US20140093600A1 - Production of zinc dust - Google Patents
Production of zinc dust Download PDFInfo
- Publication number
- US20140093600A1 US20140093600A1 US13/946,264 US201313946264A US2014093600A1 US 20140093600 A1 US20140093600 A1 US 20140093600A1 US 201313946264 A US201313946264 A US 201313946264A US 2014093600 A1 US2014093600 A1 US 2014093600A1
- Authority
- US
- United States
- Prior art keywords
- crucible
- vaporizing
- zinc dust
- production plant
- zinc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 title claims abstract description 102
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 37
- 230000008016 vaporization Effects 0.000 claims abstract description 89
- 238000002844 melting Methods 0.000 claims abstract description 52
- 230000008018 melting Effects 0.000 claims abstract description 52
- 229910052725 zinc Inorganic materials 0.000 claims abstract description 51
- 239000011701 zinc Substances 0.000 claims abstract description 51
- 229940024464 emollients and protectives zinc product Drugs 0.000 claims abstract description 9
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 25
- 239000001301 oxygen Substances 0.000 claims description 25
- 229910052760 oxygen Inorganic materials 0.000 claims description 25
- 239000002245 particle Substances 0.000 claims description 20
- 239000012768 molten material Substances 0.000 claims description 14
- 238000005259 measurement Methods 0.000 claims description 12
- 238000010926 purge Methods 0.000 claims description 12
- 238000009826 distribution Methods 0.000 claims description 11
- 239000011261 inert gas Substances 0.000 claims description 11
- 238000004891 communication Methods 0.000 claims description 10
- 238000001816 cooling Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 7
- 239000007787 solid Substances 0.000 claims description 7
- 239000000428 dust Substances 0.000 claims description 5
- 239000007788 liquid Substances 0.000 claims description 5
- 239000011344 liquid material Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000011248 coating agent Substances 0.000 claims description 2
- 238000000576 coating method Methods 0.000 claims description 2
- 239000012530 fluid Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 6
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 10
- HBMJWWWQQXIZIP-UHFFFAOYSA-N silicon carbide Chemical compound [Si+]#[C-] HBMJWWWQQXIZIP-UHFFFAOYSA-N 0.000 description 6
- 229910010271 silicon carbide Inorganic materials 0.000 description 6
- 230000009977 dual effect Effects 0.000 description 5
- 239000007789 gas Substances 0.000 description 5
- 229910052757 nitrogen Inorganic materials 0.000 description 5
- 230000004907 flux Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 239000002994 raw material Substances 0.000 description 3
- VEXZGXHMUGYJMC-UHFFFAOYSA-M Chloride anion Chemical compound [Cl-] VEXZGXHMUGYJMC-UHFFFAOYSA-M 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000011326 mechanical measurement Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B19/00—Obtaining zinc or zinc oxide
- C22B19/30—Obtaining zinc or zinc oxide from metallic residues or scraps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F9/00—Making metallic powder or suspensions thereof
- B22F9/02—Making metallic powder or suspensions thereof using physical processes
- B22F9/06—Making metallic powder or suspensions thereof using physical processes starting from liquid material
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B19/00—Obtaining zinc or zinc oxide
- C22B19/04—Obtaining zinc by distilling
- C22B19/12—Obtaining zinc by distilling in crucible furnaces
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B19/00—Obtaining zinc or zinc oxide
- C22B19/04—Obtaining zinc by distilling
- C22B19/16—Distilling vessels
- C22B19/18—Condensers, Receiving vessels
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B19/00—Obtaining zinc or zinc oxide
- C22B19/32—Refining zinc
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B9/00—General processes of refining or remelting of metals; Apparatus for electroslag or arc remelting of metals
- C22B9/16—Remelting metals
Definitions
- Disclosed embodiments relate to the production of Zinc dust.
- disclosed embodiments relate to a Zinc dust production plant.
- Zinc processing by means of retort furnaces in known requires the production of Zinc dust to be done in batches. Batch processing of raw materials leads to inefficiencies in the production process.
- Disclosed embodiments address this inefficiency and reduce energy consumption.
- a method of production of Zinc dust which includes melting Zinc products in a melting furnace on a semi-continuous basis; transferring at least a part of the molten Zinc products to a vaporizing furnace; vaporizing the molten Zinc in the vaporizing furnace into Zinc vapour on a substantially continuous basis; transferring Zinc vapour from the vaporizing furnace to a condenser; and condensing the Zinc vapour to form Zinc dust.
- the melting furnace is charged with Zinc raw materials which may be secondary Zinc products such as Zinc top-, or bottom dross material from a previous Zinc processing process and then the furnace is pre-heated to between 400° C. and 700° C. In general, the furnace is pre-heated to about 500° C.
- a flux is added to the molten Zinc in the melting furnace.
- the flux may be typically a chloride based flux to remove vaporizing inhibiting elements, such as aluminium and iron, from the molten Zinc.
- the molten Zinc Before the molten Zinc is transferred to the vaporizing furnace, its temperature is reduced to about 550° C. When transferred, the molten Zinc is poured into a tundish and transported with a launder and poured into a crucible, underneath a surface of previously molten Zinc which still remains in the crucible, in the vaporizing furnace. In order to prevent the new molten Zinc to come into contact with the Oxygen above the surface of the previously molten Zinc, it is added to the crucible via a dip tube such that a bath of molten Zinc is maintained in the vaporizing furnace.
- the temperature of the Zinc bath in the crucible is maintained at between 920° C. and 1150° C. and in particular, at about 950° C. through a closed loop temperature control system.
- the molten Zinc In order to vaporize the molten Zinc it has to be maintained at a pre-defined level that exceeds the level of the lower extreme of the dip tube, such that the atmosphere in the vaporizing crucible is isolated from the free atmosphere outside the vaporizing furnace.
- an alarm is generated if the level falls below a first predefined level to indicate that more molten Zinc should be added to the crucible in the vaporizing furnace.
- a second alarm is generated if the level of molten Zinc in the crucible falls below a second predefined level to indicate that the lower extreme of the dip tube is about to be exposed. As a safety measure, the second alarm will cause the burner in the vaporizing furnace to shut down.
- These alarms may be audible and/or visual indicators.
- the Zinc vapour When vaporized, the Zinc vapour needs to be transferred to a condenser where it is collected in the sealed vaporizing furnace at a level above the surface of the molten Zinc in the crucible.
- the Zinc vapour is transferred via a crossover tube and distributed in the condenser by means of a vapour distribution manifold.
- the next step is to condense the Zinc vapour to form Zinc dust by circulating the Zinc vapour such that the Zinc condenses in the condenser in particle sizes depending on the Zinc vapour circulation speed.
- the Zinc vapour is cooled and circulated by means of air cooling through an air cooler.
- the fine Zinc dust particles are then extracted from the Zinc vapour through a cyclone.
- a predefined percentage of about 2% of Oxygen is maintained in the condenser atmosphere and monitored by an Oxygen detector. If the level of Oxygen exceeds the predefined level the condenser atmosphere is purged with an inert gas such as Nitrogen and if the level of Oxygen falls below the predefined level air is bled from the free atmosphere into the condenser atmosphere.
- an inert gas such as Nitrogen
- the Zinc dust is transported from the condenser to a dust collection arrangement by means of a hopper and screw conveyor.
- Disclosed embodiments provide a Zinc dust production plant, which includes a vertical crucible melting furnace into which Zinc products are receivable; a vertical crucible vaporizing furnace into which molten Zinc products from the melting furnace are receivable via a dip tube with a top end of the dip tube being in flow communication with molten material transport means and a bottom end of the dip tube opening into a lower portion of the vaporizing crucible; and a condenser in fluid flow communication with the vaporizing furnace for receiving Zinc vapour into the condenser, the condenser operable to condense the vaporized Zinc into Zinc dust.
- the Zinc dust production plant may include molten Zinc material transport means for transporting heated liquid material from the melting furnace crucible to the vaporizing furnace crucible.
- the molten material transport means includes a tundish and launder combination.
- the melting furnace may include a refractory lining at least partially surrounding the vertical melting crucible.
- the melting furnace may include a gas-fired burner in heat flow communication with an outside of the melting crucible.
- At least a portion of the melting crucible body may be enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body.
- the melting crucible may be of Silicon Carbide.
- the melting furnace may include manipulation means for manipulating the melting furnace.
- the manipulation means may be in the form of tilting means for tilting the melting furnace to cause liquid material in the melting furnace to flow from the melting crucible.
- the manipulation means may include a hydraulic actuator for tilting the melting furnace.
- the melting furnace may include pouring means in the form of a spout for directing liquid flow from the melting furnace.
- the vaporizing furnace may include a refractory lining at least partially surrounding the vertical vaporizing crucible.
- the vaporizing furnace may include a gas-fired burner in heat flow communication with an outside of the vaporizing crucible.
- a portion of the vaporizing crucible body may be enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body.
- the vaporizing crucible may be of Silicon Carbide.
- the vaporizing furnace may include a dip tube extending into a lower portion of the vaporizing crucible, the top end of the dip tube being in flow communication with the molten material transport means and the bottom end of the dip tube opening into the lower portion of the vaporizing crucible.
- a level above the bottom end of the dip tube defines an operative lower working level for molten material in the vaporizing crucible.
- the refractory lining may enclose the sides of the vertical vaporizing crucible and a top cover may seal the top ends of the refractory lining and the vaporizing crucible, thereby defining a burner chamber between the outside of the vaporizing crucible and an inside of the refractory lining and defining a vaporizing chamber inside the vaporizing crucible.
- the dip tube may extend through the top cover into the vaporizing crucible.
- the vaporizing furnace may include measurement means for measuring the amount of heated liquid in the vaporizing crucible.
- the measurement means may be the form of weight measurement means such as load cells onto which the vaporizing furnace may be mounted.
- the measurement means may be in the form of level measurement means such as a dipstick protruding into the vaporizing crucible.
- the Zinc dust production plant may include vapour transport means in the form of a crossover tube having at a first end an opening through the top cover of the vaporizing crucible and a second end leading into the condenser.
- the crossover tube may include a heating element.
- the condenser may be defined by an enclosure of steel plate.
- the condenser may include a screw conveyor arrangement at a bottom of the enclosure, operable to extract solids collecting at the bottom of the enclosure.
- the condenser may include a vapour distribution manifold connected to a second end of the vapour transport tube, the vapour distribution manifold opening into the inside of the enclosure.
- the condenser may include a circulation system having an extractor at one end of the enclosure by means of which vapour may be extracted from the enclosure and an inlet at another end of the enclosure by means of which extracted vapour may be returned to the inside of the enclosure.
- the circulation system may include at least one cooling cyclone for cooling the vapour.
- the condenser may include an atmosphere control arrangement for controlling the Oxygen content in the vaporizing chamber.
- the atmosphere control arrangement may include an Oxygen detector disposed in the inside of the enclosure, an inert gas purging arrangement, an air bleed arrangement and a processor controllably connected to the inert gas purging arrangement and the air bleed arrangement, operable, if the oxygen content exceeds a predefined level, to reduce the oxygen content in the enclosure by purging the inside with an inert gas from the inert gas purging arrangement and, if the oxygen content falls below a predefined level, to increase the oxygen content in the enclosure by opening the air bleed so as to form a thin oxide coating on the dust particle that renders it passive to any reaction.
- Disclosed embodiments provide a method of controlling Zinc dust particle size in a Zinc vapour condenser by adjusting a speed of circulation of Zinc vapour in the condenser to obtain a desired Zinc dust particle size.
- FIG. 1 shows a Zinc dust production plant in accordance with the disclosed embodiments.
- a Zinc dust production plant 10 is shown.
- the plant 10 includes a vertical crucible melting furnace 12 , a vertical crucible vaporizing furnace 14 and a condenser 18 .
- Molten material transport means in the form of a tundish and launder 20 is provided between the melting furnace 12 and the vaporizing furnace 14 .
- Vapour transport means in the form of a Silicon Carbide crossover tube 22 is provided between the vaporizing furnace 14 and the condenser 18 .
- the melting furnace 12 comprises a refractory lining 24 , with a gas burner 26 protruding through the lining 24 with the burner on an inside of the lining 24 .
- the refractory lining is mounted on a hydraulic actuated tilt table 28 .
- Inside the lining 24 a Silicon Carbide melting crucible 30 is provided with an open end exposed to free atmosphere.
- a burner chamber 32 is defined between the outside wall of the melting crucible 30 and the inside of the refractory lining 24 .
- a pouring spout 34 is provided from the crucible 30 over a top edge of the refractory lining 24 .
- the melting furnace 12 is provided with an extraction system 35 .
- the pouring spout 34 is in alignment with the tundish and launder, 20 so that contents of the melting crucible 30 will flow via the spout 34 into the tundish and launder 20 when the tilt table 28 tilts the refractory lining 24 .
- the vaporizing furnace 14 comprises a refractory lining 36 , with a gas burner 38 protruding through the lining 36 .
- the gas burner is provided on an inside of the lining 36 .
- the refractory lining 36 is mounted on load cells 40 operable to measure the total weight of the vaporizing furnace. In other disclosed embodiments the amount of material in the vaporizing furnace 14 can be determined with manual measurement means, such as a dip stick, or the like.
- a Silicon Carbide vaporizing crucible 42 is provided with an open end facing upwards.
- a furnace top cover 44 seals the top of the refractory lining 36 and the vaporizing crucible 42 to define a closed burner chamber 46 and to close the top of the vaporizing crucible 42 .
- a Silicon Carbide dip tube 48 protrudes through the top cover 44 leading from a funnel assembly 50 to an inside of the vaporizing crucible 42 .
- One end of the crossover tube 22 protrudes through the top cover 44 and opens into the top of the vaporizing crucible 42 .
- the tundish and launder 20 is in alignment with the funnel assembly 50 so that liquid flowing down the tundish and launder 20 will flow into the funnel assembly 50 and into the vaporizing crucible 42 .
- the crossover tube 22 includes an electrical heating element (of which only the connection is shown as 22 . 1 ) integral with the tube 22 for maintaining the temperature in the tube at 900° C. to prevent any condensation in the crossover tube 22 .
- the condenser 18 is defined by a steel plate chamber/enclosure 54 with a heat exchanger in the form of a vapour circulation system 58 .
- the condenser 18 includes a vapour distribution manifold 56 in flow communication with another end of the crossover tube 22 .
- the vapour distribution manifold 56 and vapour distribution manifold nozzles 57 are arranged to distribute vapour from the vaporizing furnace into the chamber 54 .
- the condenser includes a vapour circulation system 58 having an extractor 62 at one end of the enclosure by means of which vapour may be extracted from the chamber 54 and a return flow inlet 60 at another end of the chamber 54 by means of which extracted vapour may be returned to the inside of the enclosure.
- a cooler/collector 100 is provided downstream of the extractor 62 and is connected via ducting to a cyclone 102 and via a second duct 64 to a circulation fan 66 and back to the return flow inlet 60 .
- Two collection bins 106 and 104 are provided at discharge points at the bottom of the cooler/collector 100 and the cyclone 102 respectively.
- Two surge hoppers with pneumatically operated dual flap valves (not shown) are provided between the cooler/collector 100 and the collection bin 106 , and the cyclone 102 and the collector 104 , respectively. The dual flap valves are controlled to open and close at predefined intervals.
- An Oxygen detector 68 is provided to monitor the Oxygen content on the inside of the chamber 54 .
- An inert gas purging system 70 using Nitrogen as gas is provided with outlets into the chamber 54 .
- An air bleed 72 is provided into the chamber 54 .
- the Oxygen detector 68 , the Nitrogen purging system 70 and the air bleed 72 are controllably connected to a SCADA control system (not shown) for controlling the Oxygen content in the inside of the chamber 54 .
- SCADA control system not shown
- any inert gas purging system can be used instead of the Nitrogen system.
- a nozzle cleaning system 76 is provided to clean the vapour distribution manifold nozzles 57 .
- a screw conveyor 78 is provided to move solids/Zinc dust collected at the bottom of the chamber 54 out of the chamber 54 .
- the screw conveyor 78 has a built in screening arrangement that is attached to screw conveyor shaft.
- the discharge point 80 discharges solids with a size smaller than 0.5 mm and the discharge point 82 discharges solids with a size larger than 0.5 mm.
- Two pneumatically operated dual falp valves 84 are provided to control the outlet from the discharge points 80 , 82 .
- a cooling screw conveyor 86 is provided with an inlet from the discharge point 80 .
- Two solid/dust collection bins 88 , 90 are provided to collect solids from the discharge point 82 and from an outlet of the screw conveyor 86 , respectively.
- the melting furnace 12 is pre-heated to a temperature of between 400° C. and 700° C. by means of the gas burner 26 .
- the melting crucible 30 is then charged with Zinc raw materials such as secondary Zinc waste metal.
- the crucible 30 can be charged with top dross Zinc.
- the melting furnace 12 is then brought up to a temperature of between 920° C. and 1150° C. and a chloride-based flux is added to the bath of molten Zinc.
- the temperature of the molten bath of Zinc is allowed to drop to 550° C.
- the molten material is transferred to the vaporizing furnace 14 by tilting the refractory 24 by means of the hydraulic tilt table 28 and pouring the molten material via the spout 34 into the tundish and launder 20 .
- the molten material is allowed to flow into the vaporizing furnace 14 through the funnel assembly 50 and dip tube 48 .
- the vaporizing crucible is filled to a level exceeding the bottom end of the dip tube 48 , but once in operation the molten material in the vaporizing crucible is controlled never to drop below the bottom end of the dip tube 48 . Therefore, once in operation the material will always be added below the surface of the material in the vaporizing crucible 42 . This is important not to allow oxygen containing air to enter the free space above the level of molten Zinc in the vaporizing furnace 14 .
- thermocouple 92 disposed on the inside of the vaporizing crucible 42 connected to a SCADA control system and the burner 38 is used to control the temperature of the bath of molten material in the vaporizing crucible. Furthermore, the level of molten material in the vaporizing crucible 42 is measured by measuring the weight of the vaporizing furnace 14 with the load cells 40 , or by means of mechanical measurement means such as a dipstick. The level is to be maintained above a predefined first set-point and if the level drops below the predefined first set-point, an alarm indicated that more molten material should be added to the vaporizing crucible. If the level drops below a second set-point an alarm indicates that the system is shutting down. The burner is then shut down to allow the material in the vaporizing furnace to cool down.
- Zinc vapor from the vaporizing furnace 14 is transferred to the condenser 18 via the crossover tube 22 .
- the vapour enters the condenser chamber 54 via a vapour distribution manifold 56 and vapour distribution nozzles 57 .
- the nozzles 57 distribute the vapour inside the chamber 54 .
- the nozzles 57 are provided with pneumatically operated nozzle wipers (not shown) and with a pneumatically operated nozzle-opening needle (not shown) to clear the nozzles at predefined time intervals.
- the vapour is cooled with the vapour circulation system 58 and forms Zinc dust that drops out to the bottom of the chamber 54 .
- the vapor circulation system cools the vapour by extracting the vapour from the chamber 54 via the extractor 62 , which is provided with an explosive discharge at its top. From the extractor 62 , the vapour is transported to a cooler/collector 100 , which is in the form of a radiator that cools the vapour and allows Zinc dust in the vapour to collect at the bottom of the cooler/collector 100 and, via the pneumatically operated dual flap valves, in the collection bin 106 .
- the vapor is then transported to the cyclone 102 , where fine particles are separated from the vapour to be collected at the bottom of the cyclone 102 and, via the pneumatically operated dual flap valves, in the collection bin 104 .
- This bin collects the finest Zinc dust particles.
- the Zinc dust, collected at the bottom of the chamber 54 is then transported by means of the screw conveyor 78 and is sorted into smaller particles and larger particles by means of a built in screening arrangement that is fixed to the screw conveyor shaft.
- the dust drops out in two discharge points 80 , 82 .
- the smaller particles drops out into discharge point 80 and the larger particles drop out into discharge point 82 into a collection bin 88 .
- the smaller particles are conveyed from the discharge point 80 via the cooling screw conveyor to a collection bin 90 .
- the Oxygen content in the condenser is controlled by means of the Nitrogen purging system 70 , the air bleed 72 , the Oxygen detector 68 , and the SCADA control system (not shown).
- the particle size of the Zinc particles is controlled by means of the vapour circulation system 58 . To increase the particle size, the vapour is circulated slower, and to decrease the particle size, the vapour is circulated faster.
- the disclosed embodiments provide an advantage in that Zinc dust can be produced on a semi-continuous basis and the system is sealed from Oxygen in free air, which provides for easier process control. Furthermore, the controllability of the particle size is of particular importance and it is believed that the particle size will be easier to control. A finer particle size can be obtained with the disclosed embodiments and the consistency of the particle size is better controlled. The disclosed embodiments will lead to an energy consumption reduction of about 50% compared to existing Zinc dust production plants. Furthermore, it is believed that the yield will be improved, when compared to existing plants.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Manufacture Of Metal Powder And Suspensions Thereof (AREA)
Abstract
A method of production of Zinc dust which includes melting Zinc products in a melting furnace on a semi-continuous basis, transferring at least a part of the molten Zinc products to a vaporizing furnace, vaporizing the molten Zinc in the vaporizing furnace into Zinc vapour on a substantially continuous basis, transferring Zinc vapour from the vaporizing furnace to a condenser, and condensing the Zinc vapour to form Zinc dust.
Description
- This patent application is a divisional of U.S. patent application ser. No. 13/057,564, filed 2 Mar. 2011, which is a national stage of PCT/IB2009/053420, field 6 Aug. 2009, which claims priority to South African Patent Application No. 2008/06828, filed 7 Aug. 2008, the disclosures of which are incorporated herein by reference in their entirety.
- Disclosed embodiments relate to the production of Zinc dust. In particular, disclosed embodiments relate to a Zinc dust production plant.
- Zinc processing by means of retort furnaces in known. However, it has been found that the present furnaces require the production of Zinc dust to be done in batches. Batch processing of raw materials leads to inefficiencies in the production process.
- Disclosed embodiments address this inefficiency and reduce energy consumption.
- In accordance with a previous U.S. patent application Ser. No. 13/057,564 (the Parent Application), a method of production of Zinc dust, is claimed, which includes melting Zinc products in a melting furnace on a semi-continuous basis; transferring at least a part of the molten Zinc products to a vaporizing furnace; vaporizing the molten Zinc in the vaporizing furnace into Zinc vapour on a substantially continuous basis; transferring Zinc vapour from the vaporizing furnace to a condenser; and condensing the Zinc vapour to form Zinc dust.
- First, the melting furnace is charged with Zinc raw materials which may be secondary Zinc products such as Zinc top-, or bottom dross material from a previous Zinc processing process and then the furnace is pre-heated to between 400° C. and 700° C. In general, the furnace is pre-heated to about 500° C.
- As part of this previously-claimed method, a flux is added to the molten Zinc in the melting furnace. The flux may be typically a chloride based flux to remove vaporizing inhibiting elements, such as aluminium and iron, from the molten Zinc.
- Before the molten Zinc is transferred to the vaporizing furnace, its temperature is reduced to about 550° C. When transferred, the molten Zinc is poured into a tundish and transported with a launder and poured into a crucible, underneath a surface of previously molten Zinc which still remains in the crucible, in the vaporizing furnace. In order to prevent the new molten Zinc to come into contact with the Oxygen above the surface of the previously molten Zinc, it is added to the crucible via a dip tube such that a bath of molten Zinc is maintained in the vaporizing furnace.
- The temperature of the Zinc bath in the crucible is maintained at between 920° C. and 1150° C. and in particular, at about 950° C. through a closed loop temperature control system.
- In order to vaporize the molten Zinc it has to be maintained at a pre-defined level that exceeds the level of the lower extreme of the dip tube, such that the atmosphere in the vaporizing crucible is isolated from the free atmosphere outside the vaporizing furnace. In order to maintain the pre-defined level of the molten Zinc an alarm is generated if the level falls below a first predefined level to indicate that more molten Zinc should be added to the crucible in the vaporizing furnace. A second alarm is generated if the level of molten Zinc in the crucible falls below a second predefined level to indicate that the lower extreme of the dip tube is about to be exposed. As a safety measure, the second alarm will cause the burner in the vaporizing furnace to shut down. These alarms may be audible and/or visual indicators.
- When vaporized, the Zinc vapour needs to be transferred to a condenser where it is collected in the sealed vaporizing furnace at a level above the surface of the molten Zinc in the crucible. The Zinc vapour is transferred via a crossover tube and distributed in the condenser by means of a vapour distribution manifold.
- In this previously-claimed method, the next step is to condense the Zinc vapour to form Zinc dust by circulating the Zinc vapour such that the Zinc condenses in the condenser in particle sizes depending on the Zinc vapour circulation speed. In the condenser, the Zinc vapour is cooled and circulated by means of air cooling through an air cooler. The fine Zinc dust particles are then extracted from the Zinc vapour through a cyclone.
- During condensing the Zinc vapour, a predefined percentage of about 2% of Oxygen is maintained in the condenser atmosphere and monitored by an Oxygen detector. If the level of Oxygen exceeds the predefined level the condenser atmosphere is purged with an inert gas such as Nitrogen and if the level of Oxygen falls below the predefined level air is bled from the free atmosphere into the condenser atmosphere.
- In the end, the Zinc dust is transported from the condenser to a dust collection arrangement by means of a hopper and screw conveyor.
- Disclosed embodiments provide a Zinc dust production plant, which includes a vertical crucible melting furnace into which Zinc products are receivable; a vertical crucible vaporizing furnace into which molten Zinc products from the melting furnace are receivable via a dip tube with a top end of the dip tube being in flow communication with molten material transport means and a bottom end of the dip tube opening into a lower portion of the vaporizing crucible; and a condenser in fluid flow communication with the vaporizing furnace for receiving Zinc vapour into the condenser, the condenser operable to condense the vaporized Zinc into Zinc dust.
- The Zinc dust production plant may include molten Zinc material transport means for transporting heated liquid material from the melting furnace crucible to the vaporizing furnace crucible. The molten material transport means includes a tundish and launder combination.
- The melting furnace may include a refractory lining at least partially surrounding the vertical melting crucible. The melting furnace may include a gas-fired burner in heat flow communication with an outside of the melting crucible.
- At least a portion of the melting crucible body may be enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body. The melting crucible may be of Silicon Carbide.
- The melting furnace may include manipulation means for manipulating the melting furnace. The manipulation means may be in the form of tilting means for tilting the melting furnace to cause liquid material in the melting furnace to flow from the melting crucible. The manipulation means may include a hydraulic actuator for tilting the melting furnace.
- The melting furnace may include pouring means in the form of a spout for directing liquid flow from the melting furnace.
- The vaporizing furnace may include a refractory lining at least partially surrounding the vertical vaporizing crucible.
- The vaporizing furnace may include a gas-fired burner in heat flow communication with an outside of the vaporizing crucible.
- A portion of the vaporizing crucible body may be enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body. The vaporizing crucible may be of Silicon Carbide.
- The vaporizing furnace may include a dip tube extending into a lower portion of the vaporizing crucible, the top end of the dip tube being in flow communication with the molten material transport means and the bottom end of the dip tube opening into the lower portion of the vaporizing crucible. A level above the bottom end of the dip tube defines an operative lower working level for molten material in the vaporizing crucible.
- The refractory lining may enclose the sides of the vertical vaporizing crucible and a top cover may seal the top ends of the refractory lining and the vaporizing crucible, thereby defining a burner chamber between the outside of the vaporizing crucible and an inside of the refractory lining and defining a vaporizing chamber inside the vaporizing crucible.
- The dip tube may extend through the top cover into the vaporizing crucible.
- The vaporizing furnace may include measurement means for measuring the amount of heated liquid in the vaporizing crucible. The measurement means may be the form of weight measurement means such as load cells onto which the vaporizing furnace may be mounted. The measurement means may be in the form of level measurement means such as a dipstick protruding into the vaporizing crucible.
- The Zinc dust production plant may include vapour transport means in the form of a crossover tube having at a first end an opening through the top cover of the vaporizing crucible and a second end leading into the condenser. The crossover tube may include a heating element.
- The condenser may be defined by an enclosure of steel plate. The condenser may include a screw conveyor arrangement at a bottom of the enclosure, operable to extract solids collecting at the bottom of the enclosure. The condenser may include a vapour distribution manifold connected to a second end of the vapour transport tube, the vapour distribution manifold opening into the inside of the enclosure.
- The condenser may include a circulation system having an extractor at one end of the enclosure by means of which vapour may be extracted from the enclosure and an inlet at another end of the enclosure by means of which extracted vapour may be returned to the inside of the enclosure. The circulation system may include at least one cooling cyclone for cooling the vapour.
- The condenser may include an atmosphere control arrangement for controlling the Oxygen content in the vaporizing chamber. The atmosphere control arrangement may include an Oxygen detector disposed in the inside of the enclosure, an inert gas purging arrangement, an air bleed arrangement and a processor controllably connected to the inert gas purging arrangement and the air bleed arrangement, operable, if the oxygen content exceeds a predefined level, to reduce the oxygen content in the enclosure by purging the inside with an inert gas from the inert gas purging arrangement and, if the oxygen content falls below a predefined level, to increase the oxygen content in the enclosure by opening the air bleed so as to form a thin oxide coating on the dust particle that renders it passive to any reaction.
- Disclosed embodiments provide a method of controlling Zinc dust particle size in a Zinc vapour condenser by adjusting a speed of circulation of Zinc vapour in the condenser to obtain a desired Zinc dust particle size.
- Disclosed embodiments will now be described, by way of example only with reference to the following drawing:
-
FIG. 1 shows a Zinc dust production plant in accordance with the disclosed embodiments. - In
FIG. 1 , a Zincdust production plant 10 is shown. Theplant 10 includes a verticalcrucible melting furnace 12, a verticalcrucible vaporizing furnace 14 and acondenser 18. Molten material transport means in the form of a tundish and launder 20 is provided between the meltingfurnace 12 and the vaporizingfurnace 14. Vapour transport means in the form of a SiliconCarbide crossover tube 22 is provided between the vaporizingfurnace 14 and thecondenser 18. - The melting
furnace 12 comprises arefractory lining 24, with agas burner 26 protruding through the lining 24 with the burner on an inside of thelining 24. The refractory lining is mounted on a hydraulic actuated tilt table 28. Inside the lining 24 a SiliconCarbide melting crucible 30 is provided with an open end exposed to free atmosphere. Aburner chamber 32 is defined between the outside wall of themelting crucible 30 and the inside of therefractory lining 24. A pouringspout 34 is provided from thecrucible 30 over a top edge of therefractory lining 24. The meltingfurnace 12 is provided with anextraction system 35. - The pouring
spout 34 is in alignment with the tundish and launder, 20 so that contents of themelting crucible 30 will flow via thespout 34 into the tundish and launder 20 when the tilt table 28 tilts therefractory lining 24. - The vaporizing
furnace 14 comprises arefractory lining 36, with agas burner 38 protruding through thelining 36. The gas burner is provided on an inside of thelining 36. Therefractory lining 36 is mounted onload cells 40 operable to measure the total weight of the vaporizing furnace. In other disclosed embodiments the amount of material in the vaporizingfurnace 14 can be determined with manual measurement means, such as a dip stick, or the like. Inside the lining 36 a SiliconCarbide vaporizing crucible 42 is provided with an open end facing upwards. A furnace top cover 44 seals the top of therefractory lining 36 and the vaporizingcrucible 42 to define aclosed burner chamber 46 and to close the top of the vaporizingcrucible 42. A SiliconCarbide dip tube 48 protrudes through thetop cover 44 leading from afunnel assembly 50 to an inside of the vaporizingcrucible 42. One end of thecrossover tube 22 protrudes through thetop cover 44 and opens into the top of the vaporizingcrucible 42. The tundish and launder 20 is in alignment with thefunnel assembly 50 so that liquid flowing down the tundish and launder 20 will flow into thefunnel assembly 50 and into the vaporizingcrucible 42. Thecrossover tube 22 includes an electrical heating element (of which only the connection is shown as 22.1) integral with thetube 22 for maintaining the temperature in the tube at 900° C. to prevent any condensation in thecrossover tube 22. - The
condenser 18 is defined by a steel plate chamber/enclosure 54 with a heat exchanger in the form of avapour circulation system 58. Thecondenser 18 includes avapour distribution manifold 56 in flow communication with another end of thecrossover tube 22. Thevapour distribution manifold 56 and vapourdistribution manifold nozzles 57 are arranged to distribute vapour from the vaporizing furnace into thechamber 54. The condenser includes avapour circulation system 58 having anextractor 62 at one end of the enclosure by means of which vapour may be extracted from thechamber 54 and areturn flow inlet 60 at another end of thechamber 54 by means of which extracted vapour may be returned to the inside of the enclosure. A cooler/collector 100 is provided downstream of theextractor 62 and is connected via ducting to acyclone 102 and via asecond duct 64 to acirculation fan 66 and back to thereturn flow inlet 60. Two 106 and 104 are provided at discharge points at the bottom of the cooler/collection bins collector 100 and thecyclone 102 respectively. Two surge hoppers with pneumatically operated dual flap valves (not shown) are provided between the cooler/collector 100 and thecollection bin 106, and thecyclone 102 and thecollector 104, respectively. The dual flap valves are controlled to open and close at predefined intervals. An Oxygen detector 68 is provided to monitor the Oxygen content on the inside of thechamber 54. An inertgas purging system 70, using Nitrogen as gas is provided with outlets into thechamber 54. An air bleed 72 is provided into thechamber 54. The Oxygen detector 68, theNitrogen purging system 70 and theair bleed 72 are controllably connected to a SCADA control system (not shown) for controlling the Oxygen content in the inside of thechamber 54. It is to be appreciated that any inert gas purging system can be used instead of the Nitrogen system. Anozzle cleaning system 76 is provided to clean the vapourdistribution manifold nozzles 57. - At the bottom of the chamber 54 a
screw conveyor 78, is provided to move solids/Zinc dust collected at the bottom of thechamber 54 out of thechamber 54. Thescrew conveyor 78 has a built in screening arrangement that is attached to screw conveyor shaft. - At an outlet end of the
conveyor 78 two discharge points are provided 80, 82. Thedischarge point 80 discharges solids with a size smaller than 0.5 mm and the discharge point 82 discharges solids with a size larger than 0.5 mm. Two pneumatically operateddual falp valves 84 are provided to control the outlet from the discharge points 80, 82. - A
cooling screw conveyor 86 is provided with an inlet from thedischarge point 80. - Two solid/
88, 90 are provided to collect solids from the discharge point 82 and from an outlet of thedust collection bins screw conveyor 86, respectively. - In operation, the melting
furnace 12 is pre-heated to a temperature of between 400° C. and 700° C. by means of thegas burner 26. Themelting crucible 30 is then charged with Zinc raw materials such as secondary Zinc waste metal. In particular thecrucible 30 can be charged with top dross Zinc. - The melting
furnace 12 is then brought up to a temperature of between 920° C. and 1150° C. and a chloride-based flux is added to the bath of molten Zinc. The temperature of the molten bath of Zinc is allowed to drop to 550° C. - The molten material is transferred to the vaporizing
furnace 14 by tilting the refractory 24 by means of the hydraulic tilt table 28 and pouring the molten material via thespout 34 into the tundish and launder 20. The molten material is allowed to flow into the vaporizingfurnace 14 through thefunnel assembly 50 anddip tube 48. Initially the vaporizing crucible is filled to a level exceeding the bottom end of thedip tube 48, but once in operation the molten material in the vaporizing crucible is controlled never to drop below the bottom end of thedip tube 48. Therefore, once in operation the material will always be added below the surface of the material in the vaporizingcrucible 42. This is important not to allow oxygen containing air to enter the free space above the level of molten Zinc in the vaporizingfurnace 14. - A
thermocouple 92 disposed on the inside of the vaporizingcrucible 42 connected to a SCADA control system and theburner 38 is used to control the temperature of the bath of molten material in the vaporizing crucible. Furthermore, the level of molten material in the vaporizingcrucible 42 is measured by measuring the weight of the vaporizingfurnace 14 with theload cells 40, or by means of mechanical measurement means such as a dipstick. The level is to be maintained above a predefined first set-point and if the level drops below the predefined first set-point, an alarm indicated that more molten material should be added to the vaporizing crucible. If the level drops below a second set-point an alarm indicates that the system is shutting down. The burner is then shut down to allow the material in the vaporizing furnace to cool down. - In operation, Zinc vapor from the vaporizing
furnace 14 is transferred to thecondenser 18 via thecrossover tube 22. The vapour enters thecondenser chamber 54 via avapour distribution manifold 56 andvapour distribution nozzles 57. Thenozzles 57 distribute the vapour inside thechamber 54. Thenozzles 57 are provided with pneumatically operated nozzle wipers (not shown) and with a pneumatically operated nozzle-opening needle (not shown) to clear the nozzles at predefined time intervals. - Inside the
condenser chamber 54, the vapour is cooled with thevapour circulation system 58 and forms Zinc dust that drops out to the bottom of thechamber 54. - The vapor circulation system cools the vapour by extracting the vapour from the
chamber 54 via theextractor 62, which is provided with an explosive discharge at its top. From theextractor 62, the vapour is transported to a cooler/collector 100, which is in the form of a radiator that cools the vapour and allows Zinc dust in the vapour to collect at the bottom of the cooler/collector 100 and, via the pneumatically operated dual flap valves, in thecollection bin 106. - The vapor is then transported to the
cyclone 102, where fine particles are separated from the vapour to be collected at the bottom of thecyclone 102 and, via the pneumatically operated dual flap valves, in thecollection bin 104. This bin collects the finest Zinc dust particles. - The Zinc dust, collected at the bottom of the
chamber 54 is then transported by means of thescrew conveyor 78 and is sorted into smaller particles and larger particles by means of a built in screening arrangement that is fixed to the screw conveyor shaft. The dust drops out in two discharge points 80, 82. The smaller particles drops out intodischarge point 80 and the larger particles drop out into discharge point 82 into acollection bin 88. The smaller particles are conveyed from thedischarge point 80 via the cooling screw conveyor to acollection bin 90. - The Oxygen content in the condenser is controlled by means of the
Nitrogen purging system 70, theair bleed 72, the Oxygen detector 68, and the SCADA control system (not shown). - The particle size of the Zinc particles is controlled by means of the
vapour circulation system 58. To increase the particle size, the vapour is circulated slower, and to decrease the particle size, the vapour is circulated faster. - The disclosed embodiments provide an advantage in that Zinc dust can be produced on a semi-continuous basis and the system is sealed from Oxygen in free air, which provides for easier process control. Furthermore, the controllability of the particle size is of particular importance and it is believed that the particle size will be easier to control. A finer particle size can be obtained with the disclosed embodiments and the consistency of the particle size is better controlled. The disclosed embodiments will lead to an energy consumption reduction of about 50% compared to existing Zinc dust production plants. Furthermore, it is believed that the yield will be improved, when compared to existing plants.
Claims (24)
1. A Zinc dust production plant, comprising:
a vertical crucible melting furnace into which Zinc products are receivable;
a vertical crucible vaporizing furnace into which molten Zinc products from the vertical crucible melting furnace are receivable via a dip tube with a top end of the dip tube being in flow communication with molten material transport means and a bottom end of the dip tube opening into a lower portion of a vaporizing crucible; and
a condenser in fluid flow communication with the vaporizing furnace for receiving Zinc vapour into the condenser, the condenser operable to condense the vaporized Zinc into Zinc dust.
2. The Zinc dust production plant of claim 1 , further comprising molten Zinc material transport means in the form of a tundish and launder combination for transporting heated liquid material from a melting crucible, forming part of the vertical crucible melting furnace, to the vertical crucible vaporizing furnace.
3. The Zinc dust production plant of claim 1 , wherein the vertical crucible melting furnace includes a refractory lining at least partially surrounding the melting crucible.
4. The Zinc dust production plant of claim 2 , wherein the vertical crucible melting furnace includes a gas-fired burner in heat flow communication with an outside of the melting crucible.
5. The Zinc dust production plant of claim 2 , wherein at least a portion of a melting crucible body is enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body.
6. The Zinc dust production plant of claim 2 , further comprising manipulation means, for manipulating the vertical crucible melting furnace, in which the manipulation means is in the form of tilting means for tilting the vertical crucible melting furnace to cause liquid material in the vertical crucible melting furnace to flow from the melting crucible.
7. The Zinc dust production plant of claim 1 , wherein the vertical crucible melting furnace includes pouring means in the form of a spout for directing liquid flow from the vertical crucible melting furnace.
8. The Zinc dust production plant of claim 1 , wherein the vertical crucible vaporizing furnace includes a refractory lining at least partially surrounding a vaporizing crucible.
9. The Zinc dust production plant of claim 8 , wherein the vertical crucible vaporizing furnace includes a gas-fired burner in heat flow communication with an outside of the vaporizing crucible.
10. The Zinc dust production plant of claim 9 , wherein a portion of the vaporizing crucible may be enclosed by the refractory lining, with the gas-fired burner being arranged in a chamber defined between the refractory lining and the melting crucible body.
11. The Zinc dust production plant of claim 8 , wherein a level above the bottom end of the dip tube defines an operative lower working level for molten material in the vaporizing crucible.
12. The Zinc dust production plant of claim 8 , wherein the refractory lining encloses sides of the vaporizing crucible and a top cover that seals top ends of the refractory lining and the vaporizing crucible, thereby defining a burner chamber between the outside of the vaporizing crucible and an inside of the refractory lining and defining a vaporizing chamber inside the vaporizing crucible.
13. The Zinc dust production plant of claim 8 , wherein the vertical crucible vaporizing furnace includes measurement means for measuring an amount of heated liquid in the vaporizing crucible.
14. The Zinc dust production plant of claim 13 , wherein the measurement means is in the form of weight measurement means such as load cells onto which the vertical crucible vaporizing furnace is mounted.
15. The Zinc dust production plant of claim 14 , wherein the measurement means is in the form of level measurement means, in which the level measurement means is in the form of a dipstick, protruding into the vaporizing crucible.
16. The Zinc dust production plant of claim 12 , further comprising vapour transport means in the form of a crossover tube having at a first end an opening through the top cover of the vaporizing crucible and a second end leading into the condenser.
17. The Zinc dust production plant of claim 16 , wherein the crossover tube includes a heating element.
18. The Zinc dust production plant of claim 1 , wherein the condenser is defined by an enclosure of steel plate.
19. The Zinc dust production plant of claim 18 , wherein the condenser includes a screw conveyor arrangement at a bottom of the enclosure, operable to extract solids collecting at the bottom of the enclosure.
20. The Zinc dust production plant of claim 18 , wherein the condenser includes a vapour distribution manifold connected to a second end of the crossover tube, the vapour distribution manifold opening into the inside of the enclosure.
21. The Zinc dust production plant of claim 18 , wherein the condenser includes a circulation system having an extractor at one end of the enclosure by means of which vapour may be extracted from the enclosure and an inlet at another end of the enclosure by means of which extracted vapour may be returned to the inside of the enclosure.
22. The Zinc dust production plant of claim 21 , wherein the circulation system includes at least one cooling cyclone for cooling the vapour.
23. The Zinc dust production plant of claim 18 , wherein the condenser includes an atmosphere control arrangement for controlling Oxygen content in the enclosure.
24. The Zinc dust production plant of claim 23 , wherein the atmosphere control arrangement includes an Oxygen detector disposed in the inside of the enclosure, an inert gas purging arrangement, an air bleed arrangement and a processor controllably connected to the inert gas purging arrangement and the air bleed arrangement, operable, if the oxygen content exceeds a predefined level, to reduce the oxygen content in the enclosure by purging the inside with an inert gas from the inert gas purging arrangement and, if the oxygen content falls below a predefined level, to increase the oxygen content in the enclosure by opening the air bleed so as to form a thin oxide coating on the dust particle that renders it passive to any reaction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/946,264 US20140093600A1 (en) | 2008-08-07 | 2013-07-19 | Production of zinc dust |
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ZA2008/06828 | 2008-08-07 | ||
| ZA200806828 | 2008-08-07 | ||
| PCT/IB2009/053420 WO2010016020A2 (en) | 2008-08-07 | 2009-08-06 | Production of zinc dust |
| US201113057564A | 2011-03-02 | 2011-03-02 | |
| US13/946,264 US20140093600A1 (en) | 2008-08-07 | 2013-07-19 | Production of zinc dust |
Related Parent Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/057,564 Division US8734563B2 (en) | 2008-08-07 | 2009-08-06 | Method and plant for the production of zinc dust |
| PCT/IB2009/053420 Division WO2010016020A2 (en) | 2008-08-07 | 2009-08-06 | Production of zinc dust |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20140093600A1 true US20140093600A1 (en) | 2014-04-03 |
Family
ID=41295806
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/057,564 Expired - Fee Related US8734563B2 (en) | 2008-08-07 | 2009-08-06 | Method and plant for the production of zinc dust |
| US13/946,264 Abandoned US20140093600A1 (en) | 2008-08-07 | 2013-07-19 | Production of zinc dust |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/057,564 Expired - Fee Related US8734563B2 (en) | 2008-08-07 | 2009-08-06 | Method and plant for the production of zinc dust |
Country Status (11)
| Country | Link |
|---|---|
| US (2) | US8734563B2 (en) |
| EP (1) | EP2324135B1 (en) |
| JP (1) | JP5567564B2 (en) |
| KR (1) | KR20110040962A (en) |
| CN (1) | CN102105608B (en) |
| AU (1) | AU2009278748A1 (en) |
| BR (1) | BRPI0917544A2 (en) |
| PL (1) | PL2324135T3 (en) |
| RU (1) | RU2484158C2 (en) |
| WO (1) | WO2010016020A2 (en) |
| ZA (1) | ZA201008940B (en) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102181664A (en) * | 2011-05-12 | 2011-09-14 | 大庆高新区北油创业科技有限公司 | Method for recovering zinc by smelting zinc ash and smelting device for implementing method |
| CN102534245A (en) * | 2011-12-02 | 2012-07-04 | 马龙仁和锌业有限公司 | Method for manufacturing high-quality zinc powder |
| US10287651B2 (en) | 2014-09-04 | 2019-05-14 | Research Institute Of Industrial Science & Technology | Thermal reduction apparatus for metal production, gate device, condensing system, and control method thereof |
| JP5881886B1 (en) * | 2015-07-22 | 2016-03-09 | 株式会社 テツゲン | Method and apparatus for recovering iron and zinc from electric furnace dust |
| JP5881885B1 (en) * | 2015-07-22 | 2016-03-09 | 株式会社 テツゲン | Method and apparatus for recovering zinc from gas containing zinc vapor |
| CN105499592B (en) * | 2015-12-08 | 2018-05-04 | 东北大学 | A kind of method that spherical zinc powder is produced using hot galvanizing residue |
| CN105855559B (en) * | 2016-05-30 | 2018-06-19 | 云南罗平锌电股份有限公司 | A kind of process and its device for producing displacement metal zinc |
| CN106077690B (en) * | 2016-08-16 | 2018-12-14 | 白银有色集团股份有限公司 | A kind of reduction alloy zinc powder production technology of the Water Quenching Slag containing zinc |
| CN108007195A (en) * | 2017-12-08 | 2018-05-08 | 佘峰 | A kind of energy-saving and environment-friendly smelting furnace |
| CN108436095A (en) * | 2018-03-14 | 2018-08-24 | 张格梅 | A method of preparing metal powder using high-temperature evaporation, spheroidization processing |
| CN108620599A (en) * | 2018-05-29 | 2018-10-09 | 葫芦岛市金景达清洁燃料有限公司 | A kind of device and method producing zinc powder using alcohol-based fuel |
| CN109014229A (en) * | 2018-08-23 | 2018-12-18 | 江苏申隆锌业有限公司 | A kind of zinc powder production combination unit |
| CN109332716A (en) * | 2018-11-26 | 2019-02-15 | 广东先导稀材股份有限公司 | Powder production device and method |
| CN109550970A (en) * | 2018-12-25 | 2019-04-02 | 江苏科创金属新材料有限公司 | A kind of preparation facilities of the dedicated zinc powder of water paint |
| CN110396601B (en) * | 2019-05-27 | 2021-04-27 | 武汉科技大学 | Method for collecting zinc powder in metallurgical ash |
| JP7688809B2 (en) * | 2021-01-25 | 2025-06-05 | 江蘇博遷新材料股▲ふん▼有限公司 | High-temperature resistant liquid reflux and exhaust structure for preparing fine powders by gas phase method |
| CN216632597U (en) * | 2021-11-12 | 2022-05-31 | 江苏博迁新材料股份有限公司 | A device for preparing ultrafine powder of conductive material |
| CN114799189A (en) * | 2022-01-04 | 2022-07-29 | 沈协江 | Co-production type metal powder preparation device and preparation method |
| JP2024073310A (en) * | 2022-11-17 | 2024-05-29 | 株式会社Sumco | Dust collection and cooling device and method for use in crucible or heater of single crystal pulling device |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8043408B2 (en) * | 2007-09-04 | 2011-10-25 | Cardero Resource Corporation | Direct smelting of zinc bearing compounds to produce metallic zinc |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES379780A1 (en) | 1970-05-18 | 1972-09-01 | Del Zinc La Azteca S A Prod | Procedure for manufacturing high quality zinc powder |
| JPS5672141A (en) * | 1979-11-16 | 1981-06-16 | Sosuke Uchida | Recovery of zinc from zinc dross by melting |
| SU999231A1 (en) * | 1981-02-02 | 1996-10-20 | Н.И. Ватутин | Installation for production of zinc oxide |
| US4549598A (en) * | 1981-12-17 | 1985-10-29 | Noranda Inc. | Process for minimizing foam formation during free falling of molten metal into moulds, launders or other containers |
| RO84748A (en) * | 1982-10-27 | 1984-09-30 | Boleslav Muler | Process for preparing ultrafine zinc powder |
| JPS61199567U (en) * | 1985-06-03 | 1986-12-13 | ||
| JP2671053B2 (en) * | 1990-04-20 | 1997-10-29 | 住友重機械工業株式会社 | Method for recovering valuable metals from zinc-containing dust |
| JPH07300631A (en) * | 1994-04-27 | 1995-11-14 | Toyota Autom Loom Works Ltd | Method and apparatus for recovering zinc oxide by oxygen burner type rotary melting furnace |
| RU2087569C1 (en) * | 1995-04-24 | 1997-08-20 | Акционерное общество "Эмпилс" | Installation for zinc oxide production |
| JPH09287033A (en) * | 1995-05-31 | 1997-11-04 | Toyota Motor Corp | Method and apparatus for treating waste containing oxides |
| RU2105019C1 (en) * | 1995-09-05 | 1998-02-20 | Геннадий Иванович Глухов | Zinc white production apparatus |
| CN2244053Y (en) * | 1995-09-21 | 1997-01-01 | 翟国华 | Zinc gasifying furnace |
| JP2000319706A (en) * | 1999-04-30 | 2000-11-21 | Mitsui Kinzoku Toryo Kagaku Kk | Manufacturing equipment and manufacturing method for zinc powder |
| AU2002952062A0 (en) * | 2002-10-15 | 2002-10-31 | D.Wilson Investments Pty. Ltd. | Process and apparatus for extracting zinc |
| CN1209218C (en) * | 2003-01-24 | 2005-07-06 | 翟国华 | Method for producing zinc powder and its mfg. device |
| CN2607217Y (en) * | 2003-02-13 | 2004-03-24 | 云南梅塞尔气体产品有限公司 | Equipment for producing ultrathin Zn powder by nitrogen and hydrogen mixed gas process |
| US20070253039A1 (en) | 2006-04-28 | 2007-11-01 | Kabushiki Kaisha Toshiba | Image processing apparatus |
| US8101006B2 (en) * | 2008-04-22 | 2012-01-24 | The Gillette Company | Centrifugal atomization for producing zinc powder |
-
2009
- 2009-08-06 RU RU2010152440/02A patent/RU2484158C2/en not_active IP Right Cessation
- 2009-08-06 KR KR1020117004928A patent/KR20110040962A/en not_active Ceased
- 2009-08-06 WO PCT/IB2009/053420 patent/WO2010016020A2/en not_active Ceased
- 2009-08-06 JP JP2011521676A patent/JP5567564B2/en not_active Expired - Fee Related
- 2009-08-06 PL PL09786820T patent/PL2324135T3/en unknown
- 2009-08-06 CN CN200980129379.3A patent/CN102105608B/en not_active Expired - Fee Related
- 2009-08-06 US US13/057,564 patent/US8734563B2/en not_active Expired - Fee Related
- 2009-08-06 BR BRPI0917544A patent/BRPI0917544A2/en not_active IP Right Cessation
- 2009-08-06 EP EP09786820A patent/EP2324135B1/en not_active Not-in-force
- 2009-08-06 AU AU2009278748A patent/AU2009278748A1/en not_active Abandoned
-
2010
- 2010-12-13 ZA ZA2010/08940A patent/ZA201008940B/en unknown
-
2013
- 2013-07-19 US US13/946,264 patent/US20140093600A1/en not_active Abandoned
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8043408B2 (en) * | 2007-09-04 | 2011-10-25 | Cardero Resource Corporation | Direct smelting of zinc bearing compounds to produce metallic zinc |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2009278748A1 (en) | 2010-02-11 |
| EP2324135A2 (en) | 2011-05-25 |
| US8734563B2 (en) | 2014-05-27 |
| WO2010016020A3 (en) | 2010-09-16 |
| RU2010152440A (en) | 2012-09-20 |
| US20120031234A1 (en) | 2012-02-09 |
| EP2324135B1 (en) | 2012-08-01 |
| WO2010016020A2 (en) | 2010-02-11 |
| PL2324135T3 (en) | 2012-12-31 |
| ZA201008940B (en) | 2012-01-25 |
| BRPI0917544A2 (en) | 2015-11-17 |
| JP2011530650A (en) | 2011-12-22 |
| JP5567564B2 (en) | 2014-08-06 |
| RU2484158C2 (en) | 2013-06-10 |
| CN102105608A (en) | 2011-06-22 |
| CN102105608B (en) | 2015-07-01 |
| KR20110040962A (en) | 2011-04-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8734563B2 (en) | Method and plant for the production of zinc dust | |
| US9707621B2 (en) | System for metal atomisation and method for atomising metal powder | |
| EP2212443A2 (en) | Method of and system for processing red mud | |
| ZA200705597B (en) | Metal vapour condensation and liquid metal withdrawal | |
| KR101742741B1 (en) | Method and apparatus for condensing metal vapours using a nozzle and a molten collector | |
| EP2146168B1 (en) | Material handling System for moving silicon powder | |
| Ling et al. | Antimony recovery from antimony-rich slag by top blowing nitrogen into the molten slag bath | |
| CN107723472A (en) | A kind of small intermittent-type reduction distillation device | |
| CN117298634A (en) | Vacuum distillation device for preparing high-purity metal by air extraction type gradient condensation | |
| US7632329B2 (en) | Method of refining scrap silicon using an electron beam | |
| CA2084220A1 (en) | Vacuum processing of particulate reactive metal | |
| EP0124635A1 (en) | Method and apparatus for liquid metal collection from vapor using molten pool of collecting metal | |
| RU2393064C1 (en) | Method of producing finely dispersed zinc powder for antirust paints and plant to this end | |
| CA1210932A (en) | Method and apparatus for liquid metal collection from vapor using molten pool of collecting metal | |
| CN209669321U (en) | A kind of anaerobic pan feeding formula zinc metal smelting-furnace | |
| CN106382818B (en) | A vacuum smelting furnace | |
| Kapsalyamov | Possibility of joint manufacture of ferroalloys and nonferrous metals by an electrothermal method | |
| WO2023170622A1 (en) | System and process for preheating raw material in the production of ferrochrome products | |
| WO2025233369A1 (en) | Melting furnace for aluminium and its alloys | |
| CN107457409A (en) | One kind plating cadmia melting continuously zinc powder furnace | |
| PL49044B3 (en) | ||
| WO2011007655A1 (en) | Apparatus and method for condensing and liquefying zinc chloride | |
| PL54248B3 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: ZINCHEM, A DIVISION OF ZIMCO GROUP (PTY) LTD., SOU Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HANNEMAN, MICHAEL;HESLOP, ROY WILLIAM;REEL/FRAME:031807/0282 Effective date: 20130807 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |