US20160090512A1 - System and method for reducing viscosity variations in roofing asphalt - Google Patents
System and method for reducing viscosity variations in roofing asphalt Download PDFInfo
- Publication number
- US20160090512A1 US20160090512A1 US14/864,625 US201514864625A US2016090512A1 US 20160090512 A1 US20160090512 A1 US 20160090512A1 US 201514864625 A US201514864625 A US 201514864625A US 2016090512 A1 US2016090512 A1 US 2016090512A1
- Authority
- US
- United States
- Prior art keywords
- coating
- wax
- viscosity
- coater
- mixer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09D—COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
- C09D195/00—Coating compositions based on bituminous materials, e.g. asphalt, tar, pitch
-
- B01F15/00246—
-
- B01F15/0243—
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F23/00—Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
- B01F23/40—Mixing liquids with liquids; Emulsifying
- B01F23/47—Mixing liquids with liquids; Emulsifying involving high-viscosity liquids, e.g. asphalt
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F23/00—Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
- B01F23/40—Mixing liquids with liquids; Emulsifying
- B01F23/49—Mixing systems, i.e. flow charts or diagrams
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F25/00—Flow mixers; Mixers for falling materials, e.g. solid particles
- B01F25/50—Circulation mixers, e.g. wherein at least part of the mixture is discharged from and reintroduced into a receptacle
- B01F25/53—Circulation mixers, e.g. wherein at least part of the mixture is discharged from and reintroduced into a receptacle in which the mixture is discharged from and reintroduced into a receptacle through a recirculation tube, into which an additional component is introduced
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F35/00—Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
- B01F35/20—Measuring; Control or regulation
- B01F35/21—Measuring
- B01F35/2136—Viscosity
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01F—MIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
- B01F35/00—Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
- B01F35/80—Forming a predetermined ratio of the substances to be mixed
- B01F35/82—Forming a predetermined ratio of the substances to be mixed by adding a material to be mixed to a mixture in response to a detected feature, e.g. density, radioactivity, consumed power or colour
-
- B01F5/0602—
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08L—COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
- C08L95/00—Compositions of bituminous materials, e.g. asphalt, tar, pitch
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D1/00—Roof covering by making use of tiles, slates, shingles, or other small roofing elements
- E04D1/26—Strip-shaped roofing elements simulating a repetitive pattern, e.g. appearing as a row of shingles
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08L—COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
- C08L2555/00—Characteristics of bituminous mixtures
- C08L2555/10—Design or test methods for bitumen or asphalt mixtures, e.g. series of measures, procedures or tests to obtain a bitumen or asphalt mixture having preset defined properties, general or international test methods, procedures or standards
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D1/00—Roof covering by making use of tiles, slates, shingles, or other small roofing elements
- E04D2001/005—Roof covering by making use of tiles, slates, shingles, or other small roofing elements the roofing elements having a granulated surface
Definitions
- This present invention relates to a system and method of reducing the variations in the viscosity of a coating asphalt mixture during the manufacturing of roofing shingles.
- Base asphalt used in roofing mixtures often includes a number of material variations due to nature or the refining process. Thus, even slight variations in the viscosity of the coating asphalt mixture can result in applying a thicker or thinner layer of asphalt coating to the shingle substrate. If the applied coating layer is too thick, then material inefficiencies are experienced. If the applied coating layer is too thin, then product performance issues may arise. In any event, variations in asphalt coating mixture viscosity results in losses due to material application inefficiencies and/or variations and uncertainty in product performance.
- the present invention is directed toward an asphalt shingle coating system comprising a coater, a mixer, a wax supply and a wax pump, a viscosity gauge, and a control system.
- the coater coats an asphalt shingle substrate with a coating asphalt mixture.
- the mixer mixes the coating asphalt mixture and is in fluid communication and upstream of the coater.
- the wax supply provides a wax that can be used to control (usually decrease) the viscosity of the coating asphalt mix, and the wax pump is used to supply the system a volume of wax from the wax supply to the mixer when or if it is needed.
- the viscosity gauge measures the viscosity of the coating asphalt mixture delivered to the coater and is disposed between the coater and the mixer.
- the control system is in electronic communication with the viscosity gauge and the wax pump, and is operable to selectively adjust the operation of the wax pump to substantially maintain a desired viscosity of the coating asphalt mixture.
- the present asphalt shingle coating system may further comprise a supply return valve and a supply return line for directing and conveying the asphalt coating back to the mixer if the asphalt coating is out of specification.
- Another embodiment may further include the mixer having two or more level sensors used to determine the amount of wax to be added to result in a coating asphalt mixture exhibiting the desired component proportions and material properties.
- Another embodiment further includes a supply conduit that places the coater in fluid communication with the mixer, and a static mixer tube disposed in the supply conduit.
- the viscosity gauge is disposed downstream of the static mixer, and the wax supply is in fluid communication with the supply conduit rather than or in addition to the mixer.
- the wax supply has an inlet into the supply conduit that is located upstream of the static mixer.
- the present asphalt shingle coating system may be used according to the following method for substantially maintaining the viscosity of a coating asphalt mixture delivered to a coater during the manufacture of a roofing shingle.
- the present method includes the steps of measuring the viscosity of the coating asphalt mixture prior to the asphalt mixture being delivered to the coater, comparing the measured viscosity to a desired viscosity, and adjusting the amount of wax in the coating asphalt mixture if the measured viscosity varies from the desired viscosity.
- the method for coating shingles herein may also include one or more of the steps of adding wax to the coating asphalt mixture if the measured viscosity is higher than the desired viscosity range, reducing the amount of wax added to the coating asphalt mixture if the measured viscosity is lower than the desired viscosity range, and mixing the coating asphalt mixture until the mixture is at least substantially homogeneous.
- FIG. 1 is a schematic view of one embodiment of an asphalt coating system in accordance with the teachings of the present disclosure
- FIG. 2 is a schematic view of another embodiment of an asphalt coating system in accordance with the teachings of the present disclosure.
- FIG. 3 is a schematic view of the flow chart for a control algorithm that may be used in one embodiment of an asphalt coating system in accordance with the teachings of the present disclosure.
- the present invention relates to a system and method for adding varying amounts of wax to a roofing asphalt mixture based upon the measured viscosity of the coating asphalt mixture proximate the point of application to a roofing substrate.
- the present invention allows for the regulation of the viscosity of the asphalt through the insertion of a known quantity of wax material into the asphalt mixture, wherein the amount can vary to maintain a consistent viscosity.
- FIG. 1 illustrates an schematic of an embodiment of an asphalt shingle coating system 10 including an asphalt supply line-in 12 for feeding a base roofing asphalt mixture, and an aggregate/filler inlet 14 which provides aggregate or filler from an aggregate/filler supply hopper 16 into a horizontal mixer 18 .
- the horizontal mixer 18 includes a mixer motor 20 that drives the mixing components to mix the asphalt mixture and the filler into a filled coating asphalt mixture to apply on the shingle substrate.
- the filled coating exits the horizontal mixer 18 at a horizontal mixer output 22 into a filled coating supply line 24 , wherein the filled coating is fed into a vertical mixer 26 driven by a vertical motor 28 .
- the filled coating enters vertical mixer 26 from supply line 24 through a filled coating inlet 30 .
- Wax may be selectively mixed into the coating asphalt mixture and may enter vertical mixer 26 through a wax inlet 32 after traveling through a wax supply line 34 from a wax supply tank 36 .
- Wax supply tank 36 may be a heated storage tank to maintain the wax in a liquid state.
- Wax supply tank 36 may be an electric trace tank with insulation or the wax may be a low temperature heated fluid.
- Wax supply tank 36 may be supported on one or more load cells 37 , which monitor the weight of the volume of wax contained in wax supply tank 36 and can be used to monitor the volume of wax that is dispersed from wax supply tank 36 at any given time.
- Load cell 37 may also be used to monitor the wax supply so as to indicate when the supply needs to be replenished.
- Other embodiments may measure the volume of wax being added into the mixture using flow meters or a pump estimation technique which estimates the volume of wax delivered using the known volume that the pump delivers per unit of time.
- the flow of wax into vertical mixer 26 and the mixture rate may be selectively and variably controlled using a wax valve 38 , and/or a wax supply pump 40 driven by a wax supply pump motor 42 .
- Wax valve 38 may be an “on or off” valve, a variable flow valve, or a check valve.
- Pump 40 may be any type of pump known in the art, including a centrifugal or positive displacement valve.
- Wax supply tank 36 may also include a temperature gauge 39 to measure the temperature of the wax additive.
- waxes Any type of wax that is now known or may be used in the future, which can be added to an asphalt composition is within the scope of the present invention. As will be recognized by a person of skill in the art, some waxes may be more preferable than others for particular circumstances.
- Waxes now known in the industry include: tailing wax, paraffin wax, microcrystalline wax (both high and low melting point), ethylene bis-stearamide wax (EBS), Fischer-Tropsch wax (FT), oxidized Fischer-Tropsch wax (FTO), polyolefin waxes, polyethylene wax (PE), oxidized polyethylene wax (PEO), polypropylene wax, polypropylene/polyethylene wax, alcohol wax, silicone wax, chlorinated wax or paraffin, amide waxes, ester waxes, carboxylic acid waxes, candelilla wax, carnauba wax, rice wax, Japan wax, jojoba oil, beeswax, lanolin, and whale wax, montan wax, ozokerite, and
- Vertical mixer 26 is of a type that is generally known in the art and may be jacketed with hot oil heating fluid or other heating method to maintain an operational temperature of the coating asphalt in the mixer between three-hundred-fifty (350) degrees and four-hundred-fifty (450) degrees.
- Vertical mixer 26 may include one or more contents level probes 41 .
- the content level probes 41 may be used to manage batch insertion and delivery processes within the vertical mixer to manage a real-time concentration problem between the low and high level probe set points in order to achieve and maintain a homogenous mixture of limestone, coating asphalt, and a desired quantity of wax material based on the required or desired physical properties of the delivered coating asphalt mixture.
- the final formulation of the coating asphalt mixture then exits vertical mixer 26 through a vertical mixer outlet valve 44 and travels through a coater supply line 46 to a coater 48 .
- a coater asphalt pump 50 driven by a motor 52 pumps the coating asphalt to coater 48 .
- the flow of the coating asphalt may be monitored by any number of instruments and/or monitors including at least a density gauge 54 , and a viscosity gauge 56 . Other gauges are within the scope of the present invention, including a temperature gauge, flow velocity gauge, or any other gauge or monitor for measuring a physical or operational property of the flowing coating asphalt.
- Supply return valve 68 and all valves utilized in the present coating system may be an “on or off” valve, a variable flow valve, or a check valve. Any of the holding tanks, mixers or supply lines of the present invention may include one or more monitors or gauges for temperature, weight, density, pressure, or to measure any other desired operational or processing property.
- Viscosity as used herein is defined as the resistance of fluid to both shear and flow. As such, the present invention may utilize both kinematic viscosity and/or dynamic viscosity measurements.
- the viscosity gauge 56 may provide a proportional control signal to a controller in the form of a prescribed voltage or a 4-20 milliamp signal to indicate the viscosity measurement of the coating asphalt flowing through the coater supply line 46 .
- a back coating line 58 may branch off of coater supply line 46 to deliver coating asphalt for coating the back side of a shingle substrate.
- the flow of the coating asphalt to the coater for back coating may be controlled using a back coating line valve 60 .
- a front coating line 62 may branch off of coater supply line 46 to deliver coating asphalt for coating the front side of a shingle substrate.
- the flow of the coating asphalt to the coater through the front coating line 62 may be controlled using a back coating line valve 64 .
- Coater supply line 46 may become a coater supply return line 66 around a supply return valve 68 which allows the coating asphalt to cycle back to the vertical mixer 26 .
- Supply return valve 68 may be selectively operated to direct all or part of the asphalt coating flow to coaters 48 .
- valve 68 , valves 60 and 64 may be coordinated so all the coating asphalt in coating supply line 46 returns to vertical mixer 26 , for example, if the asphalt coating is out of specification.
- any coating asphalt that does not adhere to the shingle substrate at coater 48 may be collected and fed back to vertical mixer 26 through a coating return line 70 .
- the flow of un-adhered coating asphalt collected at coater 48 may be controlled using at least one of a first coating return valve 72 , a coating return pump 74 , a coating return pump motor 76 , and a coating return second valve 78 .
- Controller 80 may be in electronic communication with any of the pumps, valves, motors, and measurement devices of the present asphalt shingle coating system 10 . Particularly in the embodiment shown in FIG. 1 , controller 80 is in electronic communication with at least wax supply tank 36 , load cell 37 , wax valve 38 , wax supply pump motor 42 , and the viscosity gauge 56 .
- Controller 80 may include one of or all of the following control and optimization methods: proportional control, integral control, and derivative control.
- Proportional control is the control step that calculates the difference between the target viscosity and the actual viscosity measured by viscosity gauge 56 in coater supply line 46 .
- a proportional value is applied against the resulting error factor, which results in a quantity of wax that should be added to or withheld from the overall mixture to adjust the viscosity.
- Controller 80 then controls, operates and/or monitors one of pump motor 42 , wax valve 38 , and load cell 37 or other volume measurement method to deliver the required quantity of wax to result in the desired viscosity.
- Integral control involves evaluating the effect of successive portion control sequences as sequential batches are completed. If over time the proportional adjustments are not achieving the target viscosity, then the integral control function will increase the calculated volume of wax during a proportional calculation to drive toward the target in increasingly aggressive steps. If an over-compensation condition occurs, the integral control function may result in a reduction of the amount of wax introduced into the mixture.
- Derivative control involves using successive proportional control and integral control iterations to evaluate the rate of change between batches and, thus, make an initial shock adjustment to the overall control algorithm. This may allow a reduction in the amount of time it takes for the proportional control and integral control iterations to reach target values of viscosity. This may become a slope calculation and a resultant prediction over time from the current measured value of viscosity.
- the integral and derivative control methods provide for increased overall efficiency and optimization of the control system.
- controller 80 may be a standard PID control system such as that described in SIEMENS Standard PID Control Manual, Edition 3/2003, found at http://cache.automation.siemens.com/dnl/DQ/DQ1MzA5AAAA — 1137084_HB/Stdpid_e.pdf.
- controller may utilize a control algorithm in optimizing the viscosity of the coating asphalt.
- FIG. 3 One embodiment of such a control algorithm which may be used in the present invention is shown in FIG. 3 .
- FIG. 2 illustrates an alternative embodiment wherein the wax is introduced in coater supply line 46 upstream of a static mixer tube 82 disposed in the supply line 46 at an inlet 84 .
- the static mixer tube 82 is preferably upstream of viscosity gauge 56 . If the inlet of the wax supply 84 , the static mixer tube 82 and viscosity gauge 56 are in close proximity, then this configuration may provide a faster response time and reduce the duration of time that the viscosity may be out of a desired range, but a person of skill in the art would appreciate that care must be taken to ensure homogeneity of the coating asphalt mixture when using the static mixer tube 82 .
- the present asphalt shingle coating system 10 is used to provide coater 48 with a supply of coating asphalt which has a relatively constant viscosity. This provides numerous benefits including increasing product uniformity, ensuring a consistent product quality, increasing material-use efficiency, and benefiting the proper operation of the coating machinery.
- the present asphalt shingle coating system 10 includes a variable and controlled introduction of wax into the coating asphalt mixture in response to the measured or actual viscosity of the coating asphalt in the coater supply line 46 measured by viscosity gauge 56 .
- Raw asphalt and the granular filler are introduced into horizontal mixer 18 where they are mixed together.
- the filled coating is then piped through filled coating supply line 24 to a vertical mixer 26 .
- the operation of the vertical mixer 26 may allow for the homogenous mixing of the coating asphalt, which includes the base asphalt, aggregate filler (limestone), and other additives desired in the coating mixture.
- wax may be selectively delivered into vertical mixer 26 to affect the viscosity of the coating asphalt mixture to the coater 48 .
- Vertical mixer 26 may also be used to mix the wax homogenously with the other ingredients of the coating asphalt.
- the coating asphalt mixture flows out of the vertical mixer 26 through the coater supply line 46 to coater 48 .
- Coater asphalt pump 50 and motor 52 ensure that the coating asphalt mixture is delivered to the coater 48 in the desired quantity and rate.
- One or more gauges or sensors may be disposed in coater supply line 46 to measure various physical properties of the coating asphalt mixture for quality control or operational purposes.
- viscosity gauge 56 may measure the kinematic viscosity and/or dynamic viscosity of the coating asphalt mixture. Viscosity gauge 56 is in electronic communication with controller 80 wherein controller 80 receives a signal from viscosity gauge 56 corresponding to the desired viscosity measurements.
- Controller 80 compares the measured or actual viscosity to a desired or target viscosity to determine whether the viscosity of the coating asphalt mixture is within the desired range. If the viscosity is higher than the desired range, controller 80 estimates the amount of wax that needs to be added to the filled coating mixture and signals to wax supply motor 42 of wax pump 40 to increase the flow of wax and/or adjust wax valve 38 to add the desired volume of additional wax into the formulation. The additional wax may be added directly to the vertical mixer 26 or may be added into the coater supply line 46 and incorporated into the mixture using a static mixing tube 82 . Controller 80 may record and analyze the cycles of individual adding of wax to optimize and learn how much wax needs to be added at various occurrences of the viscosity of the coating asphalt mixture being higher than the desired range.
- controller 80 may similarly act to reduce the volume of wax being added to the filled coating mixture in either vertical mixer 26 or the coater supply line 46 .
- controller 80 actively monitors the viscosity of the coating asphalt mixture and reacts in substantially real-time to increase or decrease the amount of wax added to the coating asphalt mixture based upon the measured viscosity.
- the present asphalt shingle coating system 10 may be used when the base coating asphalt mixture formulation to be used does not include wax and then exclusively adds wax as determined to decrease the viscosity. Alternatively, if the base coating asphalt mixture formulation already includes wax, the present system may be used to vary the proportionate quantity of wax in the mixture to create and maintain the desired viscosity. There are many factors which will be considered by a person of skill in the art with respect to the base formulations such as the initial quality of the base asphalt, the volume of filler, whether the base asphalt is blown, or whether additional admixtures are added to the asphalt mixture. Thus, once a base coating asphalt mixture is specified, the present asphalt shingle coating system 10 may be adapted as necessary and used to maintain the desired application viscosity using the addition of wax as described herein.
- control system/controller 80 includes step 100 of inputting a step or ramp function as an input signal in controller 80 .
- controller 80 seeks to determine whether there is an error between the viscosity measured at the sensor and a target viscosity.
- Step 104 involves controller 80 determining if the measured viscosity is above the target viscosity. If the measured viscosity is below the target viscosity, controller 80 initiates step 106 , which includes applying a negative proportional control constant “P” to reduce the wax pump's flow rate.
- step 108 controller 80 then determines if the resample time interval has elapsed. If not, then controller 80 continues performing step 106 . If the resample time interval has elapsed, then controller 80 moves to step 114 to again measure and/or determine if the viscosity is at target.
- step 104 determines that the measured viscosity is above the target viscosity. If in step 104 , it is determined that the measured viscosity is above the target viscosity, then controller 80 initiates step 110 , which comprises applying a positive proportional control constant “P” to increase the wax pump's flow rate to decrease the viscosity.
- step 112 controller 80 then determines if the resample time interval has elapsed. If not, then controller 80 continues performing step 110 . If the resample time interval has elapsed, then controller 80 moves to step 114 to determine if the viscosity is at target.
- controller 80 determines in step 114 that the system is not at target, then controller again performs step 104 and adjusts the operation of the wax pump based on whether the measured viscosity is above or below the target. If, in step 114 , controller 80 determines the system is at the target viscosity, then controller 80 moves to step 116 and maintains the wax pump flow rate. In step 118 , controller 80 then determines whether the resample interval has elapsed. If not, it keeps performing step 116 of maintaining the wax pump flow rate. If the resample interval has elapsed, controller 80 again performs step 114 to determine whether the system is operating to deliver a coating asphalt that is at target viscosity.
- the resample interval may be set to best optimize performance. In one embodiment, the interval is less than a second (in the milliseconds), and in another embodiment, the interval may be multiple minutes. This variable may be left to the discretion of the operator; however, it will be appreciated that the closer the interval, the less likelihood of the coating asphalt will be delivered to the coater outside of the target viscosity.
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wood Science & Technology (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Medicinal Chemistry (AREA)
- Polymers & Plastics (AREA)
- Coating Apparatus (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
- Architecture (AREA)
Abstract
Description
- This application claims the benefit of U.S. Provisional Patent Application No. 62/055,465 filed Sep. 25, 2014, the entire disclosure of which is hereby incorporated by reference.
- This present invention relates to a system and method of reducing the variations in the viscosity of a coating asphalt mixture during the manufacturing of roofing shingles.
- The costs of asphaltic material and other petroleum based products have steadily risen over time. Optimizing the use of coating asphalt is a continual goal in the art. An inefficiency that has remained relatively unaddressed in the manufacture of asphalt roofing shingles is the inherent variations in the viscosity of the coating asphalt mixture and its effect on material inefficiencies and/or product quality.
- Base asphalt used in roofing mixtures often includes a number of material variations due to nature or the refining process. Thus, even slight variations in the viscosity of the coating asphalt mixture can result in applying a thicker or thinner layer of asphalt coating to the shingle substrate. If the applied coating layer is too thick, then material inefficiencies are experienced. If the applied coating layer is too thin, then product performance issues may arise. In any event, variations in asphalt coating mixture viscosity results in losses due to material application inefficiencies and/or variations and uncertainty in product performance.
- Thus there is a need in the art to supply a coater used in the manufacture of asphalt shingles with a coating asphalt mixture which provides the asphalt coating at a consistent viscosity to provide and apply a coating layer of consistent thickness on the substrate in order to optimize material efficiency and provide consistent product performance.
- The present invention is directed toward an asphalt shingle coating system comprising a coater, a mixer, a wax supply and a wax pump, a viscosity gauge, and a control system. The coater coats an asphalt shingle substrate with a coating asphalt mixture. The mixer mixes the coating asphalt mixture and is in fluid communication and upstream of the coater. The wax supply provides a wax that can be used to control (usually decrease) the viscosity of the coating asphalt mix, and the wax pump is used to supply the system a volume of wax from the wax supply to the mixer when or if it is needed. The viscosity gauge measures the viscosity of the coating asphalt mixture delivered to the coater and is disposed between the coater and the mixer. The control system is in electronic communication with the viscosity gauge and the wax pump, and is operable to selectively adjust the operation of the wax pump to substantially maintain a desired viscosity of the coating asphalt mixture.
- In one embodiment, the present asphalt shingle coating system may further comprise a supply return valve and a supply return line for directing and conveying the asphalt coating back to the mixer if the asphalt coating is out of specification. Another embodiment may further include the mixer having two or more level sensors used to determine the amount of wax to be added to result in a coating asphalt mixture exhibiting the desired component proportions and material properties.
- Another embodiment further includes a supply conduit that places the coater in fluid communication with the mixer, and a static mixer tube disposed in the supply conduit. In this embodiment, the viscosity gauge is disposed downstream of the static mixer, and the wax supply is in fluid communication with the supply conduit rather than or in addition to the mixer. The wax supply has an inlet into the supply conduit that is located upstream of the static mixer.
- The present asphalt shingle coating system may be used according to the following method for substantially maintaining the viscosity of a coating asphalt mixture delivered to a coater during the manufacture of a roofing shingle. The present method includes the steps of measuring the viscosity of the coating asphalt mixture prior to the asphalt mixture being delivered to the coater, comparing the measured viscosity to a desired viscosity, and adjusting the amount of wax in the coating asphalt mixture if the measured viscosity varies from the desired viscosity.
- In addition, the method for coating shingles herein may also include one or more of the steps of adding wax to the coating asphalt mixture if the measured viscosity is higher than the desired viscosity range, reducing the amount of wax added to the coating asphalt mixture if the measured viscosity is lower than the desired viscosity range, and mixing the coating asphalt mixture until the mixture is at least substantially homogeneous.
- Other aspects and advantages of the present invention will be apparent from the following detailed description of the preferred embodiments and the accompanying drawing figures.
- The accompanying drawings form a part of the specification and are to be read in conjunction therewith, in which like reference numerals are employed to indicate like or similar parts in the various views.
-
FIG. 1 is a schematic view of one embodiment of an asphalt coating system in accordance with the teachings of the present disclosure; -
FIG. 2 is a schematic view of another embodiment of an asphalt coating system in accordance with the teachings of the present disclosure; and -
FIG. 3 is a schematic view of the flow chart for a control algorithm that may be used in one embodiment of an asphalt coating system in accordance with the teachings of the present disclosure. - While the disclosure is susceptible to various modifications and alternative forms, a specific embodiment thereof is shown by way of example in the drawing and will herein be described in detail. It should be understood, however, that the drawings and detailed description presented herein are not intended to limit the disclosure to the particular embodiment disclosed, but to the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the present disclosure as defined by the appended claims.
- The following detailed description of the present invention references the accompanying drawing figures that illustrate specific embodiments in which the invention can be practiced. The embodiments are intended to describe aspects of the present invention in sufficient detail to enable those skilled in the art to practice the invention. Other embodiments can be utilized and changes can be made without departing from the spirit and scope of the present invention. The present invention is defined by the appended claims and, therefore, the description is not to be taken in a limiting sense and shall not limit the scope of equivalents to which such claims are entitled.
- The present invention relates to a system and method for adding varying amounts of wax to a roofing asphalt mixture based upon the measured viscosity of the coating asphalt mixture proximate the point of application to a roofing substrate. The present invention allows for the regulation of the viscosity of the asphalt through the insertion of a known quantity of wax material into the asphalt mixture, wherein the amount can vary to maintain a consistent viscosity.
FIG. 1 illustrates an schematic of an embodiment of an asphaltshingle coating system 10 including an asphalt supply line-in 12 for feeding a base roofing asphalt mixture, and an aggregate/filler inlet 14 which provides aggregate or filler from an aggregate/filler supply hopper 16 into ahorizontal mixer 18. Thehorizontal mixer 18 includes amixer motor 20 that drives the mixing components to mix the asphalt mixture and the filler into a filled coating asphalt mixture to apply on the shingle substrate. - The filled coating exits the
horizontal mixer 18 at ahorizontal mixer output 22 into a filledcoating supply line 24, wherein the filled coating is fed into avertical mixer 26 driven by avertical motor 28. The filled coating entersvertical mixer 26 fromsupply line 24 through a filledcoating inlet 30. Wax may be selectively mixed into the coating asphalt mixture and may entervertical mixer 26 through awax inlet 32 after traveling through awax supply line 34 from awax supply tank 36. Waxsupply tank 36 may be a heated storage tank to maintain the wax in a liquid state.Wax supply tank 36 may be an electric trace tank with insulation or the wax may be a low temperature heated fluid. Waxsupply tank 36 may be supported on one ormore load cells 37, which monitor the weight of the volume of wax contained inwax supply tank 36 and can be used to monitor the volume of wax that is dispersed fromwax supply tank 36 at any given time.Load cell 37 may also be used to monitor the wax supply so as to indicate when the supply needs to be replenished. Other embodiments may measure the volume of wax being added into the mixture using flow meters or a pump estimation technique which estimates the volume of wax delivered using the known volume that the pump delivers per unit of time. The flow of wax intovertical mixer 26 and the mixture rate may be selectively and variably controlled using awax valve 38, and/or awax supply pump 40 driven by a waxsupply pump motor 42.Wax valve 38 may be an “on or off” valve, a variable flow valve, or a check valve.Pump 40 may be any type of pump known in the art, including a centrifugal or positive displacement valve.Wax supply tank 36 may also include atemperature gauge 39 to measure the temperature of the wax additive. - Any type of wax that is now known or may be used in the future, which can be added to an asphalt composition is within the scope of the present invention. As will be recognized by a person of skill in the art, some waxes may be more preferable than others for particular circumstances. Waxes now known in the industry include: tailing wax, paraffin wax, microcrystalline wax (both high and low melting point), ethylene bis-stearamide wax (EBS), Fischer-Tropsch wax (FT), oxidized Fischer-Tropsch wax (FTO), polyolefin waxes, polyethylene wax (PE), oxidized polyethylene wax (PEO), polypropylene wax, polypropylene/polyethylene wax, alcohol wax, silicone wax, chlorinated wax or paraffin, amide waxes, ester waxes, carboxylic acid waxes, candelilla wax, carnauba wax, rice wax, Japan wax, jojoba oil, beeswax, lanolin, and whale wax, montan wax, ozokerite, and ceresin. In addition, other viscosity modifiers may be used in place of wax, including tall oil pitch, soybean by-products, naphthenic oils, or recycled oils.
-
Vertical mixer 26 is of a type that is generally known in the art and may be jacketed with hot oil heating fluid or other heating method to maintain an operational temperature of the coating asphalt in the mixer between three-hundred-fifty (350) degrees and four-hundred-fifty (450) degrees.Vertical mixer 26 may include one or morecontents level probes 41. Thecontent level probes 41 may be used to manage batch insertion and delivery processes within the vertical mixer to manage a real-time concentration problem between the low and high level probe set points in order to achieve and maintain a homogenous mixture of limestone, coating asphalt, and a desired quantity of wax material based on the required or desired physical properties of the delivered coating asphalt mixture. - The final formulation of the coating asphalt mixture then exits
vertical mixer 26 through a verticalmixer outlet valve 44 and travels through acoater supply line 46 to acoater 48. Acoater asphalt pump 50 driven by amotor 52 pumps the coating asphalt tocoater 48. The flow of the coating asphalt may be monitored by any number of instruments and/or monitors including at least adensity gauge 54, and aviscosity gauge 56. Other gauges are within the scope of the present invention, including a temperature gauge, flow velocity gauge, or any other gauge or monitor for measuring a physical or operational property of the flowing coating asphalt. Supply return valve 68 and all valves utilized in the present coating system may be an “on or off” valve, a variable flow valve, or a check valve. Any of the holding tanks, mixers or supply lines of the present invention may include one or more monitors or gauges for temperature, weight, density, pressure, or to measure any other desired operational or processing property. - Viscosity as used herein is defined as the resistance of fluid to both shear and flow. As such, the present invention may utilize both kinematic viscosity and/or dynamic viscosity measurements. The
viscosity gauge 56 may provide a proportional control signal to a controller in the form of a prescribed voltage or a 4-20 milliamp signal to indicate the viscosity measurement of the coating asphalt flowing through thecoater supply line 46. - In delivering the coating asphalt mixture to the coater, a
back coating line 58 may branch off ofcoater supply line 46 to deliver coating asphalt for coating the back side of a shingle substrate. The flow of the coating asphalt to the coater for back coating may be controlled using a backcoating line valve 60. Similarly, afront coating line 62 may branch off ofcoater supply line 46 to deliver coating asphalt for coating the front side of a shingle substrate. The flow of the coating asphalt to the coater through thefront coating line 62 may be controlled using a back coating line valve 64. -
Coater supply line 46 may become a coater supply return line 66 around a supply return valve 68 which allows the coating asphalt to cycle back to thevertical mixer 26. Supply return valve 68 may be selectively operated to direct all or part of the asphalt coating flow tocoaters 48. Alternatively, valve 68,valves 60 and 64 may be coordinated so all the coating asphalt incoating supply line 46 returns tovertical mixer 26, for example, if the asphalt coating is out of specification. In addition, any coating asphalt that does not adhere to the shingle substrate atcoater 48 may be collected and fed back tovertical mixer 26 through acoating return line 70. The flow of un-adhered coating asphalt collected atcoater 48 may be controlled using at least one of a firstcoating return valve 72, acoating return pump 74, a coatingreturn pump motor 76, and a coating returnsecond valve 78. - The operation of all or a part of the present asphalt
shingle coating system 10 may be controlled using acontroller 80.Controller 80 may be in electronic communication with any of the pumps, valves, motors, and measurement devices of the present asphaltshingle coating system 10. Particularly in the embodiment shown inFIG. 1 ,controller 80 is in electronic communication with at leastwax supply tank 36,load cell 37,wax valve 38, waxsupply pump motor 42, and theviscosity gauge 56. -
Controller 80 may include one of or all of the following control and optimization methods: proportional control, integral control, and derivative control. Proportional control is the control step that calculates the difference between the target viscosity and the actual viscosity measured byviscosity gauge 56 incoater supply line 46. A proportional value is applied against the resulting error factor, which results in a quantity of wax that should be added to or withheld from the overall mixture to adjust the viscosity.Controller 80 then controls, operates and/or monitors one ofpump motor 42,wax valve 38, and loadcell 37 or other volume measurement method to deliver the required quantity of wax to result in the desired viscosity. - Integral control involves evaluating the effect of successive portion control sequences as sequential batches are completed. If over time the proportional adjustments are not achieving the target viscosity, then the integral control function will increase the calculated volume of wax during a proportional calculation to drive toward the target in increasingly aggressive steps. If an over-compensation condition occurs, the integral control function may result in a reduction of the amount of wax introduced into the mixture.
- Derivative control involves using successive proportional control and integral control iterations to evaluate the rate of change between batches and, thus, make an initial shock adjustment to the overall control algorithm. This may allow a reduction in the amount of time it takes for the proportional control and integral control iterations to reach target values of viscosity. This may become a slope calculation and a resultant prediction over time from the current measured value of viscosity. The integral and derivative control methods provide for increased overall efficiency and optimization of the control system.
- In one embodiment,
controller 80 may be a standard PID control system such as that described in SIEMENS Standard PID Control Manual, Edition 3/2003, found at http://cache.automation.siemens.com/dnl/DQ/DQ1MzA5AAAA—1137084_HB/Stdpid_e.pdf. In addition, controller may utilize a control algorithm in optimizing the viscosity of the coating asphalt. One embodiment of such a control algorithm which may be used in the present invention is shown inFIG. 3 . -
FIG. 2 illustrates an alternative embodiment wherein the wax is introduced incoater supply line 46 upstream of astatic mixer tube 82 disposed in thesupply line 46 at aninlet 84. Thestatic mixer tube 82 is preferably upstream ofviscosity gauge 56. If the inlet of thewax supply 84, thestatic mixer tube 82 andviscosity gauge 56 are in close proximity, then this configuration may provide a faster response time and reduce the duration of time that the viscosity may be out of a desired range, but a person of skill in the art would appreciate that care must be taken to ensure homogeneity of the coating asphalt mixture when using thestatic mixer tube 82. - The present asphalt
shingle coating system 10 is used to providecoater 48 with a supply of coating asphalt which has a relatively constant viscosity. This provides numerous benefits including increasing product uniformity, ensuring a consistent product quality, increasing material-use efficiency, and benefiting the proper operation of the coating machinery. In particular, the present asphaltshingle coating system 10 includes a variable and controlled introduction of wax into the coating asphalt mixture in response to the measured or actual viscosity of the coating asphalt in thecoater supply line 46 measured byviscosity gauge 56. - Raw asphalt and the granular filler are introduced into
horizontal mixer 18 where they are mixed together. The filled coating is then piped through filledcoating supply line 24 to avertical mixer 26. The operation of thevertical mixer 26 may allow for the homogenous mixing of the coating asphalt, which includes the base asphalt, aggregate filler (limestone), and other additives desired in the coating mixture. In one embodiment, wax may be selectively delivered intovertical mixer 26 to affect the viscosity of the coating asphalt mixture to thecoater 48.Vertical mixer 26 may also be used to mix the wax homogenously with the other ingredients of the coating asphalt. - The coating asphalt mixture flows out of the
vertical mixer 26 through thecoater supply line 46 tocoater 48.Coater asphalt pump 50 andmotor 52 ensure that the coating asphalt mixture is delivered to thecoater 48 in the desired quantity and rate. One or more gauges or sensors may be disposed incoater supply line 46 to measure various physical properties of the coating asphalt mixture for quality control or operational purposes. In particular,viscosity gauge 56 may measure the kinematic viscosity and/or dynamic viscosity of the coating asphalt mixture.Viscosity gauge 56 is in electronic communication withcontroller 80 whereincontroller 80 receives a signal fromviscosity gauge 56 corresponding to the desired viscosity measurements. -
Controller 80 compares the measured or actual viscosity to a desired or target viscosity to determine whether the viscosity of the coating asphalt mixture is within the desired range. If the viscosity is higher than the desired range,controller 80 estimates the amount of wax that needs to be added to the filled coating mixture and signals towax supply motor 42 ofwax pump 40 to increase the flow of wax and/or adjustwax valve 38 to add the desired volume of additional wax into the formulation. The additional wax may be added directly to thevertical mixer 26 or may be added into thecoater supply line 46 and incorporated into the mixture using astatic mixing tube 82.Controller 80 may record and analyze the cycles of individual adding of wax to optimize and learn how much wax needs to be added at various occurrences of the viscosity of the coating asphalt mixture being higher than the desired range. - In the event the viscosity measured by
viscosity gauge 56 is lower than the desired range, thencontroller 80 may similarly act to reduce the volume of wax being added to the filled coating mixture in eithervertical mixer 26 or thecoater supply line 46. Thus,controller 80 actively monitors the viscosity of the coating asphalt mixture and reacts in substantially real-time to increase or decrease the amount of wax added to the coating asphalt mixture based upon the measured viscosity. - The present asphalt
shingle coating system 10 may be used when the base coating asphalt mixture formulation to be used does not include wax and then exclusively adds wax as determined to decrease the viscosity. Alternatively, if the base coating asphalt mixture formulation already includes wax, the present system may be used to vary the proportionate quantity of wax in the mixture to create and maintain the desired viscosity. There are many factors which will be considered by a person of skill in the art with respect to the base formulations such as the initial quality of the base asphalt, the volume of filler, whether the base asphalt is blown, or whether additional admixtures are added to the asphalt mixture. Thus, once a base coating asphalt mixture is specified, the present asphaltshingle coating system 10 may be adapted as necessary and used to maintain the desired application viscosity using the addition of wax as described herein. - As shown in
FIG. 3 , one embodiment of a control algorithm which may be carried out by control system/controller 80 includesstep 100 of inputting a step or ramp function as an input signal incontroller 80. In step 102,controller 80 seeks to determine whether there is an error between the viscosity measured at the sensor and a target viscosity. Step 104 involvescontroller 80 determining if the measured viscosity is above the target viscosity. If the measured viscosity is below the target viscosity,controller 80 initiates step 106, which includes applying a negative proportional control constant “P” to reduce the wax pump's flow rate. Instep 108,controller 80 then determines if the resample time interval has elapsed. If not, thencontroller 80 continues performingstep 106. If the resample time interval has elapsed, thencontroller 80 moves to step 114 to again measure and/or determine if the viscosity is at target. - If in
step 104, it is determined that the measured viscosity is above the target viscosity, thencontroller 80 initiates step 110, which comprises applying a positive proportional control constant “P” to increase the wax pump's flow rate to decrease the viscosity. Instep 112,controller 80 then determines if the resample time interval has elapsed. If not, thencontroller 80 continues performingstep 110. If the resample time interval has elapsed, thencontroller 80 moves to step 114 to determine if the viscosity is at target. - If
controller 80 determines instep 114 that the system is not at target, then controller again performsstep 104 and adjusts the operation of the wax pump based on whether the measured viscosity is above or below the target. If, instep 114,controller 80 determines the system is at the target viscosity, thencontroller 80 moves to step 116 and maintains the wax pump flow rate. Instep 118,controller 80 then determines whether the resample interval has elapsed. If not, it keeps performingstep 116 of maintaining the wax pump flow rate. If the resample interval has elapsed,controller 80 again performs step 114 to determine whether the system is operating to deliver a coating asphalt that is at target viscosity. - The resample interval may be set to best optimize performance. In one embodiment, the interval is less than a second (in the milliseconds), and in another embodiment, the interval may be multiple minutes. This variable may be left to the discretion of the operator; however, it will be appreciated that the closer the interval, the less likelihood of the coating asphalt will be delivered to the coater outside of the target viscosity.
- As is evident from the foregoing description, certain aspects of the present invention are not limited to the particular details of the examples illustrated herein. It is therefore contemplated that other modifications and applications using other similar or related features or techniques will occur to those skilled in the art. It is accordingly intended that all such modifications, variations, and other uses and applications which do not depart from the spirit and scope of the present invention are deemed to be covered by the present invention.
- Other aspects, objects, and advantages of the present invention can be obtained from a study of the drawings, the disclosures, and the appended claims.
Claims (8)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/864,625 US20160090512A1 (en) | 2014-09-25 | 2015-09-24 | System and method for reducing viscosity variations in roofing asphalt |
| US16/599,612 US11186747B2 (en) | 2014-09-25 | 2019-10-11 | System and method for reducing viscosity variations in roofing asphalt |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462055465P | 2014-09-25 | 2014-09-25 | |
| US14/864,625 US20160090512A1 (en) | 2014-09-25 | 2015-09-24 | System and method for reducing viscosity variations in roofing asphalt |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/599,612 Continuation US11186747B2 (en) | 2014-09-25 | 2019-10-11 | System and method for reducing viscosity variations in roofing asphalt |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20160090512A1 true US20160090512A1 (en) | 2016-03-31 |
Family
ID=55539919
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/864,625 Abandoned US20160090512A1 (en) | 2014-09-25 | 2015-09-24 | System and method for reducing viscosity variations in roofing asphalt |
| US16/599,612 Active US11186747B2 (en) | 2014-09-25 | 2019-10-11 | System and method for reducing viscosity variations in roofing asphalt |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/599,612 Active US11186747B2 (en) | 2014-09-25 | 2019-10-11 | System and method for reducing viscosity variations in roofing asphalt |
Country Status (2)
| Country | Link |
|---|---|
| US (2) | US20160090512A1 (en) |
| CA (1) | CA2905679C (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160053119A1 (en) * | 2014-08-19 | 2016-02-25 | Atlas James Russell | System, method, apparatus, means, and computer program product for recycling asphalt shingles |
| CN105700442A (en) * | 2016-04-11 | 2016-06-22 | 长安大学 | Asphalt mixing station monitoring and management system based on IoT technology |
| CN106349723A (en) * | 2016-08-30 | 2017-01-25 | 北京东方雨虹防水技术股份有限公司 | Modified asphalt sizing material and preparation method thereof, as well as asphalt waterproof coiled material |
| US20170333858A1 (en) * | 2014-08-13 | 2017-11-23 | Ozbekogluith. Ihc. Ins. Muh. Ltd. Sti. | System For Analysis And Reuse Of Waste Liquids |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20190186140A1 (en) | 2017-12-15 | 2019-06-20 | Owens Corning Intellectual Capital, Llc | Polymer modified asphalt roofing material |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1466639A (en) * | 1922-05-09 | 1923-08-28 | Barber Asphalt Co | Mixing apparatus |
| US3632700A (en) * | 1970-03-23 | 1972-01-04 | Parke Davis & Co | Capsule production apparatus and method |
| US5465810A (en) * | 1994-10-07 | 1995-11-14 | Mobil Oil Corporation | Multi-phase lubricant and apparatus for the dispensing thereof |
| US20040110394A1 (en) * | 2002-12-09 | 2004-06-10 | International Business Machines Corporation | Method and apparatus for controlling coating thickness |
| US20100048771A1 (en) * | 2008-08-22 | 2010-02-25 | Osborn John D | Reclaimed asphalt pavement |
Family Cites Families (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2649384A (en) | 1950-05-15 | 1953-08-18 | Shell Dev | Asphalt composition and process of preparing the same |
| US2848429A (en) | 1956-05-24 | 1958-08-19 | Shell Dev | Asphalt compositions |
| US4456523A (en) | 1980-11-24 | 1984-06-26 | Ashland Oil, Inc. | Processes for producing high grade asphaltic materials from low grade bituminous materials and products resulting therefrom |
| US4397561A (en) * | 1981-05-11 | 1983-08-09 | William A. Strong | Slurry production system |
| US4497921A (en) | 1983-09-02 | 1985-02-05 | Allied Corporation | Sulfur stabilized oxidized polyolefin and asphalt composition |
| US4780146A (en) | 1986-07-30 | 1988-10-25 | Owens-Corning Fiberglas Corporation | Modified asphalt |
| US6130276A (en) | 1995-06-07 | 2000-10-10 | Owens Corning Fiberglas Technology, Inc. | Method of reducing fumes from a vessel of molten asphalt |
| US6120913A (en) | 1998-04-23 | 2000-09-19 | Shell Oil Company | Bituminous composition for shingles |
| FR2855523B1 (en) | 2003-05-28 | 2005-10-21 | Smac Acieroid | THERMOFUSIBLE BINDER FOR ASPHALTIC PRODUCT WITH REDUCED TEMPERATURE OF FABRICATION, AND APPLICATIONS OF THIS BINDER. |
| BRPI0618644A2 (en) | 2005-11-10 | 2016-11-22 | Shell Int Research | bitumen composition, asphalt composition, use of asphalt, and process for lowering the fraass point of a bitumen composition |
| NL2000192C2 (en) | 2006-08-23 | 2008-02-26 | Veenvoort B V De | Stable bitumen foam and its preparation and use. |
| US7951239B2 (en) | 2007-06-28 | 2011-05-31 | Owens Corning Intellectual Capital, Llc | Method of producing roofing shingle coating asphalt from non-coating grade asphalt |
| US7857904B2 (en) | 2007-06-28 | 2010-12-28 | Owens Corning Intellectual Capital, Llc | Process of producing roofing shingle coating asphalt |
| US7951240B2 (en) | 2007-06-28 | 2011-05-31 | Owens Corning Intellectual Capital, Llc | Process of producing roofing shingle coating asphalt allowing more material options |
| US8753442B2 (en) | 2007-06-28 | 2014-06-17 | Owens Corning Intellectual Capital, Llc | Roofing coating asphalt composition |
| MX314208B (en) | 2007-07-26 | 2013-10-14 | Akzo Nobel Nv | Adhesion and cohesion modifiers for asphalt. |
| US7815725B2 (en) | 2007-09-07 | 2010-10-19 | Alm Holding Co. | Warm asphalt binder compositions containing lubricating agents |
| EP2062943A1 (en) * | 2007-11-14 | 2009-05-27 | Akzo Nobel N.V. | Asphalt modifiers for "warm mix" applications including adhesion promoter |
| US20110233105A1 (en) | 2008-08-29 | 2011-09-29 | Billian I.P. Limited | Asphalt pellets |
| US8114927B1 (en) | 2008-11-25 | 2012-02-14 | Building Materials Investment Corp. | Asphalt emulsions, products made from asphalt emulsions, and processes for making fibrous mats from asphalt emulsions |
| US8034172B2 (en) | 2008-12-17 | 2011-10-11 | Foris Technologies, L.L.C. | Asphalt compositions and products comprising tall oil derived materials, and methods for making and using same |
| US8784554B2 (en) | 2009-03-08 | 2014-07-22 | Premnathan Naidoo | Asphalt modifiers, methods of modifying asphalt, asphalt compositions and methods of making |
| US9574350B2 (en) | 2009-03-20 | 2017-02-21 | Owens Corning Intellectual Capital, Llc | Sealant composition for releasable shingle |
| US8696806B2 (en) | 2009-05-01 | 2014-04-15 | Iowa State University Research Foundation, Inc. | Asphalt materials containing bio-oil and methods for production thereof |
| US8496196B2 (en) | 2009-07-31 | 2013-07-30 | Recycled Asphalt Shingle Technology | Asphalt material recycling system and method |
| EP2571968A1 (en) | 2010-05-21 | 2013-03-27 | H R D Corporation | Process for upgrading low value renewable oils |
| WO2011153152A2 (en) | 2010-06-01 | 2011-12-08 | Iowa State University Research Foundation, Inc. | Bio-oil formulation as an asphalt substitute |
| US9593211B2 (en) | 2011-07-29 | 2017-03-14 | Inaeris Technologies, Llc | Asphalt binder modifier composition |
| DE102011089510A1 (en) | 2011-11-16 | 2013-05-16 | W. Quandt Gmbh & Co. Kg Dachbahnen- Und Dachstoff-Fabrik | Polymer modified bituminous compound for a bituminous top layer of a roofing membrane, bituminous roofing membrane and fully recyclable roofing membrane |
| KR101310250B1 (en) | 2011-11-16 | 2013-09-24 | 금호석유화학 주식회사 | Asphalt compositions modified by styrenic block copolymer and vegetable wax |
| FR2994188B1 (en) | 2012-07-31 | 2015-09-25 | Lafarge Sa | BITUMINOUS MIXTURE WITHOUT VIRGIN BITUMEN BASED ON RECYCLED MATERIALS |
| US9631094B2 (en) | 2012-09-12 | 2017-04-25 | Honeywell International Inc. | Bitumen compositions and methods of making |
| US9068129B2 (en) | 2012-09-20 | 2015-06-30 | Exxonmobil Research And Engineering Company | Upgrading properties of asphalts with wax |
-
2015
- 2015-09-24 US US14/864,625 patent/US20160090512A1/en not_active Abandoned
- 2015-09-24 CA CA2905679A patent/CA2905679C/en active Active
-
2019
- 2019-10-11 US US16/599,612 patent/US11186747B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1466639A (en) * | 1922-05-09 | 1923-08-28 | Barber Asphalt Co | Mixing apparatus |
| US3632700A (en) * | 1970-03-23 | 1972-01-04 | Parke Davis & Co | Capsule production apparatus and method |
| US5465810A (en) * | 1994-10-07 | 1995-11-14 | Mobil Oil Corporation | Multi-phase lubricant and apparatus for the dispensing thereof |
| US20040110394A1 (en) * | 2002-12-09 | 2004-06-10 | International Business Machines Corporation | Method and apparatus for controlling coating thickness |
| US20100048771A1 (en) * | 2008-08-22 | 2010-02-25 | Osborn John D | Reclaimed asphalt pavement |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170333858A1 (en) * | 2014-08-13 | 2017-11-23 | Ozbekogluith. Ihc. Ins. Muh. Ltd. Sti. | System For Analysis And Reuse Of Waste Liquids |
| US10532336B2 (en) * | 2014-08-13 | 2020-01-14 | Ozbekoglu Ith. Ihc. Ins. Muh. Ltd. Sti. | System for analysis and reuse of waste liquids |
| US20160053119A1 (en) * | 2014-08-19 | 2016-02-25 | Atlas James Russell | System, method, apparatus, means, and computer program product for recycling asphalt shingles |
| US9951224B2 (en) * | 2014-08-19 | 2018-04-24 | Atlas James Russell | System, method, apparatus, means, and computer program product for recycling asphalt shingles |
| US10323149B2 (en) * | 2014-08-19 | 2019-06-18 | Atlas James Russell | System, method, apparatus, means, and computer program product for recycling asphalt shingles |
| CN105700442A (en) * | 2016-04-11 | 2016-06-22 | 长安大学 | Asphalt mixing station monitoring and management system based on IoT technology |
| CN106349723A (en) * | 2016-08-30 | 2017-01-25 | 北京东方雨虹防水技术股份有限公司 | Modified asphalt sizing material and preparation method thereof, as well as asphalt waterproof coiled material |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2905679C (en) | 2018-09-25 |
| US11186747B2 (en) | 2021-11-30 |
| US20200040220A1 (en) | 2020-02-06 |
| CA2905679A1 (en) | 2016-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11186747B2 (en) | System and method for reducing viscosity variations in roofing asphalt | |
| US12197238B2 (en) | Methods and systems for inline mixing of hydrocarbon liquids | |
| US12011697B2 (en) | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids | |
| CN113167632B (en) | Liquid flow meter calibration method | |
| JP6014588B2 (en) | Method for producing a liquid mixture | |
| CN110651232B (en) | Preparation systems for preparing formulations | |
| JP7098659B2 (en) | Production system for manufacturing formulations | |
| CA2249204C (en) | Oil injection apparatus and method for polymer processing | |
| US9904304B2 (en) | Viscosity feedback temperature control system | |
| US20070051832A1 (en) | Device and method for producing a foam material | |
| US12329165B2 (en) | System and method for batter mixing and application | |
| RU2841331C1 (en) | Automated system for controlling process of compounding viscous and high-viscosity oils | |
| CN106696111A (en) | Flow online automatic regulating system and method for silicone adhesive continuous production | |
| RU2849563C1 (en) | System for controlled blending of high-viscosity binary oils to obtain a mixture with specified properties | |
| CN106248525A (en) | The flow measurement device of a kind of accurate flow control and measuring method | |
| US12485389B2 (en) | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids | |
| JP2004337838A (en) | Method and device for feeding paint | |
| CA3066675C (en) | Measurement of a mass flow rate | |
| Esfahani et al. | A new slit-radial die for simultaneously measuring steady state shear viscosity and first normal stress difference of viscoelastic liquids via capillary rheometry | |
| CN113262711A (en) | Rice blending device and rice blending method | |
| JP2009213988A (en) | System and method for controlling concentration of coating material |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS, INC., MISSOURI Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HUMPHREYS, DAVID C.;REEL/FRAME:036651/0256 Effective date: 20140929 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS, INC., MISSOURI Free format text: CERTIFICATE OF CONVERSION;ASSIGNOR:TAMKO BUILDING PRODUCTS, INC.;REEL/FRAME:049234/0664 Effective date: 20190516 |
|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS, INC., MISSOURI Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE EXECUTION DATE PREVIOUSLY RECORDED ON REEL 049234 FRAME 0664. ASSIGNOR(S) HEREBY CONFIRMS THE CERTIFICATE OF CONVERSION;ASSIGNOR:TAMKO BUILDING PRODUCTS, INC.;REEL/FRAME:049261/0241 Effective date: 20190515 |
|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS LLC, MISSOURI Free format text: CHANGE OF NAME;ASSIGNOR:TAMKO BUILDING PRODUCTS, INC.;REEL/FRAME:049312/0691 Effective date: 20190515 |
|
| AS | Assignment |
Owner name: ROYAL BANK OF CANADA, AS CO-COLLATERAL AGENT, CANA Free format text: PATENT SECURITY AGREEMENT - ABL;ASSIGNOR:TAMKO BUILDING PRODUCTS LLC;REEL/FRAME:049411/0508 Effective date: 20190531 Owner name: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT, IL Free format text: PATENT SECURITY AGREEMENT - TL;ASSIGNOR:TAMKO BUILDING PRODUCTS LLC;REEL/FRAME:049411/0453 Effective date: 20190531 Owner name: ROYAL BANK OF CANADA, AS CO-COLLATERAL AGENT, CANADA Free format text: PATENT SECURITY AGREEMENT - ABL;ASSIGNOR:TAMKO BUILDING PRODUCTS LLC;REEL/FRAME:049411/0508 Effective date: 20190531 Owner name: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT, ILLINOIS Free format text: PATENT SECURITY AGREEMENT - TL;ASSIGNOR:TAMKO BUILDING PRODUCTS LLC;REEL/FRAME:049411/0453 Effective date: 20190531 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS, INC., MISSOURI Free format text: CORRECTED COVER SHEET, REEL/FRAME 049234/0664, CORRECTION TO EXECUTION DATE;ASSIGNOR:TAMKO BUILDING PRODUCTS, INC.;REEL/FRAME:061786/0553 Effective date: 20190515 |
|
| AS | Assignment |
Owner name: TAMKO BUILDING PRODUCTS LLC, KANSAS Free format text: ASSIGNEE CHANGE OF ADDRESS;ASSIGNOR:TAMKO BUILDING PRODUCTS LLC;REEL/FRAME:061880/0148 Effective date: 20200417 |