US20200048852A1 - Embanking arrangement - Google Patents
Embanking arrangement Download PDFInfo
- Publication number
- US20200048852A1 US20200048852A1 US16/488,430 US201816488430A US2020048852A1 US 20200048852 A1 US20200048852 A1 US 20200048852A1 US 201816488430 A US201816488430 A US 201816488430A US 2020048852 A1 US2020048852 A1 US 2020048852A1
- Authority
- US
- United States
- Prior art keywords
- port arrangement
- arrangement
- opening
- water volume
- embanking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 189
- 230000004888 barrier function Effects 0.000 claims abstract description 26
- 238000004891 communication Methods 0.000 claims description 16
- 239000012530 fluid Substances 0.000 claims description 16
- 230000003247 decreasing effect Effects 0.000 claims description 6
- 238000005086 pumping Methods 0.000 claims description 2
- 230000032258 transport Effects 0.000 description 7
- 230000000630 rising effect Effects 0.000 description 4
- 238000006424 Flood reaction Methods 0.000 description 3
- 230000007123 defense Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 239000013535 sea water Substances 0.000 description 2
- 239000013505 freshwater Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000005445 natural material Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/041—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours using active mechanical means, e.g. fluidizing or pumping
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/20—Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/38—Rolling gates or gates moving horizontally in their own plane, e.g. by sliding
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/50—Floating gates
Definitions
- the present invention relates in general to an embanking arrangement for protecting areas that are threatened by floods due to storms or due to other temporary water level rise at sea, rivers and lakes.
- the present invention relates especially to an embanking arrangement for separating and protecting a first water volume from a second water volume.
- the embanking arrangement comprising a barrier connected to land and having an opening, said opening allowing fluid communication and passage between the first water volume and the second water volume, a stationary basis extending across said opening, and a mobile port arrangement comprising a hull delimiting an inner tank.
- the embanking arrangement is configured to take a closed state by letting water flowing into the inner tank of the port arrangement such that the buoyancy of the port arrangement is decreased and the port arrangement sinks towards the stationary basis, preventing free passage between the first water volume and the second water volume in the closed state, and is configured to take an open state allowing free passage between the first water volume and the second water volume, wherein the inner tank of the port arrangement is at least partly filled with water and the hull of the port arrangement is located standing on said basis when the embanking arrangement is in the closed state, and wherein the port arrangement is located at a distance from said basis when the embanking arrangement is in the open state by restoring the buoyancy of the port arrangement by pumping out water from the inner tank of the port arrangement.
- WO 03/057995 it is known to use a long and narrow ship-like port arrangement in embanking arrangements, wherein the ship-like port arrangement can be lowered at an opening in the barrier connected to land by being filled with water.
- the ship-like port arrangement in said document comprises several mutually separated sections, wherein each section can be filled with water from the water volume/area facing the specific section and thereto be emptied from water to the same water volume/area facing the specific section.
- the present invention aims at obviating the aforementioned disadvantages and failings of previously known embanking arrangements, and at providing an improved embanking arrangement.
- a primary object of the present invention is to provide an improved embanking arrangement of the initially defined type, which is a simple and cheap way to protect the area that is threatened to become flooded due to rising water level in the second water volume.
- an embanking arrangement of the initially defined type which is characterized in that the port arrangement comprises at least a first opening in the hull, said first opening connecting the inner tank of the port arrangement and the side of the port arrangement facing the first water volume, said first opening comprising a controllable valve that in open state allows fluid communication through said first opening, and at least one pump, said pump being arranged in connection to the side of the port arrangement facing the second water volume and being configured to transport water from the first water volume to the second water volume.
- the present invention is based on the insight that the embanking arrangement can solve far more problems than previous attempted solutions and thereto solves the problems the known attempted solutions create, by allowing to transport water from the protected water volume to the outside water volume despite the water level in the protected water volume is lower than the water level in the outside water volume.
- the port arrangement comprises at least one channel, said channel extending from the side of the port arrangement facing the first water volume to the side of the port arrangement facing the second water volume, and said at least one pump being arranged in said channel.
- said pump is configured to transport water from the first water volume to the second water volume via the inner tank of the port arrangement and via the first opening of the hull.
- FIG. 1 is a schematic illustration of a harbor entrance wherein the embanking arrangement is in the open state and the port arrangement is located next to the opening in the barrier connected to land, i.e. allowing free passage,
- FIG. 2 is a schematic illustration of the harbor entrance according to FIG. 1 , wherein the water from the harbor, usually river water, flows into the sea,
- FIG. 3 is a schematic illustration of the harbor entrance according to FIG. 1 , wherein the sea level rises and the sea water flows into the harbor,
- FIG. 4 is a schematic illustration of the harbor entrance according to FIG. 1 , wherein the embanking arrangement is in the closed state and the port arrangement is located across the opening in the barrier connected to land, i.e. preventing free passage,
- FIG. 5 is a schematic cross section of the port arrangement and the barrier connected to land taken along A in FIG. 2 ,
- FIG. 6 is a schematic cross section of the port arrangement and the barrier connected to land taken along B in FIG. 2 ,
- FIG. 7 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C in FIG. 4 , wherein the port arrangement is standing on the basis,
- FIG. 8 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C in FIG. 4 , wherein the port arrangement is floating, i.e. at a distance from the basis,
- FIG. 9 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C in FIG. 4 , wherein lowering of the port arrangement is in progress,
- FIG. 10 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C in FIG. 4 , wherein the port arrangement is standing on the basis and water is transported from the first water volume to the second water volume, and
- FIG. 11 is a schematic cross section of the port arrangement according to an alternative embodiment and the opening of the barrier connected to land taken along C in FIG. 4 , wherein the port arrangement is standing on the basis and water is transported from the first water volume to the second water volume.
- the present invention relates in general to an embanking arrangement configured to protect an area that is threatened to be flooded during storms or during other temporary water level rises at sea, rivers and lakes.
- the inventive embanking arrangement is configured to separate and protect a first water volume 5 from a second water volume 6 .
- the first water volume 5 is the water area/harbor that shall be protected from too big water level rises
- the second water volume is the water area/sea wherein the water level rises uncontrollably.
- the embanking arrangement comprises a barrier 4 connected to land/shore and having an opening 3 .
- the barrier 4 connected to land also known as embankment, is preferably stationary and is preferably constituted by a concrete structure.
- the opening 3 in the barrier 4 connected to land allows fluid communication and passage of sea traffic between the first water volume 5 and the second water volume 6 .
- the embanking arrangement also comprises a stationary basis 2 extending across said opening 3 , in other words the stationary basis 2 connects the two halves of the barrier 4 connected to land.
- the basis 2 is preferably a concrete structure, by can also be constituted by a natural sea/river bed prepared with natural material/stones, or a frame work of metal beams lowered into the sea bed or lake bed, wherein the upper surface of the frame work has the same geometrical shape as the lower side of the hull, or a combination thereof.
- the basis 2 shall be mainly plane and horizontal.
- the inventive embanking arrangement comprises a mobile port arrangement 1 , in FIGS. 1-3 located/moored adjacent to or at a distance from the opening 3 .
- the mobile port arrangement 1 comprises a hull delimiting an inner tank, which in an empty state comprises air and which in a filled state comprises water.
- the port arrangement 1 is in the disclosed embodiments constituted by a ship-like craft.
- the embanking arrangement is configured to take a closed state, as is shown in FIGS. 4 and 6-7 , wherein free passage and fluid communication between the first water volume 5 and the second water volume 6 is blocked, and an open state, as is shown in FIGS. 2 and 5 , wherein at least fluid communication between the first water volume 5 and the second water volume 6 is allowed.
- the embanking arrangement is in the closed state the inner tank of the port arrangement 1 is at least partly filled with water and the hull of the port arrangement is located standing on said basis 2 , whereupon the port arrangement 1 prevents fluid communication between the first water volume 5 and the second water volume 6 .
- the port arrangement 1 When the embanking arrangement is in the open state the port arrangement 1 is located at a distance from the basis 2 , preferably beside the opening 3 , and fluid communication between the first water volume 5 and the second water volume 6 is allowed. When the port arrangement 1 is located beside the opening 3 free passage of sea traffic is allowed. The port arrangement 1 may also be located at another place when the embanking arrangement is in the open state.
- the port arrangement 1 can be arranged in a lowered state also when the port arrangement 1 is located beside the opening 3 in the barrier 4 connected to land.
- FIG. 8 disclose the port arrangement 1 , located across the opening 3 in the barrier 4 connected to land between the protected first water volume 5 and the outer second water volume 6 , but still in a floating (not filled with water) state. In other words free passage of sea traffic is prevented through the opening 3 at the same time as fluid communication through the opening 3 is allowed.
- the port arrangement 1 is still not in contact with the basis/bed 2 .
- FIG. 9 disclose the port arrangement 1 in the same position as in FIG. 8 , but the lowering has been started by having at least one first opening 7 in the hull opened in order to let in water into the inner tank of the port arrangement 1 .
- the first opening 7 connects the inner tank of the port arrangement 1 and the side of the port arrangement 1 facing the first water volume 5 , said first opening 7 comprising a controllable valve (gate) that in open state allows fluid communication through said first opening 7 .
- the first opening 7 shall be located as far down as possible.
- the port arrangement 1 comprises several first openings 7 .
- the first opening 7 may remain open, whereupon the water level in the inner tank is the same as the water level in the first water volume 5 .
- the first opening 7 is closed when a suitable amount of water is brought into the inner tank, and thereby a predetermined pressure result between the port arrangement 1 and the basis 2 .
- FIG. 9 also at least one second opening 7 ′ in the hull of the port arrangement 1 is opened in order to speed up the lowering of the port arrangement 1 .
- the second opening 7 ′ is optional.
- the second opening 7 ′ connects the inner tank of the port arrangement 1 and the side of the port arrangement 1 facing the second water volume 6 , said second opening 7 ′ comprising a controllable valve (gate) that in open state allows fluid communication through said second opening 7 ′.
- the second opening 7 ′ shall be located as far down as possible.
- the port arrangement 1 comprises several second openings 7 ′. When the port arrangement 1 comes in contact with and is standing on the basis 2 the second opening 7 ′ is closed.
- FIGS. 10 and 11 disclose the port arrangement 1 in the same position as in FIGS. 8 and 9 , but now at least partly filled with water and in lowered position.
- the port arrangement is now standing on the basis 2 as well as in contact with the barrier 4 connected to land, implying that the water flow from the second water volume 6 to the protected first water volume 5 is blocked.
- the first opening 7 in the hull is still open, while the second opening 7 ′ in the hull is closed.
- the inventive port arrangement 1 comprises further at least one pump 8 , said pump 8 being arranged in connection with the side of the port arrangement 1 facing the second water volume 6 and being configured to transport water from the first water volume 5 to the second water volume 6 .
- the port arrangement 1 comprises at least one channel 9 , said channel 9 extending from the side of the port arrangement 1 facing the first water volume 5 to the side of the port arrangement 1 facing the second water volume 6 , and said at least one pump 8 being arranged in said channel 9 .
- said at least one channel 9 comprises at least a first controllable valve 10 (gate) configured to prevent a flow of water in the direction from the second water volume 6 to the first water volume 5 .
- the first controllable valve 10 is in the disclosed embodiment located at the side of the port arrangement 1 facing the second water volume 6 .
- the channel 9 comprises also a second controllable valve 10 ′ (gate) that in the disclosed embodiment is located at the side of the port arrangement facing the first water volume 5 .
- the channel 9 more precisely the first controllable valve 10 and the second controllable valve 10 ′, are closed in FIGS. 8 and 9 .
- the channel 9 is open, more precisely the first controllable valve 10 and the second controllable valve 10 ′ are open and the pump 8 pumps/transports water through the channel 9 from the first water volume 5 to the second water volume 6 .
- the water level in the first water volume 5 shall not rise due to inflow from rivers and rain that otherwise will cause flooding despite the water level in the first water volume 5 is lower than the water level in the second water volume 6 .
- the area of the first water volume 5 is small in relation to the amount of fresh water that inflows from rivers and rain, the seaport risks to be flooded if the barrier is closed.
- said pump 8 is configured to transport water from the first water volume 5 to the second water volume 6 via the inner tank of the port arrangement 1 and via the first opening 7 of the hull.
- the channel 9 according to FIG. 10 can be spared.
- a first controllable valve 10 (gate), preventing a flow of water from the second water volume 6 to the inner tank of the port arrangement 1 when the pump 8 is not active, must be present.
- the habor entrance is also exposed to tide the situation may occur that during low tide the water level in the second water volume/sea 6 during a few hours, despite higher than normal, still is lower than the water level in the protected first water volume 5 . Then the water level in the first water volume 5 can be maintained or the water level in the first water volume 5 can be lowered by for instance having the first opening 7 and the second opening 7 ′, that are used during the original filling with water, temporarily opened in order to increase the outflow capacity from the first water volume 5 to the second water volume 6 .
- the filling of the port arrangement 1 with water takes place in a simple and quick way by opening big gates ( 7 , 7 ′) in the hull and letting sea water flowing into the inner tank of the port arrangement 1 .
- the port arrangement 1 sinks and the preferably plane bottom of the port arrangement 1 is placed on the preferably plane basis 2 that has been provided under the opening 3 in the permanent embankment/barrier 4 .
- the weight of the port arrangement 1 in combination with the decreased buoyancy that the water in the inner tank entails, provides a necessary weight against the basis 2 such that the frictional force makes it possible for the port arrangement 1 to remain standing when it is exposed to transversal loads from both the increased water level in the second water volume 6 and from waves and wind.
- the port arrangement 1 is moored to the barrier 4 connected to land.
- the frictional force can be increased further by decreasing the water pressure between the bottom/lower side of the port arrangement 1 and the basis 2 .
- the water pressure is decreased by decreasing the contact area between the port arrangement 1 and the basis 2 , for instance by providing the lower side of the port arrangement 1 and/or the basis 2 with means configured for draining away water from the first water volume 5 leaking under the port arrangement.
- this is accomplished by means of transversal grooves in either the lower side of the port arrangement 1 or the basis 2 .
- said pump 8 is also configures for propelling and/or maneuvering of the port arrangement 1 when the inner tank of the port arrangement 1 is empty.
- the port arrangement 1 comprises several pumps 8
- one or more of these pumps 8 must also be able to pump water out of the port arrangement 1 when the case of danger is over and/or when the water level in the second water volume 6 has sunk to normal levels, in order to get the port arrangement 1 floating again.
- the water being pumped out of the inner tank of the port arrangement 1 either in order to increase the buoyancy of the port arrangement 1 or in order to evacuate water from the first water volume 5 to the second water volume 6 , not necessarily needs to be transported through the mid-section of the port arrangement 1 , perpendicular to its longitudinal direction.
- the water can also be pumped out of or next to the fore or stern of the port arrangement 1 .
- Pumps 8 directing the flow of water in the longitudinal direction of the port arrangement 1 can also be used for propelling the port arrangement 1 in the forward or backward direction, as well as for steering and maneuvering.
- the advantage of using a ship-like port arrangement 1 as embankment is not only the fact that it can transport itself to the location where it shall be lowered, but also that it can be configured for other purposes the considerably longer time it does not serve as an embanking device.
- the port arrangement 1 can, also at another location, serve as a car park, restaurant, car ferry, floating bridge, etc., opening up for new funding opportunities and a better total economy.
- the centrally located land is expensive, and a port arrangement 1 moored to the dock in the middle of the town can provide additional valuable square meters.
- a 150 meters long and 25 meters wide hull may for instance serve as a car park having about 300 parking places.
- the income from such business may be crucial way to improve the total economy of the embanking project.
- the port arrangement 1 must in such cases comprise storage space above the inner tank, said storage space being configured to be connected to the dock or the barrier 4 connected to land by means of temporary gangways.
- the storage space of the port arrangement 1 may on ordinary days be used as warehouse for various materials, or as a car ferry, or a floating bridge. The only requirement is that it in a relatively short notice (less than 24 hours) can be made ready for its main function as embanking device, be moved to the location of service and be activated by being filled with water.
- the port arrangement 1 could also be used such other purposes also when it is located at the barrier 4 connected to land. Such a use is at least as temporary road connection, by having a roadway applied to the barrier 4 connected to land and temporarily connected to the deck or storage space of the port arrangement 1 via temporary gangways.
- the road connection can be used both when the port arrangement 1 is in the lowered state and in the floating state.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Revetment (AREA)
- Barrages (AREA)
Abstract
Description
- The present invention relates in general to an embanking arrangement for protecting areas that are threatened by floods due to storms or due to other temporary water level rise at sea, rivers and lakes.
- The present invention relates especially to an embanking arrangement for separating and protecting a first water volume from a second water volume. The embanking arrangement comprising a barrier connected to land and having an opening, said opening allowing fluid communication and passage between the first water volume and the second water volume, a stationary basis extending across said opening, and a mobile port arrangement comprising a hull delimiting an inner tank. The embanking arrangement is configured to take a closed state by letting water flowing into the inner tank of the port arrangement such that the buoyancy of the port arrangement is decreased and the port arrangement sinks towards the stationary basis, preventing free passage between the first water volume and the second water volume in the closed state, and is configured to take an open state allowing free passage between the first water volume and the second water volume, wherein the inner tank of the port arrangement is at least partly filled with water and the hull of the port arrangement is located standing on said basis when the embanking arrangement is in the closed state, and wherein the port arrangement is located at a distance from said basis when the embanking arrangement is in the open state by restoring the buoyancy of the port arrangement by pumping out water from the inner tank of the port arrangement.
- It is a known fact that the sea levels around the world are rising due to climate changes and they are expected to rise even more in the future. This entails less safety margins especially in coastal communities and thereto an increased risk for temporary floods, especially related to storms. In connection with storms the rough winds force up the water level, and thereto the water rise due to the low air pressure. The mean water level at sea may rise about 2-3 meters or more above normal. The high water situations are often temporary, usually less than 24 hours but may also continue one or more days, causing a need for a temporary protection. Thus, due to rising sea levels many coastal communities are threatened to be flooded during extreme high water situations, when winds, air pressure and also tide interacts.
- In the long-term permanent embankments may be necessary if the sea levels continue to rise, but the need for such permanent embankments can be postponed another 100-200 years ahead if the problem of temporary floods is solved.
- For this reason defenses/embanking arrangements in the form of protective sea walls have already been built in many places, such as in London, St Petersburg and Rotterdam, while the work of building sea walls are in progress at other places, such as Venice. Discussions regarding the need for building similar defenses/embanking arrangements are in progress at several places, inter alia Gothenburg, Stockholm, Copenhagen and New York. The problem exists also at some places in connection with rivers and lakes, for instance in Arvika (Sweden), but in these areas it is rain and/or melted snow that threatens to rise the water levels.
- One drawback of known projects is that they tend to be very expensive, partly because the floodgates often need to be big enough to allow commercial shipping when not closed, partly because it is technically complicated to build large and permanent mechanical structures that must be extremely reliable as well.
- In the patent literature, WO 03/057995, it is known to use a long and narrow ship-like port arrangement in embanking arrangements, wherein the ship-like port arrangement can be lowered at an opening in the barrier connected to land by being filled with water. The ship-like port arrangement in said document comprises several mutually separated sections, wherein each section can be filled with water from the water volume/area facing the specific section and thereto be emptied from water to the same water volume/area facing the specific section. By means of the proposed solution you may get away from the problem of expensive and complicated permanent mechanical structures.
- One remaining problem of the above mentioned solution is how to handle the water filling up the protected water area from rivers and rain. Many seaports are located at the mouth of a river, and if you block the inflow of water from the sea you will also block the outflow of river water to the sea, this might result in the city becoming flooded by river water, despite the water level in the protected water area is lower than the water level at the sea side of the embanking arrangement.
- The present invention aims at obviating the aforementioned disadvantages and failings of previously known embanking arrangements, and at providing an improved embanking arrangement. A primary object of the present invention is to provide an improved embanking arrangement of the initially defined type, which is a simple and cheap way to protect the area that is threatened to become flooded due to rising water level in the second water volume.
- It is another object of the present invention to provide an embanking arrangement, which at the same time protects the area that is threatened to become flooded due to rising water levels also in the first water volume.
- It is another object of the present invention to provide an embanking arrangement, which does not need external maneuvering in connection with the embankment being established/erected and terminated, respectively.
- According to the invention at least the primary object is attained by means of the initially defined embanking arrangement, having the features defined in the independent claim. Preferred embodiments of the present invention are further defined in the dependent claims.
- According to the present invention, there is provided an embanking arrangement of the initially defined type, which is characterized in that the port arrangement comprises at least a first opening in the hull, said first opening connecting the inner tank of the port arrangement and the side of the port arrangement facing the first water volume, said first opening comprising a controllable valve that in open state allows fluid communication through said first opening, and at least one pump, said pump being arranged in connection to the side of the port arrangement facing the second water volume and being configured to transport water from the first water volume to the second water volume.
- Thus, the present invention is based on the insight that the embanking arrangement can solve far more problems than previous attempted solutions and thereto solves the problems the known attempted solutions create, by allowing to transport water from the protected water volume to the outside water volume despite the water level in the protected water volume is lower than the water level in the outside water volume.
- According to a preferred embodiment of the present invention, the port arrangement comprises at least one channel, said channel extending from the side of the port arrangement facing the first water volume to the side of the port arrangement facing the second water volume, and said at least one pump being arranged in said channel. According to an alternative embodiment said pump is configured to transport water from the first water volume to the second water volume via the inner tank of the port arrangement and via the first opening of the hull.
- Further advantages with and features of the invention will be apparent from the other dependent claims as well as from the following detailed description of preferred embodiments.
- A more complete understanding of the abovementioned and other features and advantages of the present invention will be apparent from the following detailed description of preferred embodiments in conjunction with the appended drawings, wherein:
-
FIG. 1 is a schematic illustration of a harbor entrance wherein the embanking arrangement is in the open state and the port arrangement is located next to the opening in the barrier connected to land, i.e. allowing free passage, -
FIG. 2 is a schematic illustration of the harbor entrance according toFIG. 1 , wherein the water from the harbor, usually river water, flows into the sea, -
FIG. 3 is a schematic illustration of the harbor entrance according toFIG. 1 , wherein the sea level rises and the sea water flows into the harbor, -
FIG. 4 is a schematic illustration of the harbor entrance according toFIG. 1 , wherein the embanking arrangement is in the closed state and the port arrangement is located across the opening in the barrier connected to land, i.e. preventing free passage, -
FIG. 5 is a schematic cross section of the port arrangement and the barrier connected to land taken along A inFIG. 2 , -
FIG. 6 is a schematic cross section of the port arrangement and the barrier connected to land taken along B inFIG. 2 , -
FIG. 7 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C inFIG. 4 , wherein the port arrangement is standing on the basis, -
FIG. 8 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C inFIG. 4 , wherein the port arrangement is floating, i.e. at a distance from the basis, -
FIG. 9 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C inFIG. 4 , wherein lowering of the port arrangement is in progress, -
FIG. 10 is a schematic cross section of the port arrangement and the opening of the barrier connected to land taken along C inFIG. 4 , wherein the port arrangement is standing on the basis and water is transported from the first water volume to the second water volume, and -
FIG. 11 is a schematic cross section of the port arrangement according to an alternative embodiment and the opening of the barrier connected to land taken along C inFIG. 4 , wherein the port arrangement is standing on the basis and water is transported from the first water volume to the second water volume. - The present invention relates in general to an embanking arrangement configured to protect an area that is threatened to be flooded during storms or during other temporary water level rises at sea, rivers and lakes.
- Reference is initially made to
FIGS. 1-7 . The inventive embanking arrangement is configured to separate and protect afirst water volume 5 from asecond water volume 6. Thefirst water volume 5 is the water area/harbor that shall be protected from too big water level rises, and the second water volume is the water area/sea wherein the water level rises uncontrollably. - The embanking arrangement comprises a
barrier 4 connected to land/shore and having anopening 3. Thebarrier 4 connected to land, also known as embankment, is preferably stationary and is preferably constituted by a concrete structure. The opening 3 in thebarrier 4 connected to land allows fluid communication and passage of sea traffic between thefirst water volume 5 and thesecond water volume 6. The embanking arrangement also comprises astationary basis 2 extending across said opening 3, in other words thestationary basis 2 connects the two halves of thebarrier 4 connected to land. Thebasis 2, or the bed, is preferably a concrete structure, by can also be constituted by a natural sea/river bed prepared with natural material/stones, or a frame work of metal beams lowered into the sea bed or lake bed, wherein the upper surface of the frame work has the same geometrical shape as the lower side of the hull, or a combination thereof. Thebasis 2 shall be mainly plane and horizontal. - It is essential for the inventive embanking arrangement that is comprises a
mobile port arrangement 1, inFIGS. 1-3 located/moored adjacent to or at a distance from theopening 3. Themobile port arrangement 1 comprises a hull delimiting an inner tank, which in an empty state comprises air and which in a filled state comprises water. Theport arrangement 1 is in the disclosed embodiments constituted by a ship-like craft. - The embanking arrangement is configured to take a closed state, as is shown in
FIGS. 4 and 6-7 , wherein free passage and fluid communication between thefirst water volume 5 and thesecond water volume 6 is blocked, and an open state, as is shown inFIGS. 2 and 5 , wherein at least fluid communication between thefirst water volume 5 and thesecond water volume 6 is allowed. When the embanking arrangement is in the closed state the inner tank of theport arrangement 1 is at least partly filled with water and the hull of the port arrangement is located standing on saidbasis 2, whereupon theport arrangement 1 prevents fluid communication between thefirst water volume 5 and thesecond water volume 6. When the embanking arrangement is in the open state theport arrangement 1 is located at a distance from thebasis 2, preferably beside the opening 3, and fluid communication between thefirst water volume 5 and thesecond water volume 6 is allowed. When theport arrangement 1 is located beside theopening 3 free passage of sea traffic is allowed. Theport arrangement 1 may also be located at another place when the embanking arrangement is in the open state. - It shall be pointed out that the
port arrangement 1 can be arranged in a lowered state also when theport arrangement 1 is located beside theopening 3 in thebarrier 4 connected to land. -
FIG. 8 disclose theport arrangement 1, located across theopening 3 in thebarrier 4 connected to land between the protectedfirst water volume 5 and the outersecond water volume 6, but still in a floating (not filled with water) state. In other words free passage of sea traffic is prevented through theopening 3 at the same time as fluid communication through theopening 3 is allowed. Theport arrangement 1 is still not in contact with the basis/bed 2. -
FIG. 9 disclose theport arrangement 1 in the same position as inFIG. 8 , but the lowering has been started by having at least onefirst opening 7 in the hull opened in order to let in water into the inner tank of theport arrangement 1. Thefirst opening 7 connects the inner tank of theport arrangement 1 and the side of theport arrangement 1 facing thefirst water volume 5, saidfirst opening 7 comprising a controllable valve (gate) that in open state allows fluid communication through saidfirst opening 7. Preferably, thefirst opening 7 shall be located as far down as possible. Preferably theport arrangement 1 comprises severalfirst openings 7. When theport arrangement 1 comes in contact with and is standing on thebasis 2 thefirst opening 7 may remain open, whereupon the water level in the inner tank is the same as the water level in thefirst water volume 5. Preferably thefirst opening 7 is closed when a suitable amount of water is brought into the inner tank, and thereby a predetermined pressure result between theport arrangement 1 and thebasis 2. - In
FIG. 9 also at least onesecond opening 7′ in the hull of theport arrangement 1 is opened in order to speed up the lowering of theport arrangement 1. Thesecond opening 7′ is optional. Thesecond opening 7′ connects the inner tank of theport arrangement 1 and the side of theport arrangement 1 facing thesecond water volume 6, saidsecond opening 7′ comprising a controllable valve (gate) that in open state allows fluid communication through saidsecond opening 7′. Preferably, thesecond opening 7′ shall be located as far down as possible. Preferably theport arrangement 1 comprises severalsecond openings 7′. When theport arrangement 1 comes in contact with and is standing on thebasis 2 thesecond opening 7′ is closed. -
FIGS. 10 and 11 disclose theport arrangement 1 in the same position as inFIGS. 8 and 9 , but now at least partly filled with water and in lowered position. The port arrangement is now standing on thebasis 2 as well as in contact with thebarrier 4 connected to land, implying that the water flow from thesecond water volume 6 to the protectedfirst water volume 5 is blocked. Thefirst opening 7 in the hull is still open, while thesecond opening 7′ in the hull is closed. - The
inventive port arrangement 1 comprises further at least onepump 8, saidpump 8 being arranged in connection with the side of theport arrangement 1 facing thesecond water volume 6 and being configured to transport water from thefirst water volume 5 to thesecond water volume 6. - According to the embodiment disclosed in
FIG. 10 theport arrangement 1 comprises at least onechannel 9, saidchannel 9 extending from the side of theport arrangement 1 facing thefirst water volume 5 to the side of theport arrangement 1 facing thesecond water volume 6, and said at least onepump 8 being arranged in saidchannel 9. Thereto it is preferred that said at least onechannel 9 comprises at least a first controllable valve 10 (gate) configured to prevent a flow of water in the direction from thesecond water volume 6 to thefirst water volume 5. The firstcontrollable valve 10 is in the disclosed embodiment located at the side of theport arrangement 1 facing thesecond water volume 6. In the disclosed embodiment thechannel 9 comprises also a secondcontrollable valve 10′ (gate) that in the disclosed embodiment is located at the side of the port arrangement facing thefirst water volume 5. It shall be pointed out that thechannel 9, more precisely the firstcontrollable valve 10 and the secondcontrollable valve 10′, are closed inFIGS. 8 and 9 . InFIG. 10 thechannel 9 is open, more precisely the firstcontrollable valve 10 and the secondcontrollable valve 10′ are open and thepump 8 pumps/transports water through thechannel 9 from thefirst water volume 5 to thesecond water volume 6. This is performed since the water level in thefirst water volume 5 shall not rise due to inflow from rivers and rain that otherwise will cause flooding despite the water level in thefirst water volume 5 is lower than the water level in thesecond water volume 6. Thus, if the area of thefirst water volume 5 is small in relation to the amount of fresh water that inflows from rivers and rain, the seaport risks to be flooded if the barrier is closed. - According to the alternative embodiment disclosed in
FIG. 11 saidpump 8 is configured to transport water from thefirst water volume 5 to thesecond water volume 6 via the inner tank of theport arrangement 1 and via thefirst opening 7 of the hull. Thus, thechannel 9 according toFIG. 10 can be spared. However, a first controllable valve 10 (gate), preventing a flow of water from thesecond water volume 6 to the inner tank of theport arrangement 1 when thepump 8 is not active, must be present. - If the habor entrance is also exposed to tide the situation may occur that during low tide the water level in the second water volume/
sea 6 during a few hours, despite higher than normal, still is lower than the water level in the protectedfirst water volume 5. Then the water level in thefirst water volume 5 can be maintained or the water level in thefirst water volume 5 can be lowered by for instance having thefirst opening 7 and thesecond opening 7′, that are used during the original filling with water, temporarily opened in order to increase the outflow capacity from thefirst water volume 5 to thesecond water volume 6. - Thus, the filling of the
port arrangement 1 with water takes place in a simple and quick way by opening big gates (7, 7′) in the hull and letting sea water flowing into the inner tank of theport arrangement 1. Theport arrangement 1 sinks and the preferably plane bottom of theport arrangement 1 is placed on the preferablyplane basis 2 that has been provided under theopening 3 in the permanent embankment/barrier 4. The weight of theport arrangement 1, in combination with the decreased buoyancy that the water in the inner tank entails, provides a necessary weight against thebasis 2 such that the frictional force makes it possible for theport arrangement 1 to remain standing when it is exposed to transversal loads from both the increased water level in thesecond water volume 6 and from waves and wind. However, it is preferred that theport arrangement 1 is moored to thebarrier 4 connected to land. - The frictional force can be increased further by decreasing the water pressure between the bottom/lower side of the
port arrangement 1 and thebasis 2. The water pressure is decreased by decreasing the contact area between theport arrangement 1 and thebasis 2, for instance by providing the lower side of theport arrangement 1 and/or thebasis 2 with means configured for draining away water from thefirst water volume 5 leaking under the port arrangement. Preferably this is accomplished by means of transversal grooves in either the lower side of theport arrangement 1 or thebasis 2. - Preferably, said
pump 8 is also configures for propelling and/or maneuvering of theport arrangement 1 when the inner tank of theport arrangement 1 is empty. In the case theport arrangement 1 comprisesseveral pumps 8, one or more of thesepumps 8 must also be able to pump water out of theport arrangement 1 when the case of danger is over and/or when the water level in thesecond water volume 6 has sunk to normal levels, in order to get theport arrangement 1 floating again. In some cases it can be possible to temporarily, for instance during low tide, to pump out as much water as needed to have theport arrangement 1 to lift from thebasis 2 and thereby allowing water from thefirst water volume 5 by its own force flow through theopening 3 underneath theport arrangement 1. - It shall be pointed out that the water being pumped out of the inner tank of the
port arrangement 1, either in order to increase the buoyancy of theport arrangement 1 or in order to evacuate water from thefirst water volume 5 to thesecond water volume 6, not necessarily needs to be transported through the mid-section of theport arrangement 1, perpendicular to its longitudinal direction. The water can also be pumped out of or next to the fore or stern of theport arrangement 1.Pumps 8 directing the flow of water in the longitudinal direction of theport arrangement 1, or in close angle thereto, can also be used for propelling theport arrangement 1 in the forward or backward direction, as well as for steering and maneuvering. - The advantage of using a ship-
like port arrangement 1 as embankment (mobile gate) is not only the fact that it can transport itself to the location where it shall be lowered, but also that it can be configured for other purposes the considerably longer time it does not serve as an embanking device. Instead, theport arrangement 1 can, also at another location, serve as a car park, restaurant, car ferry, floating bridge, etc., opening up for new funding opportunities and a better total economy. At many seaports the centrally located land is expensive, and aport arrangement 1 moored to the dock in the middle of the town can provide additional valuable square meters. A 150 meters long and 25 meters wide hull may for instance serve as a car park having about 300 parking places. The income from such business may be crucial way to improve the total economy of the embanking project. Theport arrangement 1 must in such cases comprise storage space above the inner tank, said storage space being configured to be connected to the dock or thebarrier 4 connected to land by means of temporary gangways. - Also other fields of application are possible. The storage space of the
port arrangement 1 may on ordinary days be used as warehouse for various materials, or as a car ferry, or a floating bridge. The only requirement is that it in a relatively short notice (less than 24 hours) can be made ready for its main function as embanking device, be moved to the location of service and be activated by being filled with water. - The
port arrangement 1 could also be used such other purposes also when it is located at thebarrier 4 connected to land. Such a use is at least as temporary road connection, by having a roadway applied to thebarrier 4 connected to land and temporarily connected to the deck or storage space of theport arrangement 1 via temporary gangways. The road connection can be used both when theport arrangement 1 is in the lowered state and in the floating state. - The invention is not limited only to the embodiments described above and shown in the drawings, which primarily have an illustrative and exemplifying purpose. This patent application is intended to cover all adjustments and variants of the preferred embodiments described herein, thus the present invention is defined by the wording of the appended claims and thus, the equipment may be modified in all kinds of ways within the scope of the appended claims.
- It shall also be pointed out that all information about/concerning terms such as above, under, upper, lower, etc., shall be interpreted/read having the equipment oriented according to the figures, having the drawings oriented such that the references can be properly read. Thus, such terms only indicates mutual relations in the shown embodiments, which relations may be changed if the inventive equipment is provided with another structure/design.
- It shall also be pointed out that even thus it is not explicitly stated that features from a specific embodiment may be combined with features from another embodiment, the combination shall be considered obvious, if the combination is possible.
Claims (17)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE1730046-8 | 2017-02-25 | ||
| SE1730046A SE541900C2 (en) | 2017-02-25 | 2017-02-25 | Dam arrangement |
| PCT/SE2018/050162 WO2018156070A1 (en) | 2017-02-25 | 2018-02-20 | Embanking arrangement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20200048852A1 true US20200048852A1 (en) | 2020-02-13 |
Family
ID=63254355
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/488,430 Abandoned US20200048852A1 (en) | 2017-02-25 | 2018-02-20 | Embanking arrangement |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20200048852A1 (en) |
| EP (1) | EP3585947A4 (en) |
| SE (1) | SE541900C2 (en) |
| WO (1) | WO2018156070A1 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DK179294B1 (en) * | 2017-03-30 | 2018-04-16 | Steen Olsen Invest Aps | Flood protection |
| SE542802C2 (en) * | 2018-11-22 | 2020-07-07 | Noaq Flood Prot Ab | Protective barrier segment for a temporary liquid-damming protective barrier as well as protective barrier comprising such a protective barrier segment |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003057995A1 (en) * | 2002-01-09 | 2003-07-17 | Antonio Ieno | Device for a total, or partial, operating barrier for a channel and its installation |
| JP2004052286A (en) * | 2002-07-17 | 2004-02-19 | Mitsubishi Heavy Ind Ltd | Dam and construction method therefor |
| US8740500B2 (en) * | 2011-09-01 | 2014-06-03 | Dale A. Conway | Pumping system for use on a moveable flood control barrier |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3377810A (en) * | 1966-02-09 | 1968-04-16 | Ernest W. Crumley | Pumping apparatus for drydock and caisson |
| BE759279A (en) * | 1969-11-21 | 1971-04-30 | Lukawsky Michael | METHOD AND APPARATUS FOR FLOOD CONTROL |
| FR2299461A1 (en) * | 1975-01-31 | 1976-08-27 | Marseille Grands Travaux | Removable dam for reservoir or dock - consisting of water filled caissons which can be pumped out to float away |
| DE2716073C2 (en) * | 1977-04-09 | 1984-05-30 | Blohm + Voss Ag, 2000 Hamburg | Floatable weir to shut off channels or the like. |
| DE3714248A1 (en) * | 1987-04-29 | 1988-11-17 | George Paraskevopoulos | High-tide barrier |
| JP2003129454A (en) * | 2001-10-30 | 2003-05-08 | Ishikawajima Harima Heavy Ind Co Ltd | Floating gate |
-
2017
- 2017-02-25 SE SE1730046A patent/SE541900C2/en unknown
-
2018
- 2018-02-20 US US16/488,430 patent/US20200048852A1/en not_active Abandoned
- 2018-02-20 EP EP18756750.8A patent/EP3585947A4/en not_active Withdrawn
- 2018-02-20 WO PCT/SE2018/050162 patent/WO2018156070A1/en not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003057995A1 (en) * | 2002-01-09 | 2003-07-17 | Antonio Ieno | Device for a total, or partial, operating barrier for a channel and its installation |
| JP2004052286A (en) * | 2002-07-17 | 2004-02-19 | Mitsubishi Heavy Ind Ltd | Dam and construction method therefor |
| US8740500B2 (en) * | 2011-09-01 | 2014-06-03 | Dale A. Conway | Pumping system for use on a moveable flood control barrier |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3585947A1 (en) | 2020-01-01 |
| SE1730046A1 (en) | 2018-08-26 |
| EP3585947A4 (en) | 2020-12-30 |
| SE541900C2 (en) | 2020-01-02 |
| WO2018156070A1 (en) | 2018-08-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11274408B2 (en) | Flood mitigation system | |
| US20070217868A1 (en) | Method and apparatus for countering flooding in coastal areas | |
| Smith | Types of marine concrete structures | |
| US20200048852A1 (en) | Embanking arrangement | |
| Burcharth et al. | Types and functions of coastal structures | |
| JP2013047093A (en) | Evacuation float | |
| JP2006342653A (en) | Breakwater for tsunami | |
| Herron Jr | Case history of Mission Bay Inlet, San Diego, California | |
| KR20110107889A (en) | The implosion structure and installation method of the hydrograph for the monthly wave channel using the inertial force of the wave. | |
| CN110678608A (en) | flood protection device | |
| TWI610008B (en) | A kind of remediation structure technology of hydraulic ecosystem | |
| JP6749571B2 (en) | Tsunami attenuation groove structure | |
| JP4305872B2 (en) | Tsunami breakwater | |
| Dircke et al. | A Global Overview of Navigable Storm Surge Barriers: Suitable Gate Types fo r New York from a Dutch Perspective | |
| US8419315B2 (en) | Harbor structure and a method of building such a structure | |
| Dircke et al. | Navigable storm surge barriers for coastal cities: An overview and comparison | |
| JPH09111822A (en) | Water storage device | |
| Goudreau et al. | Designing for Inland Waterway Operational Continuity throughout High and Low Water Levels | |
| JP2006249914A5 (en) | ||
| Olson et al. | Runaway barges damage Marseilles Lock and Dam during 2013 flood on the Illinois River | |
| KR100686642B1 (en) | Water Supply Dam Protection Structure | |
| Coelho et al. | Strategies to Mitigate Coastal Erosion | |
| Padron et al. | NY/NJ Outer Harbor Gateway | |
| Grunsky et al. | Discussion of Flood Control in California Rivers | |
| Johnson et al. | Hood Canal Floating Bridge East Half Replacement Graving Dock |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SEASEAL PORT PROTECTION AB, SWEDEN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MELIN, SIGURD;REEL/FRAME:050726/0803 Effective date: 20191008 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |