US20140328316A1 - Rate Capping with Multiple Carrier Aggregation Schedulers - Google Patents

Rate Capping with Multiple Carrier Aggregation Schedulers Download PDF

Info

Publication number
US20140328316A1
US20140328316A1 US14/370,264 US201214370264A US2014328316A1 US 20140328316 A1 US20140328316 A1 US 20140328316A1 US 201214370264 A US201214370264 A US 201214370264A US 2014328316 A1 US2014328316 A1 US 2014328316A1
Authority
US
United States
Prior art keywords
user equipment
limits
scheduling
requests
cells
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/370,264
Inventor
Mieszko Chmiel
Hans Kroener
Robert Buranyi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nokia Solutions and Networks Oy
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to NOKIA SOLUTIONS AND NETWORKS OY reassignment NOKIA SOLUTIONS AND NETWORKS OY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BURANYI, Robert, KROENER, HANS, CHMIEL, MIESZKO
Publication of US20140328316A1 publication Critical patent/US20140328316A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • H04W72/1205
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling

Definitions

  • the present invention relates to carrier aggregation in cellular communication network systems.
  • the invention relates to rate capping when multiple schedulers perform carrier aggregation, also known as cell aggregation.
  • Carrier aggregation allows increasing transmission/reception bandwidth by aggregating component carriers. Prominent benefits of carrier aggregation include increased peak data rates, possibility to aggregate fragmented spectrum and fast load balancing.
  • FIG. 1 shows an eNodeB architecture for DL CA with separate coordinated DL-schedulers included in a P-cell and an S-cell of a user equipment in a cellular communications system.
  • PDCP and RLC layers in the P-cell (or S-cell) generate PDCP PDU(s) from radio bearer(s) and RLC PDU(s) from PDCP PDU(s), respectively.
  • MAC layers in the P-cell and the S-cell generate MAC PDU(s) from RLC PDU(s) based on scheduling decisions concerning carrier aggregation, and the generated MAC PDU(s) are forwarded to the PHY layers of the P-cell and the S-cell.
  • the DL-schedulers of the P-cell and the S-cell communicate with each other and with the MAC layers of the P-cell and the S-cell.
  • the total allocated resources might exceed an amount of data in a UE buffer, or some other implementation or operator-specific limit, that can be transmitted in this TTI.
  • a maximum number of DL/UL-SCH transport block bits received/transmitted within a TTI (in all TBs) and a maximum number of bits of a DL/UL-SCH transport block received/transmitted within a TTI are specified in reference [1].
  • UE category 3 is specified as follows:
  • any UE category can support carrier aggregation.
  • the limit of the number of bits per single TB i.e. maximum number of bits of a DL-SCH transport block received within a TTI
  • the total number of bits in all TBs can be exceeded because each cell can allocate additional TB(s).
  • each cell allocates the TB of 75376 bits, the TB size is within the UE category 3, but the total number of bits in all TBs exceeds the UE category.
  • a scheduling metric is calculated by the separate DL-schedulers per cell considering MC and SC UEs, the DL-schedulers coordinate with each other to ensure fairness across MC and SC UEs.
  • one common priority list is constructed, e.g. MC UEs can be included multiple times in the list, for the purpose of resource allocation. If due to scheduling on multiple cells a MC UE reaches its rate limit, e.g. due to limited data in the buffer, another UE from the list can be scheduled and loss/error, e.g. due to a MC UE being allocated too much resources, is avoided.
  • this solution is not applicable to a two-dimensional time-frequency scheduling, i.e. the frequency domain scheduling cannot be done multiple times due eNB processing time constraints.
  • the UEs that were not allocated frequency domain resources cannot be scheduled again if for some reason some resources are freed after frequency domain scheduling, e.g. due to PDCCH blocking.
  • the present invention aims at overcoming the above-described problem of rate capping with multiple two-dimensional schedulers of aggregated cells.
  • a signaled allocation is corrected in a predefined cell(s) by first reducing MCS, second, if needed, reducing the number of allocated PRBs, e.g. even up to cancellation of the whole UE's allocation on the cell, until the amount of transmitted/received data is below the limit.
  • the limit/amount of data that can be transmitted/received by the UE is split onto active cells.
  • the split is semi-static according to a predefined rule.
  • the split can use an overbooking scheme with some margin compared to the limit/amount of data that can be transmitted/received by the UE.
  • the margin of overbooking can be controlled by monitoring if the fallback solution is used or not.
  • FIG. 1 shows a schematic block diagram illustrating an eNB architecture for DL CA with separate coordinated schedulers.
  • FIG. 2 shows a schematic diagram illustrating a sequence of eNB processing for CA scheduling.
  • FIG. 3 shows a schematic diagram illustrating a sequence of eNB processing for CA scheduling according to an embodiment of the first aspect of the invention.
  • FIG. 4 shows flow charts illustrating procedures according to the first and second aspects of the invention.
  • FIG. 2 showing a sequence of general eNodeB processing during scheduling for CA with per cell schedulers
  • FIG. 3 showing a sequence of eNodeB processing for CA scheduling with per cell schedulers according to an embodiment of the first aspect of the invention.
  • an RLC entity of a P-cell (the location of the RLC entity is an example, it may be e.g. in S-cell alternatively) of a user equipment in a cellular communications network generates RLC PDU(s) in accordance with CA scheduling decisions of a scheduler of the P-cell and a scheduler of an S-cell of the user equipment, which are forwarded to MAC entities and PHY layers of the P-cell and the S-cell.
  • control channel construction is carried out in the P-cell and the S-cell. It is to be noted that control channel construction before RLC processing is an example and it may be carried out e.g. after MAC processing.
  • FIG. 3 a block “SV” is added compared to FIG. 2 , which detects limit excesses and can modify a signaled allocation along with a corresponding number of transmitted/received bits/PRBs, which will be described in more detail below.
  • control channel construction before RLC processing is an example and it may e.g. be carried out after MAC processing.
  • the SV combines scheduling decisions for each CA UE and checks if an aggregated scheduling decision over all cells still fulfills UE limitations or not. In case of any conflict, the logic entity SV reacts and corrects the scheduling on one or more cells.
  • the SV is working on UE basis.
  • FIG. 3 shows a logical processing sequence of the UE scheduling, starting from scheduling till PHY processing. Dashed arrows from P-cell's scheduler to S-cell's control channel (PDCCH) construction and from S-cell's scheduler to the RLC entity are related to carrier aggregation functionality.
  • the SV works before the SCell's control channel construction and before the RLC entity. It is noted that there is no need for an SV on the P-cell's (or on one other cell's) control channel construction (first PDCCH construction), as explained below.
  • both (multiple for more than 2 cells) SVs perform the same countermeasures if the limits are exceeded.
  • SV there may be one SV per UE which communicates its decisions to other involved entities. That is, alignment between PDCCH and RLC allocations could be also achieved by doing the SV in one of those and informing the other. However, with this approach additional time criticalities are involved in processing.
  • the SV on the RLC entity receives requests including scheduling decisions for the same UE from the PCell and from the SCell. It checks if the UE limits are exceeded by the requests, and if yes, it modifies/cancels some of the scheduling decisions. The same processing is performed by the SV at the S-cell's control channel construction. This is the point where the UE's downlink assignment/uplink grant is constructed for PDCCH signaling. Each cell's scheduling decision separately does not violate the UE limits, if only this one cell will schedule the UE within this TTI (that is, none of the schedulers assigns an assignment/grant to the UE which is above it capabilities).
  • the scheduling decisions of each carrier may be ordered.
  • An order relying on reception time of the scheduling decision at the SV is not feasible, since the order of the scheduling requests received by the RLC & PDCCH entities is not guaranteed to be the same.
  • the scheduling decisions may be ordered by logical cell index: P-cell is checked first, S-cell(1) is checked second, and so on.
  • some other rule can be used for ordering scheduling decisions from different cells e.g. according to TBS/MCS/#PRBs of the allocation (and cell index for tie-break situations).
  • the P-cell control channel construction does not need to have an SV entity for this UE. Note that for other UEs where this cell is possibly an S-cell, the SV must be active. The SV at the S-cell's control channel construction collects the scheduling decisions from the P-cell and from the first S-cell for this UE, within the same TTI.
  • the SV may decide to modify the S-cell scheduling decision by selecting a lower MCS and/or by reducing the number of PRBS, or by completely cancelling S-cell scheduling if lowering the MCS/#PRBs would still yield to an exceeding TB size.
  • the same algorithm must be applied as for the SV related to the S-cell's channel control (PDCCH) scheduler: the n th scheduler's decision may be processed (and by demand changed) only if the n ⁇ 1 th scheduling decision was already processed.
  • PDCCH channel control
  • the SV is present at entities constructing PDCCH (as described above) and at entities responsible for DL/UL PHY/MAC/RLC processing. According to an alternative embodiment, only one SV is used and the decision is communicated to other relevant entities.
  • the implementation example shown in FIG. 3 is described based on “normal” CA operation, i.e. the PDCCH and a corresponding PDSCH are sent on the same cell and a PUSCH is sent on a corresponding SIB2 linked UL cell.
  • the invention is equally applicable to “cross-CC” (aka cross-CC scheduling) CA operation where the PDCCH can be sent on a different cell than the corresponding PDSCH/PUSCH.
  • cross-CC aka cross-CC scheduling
  • the implementation can be simplified: in case PDCCH processing corresponding to multiple cells (i.e. two or more cells) is collocated, an additional SV at the control channel construction is not needed. For example, two cells cross-scheduled from one cell need only one SV for the collocated PDCCH construction.
  • the S-cell may be activated or deactivated based on required needs.
  • FIG. 4 on the left side of FIG. 4 a flowchart is shown which illustrates processing steps of a method according to the first aspect of the invention. The method may be executed by the SV(s) described above.
  • step S 41 requests for carrier aggregation scheduling for a user equipment are received.
  • the requests are received from a first cell and n second cells in a cellular communications network, which are used for carrier aggregation for the user equipment.
  • n is an integer equal to or greater than one.
  • the requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells.
  • step S 42 it is checked whether or not the requests exceed limits of the user equipment. In case the limits are exceeded, in step S 43 , the n second scheduling decisions are modified according to predefined rules such that the requests do not exceed the limits of the user equipment. In case the limits are not exceeded, the process returns.
  • the above steps may be carried out by processing resources, memory resources and interfaces of a base station, e.g. an eNodeB.
  • a base station e.g. an eNodeB.
  • the first and n second cells may be determined based on a cell index.
  • the first cell is a P-cell of the user equipment and the n second cells are S-cells of the user equipment like in the implementation example shown in FIG. 3 .
  • the first and n second cells may be determined based on allocation decisions, e.g. TBS/MCS/#PRBs of the allocation.
  • an n-th second scheduling decision is processed if an (n ⁇ 1)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
  • the above method may be implemented in an entity (first entity) of a base station, e.g. an eNodeB, which performs uplink/downlink processing for the user equipment, e.g. UL/DL PHY/MAC/RLC processing, and in an entity (second entity) of the base station which constructs a physical downlink control channel for the user equipment.
  • entity (first entity) of a base station e.g. an eNodeB
  • uplink/downlink processing for the user equipment e.g. UL/DL PHY/MAC/RLC processing
  • second entity of the base station which constructs a physical downlink control channel for the user equipment.
  • the method may be implemented in the first entity or in the second entity, wherein when the method is implemented in the first/second entity, the first/second entity informs the second/first entity about the modified n second scheduling decisions.
  • the limits of the UE may be represented by an amount of data which can be transmitted/received by the UE, wherein when modifying the n second scheduling decisions, a modulation and coding scheme set in the n second scheduling decisions is reduced until the amount of transmitted/received data is below the limits. Additionally, a number of allocated physical resource blocks in the n second scheduling decisions may be reduced, until the amount of data transmitted/received is below the limits.
  • the method may be implemented for each user equipment, and the first and n second scheduling decisions may include time and frequency domain scheduling.
  • the second aspect of the invention can be complementary in two ways. According to a first approach, for some UE rate limit(s) the solution according to the first aspect of the invention is adopted, and for some other UE rate limit(s) the solution according to the second aspect is adopted.
  • the UE limits are increased with some margin and the increased limits are split among cells used for carrier aggregation.
  • the over-allocation may be increased by a certain value when the UE limits were not exceeded and reduced by another value when the UE limits were exceeded and the first aspect of the invention is applied as a fallback solution. As a result, a certain probability of overbooking can be obtained.
  • FIG. 4 on the right side of FIG. 4 a flowchart is shown which illustrates processing steps of a method according to the second aspect of the invention.
  • step S 51 limit(s) of a user equipment are increased by a margin.
  • step S 52 the increased limit(s) are split onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one.
  • the margin is controlled in step S 54 .
  • the above steps may be carried out by processing resources, memory resources and interfaces of a base station, e.g. an eNodeB.
  • a base station e.g. an eNodeB.
  • step S 53 the process may proceed to step S 43 of the method of the first aspect as indicated by the dotted line. It is also possible to control the margin in case the UE limit(s) is/are exceeded, as indicated by the dashed line from step S 53 to step S 54 .
  • step S 54 the margin may be monitored and controlled such that the a certain probability of excess is obtained.
  • this margin of overbooking may be controlled by monitoring if the fallback solution (method of first aspect) is used or not.
  • the split can take into account UE radio conditions on cells, load on cells and also bandwidths and transmission modes of the cells if the bandwidths and transmission modes are not the same on the aggregated cells.
  • a ratio of the split is semi-static, i.e. can be changed less often than every TTI.
  • the ratio may be dynamic (i.e. can be changed every TTI) or static.
  • An advantage of the second aspect is that no PRB is wasted compared to the first approach where unused or not optimally used PRB(s) may be present in some TTIs, and there is no need to coordinated PDCCH (control channel) construction in P-cell and S-cell(s).
  • a peak data rate on each cell may be restricted, and the amount of data that can be scheduled on each cell e.g. up to a deadlock where all data can be scheduled on one cell but is not due to the split and scheduling on a single cell may be restricted.
  • the split may be inaccurate due to unpredictable load variations.
  • the second aspect relies on accurate and swift S-cell activation/deactivation decisions.
  • various UE rate limits can be fulfilled with aggregation of cells supported by individual (coordinated) schedulers. Throughput loss and an error due to scheduling more resources than the UE can transmit/receive are mitigated.
  • the solution according to the first aspect is applicable to DL/UL, to CA of two or more cells and to “normal” and “cross-CC” CA operation. Moreover, the solution does not require very accurate/swift S-cell activation/deactivation decisions.
  • an apparatus which comprises means for receiving requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells, means for checking whether or not the requests exceed limits of the user equipment, and means for modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
  • the first and n second cells may be determined based on a cell index, and/or the first and n second cells may be determined based on allocation decisions.
  • the means for modifying may comprise means for processing an n-th second scheduling decision if an (n ⁇ 1)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
  • the apparatus may comprise a first entity of a base station, which performs uplink/downlink processing for the user equipment, and/or a second entity of the base station which constructs a physical downlink control channel for the user equipment.
  • the apparatus may comprise means for sending the modified n second scheduling decisions to the first/second entity, or may comprise means for receiving the modified n second scheduling decisions from the first/second entity.
  • the limits may be represented by an amount of data which can be transmitted/received by the user equipment, and the means for modifying may comprise means for reducing a modulation and coding scheme set in the n second scheduling decisions until the amount of transmitted/received data is below the limits.
  • the means for modifying may further comprise means for reducing a number of allocated physical resource blocks in the n second scheduling decisions, until the amount of transmitted/received data is below the limits.
  • the above means may be implemented for each user equipment.
  • the first and n second scheduling decisions may include time and frequency domain scheduling.
  • an apparatus which comprises means for increasing limits of a user equipment by a margin, means for splitting the increased limits onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one, and means for controlling the margin dependent on whether the increased and split limits are exceeded or not by requests for scheduling for the user equipment from the first cell and n second cells.
  • the apparatus may comprise means for checking whether the limits are exceeded by the requests, and means for, if they are exceeded, modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment according to the first aspect.
  • the apparatus may also comprise means for monitoring and controlling the margin such that a certain probability of limit excess is obtained.
  • requests for carrier aggregation scheduling for a user equipment are received from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation.
  • the requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells. It is checked whether or not the requests exceed limits of the user equipment, and the n second scheduling decisions are modified according to predefined rules such that the requests do not exceed the limits of the user equipment.
  • limits of the user equipment are increased by a margin
  • the increased limits are split onto active cells of the first and n second cells according to a predefined rule, and the margin is controlled dependent on whether the increased and split limits are exceeded or not by the requests. If they are exceeded, the n second scheduling decisions may be modified according to the first aspect.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Requests for carrier aggregation scheduling for a user equipment are received from a first cell used for carrier aggregation and n second cells. The requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells. It is checked whether or not the requests exceed limits of the user equipment, and the n second scheduling decisions are modified according to predefined rules such that the requests do not exceed the limits. Limits of the user equipment are increased by a margin, the increased limits are split onto active cells of the first and n second cells according to a predefined rule, and the margin is controlled dependent on whether the increased and split limits are exceeded or not by the requests. If they are exceeded, the n second scheduling decisions may be modified.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to carrier aggregation in cellular communication network systems. In particular, the invention relates to rate capping when multiple schedulers perform carrier aggregation, also known as cell aggregation.
  • 2. Related Background Art
  • Prior art which is related to this technical field can e.g. be found in the following references:
    • [1] 3GPP TS 36.306 v10.3.0; and
    • [2] Yuanye Wang et al.: “Carrier Load Balancing and Packet Scheduling for Multi-Carrier Systems”, IEEE, May 2010.
  • The following meanings for the abbreviations used in this specification apply:
    • 2-D Two-dimensional
    • 3GPP The 3rd Generation Partnership Project
    • BSR Buffer Status Report
    • BW Bandwidth
    • CA Carrier Aggregation
    • CC Component Carrier
    • CQI Channel Quality Indicator
    • DL Downlink
    • DRB Data Radio Bearer
    • eNB eNode B
    • FSY Feasibility Study
    • GBR Guaranteed Bite Rate
    • HSPA High-Speed Packet Access
    • IEEE The Institute of Electrical and Electronics Engineers
    • L1 Layer 1
    • LTE Long Term Evolution
    • MAC Medium Access Control
    • MC Multi Carrier
    • MCS Modulation and Coding Scheme
    • NSN Nokia Siemens Networks
    • OLLA Outer Loop Link Adaptation
    • PCell Primary Cell
    • PDCCH Physical Downlink Control Channel
    • PDCP Packet Data Convergence Protocol
    • PDSCH Physical Downlink Shared Channel
    • PDU Protocol Data Unit
    • PF Proportional Fair
    • PHY Physical
    • PRB Physical Resource Block
    • PUSCH Physical Uplink Shared Channel
    • QAM Quadrature amplitude modulation
    • Rel Release
    • RLC Radio Link Control
    • SC Single Carrier
    • SCell Secondary Cell
    • SCH Shared Channel
    • SV Scheduling Validator
    • TB Transport Block
    • TBS Transport Block Size
    • TM Transmission Mode
    • TTI Transmission Time Interval
    • UE User Equipment
    • UL Uplink
  • Carrier aggregation allows increasing transmission/reception bandwidth by aggregating component carriers. Prominent benefits of carrier aggregation include increased peak data rates, possibility to aggregate fragmented spectrum and fast load balancing.
  • In the specification of carrier aggregation in LTE Rel-10 in 3GPP, there is a common scheduler assumed per aggregated cells while MAC entities and PHY layers are separated per cell. However, as shown in reference [2], good performance and inter-user fairness can be achieved with separate per cell schedulers which communicate with each other and coordinate a scheduling metric calculation. This solution with separate and coordinated schedulers has complexity and scalability advantages compared to one common scheduler for all aggregated cells. An eNodeB protocol architecture based on this solution is shown in FIG. 1.
  • FIG. 1 shows an eNodeB architecture for DL CA with separate coordinated DL-schedulers included in a P-cell and an S-cell of a user equipment in a cellular communications system. PDCP and RLC layers in the P-cell (or S-cell) generate PDCP PDU(s) from radio bearer(s) and RLC PDU(s) from PDCP PDU(s), respectively. MAC layers in the P-cell and the S-cell generate MAC PDU(s) from RLC PDU(s) based on scheduling decisions concerning carrier aggregation, and the generated MAC PDU(s) are forwarded to the PHY layers of the P-cell and the S-cell. The DL-schedulers of the P-cell and the S-cell communicate with each other and with the MAC layers of the P-cell and the S-cell.
  • In an approach with separate per cell schedulers, since radio resources of each aggregated cell in a given TTI are allocated separately in each cell, based on the same assumptions on UE capabilities and a UE buffer level, the following problem arises.
  • The total allocated resources might exceed an amount of data in a UE buffer, or some other implementation or operator-specific limit, that can be transmitted in this TTI.
  • Further, the total allocated resources might exceed the UE capabilities. A maximum number of DL/UL-SCH transport block bits received/transmitted within a TTI (in all TBs) and a maximum number of bits of a DL/UL-SCH transport block received/transmitted within a TTI are specified in reference [1]. For example, UE category 3 is specified as follows:
  • Maximum number of Maximum number of Maximum number of
    DL-SCH bits of a DL-SCH supported layers
    transport block transport block Total number for spatial
    bits received received of soft multiplexing
    UE Category within a TTI within a TTI channel bits in DL
    Category 3 102048 75376 1237248 2
    Maximum number of Maximum number of
    UL-SCH bits of an UL-SCH
    transport block transport block
    bits transmitted transmitted Support for
    UE Category within a TTI within a TTI 64QAM in UL
    Category 3 51024 51024 No
  • In principle, any UE category can support carrier aggregation. As can be seen, even though each cell fulfils the limit of the number of bits per single TB (i.e. maximum number of bits of a DL-SCH transport block received within a TTI), the total number of bits in all TBs can be exceeded because each cell can allocate additional TB(s). For example each cell allocates the TB of 75376 bits, the TB size is within the UE category 3, but the total number of bits in all TBs exceeds the UE category.
  • In case the total allocated resources exceed the UE category or the data available in the UE buffer, there will be an error and/or throughput loss and/or unnecessary padding.
  • This problem is overcome by the prior art solution in the following way. A scheduling metric is calculated by the separate DL-schedulers per cell considering MC and SC UEs, the DL-schedulers coordinate with each other to ensure fairness across MC and SC UEs. Based on separately calculated scheduling metrics one common priority list is constructed, e.g. MC UEs can be included multiple times in the list, for the purpose of resource allocation. If due to scheduling on multiple cells a MC UE reaches its rate limit, e.g. due to limited data in the buffer, another UE from the list can be scheduled and loss/error, e.g. due to a MC UE being allocated too much resources, is avoided.
  • However, this solution is not applicable to a two-dimensional time-frequency scheduling, i.e. the frequency domain scheduling cannot be done multiple times due eNB processing time constraints. The UEs that were not allocated frequency domain resources cannot be scheduled again if for some reason some resources are freed after frequency domain scheduling, e.g. due to PDCCH blocking.
  • SUMMARY OF THE INVENTION
  • The present invention aims at overcoming the above-described problem of rate capping with multiple two-dimensional schedulers of aggregated cells.
  • This is achieved by the methods and apparatuses as defined in the appended claims. The invention may also be implemented by a computer program product.
  • According to an embodiment of a first aspect of the invention, in case resources allocated to a UE exceed a limit/amount of data that can be transmitted/received by the UE, the excess is detected after (time and frequency domain) scheduling, a signaled allocation is corrected in a predefined cell(s) by first reducing MCS, second, if needed, reducing the number of allocated PRBs, e.g. even up to cancellation of the whole UE's allocation on the cell, until the amount of transmitted/received data is below the limit.
  • According to an embodiment of a complementary/alternative second aspect of the invention, the limit/amount of data that can be transmitted/received by the UE is split onto active cells. The split is semi-static according to a predefined rule. In case this aspect is complementary, the split can use an overbooking scheme with some margin compared to the limit/amount of data that can be transmitted/received by the UE. In case the increased and split limit is exceeded, the scheme falls back to the above aspect where the excess is detected and corrected. Furthermore, the margin of overbooking can be controlled by monitoring if the fallback solution is used or not.
  • In the following the invention will be described by way of embodiments thereof with reference to the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows a schematic block diagram illustrating an eNB architecture for DL CA with separate coordinated schedulers.
  • FIG. 2 shows a schematic diagram illustrating a sequence of eNB processing for CA scheduling.
  • FIG. 3 shows a schematic diagram illustrating a sequence of eNB processing for CA scheduling according to an embodiment of the first aspect of the invention.
  • FIG. 4 shows flow charts illustrating procedures according to the first and second aspects of the invention.
  • DESCRIPTION OF THE EMBODIMENTS
  • In the following, an implementation example of the invention will be described based on FIG. 2 showing a sequence of general eNodeB processing during scheduling for CA with per cell schedulers, and FIG. 3 showing a sequence of eNodeB processing for CA scheduling with per cell schedulers according to an embodiment of the first aspect of the invention.
  • As shown in FIG. 2, an RLC entity of a P-cell (the location of the RLC entity is an example, it may be e.g. in S-cell alternatively) of a user equipment in a cellular communications network generates RLC PDU(s) in accordance with CA scheduling decisions of a scheduler of the P-cell and a scheduler of an S-cell of the user equipment, which are forwarded to MAC entities and PHY layers of the P-cell and the S-cell. Moreover, based on the scheduling decisions control channel construction is carried out in the P-cell and the S-cell. It is to be noted that control channel construction before RLC processing is an example and it may be carried out e.g. after MAC processing.
  • With this approach, however, limitations (limits) of the user equipment may be exceeded as described above.
  • In FIG. 3, a block “SV” is added compared to FIG. 2, which detects limit excesses and can modify a signaled allocation along with a corresponding number of transmitted/received bits/PRBs, which will be described in more detail below. Again it is to be noted that control channel construction before RLC processing is an example and it may e.g. be carried out after MAC processing.
  • Referring to FIG. 3, the SV combines scheduling decisions for each CA UE and checks if an aggregated scheduling decision over all cells still fulfills UE limitations or not. In case of any conflict, the logic entity SV reacts and corrects the scheduling on one or more cells. The SV is working on UE basis. FIG. 3 shows a logical processing sequence of the UE scheduling, starting from scheduling till PHY processing. Dashed arrows from P-cell's scheduler to S-cell's control channel (PDCCH) construction and from S-cell's scheduler to the RLC entity are related to carrier aggregation functionality. The SV works before the SCell's control channel construction and before the RLC entity. It is noted that there is no need for an SV on the P-cell's (or on one other cell's) control channel construction (first PDCCH construction), as explained below.
  • Assuming that both schedulers are working independently, and only the SV is responsible for the UE limits not to be exceeded when scheduled, both (multiple for more than 2 cells) SVs perform the same countermeasures if the limits are exceeded.
  • Alternatively, there may be one SV per UE which communicates its decisions to other involved entities. That is, alignment between PDCCH and RLC allocations could be also achieved by doing the SV in one of those and informing the other. However, with this approach additional time criticalities are involved in processing.
  • The SV on the RLC entity receives requests including scheduling decisions for the same UE from the PCell and from the SCell. It checks if the UE limits are exceeded by the requests, and if yes, it modifies/cancels some of the scheduling decisions. The same processing is performed by the SV at the S-cell's control channel construction. This is the point where the UE's downlink assignment/uplink grant is constructed for PDCCH signaling. Each cell's scheduling decision separately does not violate the UE limits, if only this one cell will schedule the UE within this TTI (that is, none of the schedulers assigns an assignment/grant to the UE which is above it capabilities).
  • As there is one scheduling decision which is always correct (if it were alone), the scheduling decisions of each carrier (cell) may be ordered. An order relying on reception time of the scheduling decision at the SV is not feasible, since the order of the scheduling requests received by the RLC & PDCCH entities is not guaranteed to be the same. The scheduling decisions may be ordered by logical cell index: P-cell is checked first, S-cell(1) is checked second, and so on. Alternatively, some other rule can be used for ordering scheduling decisions from different cells e.g. according to TBS/MCS/#PRBs of the allocation (and cell index for tie-break situations).
  • In a preferred embodiment, as the P-cell is checked first and the first scheduling decision is always a valid one and not modified, the P-cell control channel construction does not need to have an SV entity for this UE. Note that for other UEs where this cell is possibly an S-cell, the SV must be active. The SV at the S-cell's control channel construction collects the scheduling decisions from the P-cell and from the first S-cell for this UE, within the same TTI. Once the P-cell and the S-cell scheduling decisions are both available, the SV may decide to modify the S-cell scheduling decision by selecting a lower MCS and/or by reducing the number of PRBS, or by completely cancelling S-cell scheduling if lowering the MCS/#PRBs would still yield to an exceeding TB size. For the RLC's SV, the same algorithm must be applied as for the SV related to the S-cell's channel control (PDCCH) scheduler: the nth scheduler's decision may be processed (and by demand changed) only if the n−1th scheduling decision was already processed.
  • According to the preferred embodiment, the SV is present at entities constructing PDCCH (as described above) and at entities responsible for DL/UL PHY/MAC/RLC processing. According to an alternative embodiment, only one SV is used and the decision is communicated to other relevant entities.
  • The implementation example shown in FIG. 3 is described based on “normal” CA operation, i.e. the PDCCH and a corresponding PDSCH are sent on the same cell and a PUSCH is sent on a corresponding SIB2 linked UL cell. However, the invention is equally applicable to “cross-CC” (aka cross-CC scheduling) CA operation where the PDCCH can be sent on a different cell than the corresponding PDSCH/PUSCH. It this case, the implementation can be simplified: in case PDCCH processing corresponding to multiple cells (i.e. two or more cells) is collocated, an additional SV at the control channel construction is not needed. For example, two cells cross-scheduled from one cell need only one SV for the collocated PDCCH construction.
  • The above implementation example is described with focus on two cells; however, the invention is equally applicable to more than two cells with the same interactions/algorithms between the relevant entities.
  • Moreover, the S-cell may be activated or deactivated based on required needs.
  • Referring to FIG. 4, on the left side of FIG. 4 a flowchart is shown which illustrates processing steps of a method according to the first aspect of the invention. The method may be executed by the SV(s) described above.
  • In step S41, requests for carrier aggregation scheduling for a user equipment are received. The requests are received from a first cell and n second cells in a cellular communications network, which are used for carrier aggregation for the user equipment. n is an integer equal to or greater than one. The requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells.
  • In step S42, it is checked whether or not the requests exceed limits of the user equipment. In case the limits are exceeded, in step S43, the n second scheduling decisions are modified according to predefined rules such that the requests do not exceed the limits of the user equipment. In case the limits are not exceeded, the process returns.
  • The above steps may be carried out by processing resources, memory resources and interfaces of a base station, e.g. an eNodeB.
  • The first and n second cells may be determined based on a cell index. For example, the first cell is a P-cell of the user equipment and the n second cells are S-cells of the user equipment like in the implementation example shown in FIG. 3.
  • Alternatively or in addition, the first and n second cells may be determined based on allocation decisions, e.g. TBS/MCS/#PRBs of the allocation.
  • When modifying the n second scheduling decisions, an n-th second scheduling decision is processed if an (n−1)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
  • The above method may be implemented in an entity (first entity) of a base station, e.g. an eNodeB, which performs uplink/downlink processing for the user equipment, e.g. UL/DL PHY/MAC/RLC processing, and in an entity (second entity) of the base station which constructs a physical downlink control channel for the user equipment.
  • Alternatively, the method may be implemented in the first entity or in the second entity, wherein when the method is implemented in the first/second entity, the first/second entity informs the second/first entity about the modified n second scheduling decisions.
  • As mentioned above, the limits of the UE may be represented by an amount of data which can be transmitted/received by the UE, wherein when modifying the n second scheduling decisions, a modulation and coding scheme set in the n second scheduling decisions is reduced until the amount of transmitted/received data is below the limits. Additionally, a number of allocated physical resource blocks in the n second scheduling decisions may be reduced, until the amount of data transmitted/received is below the limits.
  • The method may be implemented for each user equipment, and the first and n second scheduling decisions may include time and frequency domain scheduling.
  • The second aspect of the invention can be complementary in two ways. According to a first approach, for some UE rate limit(s) the solution according to the first aspect of the invention is adopted, and for some other UE rate limit(s) the solution according to the second aspect is adopted.
  • According to a second approach, the UE limits are increased with some margin and the increased limits are split among cells used for carrier aggregation. Regarding control of the margin, the over-allocation may be increased by a certain value when the UE limits were not exceeded and reduced by another value when the UE limits were exceeded and the first aspect of the invention is applied as a fallback solution. As a result, a certain probability of overbooking can be obtained.
  • Referring to FIG. 4, on the right side of FIG. 4 a flowchart is shown which illustrates processing steps of a method according to the second aspect of the invention.
  • In step S51, limit(s) of a user equipment are increased by a margin. In step S52, the increased limit(s) are split onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one. In case the increased and split limit(s) are not exceeded by requests for scheduling for the user equipment from the first cell and n second cells in step S53, the margin is controlled in step S54.
  • The above steps may be carried out by processing resources, memory resources and interfaces of a base station, e.g. an eNodeB.
  • In case the increased and split limit(s) is/are exceeded in step S53, the process may proceed to step S43 of the method of the first aspect as indicated by the dotted line. It is also possible to control the margin in case the UE limit(s) is/are exceeded, as indicated by the dashed line from step S53 to step S54.
  • In step S54, the margin may be monitored and controlled such that the a certain probability of excess is obtained. In particular, this margin of overbooking may be controlled by monitoring if the fallback solution (method of first aspect) is used or not.
  • The split can take into account UE radio conditions on cells, load on cells and also bandwidths and transmission modes of the cells if the bandwidths and transmission modes are not the same on the aggregated cells. Preferably, a ratio of the split is semi-static, i.e. can be changed less often than every TTI. Alternatively, the ratio may be dynamic (i.e. can be changed every TTI) or static.
  • An advantage of the second aspect is that no PRB is wasted compared to the first approach where unused or not optimally used PRB(s) may be present in some TTIs, and there is no need to coordinated PDCCH (control channel) construction in P-cell and S-cell(s).
  • However, according to the second aspect, a peak data rate on each cell may be restricted, and the amount of data that can be scheduled on each cell e.g. up to a deadlock where all data can be scheduled on one cell but is not due to the split and scheduling on a single cell may be restricted. Moreover, the split may be inaccurate due to unpredictable load variations. In addition, the second aspect relies on accurate and swift S-cell activation/deactivation decisions.
  • According to the first aspect of the invention, various UE rate limits can be fulfilled with aggregation of cells supported by individual (coordinated) schedulers. Throughput loss and an error due to scheduling more resources than the UE can transmit/receive are mitigated. The solution according to the first aspect is applicable to DL/UL, to CA of two or more cells and to “normal” and “cross-CC” CA operation. Moreover, the solution does not require very accurate/swift S-cell activation/deactivation decisions.
  • According to an aspect of the invention, an apparatus is provided which comprises means for receiving requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells, means for checking whether or not the requests exceed limits of the user equipment, and means for modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
  • The first and n second cells may be determined based on a cell index, and/or the first and n second cells may be determined based on allocation decisions. The means for modifying may comprise means for processing an n-th second scheduling decision if an (n−1)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
  • The apparatus may comprise a first entity of a base station, which performs uplink/downlink processing for the user equipment, and/or a second entity of the base station which constructs a physical downlink control channel for the user equipment.
  • The apparatus may comprise means for sending the modified n second scheduling decisions to the first/second entity, or may comprise means for receiving the modified n second scheduling decisions from the first/second entity.
  • The limits may be represented by an amount of data which can be transmitted/received by the user equipment, and the means for modifying may comprise means for reducing a modulation and coding scheme set in the n second scheduling decisions until the amount of transmitted/received data is below the limits.
  • The means for modifying may further comprise means for reducing a number of allocated physical resource blocks in the n second scheduling decisions, until the amount of transmitted/received data is below the limits.
  • The above means may be implemented for each user equipment.
  • The first and n second scheduling decisions may include time and frequency domain scheduling.
  • According to a second aspect of the invention, an apparatus is provided which comprises means for increasing limits of a user equipment by a margin, means for splitting the increased limits onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one, and means for controlling the margin dependent on whether the increased and split limits are exceeded or not by requests for scheduling for the user equipment from the first cell and n second cells.
  • The apparatus may comprise means for checking whether the limits are exceeded by the requests, and means for, if they are exceeded, modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment according to the first aspect.
  • The apparatus may also comprise means for monitoring and controlling the margin such that a certain probability of limit excess is obtained.
  • In a first aspect, requests for carrier aggregation scheduling for a user equipment are received from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation. The requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells. It is checked whether or not the requests exceed limits of the user equipment, and the n second scheduling decisions are modified according to predefined rules such that the requests do not exceed the limits of the user equipment. In a second aspect, limits of the user equipment are increased by a margin, the increased limits are split onto active cells of the first and n second cells according to a predefined rule, and the margin is controlled dependent on whether the increased and split limits are exceeded or not by the requests. If they are exceeded, the n second scheduling decisions may be modified according to the first aspect.
  • It is to be understood that the above description is illustrative of the invention and is not to be construed as limiting the invention. Various modifications and applications may occur to those skilled in the art without departing from the true spirit and scope of the invention as defined by the appended claims.

Claims (23)

1. A method comprising:
receiving requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells;
checking whether or not the requests exceed limits of the user equipment; and
modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
2. The method of claim 1, wherein
the first and n second cells are determined based on a cell index, and/or the first and n second cells are determined based on allocation decisions, wherein the modifying comprises:
processing an n-th second scheduling decision if an (n-I)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
3. The method of claim 1, wherein the method is implemented in an entity of a base station, which performs uplink/downlink processing for the user equipment, and in an entity of the base station which constructs a physical downlink control channel for the user equipment.
4. The method of claim 1, wherein the method is implemented in a first entity of a base station, which performs uplink/downlink processing for the user equipment, or in a second entity of the base station which constructs a physical downlink control channel for the user equipment, wherein when the method is implemented in the first/second entity, the first/second entity informs the second/first entity about the modified n second scheduling decisions.
5. The method of claim 1, wherein the limits are represented by an amount of data which can be transmitted/received by the user equipment, the modifying comprising:
reducing a modulation and coding scheme set in the n second scheduling decisions until the amount of transmitted/received data is below the limits.
6. The method of claim 5, wherein the modifying further comprises:
reducing a number of allocated physical resource blocks in the n second scheduling decisions, until the amount of transmitted/received data is below the limits.
7. The method of claim 1, wherein the method is implemented for each user equipment.
8. The method of claim 1, wherein the first and n second scheduling decisions include time and frequency domain scheduling.
9. A method comprising:
increasing limits of a user equipment by a margin;
splitting the increased limits onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one; and
controlling the margin dependent on whether the increased and split limits are exceeded or not by requests for scheduling for the user equipment from the first cell and n second cells.
10. The method of claim 9, further comprising:
checking whether the limits are exceeded by the requests; and
if they are exceeded,
modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment according to the following:
receiving requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells;
checking whether or not the requests exceed limits of the user equipment; and
modifying the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
11. The method of claim 9, comprising:
monitoring and controlling the margin such that a certain probability of limit excess is obtained.
12. A computer program product including a program for a processing device, comprising software code portions for performing the steps of claim 1 when the program is run on the processing device.
13. The computer program product according to claim 12, wherein the computer program product comprises a computer-readable medium on which the software code portions are stored.
14. The computer program product according to claim 12, wherein the program is directly loadable into an internal memory of the processing device.
15. An apparatus configured to:
receive requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells;
check whether or not the requests exceed limits of the user equipment; and
modify the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
16. The apparatus of claim 15, configured to:
determine the first and n second cells based on a cell index, and/or
determine the first and n second cells based on allocation decisions,
wherein, for the modification of the n second scheduling decisions, the apparatus is configured to:
process an n-th second scheduling decision if an (n-I)-th second scheduling decision has been processed, according to the predefined rules such that the requests do not exceed the limits of the user equipment.
17. The apparatus of claim 15, wherein the apparatus comprises at least one of an entity of a base station, which performs uplink/downlink processing for the user equipment, and an entity of the base station which constructs a physical downlink control channel for the user equipment.
18. The apparatus of claim 15, configured to:
send the modified n second scheduling decisions to a first entity of a base station, which performs uplink/downlink processing for the user equipment, or a second entity of the base station which constructs a physical downlink control channel for the user equipment, or
receive the modified n second scheduling decisions from the first/second entity.
19. The apparatus of claim 15, wherein the limits are represented by an amount of data which can be transmitted/received by the user equipment, wherein, for the modification of the n second scheduling decisions, the apparatus is configured to:
reduce a modulation and coding scheme set in the n second scheduling decisions until the amount of transmitted/received data is below the limits.
20. The apparatus of claim 19, wherein, for the modification of the n second scheduling decisions, the apparatus is further configured to:
reduce a number of allocated physical resource blocks in the n second scheduling decisions, until the amount of transmitted/received data is below the limits.
21. An apparatus configured to:
increase limits of a user equipment by a margin;
split the increased limits onto active cells of a first and n second cells used for carrier aggregation for the user equipment in a cellular communications network according to a predefined rule, n being an integer equal to or greater than one; and
control the margin dependent on whether the increased and split limits are exceeded or not by requests for scheduling for the user equipment from the first cell and n second cells.
22. The apparatus of claim 21, configured to:
check whether the limits are exceeded by the requests; and
if they are exceeded,
modify the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment according to the operations of the apparatus further configured to:
receive requests for carrier aggregation scheduling for a user equipment from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation, n being an integer equal to or greater than one, the requests including a first scheduling decision of the first cell and n second scheduling decisions of the n second cells;
check whether or not the requests exceed limits of the user equipment; and
modify the n second scheduling decisions according to predefined rules such that the requests do not exceed the limits of the user equipment.
23. The apparatus of claim 21, configured to:
monitor and control the margin such that a certain probability of limit excess is obtained.
US14/370,264 2012-01-02 2012-01-02 Rate Capping with Multiple Carrier Aggregation Schedulers Abandoned US20140328316A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2012/050020 WO2013102487A1 (en) 2012-01-02 2012-01-02 Rate capping with multiple carrier aggregation schedulers

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2012/050020 A-371-Of-International WO2013102487A1 (en) 2012-01-02 2012-01-02 Rate capping with multiple carrier aggregation schedulers

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/426,107 Continuation US9820293B2 (en) 2012-01-02 2017-02-07 Rate capping with multiple carrier aggregation schedulers

Publications (1)

Publication Number Publication Date
US20140328316A1 true US20140328316A1 (en) 2014-11-06

Family

ID=45446056

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/370,264 Abandoned US20140328316A1 (en) 2012-01-02 2012-01-02 Rate Capping with Multiple Carrier Aggregation Schedulers
US15/426,107 Expired - Fee Related US9820293B2 (en) 2012-01-02 2017-02-07 Rate capping with multiple carrier aggregation schedulers

Family Applications After (1)

Application Number Title Priority Date Filing Date
US15/426,107 Expired - Fee Related US9820293B2 (en) 2012-01-02 2017-02-07 Rate capping with multiple carrier aggregation schedulers

Country Status (3)

Country Link
US (2) US20140328316A1 (en)
EP (1) EP2801233A1 (en)
WO (1) WO2013102487A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150071099A1 (en) * 2012-04-18 2015-03-12 Lg Electronics Inc. Method and Apparatus for Receiving Downlink Data in Wireless Communication System
WO2016197740A1 (en) * 2016-01-05 2016-12-15 中兴通讯股份有限公司 Rate splitting method and apparatus and evolved node
US10271333B2 (en) 2016-12-15 2019-04-23 At&T Intellectual Property I, L.P. Service aware carrier aggregation

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9807640B2 (en) * 2013-12-17 2017-10-31 Taiwan Semiconductor Manufacturing Company, Ltd. Network operating system resource coordination
KR102179081B1 (en) * 2013-12-27 2020-11-18 삼성전자주식회사 A method and an apparatus controlling for terminal connection of a base station for efficient resource utilization in a Mobile Communication System with Carrier Aggregation
GB201400817D0 (en) * 2014-01-17 2014-03-05 Samsung Electronics Co Ltd Processing limitations with distributed scheduling
US10856175B1 (en) * 2015-08-17 2020-12-01 Sprint Spectrum L.P. Method and system for managing congestion in inter-band carrier aggregation
US10716158B1 (en) 2019-01-16 2020-07-14 Sprint Spectrum L.P. Configuration of carrier-aggregation service with dual-connectivity service

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011032497A1 (en) * 2009-09-18 2011-03-24 大唐移动通信设备有限公司 Method, device and system for reconfiguring aggregation cell
US20110275395A1 (en) * 2008-12-30 2011-11-10 Telefonaktiebolaget Lm Ericsson (Publ) Method and arrangement relating to power consumption in a communications network
US20120044894A1 (en) * 2009-05-14 2012-02-23 Hyun Soo Ko Method and apparatus for transmitting cqi in wireless communication system
US20120198077A1 (en) * 2009-10-30 2012-08-02 Sony Corporation Resource allocation method and device in communication network
US20130010743A1 (en) * 2010-03-22 2013-01-10 Lg Electronics Inc. Method and user equipment for transmitting uplink control information

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201780605U (en) * 2009-04-22 2011-03-30 万信电子科技有限公司 Clothes fitting system
BRPI1016091A2 (en) * 2009-06-17 2017-07-18 Ericsson Telefon Ab L M "Method for programming data transmissions between a mobile terminal and a base station in a wireless communication network, mobile terminal, computer program, and computer readable medium."

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110275395A1 (en) * 2008-12-30 2011-11-10 Telefonaktiebolaget Lm Ericsson (Publ) Method and arrangement relating to power consumption in a communications network
US20120044894A1 (en) * 2009-05-14 2012-02-23 Hyun Soo Ko Method and apparatus for transmitting cqi in wireless communication system
WO2011032497A1 (en) * 2009-09-18 2011-03-24 大唐移动通信设备有限公司 Method, device and system for reconfiguring aggregation cell
US20120142361A1 (en) * 2009-09-18 2012-06-07 China Academy Of Telecommunications Technology Method, Device and System for Reconfiguring Aggregation Cell
US20120198077A1 (en) * 2009-10-30 2012-08-02 Sony Corporation Resource allocation method and device in communication network
US20130010743A1 (en) * 2010-03-22 2013-01-10 Lg Electronics Inc. Method and user equipment for transmitting uplink control information

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150071099A1 (en) * 2012-04-18 2015-03-12 Lg Electronics Inc. Method and Apparatus for Receiving Downlink Data in Wireless Communication System
US9357543B2 (en) * 2012-04-18 2016-05-31 Lg Electronics Inc. Method and apparatus for receiving downlink data in wireless communication system
WO2016197740A1 (en) * 2016-01-05 2016-12-15 中兴通讯股份有限公司 Rate splitting method and apparatus and evolved node
CN106941698A (en) * 2016-01-05 2017-07-11 中兴通讯股份有限公司 Method, device and evolved node that a kind of speed is split
US10271333B2 (en) 2016-12-15 2019-04-23 At&T Intellectual Property I, L.P. Service aware carrier aggregation

Also Published As

Publication number Publication date
EP2801233A1 (en) 2014-11-12
US20170150511A1 (en) 2017-05-25
WO2013102487A1 (en) 2013-07-11
US9820293B2 (en) 2017-11-14

Similar Documents

Publication Publication Date Title
US9820293B2 (en) Rate capping with multiple carrier aggregation schedulers
US20230353432A1 (en) Uplink operation for lte in an unlicensed band
JP5456155B2 (en) Logical channel prioritization procedure to generate multiple uplink transport blocks
US10542499B2 (en) Uplink transmissions in wireless communications
US8873475B2 (en) Method of controlling allocation of a radio resource for transmitting a radio resource allocation request
US10057041B2 (en) Aperiodic triggering of channel quality information using physical downlink control channel
JP6363129B2 (en) Method and apparatus for processing scheduling information in a mobile communication system
JP5570586B2 (en) Buffer status reporting in mobile communication systems.
KR102193273B1 (en) Apparatus and method for traffic load balancing using inter-site carrier aggregation
US20150230234A1 (en) Method and apparatus for controlling small data transmission on the uplink
EP2472981B1 (en) Method and apparatus for combined time and frequency domain scheduling
JP2016028475A (en) COMMUNICATION DEVICE, COMMUNICATION METHOD, AND INTEGRATED CIRCUIT
CN106612557B (en) Transmission method, base station and user equipment for downlink ACK/NACK information
US12156188B2 (en) User equipment and scheduling device
CN105122716A (en) Method and apparatus for transmitting channel state information in wireless communication system
US20220232618A1 (en) Methods, communications devices, and infrastructure equipment
CN113273271A (en) Enhancement of logical channel prioritization in NR-U
KR20170074117A (en) Apparatus and method for scheduling a terminal in a wireless communication system
WO2019137491A1 (en) Mobile communication uplink information transmission method and system
EP3016466A1 (en) Method to operate a radio access network and radio access network
WO2022078285A1 (en) Uplink transmission method and apparatus
TWI533734B (en) Power headroom reporting for carrier aggregation

Legal Events

Date Code Title Description
AS Assignment

Owner name: NOKIA SOLUTIONS AND NETWORKS OY, FINLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHMIEL, MIESZKO;KROENER, HANS;BURANYI, ROBERT;SIGNING DATES FROM 20140508 TO 20140519;REEL/FRAME:033229/0499

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION