US20160236756A1 - Tandem and side-by-side mooring offlaoding systems and associated methods - Google Patents
Tandem and side-by-side mooring offlaoding systems and associated methods Download PDFInfo
- Publication number
- US20160236756A1 US20160236756A1 US15/022,419 US201415022419A US2016236756A1 US 20160236756 A1 US20160236756 A1 US 20160236756A1 US 201415022419 A US201415022419 A US 201415022419A US 2016236756 A1 US2016236756 A1 US 2016236756A1
- Authority
- US
- United States
- Prior art keywords
- mooring
- vessel
- line
- mooring line
- certain embodiments
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 26
- 239000007789 gas Substances 0.000 claims description 18
- 239000003550 marker Substances 0.000 claims description 18
- 239000003949 liquefied natural gas Substances 0.000 claims description 16
- 239000003921 oil Substances 0.000 description 22
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 6
- 239000010779 crude oil Substances 0.000 description 4
- WJXQFVMTIGJBFX-UHFFFAOYSA-N 4-methoxytyramine Chemical compound COC1=CC=C(CCN)C=C1O WJXQFVMTIGJBFX-UHFFFAOYSA-N 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 239000003345 natural gas Substances 0.000 description 3
- 229920000785 ultra high molecular weight polyethylene Polymers 0.000 description 3
- 238000007792 addition Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 229920000728 polyester Polymers 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000033001 locomotion Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/20—Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
- B63B22/025—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids and comprising a restoring force in the mooring connection provided by means of weight, float or spring devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
- B63B27/34—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/20—Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
- B63B2021/206—Weights attached to mooring lines or chains, or the like; Arrangements thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/448—Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
Definitions
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- Floating production storage and offloading vessels FPSOs
- FSOs floating storage and offloading vessels
- An FPSO may designed to receive crude oil produced from subsea wells or a nearby platform, process that crude oil, and then store the processed oil until it can be offloaded to a tanker or transported through a pipeline.
- An FSO is a simplified FPSO without the ability to process crude oil.
- An FSO typically receives and stores oil that has already been processed at a platform, and then offloads the stored oil to a tanker or through a pipeline.
- FPSOs and FSOs are particularly suited in offshore regions where there is no pipeline infrastructure in place for transporting produced oil to shore.
- the FPSO/FSO is employed to store the produced oil until it can be offloaded for transport to another location.
- FPSOs and FSOs are ship-shaped floating vessels or barges that are moored to the sea floor when receiving crude or processed oil from a platform.
- a shuttle vessel may be moored and connected to the FPSO or FSO, or alternatively to the platform itself, and then transfer can take place.
- U.S. Patent Application Publication No. 2010/00212570 the entirety of which is hereby incorporated by reference, describes an example of such a system.
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- the present disclosure provides a mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
- the present disclosure provides a method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- the present disclosure provides a method for offloading oil and/or gas from an offshore structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- FIG. 1 illustrates a mooring system
- FIG. 2 illustrates a side-by-side mooring system.
- FIG. 3 illustrates a tandem mooring system
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- FIG. 1 illustrates mooring system 100 .
- mooring system 100 may comprise offshore structure 110 ; vessel 120 ; first mooring line 130 ; second mooring line 140 ; and hawser 150 .
- offshore structure 110 may comprise a floating liquid natural gas facility.
- the floating liquid natural gas facility may comprise one or more liquid natural gas storage tanks and cryogenic offloading equipment.
- offshore structure 110 may comprise a floating structure floating on sea surface 170 .
- suitable floating structures include FPSOs, FSOs, spars, TLPs, semi-submersibles, or other floating structures known in the art.
- offshore structure 110 may be connected to sea floor 160 with one or more catenary or taut mooring lines 165 .
- offshore structure 110 may be a fixed structure such as a pier, compliant tower, gravity based structure, jack-up platform, or jacket platform resting on sea floor 160 .
- offshore structure 110 may comprise one or more winches 111 .
- offshore structure 110 may comprise one or more transfer devices 112 .
- the one or more transfer devices 112 may be capable of offloading oil and/or gas from offshore structure 110 .
- the one or more transfer devices 112 may comprise a hose or a loading arm.
- vessel 120 may comprise any vessel capable of transporting oil and/or natural gas.
- vessel 120 may be a liquid natural gas carrier vessel.
- vessel 120 may be a shuttle tanker.
- Vessel 120 may comprise storage facilities 121 capable of storing oil and/or gas.
- one or more hoses 112 of offshore structure 110 may be connected to storage facility 121 of vessel 120 to facilitate transfer of oil and/or gas from offshore structure 110 to vessel 120 .
- vessel 120 may further comprise one or more bollards or mooring bitts 122 .
- first mooring line 130 , second mooring line 140 , and hawser 150 may be attached individually to at least three different bollard or mooring bitts 122 of vessel 120 .
- first mooring line 130 and second mooring line 140 may each comprise chain, wire, polyester, HMPE segments, or any combination thereof.
- first end 131 of first mooring line 130 may be anchored to sea floor 160 .
- first end 131 of first mooring line 130 may be attached to chain 132 which is attached to anchor or pile 133 on sea floor 160 .
- first end 141 of second mooring line 140 may be anchored to sea floor 160 .
- first end 141 of second mooring line 140 may be attached to chain 142 which is attached to anchor or pile 143 on sea floor 160 .
- anchor 133 and/or anchor 143 may comprise mooring connectors linked to conventional anchors, vertical load anchors, or suction piles.
- first mooring line 130 may comprise buoy 134 attached directly or indirectly to first mooring 130 at buoyed point 135 .
- second mooring line 140 may comprise buoy 144 attached directly or indirectly to second mooring 140 at buoyed point 145 .
- buoy 134 and/or buoy 144 may be submersible buoys.
- buoy 134 and/or buoy 144 may be modular or single mooring buoys of elastomer or foam construction, connected via chain-throughs, pick-ups, or pendants.
- buoy 134 and buoy 144 may be connected to buoyed points 135 and 145 respectively through buoy lines 136 and 146 .
- first mooring line 130 may further comprise marker buoy 138 .
- marker buoy 138 may be floating on sea surface 170 .
- marker buoy 138 may be a small float or high-visibility buoy to help pick up messenger lines.
- second mooring line 140 may further comprise marker buoy 148 .
- marker buoy 148 may be floating on sea surface 170 .
- marker buoy 148 may be a small float or high-visibility buoy to help pick up messenger lines.
- marker buoy 138 and marker buoy 148 may be connected to each other by chord line 180 .
- chord line 180 may comprise a lightweight synthetic line composed of polyester or HMPE segments.
- second end 139 of first mooring line 130 may be connected to bollard or mooring bitt 122 of vessel 120 and second end 149 of second mooring line 140 may be connected to bollard or mooring bitt 122 of vessel 120 .
- hawser 150 may comprise a nylon or HMPE line with pick-up equipment such as messenger lines, connecting shackles, floats, and weight chains. In certain embodiments, hawser 150 may comprise a single hawser 150 or multiple hawsers 150 . In certain embodiments, first end 151 of hawser 150 may be attached to the winch 111 of vessel 110 . In certain embodiments, not illustrated in FIG. 1 , second end 152 hawser 150 may be attached to the one or more bollards or mooring bitts 122 of vessel 120 .
- FIG. 2 illustrates a side-by-side mooring system 200 .
- side-by-side mooring system 200 may comprise any of the features of mooring system 100 .
- each of the individual components of side-by-side mooring system 200 may comprise the same features of each of the individual components of mooring system 100 .
- side-by-side mooring system 200 may comprise structure 210 , vessel 220 , first mooring line 230 , second mooring line 240 , and two hawsers 250 .
- structure 210 may be floating on sea surface 170 and attached to sea floor 160 by one or more mooring lines 265 .
- two hawsers 250 may connect structure 210 to vessel 220 .
- first ends 251 of hawsers 250 may be attached to one or more winches 211 of structure 210 .
- second ends 252 of hawsers 250 may be attached to one or more bollards or mooring bitts 222 of vessel 220 .
- one or more transfer devices 212 of structure 210 may be connected to storage facility 221 of vessel 220 to facilitate transfer of oil and/or gas from structure 210 to vessel 220 .
- vessel 220 may be moored to the seafloor 260 by mooring lines 230 and 240 .
- mooring line 230 may comprise a first end 231 anchored to sea floor 260 by anchor 233 and chain 232 , second end 239 connected to bollard or mooring bitt 222 of vessel 220 , buoy 234 connected to buoyed point 235 by buoyed line 236 , and marker buoy 238 .
- mooring line 240 may comprise a first end 241 anchored to sea floor 260 by anchor 243 and chain 242 , second end 249 connected to bollard or mooring bitt 222 of vessel 220 , buoy 244 connected to buoyed point 245 by buoyed line 246 , and marker buoy 248 .
- a chord line 280 may connected marker buoy 238 to marker buoy 248 .
- side-by-side mooring system 200 allows for a vessel to be moored to a structure in a side-by-side fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by two points of contact.
- the vessel is pointed parallel with the structure.
- the relative motions between the vessel and the structure are smaller compared to a tandem mooring system, allowing for shorter loading arms. Shorter loading arms may minimize heat loss and mechanical stresses during transfers.
- tandem mooring system 300 may comprise any of the features of mooring system 100 and certain features of side-by-side mooring system 200 . Furthermore, each of the individual components of tandem mooring system 300 may comprise the same features of each of the individual components of mooring system 100 .
- tandem mooring system 300 may comprise an offshore structure 310 , a vessel 320 , a first mooring line 330 , a second mooring line 340 , and hawser 350 .
- offshore structure 310 may be floating on sea surface 370 and attached to sea floor 360 by one or more mooring lines 370 .
- hawser 350 may connect offshore structure 310 to vessel 320 .
- first end 351 of hawser 350 may be attached to winch 311 of offshore structure 310 .
- second end 352 of hawser 350 may be attached to one or more bollards or mooring bitts 322 of vessel 320 .
- one or more transfer devices 312 of offshore structure 310 may be connected to storage facility 321 of vessel 320 to facilitate transfer of oil and/or gas from offshore structure 310 to vessel 320 .
- vessel 320 may be moored to the seafloor 360 by mooring lines 330 and 340 .
- mooring line 330 may comprise a first end 331 anchored to sea floor 360 by anchor 333 and chain 332 , second end 339 connected to bollard or mooring bitt 322 of vessel 320 , buoy 334 connected to buoyed point 335 by buoyed line 336 , and marker buoy 338 .
- mooring line 340 may comprise a first end 341 anchored to sea floor 360 by anchor 343 and chain 342 , second end 349 connected to bollard or mooring bitt 322 of vessel 320 , buoy 344 connected to buoyed point 345 by buoyed line 346 , and marker buoy 348 .
- a chord line 380 may connected marker buoy 338 to marker buoy 348 .
- tandem mooring system 200 allows for a vessel to be moored to a structure in a tandem fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by one point of contact. In such a system, the vessel is pointed directly toward the structure. Such a system may allow for an easier, more controlled approach maneuvering to the structure. Lines 330 and 340 may provide increasing resistance to the vessel as it advances. Such an orientation also makes use of bow chain stoppers that are commonly found in most tankers, and that easily and safely connected to hawsers.
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising a structure, a vessel, a first mooring line, a second mooring line, and two hawsers; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- side-by-side is used to indicate that the vessel and the offshore structure are in a parallel arrangement as illustrated in FIG. 2 .
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- tandem is used to indicate that the vessel and the offshore structure are in a perpendicular arrangement as illustrated in FIG. 3 .
- a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
- the vessel may then be connected to two mooring lines and then two hawsers from the facility.
- the facility may then winch in the hawsers by first winching in a single hawser and then winching in the remaining hawser.
- liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
- the loading arms may be disconnected from the vessel and the facility may winch out the two hawsers allowing the mooring lines to pull the vessel away from the facility.
- the vessel may then be disconnected from the hawsers and the mooring lines and the facility may take back in the hawsers.
- a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
- the vessel may then be connected to two mooring lines and then a hawser from the facility.
- the facility may then winch in the hawser.
- liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
- the loading arms may be disconnected from the vessel and the facility may winch out the hawser allowing the mooring lines to pull the vessel away from the facility.
- the vessel may then be disconnected from the hawser and the mooring lines and the facility may take back in the hawser.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
Description
- This application claims the benefit of U.S. Provisional Application No. 61/879,503, filed Sep. 18, 2013, which is incorporated herein by reference.
- The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- Floating production storage and offloading vessels (FPSOs) and floating storage and offloading vessels (FSOs) are commonly used in offshore oil and gas operations to temporarily store and then offload produced oil from subsea wells. An FPSO may designed to receive crude oil produced from subsea wells or a nearby platform, process that crude oil, and then store the processed oil until it can be offloaded to a tanker or transported through a pipeline. An FSO is a simplified FPSO without the ability to process crude oil. An FSO typically receives and stores oil that has already been processed at a platform, and then offloads the stored oil to a tanker or through a pipeline. FPSOs and FSOs are particularly suited in offshore regions where there is no pipeline infrastructure in place for transporting produced oil to shore. In particular, the FPSO/FSO is employed to store the produced oil until it can be offloaded for transport to another location.
- Typically, FPSOs and FSOs are ship-shaped floating vessels or barges that are moored to the sea floor when receiving crude or processed oil from a platform. In order to offload crude oil, a shuttle vessel may be moored and connected to the FPSO or FSO, or alternatively to the platform itself, and then transfer can take place. U.S. Patent Application Publication No. 2010/00212570, the entirety of which is hereby incorporated by reference, describes an example of such a system.
- Conventional mooring systems for offloading, such as offloading buoys or tandem offloading using tugs for station keeping, may suffer from several drawbacks. These conventional systems may not be designed for the transfer of natural gas or for emergency offloads, and can be prohibitively costly or risky to operate safely. It is desirable to develop a mooring system that is particularly suited for the transfer of natural gas and also for emergency or temporary offloading.
- The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- In one embodiment, the present disclosure provides a mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
- In another embodiment, the present disclosure provides a method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
- In another embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- In another embodiment, the present disclosure provides a method for offloading oil and/or gas from an offshore structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- So that the above recited features and advantages of the disclosure may be understood in detail, a more particular description of the disclosure, briefly summarized above, may be had by reference to the embodiments thereof that are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this disclosure and are, therefore, not to be considered limiting of its scope. The figures are not necessarily to scale, and certain features and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
-
FIG. 1 illustrates a mooring system. -
FIG. 2 illustrates a side-by-side mooring system. -
FIG. 3 illustrates a tandem mooring system. - The features and advantages of the present disclosure will be readily apparent to those skilled in the art. While numerous changes may be made by those skilled in the art, such changes are within the spirit of the invention.
- The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- The description that follows includes exemplary apparatuses, methods, techniques, and instruction sequences that embody techniques of the inventive subject matter. However, it is understood that the described embodiments may be practiced without these specific details.
- Referring now to
FIG. 1 ,FIG. 1 illustratesmooring system 100. In certain embodiments,mooring system 100 may compriseoffshore structure 110;vessel 120;first mooring line 130;second mooring line 140; andhawser 150. - In certain embodiments,
offshore structure 110 may comprise a floating liquid natural gas facility. The floating liquid natural gas facility may comprise one or more liquid natural gas storage tanks and cryogenic offloading equipment. In other embodiments,offshore structure 110 may comprise a floating structure floating onsea surface 170. Examples of suitable floating structures include FPSOs, FSOs, spars, TLPs, semi-submersibles, or other floating structures known in the art. In certain embodiments,offshore structure 110 may be connected tosea floor 160 with one or more catenary ortaut mooring lines 165. Alternativelyoffshore structure 110 may be a fixed structure such as a pier, compliant tower, gravity based structure, jack-up platform, or jacket platform resting onsea floor 160. - In certain embodiments,
offshore structure 110 may comprise one ormore winches 111. In certain embodiments,offshore structure 110 may comprise one ormore transfer devices 112. In certain embodiments, the one ormore transfer devices 112 may be capable of offloading oil and/or gas fromoffshore structure 110. In certain embodiments, the one ormore transfer devices 112 may comprise a hose or a loading arm. - In certain embodiments,
vessel 120 may comprise any vessel capable of transporting oil and/or natural gas. In certain embodiments,vessel 120 may be a liquid natural gas carrier vessel. In other embodiments,vessel 120 may be a shuttle tanker. Vessel 120 may comprisestorage facilities 121 capable of storing oil and/or gas. In certain embodiments, not illustrated inFIG. 1 , one ormore hoses 112 ofoffshore structure 110 may be connected tostorage facility 121 ofvessel 120 to facilitate transfer of oil and/or gas fromoffshore structure 110 tovessel 120. - In certain embodiments,
vessel 120 may further comprise one or more bollards ormooring bitts 122. In certain embodiments, not illustrated inFIG. 1 ,first mooring line 130,second mooring line 140, andhawser 150 may be attached individually to at least three different bollard ormooring bitts 122 ofvessel 120. - In certain embodiments,
first mooring line 130 andsecond mooring line 140 may each comprise chain, wire, polyester, HMPE segments, or any combination thereof. In certain embodiments,first end 131 offirst mooring line 130 may be anchored tosea floor 160. In certain embodiments,first end 131 offirst mooring line 130 may be attached tochain 132 which is attached to anchor orpile 133 onsea floor 160. In certain embodiments,first end 141 ofsecond mooring line 140 may be anchored tosea floor 160. In certain embodiments,first end 141 ofsecond mooring line 140 may be attached tochain 142 which is attached to anchor orpile 143 onsea floor 160. In certain embodiments,anchor 133 and/oranchor 143 may comprise mooring connectors linked to conventional anchors, vertical load anchors, or suction piles. - In certain embodiments,
first mooring line 130 may comprisebuoy 134 attached directly or indirectly to first mooring 130 atbuoyed point 135. In certain embodiments,second mooring line 140 may comprisebuoy 144 attached directly or indirectly to second mooring 140 atbuoyed point 145. In certain embodiments,buoy 134 and/or buoy 144 may be submersible buoys. In certain embodiments,buoy 134 and/or buoy 144 may be modular or single mooring buoys of elastomer or foam construction, connected via chain-throughs, pick-ups, or pendants. In certain embodiments,buoy 134 and buoy 144 may be connected to buoyed 135 and 145 respectively throughpoints 136 and 146.buoy lines - In certain embodiments,
first mooring line 130 may further comprisemarker buoy 138. In certain embodiments,marker buoy 138 may be floating onsea surface 170. In certain embodiments,marker buoy 138 may be a small float or high-visibility buoy to help pick up messenger lines. In certain embodiments,second mooring line 140 may further comprisemarker buoy 148. In certain embodiments,marker buoy 148 may be floating onsea surface 170. In certain embodiments,marker buoy 148 may be a small float or high-visibility buoy to help pick up messenger lines. In certain embodiments,marker buoy 138 andmarker buoy 148 may be connected to each other by chord line 180. In certain embodiments, chord line 180 may comprise a lightweight synthetic line composed of polyester or HMPE segments. - In certain embodiments, not illustrated in
FIG. 1 ,second end 139 offirst mooring line 130 may be connected to bollard ormooring bitt 122 ofvessel 120 andsecond end 149 ofsecond mooring line 140 may be connected to bollard ormooring bitt 122 ofvessel 120. - In certain embodiments,
hawser 150 may comprise a nylon or HMPE line with pick-up equipment such as messenger lines, connecting shackles, floats, and weight chains. In certain embodiments,hawser 150 may comprise asingle hawser 150 ormultiple hawsers 150. In certain embodiments,first end 151 ofhawser 150 may be attached to thewinch 111 ofvessel 110. In certain embodiments, not illustrated inFIG. 1 ,second end 152hawser 150 may be attached to the one or more bollards ormooring bitts 122 ofvessel 120. - Referring now to
FIG. 2 ,FIG. 2 illustrates a side-by-side mooring system 200. In certain embodiments, side-by-side mooring system 200 may comprise any of the features ofmooring system 100. Furthermore, each of the individual components of side-by-side mooring system 200 may comprise the same features of each of the individual components ofmooring system 100. - As can be seen in
FIG. 2 , side-by-side mooring system 200 may comprisestructure 210,vessel 220,first mooring line 230,second mooring line 240, and twohawsers 250. - In certain embodiments,
structure 210 may be floating onsea surface 170 and attached tosea floor 160 by one or more mooring lines 265. In certain embodiments, twohawsers 250 may connectstructure 210 tovessel 220. In certain embodiments, first ends 251 ofhawsers 250 may be attached to one ormore winches 211 ofstructure 210. In certain embodiments, second ends 252 ofhawsers 250 may be attached to one or more bollards ormooring bitts 222 ofvessel 220. In certain embodiments, one or more transfer devices 212 ofstructure 210 may be connected tostorage facility 221 ofvessel 220 to facilitate transfer of oil and/or gas fromstructure 210 tovessel 220. - In certain embodiments,
vessel 220 may be moored to theseafloor 260 by 230 and 240. In certain embodiments,mooring lines mooring line 230 may comprise afirst end 231 anchored tosea floor 260 byanchor 233 andchain 232,second end 239 connected to bollard ormooring bitt 222 ofvessel 220, buoy 234 connected to buoyedpoint 235 by buoyed line 236, andmarker buoy 238. In certain embodiments,mooring line 240 may comprise afirst end 241 anchored tosea floor 260 byanchor 243 andchain 242, second end 249 connected to bollard ormooring bitt 222 ofvessel 220, buoy 244 connected to buoyedpoint 245 by buoyedline 246, andmarker buoy 248. In certain embodiments, achord line 280 may connectedmarker buoy 238 tomarker buoy 248. - As can be seen in
FIG. 2 , side-by-side mooring system 200 allows for a vessel to be moored to a structure in a side-by-side fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by two points of contact. In such a system, the vessel is pointed parallel with the structure. In such a system, the relative motions between the vessel and the structure are smaller compared to a tandem mooring system, allowing for shorter loading arms. Shorter loading arms may minimize heat loss and mechanical stresses during transfers. - Referring now to
FIG. 3 ,FIG. 3 illustrates atandem mooring system 300. In certain embodiments,tandem mooring system 300 may comprise any of the features ofmooring system 100 and certain features of side-by-side mooring system 200. Furthermore, each of the individual components oftandem mooring system 300 may comprise the same features of each of the individual components ofmooring system 100. - As can be seen in
FIG. 3 ,tandem mooring system 300 may comprise anoffshore structure 310, avessel 320, afirst mooring line 330, asecond mooring line 340, andhawser 350. - In certain embodiments,
offshore structure 310 may be floating onsea surface 370 and attached tosea floor 360 by one or more mooring lines 370. In certain embodiments,hawser 350 may connectoffshore structure 310 tovessel 320. In certain embodiments,first end 351 ofhawser 350 may be attached to winch 311 ofoffshore structure 310. In certain embodiments,second end 352 ofhawser 350 may be attached to one or more bollards ormooring bitts 322 ofvessel 320. In certain embodiments, one ormore transfer devices 312 ofoffshore structure 310 may be connected tostorage facility 321 ofvessel 320 to facilitate transfer of oil and/or gas fromoffshore structure 310 tovessel 320. - In certain embodiments,
vessel 320 may be moored to theseafloor 360 by 330 and 340. In certain embodiments,mooring lines mooring line 330 may comprise afirst end 331 anchored tosea floor 360 byanchor 333 andchain 332,second end 339 connected to bollard ormooring bitt 322 ofvessel 320, buoy 334 connected to buoyedpoint 335 by buoyedline 336, andmarker buoy 338. In certain embodiments,mooring line 340 may comprise afirst end 341 anchored tosea floor 360 byanchor 343 andchain 342,second end 349 connected to bollard ormooring bitt 322 ofvessel 320, buoy 344 connected to buoyedpoint 345 by buoyedline 346, andmarker buoy 348. In certain embodiments, achord line 380 may connectedmarker buoy 338 tomarker buoy 348. - As can be seen in
FIG. 3 ,tandem mooring system 200 allows for a vessel to be moored to a structure in a tandem fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by one point of contact. In such a system, the vessel is pointed directly toward the structure. Such a system may allow for an easier, more controlled approach maneuvering to the structure. 330 and 340 may provide increasing resistance to the vessel as it advances. Such an orientation also makes use of bow chain stoppers that are commonly found in most tankers, and that easily and safely connected to hawsers.Lines - In one embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising a structure, a vessel, a first mooring line, a second mooring line, and two hawsers; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- As used herein, the term “side-by-side” is used to indicate that the vessel and the offshore structure are in a parallel arrangement as illustrated in
FIG. 2 . - In another embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- As used herein, the term “tandem” is used to indicate that the vessel and the offshore structure are in a perpendicular arrangement as illustrated in
FIG. 3 . - To facilitate a better understanding of the present invention, the following examples of specific embodiments are given. In no way should the following examples be read to limit, or to define, the scope of the invention.
- The following example provides details on how side-by-side offloading may be preformed. A liquid natural gas carrier vessel may approach a floating liquid natural gas facility. The vessel may then be connected to two mooring lines and then two hawsers from the facility. The facility may then winch in the hawsers by first winching in a single hawser and then winching in the remaining hawser. Once the vessel is in a side-by-side arrangement with the facility, liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel. After the transfer is complete, the loading arms may be disconnected from the vessel and the facility may winch out the two hawsers allowing the mooring lines to pull the vessel away from the facility. The vessel may then be disconnected from the hawsers and the mooring lines and the facility may take back in the hawsers.
- The following example provides details on how side-by-side offloading may be preformed. A liquid natural gas carrier vessel may approach a floating liquid natural gas facility. The vessel may then be connected to two mooring lines and then a hawser from the facility. The facility may then winch in the hawser. Once the vessel is in a side-by-side arrangement with the facility, liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel. After the transfer is complete, the loading arms may be disconnected from the vessel and the facility may winch out the hawser allowing the mooring lines to pull the vessel away from the facility. The vessel may then be disconnected from the hawser and the mooring lines and the facility may take back in the hawser.
- While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of the inventive subject matter is not limited to them. Many variations, modifications, additions and improvements are possible.
- Plural instances may be provided for components, operations or structures described herein as a single instance. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements may fall within the scope of the inventive subject matter.
Claims (19)
1. A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
2. The mooring system of claim 1 , wherein the offshore structure is a floating liquid natural gas facility.
3. The mooring system of claim 1 , wherein the vessel is a liquid natural gas carrier vessel.
4. The mooring system of claim 1 , wherein the first and second mooring lines are anchored to a sea floor.
5. The mooring system of claim 1 , wherein the first and second mooring lines each comprise a buoy and a marker buoy.
6. The mooring system of claim 1 , wherein the first and second mooring lines are connected to each other via a chord line.
7. The mooring system of claim 1 , wherein the vessel is connected to the first mooring line, the second mooring line, and the one or more hawsers.
8. The mooring system of claim 7 , wherein the vessel and the offshore structure are parallel to each other.
9. The mooring system of claim 7 , wherein the vessel and the offshore structure are perpendicular to each other.
10. A method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
11. The method of claim 10 , wherein the offshore structure is a floating liquid natural gas facility.
12. The method of claim 10 wherein the vessel is a liquid natural gas carrier vessel.
13. The method of claim 10 , wherein the first and second mooring lines are anchored to a sea floor.
14. The method of claim 10 , wherein the first and second mooring lines each comprise a buoy and a marker buoy.
15. The method of claim 10 , wherein the first and second mooring lines are connected to each other via a chord line.
16. The method of claim 10 , further comprising orienting the vessel parallel with the offshore structure.
17. The method of claim 10 , further comprising orienting the vessel perindicular to the offshore structure.
18. A method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line, connecting the vessel to the first mooring line, the second mooring line, and the two hawsers in a side-by-side arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
19. A method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, a second mooring line, and a hawser; connecting the vessel to the first mooring line, the second mooring line, and the hawser in a tandem arrangement; transferring oil and/or gas from the structure to the vessel; and
disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/022,419 US20160236756A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offlaoding systems and associated methods |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201361879503P | 2013-09-18 | 2013-09-18 | |
| US15/022,419 US20160236756A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offlaoding systems and associated methods |
| PCT/US2014/055111 WO2015041916A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offloading systems and associated methods |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20160236756A1 true US20160236756A1 (en) | 2016-08-18 |
Family
ID=52689290
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/022,419 Abandoned US20160236756A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offlaoding systems and associated methods |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20160236756A1 (en) |
| EP (1) | EP3046831A4 (en) |
| CN (1) | CN105555654A (en) |
| AU (1) | AU2014321620A1 (en) |
| WO (1) | WO2015041916A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020028483A1 (en) * | 2018-07-31 | 2020-02-06 | Sofec, Inc. | Disconnectable spread mooring and riser tower system and method |
| US20220306244A1 (en) * | 2021-03-02 | 2022-09-29 | Exmar Offshore Company | Split mooring system and methods for vessels |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106035169B (en) * | 2016-06-29 | 2019-05-31 | 大连昊昇海事服务有限公司 | Offshore breeding facility based on scattered groceries ship's alternation |
| NO344968B1 (en) * | 2017-12-08 | 2020-08-03 | Can Systems As | A mooring system |
| EP4017795A1 (en) | 2019-08-19 | 2022-06-29 | SOFEC, Inc. | Mooring systems and processes for using same |
| WO2021094460A1 (en) * | 2019-11-15 | 2021-05-20 | Single Buoy Moorings Inc. | Spread mooring arrangement, use thereof and method therefor |
| CN112319700B (en) * | 2020-11-17 | 2021-08-24 | 厦门天吴海洋科技有限公司 | Anchoring method of mother ship without anchor machine |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3833032A (en) * | 1972-10-31 | 1974-09-03 | Exxon Research Engineering Co | Tandem mooring-loading system |
| US4067282A (en) * | 1976-10-04 | 1978-01-10 | Guinn David C | Releasable and retrievable mooring system |
| US6571723B1 (en) * | 1999-06-30 | 2003-06-03 | Navion Asa | System for mooring a tanker near an offshore floating unit |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6692192B2 (en) * | 2002-05-03 | 2004-02-17 | Single Buoy Moorings Inc. | Spread moored midship hydrocarbon loading and offloading system |
| GB2394457B (en) * | 2002-10-24 | 2004-09-08 | Bluewater Terminal Systems Nv | Apparatus for mooring vessels side-by-side |
| GB0321768D0 (en) * | 2003-09-17 | 2003-10-15 | Ocean Power Delivery Ltd | Mooring system |
| US7299760B2 (en) * | 2004-03-05 | 2007-11-27 | Sofec, Inc. | Floating LNG import terminal and method for docking |
| US7470163B2 (en) * | 2004-09-28 | 2008-12-30 | Exxonmobil Upstream Research Company | Combined riser, offloading and mooring system |
| ATE395248T1 (en) * | 2006-02-23 | 2008-05-15 | Bluewater Energy Services Bv | ANCHORING SYSTEM FOR A FLOATING STRUCTURE |
| NO336244B1 (en) * | 2006-10-17 | 2015-06-29 | Sevan Marine Asa | Procedure for mooring a conventional tanker |
| GB2462968B (en) * | 2007-06-27 | 2011-11-16 | Shell Int Research | Vessel mooring systems and methods |
| BR112013013403A2 (en) * | 2010-11-30 | 2016-09-06 | Single Buoy Moorings | floating gnl plant |
-
2014
- 2014-09-11 US US15/022,419 patent/US20160236756A1/en not_active Abandoned
- 2014-09-11 WO PCT/US2014/055111 patent/WO2015041916A1/en not_active Ceased
- 2014-09-11 AU AU2014321620A patent/AU2014321620A1/en not_active Abandoned
- 2014-09-11 EP EP14846525.5A patent/EP3046831A4/en not_active Withdrawn
- 2014-09-11 CN CN201480051442.7A patent/CN105555654A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3833032A (en) * | 1972-10-31 | 1974-09-03 | Exxon Research Engineering Co | Tandem mooring-loading system |
| US4067282A (en) * | 1976-10-04 | 1978-01-10 | Guinn David C | Releasable and retrievable mooring system |
| US6571723B1 (en) * | 1999-06-30 | 2003-06-03 | Navion Asa | System for mooring a tanker near an offshore floating unit |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020028483A1 (en) * | 2018-07-31 | 2020-02-06 | Sofec, Inc. | Disconnectable spread mooring and riser tower system and method |
| US11198490B2 (en) * | 2018-07-31 | 2021-12-14 | Sofec, Inc. | Disconnectable spread mooring and riser tower system and method |
| US20220306244A1 (en) * | 2021-03-02 | 2022-09-29 | Exmar Offshore Company | Split mooring system and methods for vessels |
| EP4301654A4 (en) * | 2021-03-02 | 2025-03-12 | Exmar Offshore Company | SPLIT MOORING SYSTEM AND METHODS FOR VESSELS |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105555654A (en) | 2016-05-04 |
| EP3046831A1 (en) | 2016-07-27 |
| WO2015041916A1 (en) | 2015-03-26 |
| EP3046831A4 (en) | 2017-05-24 |
| AU2014321620A1 (en) | 2016-03-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20160236756A1 (en) | Tandem and side-by-side mooring offlaoding systems and associated methods | |
| US9032892B2 (en) | Mooring system and connector assembly | |
| CN101297144B (en) | A system using a catenary flexible conduit for transferring a cryogenic fluid | |
| US20210245845A1 (en) | Jetty-Less Offshore Terminal Configurations | |
| US10059409B2 (en) | Taut inverted catenary mooring system | |
| US20030061980A1 (en) | Offloading arrangements for speard moored FPSOs | |
| Rutkowski | A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore | |
| EP2576334B1 (en) | Floating production unit with disconnectable transfer system | |
| US8156884B2 (en) | Vessel mooring systems and methods | |
| CN107107994B (en) | Tensioning inverted catenary mooring system | |
| US9409631B2 (en) | Loading hose | |
| EP2398695B1 (en) | Deep water and ultra deep water mooring system | |
| WO2000064732A1 (en) | System for transferring fluids and methods for installing, modifying and operating the system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SHELL OIL COMPANY, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:VAN DEN HAAK, ARNO LAURENTIUS MICHAEL;LIAPIS, STERGIOS;LI, YILE;AND OTHERS;SIGNING DATES FROM 20160308 TO 20160315;REEL/FRAME:038442/0565 |
|
| STCB | Information on status: application discontinuation |