US20160145815A1
US20160145815A1 US14/898,452 US201414898452A US2016145815A1 US 20160145815 A1 US20160145815 A1 US 20160145815A1 US 201414898452 A US201414898452 A US 201414898452A US 2016145815 A1 US2016145815 A1 US 2016145815A1
Authority
US
United States
Prior art keywords
steel
reinforced
carbon fibre
steel structure
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/898,452
Inventor
Masoud MOTAVALLI
Elyas Ghafoori
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
S&P Clever Reinforcement Co AG
Original Assignee
S&P Clever Reinforcement Co AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by S&P Clever Reinforcement Co AG filed Critical S&P Clever Reinforcement Co AG
Publication of US20160145815A1 publication Critical patent/US20160145815A1/en
Assigned to S&P CLEVER REINFORCEMENT COMPANY AG reassignment S&P CLEVER REINFORCEMENT COMPANY AG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GHAFOORI, Elyas, MOTAVALLI, Masoud
Assigned to S&P CLEVER REINFORCEMENT COMPANY AG reassignment S&P CLEVER REINFORCEMENT COMPANY AG CORRECTIVE ASSIGNMENT TO CORRECT THE THE NAME OF THE ASSIGNEE'S COUNTRY PREVIOUSLY RECORDED AT REEL: 059288 FRAME: 0261. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Assignors: GHAFOORI, Elyas, MOTAVALLI, Masoud
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/10Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/085Tensile members made of fiber reinforced plastics
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • E01D2101/32Metal prestressed

Definitions

  • the bridge according to FIG. 1 has a lower strut 2 , that means the lower-most horizontal strut 3 is subjected to tensile stress, and it can be reinforced by means of CFPR bands 4 , for which the following applies.
  • a CFPR band 4 is joined - over a section or over the entire length of a part of the structure subjected to tension - at both end regions thereof, capable of transferring tensile forces.
  • FIG. 4 shows a steel structure in the form of a steel bridge with upper struts 6 with a CFRP band 4 loosely joined therewith.
  • the fitted CFRP band 4 extends along the lower-most horizontal steel girder, wherein obviously there are several such steel girders in practice, which extend along the bridge, and each is equipped with at least one CFRP band 4 , each with two end anchorages 5 , which join these to the structure or the said steel girder at the ends of the band 4 , capable of transferring the tensile forces.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).

Description

  • This invention relates to a method for pre-stressing a steel structure, and the steel structure existing both on a new construction and preferably on an existing one, especially on bridge constructions. According to a study by Bien J. Elfgren L. and Olofsson J. entitled Sustainable Bridges, Assessment for Future Traffic Demands and Longer Lives, Wroclaw, Dolnoslaskie Wydawnictwo Edukacyjne, 2007, the European Railway Authorities confirm that there are about 220,000 railway bridges in Europe alone, and these are located in different climatic regions. Approximately 22% of which are metal or steel constructions, which are also often referred to as steel bridges. 3% are cast iron bridges, 25% are welded steel constructions, and 53% are made of steel, and about 20% are made of a material, not clearly identified. 28% of these metal constructions are more than 100 years old and almost 70% of the bridges are more than 50 years old. Since today trains are becoming longer, heavier and faster, the loading of these bridges is increasing very much. Each axle load generates vibrations, and thus, small cracks and gaps develop with time in the structures, and the fatigue of the carrier is progressing ever more quickly.
  • Tests at EMPA in CH-Dübendorf demonstrated that the steel girders can be strengthened in principle by the application of carbon fibre-reinforced polymers (CFRP=Carbon Fiber Reinforced Polymers). These CFRP are attached to the steel girders by means of adhesives and are capable to absorb a tensile stress, which slows down or even stops the crack formation. Nevertheless, adhesives are only partially suitable in many places, because steel is heated to high temperatures by the sunlight and this can bring the adhesive to the glass transformation limit thereof. The publications Engineering Structures 45 (2012) 270-283 and the international Journal of Fatigue 44 (2012) 303-315 in Elsevier Journal (www.elsevier.com) should be followed in this respect.
  • Another issue is the galvanic corrosion. Although, CFRP are not corrosive, they form galvanic cells in combination with steel. Then, there are many riveted steel bridges. In these, the problem is how best to attach the flat CFRP bands to the steel girders. And finally, the protection of monuments should often be taken into account, in which for instance it is required that historically important structures must again be restored into their original state where appropriate, which could hardly be achieved with glued on CFRP bands. And finally, it would be desirable, not only to strengthen the structures, but also to pre-stress, thus in order to completely close the already existing cracks and gaps and to continuously prevent further growth of these cracks and gaps. Therefore, one of the most important objects of a reinforcement system is the appropriate selection of the mechanical anchoring system, so that this develops sufficient clamping force, is subjected to minimal corrosion, if possible, requires no direct contact of the CFRP bands with the steel, and the stress-initiation in the anchoring system takes place gradually.
  • It is the object of the present invention to specify a method for pre-stressing a steel structure, and also a steel structure prestressed thereby. Therefore, the crack formation on a new or existing steel structure should be prevented by means of this pre-stressing, or already existing cracks should be closed or their further growth should be stopped or at least slowed down.
  • The object is accomplished by a method for pre-stressing a steel structure, in which at least one carbon fibre-reinforced polymer band each is joined to a steel girder to be reinforced at the end regions thereof, capable of transferring tensile forces, and subsequently at least one lifting element disposed between the respective carbon fibre-reinforced polymer band and the steel girder to be reinforced, is extended in a region between these end anchorages, substantially perpendicular to the carbon fibre-reinforced polymer band, for causing a tensile stress between the end regions of the respective carbon fibre-reinforced polymer band.
  • The object is further accomplished by a steel structure, which is characterized by that at least one carbon fibre-reinforced polymer band each is joined to a steel girder of the steel structure to be reinforced at end regions thereof, capable of transferring tensile forces, wherein at least one lifting element disposed between the respective carbon fibre-reinforced polymer band and the steel girder to be reinforced, is disposed in the region between these end regions, by means of which, the respective carbon fibre-reinforced polymer band is subjected to tensile stress from the steel girder by substantially perpendicular lifting of the carbon fibre-reinforced polymer band.
  • The invention is schematically represented in the figures and described in the following with the help of these exemplary figures and the function of the method as well as the steel structure reinforced thereby is described.
  • It shows:
  • FIG. 1: shows a steel structure in the form of a steel bridge with lower struts having a slack with CFRP band joined to the underside thereof subjected to tension;
  • FIG. 2: shows the steel structure according to FIG. 1 after inserting a lifting element;
  • FIG. 3: shows the steel structure according to FIG. 1 after inserting two lifting elements;
  • FIG. 4: shows a steel structure in the form of a steel bridge with upper struts having a slack with CFRP band joined to the underside thereof subjected to tension;
  • FIG. 5: shows the steel structure according to FIG. 4 after inserting three lifting elements;
  • FIG. 6: shows a steel structure in the form of a steel bridge with arched lower struts with an applied CFRP band and several lifting elements for pre-stressing thereof.
  • In FIG. 1, a steel structure is represented in the form of a steel bridge 1 with lower struts 2, wherein the lower-most horizontal steel girder 3 is subjected to tensile stresses. In such steel bridges, there are always steel girders, which are under compression and those which are subjected to tension. In addition, bending moments are caused, especially if the bridge is temporarily loaded, for example when a train rolls over it. Each axle load causes vibrations and these contribute towards material fatigue, so that over the years, cracks may appear in the steel girders, which increasingly weaken the steel girders. It is important to stop this process or at least to slow it down. Since carbon fibre-reinforced polymer bands (CFRP-bands) are exceptionally strong under tensile stresses and also not subjected to any corrosion, they offer to strengthen the steel girders subjected to tensile stresses. The most efficient approach would be to pre-stress the steel girders subjected to tensile stresses by means of such bands. There have been suggestions to subsequently reinforce the concrete structure by pre-stressed bands in order to improve the tensile strength thereof. In this case, the bands are highly pre-stressed by means of special device and positioned next to the concrete structure in this pre-stressed state and laminated on the concrete by means of epoxy resin adhesives. After hardening of the adhesive, the device, which generated and maintained the stress, is removed, whereupon the pre-stressed CFRP band continuously transfers the stresses thereof to the structure. However, such a method cannot be used on steel constructions. First, these generally have no smooth surfaces, and second, the use of adhesives in steel girders proves to be less suitable, because steel constructions are heated to high temperatures under intense sunlight and thus advect/drive-up the adhesive to the borders thereof. Furthermore, the advection of a heavy device for pre-stressing the bands is not feasible in many cases due to ambient conditions or due to lack of space. Especially, this method cannot be used when a bridge stretches at a great height over a vast expanse.
  • The bridge according to FIG. 1 has a lower strut 2, that means the lower-most horizontal strut 3 is subjected to tensile stress, and it can be reinforced by means of CFPR bands 4, for which the following applies. A CFPR band 4 is joined - over a section or over the entire length of a part of the structure subjected to tension - at both end regions thereof, capable of transferring tensile forces. To achieve this, there are suitable end anchorages 5 from the state of the art, for example in the form of clamping shoes, by means of which the bands 4 are mechanically joined to the steel girder 3 permanently and highly capable of transferring tensile forces. In the example shown, a CFPR band 4 stretches over the entire length of the underside of the lower horizontal steel girder 3, wherein the end anchorages 5 are attached on both sides in the vicinity of the ends of the steel girder 3. Therefore, the band 4 is loosely tensioned. Further, in the example shown, in the middle of the CFPR band 4 that means midway, a lifting element 7 is installed between steel girder 3 and CFPR band 4. This lifting element 7 can be a hydraulically, pneumatically, electrically or mechanically operated lifting element 7, which provides such translation that high lifting forces are generated, for example a few 10 k Newton. Thus, short reaction paths are created with comparatively longer action paths. When such lifting force acts substantially perpendicular to the CFPR band 4 constrained at end regions thereof and it is lifted off from the steel girder 3, then high tensile stresses are generated, widely translated on the CFPR band 4 itself, and these are then transferred to the structure 1 via the end anchorages 5. Thus, the steel girder 3 pre-stressed in such a manner experiences a very substantial reinforcement. If it already has microscopic cracks or even serious cracks, then these can be closed in many cases by means of such pre-stressing or at least it can be achieved that these cracks do not grow further. It should be understood that not just a single CFPR band 4 should be attached, but a multitude of CFPR bands 4 can be installed over the width of the bridge, or even in sections over the length of the bridge, several successive CFPR bands 4 or CFPR bands 4 mutually overlapping in the length can also be attached, which are positioned adjacently and extend parallel to each other, or even overlap in height, thus can be superimposed or intersected. In this case, the bands 4 are not laid exactly in the orientation of the steel girder itself, but laid slightly oblique-angled to it, so that intersections of the bands 4 are formed.
  • In FIG. 2, the steel structure according to FIG. 1 is shown after inserting a lifting element 7. It was mounted under the attached CFRP band 4 loosely tensioned, for example by means of a mechanical joint with the steel girder 3, by welding or bolting. This lifting element 7 can be constructed similar to a lifting jack, so that it can be hydraulically lifted by means of an external hydraulic pump, in which a hydraulic pipe is temporarily coupled to the lifting element 7. By a corresponding translation, sufficiently large forces can be generated. The elevation is then secured by means of a mechanical latch or by means of mechanical supports. Such mechanical supports are installed after completion of the working stroke of the lifting element 7, which in this case is raised a little above the tensile stress to be finally achieved, besides the lifting element 7, between the band 4 and the steel girder 3 to be reinforced. Then, the lifting element 7 is again relieved a bit, so that the targeted stress is achieved and then the supporting force is absorbed by the supports. As an alternative, the lifting element 7 can also be pneumatically operated. Then, a compressed air pipe can be attached, and the retraction of the lifting element 7 is done by a sufficient translation based on pneumatic pressure. Finally, an electric variant of the lifting element 7 is also possible, in which an enclosed EL-Motor generates a sufficiently large lifting force via a short translation, for example by means of spindles and levers. In this case, just an electric wire is needed to be directed to the lifting element 7, and it can be easily adjusted, when required. Finally, a purely mechanical embodiment is also possible, similarly equipped with spindle and/or levers, wherein the required lifting force is then generated manually or by motor with a crank arm to be attached. In any case, the loosely tensioned CFRP band 4 is tensioned by means of the lifting element 7 and then a high tensile stress is generated on the band 4 due to the lifting action, which is many times greater than the lifting force. While the anchorages 5 practically remain stationary or only marginally yield along with the structure, the travel of the lifting element 7 can be several centimetres. Because of the geometry, in this manner, it follows that very high tensile stresses of x times 10 k N are transferred to the structure.
  • FIG. 3 shows the steel structure according to FIG. 1 after inserting two lifting elements 7. In case of inserting two lifting elements 7, these are advantageously extended at the same time; so that the stress is build up uniformly distributed over the band length. As an alternative, this can extend one lifting element 7 a little bit, then the second one by a similar amount, then again the first one, then again the second one and so on, so that the tensile force is generated alternately by and by to a certain extent by both the lifting elements 7.
  • FIG. 4 shows a steel structure in the form of a steel bridge with upper struts 6 with a CFRP band 4 loosely joined therewith. In this case, the fitted CFRP band 4 extends along the lower-most horizontal steel girder, wherein obviously there are several such steel girders in practice, which extend along the bridge, and each is equipped with at least one CFRP band 4, each with two end anchorages 5, which join these to the structure or the said steel girder at the ends of the band 4, capable of transferring the tensile forces.
  • FIG. 5 shows this steel structure according to FIG. 4 after inserting three lifting elements 7, which are disposed distributed over the length of each CFRP band 4 and in turn extended at the same time or else first of all, both the outer ones are extended a little bit and subsequently the middle one is extended a little further, so that a uniform tensile stress is generated over the entire length of the CFRP band 4.
  • FIG. 6 finally shows another steel structure in the form of a steel bridge with arched lower strut 2. Here, by the own weight of the bridge 1 and by the loading thereof, a tensile force acts on the arched long girder 8 at the end of the bridge. In this case, CFRP bands 4 are laid and assembled along this curved steel girder 8. In the example shown, a single CFRP band 4 extends over the entire bridge length along the lower girder 8 and is firmly joined to the steel girder 8 of the steel bridge 1 at both the end regions by the anchorage elements 5 attached there. Here, five lifting elements 7 are inserted uniformly distributed over the band length. These are all simultaneously lifted up in order to generate a most uniform or homogenous stress build-up in the CFRP band 4. This tensile force is then transferred to the structure 1 via the anchoring elements 5.
  • By means of such reinforcements, cracks or gaps in steel structures, i.e. in the elements which are tensioned, are closed in some cases. In other cases, a further growth of these cracks and gaps can be prevented, or at least the weakening process can be substantially slowed down, and overall the structures can be definitely reinforced and stabilized, so that the service life thereof is extended, or optionally, the load bearing capacity is enhanced.

Claims (10)

1. Method for pre-stressing a steel structure, in which at least one carbon fiber-reinforced polymer band (4) each is loosely joined to a steel girder of the steel structure (1) to be reinforced at the end regions thereof with end anchorages (5) in the form of clamping shoes purely based on friction forces and without gluing, capable of transferring tensile forces, and subsequently, in a region between these end anchorages (5), at least one hydraulically, pneumatically, electrically or mechanically operated lifting element (7) disposed between the respectively carbon fibre-reinforced polymer band (4) and the steel girder to be reinforced (3,8), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4) above the tensile stress to be finally achieved for generating several 10 kN lifting force and the lifting of the polymer band (4) by means of a mechanical latch is secured, then supports are placed between the polymer band (4) and the steel structure and subsequently the lifting element (7) is relieved again, so that the target stress is achieved and the supporting force is absorbed by the supports for providing a permanent tensile force stress between the end regions of the respective carbon fibre-reinforced polymer band (4).
2. Method for pre-stressing a steel structure according to claim 1, characterized in that several carbon fibre-reinforced polymer bands (4) are laid on the same over the length of the steel girders (3,8) to be reinforced.
3. Method for pre-stressing a steel structure according to claim 1, characterized in that several carbon fibre-reinforced polymer bands (4) are aligned parallel to each other over the length of the steel girder (3,8) to be reinforced and each is laid on the same over the entire length of the steel beam (3,8).
4. Method for pre-stressing a steel structure according to claim 1, characterized in that several carbon fibre-reinforced polymer bands (4) are laid over partial sections of the lengths of the steel girders (3,8) aligned parallel to each other, over the length of the steel girders (3,8) to be reinforced.
5. Method for pre-stressing a steel structure according to claim 1, characterized in that several carbon fibre-reinforced polymer bands (4) are laid over partial sections of the lengths of the steel girder (3,8) aligned parallel to each other, over the length of the steel girder (3,8) to be reinforced, so that these are adjacent to each other and overlap in partial sections with reference to the lengths thereof.
6. Method for pre-stressing a steel structure according to claim 1, characterized in that several carbon fibre-reinforced polymer bands (4) are mislaid over the lengths of the steel beam (3,8) to be reinforced, which are disposed extending in a direction deviating from the longitudinal direction of the steel girder (3,8) and are intersected.
7. Steel structure, characterized in that at least one carbon fibre-reinforced polymer strip (4) each is joined to a steel girder of the steel structure (1) to be reinforced at the end regions thereof, capable of transferring tensile forces, wherein at least one lifting element (7) disposed between the respective carbon fibre-reinforced polymer band (4) and the steel girder (3,8) to be reinforced in the region between these end regions, by means of which the respective carbon fibre-reinforced polymer band (4) is subjected to tensile stress from the steel girder (3,8) by substantially perpendicular lifting of the carbon fibre-reinforced polymer band (4) and supports are inserted between the polymer band (4) and the steel structure on both the sides of the lifting element (7).
8. Steel structure according to claim 7, characterized in that the lifting elements (7) are the hydraulically, pneumatically, electrically or mechanically operated lifting elements (7) with such a translation that only fractions thereof are generated by their paths as the reaction paths of the lifting element.
9. Steel structure according to claim 7, characterized in that in addition to the lifting elements (7), mechanical supports are installed between the band (4) and the steel girder (3,8) to be reinforced, for relieving the lifting elements (7) after completion of the working stroke of the same.
10. Steel structure according to claim 8, characterized in that in addition to the lifting elements (7), mechanical supports are installed between the band (4) and the steel girder (3,8) to be reinforced, for relieving the lifting elements (7) after completion of the working stroke of the same.
US14/898,452 2013-05-14 2014-04-16 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method Abandoned US20160145815A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CH00950/13A CH706630B1 (en) 2013-05-14 2013-05-14 Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes
CH950/2013 2013-05-14
PCT/CH2014/000049 WO2014183224A1 (en) 2013-05-14 2014-04-16 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/CH2014/000049 A-371-Of-International WO2014183224A1 (en) 2013-05-14 2014-04-16 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/874,643 Continuation US11326313B2 (en) 2013-05-14 2020-05-14 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Publications (1)

Publication Number Publication Date
US20160145815A1 true US20160145815A1 (en) 2016-05-26

Family

ID=49773102

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/898,452 Abandoned US20160145815A1 (en) 2013-05-14 2014-04-16 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
US16/874,643 Active US11326313B2 (en) 2013-05-14 2020-05-14 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Family Applications After (1)

Application Number Title Priority Date Filing Date
US16/874,643 Active US11326313B2 (en) 2013-05-14 2020-05-14 Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Country Status (14)

Country Link
US (2) US20160145815A1 (en)
EP (1) EP2997197B1 (en)
KR (1) KR102267298B1 (en)
CN (1) CN105518218A (en)
AU (1) AU2014268098B2 (en)
BR (1) BR112015028588B1 (en)
CA (1) CA2918395C (en)
CH (1) CH706630B1 (en)
EA (1) EA031304B1 (en)
ES (1) ES2802887T3 (en)
NZ (1) NZ713701A (en)
PT (1) PT2997197T (en)
WO (1) WO2014183224A1 (en)
ZA (1) ZA201509090B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017214699A (en) * 2016-05-30 2017-12-07 東日本旅客鉄道株式会社 Girder reinforcement structure
CN108867393A (en) * 2018-08-02 2018-11-23 中铁二院工程集团有限责任公司 A kind of long-span continuous rigid-framed bridge external prestressing load system
US10190936B2 (en) 2015-01-05 2019-01-29 Bae Systems Plc Mobile bridge apparatus
US10202729B2 (en) * 2015-01-05 2019-02-12 Bae Systems Plc Mobile bridge module
CN109537475A (en) * 2018-11-26 2019-03-29 山东交通学院 The method and ruggedized construction of bent cap reinforcing are carried out using carbon fiber
WO2019175065A1 (en) * 2018-03-15 2019-09-19 Re-Fer Ag Method for creating a prestress on a component made of steel, metal or an alloy by means of an sma plate, and component prestressed in such a manner
JP2020111416A (en) * 2019-01-09 2020-07-27 日本製鉄株式会社 Steel member reinforcement structure and reinforcement method
CN112942144A (en) * 2021-01-27 2021-06-11 招商局重庆交通科研设计院有限公司 Reinforced concrete arch bridge reinforcing method based on thermal expansion principle
US11225803B2 (en) * 2018-01-12 2022-01-18 Changsha University Of Science & Technology Prestressed bailey beam for reinforcement and construction method therefor

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH706630B1 (en) 2013-05-14 2013-12-31 S & P Clever Reinforcement Company Ag Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes
PT108710A (en) * 2015-07-21 2017-01-23 António Saraiva Pires Da Fonseca João SYSTEM FOR ARC BRIDGE STRUCTURE, WITH MOBILIZATION OF EXTERIOR REACTIONS THROUGH DEFINITIVE STRETCHERS.
CN107060349A (en) * 2017-06-20 2017-08-18 中国华西企业有限公司 A kind of large-span steel girder upper air installing system in place and its construction
CN107152078B (en) * 2017-06-29 2023-04-07 中国建筑第二工程局有限公司 Hinge device and construction method for releasing welding internal stress of steel gallery by using hinge device
CN111395210B (en) * 2020-04-07 2021-10-22 浙江大学 A method of improving the bearing capacity of a truss girder bridge with external prestressing tendons
CN112412097B (en) * 2020-11-29 2022-03-25 恒上建设有限公司 Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in
CN112942890A (en) * 2021-04-07 2021-06-11 上海悍马建筑科技有限公司 Method for simultaneously reinforcing positive and negative bending moments of concrete flexural member
CN114457706A (en) * 2022-02-28 2022-05-10 广西交科集团有限公司 Method for reinforcing assembled abdominal arch ring of double-arch bridge

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US238130A (en) * 1881-02-22 Bridge
US762632A (en) * 1904-02-18 1904-06-14 Joseph W Headley Truss-bridge.
US3427811A (en) * 1967-03-22 1969-02-18 Claude C White Mine roof support system
US3909863A (en) * 1972-09-11 1975-10-07 Krupp Gmbh Bridge crane girder
US4021875A (en) * 1975-04-10 1977-05-10 The United States Of America As Represented By The Secretary Of The Army Pivotable and extensible tension post for a cable bridge structure
US4129915A (en) * 1978-04-14 1978-12-19 The United States Of America As Represented By The Secretary Of The Army Cable tensioning means for king post structuring
US4223506A (en) * 1976-05-19 1980-09-23 Blair John T Frameworks and like structures
US4589157A (en) * 1982-01-29 1986-05-20 Bouygues Apparatus for the construction of a bridge floor and similar structures, and constructions which are obtained
US4631772A (en) * 1983-12-28 1986-12-30 Bonasso S G Tension arch structure
US4987629A (en) * 1988-03-25 1991-01-29 Muller Jean M Deck for wide-span bridge
US5313749A (en) * 1992-04-28 1994-05-24 Conner Mitchel A Reinforced steel beam and girder
US6065257A (en) * 1999-05-24 2000-05-23 Hubbell, Roth & Clark, Inc. Tendon alignment assembly and method for externally reinforcing a load bearing beam
US6170209B1 (en) * 1996-11-05 2001-01-09 University Of Maine Prestressing system for wood structures and elements
US20020194808A1 (en) * 2001-06-22 2002-12-26 Ratliff Frank W. Lightweight high load capacity reinforced beam and method of making same
US6571518B1 (en) * 1998-08-06 2003-06-03 Anthony Donald Barley Ground anchorage
US6892410B2 (en) * 2002-09-04 2005-05-17 Asahi Engineering Co., Ltd. Reinforcement structure of truss bridge or arch bridge
US20050247016A1 (en) * 2002-08-20 2005-11-10 Leonhardt, Andra Und Partner Beratende Ingenieure Vbi Gmbh Method of installing tension members on supporting structures, and apparatus for performing the method
US7047704B1 (en) * 1999-10-08 2006-05-23 Interconstec Co., Ltd. Method for designing and fabricating multi-step tension prestressed girder
US7748180B1 (en) * 2005-06-23 2010-07-06 Plavidal Richard W Joist stiffening system
US20110072745A1 (en) * 2008-06-12 2011-03-31 Pantelides Chris P Anchoring, splicing and tensioning elongated reinforcement members
US20110203195A1 (en) * 2006-01-13 2011-08-25 Hillman John R Hybrid composite beams and beam systems
US8925279B2 (en) * 2008-06-12 2015-01-06 The University Of Utah Research Foundation Anchoring, splicing and tensioning elongated reinforcement members

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE810043A (en) * 1974-01-22 1974-05-16 PROCEDURE FOR PRE-STRESSING AND COUNTER-REFLECTION OF MIXED STEEL AND CONCRETE BEAMS.
DE19849605A1 (en) * 1998-10-28 2000-05-04 Goehler Andrae Und Partner Ber Tensioning device for a band-shaped tension member
KR100301431B1 (en) * 1998-11-07 2001-10-29 박상일 Prestressed concrete girder with regulable tensile force
KR20000063499A (en) * 2000-07-18 2000-11-06 박창열 Tension method of PS steel to improve bridge performance.
KR100438113B1 (en) * 2002-03-30 2004-07-02 조병완 non-metallic anchorage apparatus for prestressed concrete structure and pre-stressing method using the same
DE10249266B3 (en) * 2002-10-23 2004-04-08 Leonhardt, Andrä und Partner Beratende Ingenieure VBI GmbH Tension device for belt-like traction members on concrete support structures has guide member locally fixed between tension bar and tension anchor and supporting traction member for sliding movement upwards
KR101115160B1 (en) * 2009-02-27 2012-02-24 서울시립대학교 산학협력단 Prestessed steel beam using 3D cross type bilateral anchorage
US20120180407A1 (en) * 2011-01-13 2012-07-19 Rees Kyle J Roof truss kit to enable support of solar panels on roof structures
CN102140780A (en) * 2011-04-08 2011-08-03 浙江省电力设计院 Method and device for reinforcing bridge by external pre-stressed strands under bridge
CN102322025B (en) * 2011-08-22 2014-07-30 陈东军 Pre-stressing reinforced and widened bridge structure
CH706630B1 (en) 2013-05-14 2013-12-31 S & P Clever Reinforcement Company Ag Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US238130A (en) * 1881-02-22 Bridge
US762632A (en) * 1904-02-18 1904-06-14 Joseph W Headley Truss-bridge.
US3427811A (en) * 1967-03-22 1969-02-18 Claude C White Mine roof support system
US3909863A (en) * 1972-09-11 1975-10-07 Krupp Gmbh Bridge crane girder
US4021875A (en) * 1975-04-10 1977-05-10 The United States Of America As Represented By The Secretary Of The Army Pivotable and extensible tension post for a cable bridge structure
US4223506A (en) * 1976-05-19 1980-09-23 Blair John T Frameworks and like structures
US4129915A (en) * 1978-04-14 1978-12-19 The United States Of America As Represented By The Secretary Of The Army Cable tensioning means for king post structuring
US4589157A (en) * 1982-01-29 1986-05-20 Bouygues Apparatus for the construction of a bridge floor and similar structures, and constructions which are obtained
US4631772A (en) * 1983-12-28 1986-12-30 Bonasso S G Tension arch structure
US4987629A (en) * 1988-03-25 1991-01-29 Muller Jean M Deck for wide-span bridge
US5313749A (en) * 1992-04-28 1994-05-24 Conner Mitchel A Reinforced steel beam and girder
US6170209B1 (en) * 1996-11-05 2001-01-09 University Of Maine Prestressing system for wood structures and elements
US6571518B1 (en) * 1998-08-06 2003-06-03 Anthony Donald Barley Ground anchorage
US6065257A (en) * 1999-05-24 2000-05-23 Hubbell, Roth & Clark, Inc. Tendon alignment assembly and method for externally reinforcing a load bearing beam
US7047704B1 (en) * 1999-10-08 2006-05-23 Interconstec Co., Ltd. Method for designing and fabricating multi-step tension prestressed girder
US20020194808A1 (en) * 2001-06-22 2002-12-26 Ratliff Frank W. Lightweight high load capacity reinforced beam and method of making same
US20050247016A1 (en) * 2002-08-20 2005-11-10 Leonhardt, Andra Und Partner Beratende Ingenieure Vbi Gmbh Method of installing tension members on supporting structures, and apparatus for performing the method
US6892410B2 (en) * 2002-09-04 2005-05-17 Asahi Engineering Co., Ltd. Reinforcement structure of truss bridge or arch bridge
US7748180B1 (en) * 2005-06-23 2010-07-06 Plavidal Richard W Joist stiffening system
US20110203195A1 (en) * 2006-01-13 2011-08-25 Hillman John R Hybrid composite beams and beam systems
US20110072745A1 (en) * 2008-06-12 2011-03-31 Pantelides Chris P Anchoring, splicing and tensioning elongated reinforcement members
US8925279B2 (en) * 2008-06-12 2015-01-06 The University Of Utah Research Foundation Anchoring, splicing and tensioning elongated reinforcement members

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10190936B2 (en) 2015-01-05 2019-01-29 Bae Systems Plc Mobile bridge apparatus
US10202729B2 (en) * 2015-01-05 2019-02-12 Bae Systems Plc Mobile bridge module
JP2017214699A (en) * 2016-05-30 2017-12-07 東日本旅客鉄道株式会社 Girder reinforcement structure
US11225803B2 (en) * 2018-01-12 2022-01-18 Changsha University Of Science & Technology Prestressed bailey beam for reinforcement and construction method therefor
WO2019175065A1 (en) * 2018-03-15 2019-09-19 Re-Fer Ag Method for creating a prestress on a component made of steel, metal or an alloy by means of an sma plate, and component prestressed in such a manner
CN108867393A (en) * 2018-08-02 2018-11-23 中铁二院工程集团有限责任公司 A kind of long-span continuous rigid-framed bridge external prestressing load system
CN109537475A (en) * 2018-11-26 2019-03-29 山东交通学院 The method and ruggedized construction of bent cap reinforcing are carried out using carbon fiber
JP2020111416A (en) * 2019-01-09 2020-07-27 日本製鉄株式会社 Steel member reinforcement structure and reinforcement method
JP7115324B2 (en) 2019-01-09 2022-08-09 日本製鉄株式会社 Steel member reinforcement structure and reinforcement method
CN112942144A (en) * 2021-01-27 2021-06-11 招商局重庆交通科研设计院有限公司 Reinforced concrete arch bridge reinforcing method based on thermal expansion principle

Also Published As

Publication number Publication date
US20200299911A1 (en) 2020-09-24
KR20160015255A (en) 2016-02-12
EP2997197A1 (en) 2016-03-23
KR102267298B1 (en) 2021-06-21
US11326313B2 (en) 2022-05-10
CN105518218A (en) 2016-04-20
CA2918395C (en) 2021-10-26
CH706630B1 (en) 2013-12-31
EA031304B1 (en) 2018-12-28
CA2918395A1 (en) 2014-11-20
NZ713701A (en) 2019-01-25
PT2997197T (en) 2020-07-03
AU2014268098B2 (en) 2018-04-26
EA201501078A1 (en) 2016-06-30
EP2997197B1 (en) 2020-04-22
WO2014183224A1 (en) 2014-11-20
BR112015028588B1 (en) 2021-11-23
AU2014268098A1 (en) 2015-11-26
ES2802887T3 (en) 2021-01-21
BR112015028588A2 (en) 2018-07-24
ZA201509090B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
US11326313B2 (en) Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
Quantrill et al. The flexural rehabilitation of reinforced concrete beams by the use of prestressed advanced composite plates
Mohee et al. Anchors for CFRP plates: State-of-the-art review and future potential
Al-Saidy et al. Strengthening of steel–concrete composite girders using carbon fiber reinforced polymer plates
CN105113405B (en) A kind of combined bridge deck based on steel and UHPC
Rizkalla et al. Effectiveness of FRP for strengthening concrete bridges
CN108824221B (en) Web replacement and strengthening method of concrete continuous girder bridge based on corrugated steel plate
CN105544415A (en) Concrete bridge reinforcing method and structure
JP7118880B2 (en) Shear reinforcement method for PC box girder bridge
Wight et al. Prestressed CFRP sheets for strengthening concrete slabs in fatigue
Siwowski et al. Strengthening bridges with prestressed CFRP strips
CN109898883A (en) A kind of anchorage technology measure of armored concrete beam bottom sticking carbon fiber plate
KR101198960B1 (en) Bridge girde with the function of adjusting pre-stress
US20120255251A1 (en) Construction structure with strengthening device and method
Nordin Strengthening structures with externally prestressed tendons: literature review
Pipinato Assessment and rehabilitation of steel railway bridges using fibre-reinforced polymer (FRP) composites
CN106245539B (en) A kind of freely-supported plate girder bridge is used for the reinforcement means of Over-size transport
CN109610349B (en) PC box girder web plate reinforcing structure with built-in obliquely-woven mesh and method
COMPANYAG et al. 12, Patent Application Publication o Pub. No.: US 2016/0145815A1
Yang et al. A new concept for sustainable refurbishment of existing bridges using FRP materials
JP4885327B1 (en) Steel material repair structure and steel material repair method
CN222558184U (en) Prefabricated steel reinforced concrete beam reinforced by UHPC
Askar et al. Flexural retrofitting of reinforced concrete bridges; applications
KR101029994B1 (en) Structure reinforcement method using all synthetic gerber beam
Wight et al. CFRP Sheet Strengthening Damaged Continuous Reinforced Concrete Beams

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE AFTER FINAL ACTION FORWARDED TO EXAMINER

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: S&P CLEVER REINFORCEMENT COMPANY AG, SWAZILAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MOTAVALLI, MASOUD;GHAFOORI, ELYAS;REEL/FRAME:059288/0261

Effective date: 20220315

AS Assignment

Owner name: S&P CLEVER REINFORCEMENT COMPANY AG, SWITZERLAND

Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE THE NAME OF THE ASSIGNEE'S COUNTRY PREVIOUSLY RECORDED AT REEL: 059288 FRAME: 0261. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT;ASSIGNORS:MOTAVALLI, MASOUD;GHAFOORI, ELYAS;REEL/FRAME:059568/0647

Effective date: 20220315