US20200199991A1 - Pulsed hydraulic fracturing with geopolymer precursor fluids - Google Patents
Pulsed hydraulic fracturing with geopolymer precursor fluids Download PDFInfo
- Publication number
- US20200199991A1 US20200199991A1 US16/805,261 US202016805261A US2020199991A1 US 20200199991 A1 US20200199991 A1 US 20200199991A1 US 202016805261 A US202016805261 A US 202016805261A US 2020199991 A1 US2020199991 A1 US 2020199991A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- geopolymer
- geopolymer precursor
- precursor fluid
- fracturing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 241
- 229920000876 geopolymer Polymers 0.000 title claims abstract description 184
- 239000002243 precursor Substances 0.000 title claims abstract description 125
- 238000000034 method Methods 0.000 claims description 25
- 239000003795 chemical substances by application Substances 0.000 claims description 21
- 230000035699 permeability Effects 0.000 claims description 20
- 229910000323 aluminium silicate Inorganic materials 0.000 claims description 18
- HNPSIPDUKPIQMN-UHFFFAOYSA-N dioxosilane;oxo(oxoalumanyloxy)alumane Chemical compound O=[Si]=O.O=[Al]O[Al]=O HNPSIPDUKPIQMN-UHFFFAOYSA-N 0.000 claims description 18
- 230000002708 enhancing effect Effects 0.000 claims description 15
- 239000003153 chemical reaction reagent Substances 0.000 claims description 14
- 239000010881 fly ash Substances 0.000 claims description 12
- 239000011324 bead Substances 0.000 claims description 10
- WPYMKLBDIGXBTP-UHFFFAOYSA-N benzoic acid Chemical compound OC(=O)C1=CC=CC=C1 WPYMKLBDIGXBTP-UHFFFAOYSA-N 0.000 claims description 10
- 239000004927 clay Substances 0.000 claims description 10
- 150000003839 salts Chemical class 0.000 claims description 8
- 239000004094 surface-active agent Substances 0.000 claims description 8
- 229920000747 poly(lactic acid) Polymers 0.000 claims description 7
- 239000004626 polylactic acid Substances 0.000 claims description 7
- 239000011435 rock Substances 0.000 claims description 7
- 239000003340 retarding agent Substances 0.000 claims description 6
- 239000005711 Benzoic acid Substances 0.000 claims description 5
- 239000002253 acid Substances 0.000 claims description 5
- 235000010233 benzoic acid Nutrition 0.000 claims description 5
- 238000005086 pumping Methods 0.000 claims description 5
- 239000004111 Potassium silicate Substances 0.000 claims description 4
- 239000004115 Sodium Silicate Substances 0.000 claims description 4
- 239000003245 coal Substances 0.000 claims description 4
- 229930195733 hydrocarbon Natural products 0.000 claims description 4
- 150000002430 hydrocarbons Chemical class 0.000 claims description 4
- NNHHDJVEYQHLHG-UHFFFAOYSA-N potassium silicate Chemical compound [K+].[K+].[O-][Si]([O-])=O NNHHDJVEYQHLHG-UHFFFAOYSA-N 0.000 claims description 4
- 229910052913 potassium silicate Inorganic materials 0.000 claims description 4
- 235000019353 potassium silicate Nutrition 0.000 claims description 4
- 239000002893 slag Substances 0.000 claims description 4
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 4
- 229910052911 sodium silicate Inorganic materials 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 3
- 239000000835 fiber Substances 0.000 claims description 3
- 239000004215 Carbon black (E152) Substances 0.000 claims description 2
- 206010017076 Fracture Diseases 0.000 description 46
- 238000002347 injection Methods 0.000 description 25
- 239000007924 injection Substances 0.000 description 25
- 208000010392 Bone Fractures Diseases 0.000 description 23
- 239000000499 gel Substances 0.000 description 13
- 230000015572 biosynthetic process Effects 0.000 description 12
- 238000005755 formation reaction Methods 0.000 description 12
- 238000011282 treatment Methods 0.000 description 12
- 239000002245 particle Substances 0.000 description 7
- 239000000203 mixture Substances 0.000 description 6
- OYPRJOBELJOOCE-UHFFFAOYSA-N Calcium Chemical compound [Ca] OYPRJOBELJOOCE-UHFFFAOYSA-N 0.000 description 5
- 239000011575 calcium Substances 0.000 description 5
- 229910052791 calcium Inorganic materials 0.000 description 5
- -1 calcium-aluminum-hydrates Chemical class 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 4
- NLYAJNPCOHFWQQ-UHFFFAOYSA-N kaolin Chemical compound O.O.O=[Al]O[Si](=O)O[Si](=O)O[Al]=O NLYAJNPCOHFWQQ-UHFFFAOYSA-N 0.000 description 4
- 239000011347 resin Substances 0.000 description 4
- 229920005989 resin Polymers 0.000 description 4
- XEKOWRVHYACXOJ-UHFFFAOYSA-N Ethyl acetate Chemical compound CCOC(C)=O XEKOWRVHYACXOJ-UHFFFAOYSA-N 0.000 description 3
- KWYUFKZDYYNOTN-UHFFFAOYSA-M Potassium hydroxide Chemical compound [OH-].[K+] KWYUFKZDYYNOTN-UHFFFAOYSA-M 0.000 description 3
- HEMHJVSKTPXQMS-UHFFFAOYSA-M Sodium hydroxide Chemical compound [OH-].[Na+] HEMHJVSKTPXQMS-UHFFFAOYSA-M 0.000 description 3
- 239000011521 glass Substances 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- 238000006116 polymerization reaction Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- GJCOSYZMQJWQCA-UHFFFAOYSA-N 9H-xanthene Chemical compound C1=CC=C2CC3=CC=CC=C3OC2=C1 GJCOSYZMQJWQCA-UHFFFAOYSA-N 0.000 description 2
- BVKZGUZCCUSVTD-UHFFFAOYSA-M Bicarbonate Chemical class OC([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-M 0.000 description 2
- ZOXJGFHDIHLPTG-UHFFFAOYSA-N Boron Chemical compound [B] ZOXJGFHDIHLPTG-UHFFFAOYSA-N 0.000 description 2
- 244000303965 Cyamopsis psoralioides Species 0.000 description 2
- WCUXLLCKKVVCTQ-UHFFFAOYSA-M Potassium chloride Chemical compound [Cl-].[K+] WCUXLLCKKVVCTQ-UHFFFAOYSA-M 0.000 description 2
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 2
- GWEVSGVZZGPLCZ-UHFFFAOYSA-N Titan oxide Chemical compound O=[Ti]=O GWEVSGVZZGPLCZ-UHFFFAOYSA-N 0.000 description 2
- MCMNRKCIXSYSNV-UHFFFAOYSA-N Zirconium dioxide Chemical compound O=[Zr]=O MCMNRKCIXSYSNV-UHFFFAOYSA-N 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 150000001412 amines Chemical class 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 229910052796 boron Inorganic materials 0.000 description 2
- 239000000378 calcium silicate Substances 0.000 description 2
- 229910052918 calcium silicate Inorganic materials 0.000 description 2
- OYACROKNLOSFPA-UHFFFAOYSA-N calcium;dioxido(oxo)silane Chemical compound [Ca+2].[O-][Si]([O-])=O OYACROKNLOSFPA-UHFFFAOYSA-N 0.000 description 2
- 150000004649 carbonic acid derivatives Chemical class 0.000 description 2
- FKRCODPIKNYEAC-UHFFFAOYSA-N ethyl propionate Chemical compound CCOC(=O)CC FKRCODPIKNYEAC-UHFFFAOYSA-N 0.000 description 2
- 150000004676 glycans Chemical class 0.000 description 2
- 150000004679 hydroxides Chemical class 0.000 description 2
- 229910052622 kaolinite Inorganic materials 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 235000019198 oils Nutrition 0.000 description 2
- 229920000642 polymer Polymers 0.000 description 2
- 229920001282 polysaccharide Polymers 0.000 description 2
- 239000005017 polysaccharide Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 229920001285 xanthan gum Polymers 0.000 description 2
- 239000005995 Aluminium silicate Substances 0.000 description 1
- 239000010754 BS 2869 Class F Substances 0.000 description 1
- UXVMQQNJUSDDNG-UHFFFAOYSA-L Calcium chloride Chemical compound [Cl-].[Cl-].[Ca+2] UXVMQQNJUSDDNG-UHFFFAOYSA-L 0.000 description 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 239000004971 Cross linker Substances 0.000 description 1
- 240000007049 Juglans regia Species 0.000 description 1
- 235000009496 Juglans regia Nutrition 0.000 description 1
- UUIQMZJEGPQKFD-UHFFFAOYSA-N Methyl butyrate Chemical compound CCCC(=O)OC UUIQMZJEGPQKFD-UHFFFAOYSA-N 0.000 description 1
- BPQQTUXANYXVAA-UHFFFAOYSA-N Orthosilicate Chemical compound [O-][Si]([O-])([O-])[O-] BPQQTUXANYXVAA-UHFFFAOYSA-N 0.000 description 1
- KFNNIILCVOLYIR-UHFFFAOYSA-N Propyl formate Chemical compound CCCOC=O KFNNIILCVOLYIR-UHFFFAOYSA-N 0.000 description 1
- 244000166071 Shorea robusta Species 0.000 description 1
- 235000015076 Shorea robusta Nutrition 0.000 description 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 1
- 229910002800 Si–O–Al Inorganic materials 0.000 description 1
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 description 1
- QCWXUUIWCKQGHC-UHFFFAOYSA-N Zirconium Chemical compound [Zr] QCWXUUIWCKQGHC-UHFFFAOYSA-N 0.000 description 1
- 150000007513 acids Chemical class 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- PNEYBMLMFCGWSK-UHFFFAOYSA-N aluminium oxide Inorganic materials [O-2].[O-2].[O-2].[Al+3].[Al+3] PNEYBMLMFCGWSK-UHFFFAOYSA-N 0.000 description 1
- 235000012211 aluminium silicate Nutrition 0.000 description 1
- 229920006125 amorphous polymer Polymers 0.000 description 1
- 239000007864 aqueous solution Substances 0.000 description 1
- 229910001570 bauxite Inorganic materials 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 239000000872 buffer Substances 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 229910052792 caesium Inorganic materials 0.000 description 1
- TVFDJXOCXUVLDH-UHFFFAOYSA-N caesium atom Chemical compound [Cs] TVFDJXOCXUVLDH-UHFFFAOYSA-N 0.000 description 1
- 239000001110 calcium chloride Substances 0.000 description 1
- 229910001628 calcium chloride Inorganic materials 0.000 description 1
- 229940043430 calcium compound Drugs 0.000 description 1
- 150000001674 calcium compounds Chemical class 0.000 description 1
- AXCZMVOFGPJBDE-UHFFFAOYSA-L calcium dihydroxide Chemical compound [OH-].[OH-].[Ca+2] AXCZMVOFGPJBDE-UHFFFAOYSA-L 0.000 description 1
- 239000000920 calcium hydroxide Substances 0.000 description 1
- 229910001861 calcium hydroxide Inorganic materials 0.000 description 1
- 239000006229 carbon black Substances 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 229910052570 clay Inorganic materials 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 150000002148 esters Chemical class 0.000 description 1
- 235000019439 ethyl acetate Nutrition 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 229910021485 fumed silica Inorganic materials 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000010439 graphite Substances 0.000 description 1
- 229910002804 graphite Inorganic materials 0.000 description 1
- 229910001710 laterite Inorganic materials 0.000 description 1
- 239000011504 laterite Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- NMJORVOYSJLJGU-UHFFFAOYSA-N methane clathrate Chemical compound C.C.C.C.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O NMJORVOYSJLJGU-UHFFFAOYSA-N 0.000 description 1
- 239000010445 mica Substances 0.000 description 1
- 229910052618 mica group Inorganic materials 0.000 description 1
- 239000004005 microsphere Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000005416 organic matter Substances 0.000 description 1
- 239000001103 potassium chloride Substances 0.000 description 1
- 235000011164 potassium chloride Nutrition 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- YKYONYBAUNKHLG-UHFFFAOYSA-N propyl acetate Chemical compound CCCOC(C)=O YKYONYBAUNKHLG-UHFFFAOYSA-N 0.000 description 1
- 239000000376 reactant Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 239000000454 talc Substances 0.000 description 1
- 229910052623 talc Inorganic materials 0.000 description 1
- BFKJFAAPBSQJPD-UHFFFAOYSA-N tetrafluoroethene Chemical group FC(F)=C(F)F BFKJFAAPBSQJPD-UHFFFAOYSA-N 0.000 description 1
- 229910052719 titanium Inorganic materials 0.000 description 1
- 239000010936 titanium Substances 0.000 description 1
- 239000004408 titanium dioxide Substances 0.000 description 1
- 235000015112 vegetable and seed oil Nutrition 0.000 description 1
- 239000008158 vegetable oil Substances 0.000 description 1
- 239000003981 vehicle Substances 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
- 235000020234 walnut Nutrition 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
- 229910052726 zirconium Inorganic materials 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/80—Compositions for reinforcing fractures, e.g. compositions of proppants used to keep the fractures open
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/66—Compositions based on water or polar solvents
- C09K8/68—Compositions based on water or polar solvents containing organic compounds
- C09K8/685—Compositions based on water or polar solvents containing organic compounds containing cross-linking agents
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K2208/00—Aspects relating to compositions of drilling or well treatment fluids
- C09K2208/08—Fiber-containing well treatment fluids
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K2208/00—Aspects relating to compositions of drilling or well treatment fluids
- C09K2208/30—Viscoelastic surfactants [VES]
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/66—Compositions based on water or polar solvents
- C09K8/665—Compositions based on water or polar solvents containing inorganic compounds
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/70—Compositions for forming crevices or fractures characterised by their form or by the form of their components, e.g. foams
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/10—Production of cement, e.g. improving or optimising the production methods; Cement grinding
Definitions
- This invention relates to pulsed hydraulic fracturing of a reservoir with geopolymer precursor fluids to yield isolated geopolymer proppant pillars in the reservoir.
- Permeability of the proppant pack may be reduced by a combination of factors such as residual damage from poor gel recovery, fines migration, multiphase flow, fluid momentum losses, drag forces, capillary forces, and proppant crushing and embedment. In some cases, conventional proppant packs lose up to 99% of initial conductivity due to gel damage, fines migration, multiphase flow, and non-Darcy flow.
- fracturing a reservoir includes providing a pad fluid to the reservoir via a wellbore in a well to create fractures in the reservoir, providing a fracturing fluid to the fractures via the wellbore, providing a geopolymer precursor fluid to the fractures via the wellbore, and shutting in the wellbore at a wellbore pressure, thereby allowing the geopolymer precursor fluid to harden and form geopolymer proppant pillars in the fractures.
- Providing the geopolymer precursor fluid to the fractures includes pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid. An elapsed time between pulsing the quantities of the geopolymer precursor fluid is between 2 seconds and 20 minutes.
- Implementations of the first general aspect may include one or more of the following features.
- the pad fluid may include slickwater, a linear gel, a crosslinked gel, or a viscoelastic surfactant fluid.
- the fracturing fluid may include slickwater, a linear gel, a crosslinked gel, or a viscoelastic surfactant fluid.
- the fracturing fluid includes a proppant loading of up to 12 pounds per gallon added.
- the geopolymer precursor fluid typically includes aluminosilicate, an alkaline reagent, and a permeability enhancing agent.
- the aluminosilicate may include at least one of calcined clay, kaolinitic clay, lateritic clay, volcanic rock, mine tailings, blast furnace slag, and coal fly ash.
- the alkaline reagent may include at least one of sodium silicate and potassium silicate.
- the permeability enhancing agent may include polylactic acid, such as polylactic acid in the form of beads, fibers, or fabric.
- the permeability enhancing agent may include at least one of a resin, a salt, benzoic acid, and wax beads.
- the salt may include an acid salt.
- the geopolymer precursor may also include an accelerating agent or a retarding agent.
- the geopolymer precursor fluid is a first geopolymer precursor fluid
- the fracturing fluid is a second geopolymer precursor fluid
- the first geopolymer precursor fluid and the second geopolymer precursor fluid differ in composition.
- the elapsed time between pulsing the quantities of the geopolymer precursor is between 10 seconds and 1 minute.
- pulsing the quantities of the geopolymer precursor fluid includes pulsing discrete quantities of the geopolymer precursor fluid into the continuous flow of the fracturing fluid or alternately pulsing discrete quantities of the geopolymer precursor fluid and discrete quantities of the fracturing fluid.
- the discrete quantities of the geopolymer precursor fluid are typically spaced apart from each other.
- Pulsing the quantities of the geopolymer precursor fluid may include injecting the geopolymer precursor fluid at a rate between 1 barrel per minute and 120 barrels per minute, or injecting the geopolymer precursor fluid at a rate between 5 barrels per minute and 50 barrels per minute.
- Implementations of the first general aspect may include, after providing the fracturing fluid and the geopolymer precursor fluid to the fractures, providing a continuous flow of an additional fluid to the fractures.
- the geopolymer precursor fluid is a first geopolymer precursor fluid
- the additional fluid is a second geopolymer precursor fluid.
- the fracturing fluid is a first fracturing fluid
- the additional fluid is a second fracturing fluid.
- the second fracturing fluid may include a proppant loading of up to 12 pounds per gallon added.
- a compressive strength of the geopolymer proppant pillars exceeds an overburden pressure of the reservoir.
- the compressive strength of the geopolymer proppant pillars may be in a range of 500 pounds per square inch to 20,000 pounds per square inch.
- a permeability of the geopolymer proppant pillars may be in a range of 0.00001 Darcy to 20,000 Darcy.
- Pulsed hydraulic fracturing with geopolymer precursor fluids yields increased productivity. Moreover, because the geopolymer precursor fluid hardens in the reservoir to form proppant pillars, the need for proppant is reduced or eliminated. Methods and systems described herein advantageously reduce proppant costs, pumping horsepower, and gel damage, when compared to conventional treatments. Methods and systems described herein also reduce the opportunity for proppant to screen out during pumping procedures.
- FIG. 1 depicts an exemplary hydraulic fracture treatment for a well.
- FIG. 2 is a flowchart for a method of pulsed hydraulic fracturing with a geopolymer precursor fluid.
- FIG. 3A depicts elapsed time between pulsed quantities of geopolymer precursor fluid in a continuous flow of fracturing fluid.
- FIGS. 3B-3D depict elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.
- FIG. 4 depicts a cross-sectional view of geopolymer proppant pillars in a fracture.
- isolated proppant pillars are formed to support the fracture and keep it open.
- the isolated proppant pillars form conductive channels that provide a path having high conductivity for hydrocarbon flow.
- stable proppant pillars are generated by providing pulses of a geopolymer precursor fluid within a compatible fracturing fluid or by alternating pulses of a geopolymer precursor fluid with pulses of a compatible fracturing fluid through the wellbore into the reservoir at fracture pressure.
- the geopolymer precursor fluid includes an aluminosilicate, an alkaline reagent, and a permeability enhancing agent.
- the pulsing injection pattern allows the geopolymer precursor fluid to fill the fractures in an isolated pattern shape, creating proppant pillars in the fractures.
- the geopolymer precursor fluid hardens in the reservoir to form geopolymer proppant pillars in the fractures.
- FIG. 1 depicts an example of a fracture treatment 10 for a well 12 .
- the well 12 can be a reservoir or formation 14 , for example, an unconventional reservoir in which recovery operations in addition to conventional recovery operations are practiced to recover trapped hydrocarbons.
- unconventional reservoirs include tight-gas sands, gas and oil shales, coalbed methane, heavy oil and tar sands, and gas-hydrate deposits.
- the formation 14 includes an underground formation of naturally fractured rock containing hydrocarbons (for example, oil, gas, or both).
- the formation 14 can include a fractured shale.
- the well 12 can intersect other suitable types of formations 14 , including reservoirs that are not naturally fractured in any significant amount.
- the well 12 can include a wellbore 20 , casing 22 and well head 24 .
- the wellbore 20 can be a vertical or deviated bore.
- the casing 22 can be cemented or otherwise suitably secured in the wellbore 12 .
- Perforations 26 can be formed in the casing 22 at the level of the formation 14 to allow oil, gas, and by-products to flow into the well 12 and be produced to the surface 25 .
- Perforations 26 can be formed using shape charges, a perforating gun or otherwise.
- a work string 30 can be disposed in the wellbore 20 .
- the work string 30 can be coiled tubing, sectioned pipe or other suitable tubing.
- a fracturing tool 32 can be coupled to an end of the work string 30 .
- Packers 36 can seal an annulus 38 of the wellbore 20 above and below the formation 14 .
- Packers 36 can be mechanical, fluid inflatable or other suitable packers.
- One or more pump trucks 40 can be coupled to the work string 30 at the surface 25 .
- the pump trucks 40 pump fluid 58 down the work string 30 to perform the fracture treatment 10 and generate the fracture 60 .
- the fluid 58 can include a pad fluid, fracturing fluid, a geopolymer precursor fluid, other appropriate fluids, or any combination thereof.
- the pump trucks 40 can include mobile vehicles, equipment such as skids or other suitable structures.
- the instrument truck 44 can include a fracture control system 46 and a fracture simulator 47 .
- the fracture control system 46 monitors and controls the fracture treatment 10 .
- the fracture control system 46 can control the pump trucks 40 and fluid valves to stop and start the fracture treatment 10 as well as to stop and start the pad phase, proppant phase and/or flush phase of the fracture treatment 10 .
- the fracture control system 46 communicates with surface and/or subsurface instruments to monitor and control the fracture treatment 10 .
- the surface and subsurface instruments may include surface sensors 48 , down-hole sensors 50 and pump controls 52 .
- a quantity of energy applied by the fracture control system 46 to generate the fractures 60 in the reservoir or formation 14 can be affected not only by the properties of the reservoir rock in the formation but also by the organic matter (for example, kerogen 75 ) intertwined within the rock matrix.
- FIG. 2 is a flowchart showing operations in process 200 for fracturing a reservoir with a geopolymer precursor fluid.
- the geopolymer precursor fluid is typically a solid-in-liquid dispersion including an aluminosilicate, an alkaline reagent, and a permeability enhancing agent, which can be present in a range of 0.1 vol % to 95 vol %, 0.1 vol % to 60 vol %, and 0 vol % to 95 vol %, respectively.
- An average particle diameter of solid components in the geopolymer precursor fluid is typically up to 0.1 ⁇ m or up to 1 cm.
- the geopolymer precursor fluid has a viscosity that allows it to flow inside fractures and minimize leak-off. At reservoir temperature viscosity can be in the range of 0.01 cP to 10000 cP. As such, the geopolymer precursor fluid can be used to create fractures in a reservoir.
- geopolymer generally refers to an amorphous polymer having an Si—O—Al framework formed by polymerization of aluminosilicate.
- a geopolymer is completely inorganic.
- a geopolymer includes organic moieties.
- Components of the geopolymer precursor fluid may be selected to yield a geopolymer having a silicon (Si) to aluminum (Al) ratio (Si/Al ratio) between about 0.5:1 and about 2:1, between about 1:1 and about 2:1, between about 1:1 and about 1.5:1, or between about 0.5:1 and about 1:1.
- the aluminosilicate in the geopolymer precursor fluid includes at least one of calcined clay, kaolinite, laterite, volcanic rock, mine tailings, blast furnace slag, and coal fly ash.
- the aluminosilicate includes metakaolin, a dehydroxylated form of kaolinite.
- the aluminosilicate includes low calcium fly ash (ASTM class F fly ash).
- calcium fly ash is preferred over high calcium fly ash (ASTM class C fly ash), due at least in part to interference of a large amount of calcium with the polymerization process and subsequent alteration of the microstructure of the solidified geopolymer.
- aluminosilicate with a greater amount of calcium can produce a geopolymer with higher compressive strength, due at least in part to the formation of calcium-aluminum-hydrates and other calcium compounds.
- the aluminosilicate includes fly ash. Fly ash can be advantageously used as the aluminosilicate due at least in part to its fine particle size.
- the aluminosilicate may be selected based at least in part on color, particle size, and purity of the source material.
- the alkaline reagent may include any alkaline reagent that reacts with aluminosilicate to yield a geopolymer.
- exemplary alkaline reagents include aqueous solutions of sodium silicate, potassium silicate, calcium silicate, cesium silicate, sodium hydroxide, potassium hydroxide, and calcium hydroxide.
- Other suitable alkaline reagents include buffers such as hydroxides, carbonates, bicarbonates, amines, or a combination thereof.
- Permeability enhancing agents include components that create conductive void spaces within proppant pillars formed by the geopolymer precursor fluid.
- Permeability enhancing agents include components that decompose under ambient conditions in the reservoir, water-soluble components that dissolve in water present in the reservoir, reactants that release gas or foam in the geopolymer precursor fluid, and vegetable oil.
- permeability enhancing agents include polylactic acid (e.g., in the form of beads, fiber, or fabric), resins, salts, benzoic acid, and wax beads. Suitable salts include sodium chloride, calcium chloride, potassium chloride, and the like.
- the geopolymer precursor fluid includes an accelerating agent to accelerate formation of the geopolymer in the reservoir.
- suitable accelerating agents include reagents that increase a pH of the fluid, such as such as hydroxides, carbonates, bicarbonates, amines, or a combination thereof.
- the geopolymer precursor fluid includes a retarding agent to retard formation of the geopolymer in the reservoir.
- Suitable retarding agents include esters that generate acids. Examples of suitable retarding agents include polylactic acid, ethyl ethanoate, ethyl propanoate, propyl methanoate, methyl butanate, and propyl ethanoate.
- a pad fluid is provided to the reservoir via a wellbore to create fractures in the reservoir.
- Suitable pad fluids include slickwater, linear gels, crosslinked gels, and viscoelastic surfactant fluids.
- Splickwater generally refers to a low-viscosity fluid pumped at a high rate to generate narrow, complex fractures with low-concentrations of propping agent.
- Linear gel generally refers to an uncrosslinked solution of polysaccharides such as guar, derivatized-guar, HEC, or xanthan and having a viscosity of up to about 100 cP at surface temperature.
- Crosslinked gel generally refers to polysaccharides such as guar, derivatized-guar, HEC, or xanthan crosslinked with a crosslinker such as boron, zirconium, titanium, or aluminum, and having a viscosity of about 100 cP to about 1000 cP at surface temperature.
- Viscoelastic surfactant fluid generally refers to a polymer-free fluid that generates a viscosity suitable for fracturing operations without the use of polymer additives.
- the pad fluid is a geopolymer precursor fluid.
- a fracturing fluid is provided to the fractures via the wellbore.
- Suitable fracturing fluids include slickwater, linear gels, crosslinked gels, and viscoelastic surfactant fluids.
- the fracturing fluid is a geopolymer precursor fluid.
- the fracturing fluid may include a proppant loading of up to about 12 pounds per gallon added.
- the proppant may be a resin-coated proppant, an encapsulated resin, or a combination thereof.
- a proppant is a material that keeps an induced hydraulic fracture at least partially open during or after a fracturing treatment. Proppants can be transported into the reservoir and to the fractures using fluid, such as fracturing fluid or another fluid. A higher-viscosity fluid can more effectively transport proppants to a desired location in a fracture, especially larger proppants, by more effectively keeping proppants in a suspended state within the fluid.
- proppants include sand, gravel, glass beads, polymer beads, ground products from shells and seeds such as walnut hulls, and manmade materials such as ceramic proppant, bauxite, tetrafluoroethylene materials (for example, TEFLONTM available from DuPont), fruit pit materials, processed wood, composite particulates prepared from a binder and fine grade particulates such as silica, alumina, fumed silica, carbon black, graphite, mica, titanium dioxide, meta-silicate, calcium silicate, kaolin, talc, zirconia, boron, fly ash, hollow glass microspheres, and solid glass, or mixtures thereof.
- ceramic proppant for example, TEFLONTM available from DuPont
- TEFLONTM tetrafluoroethylene materials
- fruit pit materials processed wood, composite particulates prepared from a binder and fine grade particulates such as silica, alumina, fumed silica, carbon black, graphite, mica, titanium
- proppant can have an average particle size, in which particle size is the largest dimension of a particle, of about 0.001 mm to about 3 mm, about 0.15 mm to about 2.5 mm, about 0.25 mm to about 0.43 mm, about 0.43 mm to about 0.85 mm, about 0.85 mm to about 1.18 mm, about 1.18 mm to about 1.70 mm, or about 1.70 to about 2.36 mm.
- the proppant can have a distribution of particle sizes clustering around multiple averages, such as one, two, three, or four different average particle sizes.
- the composition or mixture can include any suitable amount of proppant, such as about 0.000.1 wt % to about 99.9 wt %, about 0.1 wt % to about 80 wt %, or about 10 wt % to about 60 wt %, or about 0.000,000,01 wt % or less, or about 0.000001 wt %, 0.0001, 0.001, 0.01, 0.1, 1, 2, 3, 4, 5, 10, 15, 20, 30, 40, 50, 60, 70, 80, 85, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 99.9 wt %, or about 99.99 wt % or more.
- proppant such as about 0.000.1 wt % to about 99.9 wt %, about 0.1 wt % to about 80 wt %, or about 10 wt % to about 60 wt %, or about 0.000,000,01 wt %
- a geopolymer precursor fluid is provided to the fractures via the wellbore.
- providing the geopolymer precursor fluid to the fractures includes pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid.
- the quantities of the geopolymer precursor fluid may be discrete quantities that are spaced apart from each other.
- Pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid may be achieved by fracturing pumps.
- providing the geopolymer precursor fluid to the fractures includes alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid.
- the quantities of the geopolymer precursor fluid may be discrete quantities that are spaced apart from each other by the quantities of the fracturing fluid, and vice versa.
- Pulsing the quantities of the geopolymer precursor fluid may include injecting the geopolymer precursor fluid at a rate between 1 barrel per minute and 120 barrels per minute, or between 5 barrels per minute and 50 barrels per minute for a pumping time between 2 seconds and 10 minutes, or between 10 seconds and 1 minute.
- Pulsing the quantities of the fracturing fluid may include injecting the fracturing fluid at a rate between 1 barrel per minute and 120 barrels per minute, or between 5 barrels per minute and 50 barrels per minute for a pumping time between 2 seconds and 10 minutes, or between 10 seconds and 1 minute.
- the fracturing fluid in 204 is a geopolymer precursor fluid that differs in composition from the geopolymer precursor fluid in 206 .
- the fracturing fluid in 204 includes different chemical components than the geopolymer precursor fluid in 206 .
- the fracturing fluid in 204 includes the same components as the geopolymer precursor fluid in 206 in different concentrations.
- an additional fluid is optionally provided to the fractures via the wellbore.
- the additional fluid is typically provided continuously (not pulsed).
- the additional fluid is typically a fracturing fluid.
- the fracturing fluid can include a proppant.
- the proppant loading is up to about 12 pounds per gallon.
- the additional fluid is a geopolymer precursor fluid.
- the geopolymer precursor fluid may differ in composition from the geopolymer precursor fluid in 206 .
- the additional fluid in 208 includes different chemical components than the geopolymer precursor fluid in 206 .
- the additional fluid in 208 includes the same components as the geopolymer precursor fluid in 206 in different concentrations.
- the wellbore is shut in at a wellbore pressure, thereby allowing the geopolymer precursor fluid to harden and to form geopolymer proppant pillars in the fractures.
- FIG. 3A depicts elapsed time between pulsed quantities of geopolymer precursor fluid in a continuous flow of fracturing fluid as a function of time.
- Waveform 300 represents the pulsed flow of geopolymer precursor fluid
- waveform 310 represents the continuous flow of fracturing fluid.
- Geopolymer injection segments 302 of waveform 300 correspond to operation of the pump that injects the geopolymer precursor fluid (“pump on”).
- a duration t g1 of geopolymer injection segments 302 is typically in a range of 2 seconds to 10 minutes, or between 10 seconds and 1 minute, and can be the same or different for one or more geopolymer injection segments.
- Geopolymer injection segments 302 are separated in time by geopolymer noninjection segments 304 .
- Geopolymer noninjection segments 304 correspond to cessation of the pump that injects the geopolymer precursor fluid (“pump off”).
- a duration t g0 of geopolymer noninjection segments 304 is typically in a range of 2 seconds to 20 minutes.
- FIG. 3B depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.
- Waveform 300 represents the pulsed flow of geopolymer precursor fluid
- waveform 310 represents the pulsed flow of fracturing fluid.
- Geopolymer injection segments 302 of waveform 300 correspond to operation of the pump that injects the geopolymer precursor fluid (“pump on”).
- a duration to of geopolymer injection segments 302 is typically in a range of 2 seconds to 10 minutes, or 10 seconds to 1 minute, and can be the same or different for one or more geopolymer injection segments.
- Geopolymer injection segments 302 are separated in time by geopolymer noninjection segments 304 .
- Geopolymer noninjection segments 304 correspond to cessation of the pump that injects the geopolymer precursor fluid (“pump off”).
- a duration t g0 of geopolymer noninjection segments 304 is typically in a range of 2 seconds to 20 minutes.
- Fracturing fluid injection segments 312 of waveform 310 correspond to operation of the pump that injects the fracturing fluid (“pump on”).
- a duration t f1 of fracturing fluid injection segments 312 is typically in a range of 2 seconds to 10 minutes, or 10 seconds to 1 minute, and can be the same or different for one or more fracturing fluid injection segments.
- Fracturing fluid injection segments 312 are separated in time by fracturing fluid noninjection segments 314 .
- Fracturing fluid noninjection segments 314 correspond to cessation of the pump that injects the fracturing fluid (“pump off”).
- a duration t f0 of fracturing fluid noninjection segments 314 is typically in a range of 2 seconds to 15 minutes.
- geopolymer injection segments 302 correspond to fracturing fluid noninjection segments 314
- geopolymer noninjection segments 304 correspond to fracturing fluid injection segments 312 .
- geopolymer injection segments 302 and fracturing fluid injection segments 312 may be separated in time by a duration t fg .
- FIG. 3C depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.
- Waveform 300 represents the pulsed flow of geopolymer precursor fluid
- waveform 310 represents the pulsed flow of fracturing fluid.
- Elapsed time between geopolymer injection segments 302 and fracturing fluid injection segments 312 , t fg may be the same or different, and is typically in a range of 2 seconds to 15 minutes.
- geopolymer injection segments 302 and fracturing fluid injection segments 312 may overlap in time by a duration t fg .
- FIG. 3D depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.
- Waveform 300 represents the pulsed flow of geopolymer precursor fluid
- waveform 310 represents the pulsed flow of geopolymer precursor fluid.
- a duration of the overlap between geopolymer injection segments 302 and fracturing fluid injection segments 312 , t fg may be the same or different, and is typically in a range of 2 seconds to 20 minutes.
- geopolymer injection segments and fracturing fluid injection segments may be separated in time, overlap in time, or any combination thereof.
- FIG. 4 depicts a fracture 400 with geopolymer proppant pillars 402 and conductive channels 404 between the pillars.
- an accelerating agent is included in the geopolymer precursor fluid to reduce the length of time required to polymerize the geopolymer precursor fluid to yield a geopolymer.
- a retarding agent is included in the geopolymer precursor fluid to increase the length of time required to polymerize the geopolymer precursor fluid to yield a geopolymer. Suitable curing and shut-in times range from less than an hour (e.g., half an hour) to days (e.g., 20 days).
- a compressive strength of the geopolymer proppant pillars may exceed the overburden pressure of the reservoir.
- a compressive strength of the geopolymer proppant pillars is in a range of about 500 psi to about 20,000 psi.
- a permeability of the geopolymer pillars is about 0.01 mD to about 20,000 D.
Landscapes
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Mechanical Light Control Or Optical Switches (AREA)
Abstract
Fracturing a reservoir includes providing a pad fluid to the reservoir via a wellbore in a well to create fractures in the reservoir, providing a fracturing fluid to the fractures via the wellbore, providing a geopolymer precursor fluid to the fractures via the wellbore, shutting in the wellbore at a wellbore pressure, thereby allowing the geopolymer precursor fluid to harden and form geopolymer proppant pillars in the fractures. Providing the geopolymer precursor fluid to the fractures includes pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid. An elapsed time between pulsing the quantities of the geopolymer precursor fluid is between 2 seconds and 20 minutes.
Description
- This application claims the benefit of U.S. application Ser. No. 15/711,889 filed on Sep. 21, 2017, the entire contents of which are incorporated by reference in its entirety.
- This invention relates to pulsed hydraulic fracturing of a reservoir with geopolymer precursor fluids to yield isolated geopolymer proppant pillars in the reservoir.
- The success of a fracturing stimulation treatment depends at least in part on the strength and distribution of the proppant used to prevent the created fracture from closing after treatment. Even for simple and wide features with high proppant placement efficiency throughout the entire fracture geometry, current mathematical and engineering concepts still overestimate the flow capacity of fractures by orders of magnitude. Permeability of the proppant pack may be reduced by a combination of factors such as residual damage from poor gel recovery, fines migration, multiphase flow, fluid momentum losses, drag forces, capillary forces, and proppant crushing and embedment. In some cases, conventional proppant packs lose up to 99% of initial conductivity due to gel damage, fines migration, multiphase flow, and non-Darcy flow.
- In a first general aspect, fracturing a reservoir includes providing a pad fluid to the reservoir via a wellbore in a well to create fractures in the reservoir, providing a fracturing fluid to the fractures via the wellbore, providing a geopolymer precursor fluid to the fractures via the wellbore, and shutting in the wellbore at a wellbore pressure, thereby allowing the geopolymer precursor fluid to harden and form geopolymer proppant pillars in the fractures. Providing the geopolymer precursor fluid to the fractures includes pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid. An elapsed time between pulsing the quantities of the geopolymer precursor fluid is between 2 seconds and 20 minutes.
- Implementations of the first general aspect may include one or more of the following features.
- The pad fluid may include slickwater, a linear gel, a crosslinked gel, or a viscoelastic surfactant fluid. The fracturing fluid may include slickwater, a linear gel, a crosslinked gel, or a viscoelastic surfactant fluid. In some cases, the fracturing fluid includes a proppant loading of up to 12 pounds per gallon added.
- The geopolymer precursor fluid typically includes aluminosilicate, an alkaline reagent, and a permeability enhancing agent. The aluminosilicate may include at least one of calcined clay, kaolinitic clay, lateritic clay, volcanic rock, mine tailings, blast furnace slag, and coal fly ash. The alkaline reagent may include at least one of sodium silicate and potassium silicate. The permeability enhancing agent may include polylactic acid, such as polylactic acid in the form of beads, fibers, or fabric. The permeability enhancing agent may include at least one of a resin, a salt, benzoic acid, and wax beads. The salt may include an acid salt. The geopolymer precursor may also include an accelerating agent or a retarding agent. In some cases, the geopolymer precursor fluid is a first geopolymer precursor fluid, the fracturing fluid is a second geopolymer precursor fluid, and the first geopolymer precursor fluid and the second geopolymer precursor fluid differ in composition.
- In some embodiments, the elapsed time between pulsing the quantities of the geopolymer precursor is between 10 seconds and 1 minute. In some embodiments, pulsing the quantities of the geopolymer precursor fluid includes pulsing discrete quantities of the geopolymer precursor fluid into the continuous flow of the fracturing fluid or alternately pulsing discrete quantities of the geopolymer precursor fluid and discrete quantities of the fracturing fluid. The discrete quantities of the geopolymer precursor fluid are typically spaced apart from each other. Pulsing the quantities of the geopolymer precursor fluid may include injecting the geopolymer precursor fluid at a rate between 1 barrel per minute and 120 barrels per minute, or injecting the geopolymer precursor fluid at a rate between 5 barrels per minute and 50 barrels per minute.
- Implementations of the first general aspect may include, after providing the fracturing fluid and the geopolymer precursor fluid to the fractures, providing a continuous flow of an additional fluid to the fractures. In some cases, the geopolymer precursor fluid is a first geopolymer precursor fluid, and the additional fluid is a second geopolymer precursor fluid. In certain cases, the fracturing fluid is a first fracturing fluid, and the additional fluid is a second fracturing fluid. The second fracturing fluid may include a proppant loading of up to 12 pounds per gallon added.
- In some embodiments, a compressive strength of the geopolymer proppant pillars exceeds an overburden pressure of the reservoir. The compressive strength of the geopolymer proppant pillars may be in a range of 500 pounds per square inch to 20,000 pounds per square inch. A permeability of the geopolymer proppant pillars may be in a range of 0.00001 Darcy to 20,000 Darcy.
- Pulsed hydraulic fracturing with geopolymer precursor fluids yields increased productivity. Moreover, because the geopolymer precursor fluid hardens in the reservoir to form proppant pillars, the need for proppant is reduced or eliminated. Methods and systems described herein advantageously reduce proppant costs, pumping horsepower, and gel damage, when compared to conventional treatments. Methods and systems described herein also reduce the opportunity for proppant to screen out during pumping procedures.
-
FIG. 1 depicts an exemplary hydraulic fracture treatment for a well. -
FIG. 2 is a flowchart for a method of pulsed hydraulic fracturing with a geopolymer precursor fluid. -
FIG. 3A depicts elapsed time between pulsed quantities of geopolymer precursor fluid in a continuous flow of fracturing fluid.FIGS. 3B-3D depict elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid. -
FIG. 4 depicts a cross-sectional view of geopolymer proppant pillars in a fracture. - To avoid loss of conductivity of a proppant pack in a reservoir, isolated proppant pillars are formed to support the fracture and keep it open. The isolated proppant pillars form conductive channels that provide a path having high conductivity for hydrocarbon flow. As described herein, stable proppant pillars are generated by providing pulses of a geopolymer precursor fluid within a compatible fracturing fluid or by alternating pulses of a geopolymer precursor fluid with pulses of a compatible fracturing fluid through the wellbore into the reservoir at fracture pressure. The geopolymer precursor fluid includes an aluminosilicate, an alkaline reagent, and a permeability enhancing agent. The pulsing injection pattern allows the geopolymer precursor fluid to fill the fractures in an isolated pattern shape, creating proppant pillars in the fractures. The geopolymer precursor fluid hardens in the reservoir to form geopolymer proppant pillars in the fractures.
-
FIG. 1 depicts an example of a fracture treatment 10 for a well 12. The well 12 can be a reservoir or formation 14, for example, an unconventional reservoir in which recovery operations in addition to conventional recovery operations are practiced to recover trapped hydrocarbons. Examples of unconventional reservoirs include tight-gas sands, gas and oil shales, coalbed methane, heavy oil and tar sands, and gas-hydrate deposits. In some implementations, the formation 14 includes an underground formation of naturally fractured rock containing hydrocarbons (for example, oil, gas, or both). For example, the formation 14 can include a fractured shale. In some implementations, the well 12 can intersect other suitable types of formations 14, including reservoirs that are not naturally fractured in any significant amount. - The well 12 can include a wellbore 20, casing 22 and well
head 24. The wellbore 20 can be a vertical or deviated bore. The casing 22 can be cemented or otherwise suitably secured in the wellbore 12. Perforations 26 can be formed in the casing 22 at the level of the formation 14 to allow oil, gas, and by-products to flow into the well 12 and be produced to the surface 25. Perforations 26 can be formed using shape charges, a perforating gun or otherwise. - For the fracture treatment 10, a
work string 30 can be disposed in the wellbore 20. Thework string 30 can be coiled tubing, sectioned pipe or other suitable tubing. A fracturing tool 32 can be coupled to an end of thework string 30.Packers 36 can seal anannulus 38 of the wellbore 20 above and below the formation 14.Packers 36 can be mechanical, fluid inflatable or other suitable packers. - One or more pump trucks 40 can be coupled to the
work string 30 at the surface 25. The pump trucks 40 pump fluid 58 down thework string 30 to perform the fracture treatment 10 and generate the fracture 60. The fluid 58 can include a pad fluid, fracturing fluid, a geopolymer precursor fluid, other appropriate fluids, or any combination thereof. The pump trucks 40 can include mobile vehicles, equipment such as skids or other suitable structures. - One or
more instrument trucks 44 can also be provided at the surface 25. Theinstrument truck 44 can include a fracture control system 46 and a fracture simulator 47. The fracture control system 46 monitors and controls the fracture treatment 10. The fracture control system 46 can control the pump trucks 40 and fluid valves to stop and start the fracture treatment 10 as well as to stop and start the pad phase, proppant phase and/or flush phase of the fracture treatment 10. The fracture control system 46 communicates with surface and/or subsurface instruments to monitor and control the fracture treatment 10. In some implementations, the surface and subsurface instruments may include surface sensors 48, down-hole sensors 50 and pump controls 52. - A quantity of energy applied by the fracture control system 46 to generate the fractures 60 in the reservoir or formation 14 can be affected not only by the properties of the reservoir rock in the formation but also by the organic matter (for example, kerogen 75) intertwined within the rock matrix.
-
FIG. 2 is a flowchart showing operations inprocess 200 for fracturing a reservoir with a geopolymer precursor fluid. The geopolymer precursor fluid is typically a solid-in-liquid dispersion including an aluminosilicate, an alkaline reagent, and a permeability enhancing agent, which can be present in a range of 0.1 vol % to 95 vol %, 0.1 vol % to 60 vol %, and 0 vol % to 95 vol %, respectively. An average particle diameter of solid components in the geopolymer precursor fluid is typically up to 0.1 μm or up to 1 cm. The geopolymer precursor fluid has a viscosity that allows it to flow inside fractures and minimize leak-off. At reservoir temperature viscosity can be in the range of 0.01 cP to 10000 cP. As such, the geopolymer precursor fluid can be used to create fractures in a reservoir. - Polymerization of the geopolymer precursor fluid yields a geopolymer. As used herein, “geopolymer” generally refers to an amorphous polymer having an Si—O—Al framework formed by polymerization of aluminosilicate. In some embodiments, a geopolymer is completely inorganic. In other embodiments, a geopolymer includes organic moieties. Components of the geopolymer precursor fluid may be selected to yield a geopolymer having a silicon (Si) to aluminum (Al) ratio (Si/Al ratio) between about 0.5:1 and about 2:1, between about 1:1 and about 2:1, between about 1:1 and about 1.5:1, or between about 0.5:1 and about 1:1.
- The aluminosilicate in the geopolymer precursor fluid includes at least one of calcined clay, kaolinite, laterite, volcanic rock, mine tailings, blast furnace slag, and coal fly ash. In some embodiments, the aluminosilicate includes metakaolin, a dehydroxylated form of kaolinite. In some embodiments, the aluminosilicate includes low calcium fly ash (ASTM class F fly ash). In certain embodiments, calcium fly ash is preferred over high calcium fly ash (ASTM class C fly ash), due at least in part to interference of a large amount of calcium with the polymerization process and subsequent alteration of the microstructure of the solidified geopolymer. However, aluminosilicate with a greater amount of calcium can produce a geopolymer with higher compressive strength, due at least in part to the formation of calcium-aluminum-hydrates and other calcium compounds. In some embodiments, the aluminosilicate includes fly ash. Fly ash can be advantageously used as the aluminosilicate due at least in part to its fine particle size. The aluminosilicate may be selected based at least in part on color, particle size, and purity of the source material.
- The alkaline reagent may include any alkaline reagent that reacts with aluminosilicate to yield a geopolymer. Exemplary alkaline reagents include aqueous solutions of sodium silicate, potassium silicate, calcium silicate, cesium silicate, sodium hydroxide, potassium hydroxide, and calcium hydroxide. Other suitable alkaline reagents include buffers such as hydroxides, carbonates, bicarbonates, amines, or a combination thereof.
- Permeability enhancing agents include components that create conductive void spaces within proppant pillars formed by the geopolymer precursor fluid. Permeability enhancing agents include components that decompose under ambient conditions in the reservoir, water-soluble components that dissolve in water present in the reservoir, reactants that release gas or foam in the geopolymer precursor fluid, and vegetable oil. Examples of permeability enhancing agents include polylactic acid (e.g., in the form of beads, fiber, or fabric), resins, salts, benzoic acid, and wax beads. Suitable salts include sodium chloride, calcium chloride, potassium chloride, and the like.
- In some embodiments, the geopolymer precursor fluid includes an accelerating agent to accelerate formation of the geopolymer in the reservoir. Examples of suitable accelerating agents include reagents that increase a pH of the fluid, such as such as hydroxides, carbonates, bicarbonates, amines, or a combination thereof.
- In some embodiments, the geopolymer precursor fluid includes a retarding agent to retard formation of the geopolymer in the reservoir. Suitable retarding agents include esters that generate acids. Examples of suitable retarding agents include polylactic acid, ethyl ethanoate, ethyl propanoate, propyl methanoate, methyl butanate, and propyl ethanoate.
- Referring again to
FIG. 2 , in 202, a pad fluid is provided to the reservoir via a wellbore to create fractures in the reservoir. Suitable pad fluids include slickwater, linear gels, crosslinked gels, and viscoelastic surfactant fluids. “Slickwater” generally refers to a low-viscosity fluid pumped at a high rate to generate narrow, complex fractures with low-concentrations of propping agent. “Linear gel” generally refers to an uncrosslinked solution of polysaccharides such as guar, derivatized-guar, HEC, or xanthan and having a viscosity of up to about 100 cP at surface temperature. “Crosslinked gel” generally refers to polysaccharides such as guar, derivatized-guar, HEC, or xanthan crosslinked with a crosslinker such as boron, zirconium, titanium, or aluminum, and having a viscosity of about 100 cP to about 1000 cP at surface temperature. “Viscoelastic surfactant fluid” generally refers to a polymer-free fluid that generates a viscosity suitable for fracturing operations without the use of polymer additives. In some embodiments, the pad fluid is a geopolymer precursor fluid. - In 204, a fracturing fluid is provided to the fractures via the wellbore. Suitable fracturing fluids include slickwater, linear gels, crosslinked gels, and viscoelastic surfactant fluids. In some embodiments, the fracturing fluid is a geopolymer precursor fluid. The fracturing fluid may include a proppant loading of up to about 12 pounds per gallon added.
- The proppant may be a resin-coated proppant, an encapsulated resin, or a combination thereof. A proppant is a material that keeps an induced hydraulic fracture at least partially open during or after a fracturing treatment. Proppants can be transported into the reservoir and to the fractures using fluid, such as fracturing fluid or another fluid. A higher-viscosity fluid can more effectively transport proppants to a desired location in a fracture, especially larger proppants, by more effectively keeping proppants in a suspended state within the fluid. Examples of proppants include sand, gravel, glass beads, polymer beads, ground products from shells and seeds such as walnut hulls, and manmade materials such as ceramic proppant, bauxite, tetrafluoroethylene materials (for example, TEFLON™ available from DuPont), fruit pit materials, processed wood, composite particulates prepared from a binder and fine grade particulates such as silica, alumina, fumed silica, carbon black, graphite, mica, titanium dioxide, meta-silicate, calcium silicate, kaolin, talc, zirconia, boron, fly ash, hollow glass microspheres, and solid glass, or mixtures thereof. In some embodiments, proppant can have an average particle size, in which particle size is the largest dimension of a particle, of about 0.001 mm to about 3 mm, about 0.15 mm to about 2.5 mm, about 0.25 mm to about 0.43 mm, about 0.43 mm to about 0.85 mm, about 0.85 mm to about 1.18 mm, about 1.18 mm to about 1.70 mm, or about 1.70 to about 2.36 mm. In some embodiments, the proppant can have a distribution of particle sizes clustering around multiple averages, such as one, two, three, or four different average particle sizes. The composition or mixture can include any suitable amount of proppant, such as about 0.000.1 wt % to about 99.9 wt %, about 0.1 wt % to about 80 wt %, or about 10 wt % to about 60 wt %, or about 0.000,000,01 wt % or less, or about 0.000001 wt %, 0.0001, 0.001, 0.01, 0.1, 1, 2, 3, 4, 5, 10, 15, 20, 30, 40, 50, 60, 70, 80, 85, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 99.9 wt %, or about 99.99 wt % or more.
- In 206, a geopolymer precursor fluid is provided to the fractures via the wellbore. In some embodiments, providing the geopolymer precursor fluid to the fractures includes pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid. The quantities of the geopolymer precursor fluid may be discrete quantities that are spaced apart from each other. Pulsing quantities of the geopolymer precursor fluid into a continuous flow of the fracturing fluid may be achieved by fracturing pumps. In some embodiments, providing the geopolymer precursor fluid to the fractures includes alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid. The quantities of the geopolymer precursor fluid may be discrete quantities that are spaced apart from each other by the quantities of the fracturing fluid, and vice versa.
- Pulsing the quantities of the geopolymer precursor fluid may include injecting the geopolymer precursor fluid at a rate between 1 barrel per minute and 120 barrels per minute, or between 5 barrels per minute and 50 barrels per minute for a pumping time between 2 seconds and 10 minutes, or between 10 seconds and 1 minute. Pulsing the quantities of the fracturing fluid may include injecting the fracturing fluid at a rate between 1 barrel per minute and 120 barrels per minute, or between 5 barrels per minute and 50 barrels per minute for a pumping time between 2 seconds and 10 minutes, or between 10 seconds and 1 minute.
- In some embodiments, the fracturing fluid in 204 is a geopolymer precursor fluid that differs in composition from the geopolymer precursor fluid in 206. In certain embodiments, the fracturing fluid in 204 includes different chemical components than the geopolymer precursor fluid in 206. In certain embodiments, the fracturing fluid in 204 includes the same components as the geopolymer precursor fluid in 206 in different concentrations.
- In 208, an additional fluid is optionally provided to the fractures via the wellbore. The additional fluid is typically provided continuously (not pulsed). The additional fluid is typically a fracturing fluid. The fracturing fluid can include a proppant. In one example, the proppant loading is up to about 12 pounds per gallon. In some embodiments, the additional fluid is a geopolymer precursor fluid. The geopolymer precursor fluid may differ in composition from the geopolymer precursor fluid in 206. In certain embodiments, the additional fluid in 208 includes different chemical components than the geopolymer precursor fluid in 206. In certain embodiments, the additional fluid in 208 includes the same components as the geopolymer precursor fluid in 206 in different concentrations.
- In 210, the wellbore is shut in at a wellbore pressure, thereby allowing the geopolymer precursor fluid to harden and to form geopolymer proppant pillars in the fractures.
-
FIG. 3A depicts elapsed time between pulsed quantities of geopolymer precursor fluid in a continuous flow of fracturing fluid as a function of time.Waveform 300 represents the pulsed flow of geopolymer precursor fluid, andwaveform 310 represents the continuous flow of fracturing fluid.Geopolymer injection segments 302 ofwaveform 300 correspond to operation of the pump that injects the geopolymer precursor fluid (“pump on”). A duration tg1 ofgeopolymer injection segments 302 is typically in a range of 2 seconds to 10 minutes, or between 10 seconds and 1 minute, and can be the same or different for one or more geopolymer injection segments.Geopolymer injection segments 302 are separated in time bygeopolymer noninjection segments 304.Geopolymer noninjection segments 304 correspond to cessation of the pump that injects the geopolymer precursor fluid (“pump off”). A duration tg0 ofgeopolymer noninjection segments 304, is typically in a range of 2 seconds to 20 minutes. -
FIG. 3B depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.Waveform 300 represents the pulsed flow of geopolymer precursor fluid, andwaveform 310 represents the pulsed flow of fracturing fluid.Geopolymer injection segments 302 ofwaveform 300 correspond to operation of the pump that injects the geopolymer precursor fluid (“pump on”). A duration to ofgeopolymer injection segments 302 is typically in a range of 2 seconds to 10 minutes, or 10 seconds to 1 minute, and can be the same or different for one or more geopolymer injection segments.Geopolymer injection segments 302 are separated in time bygeopolymer noninjection segments 304.Geopolymer noninjection segments 304 correspond to cessation of the pump that injects the geopolymer precursor fluid (“pump off”). A duration tg0 ofgeopolymer noninjection segments 304, is typically in a range of 2 seconds to 20 minutes. Fracturingfluid injection segments 312 ofwaveform 310 correspond to operation of the pump that injects the fracturing fluid (“pump on”). A duration tf1 of fracturingfluid injection segments 312 is typically in a range of 2 seconds to 10 minutes, or 10 seconds to 1 minute, and can be the same or different for one or more fracturing fluid injection segments. Fracturingfluid injection segments 312 are separated in time by fracturingfluid noninjection segments 314. Fracturingfluid noninjection segments 314 correspond to cessation of the pump that injects the fracturing fluid (“pump off”). A duration tf0 of fracturingfluid noninjection segments 314, is typically in a range of 2 seconds to 15 minutes. As depicted inFIG. 3B ,geopolymer injection segments 302 correspond to fracturingfluid noninjection segments 314, andgeopolymer noninjection segments 304 correspond to fracturingfluid injection segments 312. - In some embodiments,
geopolymer injection segments 302 and fracturingfluid injection segments 312 may be separated in time by a duration tfg.FIG. 3C depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.Waveform 300 represents the pulsed flow of geopolymer precursor fluid, andwaveform 310 represents the pulsed flow of fracturing fluid. Elapsed time betweengeopolymer injection segments 302 and fracturingfluid injection segments 312, tfg, may be the same or different, and is typically in a range of 2 seconds to 15 minutes. - In some embodiments,
geopolymer injection segments 302 and fracturingfluid injection segments 312 may overlap in time by a duration tfg.FIG. 3D depicts elapsed time between pulsed quantities of geopolymer precursor fluid and fracturing fluid.Waveform 300 represents the pulsed flow of geopolymer precursor fluid, andwaveform 310 represents the pulsed flow of geopolymer precursor fluid. A duration of the overlap betweengeopolymer injection segments 302 and fracturingfluid injection segments 312, tfg, may be the same or different, and is typically in a range of 2 seconds to 20 minutes. - In certain embodiments, geopolymer injection segments and fracturing fluid injection segments may be separated in time, overlap in time, or any combination thereof.
-
FIG. 4 depicts afracture 400 withgeopolymer proppant pillars 402 andconductive channels 404 between the pillars. In some embodiments, an accelerating agent is included in the geopolymer precursor fluid to reduce the length of time required to polymerize the geopolymer precursor fluid to yield a geopolymer. In some embodiments, a retarding agent is included in the geopolymer precursor fluid to increase the length of time required to polymerize the geopolymer precursor fluid to yield a geopolymer. Suitable curing and shut-in times range from less than an hour (e.g., half an hour) to days (e.g., 20 days). - A compressive strength of the geopolymer proppant pillars may exceed the overburden pressure of the reservoir. In some embodiments, a compressive strength of the geopolymer proppant pillars is in a range of about 500 psi to about 20,000 psi. In some embodiments, a permeability of the geopolymer pillars is about 0.01 mD to about 20,000 D.
- It is to be understood that while the invention has been described in conjunction with the detailed description thereof, the foregoing description is intended to illustrate and not limit the scope of the invention, which is defined by the scope of the appended claims. Other aspects, advantages, and modifications are within the scope of the following claims.
Claims (20)
1. A method of fracturing a reservoir, comprising:
injecting a fracturing fluid into the reservoir via a wellbore to create fractures in the reservoir;
pulsing quantities of a geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing quantities of the geopolymer precursor fluid and the fracturing fluid, wherein an elapsed time between pulsing the quantities of the geopolymer precursor fluid is between 2 seconds and 20 minutes; and
shutting in the wellbore at a wellbore pressure, thereby allowing the geopolymer precursor fluid to polymerize and harden in the fractures and form geopolymer proppant pillars.
2. The method of claim 1 , wherein injecting the fracturing fluid comprises pumping the fracturing fluid to apply energy to create the fractures with the fracturing fluid, wherein the fracturing fluid comprises slickwater, a linear gel, a crosslinked gel, or a viscoelastic surfactant fluid, and wherein the fracturing fluid does not comprise proppant.
3. The method of claim 1 , wherein the geopolymer precursor fluid comprises aluminosilicate, an alkaline reagent, and a permeability enhancing agent, and wherein the geopolymer precursor fluid does not comprise proppant.
4. The method of claim 3 , wherein the aluminosilicate comprises at least one of calcined clay, kaolinitic clay, lateritic clay, volcanic rock, mine tailings, blast furnace slag, or coal fly ash, wherein the alkaline reagent comprises at least one of sodium silicate or potassium silicate, and wherein the fracturing fluid is slickwater or a viscoelastic surfactant fluid.
5. The method of claim 3 , wherein the permeability enhancing agent comprises polylactic acid as beads, fibers, or fabric, or any combinations thereof.
6. The method of claim 3 , wherein the permeability enhancing agent comprises at least one of an acid salt, benzoic acid, or wax beads.
7. The method of claim 1 , wherein the geopolymer precursor fluid comprises an accelerating agent or a retarding agent.
8. The method of claim 1 , wherein the elapsed time between pulsing the quantities of the geopolymer precursor fluid is between 10 seconds and 1 minute, and wherein the fracturing fluid does not comprise a linear gel or a crosslinked gel.
9. The method of claim 1 , wherein pulsing the quantities of the geopolymer precursor fluid comprises injecting the geopolymer precursor fluid at a rate between 1 barrel per minute and 120 barrels per minute, and wherein proppant is not transported to the fractures.
10. The method of claim 1 , wherein pulsing the quantities of the geopolymer precursor fluid comprises injecting the geopolymer precursor fluid at a rate between 5 barrels per minute and 50 barrels per minute.
11. The method of claim 1 , wherein a compressive strength of the geopolymer proppant pillars exceeds an overburden pressure of the reservoir, wherein the compressive strength of the geopolymer proppant pillars is in a range of 500 pounds per square inch to 20,000 pounds per square inch, and wherein a permeability of the geopolymer proppant pillars is in a range of 0.00001 Darcy to 20,000 Darcy.
12. The method of claim 1 , wherein the fracturing fluid does not comprise geopolymer precursor fluid.
13. A method of fracturing a reservoir, comprising:
injecting a fracturing fluid into the reservoir via a wellbore to create fractures in the reservoir;
pulsing a geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing the geopolymer precursor fluid and the fracturing fluid, wherein an elapsed time between pulsing the geopolymer precursor fluid is between 2 seconds and 20 minutes, wherein the geopolymer precursor fluid comprises aluminosilicate, an alkaline reagent, and a permeability enhancing agent, and wherein the geopolymer precursor fluid does not comprise proppant; and
shutting in the wellbore at a wellbore pressure, thereby allowing the geopolymer precursor fluid to polymerize to form geopolymer pillars in the fractures, wherein a compressive strength of the geopolymer pillars exceeds an overburden pressure of the reservoir.
14. The method of claim 13 , wherein the fracturing fluid does not comprise proppant, and wherein the compressive strength of the geopolymer pillars is in a range of 500 pounds per square inch to 20,000 pounds per square inch.
15. The method of claim 13 , wherein the fracturing fluid comprises slickwater or a viscoelastic surfactant fluid.
16. The method of claim 13 , wherein the permeability enhancing agent comprises at least one of polylactic acid, an acid salt, benzoic acid, or wax beads, and wherein a permeability of the geopolymer pillars is in a range of 0.00001 Darcy to 20,000 Darcy.
17. A method of fracturing a reservoir, comprising:
injecting a fracturing fluid via a wellbore into the reservoir to create fractures in the reservoir, wherein the fracturing fluid does not comprise proppant;
injecting a geopolymer precursor fluid via the wellbore into the fractures in an isolated pattern shape in the fractures to form isolated geopolymer proppant pillars giving conductive channels for hydrocarbon flow, wherein injecting the geopolymer precursor fluid comprises pulsing the geopolymer precursor fluid into a continuous flow of the fracturing fluid or alternately pulsing the geopolymer precursor fluid and the fracturing fluid, and wherein the geopolymer precursor fluid does not comprise proppant; and
allowing the geopolymer precursor fluid to polymerize to yield a geopolymer to form the geopolymer proppant pillars in the fractures, wherein the geopolymer proppant pillars do not comprise proppant transported to the fractures.
18. The method of claim 17 , wherein an elapsed time between pulsing the geopolymer precursor fluid is between 2 seconds and 20 minutes, wherein the geopolymer precursor fluid comprises aluminosilicate, an alkaline reagent, and a permeability enhancing agent, and wherein the permeability enhancing agent comprises at least one of polylactic acid, an acid salt, benzoic acid, or wax beads.
19. The method of claim 18 , wherein the aluminosilicate comprises at least one of calcined clay, kaolinitic clay, lateritic clay, volcanic rock, mine tailings, blast furnace slag, or coal fly ash, wherein the alkaline reagent comprises at least one of sodium silicate or potassium silicate, and wherein compressive strength of the geopolymer proppant pillars is in a range of 500 pounds per square inch to 20,000 pounds per square inch.
20. The method of claim 17 , wherein the fracturing fluid does not comprise a linear gel or a crosslinked gel, and wherein injecting the geopolymer precursor fluid during the pulsing of the geopolymer precursor fluid comprises injecting the geopolymer precursor fluid at a rate in a range of 1 barrel per minute to 120 barrels per minute.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US16/805,261 US20200199991A1 (en) | 2017-09-21 | 2020-02-28 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/711,889 US10655443B2 (en) | 2017-09-21 | 2017-09-21 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
| US16/805,261 US20200199991A1 (en) | 2017-09-21 | 2020-02-28 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/711,889 Continuation US10655443B2 (en) | 2017-09-21 | 2017-09-21 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20200199991A1 true US20200199991A1 (en) | 2020-06-25 |
Family
ID=63794668
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/711,889 Active US10655443B2 (en) | 2017-09-21 | 2017-09-21 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
| US16/805,261 Abandoned US20200199991A1 (en) | 2017-09-21 | 2020-02-28 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/711,889 Active US10655443B2 (en) | 2017-09-21 | 2017-09-21 | Pulsed hydraulic fracturing with geopolymer precursor fluids |
Country Status (7)
| Country | Link |
|---|---|
| US (2) | US10655443B2 (en) |
| EP (1) | EP3684880A1 (en) |
| JP (1) | JP2020535334A (en) |
| CN (1) | CN111108175A (en) |
| CA (1) | CA3076211A1 (en) |
| SA (1) | SA520411539B1 (en) |
| WO (1) | WO2019060337A1 (en) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10100245B1 (en) | 2017-05-15 | 2018-10-16 | Saudi Arabian Oil Company | Enhancing acid fracture conductivity |
| US11230661B2 (en) | 2019-09-05 | 2022-01-25 | Saudi Arabian Oil Company | Propping open hydraulic fractures |
| US11352548B2 (en) | 2019-12-31 | 2022-06-07 | Saudi Arabian Oil Company | Viscoelastic-surfactant treatment fluids having oxidizer |
| CN114479797A (en) * | 2020-11-12 | 2022-05-13 | 中国石油化工股份有限公司 | Selective gel water plugging system for fracture-cavity oil reservoir and preparation method |
| US11867028B2 (en) | 2021-01-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
| US11585176B2 (en) | 2021-03-23 | 2023-02-21 | Saudi Arabian Oil Company | Sealing cracked cement in a wellbore casing |
| EP4337742A1 (en) | 2021-05-11 | 2024-03-20 | ExxonMobil Technology and Engineering Company | Polyolefin-coke composite granules as a hydraulic fracturing proppant |
| CN113355077A (en) * | 2021-06-03 | 2021-09-07 | 西南石油大学 | Working fluid system suitable for shale oil exploitation and application thereof |
| US12140585B2 (en) | 2021-07-15 | 2024-11-12 | Saudi Arabian Oil Company | Estimating molecular weight of hydrocarbons |
| US12071589B2 (en) | 2021-10-07 | 2024-08-27 | Saudi Arabian Oil Company | Water-soluble graphene oxide nanosheet assisted high temperature fracturing fluid |
| US12025589B2 (en) | 2021-12-06 | 2024-07-02 | Saudi Arabian Oil Company | Indentation method to measure multiple rock properties |
| US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
| CN114015431B (en) * | 2021-12-07 | 2023-01-31 | 河南郑矿机器有限公司 | Low-density petroleum ceramsite proppant and preparation method thereof |
| US12012550B2 (en) | 2021-12-13 | 2024-06-18 | Saudi Arabian Oil Company | Attenuated acid formulations for acid stimulation |
| US12466992B2 (en) | 2022-03-04 | 2025-11-11 | ExxonMobil Technology and Engineering Company | Proppants derived from crosslinking mixed aromatic resins |
| US12203366B2 (en) | 2023-05-02 | 2025-01-21 | Saudi Arabian Oil Company | Collecting samples from wellbores |
Family Cites Families (67)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3980136A (en) | 1974-04-05 | 1976-09-14 | Big Three Industries, Inc. | Fracturing well formations using foam |
| US3937283A (en) | 1974-10-17 | 1976-02-10 | The Dow Chemical Company | Formation fracturing with stable foam |
| US4044833A (en) | 1976-06-08 | 1977-08-30 | Phillips Petroleum Company | Acid foam fracturing |
| US4216829A (en) | 1977-10-06 | 1980-08-12 | Halliburton Company | Gelled water epoxy sand consolidation system |
| US4324669A (en) | 1979-11-19 | 1982-04-13 | Halliburton Company | Foamed high viscosity aqueous inorganic acid solutions and methods of using the same |
| FR2493910A1 (en) * | 1980-11-13 | 1982-05-14 | Produits Refractaires | ZIRCONIA AND SILICA BASE AGENT FOR DEEP GEOLOGICAL FRACTURES |
| BR8702856A (en) | 1987-06-05 | 1988-12-20 | Petroleo Brasileiro Sa | CONTINUOUS PROCESS OF FRACTURING HYDRAULIC WITH FOAM |
| EP0306546A1 (en) | 1987-09-09 | 1989-03-15 | Phillips Petroleum Company | Irradiation produced AMPS/Am copolymers in thickened acid compositions |
| US4836284A (en) | 1988-01-26 | 1989-06-06 | Shell Western E&P Inc. | Equilibrium fracture acidizing |
| US5069283A (en) | 1989-08-02 | 1991-12-03 | The Western Company Of North America | Fracturing process using carbon dioxide and nitrogen |
| US5912219A (en) | 1994-02-03 | 1999-06-15 | The Procter & Gamble Company | Acidic cleaning compositions |
| US5613555A (en) | 1994-12-22 | 1997-03-25 | Dowell, A Division Of Schlumberger Technology Corporation | Inflatable packer with wide slat reinforcement |
| US5529123A (en) | 1995-04-10 | 1996-06-25 | Atlantic Richfield Company | Method for controlling fluid loss from wells into high conductivity earth formations |
| US7426961B2 (en) | 2002-09-03 | 2008-09-23 | Bj Services Company | Method of treating subterranean formations with porous particulate materials |
| CA2255413A1 (en) | 1998-12-11 | 2000-06-11 | Fracmaster Ltd. | Foamed nitrogen in liquid co2 for fracturing |
| US6207620B1 (en) | 1999-06-04 | 2001-03-27 | Texaco Inc. | Use of encapsulated acid in acid fracturing treatments |
| DE10127919A1 (en) | 2001-06-08 | 2002-12-19 | Ecolab Gmbh & Co Ohg | Washing processes, for removing mineral or starch deposits in industrial or domestic dishwashers is effected with both alkaline and acidic stages |
| US20050137094A1 (en) | 2001-06-11 | 2005-06-23 | Halliburton Energy Sevices, Inc. | Subterranean formation treatment fluids and methods of using such fluids |
| US7001872B2 (en) | 2001-06-11 | 2006-02-21 | Halliburton Energy Services, Inc. | Subterranean formation treating fluid and methods of fracturing subterranean formations |
| US20070012437A1 (en) | 2003-07-14 | 2007-01-18 | Clingman Scott R | Inflatable packer |
| US7063150B2 (en) | 2003-11-25 | 2006-06-20 | Halliburton Energy Services, Inc. | Methods for preparing slurries of coated particulates |
| EP1735143A2 (en) * | 2004-04-12 | 2006-12-27 | Carbo Ceramics Inc. | Coating and/or treating hydraulic fracturing proppants to improve wettability, proppant lubrication, and/or to reduce damage by fracturing fluids and reservoir fluids |
| US7494963B2 (en) | 2004-08-11 | 2009-02-24 | Delaval Holding Ab | Non-chlorinated concentrated all-in-one acid detergent and method for using the same |
| US20060073980A1 (en) | 2004-09-30 | 2006-04-06 | Bj Services Company | Well treating composition containing relatively lightweight proppant and acid |
| US7281581B2 (en) | 2004-12-01 | 2007-10-16 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
| CA2603960C (en) | 2005-04-06 | 2013-11-19 | Rhodia Inc. | Method of recycling fracturing fluids using a self-degrading foaming composition |
| US7767628B2 (en) | 2005-12-02 | 2010-08-03 | Clearwater International, Llc | Method for foaming a hydrocarbon drilling fluid and for producing light weight hydrocarbon fluids |
| WO2007096711A2 (en) | 2005-12-12 | 2007-08-30 | Vitech International, Inc. | Multipurpose, non-corrosive cleaning compositions and methods of use |
| EP1977079A1 (en) | 2006-01-27 | 2008-10-08 | Schlumberger Technology B.V. | Method for hydraulic fracturing of subterranean formation |
| US7134497B1 (en) | 2006-02-15 | 2006-11-14 | Halliburton Energy Services, Inc. | Foamed treatment fluids and associated methods |
| AU2007240367B2 (en) | 2006-04-21 | 2011-04-07 | Shell Internationale Research Maatschappij B.V. | High strength alloys |
| US7581590B2 (en) | 2006-12-08 | 2009-09-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
| US8763699B2 (en) | 2006-12-08 | 2014-07-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
| US7451812B2 (en) * | 2006-12-20 | 2008-11-18 | Schlumberger Technology Corporation | Real-time automated heterogeneous proppant placement |
| US9080440B2 (en) | 2007-07-25 | 2015-07-14 | Schlumberger Technology Corporation | Proppant pillar placement in a fracture with high solid content fluid |
| FR2920435A1 (en) | 2007-08-29 | 2009-03-06 | Arkema France | Aqueous composition, useful for cleaning of hard surface including metal objects, glass, and materials based on plastics and/or resins, comprises short-chain alkane sulfonic acids, preferably methane sulfonic acid, and a surfactant |
| WO2009058278A1 (en) | 2007-10-29 | 2009-05-07 | Ekc Technology, Inc | Methods of cleaning semiconductor devices at the back end of line using amidoxime compositions |
| US7841411B2 (en) | 2007-12-14 | 2010-11-30 | Schlumberger Technology Corporation | Use of polyimides in treating subterranean formations |
| US20100282468A1 (en) | 2007-12-14 | 2010-11-11 | Dean Michael Willberg | Fracturing fluid compositions comprising solid epoxy particles and methods of use |
| US20090298720A1 (en) | 2008-05-27 | 2009-12-03 | Halliburton Energy Services, Inc. | Methods for maintaining fracture conductivity |
| AU2009288847A1 (en) | 2008-09-04 | 2010-03-11 | Schlumberger Technology B.V. | Reversible peptide surfactants for oilfield applications |
| WO2011145965A1 (en) | 2010-05-17 | 2011-11-24 | Schlumberger Canada Limited | Methods for providing proppant slugs in fracturing treatments |
| US8997854B2 (en) | 2010-07-23 | 2015-04-07 | Weatherford Technology Holdings, Llc | Swellable packer anchors |
| CA2824181C (en) | 2011-01-17 | 2015-02-17 | Enfrac Inc. | Fracturing system and method for an underground formation |
| US20120305247A1 (en) * | 2011-06-06 | 2012-12-06 | Yiyan Chen | Proppant pillar placement in a fracture with high solid content fluid |
| US8985213B2 (en) | 2012-08-02 | 2015-03-24 | Halliburton Energy Services, Inc. | Micro proppants for far field stimulation |
| CN103015957B (en) * | 2012-10-16 | 2016-02-10 | 中国石油天然气股份有限公司 | diversion fracturing method |
| US20140144634A1 (en) * | 2012-11-28 | 2014-05-29 | Halliburton Energy Services, Inc. | Methods of Enhancing the Fracture Conductivity of Multiple Interval Fractures in Subterranean Formations Propped with Cement Packs |
| US20140144635A1 (en) | 2012-11-28 | 2014-05-29 | Halliburton Energy Services, Inc. | Methods of Enhancing Fracture Conductivity of Subterranean Formations Propped with Cement Pillars |
| US20140144633A1 (en) | 2012-11-28 | 2014-05-29 | Halliburton Energy Services, Inc. | Methods of Enhancing Fracture Conductivity of Subterranean Formations Propped with Cement Packs |
| US20140290943A1 (en) * | 2013-03-29 | 2014-10-02 | Schlumberger Technology Corporation | Stabilized Fluids In Well Treatment |
| US9896923B2 (en) | 2013-05-28 | 2018-02-20 | Schlumberger Technology Corporation | Synchronizing pulses in heterogeneous fracturing placement |
| WO2016032578A1 (en) | 2014-08-28 | 2016-03-03 | Halliburton Energy Services, Inc. | Acidizing compositions including ampholyte polymers |
| US10005955B2 (en) | 2013-07-24 | 2018-06-26 | Halliburton Energy Services, Inc. | Foamed chelating agent treatment fluids for use in subterranean matrix stimulations and subterranean and surface cleanout operations |
| GB2531446A (en) | 2013-07-31 | 2016-04-20 | Halliburton Energy Services Inc | Wellbore servicing materials and methods of making and using same |
| CN105849359B (en) | 2013-09-26 | 2020-01-07 | 贝克休斯公司 | Methods for Optimizing Conductivity in Hydraulic Fracturing Operations |
| AU2014379659B2 (en) | 2014-01-22 | 2017-06-22 | Halliburton Energy Services, Inc. | Clusters of micron-and nano-sized proppant for use in subterranean operations |
| US20150211346A1 (en) | 2014-01-24 | 2015-07-30 | Schlumberger Technology Corporation | Fracturing methods and systems |
| US20150369028A1 (en) | 2014-06-24 | 2015-12-24 | Schlumberger Technology Corporation | Compound cluster placement in fractures |
| AU2014399993B2 (en) * | 2014-06-30 | 2019-07-11 | Schlumberger Technology B.V. | Method for planning production and injection wells |
| US9759054B2 (en) * | 2014-07-30 | 2017-09-12 | Energy Recovery, Inc. | System and method for utilizing integrated pressure exchange manifold in hydraulic fracturing |
| WO2016089813A1 (en) | 2014-12-01 | 2016-06-09 | Aramco Services Company | A fracturing fluid for subterranean formations |
| JP6743021B2 (en) | 2014-12-31 | 2020-08-19 | ドルビー ラボラトリーズ ライセンシング コーポレイション | Individual laser fiber input for image projector |
| US20160215604A1 (en) | 2015-01-28 | 2016-07-28 | Schlumberger Technology Corporation | Well treatment |
| US9670762B2 (en) * | 2015-02-20 | 2017-06-06 | Halliburton Energy Services, Inc. | Fracturing tight subterranean formations with a cement composition |
| CA2892877A1 (en) | 2015-05-28 | 2016-11-28 | Fluid Energy Group Ltd. | Using non-regulated synthetic acid compositions as alternatives to conventional acids in the oil and gas industry |
| WO2017040553A1 (en) | 2015-09-03 | 2017-03-09 | Schlumberger Technology Corporation | On the fly mixing of acids and diversion fluids with water-soluble retarding agents |
-
2017
- 2017-09-21 US US15/711,889 patent/US10655443B2/en active Active
-
2018
- 2018-09-19 WO PCT/US2018/051627 patent/WO2019060337A1/en not_active Ceased
- 2018-09-19 EP EP18783235.7A patent/EP3684880A1/en not_active Withdrawn
- 2018-09-19 CN CN201880061460.1A patent/CN111108175A/en active Pending
- 2018-09-19 JP JP2020516865A patent/JP2020535334A/en active Pending
- 2018-09-19 CA CA3076211A patent/CA3076211A1/en not_active Abandoned
-
2020
- 2020-02-28 US US16/805,261 patent/US20200199991A1/en not_active Abandoned
- 2020-03-15 SA SA520411539A patent/SA520411539B1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| EP3684880A1 (en) | 2020-07-29 |
| CA3076211A1 (en) | 2019-03-28 |
| CN111108175A (en) | 2020-05-05 |
| WO2019060337A1 (en) | 2019-03-28 |
| JP2020535334A (en) | 2020-12-03 |
| US10655443B2 (en) | 2020-05-19 |
| US20190085675A1 (en) | 2019-03-21 |
| SA520411539B1 (en) | 2023-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10655443B2 (en) | Pulsed hydraulic fracturing with geopolymer precursor fluids | |
| CA3076213C (en) | Pulsed hydraulic fracturing with nanosilica carrier fluid | |
| US10202833B2 (en) | Hydraulic fracturing with exothermic reaction | |
| US20140290943A1 (en) | Stabilized Fluids In Well Treatment | |
| US9790774B2 (en) | Generating and maintaining conductivity of microfractures in tight formations by generating gas and heat | |
| US8074715B2 (en) | Methods of setting particulate plugs in horizontal well bores using low-rate slurries | |
| US20180010435A1 (en) | System and method for hydraulic fracturing with nanoparticles | |
| US20140151043A1 (en) | Stabilized fluids in well treatment | |
| WO2014039216A1 (en) | Well treatment methods and systems | |
| US11441406B2 (en) | Forming frac packs in high permeability formations | |
| US20140345863A1 (en) | Electromagnetically active slurries and methods | |
| US11391139B2 (en) | Staged propping of fracture networks | |
| US20230303911A1 (en) | Sand Consolidation Compositions And Methods Of Use | |
| CA3067961A1 (en) | Plasma-pulsed hydraulic fracture with carbonaceous slurry | |
| US20190242234A1 (en) | Methods for improving channel formation | |
| CA3017115A1 (en) | Pressure dependent leak-off mitigation in unconventional formations |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SAUDI ARABIAN OIL COMPANY, SAUDI ARABIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GOMAA, AHMED M.;ALNOAIMI, KHALID R.;AL-MUNTASHERI, GHAITHAN A.;SIGNING DATES FROM 20181111 TO 20181112;REEL/FRAME:051991/0028 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |