1998-05-22 | 2002-09-10 | Industrial Roll Formers Pty Ltd. | Rock bolt and method of forming a rock bolt |
| US6886384B2 (en) * | 2000-03-15 | 2005-05-03 | Peter Andrew Gray | Process for forming a threaded member |
| US6881015B2 (en) * | 2002-10-16 | 2005-04-19 | Dywidag-Systems International, U.S.A., Inc. | Wedge barrel for a mine roof cable bolt |
| US20060216190A1 (en) * | 2004-11-08 | 2006-09-28 | Beaven Robert W | Pump |
| US20100202838A1 (en) * | 2007-08-31 | 2010-08-12 | Steven Weaver | Rock bolt |
| US20100310323A1 (en) * | 2008-01-31 | 2010-12-09 | Fci Holdings Delaware, Inc. | Rock bolt assembly |
| US8807877B1 (en) * | 2008-09-19 | 2014-08-19 | Rhino Technologies Llc | Tensionable spiral bolt with resin nut and related methods |
| US20120251765A1 (en) * | 2009-12-03 | 2012-10-04 | Cristiano Bonomi | Method and plant for producing a fiberglass profile to be used as reinforcing element for strengthening an excavation wall |
| US20110206468A1 (en) * | 2010-02-23 | 2011-08-25 | Hilti Aktiengesellschaft | Reinforcement and/or anchor bolt |
| US9677399B2 (en) * | 2013-07-12 | 2017-06-13 | Minova International Limited | Yieldable rock anchor |
Non-Patent Citations (2)
| Title |
|---|
| He et al.; "Mechanics characteristics and application of prevention and control rock bursts of the negative poisson’s ratio effect anchor; March 2014; All (Year: 2014) * |
| He et al.; Machine Translation CN 108754339A; All; 2018 (Year: 2018) * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12037904B1 (en) * | 2023-05-06 | 2024-07-16 | China University Of Mining And Technology—Beijing | Rock burst active prevention and control mechanism |
Also Published As
| Publication number | Publication date |
|---|---|
| JP7274669B2 (en) | 2023-05-16 |
| EP3954862B1 (en) | 2024-03-27 |
| JP2022549922A (en) | 2022-11-29 |
| WO2021082839A1 (en) | 2021-05-06 |
| CN211038693U (en) | 2020-07-17 |
| EP3954862A4 (en) | 2022-12-07 |
| EP3954862A1 (en) | 2022-02-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20220228487A1 (en) | Npr anchor rod | |
| CN106761868B (en) | A new type of durable magnetized bolt | |
| CN204357467U (en) | Scalable internal-injection type secondary anchoring type anchor pole | |
| WO2011153810A1 (en) | Constant resistance and large deformation anchor rod | |
| CN107060851B (en) | Two-stage constant resistance large deformation anchor | |
| CN107939427B (en) | Energy-absorbing-anti-seismic anchor rod | |
| CN109268047A (en) | Laminated structure and method are unloaded in a kind of supporting in bump tunnel | |
| CN102011595B (en) | Coal rock tunnel impact retraction energy-absorbing support device | |
| CN112593988B (en) | Multi-section anchoring energy-consumption yielding anchor rod aiming at rock burst and anchoring method | |
| CN104033169A (en) | Impact-resistant constant-resistance anchor cable | |
| CN105736023A (en) | Large-deformation energy-absorption anchor rod | |
| CN109026105A (en) | The anchor rod component and its method for protecting support of coal mine roadway buffering surrouding rock deformation | |
| CN109458197A (en) | A kind of classification yield supporting system | |
| CN109477383A (en) | A corrosion-resistant retractable bolt | |
| CN205089345U (en) | Anchor rope is put by pressure equipment | |
| CN108590721A (en) | A kind of adaptively release can anchor pole | |
| CN104481565B (en) | A kind of pressure dispersing type large deformation self adaptation anchor pole | |
| CN208347807U (en) | Anchor pole is locked in tensioning | |
| CN104061010A (en) | Rock anchor rod capable of conducting segmented anchoring | |
| CN202117695U (en) | Pressure releasing device comprising tray and assembly | |
| CN108442955A (en) | A kind of adaptive friction formula anchor pole | |
| Li | Design principles of rock support for underground excavations | |
| CN1966937A (en) | Once supporting method for reinforced anchor rod in deep tunnel | |
| CN208380611U (en) | A kind of anchor pole being suitable for different surrounding rock condition | |
| CN206830214U (en) | A kind of device for preventing that anchor cable is truncated |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: XIA, MIN, CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GUO, HONGYAN;LI, HONGCHAO;REEL/FRAME:058507/0917 Effective date: 20211119 Owner name: HE, MANCHAO, CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GUO, HONGYAN;LI, HONGCHAO;REEL/FRAME:058507/0917 Effective date: 20211119 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: ADVISORY ACTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |