US20130334158A1 - Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements - Google Patents
Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements Download PDFInfo
- Publication number
- US20130334158A1 US20130334158A1 US13/983,607 US201213983607A US2013334158A1 US 20130334158 A1 US20130334158 A1 US 20130334158A1 US 201213983607 A US201213983607 A US 201213983607A US 2013334158 A1 US2013334158 A1 US 2013334158A1
- Authority
- US
- United States
- Prior art keywords
- unloading
- boom
- arm
- loading crane
- arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000005484 gravity Effects 0.000 claims description 12
- 238000004873 anchoring Methods 0.000 claims description 2
- 230000032258 transport Effects 0.000 description 18
- 239000000463 material Substances 0.000 description 17
- 238000000034 method Methods 0.000 description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 14
- 238000003860 storage Methods 0.000 description 11
- 230000008901 benefit Effects 0.000 description 10
- 230000008569 process Effects 0.000 description 10
- 238000009434 installation Methods 0.000 description 9
- 239000000969 carrier Substances 0.000 description 7
- 238000013461 design Methods 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000007689 inspection Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 230000005855 radiation Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 229920002994 synthetic fiber Polymers 0.000 description 2
- 241001125840 Coryphaenidae Species 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000021615 conjugation Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000003562 lightweight material Substances 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000013618 particulate matter Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000010421 standard material Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
- B65G67/603—Loading or unloading ships using devices specially adapted for articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61J—SHIFTING OR SHUNTING OF RAIL VEHICLES
- B61J1/00—Turntables; Traversers; Transporting rail vehicles on other rail vehicles or dollies
- B61J1/10—Traversers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/002—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles
- B65G63/004—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles for containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
- B66C19/002—Container cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/82—Luffing gear
Definitions
- the invention relates to an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using a gripper attached to the boom, which boom is hingedly connected to an arm via a hinge point, wherein the arm is placed on at least one guide or rail.
- the invention furthermore relates to an assembly of two unloading and loading crane arrangements.
- FIG. 1 shows a diagrammatic illustration of an existing unloading and loading crane arrangement 1 .
- Such an arrangement 1 can travel in its entirety along two rails 23 and 25 which extend in the longitudinal direction, substantially parallel to the quay 27 , in particular parallel to the water side of the quay 27 .
- the rail 25 is situated closest to a water side 29 of the quay 27 on which container ships can dock.
- the rail 23 is preferably recessed in the surface 21 of the quay 27 , so that vehicles can easily move transversely to the quay, in a direction away from the water 29 , at right angles to the rail 23 without being hampered by the rail.
- the rail 25 can therefore be installed on instead of in the quay surface 21 .
- the unloading and loading crane arrangement 1 comprises wheels 31 by means of which it can move over the rails 23 , 25 in a longitudinal direction along the quay 27 , i.e. at right angles to the transverse direction.
- the unloading and loading crane arrangement 1 also comprises a boom 3 underneath which a gripper or hoist 7 is fitted which can be moved in the transverse direction along the underside of the boom 3 by means of a known drive unit.
- a cab 7 ′ for an operator is provided near the gripper 7 .
- the term gripper or hoist is intended to mean any device which is provided on a boom 3 and which can grip containers on a container ship 150 and lift them.
- the boom 3 is attached to the rest of the unloading and loading crane arrangement by means of a hinge 33 . Said rest forms a fixed structure which consists of various parts.
- the hoist 7 can move to the underside of the arm 13 along the underside of the boom 3 and vice versa.
- the hoist is denoted by reference numeral 7 ′′.
- Arm 13 rests on structure 15 which in turn rests on columns 17 and 19 .
- the columns 17 , 19 are provided with said wheels 31 .
- the area 2 below hoist 7 ′′ and arm 13 , between the columns 17 and 19 is also referred to as buffer-in area 2 , and is used to temporarily store containers.
- the hoist 7 can be moved downwards from the boom 3 by means which are known per se in order to grip a certain cargo in the hold of a ship, for example a container, and can subsequently be moved upwards again.
- a machine housing 9 which contains a machine which is known per se and which is connected to the boom 3 by means of cables 5 .
- An operator can control the machine in such a manner that the boom 3 with the cables 5 can be pulled up around hinge 33 , so that ships can moor more easily without hitting the boom 3 .
- Reference numeral 3 ′ denotes the boom in the upright position.
- a counterweight 11 is arranged which has a weight which is such that, together with the own weight of the STS crane, the unloading and loading crane arrangement is balanced on the rails at all times, irrespective of the fact whether the hoist 7 has or has not gripped a load.
- the fixed structure of the unloading and loading crane arrangement 1 usually comprises four legs or columns 17 , 19 underneath which the wheels 31 are fitted and which bear the entire weight of the unloading and loading crane arrangement.
- FIG. 1 and FIG. 12 Traditional unloading and loading crane arrangements as illustrated in FIG. 1 and FIG. 12 are used to take containers from a ship using a hoist 7 and placing them in a so-called buffer-in area 2 . With known devices, this is usually the area underneath arm 13 and between columns 17 and 19 . There, the containers are then picked up by, for example, a straddle carrier 103 and taken to a storage depot 4 further inland, where they are later, for example, loaded onto purpose-built lorries 6 in order to be transported on the road.
- the present structure inter alia has the following drawbacks.
- Known unloading and loading crane arrangements 1 have wheels 31 by means of which the arrangements can be displaced on rails 23 , 25 . No tensile forces can be transmitted between the wheels 31 and the rails 23 , 25 , so therefore the devices have to be made heavy in order to achieve the desired balance, in particular by means of a large own weight and by fitting large amounts of ballast, for example in the form of counterweight 11 .
- the large own weight and the use of ballast is disadvantageous due to the fact that the material used is expensive, that more power is required to displace the arrangement as a result of the increased mass, and the increased requirements regarding the strength and stability of the rails 23 , 25 and the quay 27 as a result of the increased weight.
- rails in grooves in the quay also have the drawback that the grooves require cleaning in order to keep them free and usable, and that they form a risk since they can cause employees to fall or stumble.
- Moving unloading and loading crane arrangements 1 on the quay are also a risk to all the other traffic on the quay.
- EP 1 923 338 A1 shows a variant of the device from FIG. 1 which addresses the problems regarding the rails in the quay by placing the rails in a raised position, but this device has new drawbacks. Thus, additional operations are, for example, required if a hoisted load according to EP 1 923 338 A1 has to be brought past a column of the rails. As a result thereof, this solution is not very practical. Both the amount of material used and the total mass are not significantly less in this solution than in the described prior art.
- One of the problems with a shorter unloading time is that more transportation equipment and a larger surface area will be needed for the temporary storage (buffer-in) of containers before they can be taken to a desired location, for example using straddle carriers, tractors, Automated Guided Vehicles (AGVs), etc., to a stack at the storage depot, where they can then be picked up by a lorry.
- AGVs Automated Guided Vehicles
- the invention provides an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using the gripper attached to the boom.
- the boom is hingedly connected to an arm via a hinge point, wherein the arm is placed on at least one landside guide and one waterside guide.
- the waterside guide is placed at a higher level than the landside guide.
- the unloading and loading crane arrangement thus has a part which is displaceable in the longitudinal direction, the arm of which serves as a kind of frame, and the boom with gripper which hinges with respect to the arm is connected thereto, and a fixed part, with columns which support the guides on which or along which the arm is displaceable in the longitudinal direction.
- At least one guide is placed on columns which have been placed in a quay and/or a bed.
- Columns are an advantageous means for supporting the guides, as no reinforced quay has to be provided underneath the entire reach of the unloading and loading crane arrangement. In fact, the arrangement may even be partly or completely above water.
- the waterside guide depending on the magnitude of the projection, is placed at least 10 metres, preferably at least 15, more preferably at least 20 metres higher than the landside guide.
- Another advantage of the rail 59 which is situated lower is that the tilting moment due to wind loads from the land side, and perpendicular to the quay, is significantly reduced in the operational position.
- the theoretical tilting moment which could cause a tensile load on rail 59 is approximately 95% less than with a traditional STS crane with rails at quay level and approximately 75% less than with an STS crane module with raised rails at equal height (for example according to EP1923338A1).
- the unloading and loading crane arrangement is configured and dimensioned in such a manner that the centre of gravity of the arrangement is lower than a horizontal plane in which the boom is situated when it has been lowered, in which lowered position the gripper can load and unload the ship.
- the boom is fixedly connected to a further arm, preferably an upright arm, wherein the boom and further arm are situated at least essentially on either side of a hinge point, by means of which the boom is hingedly connected to the arm.
- the boom and the further arm are balanced in an advantageous manner, so that the boom can pivot relatively easily about the hinge point.
- the invention furthermore provides an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using a gripper attached to the boom, which boom is hingedly connected to an arm via a hinge point, characterized in that the boom is fixedly connected to a further arm, preferably an upright arm, wherein the boom and further arm are situated at least essentially on either side of the hinge point.
- the boom and the further arm are balanced in an advantageous manner, so that the boom can pivot about the hinge point relatively easily. It is possible to provide a more lightweight counterweight or even no counterweight, thus saving material.
- the boom together with the upright arm and with further connecting bars, forms a framework structure. In this way, the required strength is achieved while using less material and increasing the projection.
- the boom in the framework structure forms one dimensionally stable projecting beam with a triangular or a rectangular cross section.
- the further arm is dimensioned and configured to act as a counterweight when the boom pivots about the hinge point.
- the further arm is connected to a distal end of the arm via a draw bar.
- a draw bar optionally in combination with cables, it is possible to provide a mechanism for tilting the boom by means of the draw bar in an advantageous and efficient manner.
- the boom is configured as a single boom.
- the prior art shows booms with double projecting booms. A drawback of this double configuration is that the arrangement becomes wider.
- the hinge point is not placed above, but on the land side of the waterside guide. In an embodiment of the invention, the hinge point is placed on the landside near the waterside guide.
- the arm is provided with a parking platform for placing the gripper and/or a cab for an operator which is connected to the gripper there when the boom is tilted upwards. In an advantageous manner, this prevents the gripper and/or the cab from being carried along when the boom is tilted upwards.
- the boom is provided with an anchorage which can be displaced along the latter and to which a cable is attached by one end thereof, which cable has another end which is attached to a guide or column for anchoring the boom in an upwardly tilted position.
- an anchorage which can be displaced along the latter and to which a cable is attached by one end thereof, which cable has another end which is attached to a guide or column for anchoring the boom in an upwardly tilted position.
- the arm is provided with wheels configured to run on an upper surface of guides and running wheels configured to run in a groove in the guides.
- the wheels make it possible for the arrangement to roll over the guides in the longitudinal direction.
- the running wheels can also help to absorb tensile forces.
- the arm is provided with an anchorage which can be brought into an open position and a closed position, and which, in the open position, allows the arm of the arrangement to be displaced in the longitudinal direction along a column and, in the closed position, prevents this passage.
- the arrangement In the closed position, the arrangement is thus better able to absorb tensile forces resulting from the gripper lifting a load.
- the arrangement In an open position, the arrangement can be more readily displaced along the full length of the guide.
- the invention also provides two or more adjacent unloading and loading crane arrangements having one or more of the above-described features, which are furthermore characterized in that the boom, the arm and further arm of the two or more unloading and loading crane arrangements are dimensioned and configured such that the grippers of two such unloading and loading crane arrangements operating next to one another can simultaneously load and unload containers from adjacent bays on a container ship.
- the more efficient design which the invention makes possible and in particular the savings in material usage which have been achieved make it possible to provide unloading and loading crane arrangements which can cooperate in such an advantageous manner.
- FIG. 1 shows a diagrammatic illustration of a known unloading and loading crane arrangement
- FIGS. 2 a - 2 p show diagrammatic illustrations of an unloading and loading crane arrangement according to aspects of the invention
- FIGS. 3 a - b show a diagrammatic illustration in perspective of an unloading and loading crane arrangement according to aspects of the invention
- FIG. 4 shows a diagrammatic top view of a known unloading and loading crane arrangement
- FIG. 5 shows a diagrammatic top view of an unloading and loading crane arrangement according to an aspect of the invention
- FIGS. 6 a - d show diagrammatic illustrations of an unloading and loading crane arrangement according to an aspect of the invention
- FIGS. 7 a - b show a diagrammatic illustration of an unloading and loading crane arrangement according to an aspect of the invention
- FIGS. 8 a - d show diagrammatic illustrations of an unloading and loading crane arrangement according to an aspect of the invention
- FIGS. 9 a - e diagrammatically show a transport platform and conveyor track for an unloading and loading crane arrangement according to an aspect of the invention
- FIGS. 10 a - b show a top view of a conveyor track and a conveyor floor
- FIGS. 11 a - b show a view in perspective of a conveyor floor in different embodiments
- FIG. 12 shows a top view of a known unloading and loading crane arrangement and a stack area
- FIG. 13 a shows a top view of an unloading and loading crane arrangement and an integrated stack area in the STS area according to an aspect of the invention
- FIG. 13 b diagrammatically shows the loading and unloading process
- FIG. 13 c - d shows the simultaneous loading and unloading process in top view on the conveyor floor in an embodiment of the conveyor floor comprising three tracks on the outer side of the row of columns 51 and four tracks on the inside;
- FIG. 14 shows an overview of an installation by means of which containers can be loaded onto lorries or goods carriages
- FIG. 15 shows a side view of an unloading and loading crane arrangement with the integration of stack area and STS area according to an aspect of the invention
- FIG. 16 shows a side view of a scanning device
- FIG. 17 shows a view in perspective of a scanning device.
- FIGS. 18 a - c show a vehicle for use on a conveyor floor according the invention.
- FIG. 1 has already been discussed in the introduction.
- FIGS. 2 a - 2 p show diagrammatic illustrations of an unloading and loading crane arrangement 35 according to several aspects of the invention.
- This arrangement 35 has a boom 37 on the underside of which hoist 7 is arranged so as to be movable. Hoist 7 has the same function and can carry out substantially the same movements as in FIG. 1 .
- the boom 37 extends over water, so that a ship 150 with cargo can pass under it.
- the dimensions as indicated in FIG. 2 b only serve as an indication for a certain size of the installation. With a larger or smaller projection of boom 37 , the indicated dimensions may become larger or smaller.
- the boom 37 On the landside, the boom 37 is fixedly connected to a slightly upright arm 41 .
- securing parts 49 are fitted between upright arm 41 and various points on the boom 37 .
- the securing parts 49 are fitted together as a framework structure, more preferably as a three-dimensional framework structure.
- the upright arm 41 is thus connected to the boom 37 in a substantially rigid way.
- the connection between arm 41 and boom 37 is such that when the arm 41 , from the position illustrated in FIG. 2 a , is tilted around the hinge point 39 in the direction of the land, the boom 37 tilts along in such a manner that a distal end of the boom 37 moves away from the water surface.
- the arrangement 35 is provided with an arm 43 which, in the drawing, is fitted at an acute angle to the horizontal plane (or the boom 37 , if this is in the lowered position).
- the arm 43 On the rear side, the arm 43 has a, for example horizontal, platform 44 on which a counterweight can be placed.
- the counterweight is omitted by configuring the structure of arm 43 , arm 41 and boom 37 in such a manner in terms of weight distribution that together they ensure that the arrangement is sufficiently balanced, both in the position when the hoist 7 has gripped a load and in the position when the hoist 7 has not gripped a load.
- a machine housing 45 is placed on platform 44 . The machines in housing 45 are used to tilt the boom 37 about hinge point 39 by means of cables 47 and draw bar 47 ′.
- the boom 37 together with the upright arm 41 and the other bars of the framework structure 49 , form one dimensionally stable projecting beam with a triangular cross section.
- FIG. 2 g shows a view in the transverse direction (i.e. at right angles to a line along the quay) of the projecting part 37 , 49 onto the waterside rail beam 61 .
- This dimensionally stable projecting structure can be rotated upwards from the horizontal position about hinge point 39 approximately as far as the vertical position or at least such that the end is sufficiently far from the side of the ship 150 (see FIG. 2 b ).
- a substantially two-dimensional extending arm is often used (see, for example, FIG. 1 and FIG. 4 ). Such a two-dimensional arm has to be made extra strong in order to achieve the required rigidity.
- the framework structure is preferably three-dimensionally stable, as a result of which the risk of damage as a result of a heavy storm or hurricane can be reduced significantly.
- the illustrated framework structure offers sufficient possibilities to limit the risks to a minimum.
- the fixed framework structure which connects arm 37 and arm 41 via structure 49 preferably does not use cables and winches.
- wear on cables and winches in this part of the crane will not occur and, in an advantageous manner, less maintenance will be required than with a known structure, such as for example illustrated in FIG. 1 .
- the crane module 35 Due to the rigid framework structure of the boom 37 , 41 , 49 , the crane module 35 is, for example, better able to withstand heavy storms and hurricanes than a known projecting boom which is anchored by cables and winches.
- the landside arm 43 of the crane module 35 effectively forms the base of the crane module.
- the arm 43 has a wheel set 55 and 57 , respectively, by means of which the entire crane module can be displaced in the longitudinal direction (substantially parallel to the quay) along the raised waterside guide or rail beam 61 and along the lowered landside guide or rail beam 55 .
- the upper part 37 , 41 , 49 is attached to the landside arm 43 which forms the base by means of the hinge 39 and the draw bar 47 ′.
- the landside rail beam 59 is situated approximately 15 to 25 metres lower than the waterside rail beam 61 .
- An additional advantage is that the centre of gravity 73 (see FIG. 7 ) of the entire crane module 35 comes to lie significantly lower than is known from the prior art, which has an advantageous effect on the stability and the susceptibility to wind of the module 35 .
- the centre of gravity of the entire crane module 35 in particular of the entire assembly consisting of 37 , 49 , 41 , 43 , 44 , 45 , 47 , is approximately 10 to 15 metres below the waterside rail beam 61 .
- the centre of gravity of the entire crane module 35 is thus, for example, at a height between the heights of the landside 59 rail beams and the waterside 61 rail beams.
- the two parts of the crane module 35 , the upper part 37 , 41 , 49 and the lower part 43 can be prefabricated and transported separately, which results in a significant simplification compared to known methods of production and transportation.
- the assembly consisting of boom 37 , structure 49 and upright arm 41 is connected to arm 43 via a hinge 39 .
- This is done in such a manner that the boom 37 together with the arm 41 can tilt in such a manner that the boom 37 can be taken to an upright position, so that ships can moor underneath the boom 37 without hitting it.
- the hinge point 39 is situated on the landside near the fixed supporting structures 61 and 51 .
- all loads on the boom 37 , 49 , 41 are transferred to the rail 61 by means of the wheels 57 via the arm 43 .
- the hinge 39 is thus only subjected to little, if any load.
- the wheels 57 are provided with a “mounting” structure or “cam” structure.
- Cables 47 are provided substantially parallel to the draw bar 47 ′, between the arm 41 of the upper part and the underside of arm 43 .
- the cables 47 are operational when the upper part 37 , 41 , 49 of the crane module is pulled up or lowered.
- the fixed draw bar 47 ′ assumes the tensile force, which also reduces the wear on cables 47 and winches.
- the cables 47 and the draw bar 47 ′ serve as a backup facility in case an emergency occurs in one of the two.
- a “parking platform” 90 (see FIG. 2 e ) is attached to the end side of the gripper 7 and the cab 7 ′ of the crane operator.
- the gripper 7 and cab 7 ′ can thus be parked on the parking platform 90 separately from the upper part 37 , 39 , 41 when the upper part is or has been lifted up.
- FIG. 2 shows how, in the upright position, the upper part 37 , 41 , 49 can be readily anchored in a storm-proof way on the waterside rail beam 61 in case a heavy storm or hurricane is to be expected.
- a cable 46 is present on a winch 44 .
- the end of cable 46 is attached to a displaceable and preferably remote-controllable anchorage 48 which is displaceably arranged on the side or on the underside of the boom 37 . After the anchorage 48 has been moved upwards, the cable 46 is made storm-proof by means of the winch 44 .
- a problem of known crane modules is the fact that they can collapse in stormy weather conditions.
- the storm-proof anchorage of the upper part 37 , 41 , 49 makes the crane module stronger, especially since the anchorage preferably engages with rail beam 61 at the location of the hinge point and with a range of, for example, ⁇ 60 metres.
- the anchorage point if applicable, is at quay level, i.e. approximately 50 metres below the hinge point and with a range of, for example, ⁇ 27 metres.
- the arrangement 35 has a first series of fixed mechanical legs or columns 51 on the waterside of the quay 27 and a second series of fixed mechanical legs or columns 53 on the landside of the quay 27 .
- These first and second series of fixed mechanical columns 51 , 53 are fixedly anchored to the ground and can therefore not be moved along rails 31 , as is the case in FIG. 1 .
- the unloading and loading crane arrangement 35 is provided with wheels 55 , 57 and support wheels 63 , 65 , but these are not intended to drive at quay level 27 itself.
- the area 97 between the columns 51 and 53 is denoted as the buffer-in area 97 insofar as this area is situated on dry land.
- quay 27 also refers to a mooring facility 27 ′, for example a fender wall or a number of mooring posts or dolphins which are spaced apart slightly.
- the first series of columns 51 is provided with a first guide or rail 61 which extends in the direction of the quay 27 (see for example FIG. 3 a ).
- Said guide 61 is configured such that the wheels 57 can drive on this guide 61 in a direction parallel to the quay 27 .
- the upper side of the second series of columns 53 is provided with a second guide 59 which extends in the direction of the quay 27 .
- Said guide 59 is configured such that the wheels 55 can drive on this guide 61 in a direction parallel to the quay 27 or mooring structure 27 ′.
- the combination is configured in such a manner that the boom 37 can swing upwards, while the wheels 57 still remain on the guide 61 .
- the arrangement 35 comprises one or more running wheels 63 which can rotate horizontally in a notch in the guide 61 .
- the arrangement 35 also has one or more running wheels 65 which can rotate horizontally in a notch in the guide 59 .
- the guide/wheel connection is, in an advantageous manner, configured to absorb tensile forces to a large degree, in particular forces which could make the crane module tilt.
- Running wheels 63 may be provided in a groove on the landside of guide 61 or the waterside of guide 61 .
- Running wheels 65 may be provided in a groove on the landside of guide 59 or the waterside of guide 59 .
- Reference numeral 67 ( FIG. 2 h ), for example in the shape of a hook, indicates a mechanical anchorage of the arrangement 35 to the rail structure on the landside.
- FIG. 2 h shows a detail of the arrangement of the arm 43 with wheels 55 on the landside rail beam 59 .
- Securing part 91 is formed in such a manner that when the crane module 35 is placed on the rail beam 59 , wheels 55 come into contact with an upper surface of the rail beam 59 , and support wheels 65 run in a groove in the rail beam 59 .
- Partial hook 67 which can be opened forms an additional anchorage in case very heavy loads have to be lifted.
- the crane module 35 is also provided with a securing part 92 which cooperates with the rail beam 61 in a similar way by means of wheels 57 and support wheels 63 .
- FIG. 2 m shows a variant in which the column or series of columns 51 is placed in the bed 29 ′.
- the term bed 29 ′ is generally also understood to refer to the slope 29 ′′ which is situated above or below water and may or may not be reinforced.
- no quay wall is therefore provided, but, viewed from the landside in the direction of the waterside, the quay surface 21 ends at a certain point, beyond which a reinforced or non-reinforced slope continues as far as the waterside.
- This variant makes it possible, in an advantageous way, to provide an unloading and loading crane arrangement 35 without a reinforced quay 27 .
- a mooring facility 27 ′ is provided, so that ships cannot come too close to the landside.
- FIG. 2 n shows a variant in which both series of columns 51 and 53 have been placed in the bed 29 ′ or slope 29 ′′.
- FIG. 20 shows a variant in which a second mooring facility 27 ′′ has been provided on the landside of the first mooring facility 27 ′, as a result of which a river vessel can moor between the mooring facility 27 ′ and the series of columns 53 .
- the device 35 therefore also functions as a ship-to-ship unloading and loading crane arrangement. Cargo from a container ship 150 can be gripped by gripper 7 and taken to a river vessel 151 via conveyor floor 75 and transverse conveyor track 77 .
- FIGS. 2 a - 2 p show an arrangement 35 in which the arm 43 is at an angle with respect to the boom 37 , this is not strictly necessary for aspects of the invention, such as for example the use of the framework structure or the foundation of the columns 51 , 53 in a quay and/or in a bed.
- Columns 53 may be of equal length to columns 51 , and rails 59 , 61 may be situated at substantially the same height.
- both rail beams 59 and 61 may, in certain embodiments, have a height of at most 2 metres, preferably at most 1.5 metres, and a width of approximately at most 2 metres, preferably at most 1.5 metres, as a result of which a significant saving in material is achieved.
- the rail beams may have a box profile.
- unloading and loading crane arrangement may, depending on the context, be used to refer to a single unloading and loading crane module or to an assembly of, for example, series of columns 51 , 53 , guides 59 , 61 , and one or more loading crane modules which are displaceable on said guides.
- FIGS. 2 a - 2 p show different views of the unloading and loading crane arrangement according to aspects of the invention
- FIGS. 3 a and 3 b show a diagrammatic illustration in perspective with a relatively small projection and with a relatively large projection of the boom, respectively.
- Several columns 53 of the first series of columns can clearly be seen, as well as several columns 51 of the second series of columns.
- FIG. 3 a shows that each of the first series of columns 53 is anchored securely in the ground (quay 27 or bed) by means of respective foundation means 69 and each of the second series of columns 51 is anchored securely by means of respective foundation means 71 .
- FIG. 3 a shows that each of the first series of columns 53 is anchored securely in the ground (quay 27 or bed) by means of respective foundation means 69 and each of the second series of columns 51 is anchored securely by means of respective foundation means 71 .
- the complete structure may comprise two or more adjacent movable crane modules of unloading and loading crane arrangements 35 , 35 ′′ which can all drive on the same guides 59 , 61 .
- Each of such crane modules comprises a boom 37 , an arm 41 and an arm 43 , as well as all the described parts which can be driven on the guides 59 , 61 by means thereof.
- FIGS. 2 a - 2 p and 3 a - b inter alia have the following advantages.
- Use of ballast, for example as counterweight 29 in FIG. 1 is not required in the structures illustrated in FIGS. 2 a - 2 o and 3 a - b , or hardly at all, which results in a saving in material.
- Any tensile forces on the guides 59 , 61 are transmitted to the ground via the series of columns 51 , 53 and foundation means 69 , 71 .
- the unloading and loading crane arrangement 35 according to an aspect of the invention can be displaced with relatively little energy.
- each column 51 can have its own foundation means 71 .
- the loads on the guides 61 exerted by movable parts of the unloading and loading crane arrangement 35 which can drive on guides 61 are transmitted to the fixedly arranged columns 51 .
- the foundation means 71 may be fitted in the ground and, depending on the positioning, not each part of the quay 27 has to be dimensioned on the basis of a maximum load as was the case in FIG.
- the structural demands on the quay site, in particular on the landside are further reduced in an advantageous manner.
- the overall structure can be configured such that, on the landside, each leg 53 can have its own foundation means 69 . There are no longer any rails 23 , as was the case in FIG. 1 .
- the loads on the guides 59 can be transmitted to the fixedly arranged columns 53 by movable parts of the unloading and loading crane arrangement 35 which can drive on guides 59 .
- the foundation means 69 may be fitted in the ground.
- the distance between two adjacent columns 53 is, for example, 27 to 30 m.
- the quay site does not require any obstacles on the landside of the structure.
- FIG. 4 shows a top view of a conventional unloading and loading crane arrangement 1 .
- FIG. 4 shows that the boom 3 in the prior art consists of two booms 3 a, 3 b which run parallel to each other and between which the hoist 7 is situated. If, as in FIG. 4 , the booms 3 a, 3 b are positioned in such a manner that the gripper can reach containers in a bay of a container ship, the parallel booms 3 a, 3 b block the adjacent bays. These are then not accessible for a possible second unloading and loading crane arrangement 1 . This structure therefore makes it impossible to load or unload containers from two adjacent bays simultaneously.
- the boom 37 can be configured as a single boom underneath which a hoist 7 which is displaceable in the transverse direction (away from the water 29 and towards the water 29 ) is provided. In that case, there is only one upright arm 41 and one arm 43 present for each boom 37 .
- the booms 37 have a hinge point which is situated on the landside, near the columns 51 .
- the booms 37 pivot together with the arms 41 .
- Arm 41 can therefore be fixedly attached to the boom 37 , as a result of which fewer cables with winches are required. This in turn leads to fewer parts which are subject to wear.
- the boom 37 only requires a small counterweight, if any, since this is already provided by the arm 41 .
- the connections 49 between the arm 41 may consist of a triangular or rectangular dimensionally stable framework beam, strong bars, strong steel cables or other strong materials which are sufficiently sturdy.
- the arm 13 is at the same level as the projecting boom 3 . This is necessary because the hoist 7 with its ballast has to be able to pass to and fro from the boom 3 to the arm 13 .
- counterweight 11 is situated high above the earth's surface, for example at a level of as much as 50 m. Consequently, the centre of gravity of the entire unloading and loading crane arrangement 1 is also situated at a high level, for example still above the arm 13 and on the landside of hinge 33 . This is disadvantageous with regard to stability. This is aggravated by the fact that the total weight which can be moved over rails 31 may be between 800 and 2,200 tons.
- FIGS. 7 a and 7 b show another side view of the unloading and loading crane arrangement 35 which has already been shown in earlier figures, but in this case the centre of gravity 73 is clearly indicated and is situated below a horizontal plane in which boom 37 is situated when the latter is in the unloading and loading position (lowered position).
- the arm 43 is connected at a downwardly directed angle to the boom 37 via hinge 39 , so that the centre of gravity of the arm 43 (including platform 44 and counterweight 435 , if present) is below the horizontal plane in which the boom 37 is located while it is in its operating position.
- This is advantageous from the point of view of consumption of material and stability.
- the entire movable crane module can consequently be made more lightweight and only a little, if any, counterweight 45 has to be used. There are fewer dynamic loads.
- FIGS. 8 a - 8 d show a further aspect of the invention.
- FIG. 8 a again shows a side view of the unloading and loading crane arrangement 35 which is in the process of unloading a ship 150 by means of hoist 7 .
- the unloading and loading crane arrangement 35 has a conveyor floor 75 which, in use, is preferably situated above the quay site (provided there is a quay underneath the unloading and loading crane arrangement).
- the height of the conveyor floor can be selected freely, depending on the specific situation and the specific overall dimensions of the terminal.
- the gripper 7 of the boom 37 is configured such that it does not go further inland than a position above the conveyor floor 75 . This makes it possible to make the design of the boom 37 simpler in an advantageous manner. In particular, it is then possible to omit a mechanism which allows the gripper to go beyond the hinge point 39 or the waterside guide 61 , which lowers costs. Incidentally, if no conveyor floor is provided, it is also possible to use this efficient embodiment of the boom 13 and the gripper 7 . The space on the quay between waterside columns 51 and the shore, the so-called STS area, can then be used for the temporary storage of containers and ship's hatch covers.
- the conveyor floor 75 comprises two conveyor floor parts 751 , 752 (see for example FIGS. 8 c and 9 e ), as it were.
- the first conveyor floor part 751 is defined as that part of the conveyor floor 75 which is accessible to the gripper 7
- the second conveyor floor part 752 is defined as that part of the conveyor floor 75 which is accessible to a second conveyor track between the conveyor floor 75 and the downstream store, such as the transverse conveyor track 77 in FIG. 9 e .
- the two floors may be separated from one another, that is to say they do not overlap one another. This has certain design advantages since there is then no risk of the conveyor track 77 and the gripper 7 being in each other's way.
- the conveyor floor has to be provided with a third transport means for moving the cargo between the first and second conveyor floor 751 , 752 . Such transport means are described below.
- FIGS. 8 a and 8 b show a quay 27 below the conveyor floor 75 .
- the conveyor floor is provided at least partly above water 29 , for example if columns 51 and/or 53 are not fitted on a quay 27 , but in a bed 29 ′. If a quay 27 is present, operators can walk underneath this conveyor floor 75 and vehicles can then also move underneath this conveyor floor 75 .
- the conveyor floor 75 is, for example, connected to columns 51 by means of suitable support means which support the conveyor floor 75 in such a manner that it can carry a predetermined number of containers on a predetermined surface.
- a walkway and/or bridge structure at quay level may be provided underneath the conveyor floor 75 , if desired (see also FIGS. 2 m and 2 n ).
- Conveyor floor 75 extends along quay 27 in the longitudinal direction, as can be seen in FIG. 8 b which shows a front view of the unloading and loading crane arrangement 35 viewed from the water 29 .
- the unloading and loading arrangement 35 comprises a transverse conveyor track 77 which is supported by columns 51 , 53 in a suitable manner, for example.
- the conveyor track 77 is provided with a suitable hoist 79 , 80 which can be moved to a position above the conveyor floor 75 by means of drive means which are known per se.
- This hoist 79 , 80 is configured to grip containers from the conveyor floor 75 , lift them up, move them inland underneath the transverse conveyor track 77 and set them down behind the unloading and loading crane arrangement 35 , for example on the ground (but this may also be higher or lower). There, the containers can be placed on lorries or goods carriages by means of further transporting means for further transportation.
- the transverse conveyor tracks 77 run as far as the waterside row of columns 51 , so that a complete integration of the STS area and the stack area is achieved.
- the overhead cranes 79 can thus move containers from the conveyor floor 75 to the stacks without the use of other transport means. Of course, this also applies in the other direction, i.e. from the stacks to the ship.
- the conveyor track 77 with its hoist can also be used for transporting containers in the opposite direction, that is to say from a storage location inland from unloading and loading device 35 to the conveyor floor 75 in order to then be loaded onto a ship.
- the upper part of the unloading and loading crane module 35 takes the container out of the ship to a position on the conveyor floor 75 which, in this example, is situated at a height of approximately 11 to 12 metres above the quay level on the waterside of the outer structure of columns 51 .
- the width of the conveyor floor may be chosen freely depending on the desired throughput capacity and on the desired unloading and loading speed.
- the height position of the conveyor floor with respect to the quay level can also be chosen freely depending on the other functions on the quay.
- FIGS. 9 a - 9 d and 10 a - 10 b show a conveyor floor 75 which is provided with two longitudinal conveyor tracks 94 and 95 on the waterside of series of columns 51 , and a longitudinal conveyor track 93 on the quayside of series of columns 51 .
- the longitudinal conveyor tracks 93 , 94 , 95 illustrated by way of example consist, for example, of a fixed rail or crane rail structure, two rails 89 per track, but may also consist of a fixed steel “trench” profile, two trenches per track or even of a completely flat floor, as is illustrated in FIG. 9 e .
- the rail tracks are provided with points 96 , so that, for example, a vehicle 81 which moves along the longitudinal conveyor track 94 can move onto conveyor track 93 .
- the vehicles 81 can be moved manually, independently, or automatically across the conveyor floor in the longitudinal direction. In the case of a flat floor or in the case that for example both transversal guides and a longitudinal guides for the vehicle 81 are provided in the floor 75 , the vehicles 81 can also move or be moved in the transverse direction within the range of the transport means 79 .
- the vehicles with a container can be placed in a suitable location, so that the overhead crane 79 can lift the containers, following which the container is moved along the transverse conveyor track 77 . This prevents, in an advantageous manner, the exact longitudinal position of the ship, in particular the relative positioning of the container bays of the ship with respect to the transverse conveyor tracks 77 of the crane module 35 , from being of crucial importance to the loading or unloading of containers.
- transverse and longitudinal conveyor tracks 77 , 93 , 94 , 95 are discussed, it is in principle also possible to provide these conveyor tracks in and above the quay without a conveyor floor 75 being provided.
- the longitudinal conveyor tracks 93 , 94 , 95 may be provided, for example in the STS area, and the transverse conveyor track 77 may run into these.
- a number of advantages of the use of conveyor tracks which serve a raised unloading and loading floor 75 is then lost.
- the safety at quay level is not improved, the conveyor tracks are susceptible to damage by other traffic on the quay, off-shore crane arrangements are no longer possible or far less practical, etc.
- the unloading and loading crane arrangement 35 comprises two or more transverse conveyor tracks 77 which are arranged next to one another and which extend transversely with respect to the quay 27 (see FIGS. 10 a and 10 b ).
- the mutual distance between such adjacent conveyor tracks 77 measured in the longitudinal direction of the quay 27 and between the axes of the conveyor tracks 77 is as great as the distance which a whole number of containers, including the intermediate space, takes up on a ship in the longitudinal direction of the containers.
- Such dimensional accuracy between the axes of the conveyor tracks 77 makes it possible to stack containers at the storage location on land in the same way and at approximately the same intermediate distance as on the ship.
- the grid pattern size is adapted to the stack size. This substantially increases the effective floor surface on the land on which containers can be stored.
- the distance between two conveyor tracks 77 is, for example, approximately substantially equal to the width of one container bay in which, for example, four 20-foot containers or two 40-foot containers of a ship fit.
- the distance between tracks 77 may also be equal to twice the width, including an aisle in between, of a container bay, as is illustrated in FIG. 10 a .
- it is therefore advantageous if the distance between two conveyor tracks 77 is an integer multiple of the width, including intermediate spaces, of container bays of a ship.
- the distance in between is adapted to this intermediate distance between adjacent conveyor tracks.
- the dimensions of these unloading and loading crane modules may be such that they can be brought so close together that two adjacent unloading and loading modules can process adjacent bays of containers simultaneously.
- a width of the conveyor floor 75 of approximately 7 to 8 m may be chosen, as a result of which the two illustrated longitudinal conveyor tracks 94 , 95 can be realized adjacent to the waterside of the outer structure of columns 51 .
- the example from FIG. 9 a has one conveyor track 93 on the inner side of the outer structure of columns 51 .
- the invention can also be realized using different numbers of longitudinal conveyor tracks on the landside and/or the waterside.
- the selection has to be adapted to the desired processing speed and to the desired redundancy options in case of failures.
- the points 96 of the rail tracks 93 , 94 , 95 illustrated in FIGS. 10 a and 10 b make it possible to guide vehicles 81 around congestion on a particular longitudinal conveyor track.
- lane width the width between conveyor tracks 77 , see for example FIG. 10 a
- the longitudinal transportation of the containers via, for example, longitudinal conveyor tracks 93 , 94 , 95 on the conveyor floor will remain very limited. If this “lane width” is moreover adapted to the width of the “bays” on the ship, the necessity of longitudinal transportation on the conveyor floor is limited further to a minimum.
- the terminal lay-out is chosen such that sufficient flexibility is offered with regard to the current ships.
- Embodiments of the invention make it possible for all containers on the longitudinal conveyor tracks (which form part of the conveyor floor 75 ) to be moved, manually, or with a chain system, or semi-automatically, or completely automatically, to within the “lane width” of the buffer-in area 97 which is preferably substantially equal to the “lane width” of the stack area 99 .
- containers can also be transported to the inner side of the fixed structure without having to use the fold-out overhead crane system 85 (see FIGS. 9 a , 9 b ) or displacement device 87 ′ (see FIGS. 9 c , 9 d ).
- the track points system 96 on the conveyor floor increases the flexibility and is not only necessary in case of a local malfunction. Apart from the above-described small longitudinal displacements along the conveyor floor, it is of course also possible to move containers across large distances over the conveyor floor 75 in the longitudinal direction, should this be necessary.
- a further aspect focuses on the use of the conveyor track 77 with dedicated hoist or dedicated robot device 79 , as clarified further in FIGS. 9 a and 9 b .
- the conveyor track 77 extends as far as column 51 and is supported by the latter. Via a hinge 87 , the conveyor track 77 is connected to a subconveyor track 85 which, in use, can be swung above the conveyor floor 75 in such a manner that the latter extends in line with conveyor track 77 .
- a robot 79 with suitable hoist 80 can be driven in a transverse direction over the conveyor track 77 by suitable drive means.
- the subconveyor track 85 is in a downward position and the robot 79 can move from the conveyor track 77 to the subconveyor track 85 and vice versa, as is indicated in FIG. 9 b.
- FIG. 9 a shows how containers are stacked in the buffer-in area 97 on the quay between columns 51 and 53 .
- the figure shows how hoist 80 of robot device 79 has taken a container 88 out of the stack and lifted it to a higher position.
- FIG. 9 b shows how this container 88 is moved to a position above a vehicle 81 by means of the robot 79 , where the container 88 is placed on the vehicle 81 .
- Vehicle 81 is placed on one of the longitudinal conveyor tracks 93 , 94 , 95 on conveyor floor 75 and is displaceable in a direction along quay 27 . Vehicle 81 can be moved by means of suitable drive means, optionally manually or automatically.
- containers can still be displaced in the longitudinal direction before they are loaded onto the ship by means of hoist 7 . This is necessary in situations where the stacking of containers on the ship in the longitudinal direction of the quay 27 does not exactly match the stacking in the buffer-in area.
- a conveyor belt for example in the form of a chain.
- FIGS. 9 a and 9 b show the process when a container is moved from the buffer-in area onto the ship. Obviously, it also works in the opposite direction.
- FIG. 9 a also shows a container 83 which is held by hoist 7 (not illustrated in FIG. 9 a ) and is in the middle of an upward/downward movement in order to be placed on the vehicle 81 or to be lifted from the latter.
- hoist 7 not illustrated in FIG. 9 a
- subconveyor track 85 is at that point in time pulled upwards about hinge 87 so that it is not on the path of the container 83 .
- the structure can also be configured in such a way that the subconveyor track 85 can be retracted or extended in the transverse direction, at right angles to the quay 27 (see FIGS. 9 c and 9 d ), via displacement device 87 ′.
- subconveyor track 85 ′ When retracted, subconveyor track 85 ′ is not situated above vehicles 81 and not on the path of hoist 7 with container 83 .
- subconveyor track 85 ′ is situated above vehicle 81 so that robot 79 can move to a position above vehicle 81 and can load and unload containers there.
- an All-Directional AGV or a Two-Directional AGV to move cargo on the conveyor floor as illustrated in FIG. 11 b .
- These All- or Two-Directional AGVs are capable of moving both in the longitudinal and in the transverse direction without changing the orientation of the cargo it is transporting.
- the AGV can position itself in a spot where the AGV is accessible to the gripper of the boom and can then move in the longitudinal and transverse direction to a spot which is accessible to the gripper 79 of the transverse conveyor track 77 .
- the use of such AGVs then makes the hinged or slidable subconveyor track redundant.
- FIGS. 10 a - b and 11 a - b clarify certain aspects by means of diagrammatic top views and a view in perspective. It can clearly be seen that vehicles 81 can be displaced in the longitudinal direction along the quay 27 in order to match the stacking on the quayside with that on the ship.
- Reference numeral 79 shows a robot in its position on the subconveyor track 85 above a vehicle 81 in order to load or unload a container.
- Reference numeral 79 ′ refers to a robot in a position above the buffer-in area 97 .
- FIG. 12 shows an overview of a known container terminal.
- the terminal has a buffer-in area 2 , substantially between the waterside rails 25 and the landside rails 23 , underneath the boom 3 a, 3 b and fixed arm 13 of the crane module 1 . Behind it, in the landside direction, the stack area 4 is situated, and in an adjacent part 6 , lorries can be loaded and unloaded.
- Containers on sea-going vessels are usually stacked in the longitudinal direction of the ship, in other words the longitudinal axis of the containers runs parallel to the longitudinal axis of the ship.
- the known STS cranes or crane modules 1 lift the containers from the ship and place them in the buffer-in area 2 without turning them, i.e. the longitudinal axis of the containers still runs parallel to the quay.
- the containers are moved to the storage site in the stack area 4 by means of straddle carriers, tractors or reach-stackers 103 . During this move, the containers are usually turned by 90°, so that the longitudinal axis ends up at right angles to the quay.
- FIG. 13 a shows an embodiment according to a particularly advantageous aspect of the invention, in which the dimensions of the STS (crane) area 98 , the buffer-in area 97 , the stack area 99 and the lorry-loading area 99 ′ are matched to one another.
- the STS or crane area that is to say the area 98 between the quay 27 and the outer structure of columns 51 , a small longitudinal displacement is only necessary for a small number of the containers and this takes place on the conveyor floor, in this example at approximately 11 to 12 m above quay level.
- the buffer-in area 97 , the stack area 99 situated behind it and the lorry-loading area 99 ′ are of exactly the same width, so that further longitudinal moves are, in principle, not necessary.
- the above-described embodiment removes the need for rotating containers and also reduces the number of metres to be travelled by the container. As a result thereof, the throughput speed of the container terminal is improved and the energy consumption is reduced. Less travel for the containers means less wasted space and also less wear, less CO 2 and fewer emissions of fine particulate matter, less noise and fewer safety risks.
- Containers at the terminal are mainly transported by means of robot devices or overhead cranes 79 along conveyor tracks 77 .
- This has the advantage of a relatively low own weight of this transport means compared to the weight to be displaced and the low rolling friction of the steel wheels on the steel rails.
- the drive mechanism for both lifting and driving is electrical, thus saving on (fossil) fuel and resulting in lower emissions, less CO 2 , less noise and, if desired, 100% automation.
- lorries can be loaded in zone 99 ′ without the lorries having to enter the terminal site.
- trains can be loaded by means of the same system.
- FIGS. 13 b and 13 c show a diagrammatic illustration of the loading and unloading process in a specific situation.
- the transportation of containers at the terminal can be fully automated as the position in the horizontal and in the vertical plane of each container is known and the distances are travelled according to preprogrammable routes which are at right angles to one another and using preprogammable transport means and speeds. Traffic never has to cross at the same level.
- FIG. 13 d shows a further diagrammatic illustration of the loading and unloading process. It is similar to the example of FIG. 13 c , except that the vehicles are made to move in (clockwise) loops, which advantageously reduces the chance that two vehicles obstruct each other.
- the loading process and the unloading process can be carried out simultaneously by one STS crane module, which is an important requirement for the latest generation of container terminals.
- FIG. 14 shows an impression of the installation by means of which containers can be loaded onto lorries or goods carriages from the storage space or can be unloaded therefrom.
- the conveyor track 77 not only extends to a position above the storage space, but also above a road on which lorries can drive.
- the same robots 79 with hoists 80 can be used to carry out the loading and unloading.
- the hoist 80 is preferably configured such that it can also be displaced at right angles to the direction of the conveyor tracks 77 , i.e. in a longitudinal direction of the stored containers and in the direction of travel of lorries on the road.
- FIG. 15 shows a scan area 100 situated between the buffer-in area 97 and the stack area 99 .
- the scan area 100 forms a transverse strip which is provided with scan tracks 101 .
- the scan tracks 101 run in substantially longitudinal direction, i.e. parallel to the quay.
- a container inspection system 102 , 103 is provided in the scan area 100 , in the present example in the form of an Integrated Container Inspection System (ICIS), see also FIG. 16 and FIG. 17 .
- a VACIS portal Vehicle And Cargo Inspection System
- Radiation portal monitoring module for radiation monitoring
- OCR module automated container identification
- Empty view system an “Empty view system”.
- the scan area 100 can also be provided essentially at the level of the conveyor floor, substantially between or near columns 51 and 53 .
- the scan area 100 can then also be integrated with the conveyor floor 75 , in particular the longitudinal tracks 93 , 94 , 95 of the conveyor floor 75 can be shared with the scan tracks 101 .
- a mobile scanning installation 103 Preferably, use is made of a mobile scanning installation 103 .
- Known mobile scanning installations make it possible to drive over and along containers at a speed of 10 to 20 km per hour or more and to generate complete scanning results while simultaneously communicating with a central ICIS server via a high-speed wireless network.
- the scanning can, if desired, be carried out over and along container stacks which are three units high. Furthermore, the area 100 where scanning takes place is not manned and therefore no health risks will result from the radiation used in the scanning process.
- the overhead cranes 79 along the conveyor tracks 77 can take the containers from the conveyor floor 75 and place them directly on a scanning track 101 in a predetermined number of rows which are, for example, three units high. In this case, no temporary storage in the buffer-in area 97 is necessary. After scanning, the containers are transported to the stacks or stack area 99 by means of overhead cranes 79 .
- the containers When dealing with large numbers of containers, the containers will be placed both in the buffer-in area 97 and in the scan area 100 , and the scanning will continue during the off-peak hours.
- the mobile scanning installation 103 can be controlled manually, semi-automatically or completely automatically.
- the overhead cranes 79 can be programmed to place the containers, for example at night, according to fixed patterns and frequencies on the scanning tracks 101 and transport them on to the stack area 99 after scanning.
- the advantage is that, depending on the number of tracks and the number of mobile scanning installations, all containers can be scanned before they are placed in the stack area.
- containers are only scanned at random.
- the selected containers to be scanned are driven by a lorry or other terminal vehicle to a fixed scanning installation.
- the invention an embodiment of which is illustrated in FIGS. 15 , 16 and 17 , makes it possible in practice to check all containers, which is highly desirable from the point of view of safety and traceability.
- the transverse scan tracks 101 can also be used to displace containers in the longitudinal direction, i.e. parallel to the quay, from one track to the other or from one stack 99 to the other in case there are failures or emergency situations in other parts of the terminal.
- the conveyor tracks 101 can mainly be used for the transportation of containers from the stacks to the ship. This makes simultaneous unloading and loading, the so-called dual-cycling, possible in an optimum manner. For example, if the longitudinal conveyor tracks 93 , 94 , 95 on the conveyor floor 75 are used to transport the containers away from the ship, the longitudinal conveyor tracks 101 can be used simultaneously to transport other containers to the ship. Both the overhead cranes 79 and the STS crane modules 35 can then always return fully loaded to the location where the unloading procedure is taking place at that point in time.
- the mobile scanning installation also drives in the longitudinal direction of the terminal along a dedicated, optionally raised or recessed rail system, the gauge of which can be adapted, as desired, to the number of conveyor tracks in the transverse strip, as is illustrated in FIG. 17 .
- FIGS. 18 a - b schematically show a vehicle 810 that is particularly well-suited for use as transport vehicle 81 on a conveyor floor 75 , as shown in FIG. 18 c .
- the vehicle 810 comprises an upper part 801 , suitable for supporting a container, and one or more undercarriages 802 (in the present example, three undercarriages).
- Each undercarriage 802 is provided with an engine or other drive means for moving the undercarriage and comprises two rows of longitudinal wheels 803 (in the present example with three wheels in a row) and two rows of transversal wheels 804 .
- the longitudinal wheels and the transversal wheels are perpendicular to each other.
- the undercarriage is provided with means for raising and lowering the longitudinal rows of wheels 803 .
- the rows of wheels 803 , 804 are thus arranged in the undercarriage 802 in such a manner that the undercarriage 802 may be moved up and down (along direction u).
- the longitudinal rows 803 are lowered, the undercarriage is moved up (see FIG. 18 a (1)) and the longitudinal wheels will support the vehicle 810 .
- the vehicle can then move in a longitudinal direction.
- the longitudinal rows 803 are raised, the undercarriage is lowered until such point that the transversal rows of wheels 804 will support the undercarriage ( 18 a (2)).
- the vehicle is then ready to move in a transversal direction.
- the vehicle 810 may be made of relatively (compared to known AGVs) light-weight materials, such as synthetic materials.
- the upper part 801 and/or the wheels can be made of synthetic materials to reduce weight.
- the basic principle of two-directional vehicle 810 which allows only two basic directions of movement, and for example no diagonal movement, allows for a simple and robust design, unlike known all-directional AGVs. When the vehicles weigh less, the demands on the structure of conveyor floor 75 are reduced, allowing a less expensive construction.
- FIG. 18 c shows a vehicle 810 on conveyor floor 750 , which floor is provided with longitudinal guides 811 for the longitudinal wheels 803 and transversal guides 812 for the transversal wheels. It is also possible to provide electric conductors in the conveyor floor or in or on the guides for powering an electric motor in vehicle 810 . In that case, the vehicle can independently and automatically move using an electrical engine in the vehicle, and does not need to be provided with a battery that must also regularly be recharged.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Ship Loading And Unloading (AREA)
- Jib Cranes (AREA)
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
- Loading Or Unloading Of Vehicles (AREA)
- Handcart (AREA)
- Platform Screen Doors And Railroad Systems (AREA)
Abstract
An unloading and loading crane arrangement (35) with a boom (37), in particular a projecting boom, for loading and unloading a ship using a gripper (7) attached to the boom, which boom is hingedly connected to an arm (43) via a hinge point, wherein the arm is placed on at least one landside guide (59) and one waterside guide (61), wherein the waterside guide is placed at a higher level than the landside guide. An assembly of two or more such unloading and loading crane arrangements is also described.
Description
- The invention relates to an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using a gripper attached to the boom, which boom is hingedly connected to an arm via a hinge point, wherein the arm is placed on at least one guide or rail. The invention furthermore relates to an assembly of two unloading and loading crane arrangements.
- There is a worldwide trend to design and construct new container terminals for ports in such a manner that loading and unloading of container ships using so-called Ship-To-Shore (STS) cranes can be carried out more quickly, so that the turnaround time of container ships in container ports can be reduced. As a consequence, it is necessary to adapt the cargo handling on the terminal to make it possible for loading and unloading to take place simultaneously, so that as few empty runs as possible take place, which is also referred to as dual cycling.
-
FIG. 1 shows a diagrammatic illustration of an existing unloading and loadingcrane arrangement 1. Such anarrangement 1 can travel in its entirety along two 23 and 25 which extend in the longitudinal direction, substantially parallel to therails quay 27, in particular parallel to the water side of thequay 27. Therail 25 is situated closest to awater side 29 of thequay 27 on which container ships can dock. Therail 23 is preferably recessed in thesurface 21 of thequay 27, so that vehicles can easily move transversely to the quay, in a direction away from thewater 29, at right angles to therail 23 without being hampered by the rail. Therail 25 can therefore be installed on instead of in thequay surface 21. - The unloading and
loading crane arrangement 1 compriseswheels 31 by means of which it can move over the 23, 25 in a longitudinal direction along therails quay 27, i.e. at right angles to the transverse direction. - The unloading and
loading crane arrangement 1 also comprises aboom 3 underneath which a gripper orhoist 7 is fitted which can be moved in the transverse direction along the underside of theboom 3 by means of a known drive unit. Usually, acab 7′ for an operator is provided near thegripper 7. The term gripper or hoist is intended to mean any device which is provided on aboom 3 and which can grip containers on acontainer ship 150 and lift them. Theboom 3 is attached to the rest of the unloading and loading crane arrangement by means of ahinge 33. Said rest forms a fixed structure which consists of various parts. These include anarm 13 which extends in the longitudinal direction next to theboom 3 and is configured in such a manner that thehoist 7 can move to the underside of thearm 13 along the underside of theboom 3 and vice versa. In a position under thearm 13, the hoist is denoted byreference numeral 7″.Arm 13 rests onstructure 15 which in turn rests on 17 and 19. Thecolumns 17, 19 are provided with saidcolumns wheels 31. Thearea 2 below hoist 7″ andarm 13, between the 17 and 19, is also referred to as buffer-incolumns area 2, and is used to temporarily store containers. - The
hoist 7 can be moved downwards from theboom 3 by means which are known per se in order to grip a certain cargo in the hold of a ship, for example a container, and can subsequently be moved upwards again. - On the
arm 13, amachine housing 9 is arranged which contains a machine which is known per se and which is connected to theboom 3 by means ofcables 5. An operator can control the machine in such a manner that theboom 3 with thecables 5 can be pulled up aroundhinge 33, so that ships can moor more easily without hitting theboom 3.Reference numeral 3′ denotes the boom in the upright position. - On the
arm 13, acounterweight 11 is arranged which has a weight which is such that, together with the own weight of the STS crane, the unloading and loading crane arrangement is balanced on the rails at all times, irrespective of the fact whether thehoist 7 has or has not gripped a load. - The fixed structure of the unloading and
loading crane arrangement 1 usually comprises four legs or 17, 19 underneath which thecolumns wheels 31 are fitted and which bear the entire weight of the unloading and loading crane arrangement. - Traditional unloading and loading crane arrangements as illustrated in
FIG. 1 andFIG. 12 are used to take containers from a ship using ahoist 7 and placing them in a so-called buffer-inarea 2. With known devices, this is usually the area underneatharm 13 and between 17 and 19. There, the containers are then picked up by, for example, acolumns straddle carrier 103 and taken to a storage depot 4 further inland, where they are later, for example, loaded onto purpose-builtlorries 6 in order to be transported on the road. - This makes it necessary for the
rails 31 which are situated inland to be fitted recessed in the quay so that the straddle carriers can drive on them. Such a recessed structure requires more maintenance and it also results in vehicles (for example straddle carriers 103) being situated underneath the unloading and loading crane arrangement during operation, which requires coordination with regard to the dropping and picking up of containers in the buffer-in area byhoist 7. - The present structure inter alia has the following drawbacks. Known unloading and loading
crane arrangements 1 havewheels 31 by means of which the arrangements can be displaced on 23, 25. No tensile forces can be transmitted between therails wheels 31 and the 23, 25, so therefore the devices have to be made heavy in order to achieve the desired balance, in particular by means of a large own weight and by fitting large amounts of ballast, for example in the form ofrails counterweight 11. The large own weight and the use of ballast is disadvantageous due to the fact that the material used is expensive, that more power is required to displace the arrangement as a result of the increased mass, and the increased requirements regarding the strength and stability of the 23, 25 and the quay 27 as a result of the increased weight. The fact is that if there are two suchrails 23, 25 and the crane has fourparallel rails wheel sets 31, almost half the entire weight of such cranes can be at any position on said rails at any point in time. For this reason, quays on which container ships moor have, until now, had to be very sturdy and strong. When building a container terminal on land with existing quays, said quays have to be replaced and on land with no quays, no container terminal can be built without a new quay. - Another drawback is the fact that, as a result of the fact that ships are becoming ever wider, the
boom 3 has to project further fromstructure 15, which increases the pressure load onrail 25 during loading and unloading and increases the need forgreater ballast 11 overrail 23. With the traditional method, thewaterside rail 25 is for this reason positioned as closely as possible to the edge ofquay 27, which limits the working space on the outer side ofrail 25. - Furthermore, rails in grooves in the quay also have the drawback that the grooves require cleaning in order to keep them free and usable, and that they form a risk since they can cause employees to fall or stumble. Moving unloading and loading
crane arrangements 1 on the quay are also a risk to all the other traffic on the quay. - Although
EP 1 923 338 A1 shows a variant of the device fromFIG. 1 which addresses the problems regarding the rails in the quay by placing the rails in a raised position, but this device has new drawbacks. Thus, additional operations are, for example, required if a hoisted load according toEP 1 923 338 A1 has to be brought past a column of the rails. As a result thereof, this solution is not very practical. Both the amount of material used and the total mass are not significantly less in this solution than in the described prior art. - Another problem which is associated with the known cranes at present is the fact that they have a counterweight which is situated at a considerable height. Said counterweight increases the material costs of the crane. A relatively high centre of gravity of the crane, partly due to the counterweight, is not advantageous with regard to the stability and safety of the structure.
- One of the problems with a shorter unloading time is that more transportation equipment and a larger surface area will be needed for the temporary storage (buffer-in) of containers before they can be taken to a desired location, for example using straddle carriers, tractors, Automated Guided Vehicles (AGVs), etc., to a stack at the storage depot, where they can then be picked up by a lorry.
- The way current terminals are laid out, a large amount of space is required in order to be able to transport the containers from underneath the STS cranes (buffer-in area) to the stack-area. Irrespective of whether these transports take place by means of AGVs or by means of straddle carriers, both means of transport require a significant amount of manoeuvring space in an area directly behind the STS area.
- It is an object of the invention to solve at least one or some of these problems.
- The invention has several aspects which are claimed separately in the independent claims, but which can also be applied in any desired combination.
- The invention provides an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using the gripper attached to the boom. The boom is hingedly connected to an arm via a hinge point, wherein the arm is placed on at least one landside guide and one waterside guide. The waterside guide is placed at a higher level than the landside guide. This embodiment, as well as the embodiments described below, has various advantages which will be explained in more detail with reference to the figures. Some advantages are the fact that rails and rail grooves in the quay are redundant, that the quay no longer has to be made so strong and that the working area on the outer side of the quay is increased. In fact, when the guides are supported by columns, there is no need for a quay at all. The columns can also (partly) be placed in a bed. Insofar as there is a quay underneath the arrangement, it increases safety locally. The unloading and loading crane arrangement thus has a part which is displaceable in the longitudinal direction, the arm of which serves as a kind of frame, and the boom with gripper which hinges with respect to the arm is connected thereto, and a fixed part, with columns which support the guides on which or along which the arm is displaceable in the longitudinal direction. Providing one guide which is placed at a higher level has the advantage that the structure requires less material and can still reach the minimum height which is required for loading and unloading a container ship. In addition, the centre of gravity of the arrangement is lowered in an advantageous manner.
- In an embodiment of the invention, at least one guide is placed on columns which have been placed in a quay and/or a bed. Columns are an advantageous means for supporting the guides, as no reinforced quay has to be provided underneath the entire reach of the unloading and loading crane arrangement. In fact, the arrangement may even be partly or completely above water.
- In an embodiment of the invention, the waterside guide, depending on the magnitude of the projection, is placed at least 10 metres, preferably at least 15, more preferably at least 20 metres higher than the landside guide.
- Another advantage of the
rail 59 which is situated lower is that the tilting moment due to wind loads from the land side, and perpendicular to the quay, is significantly reduced in the operational position. - The theoretical tilting moment which could cause a tensile load on
rail 59, is approximately 95% less than with a traditional STS crane with rails at quay level and approximately 75% less than with an STS crane module with raised rails at equal height (for example according to EP1923338A1). - In an embodiment of the invention, the unloading and loading crane arrangement is configured and dimensioned in such a manner that the centre of gravity of the arrangement is lower than a horizontal plane in which the boom is situated when it has been lowered, in which lowered position the gripper can load and unload the ship. As a result thereof, it is possible to achieve a saving on material, while the structure remains very strong and storm-proof.
- In an embodiment of the invention, the boom is fixedly connected to a further arm, preferably an upright arm, wherein the boom and further arm are situated at least essentially on either side of a hinge point, by means of which the boom is hingedly connected to the arm. Thus, the boom and the further arm are balanced in an advantageous manner, so that the boom can pivot relatively easily about the hinge point.
- The invention furthermore provides an unloading and loading crane arrangement with a boom, in particular a projecting boom, for loading and unloading a ship using a gripper attached to the boom, which boom is hingedly connected to an arm via a hinge point, characterized in that the boom is fixedly connected to a further arm, preferably an upright arm, wherein the boom and further arm are situated at least essentially on either side of the hinge point. Thus, the boom and the further arm are balanced in an advantageous manner, so that the boom can pivot about the hinge point relatively easily. It is possible to provide a more lightweight counterweight or even no counterweight, thus saving material.
- In an embodiment of the invention, the boom, together with the upright arm and with further connecting bars, forms a framework structure. In this way, the required strength is achieved while using less material and increasing the projection.
- In an embodiment of the invention, the boom in the framework structure forms one dimensionally stable projecting beam with a triangular or a rectangular cross section.
- In an embodiment of the invention, the further arm is dimensioned and configured to act as a counterweight when the boom pivots about the hinge point.
- In an embodiment of the invention, the further arm is connected to a distal end of the arm via a draw bar. Optionally in combination with cables, it is possible to provide a mechanism for tilting the boom by means of the draw bar in an advantageous and efficient manner.
- In an embodiment of the invention, the boom is configured as a single boom. The prior art shows booms with double projecting booms. A drawback of this double configuration is that the arrangement becomes wider.
- In an embodiment of the invention, the hinge point is not placed above, but on the land side of the waterside guide. In an embodiment of the invention, the hinge point is placed on the landside near the waterside guide.
- In an embodiment of the invention, the arm is provided with a parking platform for placing the gripper and/or a cab for an operator which is connected to the gripper there when the boom is tilted upwards. In an advantageous manner, this prevents the gripper and/or the cab from being carried along when the boom is tilted upwards.
- In an embodiment of the invention, the boom is provided with an anchorage which can be displaced along the latter and to which a cable is attached by one end thereof, which cable has another end which is attached to a guide or column for anchoring the boom in an upwardly tilted position. In this way, it is possible to anchor the arrangement in a storm-proof way in an advantageous manner.
- In an embodiment of the invention, the arm is provided with wheels configured to run on an upper surface of guides and running wheels configured to run in a groove in the guides. The wheels make it possible for the arrangement to roll over the guides in the longitudinal direction. The running wheels can also help to absorb tensile forces.
- In an embodiment of the invention, the arm is provided with an anchorage which can be brought into an open position and a closed position, and which, in the open position, allows the arm of the arrangement to be displaced in the longitudinal direction along a column and, in the closed position, prevents this passage. In the closed position, the arrangement is thus better able to absorb tensile forces resulting from the gripper lifting a load. In an open position, the arrangement can be more readily displaced along the full length of the guide.
- The invention also provides two or more adjacent unloading and loading crane arrangements having one or more of the above-described features, which are furthermore characterized in that the boom, the arm and further arm of the two or more unloading and loading crane arrangements are dimensioned and configured such that the grippers of two such unloading and loading crane arrangements operating next to one another can simultaneously load and unload containers from adjacent bays on a container ship. The more efficient design which the invention makes possible and in particular the savings in material usage which have been achieved make it possible to provide unloading and loading crane arrangements which can cooperate in such an advantageous manner.
- The invention will be explained by means of various figures which show diagrammatic exemplary embodiments of various aspects thereof. Someone skilled in the art will understand that parts of these figures are intended to be illustrative and that standard parts can be replaced by technically equivalent parts which fulfil the same or virtually the same function. It is also possible to change the shape of parts compared to those in the figures without their technical function changing substantially.
- The entire structure may be made from standard materials which are known to the person skilled in the art. However, the inventive idea can also be embodied using materials which can fulfil the correct function but which will only become available in the future. Where the figures show relative or absolute dimensions, these are intended as an example and the invention is not limited by the illustrated dimensions or design or position with respect to the shore or the mutual relationships between the dimensions given.
-
FIG. 1 shows a diagrammatic illustration of a known unloading and loading crane arrangement; -
FIGS. 2 a-2 p show diagrammatic illustrations of an unloading and loading crane arrangement according to aspects of the invention; -
FIGS. 3 a-b show a diagrammatic illustration in perspective of an unloading and loading crane arrangement according to aspects of the invention; -
FIG. 4 shows a diagrammatic top view of a known unloading and loading crane arrangement; -
FIG. 5 shows a diagrammatic top view of an unloading and loading crane arrangement according to an aspect of the invention; -
FIGS. 6 a-d show diagrammatic illustrations of an unloading and loading crane arrangement according to an aspect of the invention; -
FIGS. 7 a-b show a diagrammatic illustration of an unloading and loading crane arrangement according to an aspect of the invention; -
FIGS. 8 a-d show diagrammatic illustrations of an unloading and loading crane arrangement according to an aspect of the invention; -
FIGS. 9 a-e diagrammatically show a transport platform and conveyor track for an unloading and loading crane arrangement according to an aspect of the invention; -
FIGS. 10 a-b show a top view of a conveyor track and a conveyor floor; -
FIGS. 11 a-b show a view in perspective of a conveyor floor in different embodiments; -
FIG. 12 shows a top view of a known unloading and loading crane arrangement and a stack area; -
FIG. 13 a shows a top view of an unloading and loading crane arrangement and an integrated stack area in the STS area according to an aspect of the invention; -
FIG. 13 b diagrammatically shows the loading and unloading process; -
FIG. 13 c-d shows the simultaneous loading and unloading process in top view on the conveyor floor in an embodiment of the conveyor floor comprising three tracks on the outer side of the row ofcolumns 51 and four tracks on the inside; -
FIG. 14 shows an overview of an installation by means of which containers can be loaded onto lorries or goods carriages; -
FIG. 15 shows a side view of an unloading and loading crane arrangement with the integration of stack area and STS area according to an aspect of the invention; -
FIG. 16 shows a side view of a scanning device; -
FIG. 17 shows a view in perspective of a scanning device. -
FIGS. 18 a-c show a vehicle for use on a conveyor floor according the invention. - In the figures, identical reference numerals refer to the same parts.
FIG. 1 has already been discussed in the introduction. -
FIGS. 2 a-2 p show diagrammatic illustrations of an unloading andloading crane arrangement 35 according to several aspects of the invention. Thisarrangement 35 has aboom 37 on the underside of which hoist 7 is arranged so as to be movable. Hoist 7 has the same function and can carry out substantially the same movements as inFIG. 1 . In use, theboom 37 extends over water, so that aship 150 with cargo can pass under it. - The dimensions as indicated in
FIG. 2 b only serve as an indication for a certain size of the installation. With a larger or smaller projection ofboom 37, the indicated dimensions may become larger or smaller. - On the landside, the
boom 37 is fixedly connected to a slightlyupright arm 41. In order to provide strength, one or more, for example steel, securingparts 49 are fitted betweenupright arm 41 and various points on theboom 37. - Preferably, the securing
parts 49 are fitted together as a framework structure, more preferably as a three-dimensional framework structure. Theupright arm 41 is thus connected to theboom 37 in a substantially rigid way. In any case, the connection betweenarm 41 andboom 37 is such that when thearm 41, from the position illustrated inFIG. 2 a, is tilted around thehinge point 39 in the direction of the land, theboom 37 tilts along in such a manner that a distal end of theboom 37 moves away from the water surface. Above land, thearrangement 35 is provided with anarm 43 which, in the drawing, is fitted at an acute angle to the horizontal plane (or theboom 37, if this is in the lowered position). On the rear side, thearm 43 has a, for example horizontal,platform 44 on which a counterweight can be placed. Preferably, the counterweight is omitted by configuring the structure ofarm 43,arm 41 andboom 37 in such a manner in terms of weight distribution that together they ensure that the arrangement is sufficiently balanced, both in the position when the hoist 7 has gripped a load and in the position when the hoist 7 has not gripped a load. Amachine housing 45 is placed onplatform 44. The machines inhousing 45 are used to tilt theboom 37 abouthinge point 39 by means ofcables 47 and drawbar 47′. - The
boom 37, together with theupright arm 41 and the other bars of theframework structure 49, form one dimensionally stable projecting beam with a triangular cross section. - This makes it possible to choose the dimensions of the boom in such a manner that projections of 100 metres or more are possible without causing any problems.
- In
FIG. 2 b, with a distance ofcolumn 51 to thequay 27 of ±30 metres, this still makes it possible to achieve a sufficiently large outreach to be able to load and unload the widest ships. A working space between thequay 27 and thewaterside columns 51 of the fixed structure of ±30 metres makes it possible to carry out virtually all longitudinal container displacements for the purpose of loading and unloading on the outer side of the fixed structure while also allowing sufficient space for stacking the hatch covers. -
FIG. 2 g shows a view in the transverse direction (i.e. at right angles to a line along the quay) of the projecting 37, 49 onto thepart waterside rail beam 61. This dimensionally stable projecting structure can be rotated upwards from the horizontal position abouthinge point 39 approximately as far as the vertical position or at least such that the end is sufficiently far from the side of the ship 150 (seeFIG. 2 b). In known cranes, a substantially two-dimensional extending arm is often used (see, for example,FIG. 1 andFIG. 4 ). Such a two-dimensional arm has to be made extra strong in order to achieve the required rigidity. Using a framework structure as illustrated inFIGS. 2 a-2 o makes it possible to make the crane module much lighter, which results in a direct saving in material as well as an indirect energy saving with regard to the displacement in the longitudinal direction of the quay. It is also possible to achieve a saving during assembly in situ in an advantageous manner as a result of the fact that lighter materials are being used. - In addition, the framework structure is preferably three-dimensionally stable, as a result of which the risk of damage as a result of a heavy storm or hurricane can be reduced significantly. In areas where earthquakes, typhoons and the like have to be taken into account in the design, the illustrated framework structure offers sufficient possibilities to limit the risks to a minimum.
- The fixed framework structure which connects
arm 37 andarm 41 viastructure 49 preferably does not use cables and winches. Thus, wear on cables and winches in this part of the crane will not occur and, in an advantageous manner, less maintenance will be required than with a known structure, such as for example illustrated inFIG. 1 . Due to the rigid framework structure of the 37, 41, 49, theboom crane module 35 is, for example, better able to withstand heavy storms and hurricanes than a known projecting boom which is anchored by cables and winches. - The
landside arm 43 of thecrane module 35 effectively forms the base of the crane module. Both on the underside 55 (that is to say, on the side ofplatform 44, see alsoFIGS. 2 c and 2 d) and on the upper side 57 (that is to say on the side ofhinge point 39, see alsoFIGS. 2 e and 2 f), thearm 43 has a 55 and 57, respectively, by means of which the entire crane module can be displaced in the longitudinal direction (substantially parallel to the quay) along the raised waterside guide orwheel set rail beam 61 and along the lowered landside guide orrail beam 55. The 37, 41, 49 is attached to theupper part landside arm 43 which forms the base by means of thehinge 39 and thedraw bar 47′. - In the embodiment from
FIG. 2 a, thelandside rail beam 59 is situated approximately 15 to 25 metres lower than thewaterside rail beam 61. This results in a significant saving in the required structure material compared to the prior art, as is, for example, illustrated inFIG. 1 . An additional advantage is that the centre of gravity 73 (seeFIG. 7 ) of theentire crane module 35 comes to lie significantly lower than is known from the prior art, which has an advantageous effect on the stability and the susceptibility to wind of themodule 35. The centre of gravity of theentire crane module 35, in particular of the entire assembly consisting of 37, 49, 41, 43, 44, 45, 47, is approximately 10 to 15 metres below thewaterside rail beam 61. The centre of gravity of theentire crane module 35 is thus, for example, at a height between the heights of the landside 59 rail beams and the waterside 61 rail beams. - The two parts of the
crane module 35, the 37, 41, 49 and theupper part lower part 43 can be prefabricated and transported separately, which results in a significant simplification compared to known methods of production and transportation. - The assembly consisting of
boom 37,structure 49 andupright arm 41 is connected toarm 43 via ahinge 39. This is done in such a manner that theboom 37 together with thearm 41 can tilt in such a manner that theboom 37 can be taken to an upright position, so that ships can moor underneath theboom 37 without hitting it. Thehinge point 39 is situated on the landside near the fixed supporting 61 and 51. When transporting containers from or to the ship, all loads on thestructures 37, 49, 41 are transferred to theboom rail 61 by means of thewheels 57 via thearm 43. Thehinge 39 is thus only subjected to little, if any load. To this end, thewheels 57 are provided with a “mounting” structure or “cam” structure. -
Cables 47 are provided substantially parallel to thedraw bar 47′, between thearm 41 of the upper part and the underside ofarm 43. Thecables 47 are operational when the 37, 41, 49 of the crane module is pulled up or lowered. As soon as theupper part boom 37 is in a horizontal position, the fixeddraw bar 47′ assumes the tensile force, which also reduces the wear oncables 47 and winches. Preferably, thecables 47 and thedraw bar 47′ serve as a backup facility in case an emergency occurs in one of the two. - On the upper side of
arm 43, a “parking platform” 90 (seeFIG. 2 e) is attached to the end side of thegripper 7 and thecab 7′ of the crane operator. Thegripper 7 andcab 7′ can thus be parked on theparking platform 90 separately from the 37, 39, 41 when the upper part is or has been lifted up.upper part - FIG. 2/shows how, in the upright position, the
37, 41, 49 can be readily anchored in a storm-proof way on theupper part waterside rail beam 61 in case a heavy storm or hurricane is to be expected. On the upper side of thecolumns 51, acable 46 is present on awinch 44. The end ofcable 46 is attached to a displaceable and preferably remote-controllable anchorage 48 which is displaceably arranged on the side or on the underside of theboom 37. After theanchorage 48 has been moved upwards, thecable 46 is made storm-proof by means of thewinch 44. A problem of known crane modules is the fact that they can collapse in stormy weather conditions. The storm-proof anchorage of the 37, 41, 49, in an advantageous way, makes the crane module stronger, especially since the anchorage preferably engages withupper part rail beam 61 at the location of the hinge point and with a range of, for example, ±60 metres. With known STS cranes, the anchorage point, if applicable, is at quay level, i.e. approximately 50 metres below the hinge point and with a range of, for example, ±27 metres. - The
arrangement 35 has a first series of fixed mechanical legs orcolumns 51 on the waterside of thequay 27 and a second series of fixed mechanical legs orcolumns 53 on the landside of thequay 27. These first and second series of fixed 51, 53 are fixedly anchored to the ground and can therefore not be moved alongmechanical columns rails 31, as is the case inFIG. 1 . The unloading andloading crane arrangement 35 is provided with 55, 57 andwheels 63, 65, but these are not intended to drive atsupport wheels quay level 27 itself. Thearea 97 between the 51 and 53 is denoted as the buffer-incolumns area 97 insofar as this area is situated on dry land. Incidentally, the fixed arrangement can equally well be built over aninclined slope 29″, as is illustrated inFIG. 2 m, or completely over the water surface, as is illustrated inFIGS. 2 n and 2 o, with the 51, 53 being placed in thecolumns bed 29′. In these cases,quay 27 also refers to amooring facility 27′, for example a fender wall or a number of mooring posts or dolphins which are spaced apart slightly. - On the upper side, the first series of
columns 51 is provided with a first guide orrail 61 which extends in the direction of the quay 27 (see for exampleFIG. 3 a). Saidguide 61 is configured such that thewheels 57 can drive on thisguide 61 in a direction parallel to thequay 27. In a similar manner, the upper side of the second series ofcolumns 53 is provided with asecond guide 59 which extends in the direction of thequay 27. Saidguide 59 is configured such that thewheels 55 can drive on thisguide 61 in a direction parallel to thequay 27 ormooring structure 27′. - The combination is configured in such a manner that the
boom 37 can swing upwards, while thewheels 57 still remain on theguide 61. Thearrangement 35 comprises one ormore running wheels 63 which can rotate horizontally in a notch in theguide 61. Thus, thearrangement 35 also has one ormore running wheels 65 which can rotate horizontally in a notch in theguide 59. Thus, the guide/wheel connection is, in an advantageous manner, configured to absorb tensile forces to a large degree, in particular forces which could make the crane module tilt. Runningwheels 63 may be provided in a groove on the landside ofguide 61 or the waterside ofguide 61. Runningwheels 65 may be provided in a groove on the landside ofguide 59 or the waterside ofguide 59. Reference numeral 67 (FIG. 2 h), for example in the shape of a hook, indicates a mechanical anchorage of thearrangement 35 to the rail structure on the landside. -
FIG. 2 h shows a detail of the arrangement of thearm 43 withwheels 55 on thelandside rail beam 59. Securingpart 91 is formed in such a manner that when thecrane module 35 is placed on therail beam 59,wheels 55 come into contact with an upper surface of therail beam 59, andsupport wheels 65 run in a groove in therail beam 59.Partial hook 67 which can be opened forms an additional anchorage in case very heavy loads have to be lifted. - By means of the
anchorage 67 of thepart 43 on the landside rail beam 59 (see alsoFIG. 2 i), little, if any ballast weight is required in thecrane module 35. Thisanchorage 67 is used during loading and unloading of the containers. The resulting tensile forces are transmitted by thisanchorage 67 to the fixed structure and transmitted to thefoundation 69 via the columns 53 (see alsoFIG. 3 a). - While the crane module is driving in the longitudinal direction, parallel to the quay, and when stationary while lifting less heavy loads, any tensile forces resulting from wind loads and brake forces are transmitted to the
landside rail beam 59 by the support wheels 65 (seeFIGS. 2 j and 2 k). With this combination of loads, theanchorage 67 is not required. - On the waterside, at
rail beam 61, thecrane module 35 is also provided with a securingpart 92 which cooperates with therail beam 61 in a similar way by means ofwheels 57 andsupport wheels 63. -
FIG. 2 m shows a variant in which the column or series ofcolumns 51 is placed in thebed 29′. Theterm bed 29′ is generally also understood to refer to theslope 29″ which is situated above or below water and may or may not be reinforced. InFIG. 2 m, no quay wall is therefore provided, but, viewed from the landside in the direction of the waterside, thequay surface 21 ends at a certain point, beyond which a reinforced or non-reinforced slope continues as far as the waterside. This variant makes it possible, in an advantageous way, to provide an unloading andloading crane arrangement 35 without a reinforcedquay 27. Preferably, amooring facility 27′ is provided, so that ships cannot come too close to the landside. -
FIG. 2 n shows a variant in which both series of 51 and 53 have been placed in thecolumns bed 29′ orslope 29″. -
FIG. 20 shows a variant in which asecond mooring facility 27″ has been provided on the landside of thefirst mooring facility 27′, as a result of which a river vessel can moor between themooring facility 27′ and the series ofcolumns 53. Obviously, it is also possible to construct a second mooring facility between 51 and 53. In the variant fromseries FIG. 2 o, thedevice 35 therefore also functions as a ship-to-ship unloading and loading crane arrangement. Cargo from acontainer ship 150 can be gripped bygripper 7 and taken to ariver vessel 151 viaconveyor floor 75 andtransverse conveyor track 77. - Although
FIGS. 2 a-2 p show anarrangement 35 in which thearm 43 is at an angle with respect to theboom 37, this is not strictly necessary for aspects of the invention, such as for example the use of the framework structure or the foundation of the 51, 53 in a quay and/or in a bed.columns Columns 53 may be of equal length tocolumns 51, and rails 59, 61 may be situated at substantially the same height. - The embodiments described in connection with
FIGS. 2 a-2 p can, in an advantageous manner, be produced with less material than known crane modules. For example, the cross sections of both rail beams 59 and 61 may, in certain embodiments, have a height of at most 2 metres, preferably at most 1.5 metres, and a width of approximately at most 2 metres, preferably at most 1.5 metres, as a result of which a significant saving in material is achieved. The rail beams may have a box profile. - The term unloading and loading crane arrangement may, depending on the context, be used to refer to a single unloading and loading crane module or to an assembly of, for example, series of
51, 53, guides 59, 61, and one or more loading crane modules which are displaceable on said guides.columns - While
FIGS. 2 a-2 p show different views of the unloading and loading crane arrangement according to aspects of the invention,FIGS. 3 a and 3 b show a diagrammatic illustration in perspective with a relatively small projection and with a relatively large projection of the boom, respectively.Several columns 53 of the first series of columns can clearly be seen, as well asseveral columns 51 of the second series of columns. In addition,FIG. 3 a shows that each of the first series ofcolumns 53 is anchored securely in the ground (quay 27 or bed) by means of respective foundation means 69 and each of the second series ofcolumns 51 is anchored securely by means of respective foundation means 71. Finally,FIG. 3 a shows that the complete structure may comprise two or more adjacent movable crane modules of unloading and 35, 35″ which can all drive on theloading crane arrangements 59, 61. Each of such crane modules comprises asame guides boom 37, anarm 41 and anarm 43, as well as all the described parts which can be driven on the 59, 61 by means thereof.guides - The structures illustrated in
FIGS. 2 a-2 p and 3 a-b inter alia have the following advantages. Use of ballast, for example ascounterweight 29 inFIG. 1 , is not required in the structures illustrated inFIGS. 2 a-2 o and 3 a-b, or hardly at all, which results in a saving in material. Any tensile forces on the 59, 61 are transmitted to the ground via the series ofguides 51, 53 and foundation means 69, 71. The unloading andcolumns loading crane arrangement 35 according to an aspect of the invention can be displaced with relatively little energy. In addition, the displacement takes place at a distance above the quay surface 21 (if present), as a result of which the traffic safety on thequay surface 21 is improved. Finally, due to the use of raised guides, it is no longer necessary to keep rail grooves in the quay surface clean. - According to an aspect of the invention, the structural demands on the quay, in particular on the waterside, are reduced in an advantageous manner. As
FIG. 3 a already indicates, the total structure may be configured in such a manner that eachcolumn 51 can have its own foundation means 71. There are no longer anyrails 25, as was the case inFIG. 1 . The loads on theguides 61 exerted by movable parts of the unloading andloading crane arrangement 35 which can drive on guides 61, are transmitted to the fixedly arrangedcolumns 51. The foundation means 71 may be fitted in the ground and, depending on the positioning, not each part of thequay 27 has to be dimensioned on the basis of a maximum load as was the case inFIG. 1 in the case of a continuous quay on dry land. Only thecolumns 51 have to be able to bear the load. The distance between twoadjacent columns 51 is, for example, 27 to 30 m. This makes it possible to construct a container terminal above the water surface without a quay wall. - According to an aspect of the invention, the structural demands on the quay site, in particular on the landside, are further reduced in an advantageous manner. As
FIG. 3 a indicates further, the overall structure can be configured such that, on the landside, eachleg 53 can have its own foundation means 69. There are no longer anyrails 23, as was the case inFIG. 1 . The loads on theguides 59 can be transmitted to the fixedly arrangedcolumns 53 by movable parts of the unloading andloading crane arrangement 35 which can drive on guides 59. The foundation means 69 may be fitted in the ground. - Only the
columns 53 have to be able to withstand the load. The distance between twoadjacent columns 53 is, for example, 27 to 30 m. - It is not necessary to provide a rail groove on the quay site with
rails 31 fitted therein in order for vehicles to be able to carry out a transverse movement, at right angles to the rails, with respect to thequay 27. In other words, the quay site does not require any obstacles on the landside of the structure. -
FIG. 4 shows a top view of a conventional unloading andloading crane arrangement 1.FIG. 4 shows that theboom 3 in the prior art consists of two 3 a, 3 b which run parallel to each other and between which the hoist 7 is situated. If, as inbooms FIG. 4 , the 3 a, 3 b are positioned in such a manner that the gripper can reach containers in a bay of a container ship, thebooms 3 a, 3 b block the adjacent bays. These are then not accessible for a possible second unloading andparallel booms loading crane arrangement 1. This structure therefore makes it impossible to load or unload containers from two adjacent bays simultaneously. - However, in a further aspect of the invention, as is illustrated in
FIG. 5 , theboom 37 can be configured as a single boom underneath which a hoist 7 which is displaceable in the transverse direction (away from thewater 29 and towards the water 29) is provided. In that case, there is only oneupright arm 41 and onearm 43 present for eachboom 37. This makes it possible to make the movable crane modules of the unloading and loading crane arrangements less wide, so that two adjacent modules can load and unload adjacent bays of containers in a ship. As a result thereof, several adjacent crane modules can operate at the same time, resulting in quicker loading and unloading of a ship. - As is illustrated in
FIG. 1 , traditional unloading and loading crane arrangements have ahinge 33 in the projectingboom 3. However, according to an aspect of the invention, thebooms 37 have a hinge point which is situated on the landside, near thecolumns 51. As is illustrated inFIGS. 6 a-d, thebooms 37 pivot together with thearms 41.Arm 41 can therefore be fixedly attached to theboom 37, as a result of which fewer cables with winches are required. This in turn leads to fewer parts which are subject to wear. Also, theboom 37 only requires a small counterweight, if any, since this is already provided by thearm 41. Theconnections 49 between thearm 41 may consist of a triangular or rectangular dimensionally stable framework beam, strong bars, strong steel cables or other strong materials which are sufficiently sturdy. - With traditional STS cranes, the
arm 13 is at the same level as the projectingboom 3. This is necessary because the hoist 7 with its ballast has to be able to pass to and fro from theboom 3 to thearm 13. As a result thereof,counterweight 11 is situated high above the earth's surface, for example at a level of as much as 50 m. Consequently, the centre of gravity of the entire unloading andloading crane arrangement 1 is also situated at a high level, for example still above thearm 13 and on the landside ofhinge 33. This is disadvantageous with regard to stability. This is aggravated by the fact that the total weight which can be moved overrails 31 may be between 800 and 2,200 tons. - An aspect of the invention relates to such a form of the displaceable part of the unloading and
loading crane arrangement 35, that is to say the crane module, that the centre of gravity thereof is much lower.FIGS. 7 a and 7 b show another side view of the unloading andloading crane arrangement 35 which has already been shown in earlier figures, but in this case the centre ofgravity 73 is clearly indicated and is situated below a horizontal plane in which boom 37 is situated when the latter is in the unloading and loading position (lowered position). This is due to the fact that thearm 43 is connected at a downwardly directed angle to theboom 37 viahinge 39, so that the centre of gravity of the arm 43 (includingplatform 44 and counterweight 435, if present) is below the horizontal plane in which theboom 37 is located while it is in its operating position. This is advantageous from the point of view of consumption of material and stability. The entire movable crane module can consequently be made more lightweight and only a little, if any,counterweight 45 has to be used. There are fewer dynamic loads. -
FIGS. 8 a-8 d show a further aspect of the invention.FIG. 8 a again shows a side view of the unloading andloading crane arrangement 35 which is in the process of unloading aship 150 by means of hoist 7. According to this aspect of the invention, the unloading andloading crane arrangement 35 has aconveyor floor 75 which, in use, is preferably situated above the quay site (provided there is a quay underneath the unloading and loading crane arrangement). The height of the conveyor floor can be selected freely, depending on the specific situation and the specific overall dimensions of the terminal. - In an embodiment, the
gripper 7 of theboom 37 is configured such that it does not go further inland than a position above theconveyor floor 75. This makes it possible to make the design of theboom 37 simpler in an advantageous manner. In particular, it is then possible to omit a mechanism which allows the gripper to go beyond thehinge point 39 or thewaterside guide 61, which lowers costs. Incidentally, if no conveyor floor is provided, it is also possible to use this efficient embodiment of theboom 13 and thegripper 7. The space on the quay betweenwaterside columns 51 and the shore, the so-called STS area, can then be used for the temporary storage of containers and ship's hatch covers. - The
conveyor floor 75 comprises twoconveyor floor parts 751, 752 (see for exampleFIGS. 8 c and 9 e), as it were. The firstconveyor floor part 751 is defined as that part of theconveyor floor 75 which is accessible to thegripper 7, and the secondconveyor floor part 752 is defined as that part of theconveyor floor 75 which is accessible to a second conveyor track between theconveyor floor 75 and the downstream store, such as thetransverse conveyor track 77 inFIG. 9 e. The two floors may be separated from one another, that is to say they do not overlap one another. This has certain design advantages since there is then no risk of theconveyor track 77 and thegripper 7 being in each other's way. In that case though, the conveyor floor has to be provided with a third transport means for moving the cargo between the first and 751, 752. Such transport means are described below.second conveyor floor -
FIGS. 8 a and 8 b show aquay 27 below theconveyor floor 75. However, it is also possible and advantageous to provide this floor if the conveyor floor is provided at least partly abovewater 29, for example ifcolumns 51 and/or 53 are not fitted on aquay 27, but in abed 29′. If aquay 27 is present, operators can walk underneath thisconveyor floor 75 and vehicles can then also move underneath thisconveyor floor 75. Theconveyor floor 75 is, for example, connected tocolumns 51 by means of suitable support means which support theconveyor floor 75 in such a manner that it can carry a predetermined number of containers on a predetermined surface. However, if the fixed structure is situated completely or partly offshore, a walkway and/or bridge structure at quay level may be provided underneath theconveyor floor 75, if desired (see alsoFIGS. 2 m and 2 n). -
Conveyor floor 75 extends alongquay 27 in the longitudinal direction, as can be seen inFIG. 8 b which shows a front view of the unloading andloading crane arrangement 35 viewed from thewater 29. In order to be able to take containers from theconveyor floor 75 inland to a further storage location, the unloading andloading arrangement 35 comprises atransverse conveyor track 77 which is supported by 51, 53 in a suitable manner, for example. Thecolumns conveyor track 77 is provided with a suitable hoist 79, 80 which can be moved to a position above theconveyor floor 75 by means of drive means which are known per se. This hoist 79, 80 is configured to grip containers from theconveyor floor 75, lift them up, move them inland underneath thetransverse conveyor track 77 and set them down behind the unloading andloading crane arrangement 35, for example on the ground (but this may also be higher or lower). There, the containers can be placed on lorries or goods carriages by means of further transporting means for further transportation. - The transverse conveyor tracks 77 run as far as the waterside row of
columns 51, so that a complete integration of the STS area and the stack area is achieved. Theoverhead cranes 79 can thus move containers from theconveyor floor 75 to the stacks without the use of other transport means. Of course, this also applies in the other direction, i.e. from the stacks to the ship. - Obviously, the
conveyor track 77 with its hoist can also be used for transporting containers in the opposite direction, that is to say from a storage location inland from unloading andloading device 35 to theconveyor floor 75 in order to then be loaded onto a ship. - The upper part of the unloading and
loading crane module 35 takes the container out of the ship to a position on theconveyor floor 75 which, in this example, is situated at a height of approximately 11 to 12 metres above the quay level on the waterside of the outer structure ofcolumns 51. The width of the conveyor floor may be chosen freely depending on the desired throughput capacity and on the desired unloading and loading speed. The height position of the conveyor floor with respect to the quay level can also be chosen freely depending on the other functions on the quay. -
FIGS. 9 a-9 d and 10 a-10 b show aconveyor floor 75 which is provided with two longitudinal conveyor tracks 94 and 95 on the waterside of series ofcolumns 51, and alongitudinal conveyor track 93 on the quayside of series ofcolumns 51. The longitudinal conveyor tracks 93, 94, 95 illustrated by way of example consist, for example, of a fixed rail or crane rail structure, tworails 89 per track, but may also consist of a fixed steel “trench” profile, two trenches per track or even of a completely flat floor, as is illustrated inFIG. 9 e. There aresufficient vehicles 81 on the rail tracks for thecrane module 35 to lower the containers onto. The rail tracks are provided withpoints 96, so that, for example, avehicle 81 which moves along thelongitudinal conveyor track 94 can move ontoconveyor track 93. Thevehicles 81 can be moved manually, independently, or automatically across the conveyor floor in the longitudinal direction. In the case of a flat floor or in the case that for example both transversal guides and a longitudinal guides for thevehicle 81 are provided in thefloor 75, thevehicles 81 can also move or be moved in the transverse direction within the range of the transport means 79. Thus, the vehicles with a container can be placed in a suitable location, so that theoverhead crane 79 can lift the containers, following which the container is moved along thetransverse conveyor track 77. This prevents, in an advantageous manner, the exact longitudinal position of the ship, in particular the relative positioning of the container bays of the ship with respect to the transverse conveyor tracks 77 of thecrane module 35, from being of crucial importance to the loading or unloading of containers. - It will be clear to the person skilled in the art that where transverse and longitudinal conveyor tracks 77, 93, 94, 95 are discussed, it is in principle also possible to provide these conveyor tracks in and above the quay without a
conveyor floor 75 being provided. Thus, the longitudinal conveyor tracks 93, 94, 95 may be provided, for example in the STS area, and thetransverse conveyor track 77 may run into these. However, a number of advantages of the use of conveyor tracks which serve a raised unloading andloading floor 75 is then lost. Thus, for example, the safety at quay level is not improved, the conveyor tracks are susceptible to damage by other traffic on the quay, off-shore crane arrangements are no longer possible or far less practical, etc. - Instead of providing one or more longitudinal conveyor tracks on the
conveyor floor 75, it is for example also possible, on an otherwise flat conveyor floor, to use an All-Directional Automated Guided Vehicle (AGV) (not shown) on the conveyor floor which is, for example, guided by a laser. In another embodiment of the conveyor floor comprising longitudinal and transversal (rail) guides a special Two-Directional AGV can be used (seeFIG. 18 a-c). - In an advantageous embodiment, the unloading and
loading crane arrangement 35 comprises two or more transverse conveyor tracks 77 which are arranged next to one another and which extend transversely with respect to the quay 27 (seeFIGS. 10 a and 10 b). - It is particularly advantageous if the mutual distance between such adjacent conveyor tracks 77 measured in the longitudinal direction of the
quay 27 and between the axes of the conveyor tracks 77 is as great as the distance which a whole number of containers, including the intermediate space, takes up on a ship in the longitudinal direction of the containers. There are fixed standard distances for this purpose, so that said intermediate distance can be determined beforehand in a simple manner. Such dimensional accuracy between the axes of the conveyor tracks 77 makes it possible to stack containers at the storage location on land in the same way and at approximately the same intermediate distance as on the ship. In other words: the grid pattern size is adapted to the stack size. This substantially increases the effective floor surface on the land on which containers can be stored. No space is required on the land anymore for freely movable transport means such as straddle carriers. The distance between twoconveyor tracks 77 is, for example, approximately substantially equal to the width of one container bay in which, for example, four 20-foot containers or two 40-foot containers of a ship fit. The distance betweentracks 77 may also be equal to twice the width, including an aisle in between, of a container bay, as is illustrated inFIG. 10 a. In general, it is therefore advantageous if the distance between twoconveyor tracks 77 is an integer multiple of the width, including intermediate spaces, of container bays of a ship. - When there are several unloading and loading crane modules, according to an aspect of the invention, the distance in between is adapted to this intermediate distance between adjacent conveyor tracks. The dimensions of these unloading and loading crane modules may be such that they can be brought so close together that two adjacent unloading and loading modules can process adjacent bays of containers simultaneously.
- By way of example, a width of the
conveyor floor 75 of approximately 7 to 8 m may be chosen, as a result of which the two illustrated longitudinal conveyor tracks 94, 95 can be realized adjacent to the waterside of the outer structure ofcolumns 51. As has already been mentioned, the example fromFIG. 9 a has oneconveyor track 93 on the inner side of the outer structure ofcolumns 51. However, the invention can also be realized using different numbers of longitudinal conveyor tracks on the landside and/or the waterside. - Thus, there is a trend at current container terminals for 6 STS cranes to be operational simultaneously next to one another. In order to be able to unload the ship quickly, at least three longitudinal conveyor tracks are required on the outer side of the row of
columns 51. - In order to be able to simultaneously load the ship quickly, three conveyor tracks have to be provided on the inner side of the row of
columns 51, the relevant parts being as shown inFIG. 9 e. - The selection has to be adapted to the desired processing speed and to the desired redundancy options in case of failures. The
points 96 of the rail tracks 93, 94, 95 illustrated inFIGS. 10 a and 10 b, for example, make it possible to guidevehicles 81 around congestion on a particular longitudinal conveyor track. - With a chosen “lane width” (the width between conveyor tracks 77, see for example
FIG. 10 a) in thestack area 99 of approximately 27 to 30 metres which is also continued in the buffer-inarea 97, the longitudinal transportation of the containers via, for example, longitudinal conveyor tracks 93, 94, 95 on the conveyor floor will remain very limited. If this “lane width” is moreover adapted to the width of the “bays” on the ship, the necessity of longitudinal transportation on the conveyor floor is limited further to a minimum. - The terminal lay-out is chosen such that sufficient flexibility is offered with regard to the current ships. Embodiments of the invention make it possible for all containers on the longitudinal conveyor tracks (which form part of the conveyor floor 75) to be moved, manually, or with a chain system, or semi-automatically, or completely automatically, to within the “lane width” of the buffer-in
area 97 which is preferably substantially equal to the “lane width” of thestack area 99. - By incorporating one or more points structures into the conveyor floor, containers can also be transported to the inner side of the fixed structure without having to use the fold-out overhead crane system 85 (see
FIGS. 9 a, 9 b) ordisplacement device 87′ (seeFIGS. 9 c, 9 d). - The
track points system 96 on the conveyor floor increases the flexibility and is not only necessary in case of a local malfunction. Apart from the above-described small longitudinal displacements along the conveyor floor, it is of course also possible to move containers across large distances over theconveyor floor 75 in the longitudinal direction, should this be necessary. - A further aspect focuses on the use of the
conveyor track 77 with dedicated hoist ordedicated robot device 79, as clarified further inFIGS. 9 a and 9 b. Theconveyor track 77 extends as far ascolumn 51 and is supported by the latter. Via ahinge 87, theconveyor track 77 is connected to asubconveyor track 85 which, in use, can be swung above theconveyor floor 75 in such a manner that the latter extends in line withconveyor track 77. Arobot 79 with suitable hoist 80 can be driven in a transverse direction over theconveyor track 77 by suitable drive means. In use, thesubconveyor track 85 is in a downward position and therobot 79 can move from theconveyor track 77 to thesubconveyor track 85 and vice versa, as is indicated inFIG. 9 b. -
FIG. 9 a shows how containers are stacked in the buffer-inarea 97 on the quay between 51 and 53. The figure shows how hoist 80 ofcolumns robot device 79 has taken acontainer 88 out of the stack and lifted it to a higher position.FIG. 9 b shows how thiscontainer 88 is moved to a position above avehicle 81 by means of therobot 79, where thecontainer 88 is placed on thevehicle 81.Vehicle 81 is placed on one of the longitudinal conveyor tracks 93, 94, 95 onconveyor floor 75 and is displaceable in a direction alongquay 27.Vehicle 81 can be moved by means of suitable drive means, optionally manually or automatically. By means ofvehicle 81, containers can still be displaced in the longitudinal direction before they are loaded onto the ship by means of hoist 7. This is necessary in situations where the stacking of containers on the ship in the longitudinal direction of thequay 27 does not exactly match the stacking in the buffer-in area. Instead of a vehicle, it is also possible to use a conveyor belt, for example in the form of a chain. -
FIGS. 9 a and 9 b show the process when a container is moved from the buffer-in area onto the ship. Obviously, it also works in the opposite direction. -
FIG. 9 a also shows acontainer 83 which is held by hoist 7 (not illustrated inFIG. 9 a) and is in the middle of an upward/downward movement in order to be placed on thevehicle 81 or to be lifted from the latter. At the location of theconveyor track 77, such acontainer 83 with hoist 7 must not collide withsubconveyor track 85. Therefore,subconveyor track 85 is at that point in time pulled upwards abouthinge 87 so that it is not on the path of thecontainer 83. - In order to ensure that the
subconveyor track 85 is not on the path of hoist 7 withcontainer 83 when thecontainer 83 is at the location of theconveyor track 77, the structure can also be configured in such a way that thesubconveyor track 85 can be retracted or extended in the transverse direction, at right angles to the quay 27 (seeFIGS. 9 c and 9 d), viadisplacement device 87′. When retracted,subconveyor track 85′ is not situated abovevehicles 81 and not on the path of hoist 7 withcontainer 83. When extended,subconveyor track 85′ is situated abovevehicle 81 so thatrobot 79 can move to a position abovevehicle 81 and can load and unload containers there. - As is illustrated in
FIG. 9 e, it is also possible, as an alternative to the provision of a subconveyor track, to use an All-Directional AGV or a Two-Directional AGV to move cargo on the conveyor floor as illustrated inFIG. 11 b. These All- or Two-Directional AGVs are capable of moving both in the longitudinal and in the transverse direction without changing the orientation of the cargo it is transporting. As a result thereof, the AGV can position itself in a spot where the AGV is accessible to the gripper of the boom and can then move in the longitudinal and transverse direction to a spot which is accessible to thegripper 79 of thetransverse conveyor track 77. The use of such AGVs then makes the hinged or slidable subconveyor track redundant. -
FIGS. 10 a-b and 11 a-b clarify certain aspects by means of diagrammatic top views and a view in perspective. It can clearly be seen thatvehicles 81 can be displaced in the longitudinal direction along thequay 27 in order to match the stacking on the quayside with that on the ship.Reference numeral 79 shows a robot in its position on thesubconveyor track 85 above avehicle 81 in order to load or unload a container.Reference numeral 79′ refers to a robot in a position above the buffer-inarea 97. -
FIG. 12 shows an overview of a known container terminal. The terminal has a buffer-inarea 2, substantially between thewaterside rails 25 and the landside rails 23, underneath the 3 a, 3 b and fixedboom arm 13 of thecrane module 1. Behind it, in the landside direction, the stack area 4 is situated, and in anadjacent part 6, lorries can be loaded and unloaded. - Containers on sea-going vessels are usually stacked in the longitudinal direction of the ship, in other words the longitudinal axis of the containers runs parallel to the longitudinal axis of the ship. The known STS cranes or
crane modules 1 lift the containers from the ship and place them in the buffer-inarea 2 without turning them, i.e. the longitudinal axis of the containers still runs parallel to the quay. From the buffer-inarea 2, the containers are moved to the storage site in the stack area 4 by means of straddle carriers, tractors or reach-stackers 103. During this move, the containers are usually turned by 90°, so that the longitudinal axis ends up at right angles to the quay. -
FIG. 13 a shows an embodiment according to a particularly advantageous aspect of the invention, in which the dimensions of the STS (crane)area 98, the buffer-inarea 97, thestack area 99 and the lorry-loading area 99′ are matched to one another. In the STS or crane area, that is to say thearea 98 between thequay 27 and the outer structure ofcolumns 51, a small longitudinal displacement is only necessary for a small number of the containers and this takes place on the conveyor floor, in this example at approximately 11 to 12 m above quay level. - The buffer-in
area 97, thestack area 99 situated behind it and the lorry-loading area 99′ are of exactly the same width, so that further longitudinal moves are, in principle, not necessary. - The above-described embodiment removes the need for rotating containers and also reduces the number of metres to be travelled by the container. As a result thereof, the throughput speed of the container terminal is improved and the energy consumption is reduced. Less travel for the containers means less wasted space and also less wear, less CO2 and fewer emissions of fine particulate matter, less noise and fewer safety risks.
- Containers at the terminal are mainly transported by means of robot devices or
overhead cranes 79 along conveyor tracks 77. This has the advantage of a relatively low own weight of this transport means compared to the weight to be displaced and the low rolling friction of the steel wheels on the steel rails. The drive mechanism for both lifting and driving is electrical, thus saving on (fossil) fuel and resulting in lower emissions, less CO2, less noise and, if desired, 100% automation. - By means of the described advantageous embodiment, lorries can be loaded in
zone 99′ without the lorries having to enter the terminal site. In addition, depending on the location of the rail tracks, trains can be loaded by means of the same system. -
FIGS. 13 b and 13 c show a diagrammatic illustration of the loading and unloading process in a specific situation. The transportation of containers at the terminal can be fully automated as the position in the horizontal and in the vertical plane of each container is known and the distances are travelled according to preprogrammable routes which are at right angles to one another and using preprogammable transport means and speeds. Traffic never has to cross at the same level.FIG. 13 d shows a further diagrammatic illustration of the loading and unloading process. It is similar to the example ofFIG. 13 c, except that the vehicles are made to move in (clockwise) loops, which advantageously reduces the chance that two vehicles obstruct each other. - The loading process and the unloading process can be carried out simultaneously by one STS crane module, which is an important requirement for the latest generation of container terminals.
- As a result of the integration of the transport systems of the stack area (77, 79, 79′) as far as above the
conveyor floor 75 in the STS area, all containers can be transported from or to the ship over the quay site without the use of other means of transport, such as straddle carriers, terminal tractors and AGVs. This results in a higher processing speed, less waste of space, shorter distances, increased safety and fewer polluting effects. -
FIG. 14 shows an impression of the installation by means of which containers can be loaded onto lorries or goods carriages from the storage space or can be unloaded therefrom. In the embodiment fromFIG. 14 , theconveyor track 77 not only extends to a position above the storage space, but also above a road on which lorries can drive. Thesame robots 79 withhoists 80 can be used to carry out the loading and unloading. - However, in an alternative embodiment, additional robots are provided for this purpose. This obviously means that these will have to operate in tune with the
robots 79 which are on the same conveyor tracks 77. In order to achieve a flexible procedure of loading and unloading the lorries, the hoist 80 is preferably configured such that it can also be displaced at right angles to the direction of the conveyor tracks 77, i.e. in a longitudinal direction of the stored containers and in the direction of travel of lorries on the road. - Due to these measures, it is possible to achieve a substantial energy saving and to load and unload more quickly. In addition, there will be less noise and it will be possible to increase the degree of automation.
-
FIG. 15 shows ascan area 100 situated between the buffer-inarea 97 and thestack area 99. InFIG. 15 , thescan area 100 forms a transverse strip which is provided with scan tracks 101. In the present example, the scan tracks 101 run in substantially longitudinal direction, i.e. parallel to the quay. Furthermore, a 102, 103 is provided in thecontainer inspection system scan area 100, in the present example in the form of an Integrated Container Inspection System (ICIS), see alsoFIG. 16 andFIG. 17 . The following are used as part of the system: a VACIS portal (Vehicle And Cargo Inspection System), a module for radiation monitoring (“Radiation portal monitoring”), an OCR module (automated container identification), and an “Empty view system”. - In a variant which is particularly advantageous if the
conveyor floor 75 is completely or partly abovewater 29 and as a result thereof little or no stack space is present between the 51 and 53, thecolumns scan area 100 can also be provided essentially at the level of the conveyor floor, substantially between or 51 and 53. Thenear columns scan area 100 can then also be integrated with theconveyor floor 75, in particular the 93, 94, 95 of thelongitudinal tracks conveyor floor 75 can be shared with the scan tracks 101. - Preferably, use is made of a
mobile scanning installation 103. Known mobile scanning installations make it possible to drive over and along containers at a speed of 10 to 20 km per hour or more and to generate complete scanning results while simultaneously communicating with a central ICIS server via a high-speed wireless network. - According to an embodiment of the invention, the scanning can, if desired, be carried out over and along container stacks which are three units high. Furthermore, the
area 100 where scanning takes place is not manned and therefore no health risks will result from the radiation used in the scanning process. - When dealing with small number of containers, the
overhead cranes 79 along the conveyor tracks 77 can take the containers from theconveyor floor 75 and place them directly on ascanning track 101 in a predetermined number of rows which are, for example, three units high. In this case, no temporary storage in the buffer-inarea 97 is necessary. After scanning, the containers are transported to the stacks or stackarea 99 by means ofoverhead cranes 79. - When dealing with large numbers of containers, the containers will be placed both in the buffer-in
area 97 and in thescan area 100, and the scanning will continue during the off-peak hours. - The
mobile scanning installation 103 can be controlled manually, semi-automatically or completely automatically. Theoverhead cranes 79 can be programmed to place the containers, for example at night, according to fixed patterns and frequencies on the scanning tracks 101 and transport them on to thestack area 99 after scanning. - The advantage is that, depending on the number of tracks and the number of mobile scanning installations, all containers can be scanned before they are placed in the stack area.
- In known container terminals, containers are only scanned at random. In known container terminals, the selected containers to be scanned are driven by a lorry or other terminal vehicle to a fixed scanning installation. The invention, an embodiment of which is illustrated in
FIGS. 15 , 16 and 17, makes it possible in practice to check all containers, which is highly desirable from the point of view of safety and traceability. - Except for scanning, the transverse scan tracks 101 can also be used to displace containers in the longitudinal direction, i.e. parallel to the quay, from one track to the other or from one
stack 99 to the other in case there are failures or emergency situations in other parts of the terminal. - In terminals where the loading of ships forms an important part of container transport, the conveyor tracks 101 can mainly be used for the transportation of containers from the stacks to the ship. This makes simultaneous unloading and loading, the so-called dual-cycling, possible in an optimum manner. For example, if the longitudinal conveyor tracks 93, 94, 95 on the
conveyor floor 75 are used to transport the containers away from the ship, the longitudinal conveyor tracks 101 can be used simultaneously to transport other containers to the ship. Both theoverhead cranes 79 and theSTS crane modules 35 can then always return fully loaded to the location where the unloading procedure is taking place at that point in time. - In the
transverse scanning area 100,several conveyor tracks 101 are installed on railway or crane rails, two per track, or in recessed trenches or on flat floors on which the containers are put down by the overhead cranes on wheel sets which have been coupled together. As a result thereof, it is also possible to displace the containers in the longitudinal direction. - The mobile scanning installation also drives in the longitudinal direction of the terminal along a dedicated, optionally raised or recessed rail system, the gauge of which can be adapted, as desired, to the number of conveyor tracks in the transverse strip, as is illustrated in
FIG. 17 . -
FIGS. 18 a-b schematically show avehicle 810 that is particularly well-suited for use astransport vehicle 81 on aconveyor floor 75, as shown inFIG. 18 c. Thevehicle 810 comprises anupper part 801, suitable for supporting a container, and one or more undercarriages 802 (in the present example, three undercarriages). Eachundercarriage 802 is provided with an engine or other drive means for moving the undercarriage and comprises two rows of longitudinal wheels 803 (in the present example with three wheels in a row) and two rows oftransversal wheels 804. The longitudinal wheels and the transversal wheels are perpendicular to each other. - The undercarriage is provided with means for raising and lowering the longitudinal rows of
wheels 803. The rows of 803, 804 are thus arranged in thewheels undercarriage 802 in such a manner that theundercarriage 802 may be moved up and down (along direction u). When thelongitudinal rows 803 are lowered, the undercarriage is moved up (seeFIG. 18 a (1)) and the longitudinal wheels will support thevehicle 810. The vehicle can then move in a longitudinal direction. When thelongitudinal rows 803 are raised, the undercarriage is lowered until such point that the transversal rows ofwheels 804 will support the undercarriage (18 a (2)). The vehicle is then ready to move in a transversal direction. - Many variations of this general principle are possible. For example, it is possible to keep the
longitudinal wheels 803 fixed with respect to theundercarriage 802 and make thetransversal wheels 804 vertically moveable along direction u. The number of wheels, rows, and undercarriages can be varied. - The
vehicle 810 may be made of relatively (compared to known AGVs) light-weight materials, such as synthetic materials. In particular theupper part 801 and/or the wheels can be made of synthetic materials to reduce weight. The basic principle of two-directional vehicle 810, which allows only two basic directions of movement, and for example no diagonal movement, allows for a simple and robust design, unlike known all-directional AGVs. When the vehicles weigh less, the demands on the structure ofconveyor floor 75 are reduced, allowing a less expensive construction. -
FIG. 18 c shows avehicle 810 onconveyor floor 750, which floor is provided withlongitudinal guides 811 for thelongitudinal wheels 803 andtransversal guides 812 for the transversal wheels. It is also possible to provide electric conductors in the conveyor floor or in or on the guides for powering an electric motor invehicle 810. In that case, the vehicle can independently and automatically move using an electrical engine in the vehicle, and does not need to be provided with a battery that must also regularly be recharged. - It is to be understood that the invention is limited by the annexed claims and its technical equivalents only. In this document and in its claims, the verb “to comprise” and its conjugations are used in their non-limiting sense to mean that items following the word are included, without excluding items not specifically mentioned. In addition, reference to an element by the indefinite article “a” or “an” does not exclude the possibility that more than one of the element is present, unless the context clearly requires that there be one and only one of the elements. The indefinite article “a” or “an” thus usually means “at least one”.
Claims (21)
1-18. (canceled)
19. Unloading and loading crane arrangement (35) with a boom (37), in particular a projecting boom, for loading and unloading a ship using a gripper (7) attached to the boom, which boom (37) is hingedly connected to an arm (43) via a hinge point (39), wherein the arm (43) is placed on at least one landside guide (59) and one waterside guide (61), characterized in that the waterside guide (61) is placed at a higher level than the landside guide (59).
20. Unloading and loading crane arrangement according to claim 19 , wherein at least one guide (59, 61) is placed on columns (51, 53) which have been placed in a quay (27) and/or a bed (29′).
21. Unloading and loading crane arrangement according to claim 19 , wherein the waterside guide (61) is placed at least 10 metres, preferably at least 15, more preferably at least 20 metres or higher than the landside guide (59).
22. Unloading and loading crane arrangement according to claim 19 , which is configured and dimensioned in such a manner that the centre of gravity of the arrangement is lower than a horizontal plane in which the boom (37) is situated when it has been lowered, in which lowered position the gripper (7) can load and unload the ship.
23. Unloading and loading crane arrangement according to claim 19 , wherein the boom (37) is fixedly connected to a further arm, preferably an upright arm (41), and wherein the boom (37) and further arm are situated at least essentially on either side of a hinge point (39), by means of which the boom (37) is hingedly connected to the arm (43).
24. Unloading and loading crane arrangement (35) according to claim 23 , wherein the boom (37), together with the upright arm (41) and with further connecting bars, forms a framework structure (49).
25. Unloading and loading crane arrangement (35) according to claim 24 , wherein the boom (37) in the framework structure (49) forms one dimensionally stable projecting beam with a triangular or rectangular cross section.
26. Unloading and loading crane arrangement (35) according to claim 24 , wherein the further arm (41) is dimensioned and configured to act as a counterweight when the boom (37) pivots about the hinge point (39).
27. Unloading and loading crane arrangement (35) according to claim 24 , wherein the further arm (41) is connected to a distal end of the arm (43) via a draw bar (47′).
28. Unloading and loading crane arrangement (35) according to claim 19 , wherein the hinge point (39) is situated on the landside of a waterside guide (61).
29. Unloading and loading crane arrangement (35) according to claim 19 , wherein the arm (43) is provided with a parking platform (90) for placing the gripper (7) and/or a cab for an operator (7′) which is connected to the gripper there when the boom (37) is tilted upwards.
30. Unloading and loading crane arrangement (35) according to claim 19 , wherein the boom (37) is provided with an anchorage (48) which can be displaced along the latter and to which a cable (46) is attached by one end thereof, which cable (46) has another end which is attached to a guide (61) or column (51) for anchoring the boom (37) in an upwardly tilted position.
31. Unloading and loading crane arrangement (35) according to claim 19 , wherein the arm (43) is provided with wheels (55, 57), configured to run on an upper surface of a guide (59, 61) and running wheels (65, 63) configured to run in a groove in a guide (59, 61).
32. Unloading and loading crane arrangement (35) according to claim 19 wherein the arm (43) is provided with an anchorage (67) which can be brought into an open position (67′) and a closed position, and which, in the open position, allows the arm (43) of the arrangement to be displaced in the longitudinal direction along a column (51, 53) and, in the closed position, prevents this passage.
33. Two or more adjacent unloading and loading crane arrangements, wherein each unloading and loading crane arrangement (35) is configured according to claim 19 , characterized in that the boom (37), the arm (43), and further arm (41) of the two or more unloading and loading crane arrangements are dimensioned and configured such that the grippers (7) of two such unloading and loading crane arrangements operating next to one another can simultaneously load and/or unload containers from adjacent bays on a container ship.
34. Unloading and loading crane arrangement according to claim 20 , which is configured and dimensioned in such a manner that the centre of gravity of the arrangement is lower than a horizontal plane in which the boom (37) is situated when it has been lowered, in which lowered position the gripper (7) can load and unload the ship.
35. Unloading and loading crane arrangement (35) according to claim 25 , wherein the further arm (41) is dimensioned and configured to act as a counterweight when the boom (37) pivots about the hinge point (39).
36. Unloading and loading crane arrangement (35) according to claim 25 , wherein the further arm (41) is connected to a distal end of the arm (43) via a draw bar (47′).
37. Unloading and loading crane arrangement (35) according to claim 25 , wherein the hinge point (39) is situated on the landside of a waterside guide (61).
38. Unloading and loading crane arrangement (35) according to claim 20 , wherein the arm (43) is provided with a parking platform (90) for placing the gripper (7) and/or a cab for an operator (7′) which is connected to the gripper there when the boom (37) is tilted upwards.
Applications Claiming Priority (9)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NL2006132A NL2006132C2 (en) | 2011-02-03 | 2011-02-03 | CONTAINER TERMINAL. |
| NL2006132 | 2011-02-03 | ||
| NL2006629A NL2006629C2 (en) | 2011-02-03 | 2011-04-19 | UNLOADING AND LOADING CRANE ASSEMBLY AND COMPOSITION OF TWO UNLOADING AND LOADING CRANE ARRANGEMENTS. |
| NL2006628A NL2006628C2 (en) | 2011-02-03 | 2011-04-19 | UNLOADING AND LOADING CRANE SETUP, CONTAINER TERMINAL, AND METHOD FOR UNLOADING A SHIP. |
| NL2006629 | 2011-04-19 | ||
| NL2006628 | 2011-04-19 | ||
| NL2007232 | 2011-08-08 | ||
| NL2007232 | 2011-08-08 | ||
| PCT/NL2012/050060 WO2012105841A2 (en) | 2011-02-03 | 2012-02-03 | Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20130334158A1 true US20130334158A1 (en) | 2013-12-19 |
Family
ID=45755468
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/983,607 Abandoned US20130334158A1 (en) | 2011-02-03 | 2012-02-03 | Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements |
| US13/983,605 Expired - Fee Related US9193571B2 (en) | 2011-02-03 | 2012-02-03 | Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/983,605 Expired - Fee Related US9193571B2 (en) | 2011-02-03 | 2012-02-03 | Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship |
Country Status (11)
| Country | Link |
|---|---|
| US (2) | US20130334158A1 (en) |
| EP (2) | EP2670691A2 (en) |
| JP (1) | JP2014507358A (en) |
| KR (2) | KR20130132978A (en) |
| CN (2) | CN103492294B (en) |
| CA (1) | CA2825045A1 (en) |
| EA (1) | EA022587B1 (en) |
| MX (1) | MX2013008971A (en) |
| NL (1) | NL2008775C2 (en) |
| SG (1) | SG192218A1 (en) |
| WO (2) | WO2012105841A2 (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9643690B2 (en) * | 2012-11-19 | 2017-05-09 | U-Sea Beheer B.V. | Transfer system, ship and method for transferring persons and/or goods to and/or from a floating ship |
| US20180265311A1 (en) * | 2017-03-17 | 2018-09-20 | Berkshire Grey Inc. | Systems and methods for processing objects including a linear gantry system |
| US20180265298A1 (en) * | 2017-03-15 | 2018-09-20 | Berkshire Grey, Inc. | Systems and methods for storing, retreiving and processing objects including stackable semicircular towers |
| US20180273297A1 (en) * | 2017-03-23 | 2018-09-27 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US20180282065A1 (en) * | 2017-03-22 | 2018-10-04 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US20180282066A1 (en) * | 2017-03-23 | 2018-10-04 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US10913612B2 (en) | 2017-10-27 | 2021-02-09 | Berkshire Grey, Inc. | Discontinuous grid system for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11267662B2 (en) | 2019-02-27 | 2022-03-08 | Berkshire Grey, Inc. | Systems and methods for controlling the disgorging of objects in containers by vibratory motion |
| US11390459B2 (en) | 2017-03-20 | 2022-07-19 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| CN119389943A (en) * | 2025-01-03 | 2025-02-07 | 唐山曹妃甸实业港务有限公司 | A control method and control system for under-machine operation of portal crane |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5840853B2 (en) * | 2011-03-28 | 2016-01-06 | 三井造船株式会社 | Container terminal with quay crane and its control method |
| CL2012001183A1 (en) * | 2012-05-04 | 2012-07-06 | Giglio Guillermo Bobenrieth | System for loading and unloading in port operations and support of hatch covers of holds of maritime vessels, comprising a loading and unloading crane and a base located in the body of said crane to support and stack said hatch covers; process. |
| CN105668423B (en) * | 2015-11-26 | 2017-10-10 | 上海盛东国际集装箱码头有限公司 | A kind of container hanging method |
| CN105645119B (en) * | 2016-03-15 | 2023-12-29 | 孙润 | A layout method for direct discharge of belt conveyor |
| NL2017388B1 (en) * | 2016-08-30 | 2018-03-08 | Hallcon B V | SYSTEM FOR TRANSFERRING PERSONS AND / OR CARGO WITH A SHUTTLE |
| CN108508496A (en) * | 2018-04-04 | 2018-09-07 | 同方威视技术股份有限公司 | Container check system, port facilities and inspection of containers method |
| CN108622807A (en) * | 2018-04-09 | 2018-10-09 | 南通振华重型装备制造有限公司 | A kind of 40T door machines displacement technique |
| CN108873088A (en) * | 2018-05-07 | 2018-11-23 | 同方威视技术股份有限公司 | Container check system, port facilities and inspection of containers method |
| EP3771667B1 (en) * | 2019-07-29 | 2024-09-18 | Bühler AG | Loading device and pylon for a loading device |
| RU2721865C1 (en) * | 2019-09-24 | 2020-05-25 | Владимир Валерьевич ШУМОВСКИЙ | Port logistics complex of shumovsky |
| RU2721809C1 (en) * | 2019-09-24 | 2020-05-22 | Владимир Валерьевич ШУМОВСКИЙ | Universal automated loading and unloading module of the shumovsky |
| CN110642152B (en) * | 2019-10-16 | 2020-08-28 | 长沙理工大学 | A large-span bulk material conveying system |
| CN110697436B (en) * | 2019-10-16 | 2020-12-01 | 长沙理工大学 | A horizontally rotating folding arm conveyor |
| CN111535321B (en) * | 2020-04-26 | 2021-08-17 | 广东裕基建筑工程有限公司 | A kind of artificial digging pile lifting protection structure and construction method |
| CN111776784A (en) * | 2020-07-17 | 2020-10-16 | 交通运输部天津水运工程科学研究所 | Bulk cargo terminal loading and unloading operation falling object recovery system |
| CN111874815B (en) * | 2020-08-26 | 2024-05-24 | 上海振华重工(集团)股份有限公司 | Container crane with deck plate platform and use method thereof |
| CN112173764A (en) * | 2020-09-09 | 2021-01-05 | 神华天津煤炭码头有限责任公司 | Ship loader and cantilever thereof |
| RU209045U1 (en) * | 2021-04-13 | 2022-01-31 | Федеральное государственное бюджетное образовательное учреждение высшего образования «Сибирский государственный автомобильно-дорожный университет (СибАДИ)» | Jib rack stacker crane |
| CN114111442B (en) * | 2021-11-05 | 2023-07-14 | 河北汉光重工有限责任公司 | Transport loading system and method for shipboard vertical missile |
| CN115849209A (en) * | 2022-12-07 | 2023-03-28 | 沧州港务集团有限公司绿化分公司 | Coastal water transport engineering system and construction method thereof |
| DE102024111980A1 (en) * | 2024-04-29 | 2025-10-30 | Stemmann-Technik Gmbh | Device for connecting a ship to a shore-based supply network |
| CN118545610A (en) * | 2024-07-29 | 2024-08-27 | 江苏润邦工业装备有限公司 | A quay crane crossing mechanism |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2995259A (en) * | 1960-03-17 | 1961-08-08 | Heyl & Patterson | Unloader |
| US3051322A (en) * | 1960-03-04 | 1962-08-28 | Strachan & Henshaw Ltd | Ship or barge unloaders |
| US5775866A (en) * | 1994-05-20 | 1998-07-07 | Tax Ingenieurgesellschaft Mbh | Cargo loading crane |
| US5951226A (en) * | 1994-09-20 | 1999-09-14 | Reggiane S.P.A. | Freight handling plant in depots and related depots |
| EP2586735A1 (en) * | 2011-10-31 | 2013-05-01 | Cargotec Netherlands B.V. | Ship to shore crane with dual trolleys. |
Family Cites Families (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1305802A (en) * | 1919-06-03 | Geobge h | ||
| US1107378A (en) * | 1912-04-02 | 1914-08-18 | George E Titcomb | Apparatus for freight transference. |
| US1111100A (en) * | 1913-05-19 | 1914-09-22 | Harry Sawyer | Freight-handling apparatus. |
| US1190822A (en) * | 1913-07-15 | 1916-07-11 | Alexandre Vandevelde | Means for loading and unloading merchandise. |
| US2366574A (en) * | 1943-09-10 | 1945-01-02 | Ind Brownhoist Corp | Bridge crane |
| US2793766A (en) * | 1954-06-03 | 1957-05-28 | Joseph A Fetchko | Cargo handling device |
| FR1213046A (en) * | 1958-10-23 | 1960-03-28 | Creusot Forges Ateliers | Improvements to gantry cranes capable of rolling indifferently on tracks forming an angle between them |
| DE2440682C3 (en) * | 1974-08-24 | 1978-08-24 | Karl L. Dipl.-Ing. 7967 Bad Waldsee Ringer | Handling system for containers and pallets |
| NL161727C (en) * | 1974-09-06 | 1980-03-17 | Stork Conrad Bv | TRANSFER DEVICE, PARTICULARLY FOR CHARGERS OR CONTAINERS. |
| DE3326809A1 (en) * | 1983-07-26 | 1985-02-07 | SEVAR Entsorgungsanlagen GmbH, 8590 Marktredwitz | Device for transferring containers |
| JPH0818788B2 (en) * | 1987-02-06 | 1996-02-28 | 石川島播磨重工業株式会社 | Container crane |
| US4986705A (en) * | 1987-11-25 | 1991-01-22 | Eis Corporation | Stackable freight container for holding stacked chassis |
| US4858775A (en) * | 1988-02-12 | 1989-08-22 | Paceco Corp. | Personnel trolley and elevator platform for a cargo container handling gantry crane |
| JPH10194463A (en) * | 1996-12-27 | 1998-07-28 | Ishikawajima Harima Heavy Ind Co Ltd | Container terminal |
| JP2000255786A (en) * | 1999-03-02 | 2000-09-19 | Ishikawajima Harima Heavy Ind Co Ltd | Container terminal |
| DE19958501A1 (en) * | 1999-11-30 | 2001-06-07 | Mannesmann Ag | Lifting device to increase the performance of a handling device for ISO containers |
| DE10023977C2 (en) * | 2000-05-16 | 2002-03-14 | Wilfried Strothmann Gmbh & Co | Trolleys for rail systems |
| US20020092820A1 (en) * | 2000-11-14 | 2002-07-18 | Nigel Chattey | Crane apparatus for direct transshipment of marine containers between transportation modes without need of ground placement |
| US20080219804A1 (en) * | 2000-11-14 | 2008-09-11 | Nigel Chattey | Container crane apparatus and method for container security screening during direct transshipment between transportation modes |
| DE10244116A1 (en) * | 2002-09-12 | 2004-03-25 | Gottwald Port Technology Gmbh | System for loading and unloading ISO-containers from ships, comprises tower crane with lifting unit mounted on swiveling seaward section of boom and rails on landward section of boom, along which grabs move |
| CN2666872Y (en) * | 2003-06-27 | 2004-12-29 | 上海港口机械制造厂 | Harbour crane with crane span structure |
| US6845873B1 (en) * | 2003-07-17 | 2005-01-25 | Nigel Chattey | Crane apparatus equipped with container security scanning system |
| EP1923338A1 (en) * | 2006-11-17 | 2008-05-21 | APM Terminals B.V. | Plant for transporting cargo to and/or from a ship |
| US7753637B2 (en) * | 2007-03-01 | 2010-07-13 | Benedict Charles E | Port storage and distribution system for international shipping containers |
| FI118698B (en) * | 2007-03-02 | 2008-02-15 | Kalmar Ind Oy Ab | Positioning system for container handling equipment e.g. trailer, has transmitter/receiver for sending/receiving radio signal, and calculates distance between transmitters/receivers in crane and container handling equipment |
-
2012
- 2012-02-03 US US13/983,607 patent/US20130334158A1/en not_active Abandoned
- 2012-02-03 EP EP12705485.6A patent/EP2670691A2/en not_active Withdrawn
- 2012-02-03 MX MX2013008971A patent/MX2013008971A/en unknown
- 2012-02-03 WO PCT/NL2012/050060 patent/WO2012105841A2/en not_active Ceased
- 2012-02-03 WO PCT/NL2012/050061 patent/WO2012105842A2/en not_active Ceased
- 2012-02-03 CA CA2825045A patent/CA2825045A1/en not_active Abandoned
- 2012-02-03 KR KR1020137022464A patent/KR20130132978A/en not_active Ceased
- 2012-02-03 SG SG2013057906A patent/SG192218A1/en unknown
- 2012-02-03 EA EA201391125A patent/EA022587B1/en not_active IP Right Cessation
- 2012-02-03 KR KR1020137022970A patent/KR20140027934A/en not_active Withdrawn
- 2012-02-03 JP JP2013552485A patent/JP2014507358A/en active Pending
- 2012-02-03 CN CN201280007775.0A patent/CN103492294B/en not_active Expired - Fee Related
- 2012-02-03 CN CN201280007749.8A patent/CN103459279B/en not_active Expired - Fee Related
- 2012-02-03 US US13/983,605 patent/US9193571B2/en not_active Expired - Fee Related
- 2012-02-03 EP EP12705486.4A patent/EP2670692A2/en not_active Withdrawn
- 2012-05-08 NL NL2008775A patent/NL2008775C2/en not_active IP Right Cessation
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3051322A (en) * | 1960-03-04 | 1962-08-28 | Strachan & Henshaw Ltd | Ship or barge unloaders |
| US2995259A (en) * | 1960-03-17 | 1961-08-08 | Heyl & Patterson | Unloader |
| US5775866A (en) * | 1994-05-20 | 1998-07-07 | Tax Ingenieurgesellschaft Mbh | Cargo loading crane |
| US5951226A (en) * | 1994-09-20 | 1999-09-14 | Reggiane S.P.A. | Freight handling plant in depots and related depots |
| EP2586735A1 (en) * | 2011-10-31 | 2013-05-01 | Cargotec Netherlands B.V. | Ship to shore crane with dual trolleys. |
Cited By (50)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9643690B2 (en) * | 2012-11-19 | 2017-05-09 | U-Sea Beheer B.V. | Transfer system, ship and method for transferring persons and/or goods to and/or from a floating ship |
| US12134517B2 (en) * | 2017-03-15 | 2024-11-05 | Berkshire Grey Operating Company, Inc. | Systems and methods for storing, retrieving and processing objects including stackable semicircular towers |
| US20180265298A1 (en) * | 2017-03-15 | 2018-09-20 | Berkshire Grey, Inc. | Systems and methods for storing, retreiving and processing objects including stackable semicircular towers |
| US10649445B2 (en) * | 2017-03-15 | 2020-05-12 | Berkshire Grey, Inc. | Systems and methods for storing, retrieving and processing objects including stackable semicircular towers |
| US11554916B2 (en) * | 2017-03-15 | 2023-01-17 | Berkshire Grey Operating Company, Inc. | Systems and methods for storing, retrieving and processing objects including stackable semicircular towers |
| US12012285B2 (en) | 2017-03-17 | 2024-06-18 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including a linear gantry system |
| US10596696B2 (en) * | 2017-03-17 | 2020-03-24 | Berkshire Grey, Inc. | Systems and methods for processing objects including a linear gantry system |
| US11358794B2 (en) | 2017-03-17 | 2022-06-14 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including a linear gantry system |
| US12404105B2 (en) | 2017-03-17 | 2025-09-02 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including a linear gantry system |
| US20180265311A1 (en) * | 2017-03-17 | 2018-09-20 | Berkshire Grey Inc. | Systems and methods for processing objects including a linear gantry system |
| US11390459B2 (en) | 2017-03-20 | 2022-07-19 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US12145798B2 (en) | 2017-03-20 | 2024-11-19 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US11814245B2 (en) | 2017-03-20 | 2023-11-14 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US20180282065A1 (en) * | 2017-03-22 | 2018-10-04 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US20210101749A1 (en) * | 2017-03-22 | 2021-04-08 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US11718479B2 (en) * | 2017-03-22 | 2023-08-08 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US10906740B2 (en) * | 2017-03-22 | 2021-02-02 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US12141650B2 (en) * | 2017-03-22 | 2024-11-12 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated radial processing stations |
| US20220311480A1 (en) * | 2017-03-23 | 2022-09-29 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US20180282066A1 (en) * | 2017-03-23 | 2018-10-04 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US12474698B2 (en) * | 2017-03-23 | 2025-11-18 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US20180273297A1 (en) * | 2017-03-23 | 2018-09-27 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US12282321B2 (en) * | 2017-03-23 | 2025-04-22 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US11402831B2 (en) * | 2017-03-23 | 2022-08-02 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| CN110662707A (en) * | 2017-03-23 | 2020-01-07 | 伯克希尔格雷股份有限公司 | System and method for processing objects including automatically moving matrix boxes |
| US11493910B2 (en) * | 2017-03-23 | 2022-11-08 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US10576621B2 (en) * | 2017-03-23 | 2020-03-03 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US12032367B2 (en) * | 2017-03-23 | 2024-07-09 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects, including automated mobile matrix bins |
| US10611021B2 (en) * | 2017-03-23 | 2020-04-07 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US20200206908A1 (en) * | 2017-03-23 | 2020-07-02 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| US11161689B2 (en) | 2017-10-27 | 2021-11-02 | Berkshire Grey, Inc. | Movement systems and method for processing objects including mobile matrix carrier systems |
| US10913612B2 (en) | 2017-10-27 | 2021-02-09 | Berkshire Grey, Inc. | Discontinuous grid system for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11814246B2 (en) | 2017-10-27 | 2023-11-14 | Berkshire Grey Operating Company, Inc. | Bin infeed and removal systems and methods for processing objects including mobile matrix carrier systems |
| US11661275B2 (en) | 2017-10-27 | 2023-05-30 | Berkshire Grey Operating Company, Inc. | Maintenance systems for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11866255B2 (en) | 2017-10-27 | 2024-01-09 | Berkshire Grey Operating Company, Inc. | Discontinuous grid system for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11597615B2 (en) | 2017-10-27 | 2023-03-07 | Berkshire Grey Operating Company, Inc. | Discontinuous grid system for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11577920B2 (en) | 2017-10-27 | 2023-02-14 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US12098027B2 (en) | 2017-10-27 | 2024-09-24 | Berkshire Grey Operating Company, Inc. | Maintenance systems for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11084660B2 (en) | 2017-10-27 | 2021-08-10 | Berkshire Grey, Inc. | Bin infeed and removal systems and methods for processing objects including mobile matrix carrier systems |
| US10988323B2 (en) | 2017-10-27 | 2021-04-27 | Berkshire Grey, Inc. | Maintenance systems for use in systems and methods for processing objects including mobile matrix carrier systems |
| US12157632B2 (en) | 2017-10-27 | 2024-12-03 | Berkshire Grey Operating Company, Inc. | Discontinuous grid system for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11148890B2 (en) | 2017-10-27 | 2021-10-19 | Berkshire Grey, Inc. | Mobile carriers for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11673742B2 (en) | 2017-10-27 | 2023-06-13 | Berkshire Grey Operating Company, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US12157631B2 (en) | 2017-10-27 | 2024-12-03 | Berkshire Grey Operating Company, Inc. | Bin infeed and removal systems and methods for processing objects including mobile matrix carrier systems |
| US12195274B2 (en) | 2017-10-27 | 2025-01-14 | Berkshire Grey Operating Company, Inc. | Mobile carriers for use in systems and methods for processing objects including mobile matrix carrier systems |
| US11117760B2 (en) | 2017-10-27 | 2021-09-14 | Berkshire Grey, Inc. | Systems and methods for processing objects including mobile matrix carrier systems |
| US12252340B2 (en) | 2017-10-27 | 2025-03-18 | Berkshire Grey Operating Company, Inc. | Movement systems and method for processing objects including mobile matrix carrier systems |
| US12145811B2 (en) | 2019-02-27 | 2024-11-19 | Berkshire Grey Operating Company, Inc. | Systems and methods for controlling the disgorging of objects in containers by vibratory motion |
| US11267662B2 (en) | 2019-02-27 | 2022-03-08 | Berkshire Grey, Inc. | Systems and methods for controlling the disgorging of objects in containers by vibratory motion |
| CN119389943A (en) * | 2025-01-03 | 2025-02-07 | 唐山曹妃甸实业港务有限公司 | A control method and control system for under-machine operation of portal crane |
Also Published As
| Publication number | Publication date |
|---|---|
| NL2008775A (en) | 2013-08-06 |
| WO2012105841A2 (en) | 2012-08-09 |
| US20130343850A1 (en) | 2013-12-26 |
| WO2012105841A3 (en) | 2012-09-20 |
| JP2014507358A (en) | 2014-03-27 |
| MX2013008971A (en) | 2014-02-10 |
| EP2670691A2 (en) | 2013-12-11 |
| CN103459279B (en) | 2015-10-14 |
| WO2012105842A3 (en) | 2012-11-29 |
| NL2008775C2 (en) | 2014-02-25 |
| CA2825045A1 (en) | 2012-08-09 |
| CN103492294B (en) | 2016-06-29 |
| EA201391125A1 (en) | 2013-12-30 |
| CN103492294A (en) | 2014-01-01 |
| KR20140027934A (en) | 2014-03-07 |
| US9193571B2 (en) | 2015-11-24 |
| CN103459279A (en) | 2013-12-18 |
| WO2012105842A2 (en) | 2012-08-09 |
| SG192218A1 (en) | 2013-09-30 |
| KR20130132978A (en) | 2013-12-05 |
| EA022587B1 (en) | 2016-01-29 |
| EP2670692A2 (en) | 2013-12-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9193571B2 (en) | Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship | |
| US6802684B2 (en) | Container tranfer terminal system and method | |
| US7370768B2 (en) | Crane apparatus for direct transshipment of marine containers between transportation modes without need of ground placement | |
| ES2965298T3 (en) | Air transportation and route management system | |
| KR101454843B1 (en) | Plants for transporting cargo from and to ships | |
| KR101653672B1 (en) | A Container Handling system comprising a crane and a plurality of base elements which can be mounted on top of containers for supporting the crane and transporting the containers | |
| EA028669B1 (en) | Assembly for hoisting and moving containers | |
| CN113620172A (en) | Lifting and transferring device and method for freight air-rail container | |
| US20240326956A1 (en) | Storage and distribution system for containers | |
| AU2012211540B2 (en) | Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements | |
| KR101037262B1 (en) | Method for handling cargo containers by dockside buffer jib crane in cooperation with key crane | |
| US20070217895A1 (en) | Device for offshore loading and unloading of ships | |
| AU2012211540A1 (en) | Unloading and loading crane arrangement and assembly of two unloading and loading crane arrangements | |
| WO2020049285A1 (en) | Vehicle for hatch cover storage | |
| KR960004057B1 (en) | All-weather wharf shipping system | |
| NL2006628C2 (en) | UNLOADING AND LOADING CRANE SETUP, CONTAINER TERMINAL, AND METHOD FOR UNLOADING A SHIP. | |
| WO2025208025A1 (en) | Grid storage system with above grip atu | |
| HK1033750B (en) | Container transfer terminal system and method | |
| HK1150162A (en) | Rear yard crane for automatic terminal |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: RAADGEVEND INGENIEURSBURO F. KOCH B.V., NETHERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KOCH, FRANCISCUS;REEL/FRAME:031133/0154 Effective date: 20130726 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |