[go: up one dir, main page]

US20180319040A1 - Methods and systems using concrete mix temperature measurement - Google Patents

Methods and systems using concrete mix temperature measurement Download PDF

Info

Publication number
US20180319040A1
US20180319040A1 US16/032,499 US201816032499A US2018319040A1 US 20180319040 A1 US20180319040 A1 US 20180319040A1 US 201816032499 A US201816032499 A US 201816032499A US 2018319040 A1 US2018319040 A1 US 2018319040A1
Authority
US
United States
Prior art keywords
concrete
temperature
water
mixer drum
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US16/032,499
Inventor
Denis Beaupre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Command Alkon Original Dutch Holdings Bv
Command Alkon Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US16/032,499 priority Critical patent/US20180319040A1/en
Assigned to I.B.B. RHÉOLOGIE INC. reassignment I.B.B. RHÉOLOGIE INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BEAUPRÉ, Denis
Assigned to COMMAND ALKON CANADA INC. C/O COMMAND ALKON INCORPORATED reassignment COMMAND ALKON CANADA INC. C/O COMMAND ALKON INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: I.B.B. RHÉOLOGIE INC.
Assigned to COMMAND ALKON ORIGINAL DUTCH HOLDINGS reassignment COMMAND ALKON ORIGINAL DUTCH HOLDINGS ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COMMAND ALKON CANADA INC. C/O COMMAND ALKON INCORPORATED
Assigned to COMMAND ALKON DUTCH TECH B.V. reassignment COMMAND ALKON DUTCH TECH B.V. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COMMAND ALKON ORIGINAL DUTCH HOLDINGS
Publication of US20180319040A1 publication Critical patent/US20180319040A1/en
Assigned to COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V. reassignment COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COMMAND ALKON DUTCH TECH B.V.
Assigned to COMMAND ALKON INCORPORATED reassignment COMMAND ALKON INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V.
Assigned to ARES CAPITAL CORPORATION, AS COLLATERAL AGENT reassignment ARES CAPITAL CORPORATION, AS COLLATERAL AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: COMMAND ALKON INCORPORATED
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/42Apparatus specially adapted for being mounted on vehicles with provision for mixing during transport
    • B28C5/4203Details; Accessories
    • B28C5/4231Proportioning or supplying water
    • B01F13/0037
    • B01F15/00155
    • B01F15/00175
    • B01F15/0216
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F23/00Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
    • B01F23/50Mixing liquids with solids
    • B01F23/51Methods thereof
    • B01F23/511Methods thereof characterised by the composition of the liquids or solids
    • B01F3/1214
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F33/00Other mixers; Mixing plants; Combinations of mixers
    • B01F33/50Movable or transportable mixing devices or plants
    • B01F33/502Vehicle-mounted mixing devices
    • B01F33/5021Vehicle-mounted mixing devices the vehicle being self-propelled, e.g. truck mounted, provided with a motor, driven by tracks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/21Measuring
    • B01F35/211Measuring of the operational parameters
    • B01F35/2112Level of material in a container or the position or shape of the upper surface of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/21Measuring
    • B01F35/211Measuring of the operational parameters
    • B01F35/2115Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/71Feed mechanisms
    • B01F35/714Feed mechanisms for feeding predetermined amounts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/42Apparatus specially adapted for being mounted on vehicles with provision for mixing during transport
    • B28C5/4203Details; Accessories
    • B28C5/4206Control apparatus; Drive systems, e.g. coupled to the vehicle drive-system
    • B28C5/422Controlling or measuring devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/02Controlling the operation of the mixing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/0404Proportioning
    • B28C7/0418Proportioning control systems therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/12Supplying or proportioning liquid ingredients
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • G01N33/383Concrete or cement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F2101/00Mixing characterised by the nature of the mixed materials or by the application field
    • B01F2101/28Mixing cement, mortar, clay, plaster or concrete ingredients
    • B01F2215/0047

Definitions

  • a method of using temperature measurements of concrete in a mixer drum comprising: obtaining a sudden temperature variation threshold of said concrete for said period of time; determining an actual temperature variation of said concrete over said given period of time using said temperature measurements; comparing the actual temperature variation to the sudden temperature variation threshold; and generating a signal based on said comparison.
  • a method of using temperature measurements of concrete in a mixer drum comprising: adding water to the concrete in the mixer drum; obtaining a quantity and a thermal capacity of the concrete in the mixer drum prior to said adding; obtaining a temperature of said water added to the mixer drum; calculating the amount of water added to the mixer drum based on said quantity and thermal capacity of the concrete and said temperature of said water.
  • a method of using temperature measurements of concrete in a mixer drum comprising: determining a temperature evolution curve projection for said concrete over a period of time; comparing the measured temperature of the concrete to said temperature evolution curve to associate the concrete to a moment in time of said period of time; and generating a signal based on said comparison.
  • a method of using temperature measurements of concrete in a mixer drum comprising: obtaining a target temperature of the concrete; determining a temperature of water in a water system; obtaining a quantity and a thermal capacity of said concrete in the mixer drum; calculating an amount of said water to be added to the mixer drum to reach said target temperature based on said quantity and thermal capacity of the concrete and said measured temperature of said water; and adding the calculated amount of water from the water system to the mixer drum.
  • FIG. 1 is an example mixer truck.
  • the temperature of concrete can be monitored by a temperature probe.
  • large volumes of concrete such as are typically carried in mixer trucks or mixed in industrial concrete production drums have a relatively stable, or slowly varying temperature, given the high thermal capacity of concrete (which, depending of specific formulations, can be around 2700 kJ/m 3 /° C. for instance).
  • a sudden change in temperature can thus be attributed to an external event.
  • a sudden addition of even a relatively small amount of water for instance, which has an even higher thermal capacity, can produce a notable sudden change in temperature.
  • the sudden difference in temperature can be correlated to a volume of added water. This also can be useful, as will be exemplified below.
  • concrete temperature may start to rise due to internal heat generation cause by slow hydration.
  • This temperature variation can be projected as a function of external temperature and/or water addition.
  • measuring the temperature of concrete can allow determining when the concrete mixing has reached a given stage of evolution and can be used, for instance, in determining when to stop mixing the concrete.
  • the actual temperature can be monitored, and compared to the temperature projection, in which case detecting a temperature which suddenly departs from the temperature projection can be attributed to an external influence such as the addition of water.
  • the ready-mix truck is equipped with a drum ( 1 ) that can be used to deliver fresh concrete.
  • the drum is equipped with an internal wireless volume and temperature sensor ( 2 ) that sends data to a processing unit ( 8 ).
  • the ready-mix truck further has a water system which includes a water tank ( 3 ); a water pipe ( 4 ) intended to be used in providing water inside the drum, the water pipe ( 4 ) being equipped with an optional water meter ( 5 ) (e.g. a flow meter); and a washing hose ( 6 ).
  • the washing hose reaches the opening of the water tank ( 3 ) and can thus also be used to add water into the concrete and bypasses the water meter in a manner that any water added into the concrete by the washing hose ( 6 ) rather than the water pipe ( 4 ) goes unmonitored by the water meter, if any.
  • the water system in this embodiment includes a water temperature sensor ( 7 ) that is connected to the processing unit ( 8 ).
  • the processing unit ( 8 ) can be link to a communication system ( 9 ) to send alarm and data to a remote location, for instance, and can alternately be incorporated in a personal communications device.
  • W/C Water-cement ratio
  • a concrete mix i.e. the ratio of weight of water to the weight of cement
  • W/C is an important parameter in obtaining satisfactory properties in the concrete produced, such as satisfactory workability, strength and durability.
  • W/C is normally controlled at the batching plant where the amount of water and cement are controlled during initial manufacturing of fresh concrete.
  • the W/C can become altered thereafter, such when water is later added to increase the workability of the concrete, for stance, which can negatively affect the strength and durability of the concrete produced.
  • the temperature of the concrete in the mixer truck can be measured in real time using the temperature sensor ( 2 ).
  • the processor unit ( 8 ) can monitor the temperature, and especially in cases where the temperature of the added water is significantly different from the temperature of the concrete, it can have a program to detect the sudden increase in temperature which would be caused by unauthorized addition of water from any one of the three potential sources identified above.
  • the temperature of the added water, and the amount of concrete left in the drum at the time water is added is an important parameter to determine a current value of W/C.
  • the temperature of the water from the water tank can be obtained by way of a temperature sensor ( 7 ). Positioning the flow meter ( 5 ) upstream from both the water pipe ( 3 ) and the washing hose ( 4 ) can allow obtaining a positive confirmation as to whether or not the added water comes from the water tank or not and whether this temperature measurement can be used, if this is considered relevant in a given application.
  • there are many ways to obtain indications of the amount of concrete in the drum For instance, the initial amount of concrete can be known or obtained.
  • Alternative methods include: 1) Load cell estimation the weight of concrete in the drum (weight and volume can easily be converted using the concrete density); 2) Using a pressure sensor inside the drum and measuring the time the sensor spends in the fresh concrete in one turn at constant speed; 3) Using a pressure sensor inside the drum and measuring the total angle the sensor has traveled inside the fresh concrete in one turn; 4) Using a moisture sensor on the surface of the drum measuring the angle the sensor traveled along the fresh concrete in one turn. All these latter measuring methods use some sort of calibration function, chart or table.
  • any one of these methods to measure the amount of concrete in the drum, and knowing the temperature of the added water, one can determine the amount of water added upon an occurrence of temperature variation within a level of uncertainty which can depend on the uncertainty of the other variables, and particularly the degree of variation in temperature.
  • obtaining an indication of the amount of added water and an indication of the amount of concrete which remained in the drum at each water addition occurrence is a first step in calculating, or actualizing, the new W/C; assuming that the initial composition of concrete is also known.
  • the system can be further enhanced by the definition and use of an alarm that will warn relevant (such as quality control or production) personnel.
  • This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system.
  • a proper communication system radio signal, cellular technology, wi-fi of the like
  • the use of a temperature sensor can be installed into the water tank or into the pipe line between the water tank and the drum of the ready-mix truck ( 7 ). By combining the sudden change in concrete temperature with the actual temperature of the added water as determine with the water temperature sensor.
  • an alarm can be used to warn relevant (such as quality control or production) personnel if the W/C has been changed (usually to higher values) up to define limits.
  • This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system.
  • the calculation of change in W/C can be obtained for all quantity (complete and partial load) of concrete into the drum by combining the data from three sensors: the concrete temperature sensor ( 2 ), the water temperature sensor ( 7 ), and the sensor that allow to establishing in real time the volume of concert into the drum of the ready mix ( 2 ).
  • the dada from all the three sensors it is possible to calculate the amount of water added using the thermal capacity of concrete (calculated based on composition) and the W/C of the full or partial concrete load.
  • an alarm can be used to warn relevant (such as quality control or production) personnel if the W/C has been changed (usually to higher values) up to define limits.
  • This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Dispersion Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Medicinal Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Ceramic Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The temperature of concrete can be monitored by a temperature probe. Typically, large volumes of concrete such as are typically carried in mixer trucks or mixed in industrial concrete production drums have a relatively stable, or slowly varying temperature, given the high thermal capacity of concrete. A sudden change in temperature can thus be attributed to an external event. A sudden addition of even a relatively small amount of water for instance, which has an even higher thermal capacity, can produce a notable sudden change in temperature. Examples where the detection of the addition of water can be particularly useful in the production and/or transport of concrete are provided herein. Moreover, if the temperature of the added water is known, and the quantity of concrete is also known, the sudden difference in temperature can be correlated to a volume of added water.

Description

    BACKGROUND
  • Although using temperature probes to measure the temperature of concrete in industrial mixers has been widespread, the use of temperature probes in mixer trucks has significantly increased in recent years. This has opened the door to new opportunities in terms of potential uses of temperature measurement.
  • SUMMARY
  • In accordance with one aspect, there is provided a method of using temperature measurements of concrete in a mixer drum, the method comprising: obtaining a sudden temperature variation threshold of said concrete for said period of time; determining an actual temperature variation of said concrete over said given period of time using said temperature measurements; comparing the actual temperature variation to the sudden temperature variation threshold; and generating a signal based on said comparison.
  • In accordance with another aspect, there is provided a method of using temperature measurements of concrete in a mixer drum, the method comprising: adding water to the concrete in the mixer drum; obtaining a quantity and a thermal capacity of the concrete in the mixer drum prior to said adding; obtaining a temperature of said water added to the mixer drum; calculating the amount of water added to the mixer drum based on said quantity and thermal capacity of the concrete and said temperature of said water.
  • In accordance with another aspect, there is provided a method of using temperature measurements of concrete in a mixer drum, said method comprising: determining a temperature evolution curve projection for said concrete over a period of time; comparing the measured temperature of the concrete to said temperature evolution curve to associate the concrete to a moment in time of said period of time; and generating a signal based on said comparison.
  • In accordance with another aspect, there is provided a method of using temperature measurements of concrete in a mixer drum, said method comprising: obtaining a target temperature of the concrete; determining a temperature of water in a water system; obtaining a quantity and a thermal capacity of said concrete in the mixer drum; calculating an amount of said water to be added to the mixer drum to reach said target temperature based on said quantity and thermal capacity of the concrete and said measured temperature of said water; and adding the calculated amount of water from the water system to the mixer drum.
  • Many further features and combinations thereof concerning the present improvements will appear to those skilled in the art following a reading of the instant disclosure.
  • DESCRIPTION OF THE FIGURES
  • In the figures,
  • FIG. 1 is an example mixer truck.
  • DETAILED DESCRIPTION
  • The temperature of concrete can be monitored by a temperature probe. Typically, large volumes of concrete such as are typically carried in mixer trucks or mixed in industrial concrete production drums have a relatively stable, or slowly varying temperature, given the high thermal capacity of concrete (which, depending of specific formulations, can be around 2700 kJ/m3/° C. for instance). A sudden change in temperature can thus be attributed to an external event. A sudden addition of even a relatively small amount of water for instance, which has an even higher thermal capacity, can produce a notable sudden change in temperature.
  • Examples where the detection of the addition of water can be particularly useful in the production and/or transport of concrete are provided below.
  • Moreover, if the temperature of the added water is known, and the quantity of concrete is also known, the sudden difference in temperature can be correlated to a volume of added water. This also can be useful, as will be exemplified below.
  • After mixing the components thereof, concrete temperature may start to rise due to internal heat generation cause by slow hydration. This temperature variation can be projected as a function of external temperature and/or water addition. Henceforth, measuring the temperature of concrete can allow determining when the concrete mixing has reached a given stage of evolution and can be used, for instance, in determining when to stop mixing the concrete. Further, the actual temperature can be monitored, and compared to the temperature projection, in which case detecting a temperature which suddenly departs from the temperature projection can be attributed to an external influence such as the addition of water.
  • Let us now turn to a specific example of a ready-mix truck as shown in FIG. 1 to provide examples where such uses of concrete temperature measurements can be beneficial. In this example, the ready-mix truck is equipped with a drum (1) that can be used to deliver fresh concrete. The drum is equipped with an internal wireless volume and temperature sensor (2) that sends data to a processing unit (8). The ready-mix truck further has a water system which includes a water tank (3); a water pipe (4) intended to be used in providing water inside the drum, the water pipe (4) being equipped with an optional water meter (5) (e.g. a flow meter); and a washing hose (6). In this embodiment, the washing hose reaches the opening of the water tank (3) and can thus also be used to add water into the concrete and bypasses the water meter in a manner that any water added into the concrete by the washing hose (6) rather than the water pipe (4) goes unmonitored by the water meter, if any. Further, the water system in this embodiment includes a water temperature sensor (7) that is connected to the processing unit (8). The processing unit (8) can be link to a communication system (9) to send alarm and data to a remote location, for instance, and can alternately be incorporated in a personal communications device.
  • Water-cement ratio (W/C) of a concrete mix, i.e. the ratio of weight of water to the weight of cement, is an important parameter in obtaining satisfactory properties in the concrete produced, such as satisfactory workability, strength and durability. W/C is normally controlled at the batching plant where the amount of water and cement are controlled during initial manufacturing of fresh concrete. However, the W/C can become altered thereafter, such when water is later added to increase the workability of the concrete, for stance, which can negatively affect the strength and durability of the concrete produced.
  • Adding water to concrete in the truck either by fixed pipe or the washing hose affects the W/C, In some cases, people can be motivated to add water to the concrete to improve workability but do not want this to be known because of the potential negative effects. In the example provided above, either one of 1) the addition of external water at a check point without using the water pipe; 2) the use of the washing hose by the driver to add water rather than the water pipe; or 3) the use of an alternative water supply at the delivery site would all go undetected by the flow meter of the water pipe, biasing the measurement of added water to a minimum value rather than a total effective amount.
  • Using the example mixer truck described above, the temperature of the concrete in the mixer truck can be measured in real time using the temperature sensor (2). The processor unit (8) can monitor the temperature, and especially in cases where the temperature of the added water is significantly different from the temperature of the concrete, it can have a program to detect the sudden increase in temperature which would be caused by unauthorized addition of water from any one of the three potential sources identified above.
  • The temperature of the added water, and the amount of concrete left in the drum at the time water is added is an important parameter to determine a current value of W/C. The temperature of the water from the water tank can be obtained by way of a temperature sensor (7). Positioning the flow meter (5) upstream from both the water pipe (3) and the washing hose (4) can allow obtaining a positive confirmation as to whether or not the added water comes from the water tank or not and whether this temperature measurement can be used, if this is considered relevant in a given application. On the other hand, there are many ways to obtain indications of the amount of concrete in the drum. For instance, the initial amount of concrete can be known or obtained. It can also be known that the delivery of the concrete has not yet begun and so the initial amount is still in the drum. One method to obtain an estimation of the amount of concrete is to count the number of rotations in the delivery direction (as oppose to ready-mix drum mixing direction) to estimate the amount of concrete left in the drum. However, because concrete is not always discharged in a continuous way and that the amount of concrete discharged in one drum turn depends on the concrete workability, this form of volume determination can underestimate the amount of concrete left in the drum of the ready-mix. Alternative methods include: 1) Load cell estimation the weight of concrete in the drum (weight and volume can easily be converted using the concrete density); 2) Using a pressure sensor inside the drum and measuring the time the sensor spends in the fresh concrete in one turn at constant speed; 3) Using a pressure sensor inside the drum and measuring the total angle the sensor has traveled inside the fresh concrete in one turn; 4) Using a moisture sensor on the surface of the drum measuring the angle the sensor traveled along the fresh concrete in one turn. All these latter measuring methods use some sort of calibration function, chart or table.
  • Using any one of these methods to measure the amount of concrete in the drum, and knowing the temperature of the added water, one can determine the amount of water added upon an occurrence of temperature variation within a level of uncertainty which can depend on the uncertainty of the other variables, and particularly the degree of variation in temperature.
  • Further, obtaining an indication of the amount of added water and an indication of the amount of concrete which remained in the drum at each water addition occurrence, is a first step in calculating, or actualizing, the new W/C; assuming that the initial composition of concrete is also known.
  • EXAMPLE
  • In the northern hemisphere, (Canada, USA, Europe etc) it is common, to have concrete temperature specified to be above 20 C while the water temperature in the water tank of the ready-mix tank can be around 10 C. Adding only 7 kg of water at 10 C into 1 m3 of concrete at 20 C will create sudden change of temperature of more than 0.1 C which is easy to detect with a proper temperature sensor installed in the drum of the ready-mix.
  • It will be noted that the description provided above is intended to be exemplary only. For instance, further to the detection of a sudden change in temperature, the system can be further enhanced by the definition and use of an alarm that will warn relevant (such as quality control or production) personnel. This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system. Further to the detection of a sudden change in temperature, the use of a temperature sensor can be installed into the water tank or into the pipe line between the water tank and the drum of the ready-mix truck (7). By combining the sudden change in concrete temperature with the actual temperature of the added water as determine with the water temperature sensor. It is possible to calculate the change in W/C provided the discharged of concrete has not started. Further to the calculation of the W/C for a complete load of concrete, an alarm can be used to warn relevant (such as quality control or production) personnel if the W/C has been changed (usually to higher values) up to define limits. This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system. The calculation of change in W/C can be obtained for all quantity (complete and partial load) of concrete into the drum by combining the data from three sensors: the concrete temperature sensor (2), the water temperature sensor (7), and the sensor that allow to establishing in real time the volume of concert into the drum of the ready mix (2). When the dada from all the three sensors are combined, it is possible to calculate the amount of water added using the thermal capacity of concrete (calculated based on composition) and the W/C of the full or partial concrete load. Further to the calculation of the W/C for a partial load of concrete, an alarm can be used to warn relevant (such as quality control or production) personnel if the W/C has been changed (usually to higher values) up to define limits. This alarm can be further broadcast by a proper communication system (radio signal, cellular technology, wi-fi of the like) to more people and location as part of a global system.
  • As can be understood, the examples described above and illustrated are intended to be exemplary only. The scope is indicated by the appended claims.

Claims (6)

1. A method of using temperature measurements of concrete in a mixer drum, the method comprising:
obtaining a sudden temperature variation threshold of said concrete for said period of time;
measuring an actual temperature variation of said concrete over said given period of time using said temperature measurements;
using a processing unit, comparing the actual temperature variation to the sudden temperature variation threshold; and
generating a signal based on said comparison.
2. The method of claim 1, further comprising storing data in a memory upon said generating.
3-7. (canceled)
8. A method of using temperature measurements of concrete in a mixer drum, said method comprising:
determining a temperature evolution curve projection for said concrete over a period of time;
using a processing unit, comparing the measured temperature of the concrete to said temperature evolution curve to associate the concrete to a moment in time of said period of time; and
generating a signal based on said comparison.
9. The method of claim 8 further comprising mixing said concrete in said mixer drum during said period of time and stopping the mixing based on said signal.
10. A method of using temperature measurements of concrete in a mixer drum, said method comprising:
obtaining a target temperature of the concrete;
determining a temperature of water in a water system;
obtaining a quantity and a thermal capacity of said concrete in the mixer drum;
using a processing unit, calculating an amount of said water to be added to the mixer drum to reach said target temperature based on said quantity and thermal capacity of the concrete and said measured temperature of said water; and
adding the calculated amount of water from the water system to the mixer drum.
US16/032,499 2012-11-09 2018-07-11 Methods and systems using concrete mix temperature measurement Abandoned US20180319040A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/032,499 US20180319040A1 (en) 2012-11-09 2018-07-11 Methods and systems using concrete mix temperature measurement

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201261724301P 2012-11-09 2012-11-09
PCT/CA2013/050857 WO2014071526A1 (en) 2012-11-09 2013-11-08 Methods and systems using concrete mix temperature measurement
US201514441412A 2015-05-07 2015-05-07
US16/032,499 US20180319040A1 (en) 2012-11-09 2018-07-11 Methods and systems using concrete mix temperature measurement

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
PCT/CA2013/050857 Continuation WO2014071526A1 (en) 2012-11-09 2013-11-08 Methods and systems using concrete mix temperature measurement
US14/441,412 Continuation US10052794B2 (en) 2012-11-09 2013-11-08 Methods and systems using concrete mix temperature measurement

Publications (1)

Publication Number Publication Date
US20180319040A1 true US20180319040A1 (en) 2018-11-08

Family

ID=50683881

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/441,412 Active 2035-02-05 US10052794B2 (en) 2012-11-09 2013-11-08 Methods and systems using concrete mix temperature measurement
US16/032,499 Abandoned US20180319040A1 (en) 2012-11-09 2018-07-11 Methods and systems using concrete mix temperature measurement

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US14/441,412 Active 2035-02-05 US10052794B2 (en) 2012-11-09 2013-11-08 Methods and systems using concrete mix temperature measurement

Country Status (4)

Country Link
US (2) US10052794B2 (en)
EP (1) EP2917009A4 (en)
CA (1) CA2853438C (en)
WO (1) WO2014071526A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11312039B1 (en) * 2021-05-06 2022-04-26 Command Alkon Incorporated System and method for monitoring fresh concrete being handled in a concrete mixer using trained data processing engines
US11402312B2 (en) * 2018-02-08 2022-08-02 Command Alkon Incorporated Methods and systems for handling fresh concrete based on hydraulic pressure and on rheological probe pressure
US20220326213A1 (en) * 2020-06-09 2022-10-13 Guangxi University Quantitative evaluation method for workability of concrete based on bottom resistance analysis

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9518870B2 (en) * 2007-06-19 2016-12-13 Verifi Llc Wireless temperature sensor for concrete delivery vehicle
US8845940B2 (en) 2012-10-25 2014-09-30 Carboncure Technologies Inc. Carbon dioxide treatment of concrete upstream from product mold
US20140216303A1 (en) 2013-02-04 2014-08-07 Michael Lee System and method of applying carbon dioxide during the production of concrete
US10927042B2 (en) 2013-06-25 2021-02-23 Carboncure Technologies, Inc. Methods and compositions for concrete production
US20160107939A1 (en) 2014-04-09 2016-04-21 Carboncure Technologies Inc. Methods and compositions for concrete production
US9376345B2 (en) * 2013-06-25 2016-06-28 Carboncure Technologies Inc. Methods for delivery of carbon dioxide to a flowable concrete mix
US9388072B2 (en) 2013-06-25 2016-07-12 Carboncure Technologies Inc. Methods and compositions for concrete production
US9108883B2 (en) 2013-06-25 2015-08-18 Carboncure Technologies, Inc. Apparatus for carbonation of a cement mix
WO2015123769A1 (en) 2014-02-18 2015-08-27 Carboncure Technologies, Inc. Carbonation of cement mixes
CA2943791C (en) 2014-04-07 2023-09-05 Carboncure Technologies Inc. Integrated carbon dioxide capture
WO2017044913A1 (en) 2015-09-11 2017-03-16 Beck Manufacturing International, Inc. Concrete mixer truck cleaning system
CA3019860A1 (en) 2016-04-11 2017-10-19 Carboncure Technologies Inc. Methods and compositions for treatment of concrete wash water
JP2017189966A (en) * 2016-04-15 2017-10-19 Kyb株式会社 Mixer truck and mixer truck management system
US11041794B2 (en) * 2016-08-31 2021-06-22 Command Alkon Incorporated Rheological probe
CN106768432A (en) * 2016-11-17 2017-05-31 南通四建集团有限公司 A BIM-based real-time temperature monitoring and early warning method for mass concrete
JP6997191B2 (en) * 2016-12-22 2022-02-03 コマンド アルコン インコーポレイテッド Methods and systems for handling fresh concrete
JP6782640B2 (en) * 2017-01-06 2020-11-11 鹿島建設株式会社 Inspection equipment and inspection method
SG11201912759RA (en) 2017-06-20 2020-01-30 Carboncure Tech Inc Methods and compositions for treatment of concrete wash water
PL3664925T3 (en) * 2017-08-11 2024-06-24 Gcp Applied Technologies Inc. Grey water measurement
WO2019070715A1 (en) * 2017-10-03 2019-04-11 Command Alkon Incorporated Method and system for mixing concrete constituents in a drum
EP3959185A4 (en) 2019-04-26 2023-05-31 Carboncure Technologies Inc. CARBONIZATION OF CONCRETE AGGREGATES
WO2022249162A1 (en) * 2021-05-25 2022-12-01 Chemability Ltd. A system and method for continuous visual monitoring and quality control of fresh concrete, concrete mixes and aggregates used in a manufacture of the concrete

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2111299A (en) * 1981-11-30 1983-06-29 Thermo Electron Corp High current density photoelectron generators
GB2111399A (en) * 1981-11-20 1983-07-06 Kallinger Walter A method of temperature control of building materials
US5695280A (en) * 1995-07-28 1997-12-09 Ozinga Bros., Inc. Concrete stabilization system and method for utilizing same
US6484079B2 (en) * 2000-04-28 2002-11-19 Rmc Industries Corporation Methods and systems for remotely monitoring sensor data in delivery vehicles
US9466203B2 (en) * 2012-10-15 2016-10-11 Gcp Applied Technologies Inc. Sneak water detection for concrete delivery vehicles

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0303554A3 (en) * 1987-08-13 1991-03-20 Heat-Crete Pty. Ltd. Liquid heating system for concrete plants
DE10013664A1 (en) * 2000-03-20 2001-10-18 Voest Alpine Ind Anlagen Process and device for granulating sludge
EP1412089A2 (en) * 2001-02-13 2004-04-28 Knelson Patents Inc. Concrete recovery
JP2003193680A (en) 2001-12-27 2003-07-09 Topy Ind Ltd Temperature control system of fluid and heat exchanger used for the system
US8020431B2 (en) * 2007-06-19 2011-09-20 Verifi, LLC Method and system for calculating and reporting slump in delivery vehicles
US20110004332A1 (en) * 2009-07-01 2011-01-06 Icrete International, Inc. Method of designing a concrete compositions having desired slump with minimal water and plasticizer
CA2771589C (en) 2009-10-07 2013-01-22 I.B.B. Rheologie Inc. Probe and method for obtaining rheological property value

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2111399A (en) * 1981-11-20 1983-07-06 Kallinger Walter A method of temperature control of building materials
GB2111299A (en) * 1981-11-30 1983-06-29 Thermo Electron Corp High current density photoelectron generators
US5695280A (en) * 1995-07-28 1997-12-09 Ozinga Bros., Inc. Concrete stabilization system and method for utilizing same
US6484079B2 (en) * 2000-04-28 2002-11-19 Rmc Industries Corporation Methods and systems for remotely monitoring sensor data in delivery vehicles
US9466203B2 (en) * 2012-10-15 2016-10-11 Gcp Applied Technologies Inc. Sneak water detection for concrete delivery vehicles

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11402312B2 (en) * 2018-02-08 2022-08-02 Command Alkon Incorporated Methods and systems for handling fresh concrete based on hydraulic pressure and on rheological probe pressure
US20220326213A1 (en) * 2020-06-09 2022-10-13 Guangxi University Quantitative evaluation method for workability of concrete based on bottom resistance analysis
US11630097B2 (en) * 2020-06-09 2023-04-18 Guangxi University Quantitative evaluation method for workability of concrete based on bottom resistance analysis
US11312039B1 (en) * 2021-05-06 2022-04-26 Command Alkon Incorporated System and method for monitoring fresh concrete being handled in a concrete mixer using trained data processing engines
US20220355509A1 (en) * 2021-05-06 2022-11-10 Command Alkon Incorporated System and method for monitoring fresh concrete being handled in a concrete mixer using trained data processing engines

Also Published As

Publication number Publication date
US10052794B2 (en) 2018-08-21
EP2917009A4 (en) 2016-08-17
US20150298351A1 (en) 2015-10-22
CA2853438C (en) 2015-03-17
WO2014071526A1 (en) 2014-05-15
CA2853438A1 (en) 2014-05-15
EP2917009A1 (en) 2015-09-16

Similar Documents

Publication Publication Date Title
US20180319040A1 (en) Methods and systems using concrete mix temperature measurement
US11454606B2 (en) Method and systems relating to construction material assessment
US12151400B2 (en) Wide speed range concrete monitoring calibration
US12436111B2 (en) Construction material assessment method and systems
CA2962684C (en) Embedded wireless monitoring sensors
US8746954B2 (en) Method and system for calculating and reporting slump in delivery vehicles
ES2975934T3 (en) Gray water measurement
Sakai Correlations between air permeability coefficients and pore structure indicators of cementitious materials
US20250237585A1 (en) Embedded sensor devices and methods
WO2016023119A1 (en) Method and system for handling ready-mix concrete and method for producing calibration data
WO2011032409A1 (en) Square quantum detecting method, system, device for agglomerates in mixing drum and mixing vehicle
US20230288397A1 (en) Real time water content and water-cement monitoring on a ready-mix concrete truck
HK40001794B (en) Wide speed range concrete monitoring calibration

Legal Events

Date Code Title Description
AS Assignment

Owner name: I.B.B. RHEOLOGIE INC., CANADA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BEAUPRE, DENIS;REEL/FRAME:046586/0794

Effective date: 20150702

AS Assignment

Owner name: COMMAND ALKON CANADA INC. C/O COMMAND ALKON INCORP

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:I.B.B. RHEOLOGIE INC.;REEL/FRAME:046787/0221

Effective date: 20160331

AS Assignment

Owner name: COMMAND ALKON ORIGINAL DUTCH HOLDINGS, ALABAMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMMAND ALKON CANADA INC. C/O COMMAND ALKON INCORPORATED;REEL/FRAME:046799/0518

Effective date: 20160401

AS Assignment

Owner name: COMMAND ALKON DUTCH TECH B.V., ALABAMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMMAND ALKON ORIGINAL DUTCH HOLDINGS;REEL/FRAME:046823/0303

Effective date: 20160401

AS Assignment

Owner name: COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V., ALABAMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMMAND ALKON DUTCH TECH B.V.;REEL/FRAME:047671/0726

Effective date: 20180926

Owner name: COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V., ALABAM

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMMAND ALKON DUTCH TECH B.V.;REEL/FRAME:047671/0726

Effective date: 20180926

Owner name: COMMAND ALKON INCORPORATED, ALABAMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMMAND ALKON ORIGINAL DUTCH HOLDINGS B.V.;REEL/FRAME:047671/0779

Effective date: 20180926

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: ADVISORY ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

AS Assignment

Owner name: ARES CAPITAL CORPORATION, AS COLLATERAL AGENT, NEW YORK

Free format text: SECURITY INTEREST;ASSIGNOR:COMMAND ALKON INCORPORATED;REEL/FRAME:052473/0425

Effective date: 20200423

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION