US20150321846A1 - Hydrogen cavern pad gas management - Google Patents
Hydrogen cavern pad gas management Download PDFInfo
- Publication number
- US20150321846A1 US20150321846A1 US14/272,669 US201414272669A US2015321846A1 US 20150321846 A1 US20150321846 A1 US 20150321846A1 US 201414272669 A US201414272669 A US 201414272669A US 2015321846 A1 US2015321846 A1 US 2015321846A1
- Authority
- US
- United States
- Prior art keywords
- storage volume
- trans
- underground storage
- casing
- depth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C1/00—Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
- F17C1/007—Underground or underwater storage
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G5/00—Storing fluids in natural or artificial cavities or chambers in the earth
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C7/00—Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/01—Pure fluids
- F17C2221/012—Hydrogen
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/01—Pure fluids
- F17C2221/013—Carbon dioxide
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/01—Pure fluids
- F17C2221/014—Nitrogen
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/01—Pure fluids
- F17C2221/016—Noble gases (Ar, Kr, Xe)
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/01—Pure fluids
- F17C2221/016—Noble gases (Ar, Kr, Xe)
- F17C2221/017—Helium
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/031—Air
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0107—Single phase
- F17C2223/0123—Single phase gaseous, e.g. CNG, GNC
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/03—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
- F17C2223/035—High pressure (>10 bar)
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/01—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
- F17C2225/0107—Single phase
- F17C2225/0123—Single phase gaseous, e.g. CNG, GNC
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/03—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
- F17C2225/035—High pressure, i.e. between 10 and 80 bars
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/03—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
- F17C2225/036—Very high pressure, i.e. above 80 bars
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/04—Indicating or measuring of parameters as input values
- F17C2250/0404—Parameters indicated or measured
- F17C2250/043—Pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/04—Indicating or measuring of parameters as input values
- F17C2250/0486—Indicating or measuring characterised by the location
- F17C2250/0491—Parameters measured at or inside the vessel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/06—Controlling or regulating of parameters as output values
- F17C2250/0605—Parameters
- F17C2250/0626—Pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0142—Applications for fluid transport or storage placed underground
- F17C2270/0144—Type of cavity
- F17C2270/0149—Type of cavity by digging cavities
- F17C2270/0152—Salt caverns
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0142—Applications for fluid transport or storage placed underground
- F17C2270/0144—Type of cavity
- F17C2270/0155—Type of cavity by using natural cavities
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/30—Hydrogen technology
- Y02E60/32—Hydrogen storage
Definitions
- Hydrogen is commonly supplied to customers that are connected to a supplier's hydrogen pipeline system.
- the hydrogen is manufactured by steam methane reforming in which a hydrocarbon such as methane and steam are reacted at high temperature in order to produce a synthesis gas containing hydrogen and carbon monoxide. Hydrogen may then be separated from the synthesis gas to produce a hydrogen product stream that is introduced into the pipeline system for distribution to customers that are connected to the pipeline system.
- hydrogen produced from the partial oxidation of a hydrocarbon can be recovered from a hydrogen rich stream.
- high pressure gases such as but not limited to nitrogen, air, carbon dioxide, hydrogen, helium, and argon
- a minimum volume of gas is stored in the cavern to provide adequate pressure to maintain the integrity of the cavern and prevent the cavern roof from collapsing and to keep the cavern walls from moving inward.
- This minimum volume of gas is called the pad gas or base gas.
- the amount of gas stored in addition to the pad gas or base gas volume is called the working gas or working inventory.
- Business opportunities can require removing more gas volume from the cavern than the working gas volume. To meet this business need, the volume of pad gas or base gas can be reduced to provide additional volume.
- the definition of high pressure is defined as a pressure at or above 10 atm.
- the definition of cavern integrity is defined as the ability of the cavern to hold static pressure when blocked in for 48 hours such that the cavern gas pressure does not decrease for 48 hours when all flows in and out of the cavern are stopped.
- the gas pad management method includes storing a first compressible fluid in an underground storage volume, determining a transient minimum operating pressure (P trans ) for said underground storage volume, measuring the pressure (P act ), of said underground storage volume, removing at least a portion of said first compressible fluid from said underground storage volume, concurrently, introducing an incompressible fluid into said underground storage volume, thereby producing a transient pressure condition, wherein the transient pressure condition is controlled by the flow rate of said incompressible fluid, such that P trans ⁇ P act .
- P trans transient minimum operating pressure
- the method may include an underground storage volume that is an underground salt cavern.
- the first compressible fluid may be selected from the group consisting of nitrogen, air, carbon dioxide, hydrogen, helium, and argon.
- the first compressible fluid may be hydrogen.
- the incompressible fluid may be selected from the group consisting of brine, water, or water slurry.
- the method may also include a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (D casing ), determining a transient pressure gradient (G trans ) for said underground storage volume, wherein P trans ⁇ D casing ⁇ G trans .
- the method may be such that 0.2 psi/ft of depth ⁇ G trans ⁇ 0.3 psi/ft of depth.
- the method may be such that 0.25 psi/ft of depth ⁇ G min .
- the incompressible fluid may not exceed a predetermined maximum flow rate (F max ).
- the predetermined maximum flow rate may be such that F max is 20 feet per second.
- a method of pad gas management in an underground storage volume comprising storing a first compressible fluid in an underground storage volume, determining a transient minimum operating pressure (P trans ) for said underground storage volume, measuring the pressure (P act ), of said underground storage volume, removing at least a portion of said first compressible fluid from said underground storage volume, wherein the maximum removal of said first compressible fluid is controlled such that P min ⁇ P act , and wherein said transient pressure condition has a duration (D) of less than a predetermined period of time.
- the duration of the transient period may be less than 7 days.
- the duration of the transient period may be less than 5 days.
- the safe operating pressure range for high pressure gas caverns is defined as the pressure between the minimum pressure and maximum pressure of the cavern.
- the minimum operating pressure is a function of the depth of the last cemented pipe casing shoe and the minimum pressure gradient, which is determined for the evaluation of the strength of the salt or rock formation and is typically of a value of 0.3 psi to 0.35 psi per foot of depth.
- the maximum operating pressure is a function of the depth of the last cemented pipe casing shoe and the maximum pressure gradient typically defined by regulatory statute and is typically of a value of 0.8 psi to 0.85 psi per foot of depth.
- liquid either brine, water or a combination of brine and water
- the cavern pressure is monitored by pressure indicators on the wellhead and piping. Liquid is pumped into the cavern and gas is withdrawn at rates that maintain the cavern pressure between the minimum and maximum safe operating pressures. The volume of liquid and gas moved into and out of the cavern are measured by flow meters.
- the maximum depth of pad gas or base gas that is stored in the cavern is determined by the depth of the brine casing and a weep hole that is cut into the brine casing 10 ft from the bottom opening.
- the weep hole can be triangular, round, square or other geometry. The weep hole allows gas to enter the brine casing as an indicator that the cavern is filled to the desired depth.
- This invention further claims that a cavern minimum pressure as low at 0.25 psi per foot of cemented casing depth can be maintained for a very short duration, typically 5 to 7 days. This very low pressure is brought back to the desired cavern operating range by injection of additional gas volume or by injection of additional liquid or by injection of both additional liquid and gas at the same time.
- a static pressure test may be necessary to ensure cavern integrity has been maintained.
- a cavern that does not demonstrate integrity in a static pressure test may require additional testing such as a gas—liquid interface test and/or sonar to demonstrate integrity.
- compressible fluid 103 is stored in underground storage volume 102 .
- Underground storage volume 102 may be a salt cavern, a depleted reservoir in an oil or gas field, an aquifer, or any system know to one skilled in the art.
- the underground storage volume 102 may have a first conduit 101 for admitting or removing the compressible fluid 103 .
- the underground storage volume 102 may contain an incompressible fluid 104 .
- Incompressible fluid 104 may be water, water slurry, brine, diesel, or any appropriate fluid known to one skilled in the art.
- the underground storage volume 102 may have a second conduit 105 from admitting or removing incompressible fluid 104 .
- first conduit 101 and/or second conduit 105 may be anchored into the surrounding rock formations by means of a cemented casing 106 .
- the depth of the casing from grade 107 to the limit of the cemented casing 106 is the depth of the casing D casing .
- a method of pad gas management in an underground storage volume is provided.
- Compressible fluid 103 is stored in underground storage volume 102 .
- Compressible fluid 103 may be nitrogen, air, carbon dioxide, hydrogen, helium, and argon.
- a transient minimum operating pressure (P trans ) is then determined for underground storage volume 102 .
- a transient pressure gradient (G trans ) is established for underground storage volume 102 , such that P trans ⁇ D casing ⁇ G trans .
- the actual pressure (P act ), of underground storage volume 102 is measured.
- compressible fluid 103 may be removed through conduit 101 .
- incompressible fluid 104 may be introduced into underground storage volume 102 through conduit 105 , thereby minimizing the resulting transient pressure condition.
- the transient pressure condition may be controlled by the flow rate of incompressible fluid 104 , such that P trans ⁇ P act .
- G trans may be such that 0.2 psi/ft of depth ⁇ G trans ⁇ 0.3 psi/ft of depth.
- G trans may be such that 0.25 psi/ft of depth ⁇ G min .
- the maximum flow rate of incompressible fluid 104 may not exceed a predetermined maximum flow rate (F max ). F max may not exceed 20 feet per second.
- incompressible fluid 104 may not be introduced into underground storage volume 102 through conduit 105 .
- the transient pressure condition may then be controlled by the flow rate of compressible fluid 103 , such that P trans ⁇ P act .
- G trans may be such that 0.2 psi/ft of depth ⁇ G trans ⁇ 0.3 psi/ft of depth.
- G trans may be such that 0.25 psi/ft of depth ⁇ G min .
- the transient pressure condition in the embodiment where no incompressible fluid is introduced to minimize the transient pressure may have a duration (D) of less than a predetermined period of time.
- the duration of the transient pressure condition (D) may be less than 7 days, preferably less than 5 days.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
A method of pad gas management in an underground storage volume including storing a first compressible fluid, determining a transient minimum operating pressure (Ptrans), measuring the pressure (Pact), removing at least a portion of the first compressible fluid, concurrently, introducing an incompressible fluid, thereby producing a transient pressure condition controlled by the flow rate of the incompressible fluid, such that Ptrans<Pact. The method may also include a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (Dcasing), determining a transient pressure gradient (Gtrans) for the underground storage volume, wherein Ptrans<Dcasing×Gtrans. The maximum removal of the first compressible fluid is controlled such that Pmin<Pact, and wherein the transient pressure condition has a duration (D) of less than 7 days, more preferably less than 5 days.
Description
- Hydrogen is commonly supplied to customers that are connected to a supplier's hydrogen pipeline system. Typically, the hydrogen is manufactured by steam methane reforming in which a hydrocarbon such as methane and steam are reacted at high temperature in order to produce a synthesis gas containing hydrogen and carbon monoxide. Hydrogen may then be separated from the synthesis gas to produce a hydrogen product stream that is introduced into the pipeline system for distribution to customers that are connected to the pipeline system. Alternatively, hydrogen produced from the partial oxidation of a hydrocarbon can be recovered from a hydrogen rich stream.
- Typically, hydrogen is supplied to customers under agreements that require availability and reliability for the steam methane reformer or hydrogen recovery plant. When a steam methane reformer is taken off-line for unplanned or extended maintenance, the result could be a violation of such agreements. Additionally, there are instances in which customer demand can exceed hydrogen production capacity of existing plants in the short term. Having a storage facility to supply back-up hydrogen to the pipeline supply is therefore desirable in connection with hydrogen pipeline operations.
- Considering that hydrogen production plants on average have production capacities that are roughly 50 million standard cubic feet per day, a storage facility for hydrogen that would allow a plant to be taken off-line, to be effective, would need to have storage capacity in the order of 1 billion standard cubic feet or greater.
- In order to provide this large storage capacity, high pressure gases, such as but not limited to nitrogen, air, carbon dioxide, hydrogen, helium, and argon, are stored in caverns, whether leached in salt formations or created by hard rock mining. A minimum volume of gas is stored in the cavern to provide adequate pressure to maintain the integrity of the cavern and prevent the cavern roof from collapsing and to keep the cavern walls from moving inward. This minimum volume of gas is called the pad gas or base gas. The amount of gas stored in addition to the pad gas or base gas volume is called the working gas or working inventory. Business opportunities can require removing more gas volume from the cavern than the working gas volume. To meet this business need, the volume of pad gas or base gas can be reduced to provide additional volume. For the purpose of this invention, the definition of high pressure is defined as a pressure at or above 10 atm. For the purpose of this invention, the definition of cavern integrity is defined as the ability of the cavern to hold static pressure when blocked in for 48 hours such that the cavern gas pressure does not decrease for 48 hours when all flows in and out of the cavern are stopped.
- A method of pad gas management in an underground storage volume is provided. In one embodiment of the present invention, the gas pad management method includes storing a first compressible fluid in an underground storage volume, determining a transient minimum operating pressure (Ptrans) for said underground storage volume, measuring the pressure (Pact), of said underground storage volume, removing at least a portion of said first compressible fluid from said underground storage volume, concurrently, introducing an incompressible fluid into said underground storage volume, thereby producing a transient pressure condition, wherein the transient pressure condition is controlled by the flow rate of said incompressible fluid, such that Ptrans<Pact.
- The method may include an underground storage volume that is an underground salt cavern. The first compressible fluid may be selected from the group consisting of nitrogen, air, carbon dioxide, hydrogen, helium, and argon. The first compressible fluid may be hydrogen. The incompressible fluid may be selected from the group consisting of brine, water, or water slurry.
- The method may also include a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (Dcasing), determining a transient pressure gradient (Gtrans) for said underground storage volume, wherein Ptrans<Dcasing×Gtrans.
- The method may be such that 0.2 psi/ft of depth<Gtrans<0.3 psi/ft of depth. The method may be such that 0.25 psi/ft of depth<Gmin. The incompressible fluid may not exceed a predetermined maximum flow rate (Fmax). The predetermined maximum flow rate may be such that Fmax is 20 feet per second.
- In another embodiment of the present invention, a method of pad gas management in an underground storage volume is provided, comprising storing a first compressible fluid in an underground storage volume, determining a transient minimum operating pressure (Ptrans) for said underground storage volume, measuring the pressure (Pact), of said underground storage volume, removing at least a portion of said first compressible fluid from said underground storage volume, wherein the maximum removal of said first compressible fluid is controlled such that Pmin<Pact, and wherein said transient pressure condition has a duration (D) of less than a predetermined period of time. The duration of the transient period may be less than 7 days. The duration of the transient period may be less than 5 days.
- Illustrative embodiments of the invention are described below. While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof have been shown by way of example in the drawings and are herein described in detail. It should be understood, however, that the description herein of specific embodiments is not intended to limit the invention to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
- It will of course be appreciated that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the developer's specific goals, such as compliance with system-related and business-related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time-consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of this disclosure.
- The safe operating pressure range for high pressure gas caverns is defined as the pressure between the minimum pressure and maximum pressure of the cavern. The minimum operating pressure is a function of the depth of the last cemented pipe casing shoe and the minimum pressure gradient, which is determined for the evaluation of the strength of the salt or rock formation and is typically of a value of 0.3 psi to 0.35 psi per foot of depth. The maximum operating pressure is a function of the depth of the last cemented pipe casing shoe and the maximum pressure gradient typically defined by regulatory statute and is typically of a value of 0.8 psi to 0.85 psi per foot of depth.
- In one embodiment of the present invention, it is claimed that to maintain the cavern at a safe minimum operating pressure while removing pad gas or base gas, liquid, either brine, water or a combination of brine and water, is pumped into the cavern. The cavern pressure is monitored by pressure indicators on the wellhead and piping. Liquid is pumped into the cavern and gas is withdrawn at rates that maintain the cavern pressure between the minimum and maximum safe operating pressures. The volume of liquid and gas moved into and out of the cavern are measured by flow meters.
- This invention further claims that the maximum depth of pad gas or base gas that is stored in the cavern is determined by the depth of the brine casing and a weep hole that is cut into the brine casing 10 ft from the bottom opening. The weep hole can be triangular, round, square or other geometry. The weep hole allows gas to enter the brine casing as an indicator that the cavern is filled to the desired depth.
- This invention further claims that a cavern minimum pressure as low at 0.25 psi per foot of cemented casing depth can be maintained for a very short duration, typically 5 to 7 days. This very low pressure is brought back to the desired cavern operating range by injection of additional gas volume or by injection of additional liquid or by injection of both additional liquid and gas at the same time.
- After operation of a cavern at very low pressures, a static pressure test may be necessary to ensure cavern integrity has been maintained. A cavern that does not demonstrate integrity in a static pressure test may require additional testing such as a gas—liquid interface test and/or sonar to demonstrate integrity.
- Turning to
FIG. 1 ,compressible fluid 103 is stored inunderground storage volume 102.Underground storage volume 102 may be a salt cavern, a depleted reservoir in an oil or gas field, an aquifer, or any system know to one skilled in the art. Theunderground storage volume 102 may have afirst conduit 101 for admitting or removing thecompressible fluid 103. Theunderground storage volume 102 may contain anincompressible fluid 104.Incompressible fluid 104 may be water, water slurry, brine, diesel, or any appropriate fluid known to one skilled in the art. Theunderground storage volume 102 may have asecond conduit 105 from admitting or removingincompressible fluid 104. - As the underground storage volume may be at a considerable depth below
grade 107, the nominally vertical portions offirst conduit 101 and/orsecond conduit 105 may be anchored into the surrounding rock formations by means of a cementedcasing 106. The depth of the casing fromgrade 107 to the limit of the cementedcasing 106 is the depth of the casing Dcasing. - In one embodiment of the present invention, a method of pad gas management in an underground storage volume is provided.
Compressible fluid 103 is stored inunderground storage volume 102.Compressible fluid 103 may be nitrogen, air, carbon dioxide, hydrogen, helium, and argon. A transient minimum operating pressure (Ptrans) is then determined forunderground storage volume 102. A transient pressure gradient (Gtrans) is established forunderground storage volume 102, such that Ptrans<Dcasing×Gtrans. The actual pressure (Pact), ofunderground storage volume 102 is measured. - During normal operation of
underground storage volume 102, at least a portion ofcompressible fluid 103 may be removed throughconduit 101. Concurrently,incompressible fluid 104 may be introduced intounderground storage volume 102 throughconduit 105, thereby minimizing the resulting transient pressure condition. - The transient pressure condition may be controlled by the flow rate of
incompressible fluid 104, such that Ptrans<Pact. Gtrans may be such that 0.2 psi/ft of depth<Gtrans<0.3 psi/ft of depth. Gtrans may be such that 0.25 psi/ft of depth<Gmin. The maximum flow rate ofincompressible fluid 104 may not exceed a predetermined maximum flow rate (Fmax). Fmax may not exceed 20 feet per second. - In another embodiment of the present invention
incompressible fluid 104 may not be introduced intounderground storage volume 102 throughconduit 105. The transient pressure condition may then be controlled by the flow rate ofcompressible fluid 103, such that Ptrans<Pact. Gtrans may be such that 0.2 psi/ft of depth<Gtrans<0.3 psi/ft of depth. Gtrans may be such that 0.25 psi/ft of depth<Gmin. The transient pressure condition in the embodiment where no incompressible fluid is introduced to minimize the transient pressure, may have a duration (D) of less than a predetermined period of time. The duration of the transient pressure condition (D) may be less than 7 days, preferably less than 5 days.
Claims (19)
1. A method of pad gas management in an underground storage volume, comprising:
storing a first compressible fluid in an underground storage volume,
determining a transient minimum operating pressure (Ptrans) for said underground storage volume,
measuring the pressure (Pact), of said underground storage volume,
removing at least a portion of said first compressible fluid from said underground storage volume,
concurrently, introducing an incompressible fluid into said underground storage volume, thereby producing a transient pressure condition,
wherein the transient pressure condition is controlled by the flow rate of said incompressible fluid, such that Ptrans<Pact.
2. The method of claim 1 , wherein said underground storage volume is an underground salt cavern.
3. The method of claim 1 , wherein said first compressible fluid is selected from the group consisting of nitrogen, air, carbon dioxide, hydrogen, helium, and argon.
4. The method of claim 3 , wherein said first compressible fluid is hydrogen.
5. The method of claim 1 , wherein said incompressible fluid is selected from the group consisting of brine, water, or water slurry.
6. The method of claim 1 , further comprising;
a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (Dcasing),
determining a transient pressure gradient (Gtrans) for said underground storage volume,
wherein Ptrans<Dcasing×Gtrans.
7. The method of claim 6 , wherein 0.2 psi/ft of depth<Gtrans<0.3 psi/ft of depth.
8. The method of claim 7 , wherein 0.25 psi/ft of depth<Gmin.
9. The method of claim 1 , wherein said incompressible fluid does not exceed a predetermined maximum flow rate (Fmax).
10. The method of claim 9 , wherein Fmax is 20 feet per second.
11. A method of pad gas management in an underground storage volume, comprising:
storing a first compressible fluid in an underground storage volume,
determining a transient minimum operating pressure (Ptrans) for said underground storage volume,
measuring the pressure (Pact), of said underground storage volume,
removing at least a portion of said first compressible fluid from said underground storage volume,
wherein the maximum removal of said first compressible fluid is controlled such that Pmin<Pact, and
wherein said transient pressure condition has a duration (D) of less than a predetermined period of time.
12. The method of claim 11 , wherein said underground storage volume is an underground salt cavern.
13. The method of claim 11 , wherein said first compressible fluid is selected from the group consisting of nitrogen, air, carbon dioxide, hydrogen, helium, and argon.
14. The method of claim 13 , wherein said first compressible fluid is hydrogen.
15. The method of claim 11 , further comprising;
a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (Dcasing),
determining a transient pressure gradient (Gtrans) for said underground storage volume,
wherein Ptrans<Dcasing×Gtrans.
16. The method of claim 15 , wherein 0.2 psi/ft of depth<Gtrans<0.3 psi/ft of depth.
17. The method of claim 16 , wherein 0.25 psi/ft of depth<Gmin.
18. The method of claim 11 , wherein D is less than 7 days.
19. The method of claim 18 , wherein D is less than 5 days.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/272,669 US20150321846A1 (en) | 2014-05-08 | 2014-05-08 | Hydrogen cavern pad gas management |
| US14/468,531 US9656807B2 (en) | 2014-05-08 | 2014-08-26 | Hydrogen cavern pad gas management |
| EP15723805.6A EP3140585B1 (en) | 2014-05-08 | 2015-05-07 | Hydrogen cavern pad gas management |
| PCT/US2015/029646 WO2015171867A1 (en) | 2014-05-08 | 2015-05-07 | Hydrogen cavern pad gas management |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/272,669 US20150321846A1 (en) | 2014-05-08 | 2014-05-08 | Hydrogen cavern pad gas management |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/468,531 Continuation US9656807B2 (en) | 2014-05-08 | 2014-08-26 | Hydrogen cavern pad gas management |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20150321846A1 true US20150321846A1 (en) | 2015-11-12 |
Family
ID=54367182
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/272,669 Abandoned US20150321846A1 (en) | 2014-05-08 | 2014-05-08 | Hydrogen cavern pad gas management |
| US14/468,531 Expired - Fee Related US9656807B2 (en) | 2014-05-08 | 2014-08-26 | Hydrogen cavern pad gas management |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/468,531 Expired - Fee Related US9656807B2 (en) | 2014-05-08 | 2014-08-26 | Hydrogen cavern pad gas management |
Country Status (3)
| Country | Link |
|---|---|
| US (2) | US20150321846A1 (en) |
| EP (1) | EP3140585B1 (en) |
| WO (1) | WO2015171867A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2667708C1 (en) * | 2017-09-01 | 2018-09-24 | Александр Юрьевич Климентьев | Helium storage |
| US11680466B2 (en) | 2021-02-08 | 2023-06-20 | TerraH2 LLC | Hydrogen storage and recovery with fracture monitoring |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9669997B2 (en) * | 2015-04-25 | 2017-06-06 | James N. McCoy | Method for determining the profile of an underground hydrocarbon storage cavern |
| IL249007B (en) * | 2016-11-16 | 2018-01-31 | Or Yogev | System for storing compressed gas and method for construction thereof |
| US10215024B1 (en) * | 2017-02-08 | 2019-02-26 | Air Liquide Large Industries U.S. Lp | System for forming and maintaining a fundamentally impervious boundary in a salt cavern for storing very pure hydrogen |
| US11180318B1 (en) * | 2017-02-08 | 2021-11-23 | Air Liquide Large Industries U.S. Lp | Method and system for selecting and using a salt cavern to store very pure hydrogen |
| US11167927B1 (en) * | 2017-02-08 | 2021-11-09 | Air Liquide Large Industries U.S. Lp | Method for storing very high purity hydrogen in a salt cavern |
| US12281542B2 (en) * | 2020-10-13 | 2025-04-22 | Adantek Waste Management Services, Inc. | Subterranean sequestration of low-density organic wastes |
| US12320244B2 (en) | 2023-09-14 | 2025-06-03 | NeuVentus, LLC | Methods and systems for storing hydrogen in a salt cavern |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130315669A1 (en) * | 2012-05-25 | 2013-11-28 | Rommel M. Oates | Method and system for storing hydrogen in a salt cavern with a permeation barrier |
Family Cites Families (61)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1923896A (en) | 1931-11-10 | 1933-08-22 | Edward N Trump | Mining soluble salt |
| US2009534A (en) | 1933-08-12 | 1935-07-30 | Edward N Trump | System for mining a soluble |
| US2073053A (en) | 1934-12-22 | 1937-03-09 | Standard Oil Co | Pressure vessels for use at low temperatures |
| US2229140A (en) | 1939-12-20 | 1941-01-21 | Republic Steel Corp | Abnormal steel |
| US2284869A (en) | 1940-02-27 | 1942-06-02 | Frank J Hinderliter | Blowout preventer |
| US2346392A (en) | 1941-11-15 | 1944-04-11 | Edward J Protin | Well casing and method of making it |
| US2402862A (en) | 1943-03-25 | 1946-06-25 | Nat Tube Co | Well casing |
| US2878165A (en) | 1953-11-16 | 1959-03-17 | Phillips Petroleum Co | Ammonia storage and recovery system |
| US2787455A (en) | 1955-03-29 | 1957-04-02 | Gulf Oil Corp | Method for developing cavities in salt or other soluble rock |
| US3056265A (en) * | 1958-06-16 | 1962-10-02 | Phillips Petroleum Co | Underground storage |
| US3148000A (en) | 1962-02-28 | 1964-09-08 | Pittsburgh Plate Glass Co | Solution mining of potassium chloride |
| US3289609A (en) | 1964-02-20 | 1966-12-06 | Signal Oil & Gas Co | Liquid recovery |
| US3438203A (en) | 1967-08-08 | 1969-04-15 | Shell Oil Co | Method of removing hydrocarbons from salt caverns |
| US3848427A (en) | 1971-03-01 | 1974-11-19 | R Loofbourow | Storage of gas in underground excavation |
| DE2126823C3 (en) * | 1971-05-29 | 1975-09-11 | Edeleanu Gmbh, 6000 Frankfurt | Process for the storage and recovery of gases soluble in hydrocarbons |
| US4342911A (en) | 1979-12-28 | 1982-08-03 | French Lewis L | Focused nuclear interface survey instrument and method of determining density changes in mining and storage wells |
| US4365978A (en) | 1980-03-25 | 1982-12-28 | Shell Oil Company | Storage of liquid hydrocarbons in salt dome caverns |
| US4538414A (en) | 1982-02-17 | 1985-09-03 | Bbc Brown, Boveri & Company Limited | Apparatus for preventing blowing out of the water supply of constant pressure air storage installations of gas turbine power plants |
| US4377397A (en) | 1982-02-24 | 1983-03-22 | Standard Havens, Inc. | Baghouse with on-line maintenance capability |
| US4422859A (en) | 1982-05-24 | 1983-12-27 | Consolidated Technology Corporation | Apparatus and method for safely purifying hydrogen gas |
| US4592677A (en) | 1984-03-21 | 1986-06-03 | Phillips Petroleum Company | Desiccant bed on hydrocarbon charged to and removed from underground (salt) cavern |
| US4616669A (en) | 1985-04-08 | 1986-10-14 | Phillips Petroleum Company | Mixing fluids |
| US4632601A (en) | 1985-11-01 | 1986-12-30 | Kuwada James T | System and method for disposal of noncondensable gases from geothermal wells |
| US4720995A (en) | 1986-04-09 | 1988-01-26 | Phillips Petroleum Company | Method of determining the volume of a section of an underground cavity |
| US4789101A (en) | 1987-03-04 | 1988-12-06 | Spectrum Manufacturing Company, Inc. | Water-driven oscillating monitor |
| FR2624410B1 (en) | 1987-12-11 | 1992-12-04 | Geostock | PROCESS FOR THE SUBTERRANEAN CONTAINMENT OF WASTE IN A HOLLOW-LUCKY CAVITY |
| US5336083A (en) | 1991-02-22 | 1994-08-09 | Rajewski Robert K | Detonation arrestor with cooling section and quenching section |
| US5246273A (en) | 1991-05-13 | 1993-09-21 | Rosar Edward C | Method and apparatus for solution mining |
| US5869592A (en) | 1991-08-19 | 1999-02-09 | Maxdem Incorporated | Macromonomers having reactive side groups |
| US5333465A (en) | 1992-04-30 | 1994-08-02 | Mcbride Terry R | Underground storage system for natural gas |
| US5207530A (en) | 1992-07-29 | 1993-05-04 | Halliburton Company | Underground compressed natural gas storage and service system |
| US5431482A (en) | 1993-10-13 | 1995-07-11 | Sandia Corporation | Horizontal natural gas storage caverns and methods for producing same |
| US5511905A (en) | 1993-10-26 | 1996-04-30 | Pb-Kbb, Inc. | Direct injection of cold fluids into a subterranean cavern |
| US5486811A (en) | 1994-02-09 | 1996-01-23 | The United States Of America As Represented By The Secretary Of The Navy | Fire detection and extinguishment system |
| US5957539A (en) | 1996-07-19 | 1999-09-28 | Gaz De France (G.D.F.) Service National | Process for excavating a cavity in a thin salt layer |
| HUP9800578A1 (en) | 1998-03-16 | 1999-11-29 | István Szakály | Process and apparatus for eliminating filling and evaporation loss of volatile materials storaged in tank, and for protection of corrosion of the storaged product and tank |
| US6412508B1 (en) | 2000-01-12 | 2002-07-02 | Resource Llc | Natural gas pipe storage facility |
| DE10006262B4 (en) | 2000-02-12 | 2005-12-01 | Dürr Ecoclean GmbH | Magnetic separator |
| DE10117617A1 (en) | 2001-04-07 | 2002-10-10 | Ruhrgas Ag | System for storing fluid in underground hollow chamber comprises storage chamber for displacement fluid formed as underground hollow chamber |
| US6581618B2 (en) | 2001-05-25 | 2003-06-24 | Canatxx Energy, L.L.C. | Shallow depth, low pressure gas storage facilities and related methods of use |
| US6582025B2 (en) | 2001-08-03 | 2003-06-24 | Crescent Technology, Inc. | Sulfur storage method |
| TWI290177B (en) | 2001-08-24 | 2007-11-21 | Nippon Steel Corp | A steel sheet excellent in workability and method for producing the same |
| US7451605B2 (en) | 2001-12-19 | 2008-11-18 | Conversion Gas Imports, L.P. | LNG receiving terminal that primarily uses compensated salt cavern storage and method of use |
| US6840709B2 (en) | 2003-01-13 | 2005-01-11 | David Fred Dahlem | Distributed natural gas storage system(s) using oil & gas & other well(s) |
| US7097386B2 (en) | 2003-11-13 | 2006-08-29 | Freeport-Mcmoran Energy Llc | Simultaneous development of underground caverns and deposition of materials |
| US7152675B2 (en) | 2003-11-26 | 2006-12-26 | The Curators Of The University Of Missouri | Subterranean hydrogen storage process |
| US7078011B2 (en) | 2004-03-30 | 2006-07-18 | Praxair Technology, Inc. | Method of storing and supplying hydrogen to a pipeline |
| CN101133229A (en) | 2004-08-11 | 2008-02-27 | 亿万奇环球技术公司 | Expandable tubular member with variable material properties |
| US7722289B2 (en) | 2004-12-08 | 2010-05-25 | Casella Waste Systems, Inc. | Systems and methods for underground storage of biogas |
| WO2008091373A2 (en) | 2006-07-20 | 2008-07-31 | Dq Holdings, Llc | Container for transport and storage for compressed natural gas |
| US7905251B2 (en) | 2006-12-29 | 2011-03-15 | Saudi Arabian Oil Company | Method for wellhead high integrity protection system |
| GB0810365D0 (en) | 2008-06-06 | 2008-07-09 | Portland Gas Plc | Gas storage method & system |
| EP2321497B1 (en) | 2008-08-01 | 2017-06-14 | Solvay Chemicals, Inc. | Traveling undercut solution mining systems and methods |
| US8171996B2 (en) | 2009-04-29 | 2012-05-08 | Vetco Gray Inc. | Wellhead system having a tubular hanger securable to wellhead and method of operation |
| US8347629B2 (en) | 2009-10-30 | 2013-01-08 | General Electric Company | System and method for reducing moisture in a compressed air energy storage system |
| US8425149B2 (en) * | 2010-06-10 | 2013-04-23 | Praxair Technology, Inc. | Hydrogen storage method and system |
| WO2012097216A1 (en) | 2011-01-14 | 2012-07-19 | General Compression, Inc. | Compressed gas storage and recovery system and method of operation systems |
| US8814133B2 (en) | 2011-06-23 | 2014-08-26 | General Equipment And Manufacturing Company, Inc. | Automatic speed searching device and method for a partial stroke test of a control valve |
| US8950419B2 (en) | 2012-02-16 | 2015-02-10 | Praxair Technology, Inc. | Hydrogen supply method and system |
| WO2013173709A1 (en) | 2012-05-18 | 2013-11-21 | General Compression, Inc. | Excavated underground caverns for fluid storage |
| BR102012013521B1 (en) | 2012-06-05 | 2020-09-15 | Mosaic Fertilizantes P&K Ltda | METHOD OF EXPLORING POTASSIUM SALTS FROM AN UNDERGROUND DEPOSIT |
-
2014
- 2014-05-08 US US14/272,669 patent/US20150321846A1/en not_active Abandoned
- 2014-08-26 US US14/468,531 patent/US9656807B2/en not_active Expired - Fee Related
-
2015
- 2015-05-07 EP EP15723805.6A patent/EP3140585B1/en active Active
- 2015-05-07 WO PCT/US2015/029646 patent/WO2015171867A1/en not_active Ceased
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130315669A1 (en) * | 2012-05-25 | 2013-11-28 | Rommel M. Oates | Method and system for storing hydrogen in a salt cavern with a permeation barrier |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2667708C1 (en) * | 2017-09-01 | 2018-09-24 | Александр Юрьевич Климентьев | Helium storage |
| US11680466B2 (en) | 2021-02-08 | 2023-06-20 | TerraH2 LLC | Hydrogen storage and recovery with fracture monitoring |
| US11959364B2 (en) | 2021-02-08 | 2024-04-16 | TerraH2 LLC | Hydrogen production, storage and recovery |
| US12366138B2 (en) | 2021-02-08 | 2025-07-22 | TerraH2 LLC | Hydrogen production, storage and recovery |
| US12467341B2 (en) | 2021-02-08 | 2025-11-11 | TerraH2 LLC | Hydrogen production, storage and recovery |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3140585B1 (en) | 2023-08-23 |
| US9656807B2 (en) | 2017-05-23 |
| US20150321848A1 (en) | 2015-11-12 |
| EP3140585A1 (en) | 2017-03-15 |
| WO2015171867A1 (en) | 2015-11-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3140585B1 (en) | Hydrogen cavern pad gas management | |
| EP3140587B1 (en) | Gas storage refill and dewatering | |
| EP2580156B2 (en) | Hydrogen storage method | |
| US9322253B2 (en) | Method for production of hydrocarbons using caverns | |
| CN110837116A (en) | Method for determining operation upper limit pressure of salt cavern gas storage | |
| US9573762B2 (en) | Cavern pressure management | |
| US20160138377A1 (en) | Solution mining under an inert gas | |
| US20160355342A1 (en) | Cavern pressure management | |
| Aminian et al. | Natural gas storage engineering | |
| US12320244B2 (en) | Methods and systems for storing hydrogen in a salt cavern | |
| Molyneux et al. | Atlantic and Cromarty–A hydrate blockage and remediation case study | |
| Gilbert et al. | Post-shutdown recovery behavior of horizontal coalbed methane wells in the Bowen Basin | |
| Kuiekem et al. | Simulation Of Underground Liqufied Petroleum Gas (LPG) Storage In A Depleted Field | |
| Hill et al. | Steady-state, and interrupted, production through a deep water black oil system | |
| Mollayev et al. | Innovative Completion Clean-Up Design and Execution for Shah Deniz Stage 2 Development Project | |
| Michael et al. | The new system equation for determining the quantity of gas loss from an underground natural gas storage system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: AIR LIQUIDE LARGE INDUSTRIES U.S. LP, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:STRYBOS, RONALD;DONY, AZY;REEL/FRAME:032972/0222 Effective date: 20140520 |
|
| AS | Assignment |
Owner name: AIR LIQUIDE LARGE INDUSTRIES U.S. LP, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DONY, AZADEH;REEL/FRAME:033361/0886 Effective date: 20140711 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |