- Publication number
- US20110247358A1 US20110247358A1 US13/140,331 US200913140331A US2011247358A1 US 20110247358 A1 US20110247358 A1 US 20110247358A1 US 200913140331 A US200913140331 A US 200913140331A US 2011247358 A1 US2011247358 A1 US 2011247358A1
- Authority
- US
- United States
- Prior art keywords
- compressor
- activation
- working fluid
- refrigeration cycle
- expander
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005057 refrigeration Methods 0.000 title claims abstract description 108
- 239000012530 fluid Substances 0.000 claims abstract description 191
- 230000004913 activation Effects 0.000 claims abstract description 136
- 238000011084 recovery Methods 0.000 claims abstract description 37
- 238000011144 upstream manufacturing Methods 0.000 claims description 28
- 230000004044 response Effects 0.000 claims description 8
- 238000001514 detection method Methods 0.000 claims description 5
- 238000001816 cooling Methods 0.000 claims description 2
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 238000001704 evaporation Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 10
- 239000007791 liquid phase Substances 0.000 description 9
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 8
- 230000007423 decrease Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 8
- 230000006870 function Effects 0.000 description 7
- 230000010349 pulsation Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 229910002092 carbon dioxide Inorganic materials 0.000 description 4
- 239000001569 carbon dioxide Substances 0.000 description 4
- 239000012808 vapor phase Substances 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 238000007599 discharging Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000005461 lubrication Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005094 computer simulation Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B9/00—Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
- F25B9/06—Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point using expanders
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B1/00—Compression machines, plants or systems with non-reversible cycle
- F25B1/10—Compression machines, plants or systems with non-reversible cycle with multi-stage compression
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B9/00—Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
- F25B9/002—Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant
- F25B9/008—Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant the refrigerant being carbon dioxide
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2309/00—Gas cycle refrigeration machines
- F25B2309/06—Compression machines, plants or systems characterised by the refrigerant being carbon dioxide
- F25B2309/061—Compression machines, plants or systems characterised by the refrigerant being carbon dioxide with cycle highest pressure above the supercritical pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2400/00—General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
- F25B2400/04—Refrigeration circuit bypassing means
- F25B2400/0401—Refrigeration circuit bypassing means for the compressor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2400/00—General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
- F25B2400/14—Power generation using energy from the expansion of the refrigerant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2500/00—Problems to be solved
- F25B2500/26—Problems to be solved characterised by the startup of the refrigeration cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2600/00—Control issues
- F25B2600/01—Timing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/19—Pressures
- F25B2700/191—Pressures near an expansion valve
Definitions
- the present invention relates to a refrigeration cycle apparatus.
- a refrigeration cycle apparatus 500 shown in FIG. 9 is conventionally known as a refrigeration cycle apparatus provided with an expander that recovers power by expanding a working fluid, and a second compressor that preliminarily increases the pressure of the working fluid (for example, see JP 2003-307358 A). With reference to FIG. 9 , the configuration of the conventional refrigeration cycle apparatus 500 is described.
- the refrigeration cycle apparatus 500 is provided with a working fluid circuit 6 formed of a first compressor 1 , a heat radiator 2 , an expander 3 , an evaporator 4 , a second compressor 5 , and flow passages 10 a to 10 e connecting these components in this order.
- the second compressor 5 is coupled to the expander 3 by a power-recovery shaft 7 , and is driven by receiving mechanical energy recovered by the expander 3 , via the power-recovery shaft 7 .
- bypass passage 8 that bypasses the second compressor 5
- bypass valve 9 that controls the flow of the working fluid in the bypass passage 8
- the upstream end of the bypass passage 8 is connected to the flow passage 10 d connecting the outlet of the evaporator 4 and the suction port of the second compressor 5 .
- the downstream end of the bypass passage 8 is connected to the flow passage 10 e connecting the discharge port of the second compressor 5 and the suction port of the first compressor 1 .
- the refrigeration cycle apparatus 500 is activated according to the following procedures. First, the first compressor 1 starts operating, and the bypass valve 9 is opened. This allows the working fluid in the evaporator 4 to be drawn into the first compressor 1 through the bypass passage 8 as shown by solid arrows in FIG. 9 . The working fluid with the pressure increased in the first compressor 1 is discharged therefrom, thereby causing an increase in the pressure at the suction port of the expander 3 . As a result of this, a pressure difference is caused between before and after the expander 3 , as shown in FIG. 10 , so that the expander 3 and the second compressor 5 can be activated rapidly. After the expander 3 and the second compressor 5 are activated, the bypass valve 9 is closed.
- the working fluid flowing out of the evaporator 4 is drawn into the second compressor 5 through the flow passage 10 d , as shown by dashed arrows in FIG. 9 .
- a smooth transfer to regular operation can be achieved by providing the bypass passage 8 .
- the second compressor 5 acts as a load at the time of activation of the expander 3 . That is, friction or the like between the power-recovery shaft 7 and the component parts of the second compressor 5 acts as a driving resistance in the expander 3 .
- the second compressor 5 and the expander 3 are coupled to each other by the power-recovery shaft 7 that is commonly shared therebetween and thus have identical rotation rates, as well as forming the working fluid circuit 6 of a single channel. Accordingly, the volume of the second compressor 5 and the volume of the expander 3 need to be set so that the mass of the working fluid to be drawn by the second compressor 5 per unit time is equal to the mass of the working fluid to be drawn by the expander 3 per unit time.
- FIG. 11 is a Mollier diagram when carbon dioxide is used as the working fluid in the conventional refrigeration cycle apparatus 500 .
- the working fluid drawn by the second compressor 5 has a pressure of 40 kg/cm 2 and a temperature of about 10° C. (point A in FIG. 11 ).
- the working fluid has a density of 108.0 kg/m 3 .
- the working fluid drawn by the expander 3 has a pressure of 100 kg/cm 2 and a temperature of 40° C. (point C in FIG. 11 ).
- the working fluid has a density of 628.61 kg/m 3 .
- the suction volume (m 3 ) of the second compressor 5 is referred to as Vc
- the suction volume (m 3 ) of the expander 3 is referred to as Ve
- the rotation rate (S ⁇ 1 ) of the power-recovery shaft 7 per second is referred to as N.
- the mass (kg/s) of the working fluid that the second compressor 5 can draw per second and the mass (kg/s) of the working fluid that the expander 3 can draw per second can be expressed respectively by Formula 1 and Formula 2.
- Vc (628.61/108.0) ⁇ Ve ⁇ 5.8 ⁇ Ve Formula 3:
- the expander 3 needs to drive the second compressor 5 having a suction volume that is about 5.8 times that of the expander 3 , at the time of activation of the refrigeration cycle apparatus 500 .
- the larger the ratio between the density of the working fluid to be drawn by the second compressor 5 and the density of the working fluid to be drawn by the expander 3 the larger the ratio between the suction volume of the second compressor 5 and the suction volume of the expander 3 also should be.
- the suction volume of the expander 3 becomes smaller with respect to the suction volume of the second compressor 5 , and the driving resistance of the expander 3 at the time of activation of the second compressor 5 relatively increases.
- the present invention aims to solve the above-mentioned conventional problems, and it is an object of the present invention to provide a refrigeration cycle apparatus that can be activated surely and stably.
- the present invention provide a refrigeration cycle apparatus including: a working fluid circuit formed of a first compressor for compressing a working fluid, a heat radiator for cooling the working fluid compressed by the first compressor, an expander for expanding the working fluid cooled by the heat radiator and recovering power from the working fluid, an evaporator for evaporating the working fluid that has been expanded by the expander, a second compressor for increasing the pressure of the working fluid that has been evaporated by the evaporator and supplying it to the first compressor, and flow passages connecting these components in this order; a power-recovery shaft coupling the expander to the second compressor so that the second compressor is driven by the power that has been recovered by the expander; a first bypass passage for communicating between a portion from the discharge port of the first compressor to the suction port of the expander in the working fluid circuit and a portion from the outlet of the evaporator to the suction port of the second compressor in the working fluid circuit; and a first bypass valve, provided on the first bypass passage, for controlling the flow of the working fluid in
- a working fluid at high pressure that is equivalent to one supplied to the suction port of the expander can be supplied to the suction port of the second compressor at the time of activation.
- the pressure at the discharge port of the second compressor is equalized with that at the suction port of the first compressor, that is, the pressure becomes relatively low. In other words, a large pressure difference can be caused between before and after the second compressor. Therefore, the refrigeration cycle apparatus of the present invention can be activated surely and stably independent of operational conditions.
- FIG. 1 is a configuration diagram of the refrigeration cycle apparatus in Embodiment 1 of the present invention.
- FIG. 2 is a flow chart of the activation control of the refrigeration cycle apparatus in Embodiment 1 of the present invention.
- FIG. 3 is a configuration diagram of the refrigeration cycle apparatus in Embodiment 2 of the present invention.
- FIG. 4 is a flow chart of the activation control of the refrigeration cycle apparatus in Embodiment 2 of the present invention.
- FIG. 5 is a configuration diagram of the refrigeration cycle apparatus in Embodiment 3 of the present invention.
- FIG. 6A is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus in Embodiments 1 and 2.
- FIG. 6B is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus in Embodiment 3.
- FIG. 7 is a configuration diagram of the refrigeration cycle apparatus in Reference Example.
- FIG. 8A is a schematic view showing the flow of the working fluid at the time of activation of a conventional refrigeration cycle apparatus.
- FIG. 8B is a schematic view showing the flow of the working fluid at the time of activation of the refrigeration cycle apparatus in Embodiment 1, Embodiment 2 and Reference Example.
- FIG. 9 is a configuration diagram of the conventional refrigeration cycle apparatus.
- FIG. 10 is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus shown in FIG. 9 .
- FIG. 11 is a Mollier diagram when carbon dioxide is used as a working fluid in the conventional refrigeration cycle apparatus.
- FIG. 1 is a configuration diagram showing a refrigeration cycle apparatus 100 in Embodiment 1 of the present invention.
- the refrigeration cycle apparatus 100 is provided with a working fluid circuit 106 formed by sequentially connecting a first compressor 101 , a heat radiator 102 , an expander 103 , an evaporator 104 and a second compressor 105 , with flow passages (pipes) 106 a to 106 e .
- a working fluid a refrigerant such as carbon dioxide can be used.
- the first compressor 101 is constituted by arranging a compression mechanism 101 a and a motor 101 b for driving the compression mechanism 101 a in a single closed casing 101 c holding lubrication oil.
- the first compressor 101 compresses the working fluid to high temperature and high pressure.
- a scroll compressor or a rotary compressor, for example, can be used as the first compressor 101 .
- the discharge port of the first compressor 101 is connected to the inlet of the heat radiator 102 via the flow passage 106 a.
- the heat radiator 102 allows the working fluid that has been compressed to high temperature and high pressure by the first compressor 101 to radiate heat. (The heat radiator 102 cools the working fluid that has been compressed to high temperature and high pressure by the first compressor 101 .) The outlet of the heat radiator 102 is connected to the suction port of the expander 103 via the flow passage 106 b.
- the expander 103 expands the working fluid that has flowed out of the heat radiator 102 and is at intermediate temperature and high pressure.
- the expander 103 converts the expansion energy (power) of the working fluid into mechanical energy so as to recover it.
- the discharge port of the expander 103 is connected to the inlet of the evaporator 104 via the flow passage 106 c .
- a scroll expander or a rotary expander, for example, can be used as the expander 103 .
- a fluid pressure motor expander can be used as the expander 103 .
- the fluid pressure motor expander is a fluid machine that recovers power from a working fluid by sequentially performing processes of drawing the working fluid from the heat radiator 102 and discharging the drawn working fluid into the evaporator 104 without performing any substantial expansion process in the working chamber.
- the detailed structure and the operational principle of the fluid pressure motor expander is disclosed, for example, in WO 2008/050654 A.
- the evaporator 104 evaporates the working fluid at low temperature and low pressure that has been expanded by the expander 103 , by heating.
- the outlet of the evaporator 104 is connected to the suction port of the second compressor 105 via the flow passage 106 d.
- the second compressor 105 draws the working fluid that has flowed out of the evaporator 104 and is at intermediate temperature and low pressure.
- the second compressor 105 discharges it into the first compressor 101 after preliminarily increasing the pressure thereof.
- the discharge port of the second compressor 105 is connected to the suction port of the first compressor 101 via the flow passage 106 e .
- a scroll compressor or a rotary compressor can be used as the second compressor 105 .
- a fluid pressure motor compressor can be used as the second compressor 105 .
- the fluid pressure motor compressor is a fluid machine that increases the pressure of a working fluid by substantially sequentially performing processes of drawing the working fluid from the evaporator 104 and discharging the drawn working fluid into the first compressor 101 .
- the fluid pressure motor compressor is a fluid machine that allows substantially no volume change of the working fluid in a working chamber.
- the fluid pressure motor compressor has basically the same structure as the fluid pressure motor expander, and the above-mentioned literature discloses it in detail.
- the expander 103 and the second compressor 105 are accommodated in a single closed casing 109 holding lubrication oil.
- the expander 103 is coupled to the second compressor 105 by a power-recovery shaft 107 .
- the expander 103 , the second compressor 105 and the power-recovery shaft 107 function as a power recovery system 108 that drives the second compressor 105 by transferring the mechanical energy (power) recovered by the expander 103 to the second compressor 105 via the power-recovery shaft 107 .
- the second compressor 105 has a larger volume than the expander 103 .
- the ratio (Vc/Ve) of the volume Vc of the second compressor 105 with respect to the volume Ve of the expander 103 is set, for example, to the range of 5 to 15. Particularly, in the case of using a working fluid, such as carbon dioxide, that forms a refrigeration cycle with a large pressure difference, the ratio (Vc/Ve) also tends to be large. Generally, the larger the ratio (Vc/Ve), the larger the driving force (torque) is required for the self-activation of the power recovery system 108 .
- the volume of the second compressor 105 means a confined volume, that is, the volume of the working chamber at the completion of the drawing process. This should be applied to the volume of the expander 103 as well.
- the refrigeration cycle apparatus 100 is further provided with a first bypass passage 112 and a first bypass valve 113 .
- the first bypass passage 112 is connected to the working fluid circuit 106 so as to communicate between the flow passage 106 b connecting the outlet of the heat radiator 102 to the suction port of the expander 103 , and the flow passage 106 d connecting the outlet of the evaporator 104 to the suction port of the second compressor 105 .
- the first bypass valve 113 is provided on the first bypass passage 112 , and controls the flow of the working fluid in the first bypass passage 112 .
- the upstream end K 1 of the first bypass passage 112 is connected to the flow passage 106 b , and the downstream end K 2 of the first bypass passage 112 is connected to the flow passage 106 d . That is, the first bypass passage 112 is a flow passage that allows the working fluid in the flow passage 106 b to be drawn directly into the second compressor 105 , before the power-recovery shaft 107 is rotated, while bypassing the expander 103 and the evaporator 104 .
- the position of the upstream end K 1 is not limited to the position shown in FIG. 1 . That is, the position of the upstream end K 1 of the first bypass passage 112 is not specifically limited, as long as a portion from the discharge port of the first compressor 101 to the suction port of the expander 103 in the working fluid circuit 106 and a portion from the outlet of the evaporator 104 to the suction port of the second compressor 105 in the working fluid circuit 106 can be communicated with each other.
- the first bypass passage 112 may be connected to the working fluid circuit 106 in such a way as to communicate between the flow passage 106 a connecting the discharge port of the first compressor 101 to the inlet of the heat radiator 102 , and the flow passage 106 d connecting the outlet of the evaporator 104 to the suction port of the second compressor 105 .
- the first bypass passage 112 may be branched from the heat radiator 102 .
- the heat radiator 102 is composed of an upstream part and a downstream part, the first bypass passage 112 can be easily branched from a portion between these two parts.
- the first bypass valve 113 is provided in the upstream end section of the first bypass passage 112 .
- the “upstream end section” corresponds to a section defined between the upstream end K 1 and the point of L 1 /4 from the upstream end K 1 toward the downstream end K 2 , when the full length of the first bypass passage 112 is referred to as L 1 .
- the position of the first bypass valve 113 is not specifically limited, and may be provided in the downstream end section of the first bypass passage 112 , for example.
- the “downstream end section” corresponds to a section defined between the downstream end K 2 and the point of L 1 /4 from the downstream end K 2 toward the upstream end K 1 .
- the first bypass valve 113 used in Embodiment 1 is an on-off valve, though it is not limited thereto.
- a three-way valve can be used as first bypass valve 113 .
- the use of a three-way valve is advantageous in that the number of pipe connections can be reduced.
- the refrigeration cycle apparatus 100 is further provided with an activation assist valve 114 provided on the working fluid circuit 106 at a point that is located between the outlet of the evaporator 104 and the suction port of the second compressor 105 , and that is closer to the evaporator 104 than the downstream end K 2 of the first bypass passage 112 is.
- the activation assist valve 114 controls the flow of the working fluid in the flow passage 106 d .
- An on-off valve can be used as the activation assist valve 114 .
- the working fluid in the flow passage 106 b is allowed to flow directly into the suction port of the second compressor 105 through the first bypass passage 112 .
- the working fluid can be prevented from flowing, from the evaporator 104 into the second compressor 105 , by closing the activation assist valve 114 .
- the refrigeration cycle apparatus 100 is further provided with a second bypass passage 110 and a second bypass valve 111 .
- the second bypass passage 110 is connected to the working fluid circuit 106 so as to communicate between the flow passage 106 c connecting the discharge port of the expander 103 to the inlet of the evaporator 104 , and the flow passage 106 e connecting the discharge port of the second compressor 105 to the suction port of the first compressor 101 . That is, the second bypass passage 110 bypasses the evaporator 104 and the second compressor 105 .
- the second bypass valve 111 is provided on the second bypass passage 110 , and controls the flow of the working fluid in the second bypass passage 110 .
- the upstream end H 1 of the second bypass passage 110 is connected to the flow passage 106 c , and the downstream end H 2 of the second bypass passage 110 is connected to the flow passage 106 e . That is, the second bypass passage 110 is a flow passage that allows the working fluid in the flow passage 106 c to be drawn directly into the first compressor 101 , while bypassing the evaporator 104 and the second compressor 105 .
- the position of the upstream end H 1 is not limited to the position shown in FIG. 1 .
- the upstream end H 1 may be positioned at any point in the zone from the discharge port of the expander 103 to the downstream end K 2 of the first bypass passage 112 .
- the second bypass passage 110 may be connected to the working fluid circuit 106 in such a way as to communicate between a portion from the outlet of the evaporator 104 to the downstream end K 2 of the first bypass passage 112 in the working fluid circuit 106 (a part of the flow passage 106 d ), and a portion from the discharge port of the second compressor 105 to the suction port of the first compressor 101 in the working fluid circuit 106 (flow passage 106 e ).
- the second bypass passage 110 may be branched from the evaporator 104 .
- the second bypass passage 110 can be easily branched from a portion between these two parts.
- the second bypass valve 111 is provided in the upstream end section of the second bypass passage 110 .
- the “upstream end section” corresponds to a section defined between the upstream end H 1 and the point of L 2 /4 from the upstream end H 1 toward the downstream end H 2 , when the full length of the second bypass passage 111 is referred to as L 2 .
- the second bypass valve 111 may be provided also in the downstream end section of the second bypass passage 111 .
- the “downstream end section” corresponds to a section defined between the downstream end H 2 and the point of L 2 /4 from the downstream end H 2 toward the upstream end H 1 .
- the second bypass valve 111 used in Embodiment 1 is a check valve, it is not limited thereto. An on-off valve or a three-way valve may be used therefor.
- the second bypass valve 111 allows the working fluid in the flow passage 106 c to flow into the second bypass passage 110 . That is, when the pressure in the flow passage 106 e is lower than the pressure in the flow passages between the discharge port of the expander 103 and the suction port of the second compressor 105 (the flow passage 106 c , the evaporator 104 and the flow passage 106 d ), the working fluid in the flow passage 106 c is allowed to flow directly into the suction port of the first compressor 101 through the second bypass passage 110 .
- the refrigeration cycle apparatus 100 is further provided with a controller 117 for controlling opening and closing of the first bypass valve 113 and the activation assist valve 114 .
- the first bypass valve 113 and the activation assist valve 114 are provided respectively with valve opening and closing devices 115 and 116 .
- the valve opening and closing devices 115 and 116 typically are composed of an actuator for actuating valves such as a solenoid, and are controlled by the controller 117 .
- the controller 117 typically is composed of a microcomputer.
- An input apparatus 118 provided with an activation button is connected to the controller 117 . Upon input of an operation command to the controller 117 through the input apparatus 118 , a specific control program stored in the internal memory of the controller 117 is executed.
- an activation command (activation signal) is transmitted from the input apparatus 118 to the controller 117 .
- the controller 117 performs a specific activation control to be described later with reference to FIG. 2 . Further, the controller 117 controls the operation of the motor 101 b that drives the first compressor 101 .
- the refrigeration cycle apparatus 100 is further provided with an activation detector 119 for detecting that the second compressor 105 has been activated.
- the activation detector 119 transmits the detection signal to the controller 117 .
- the controller 117 detects the activation of the second compressor 105 on the basis of the acquisition of the detection signal.
- a temperature detector, a pressure detector, or the like can be used as the activation detector 119 .
- the temperature detector when used as the activation detector 119 for example, includes a temperature detecting element such as a thermocouple and a thermistor, and detects the difference ⁇ T between the temperature of the working fluid to be drawn into the expander 103 and the temperature of the working fluid discharged from the expander 103 .
- the pressure detector when used as the activation detector 119 includes a piezoelectric element, and detects the difference ⁇ P between the pressure of the working fluid to be drawn into the expander 103 and the pressure of the working fluid discharged from the expander 103 .
- a timer for measuring the time elapsed from the time point of the activation of the first compressor 101 may be provided as the activation detector 119 for detecting the activation of the second compressor 105 .
- Such a timer can be provided also as a function of the controller 117 .
- the controller 117 itself can serve as the activation detector 119 .
- a contact or noncontact displacement sensor for detecting the driving of the power-recovery shaft 107 such as an encoder, may be provided as the activation detector 119 for detecting the activation of the second compressor 105 .
- the method for detecting that “the second compressor 105 has been activated” differs as follows.
- a specific value T 1 that has been experimentally or theoretically determined is set by the controller 117 .
- the controller 117 detects that “the second compressor 105 has been activated” when the temperature difference ⁇ T detected by the temperature detector exceeds the specific value T 1 .
- a specific value P 1 that has been experimentally or theoretically determined is set by the controller 117 .
- the controller 117 detects that “the second compressor 105 has been activated” when the pressure difference ⁇ P detected by the pressure detector exceeds the specific value P 1 .
- the activation of the second compressor 105 can be detected from the comparison between the temperature difference ⁇ T and the specific value T 1 , or from the comparison between the pressure difference ⁇ P and the specific value P 1 .
- the first compressor 101 When the first compressor 101 is activated, the working fluid discharged from the first compressor 101 is supplied to the suction port of the second compressor 105 through the first bypass passage 112 . This activates the power recovery system 108 .
- the second compressor 105 serves as a driving source, and therefore the power recovery system 108 starts rotating before a large temperature difference is made between the suction temperature of the first compressor 101 and the discharge temperature of the first compressor 101 .
- the rotation rate of the power recovery system 108 also is low.
- the rotation rate of the expander 103 also is low. This state corresponds to the “narrow state” in terms of the expansion valve. Accordingly, the discharge temperature and the discharge pressure of the first compressor 101 gradually increase as well.
- the power to rotate the expander 103 and the second compressor 105 also increases, so that the rotation rate of the power recovery system 108 becomes high. Then, once a high rotation rate is achieved, the power recovery system 108 stably rotates under the influence of the inertial force. It is desirable that the first bypass passage 112 is kept open until such a stable rotation state is achieved.
- the suction temperature of the expander 103 gradually increases from substantially the same temperature as the outdoor air temperature at the stopped state.
- the discharge temperature (or discharge pressure) of the expander 103 depends on the suction temperature (or suction pressure) of the expander 103 .
- Suction temperature 10° C.
- Suction pressure 5.0 MPa
- Discharge temperature ⁇ 3.0° C.
- Discharge pressure 3.2 MPa
- Difference between suction temperature and discharge temperature 13° C.
- Difference between suction pressure and discharge pressure 1.8 MPa
- Suction temperature 40° C.
- Suction pressure 10.0 MPa
- Discharge temperature 13.4° C.
- Discharge pressure 4.9 MPa
- Difference between suction temperature and discharge temperature 26.6° C.
- Difference between suction pressure and discharge pressure 5.1 MPa
- the suction temperature of the expander 103 and the discharge temperature of the expander 103 each gradually increase, as mentioned above.
- the difference between the suction temperature and the discharge temperature also gradually grows. This also can be applied to the pressure. Therefore, it is possible to detect the activation of the second compressor 105 (the activation of the power recovery system 108 ) by setting appropriate values as the specific values T 1 and P 1 (for example, slightly larger values than the temperature difference and the pressure difference at the time of activation).
- the second compressor 105 It also is possible to detect the activation of the second compressor 105 on the basis of the discharge temperature of the expander 103 or the discharge pressure of the expander 103 , instead of the temperature difference ⁇ and the pressure difference ⁇ T.
- the expander 103 When the power recovery system 108 is activated, the expander 103 also rotates. After drawing the working fluid, the expander 103 expands the drawn working fluid and discharges it. Therefore, the working fluid discharged from the expander 103 has lower temperature and pressure than before being drawn thereinto. It is possible to determine that the second compressor 105 has been activated, by capturing a sudden change in the temperature (or pressure) as well as monitoring the temperature (or pressure) at the discharge port of the expander 103 in chronological terms.
- a specific time t that has been experimentally or theoretically determined is set by the controller 117 .
- the controller 117 transmits a control signal to the motor 101 b of the first compressor 101 and starts measuring the time by the timer.
- the controller 117 detects that “the second compressor 105 has been activated” when the time measured by the timer exceeds the specific time t.
- the “specific time t” is written in the activation control program to be executed in the controller 117 .
- the time from the time point of the activation of the first compressor 101 to the activation of the second compressor 105 is actually measured under various operational conditions (such as outdoor air temperature). Then, the time from which the activation of the second compressor 105 is determinable in all the operational conditions can be set as the “specific time t”.
- a model of the refrigeration cycle apparatus 100 is constructed, and a pressure difference that is necessary and sufficient to activate the power recovery system 108 is estimated by computer simulation. Then, using parameters such as the volume of the first compressor 101 and the filling amount of the working fluid in the working fluid circuit 106 , the initial activation time necessary to produce the estimated pressure difference is calculated. The calculated initial activation time can be set as the “specific time t”.
- FIG. 2 is a flow chart of the activation control of the refrigeration cycle apparatus 100 .
- the refrigeration cycle apparatus 100 starts the regular operation after performing the activation control shown in FIG. 2 .
- the first compressor 101 is stopped, the first bypass valve 113 is closed, and the activation assist valve 114 is opened.
- the pressure of the working fluid in the working fluid circuit 106 is substantially uniform.
- a fan or a pump for causing a fluid (air or water) that should exchange heat with the working fluid to flow into the heat radiator 102 is actuated after the completion of the activation control.
- a fan or a pump for causing a fluid that should exchange heat with the working fluid to flow into the evaporator 104 also is actuated after the completion of the activation control.
- step S 11 in response to the reception of the activation command from the input apparatus 118 , the controller 117 transmits a control signal to the valve opening and closing devices 115 and 116 so that the first bypass valve 113 is opened and the activation assist valve 114 is closed (step S 12 ). This allows the first bypass passage 112 to be opened, and the flow passage 106 d to be closed between the outlet of the evaporator 104 and the downstream end K 2 of the first bypass passage 112 .
- the controller 117 starts supplying power to the motor 101 b so that the first compressor 101 is activated (step S 13 ).
- This allows the working fluid in the flow passage 106 e and the second bypass passage 110 to be drawn into the first compressor 101 .
- the activation assist valve 114 may be closed. That is, there is no problem as long as the working fluid is allowed to flow in the first bypass passage 112 after the activation of the first compressor 101 and before the rotation of the power-recovery shaft 107 .
- the pressure in the flow passage 106 e and the second bypass passage 110 decreases.
- the working fluid that has flown into the second bypass passage 110 is drawn into the first compressor 101 to be compressed therein, and discharged into the flow passage 106 a . Accordingly, the pressure in the flow passages from the discharge port of the expander 103 to the activation assist valve 114 (the flow passage 106 c , the evaporator 104 and a part of the flow passage 106 d ) decreases.
- the pressure in the flow passages from the discharge port of the first compressor 101 to the suction port of the expander 103 increases.
- the compressed working fluid flows also into the flow passage 106 d between the activation assist valve 114 and the suction port of the second compressor 105 through the first bypass passage 112 . This causes the pressure in the flow passage from the activation assist valve 114 to the suction port of the second compressor 105 (a part of the flow passage 106 d ) to increase.
- the pressure at the suction port of each of the expander 103 and the second compressor 105 is rendered relatively high, and the pressure at the discharge port of each of the expander 103 and the second compressor 105 is rendered relatively low. That is, a pressure difference can be caused not only between the suction port and the discharge port of the expander 103 , but also between the suction port and the discharge port of the second compressor 105 .
- the pressure difference of the working fluid acts on each of the expander 103 and the second compressor 105 , and thus self-activation of the power recovery system 108 can be easily achieved.
- the controller 117 Upon detecting the activation of the second compressor 105 through the activation detector 119 (step S 14 ), the controller 117 transmits a control signal to the valve opening and closing devices 115 and 116 so that the first bypass valve 113 is closed and the activation assist valve 114 is opened (step S 15 ). Specifically, the controller 117 detects the activation of the second compressor 105 by receiving the detection signal from the activation detector 119 , and thereafter closes the first bypass valve 113 and opens the activation assist valve 114 . This allows the first bypass passage 112 to be closed, and the flow passage 106 d to be opened. After the completion of the activation control, the refrigeration cycle apparatus 100 is transferred to the regular operation in which the working fluid is circulated in the working fluid circuit 106 .
- the second bypass valve 111 serving as a check valve is closed.
- the pressure in the flow passage 106 e and the second bypass passage 110 on the downstream side of the second bypass valve 111 is higher than the pressure in the flow passage 106 c , the evaporator 104 and the flow passage 106 d , and thus the second bypass valve 111 is kept closed. This allows the working fluid to be circulated in the working fluid circuit 106 during the regular operation.
- the working fluid in the liquid phase might be drawn into the second compressor 105 at the time of activation of the refrigeration cycle apparatus 100 , though it depends also on the conditions such as outdoor air temperature. Therefore, the fluid pressure motor compressor described above can be used suitably as the second compressor 105 . This is because the fluid pressure motor compressor allows substantially no volume change of the working fluid to be caused in the working chamber and therefore is capable of accepting the working fluid in a liquid phase to be drawn therein to some extent.
- a pressure pulsation might occur in the flow passage 106 e on the basis that the working fluid is confined in the compression mechanism 101 a .
- a part of the second bypass passage 110 (the part from the second bypass valve 111 to the downstream end H 2 ) can function as a buffer space to allow the volume of the flow passage 106 e to extend. Therefore, the pulse width of the pressure pulsation that has occurred in the flow passage 106 e can be expected to be reduced, resulting in an enhancement in the operational reliability of the refrigeration cycle apparatus 100 .
- a pressure pulsation might occur in the flow passage 106 d on the basis that the working fluid is confined in the working chamber of the second compressor 105 .
- a part of the first bypass passage 112 (the part from the first bypass valve 113 to the downstream end K 2 ) can function as a buffer space to allow the volume of the flow passage 106 d to extend. Therefore, the pulse width of the pressure pulsation that has occurred in the flow passage 106 d can be expected to be reduced, resulting in an enhancement in the operational reliability of the refrigeration cycle apparatus 100 .
- the rotation rate of the first compressor 101 is progressively reduced, for example.
- the working fluid travels through the first compressor 101 , the expander 103 and the second compressor 105 , taking sufficient time. Therefore, the pressure difference in the working fluid circuit 106 naturally disappears, so that the pressure becomes substantially uniform to be stabilized. This allows the expander 103 and the second compressor 105 to be stopped naturally.
- the first bypass valve 113 is opened, and the activation assist valve 114 is closed, according to Embodiment 1. Therefore, the working fluid in the flow passages from the discharge port of the first compressor 101 to the suction port of the expander 103 can be supplied to the suction port of the second compressor 105 through the first bypass passage 112 . This causes the pressure at the suction port of the second compressor 105 to increase. Further, the working fluid in the flow passages from the discharge port of the expander 103 to the activation assist valve 114 can be supplied directly to the first compressor 101 through the second bypass passage 110 in addition to the working fluid in the flow passage 106 e.
- the pressure in the flow passage 106 e and the second bypass passage 110 on the downstream side of the second bypass valve 111 decreases. This allows the second bypass valve 111 serving as a check valve to be opened.
- the working fluid in the flow passages from the discharge port of the expander 103 to the activation assist valve 114 flows into the second bypass passage 110 , and is drawn into the first compressor 101 together with the working fluid in the second bypass passage 110 and the flow passage 106 e.
- a pressure difference can be caused not only between the suction port and the discharge port of the expander 103 but also between the suction port and the discharge port of the second compressor 105 . Therefore, the power recovery system 108 can be activated stably and surely, resulting in an improvement in the reliability of the refrigeration cycle apparatus 100 .
- FIG. 3 is a configuration diagram of a refrigeration cycle apparatus 200 in Embodiment 2 of the present invention.
- the refrigeration cycle apparatus 200 differs from Embodiment 1 in that a three-way valve is used as the first bypass valve 201 . That is, the first bypass valve 201 functions both as the first bypass valve 113 and the activation assist valve 114 in Embodiment 1.
- Embodiment 2 common parts with Embodiment 1 are designated with identical reference numerals, and the detailed description thereof is omitted.
- the first bypass valve 201 is provided at the junction of the downstream end K 2 of the first bypass passage 112 and the flow passage 106 d .
- the channel for the working fluid can be switched easily and conveniently between (a) the state where the flow passage 106 d is opened, and the first bypass passage 112 is closed (for example, in the regular operation), and (b) the state where the first bypass passage 112 is opened, and the flow passage 106 d is closed at the junction with the downstream end K 2 of the first bypass passage 112 (for example, in the activation control).
- the first bypass valve 201 may be provided at the junction of the upstream end K 1 of the first bypass passage 112 and the flow passage 106 b.
- a valve switching device 202 is provided in the first bypass valve 201 .
- the valve switching device 202 is typically composed of an actuator such as a solenoid, and controlled by the controller 117 .
- FIG. 4 is a flow chart of the activation control of the refrigeration cycle apparatus 200 .
- the refrigeration cycle apparatus 200 starts the regular operation after performing the activation control shown in FIG. 4 .
- the first compressor 101 is stopped, the flow passage 106 d is opened by the first bypass valve 201 , and the first bypass passage 112 is closed (the above state (a)).
- the pressure of the working fluid in the working fluid circuit 106 is substantially uniform.
- step S 21 in response to the reception of the activation command from the input apparatus 118 , the controller 117 transmits a control signal to a valve control device 202 so that the state is switched from the above-described state (a) to the state (b) (step S 22 ).
- step S 23 the controller 117 starts supplying power to the motor 101 b so that the first compressor 101 is activated. This allows the working fluid in the flow passage 106 e and the second bypass passage 110 to be drawn into the first compressor 101 .
- the process of step S 22 may be carried out in response to the activation of the first compressor 101 .
- the pressure in the flow passage 106 e and the second bypass passage 110 decreases.
- the working fluid that has flown into the second bypass passage 110 is drawn into the first compressor 101 to be compressed therein, and discharged into the flow passage 106 a . Accordingly, the pressure in the flow passages from the discharge port of the expander 103 to the first bypass valve 201 (the flow passage 106 c , the evaporator 104 , a part of the flow passage 106 d ) also decreases.
- the pressure in the flow passages from the discharge port of the first compressor 101 to the suction port of the expander 103 increases.
- the compressed working fluid flows also into the flow passage 106 d between the first bypass valve 201 and the suction port of the second compressor 105 through the first bypass passage 112 .
- This causes the pressure in the flow passage from the first bypass valve 201 to the suction port of the second compressor 105 (a part of the flow passage 106 d ) to increase.
- Embodiment 1 the state shown in FIG. 6A is established, and thus self-activation of the power recovery system 108 can be easily achieved.
- step S 24 Upon detecting the activation of the second compressor 105 through the activation detector 119 (step S 24 ), the controller 117 transmits a control signal to the valve switching device 202 so that the state is switched from the above-described state (b) to the state (a) (step S 25 ). This causes the first bypass valve 201 to be switched, and the first bypass passage 112 to be closed. After the completion of the activation control, the refrigeration cycle apparatus 200 is transferred to the regular operation.
- a part of the second bypass passage 110 (the part from the second bypass valve 111 to the downstream end H 2 ) can function as a buffer space to allow the volume of the flow passage 106 e to extend. Accordingly, as has been described in Embodiment 1, the pulse width of the pressure pulsation that has occurred in the flow passage 106 e can be expected to be reduced, resulting in an enhancement in the operational reliability of the refrigeration cycle apparatus 200 .
- the first bypass passage 112 can function as a buffer space to allow the volume of the flow passage 106 b to extend. Accordingly, the pulse width of the pressure pulsation that has occurred in the flow passage 106 b can be expected to be reduced, resulting in an enhancement in the operational reliability of the refrigeration cycle apparatus 200 .
- the first bypass passage 112 is opened, and the flow passage 106 d is closed at the junction with the downstream end K 2 of the first bypass passage 112 , according to Embodiment 2. Therefore, the working fluid in the flow passages from the discharge port of the first compressor 101 to the suction port of the expander 103 can be supplied to the suction port of the second compressor 105 through the first bypass passage 112 . This causes the pressure at the suction port of the second compressor 105 to increase. Further, the working fluid in the flow passages from the discharge port of the expander 103 to the first bypass valve 201 can be supplied directly to the first compressor 101 through the second bypass passage 110 in addition to the working fluid in the flow passage 106 e.
- the pressure in the flow passage 106 e and the second bypass passage 110 on the downstream side of the second bypass valve 111 decreases. This allows the second bypass valve 111 serving as a check valve to be opened.
- the working fluid in the flow passages from the discharge port of the expander 103 to the first bypass valve 201 flows into the second bypass passage 110 , and is drawn into the first compressor 101 together with the working fluid in the second bypass passage 110 and the flow passage 106 e.
- the pressure loss of the working fluid due to the evaporator 104 and the second compressor 105 can be avoided, and the pressure decrease of the working fluid to be drawn by the first compressor 101 can be suppressed, at the time of activation. These allow a reduction in the power required to increase the pressure of the working fluid by the first compressor 101 .
- a pressure difference can be caused not only between the suction port and the discharge port of the expander 103 but also between the suction port and the discharge port of the second compressor 105 . Therefore, the power recovery system 108 can be activated stably and surely, resulting in an improvement in the reliability of the refrigeration cycle apparatus 200 .
- Embodiments 1 and 2 are provided with the second bypass passage 110 and the second bypass valve 111 . However, these are not always necessary. That is, a refrigeration cycle apparatus 300 with a configuration in which the second bypass passage 110 and the second bypass valve 111 are omitted can be proposed, as shown in FIG. 5 .
- the first bypass valve 113 is opened, and the activation assist valve 114 is closed, at the time of activation.
- the first compressor 101 can draw only the working fluid in the flow passage 106 e . That is, focusing on the amount of the working fluid that the first compressor 101 can draw thereinto, Embodiment 3 may be less advantageous than Embodiments 1 and 2.
- a pressure difference can be caused not only between the suction port and the discharge port of the expander 103 but also between the suction port and the discharge port of the second compressor 105 (see FIG. 6A ). Accordingly, even if the second bypass passage 110 and the second bypass valve 111 are omitted, the power recovery system 108 can be activated easily and surely.
- the activation assist valve 114 in the refrigeration cycle apparatus 300 .
- a pressure difference is caused only between the suction port and the discharge port of the second compressor 105 , as shown in FIG. 6B .
- the driving resistance of the second compressor 105 is relatively larger than the driving resistance of the expander 103 . Accordingly, the state shown in FIG. 6B is more advantageous for the activation of the power recovery system 108 than the state shown in FIG. 10 .
- a refrigeration cycle apparatus 400 shown in FIG. 7 differs from the conventional refrigeration cycle apparatus 500 (see FIG. 9 ) in the position of the upstream end H 1 of the bypass passage 110 .
- the upstream end H 1 of the bypass passage 110 is positioned on the flow passage 106 c connecting the discharge port of the expander 103 to the inlet of the evaporator 104 .
- the refrigeration cycle apparatus 400 has the same configuration including the method for detecting the activation as the refrigeration cycle apparatus 100 that has been described with reference to FIG. 1 , etc.
- the refrigeration cycle apparatus 400 allows the following advantageous effects to be obtained on the basis of the difference in the position of the upstream end H 1 of the bypass passage 110 . That is, according to the refrigeration cycle apparatus 400 , the pressure loss of the working fluid due to the evaporator 104 and the second compressor 105 can be avoided during a constant period before and after the activation, and thereby the pressure decrease of the working fluid to be drawn by the first compressor 101 can be suppressed. These result in a reduction in the power required for the first compressor 101 to increase the pressure of the working fluid, thus making it easy to form a stable operation state more rapidly.
- the working fluid in the liquid phase tends to be retained in a comparatively downstream portion inside the evaporator 4 in the state where the conventional refrigeration cycle apparatus 500 ( FIG. 9 ) is stopped.
- the refrigeration cycle apparatus 500 is activated in the state where the working fluid in the liquid phase is retained inside the evaporator 4 , the working fluid in the vapor phase inside the flow passages 10 c and 10 d , and the working fluid in the vapor phase inside the evaporator 4 proceed in the first compressor 1 or the second compressor 5 , while passing through the inside of the evaporator 4 . Since the working fluid travels a comparatively long distance, the pressure loss also is comparatively large. Furthermore, there is a possibility that the working fluid in the liquid phase is drawn into the first compressor 101 , and there also is a possibility that the working fluid in the liquid phase serves as a resistance and increases the pressure loss.
- the working fluid in the vapor phase flows back in the evaporator 104 , and is drawn directly into the first compressor 101 through the bypass passage 110 , as shown in FIG. 8 .
- the working fluid in the liquid phase travels inside the evaporator 104 while being vaporized, and is drawn into the first compressor 101 through the bypass passage 110 .
- the pressure in the evaporator 104 that is, the suction pressure of the first compressor 101 is maintained substantially constant.
- the working fluid in the liquid phase never serves as a resistance, and the pressure loss of the working fluid in the vapor phase is comparatively low.
- the possibility that the working fluid in the liquid phase is drawn into the first compressor 101 at the time of activation is low, and therefore stable activation can be achieved.
- the refrigeration cycle apparatus 100 and 200 of Embodiments 1 and 2 also are provided with the bypass passage 110 , and therefore the above-mentioned effects can be obtained at the time of activation.
- the refrigeration cycle apparatus of the present invention is useful as equipments such as water heaters, air conditioners, dryers, etc.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Applications Or Details Of Rotary Compressors (AREA)
- Control Of Turbines (AREA)
- Control Of Positive-Displacement Pumps (AREA)
- Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
Abstract
A refrigeration cycle apparatus 100 is provided with a working fluid circuit 106 and a first bypass passage 112. The working fluid circuit 106 is formed of a first compressor 101, a heat radiator 102, an expander 103, an evaporator 104, a second compressor 105, and flow passages 106 a to 106 e connecting these components in this order. The expander 103 and the second compressor 105 are coupled to each other by a power-recovery shaft 107 so that the second compressor 105 is driven by the power recovered by the expander 103. The first bypass passage 112 communicates between a portion from the discharge port of the first compressor 101 to the suction port of the expander 103 in the working fluid circuit 106 and a portion from the outlet of the evaporator 104 to the suction port of the second compressor 105 in the working fluid circuit 106, at the time of activation of the refrigeration cycle apparatus 100.
Description
- The present invention relates to a refrigeration cycle apparatus.
- A
refrigeration cycle apparatus 500 shown inFIG. 9 is conventionally known as a refrigeration cycle apparatus provided with an expander that recovers power by expanding a working fluid, and a second compressor that preliminarily increases the pressure of the working fluid (for example, see JP 2003-307358 A). With reference toFIG. 9 , the configuration of the conventionalrefrigeration cycle apparatus 500 is described. - As shown in
FIG. 9 , therefrigeration cycle apparatus 500 is provided with aworking fluid circuit 6 formed of afirst compressor 1, aheat radiator 2, anexpander 3, anevaporator 4, asecond compressor 5, andflow passages 10 a to 10 e connecting these components in this order. Thesecond compressor 5 is coupled to theexpander 3 by a power-recovery shaft 7, and is driven by receiving mechanical energy recovered by theexpander 3, via the power-recovery shaft 7. - Further, a
bypass passage 8 that bypasses thesecond compressor 5, and a bypass valve 9 that controls the flow of the working fluid in thebypass passage 8 are provided therein. The upstream end of thebypass passage 8 is connected to theflow passage 10 d connecting the outlet of theevaporator 4 and the suction port of thesecond compressor 5. The downstream end of thebypass passage 8 is connected to theflow passage 10 e connecting the discharge port of thesecond compressor 5 and the suction port of thefirst compressor 1. - The
refrigeration cycle apparatus 500 is activated according to the following procedures. First, thefirst compressor 1 starts operating, and the bypass valve 9 is opened. This allows the working fluid in theevaporator 4 to be drawn into thefirst compressor 1 through thebypass passage 8 as shown by solid arrows inFIG. 9 . The working fluid with the pressure increased in thefirst compressor 1 is discharged therefrom, thereby causing an increase in the pressure at the suction port of theexpander 3. As a result of this, a pressure difference is caused between before and after theexpander 3, as shown inFIG. 10 , so that theexpander 3 and thesecond compressor 5 can be activated rapidly. After theexpander 3 and thesecond compressor 5 are activated, the bypass valve 9 is closed. The working fluid flowing out of theevaporator 4 is drawn into thesecond compressor 5 through theflow passage 10 d, as shown by dashed arrows inFIG. 9 . In this way, a smooth transfer to regular operation can be achieved by providing thebypass passage 8. -
- Patent Literature 1: JP 2003-307358 A
- In the
refrigeration cycle apparatus 500, only theexpander 3 is involved in the activation of theexpander 3 and thesecond compressor 5, whereas thesecond compressor 5 does not contribute thereto. Rather, thesecond compressor 5 acts as a load at the time of activation of theexpander 3. That is, friction or the like between the power-recovery shaft 7 and the component parts of thesecond compressor 5 acts as a driving resistance in theexpander 3. - Meanwhile, in the regular operation of the
refrigeration cycle apparatus 500, thesecond compressor 5 and theexpander 3 are coupled to each other by the power-recovery shaft 7 that is commonly shared therebetween and thus have identical rotation rates, as well as forming the workingfluid circuit 6 of a single channel. Accordingly, the volume of thesecond compressor 5 and the volume of theexpander 3 need to be set so that the mass of the working fluid to be drawn by thesecond compressor 5 per unit time is equal to the mass of the working fluid to be drawn by theexpander 3 per unit time. -
FIG. 11 is a Mollier diagram when carbon dioxide is used as the working fluid in the conventionalrefrigeration cycle apparatus 500. As shown inFIG. 11 , in the regular operation of the conventionalrefrigeration cycle apparatus 500, the working fluid drawn by thesecond compressor 5 has a pressure of 40 kg/cm2 and a temperature of about 10° C. (point A inFIG. 11 ). At this time, the working fluid has a density of 108.0 kg/m3. The working fluid drawn by theexpander 3 has a pressure of 100 kg/cm2 and a temperature of 40° C. (point C inFIG. 11 ). At this time, the working fluid has a density of 628.61 kg/m3. - Here, the suction volume (m3) of the
second compressor 5 is referred to as Vc, the suction volume (m3) of theexpander 3 is referred to as Ve, and the rotation rate (S−1) of the power-recovery shaft 7 per second is referred to as N. The mass (kg/s) of the working fluid that thesecond compressor 5 can draw per second and the mass (kg/s) of the working fluid that theexpander 3 can draw per second can be expressed respectively by Formula 1 and Formula 2. -
(The mass of the working fluid that thesecond compressor 5 can draw per second)=108.0×Vc×N Formula 1: -
(The mass of the working fluid that theexpander 3 can draw per second)=628.61×Ve×N Formula 2: - When the mass of the working fluid that the
second compressor 5 can draw per second is equal to the mass of the working fluid that theexpander 3 can draw per second, the suction volume Vc of thesecond compressor 5 can be expressed by -
Formula 3 from the above-mentionedFormula 1 and Formula 2. -
Vc=(628.61/108.0)×Ve≈5.8×Ve Formula 3: - That is, the
expander 3 needs to drive thesecond compressor 5 having a suction volume that is about 5.8 times that of theexpander 3, at the time of activation of therefrigeration cycle apparatus 500. Further, the larger the ratio between the density of the working fluid to be drawn by thesecond compressor 5 and the density of the working fluid to be drawn by theexpander 3, the larger the ratio between the suction volume of thesecond compressor 5 and the suction volume of theexpander 3 also should be. In other words, the suction volume of theexpander 3 becomes smaller with respect to the suction volume of thesecond compressor 5, and the driving resistance of theexpander 3 at the time of activation of thesecond compressor 5 relatively increases. Accordingly, there is a possibility that theexpander 3 cannot drive thesecond compressor 5 at the time of activation, depending on the operational conditions of therefrigeration cycle apparatus 500. Instead, it might be necessary to impose an excess pressure, as compared to that in the regular operation, on the suction port side of theexpander 3, so that a driving force necessary to drive thesecond compressor 5 should be obtained, possibly resulting in a problem of safety, such as pressure resistance. - The present invention aims to solve the above-mentioned conventional problems, and it is an object of the present invention to provide a refrigeration cycle apparatus that can be activated surely and stably.
- That is, the present invention provide a refrigeration cycle apparatus including: a working fluid circuit formed of a first compressor for compressing a working fluid, a heat radiator for cooling the working fluid compressed by the first compressor, an expander for expanding the working fluid cooled by the heat radiator and recovering power from the working fluid, an evaporator for evaporating the working fluid that has been expanded by the expander, a second compressor for increasing the pressure of the working fluid that has been evaporated by the evaporator and supplying it to the first compressor, and flow passages connecting these components in this order; a power-recovery shaft coupling the expander to the second compressor so that the second compressor is driven by the power that has been recovered by the expander; a first bypass passage for communicating between a portion from the discharge port of the first compressor to the suction port of the expander in the working fluid circuit and a portion from the outlet of the evaporator to the suction port of the second compressor in the working fluid circuit; and a first bypass valve, provided on the first bypass passage, for controlling the flow of the working fluid in the first bypass passage.
- According to the refrigeration cycle apparatus of the present invention, a working fluid at high pressure that is equivalent to one supplied to the suction port of the expander can be supplied to the suction port of the second compressor at the time of activation. On the other hand, the pressure at the discharge port of the second compressor is equalized with that at the suction port of the first compressor, that is, the pressure becomes relatively low. In other words, a large pressure difference can be caused between before and after the second compressor. Therefore, the refrigeration cycle apparatus of the present invention can be activated surely and stably independent of operational conditions.
-
FIG. 1 is a configuration diagram of the refrigeration cycle apparatus inEmbodiment 1 of the present invention. -
FIG. 2 is a flow chart of the activation control of the refrigeration cycle apparatus inEmbodiment 1 of the present invention. -
FIG. 3 is a configuration diagram of the refrigeration cycle apparatus inEmbodiment 2 of the present invention. -
FIG. 4 is a flow chart of the activation control of the refrigeration cycle apparatus inEmbodiment 2 of the present invention. -
FIG. 5 is a configuration diagram of the refrigeration cycle apparatus inEmbodiment 3 of the present invention. -
FIG. 6A is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus in 1 and 2.Embodiments -
FIG. 6B is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus inEmbodiment 3. -
FIG. 7 is a configuration diagram of the refrigeration cycle apparatus in Reference Example. -
FIG. 8A is a schematic view showing the flow of the working fluid at the time of activation of a conventional refrigeration cycle apparatus. -
FIG. 8B is a schematic view showing the flow of the working fluid at the time of activation of the refrigeration cycle apparatus inEmbodiment 1,Embodiment 2 and Reference Example. -
FIG. 9 is a configuration diagram of the conventional refrigeration cycle apparatus. -
FIG. 10 is a schematic view showing the state at the time of activation of the refrigeration cycle apparatus shown inFIG. 9 . -
FIG. 11 is a Mollier diagram when carbon dioxide is used as a working fluid in the conventional refrigeration cycle apparatus. - Hereinafter, several embodiments of the present invention are described with reference to the drawings. It should be noted that the present invention is not limited to the following embodiments.
-
FIG. 1 is a configuration diagram showing arefrigeration cycle apparatus 100 inEmbodiment 1 of the present invention. As shown inFIG. 1 , therefrigeration cycle apparatus 100 is provided with a workingfluid circuit 106 formed by sequentially connecting afirst compressor 101, aheat radiator 102, anexpander 103, anevaporator 104 and asecond compressor 105, with flow passages (pipes) 106 a to 106 e. As a working fluid, a refrigerant such as carbon dioxide can be used. - The
first compressor 101 is constituted by arranging acompression mechanism 101 a and amotor 101 b for driving thecompression mechanism 101 a in a singleclosed casing 101 c holding lubrication oil. Thefirst compressor 101 compresses the working fluid to high temperature and high pressure. A scroll compressor or a rotary compressor, for example, can be used as thefirst compressor 101. The discharge port of thefirst compressor 101 is connected to the inlet of theheat radiator 102 via theflow passage 106 a. - The
heat radiator 102 allows the working fluid that has been compressed to high temperature and high pressure by thefirst compressor 101 to radiate heat. (Theheat radiator 102 cools the working fluid that has been compressed to high temperature and high pressure by thefirst compressor 101.) The outlet of theheat radiator 102 is connected to the suction port of theexpander 103 via theflow passage 106 b. - The
expander 103 expands the working fluid that has flowed out of theheat radiator 102 and is at intermediate temperature and high pressure. Theexpander 103 converts the expansion energy (power) of the working fluid into mechanical energy so as to recover it. The discharge port of theexpander 103 is connected to the inlet of theevaporator 104 via theflow passage 106 c. A scroll expander or a rotary expander, for example, can be used as theexpander 103. In addition, a fluid pressure motor expander can be used as theexpander 103. The fluid pressure motor expander is a fluid machine that recovers power from a working fluid by sequentially performing processes of drawing the working fluid from theheat radiator 102 and discharging the drawn working fluid into theevaporator 104 without performing any substantial expansion process in the working chamber. The detailed structure and the operational principle of the fluid pressure motor expander is disclosed, for example, in WO 2008/050654 A. - The
evaporator 104 evaporates the working fluid at low temperature and low pressure that has been expanded by theexpander 103, by heating. The outlet of theevaporator 104 is connected to the suction port of thesecond compressor 105 via theflow passage 106 d. - The
second compressor 105 draws the working fluid that has flowed out of theevaporator 104 and is at intermediate temperature and low pressure. Thesecond compressor 105 discharges it into thefirst compressor 101 after preliminarily increasing the pressure thereof. The discharge port of thesecond compressor 105 is connected to the suction port of thefirst compressor 101 via theflow passage 106 e. A scroll compressor or a rotary compressor can be used as thesecond compressor 105. In addition, a fluid pressure motor compressor can be used as thesecond compressor 105. The fluid pressure motor compressor is a fluid machine that increases the pressure of a working fluid by substantially sequentially performing processes of drawing the working fluid from theevaporator 104 and discharging the drawn working fluid into thefirst compressor 101. In other words, the fluid pressure motor compressor is a fluid machine that allows substantially no volume change of the working fluid in a working chamber. The fluid pressure motor compressor has basically the same structure as the fluid pressure motor expander, and the above-mentioned literature discloses it in detail. - The
expander 103 and thesecond compressor 105 are accommodated in a singleclosed casing 109 holding lubrication oil. Theexpander 103 is coupled to thesecond compressor 105 by a power-recovery shaft 107. Theexpander 103, thesecond compressor 105 and the power-recovery shaft 107 function as apower recovery system 108 that drives thesecond compressor 105 by transferring the mechanical energy (power) recovered by theexpander 103 to thesecond compressor 105 via the power-recovery shaft 107. - In
Embodiment 1, thesecond compressor 105 has a larger volume than theexpander 103. The ratio (Vc/Ve) of the volume Vc of thesecond compressor 105 with respect to the volume Ve of theexpander 103 is set, for example, to the range of 5 to 15. Particularly, in the case of using a working fluid, such as carbon dioxide, that forms a refrigeration cycle with a large pressure difference, the ratio (Vc/Ve) also tends to be large. Generally, the larger the ratio (Vc/Ve), the larger the driving force (torque) is required for the self-activation of thepower recovery system 108. In this regard, “the volume of thesecond compressor 105” means a confined volume, that is, the volume of the working chamber at the completion of the drawing process. This should be applied to the volume of theexpander 103 as well. - The
refrigeration cycle apparatus 100 is further provided with afirst bypass passage 112 and afirst bypass valve 113. Thefirst bypass passage 112 is connected to the workingfluid circuit 106 so as to communicate between theflow passage 106 b connecting the outlet of theheat radiator 102 to the suction port of theexpander 103, and theflow passage 106 d connecting the outlet of theevaporator 104 to the suction port of thesecond compressor 105. Thefirst bypass valve 113 is provided on thefirst bypass passage 112, and controls the flow of the working fluid in thefirst bypass passage 112. - The upstream end K1 of the
first bypass passage 112 is connected to theflow passage 106 b, and the downstream end K2 of thefirst bypass passage 112 is connected to theflow passage 106 d. That is, thefirst bypass passage 112 is a flow passage that allows the working fluid in theflow passage 106 b to be drawn directly into thesecond compressor 105, before the power-recovery shaft 107 is rotated, while bypassing theexpander 103 and theevaporator 104. - As long as the pressure at the suction port of the
second compressor 105 can be increased at the time of activation of therefrigeration cycle apparatus 100, the position of the upstream end K1 is not limited to the position shown inFIG. 1 . That is, the position of the upstream end K1 of thefirst bypass passage 112 is not specifically limited, as long as a portion from the discharge port of thefirst compressor 101 to the suction port of theexpander 103 in the workingfluid circuit 106 and a portion from the outlet of theevaporator 104 to the suction port of thesecond compressor 105 in the workingfluid circuit 106 can be communicated with each other. Specifically, thefirst bypass passage 112 may be connected to the workingfluid circuit 106 in such a way as to communicate between theflow passage 106 a connecting the discharge port of thefirst compressor 101 to the inlet of theheat radiator 102, and theflow passage 106 d connecting the outlet of theevaporator 104 to the suction port of thesecond compressor 105. Depending on the case, thefirst bypass passage 112 may be branched from theheat radiator 102. For example, in the case where theheat radiator 102 is composed of an upstream part and a downstream part, thefirst bypass passage 112 can be easily branched from a portion between these two parts. - The
first bypass valve 113 is provided in the upstream end section of thefirst bypass passage 112. The “upstream end section” corresponds to a section defined between the upstream end K1 and the point of L1/4 from the upstream end K1 toward the downstream end K2, when the full length of thefirst bypass passage 112 is referred to as L1. However, the position of thefirst bypass valve 113 is not specifically limited, and may be provided in the downstream end section of thefirst bypass passage 112, for example. The “downstream end section” corresponds to a section defined between the downstream end K2 and the point of L1/4 from the downstream end K2 toward the upstream end K1. Thefirst bypass valve 113 used inEmbodiment 1 is an on-off valve, though it is not limited thereto. In the case where thefirst bypass valve 113 is provided at the upstream end K1 or the downstream end K2, a three-way valve can be used asfirst bypass valve 113. The use of a three-way valve is advantageous in that the number of pipe connections can be reduced. - The
refrigeration cycle apparatus 100 is further provided with anactivation assist valve 114 provided on the workingfluid circuit 106 at a point that is located between the outlet of theevaporator 104 and the suction port of thesecond compressor 105, and that is closer to theevaporator 104 than the downstream end K2 of thefirst bypass passage 112 is. Theactivation assist valve 114 controls the flow of the working fluid in theflow passage 106 d. An on-off valve can be used as the activation assistvalve 114. - Upon opening the
first bypass valve 113, the working fluid in theflow passage 106 b is allowed to flow directly into the suction port of thesecond compressor 105 through thefirst bypass passage 112. At that time, the working fluid can be prevented from flowing, from theevaporator 104 into thesecond compressor 105, by closing the activation assistvalve 114. - The
refrigeration cycle apparatus 100 is further provided with asecond bypass passage 110 and asecond bypass valve 111. Thesecond bypass passage 110 is connected to the workingfluid circuit 106 so as to communicate between theflow passage 106 c connecting the discharge port of theexpander 103 to the inlet of theevaporator 104, and theflow passage 106 e connecting the discharge port of thesecond compressor 105 to the suction port of thefirst compressor 101. That is, thesecond bypass passage 110 bypasses theevaporator 104 and thesecond compressor 105. Thesecond bypass valve 111 is provided on thesecond bypass passage 110, and controls the flow of the working fluid in thesecond bypass passage 110. - The upstream end H1 of the
second bypass passage 110 is connected to theflow passage 106 c, and the downstream end H2 of thesecond bypass passage 110 is connected to theflow passage 106 e. That is, thesecond bypass passage 110 is a flow passage that allows the working fluid in theflow passage 106 c to be drawn directly into thefirst compressor 101, while bypassing theevaporator 104 and thesecond compressor 105. - However, as long as the
first compressor 101 can draw the working fluid in theevaporator 104 at the time of activation of therefrigeration cycle apparatus 100, the position of the upstream end H1 is not limited to the position shown inFIG. 1 . The upstream end H1 may be positioned at any point in the zone from the discharge port of theexpander 103 to the downstream end K2 of thefirst bypass passage 112. That is, thesecond bypass passage 110 may be connected to the workingfluid circuit 106 in such a way as to communicate between a portion from the outlet of theevaporator 104 to the downstream end K2 of thefirst bypass passage 112 in the working fluid circuit 106 (a part of theflow passage 106 d), and a portion from the discharge port of thesecond compressor 105 to the suction port of thefirst compressor 101 in the working fluid circuit 106 (flowpassage 106 e). Depending on the case, thesecond bypass passage 110 may be branched from theevaporator 104. For example, in the case where theevaporator 104 is composed of an upstream part and a downstream part, thesecond bypass passage 110 can be easily branched from a portion between these two parts. - The
second bypass valve 111 is provided in the upstream end section of thesecond bypass passage 110. The “upstream end section” corresponds to a section defined between the upstream end H1 and the point of L2/4 from the upstream end H1 toward the downstream end H2, when the full length of thesecond bypass passage 111 is referred to as L2. Thesecond bypass valve 111 may be provided also in the downstream end section of thesecond bypass passage 111. The “downstream end section” corresponds to a section defined between the downstream end H2 and the point of L2/4 from the downstream end H2 toward the upstream end H1. Although thesecond bypass valve 111 used inEmbodiment 1 is a check valve, it is not limited thereto. An on-off valve or a three-way valve may be used therefor. - When the pressure at the outlet of the
second bypass valve 111 is lower than the pressure at the inlet thereof, thesecond bypass valve 111 allows the working fluid in theflow passage 106 c to flow into thesecond bypass passage 110. That is, when the pressure in theflow passage 106 e is lower than the pressure in the flow passages between the discharge port of theexpander 103 and the suction port of the second compressor 105 (theflow passage 106 c, theevaporator 104 and theflow passage 106 d), the working fluid in theflow passage 106 c is allowed to flow directly into the suction port of thefirst compressor 101 through thesecond bypass passage 110. - The
refrigeration cycle apparatus 100 is further provided with acontroller 117 for controlling opening and closing of thefirst bypass valve 113 and the activation assistvalve 114. Thefirst bypass valve 113 and the activation assistvalve 114 are provided respectively with valve opening and 115 and 116. The valve opening andclosing devices 115 and 116 typically are composed of an actuator for actuating valves such as a solenoid, and are controlled by theclosing devices controller 117. Thecontroller 117 typically is composed of a microcomputer. Aninput apparatus 118 provided with an activation button is connected to thecontroller 117. Upon input of an operation command to thecontroller 117 through theinput apparatus 118, a specific control program stored in the internal memory of thecontroller 117 is executed. For example, by turning on the activation button, an activation command (activation signal) is transmitted from theinput apparatus 118 to thecontroller 117. In response to the reception of the activation command, thecontroller 117 performs a specific activation control to be described later with reference toFIG. 2 . Further, thecontroller 117 controls the operation of themotor 101 b that drives thefirst compressor 101. - The
refrigeration cycle apparatus 100 is further provided with anactivation detector 119 for detecting that thesecond compressor 105 has been activated. Theactivation detector 119 transmits the detection signal to thecontroller 117. Thecontroller 117 detects the activation of thesecond compressor 105 on the basis of the acquisition of the detection signal. A temperature detector, a pressure detector, or the like can be used as theactivation detector 119. The temperature detector when used as theactivation detector 119, for example, includes a temperature detecting element such as a thermocouple and a thermistor, and detects the difference ΔT between the temperature of the working fluid to be drawn into theexpander 103 and the temperature of the working fluid discharged from theexpander 103. The pressure detector when used as theactivation detector 119, for example, includes a piezoelectric element, and detects the difference ΔP between the pressure of the working fluid to be drawn into theexpander 103 and the pressure of the working fluid discharged from theexpander 103. Further, a timer for measuring the time elapsed from the time point of the activation of thefirst compressor 101 may be provided as theactivation detector 119 for detecting the activation of thesecond compressor 105. Such a timer can be provided also as a function of thecontroller 117. In this case, thecontroller 117 itself can serve as theactivation detector 119. Furthermore, a contact or noncontact displacement sensor for detecting the driving of the power-recovery shaft 107, such as an encoder, may be provided as theactivation detector 119 for detecting the activation of thesecond compressor 105. - Depending on the type of the
activation detector 119, the method for detecting that “thesecond compressor 105 has been activated” differs as follows. - In the case of the temperature detector, a specific value T1 that has been experimentally or theoretically determined is set by the
controller 117. Thecontroller 117 detects that “thesecond compressor 105 has been activated” when the temperature difference ΔT detected by the temperature detector exceeds the specific value T1. - In the case of the pressure detector, a specific value P1 that has been experimentally or theoretically determined is set by the
controller 117. Thecontroller 117 detects that “thesecond compressor 105 has been activated” when the pressure difference ΔP detected by the pressure detector exceeds the specific value P1. - The following is the reason why the activation of the
second compressor 105 can be detected from the comparison between the temperature difference ΔT and the specific value T1, or from the comparison between the pressure difference ΔP and the specific value P1. When thefirst compressor 101 is activated, the working fluid discharged from thefirst compressor 101 is supplied to the suction port of thesecond compressor 105 through thefirst bypass passage 112. This activates thepower recovery system 108. At this time, thesecond compressor 105 serves as a driving source, and therefore thepower recovery system 108 starts rotating before a large temperature difference is made between the suction temperature of thefirst compressor 101 and the discharge temperature of thefirst compressor 101. At the time of activation of the rotation of thepower recovery system 108, the pressure difference in therefrigeration cycle apparatus 100 has not yet become large enough, and thus the power to rotate thepower recovery system 108 is low. Therefore, the rotation rate of thepower recovery system 108 also is low. When the rotation rate of thepower recovery system 108 is low, the rotation rate of theexpander 103 also is low. This state corresponds to the “narrow state” in terms of the expansion valve. Accordingly, the discharge temperature and the discharge pressure of thefirst compressor 101 gradually increase as well. - As the discharge temperature and the discharge pressure of the
first compressor 101 increase, the power to rotate theexpander 103 and thesecond compressor 105 also increases, so that the rotation rate of thepower recovery system 108 becomes high. Then, once a high rotation rate is achieved, thepower recovery system 108 stably rotates under the influence of the inertial force. It is desirable that thefirst bypass passage 112 is kept open until such a stable rotation state is achieved. - On the other hand, the suction temperature of the
expander 103 gradually increases from substantially the same temperature as the outdoor air temperature at the stopped state. The discharge temperature (or discharge pressure) of theexpander 103 depends on the suction temperature (or suction pressure) of theexpander 103. For example, supposing that the outdoor air temperature is 10° C., the suction temperature, the discharge temperature, the suction pressure and the discharge pressure of theexpander 103 at the time of activation of thepower recovery system 108 and in the regular operation of thepower recovery system 108 each are shown as follows. It should be noted that the following values are calculated with an expansion ratio=2.0. - <At the Time of Activation>
- Suction temperature: 10° C.
Suction pressure: 5.0 MPa
Discharge temperature: −3.0° C.
Discharge pressure: 3.2 MPa
Difference between suction temperature and discharge temperature: 13° C.
Difference between suction pressure and discharge pressure: 1.8 MPa - Suction temperature: 40° C.
Suction pressure: 10.0 MPa
Discharge temperature: 13.4° C.
Discharge pressure: 4.9 MPa
Difference between suction temperature and discharge temperature: 26.6° C.
Difference between suction pressure and discharge pressure: 5.1 MPa - When the
power recovery system 108 is activated in the state where the discharge temperature and the discharge pressure of thefirst compressor 101 are low, the suction temperature of theexpander 103 and the discharge temperature of theexpander 103 each gradually increase, as mentioned above. The difference between the suction temperature and the discharge temperature also gradually grows. This also can be applied to the pressure. Therefore, it is possible to detect the activation of the second compressor 105 (the activation of the power recovery system 108) by setting appropriate values as the specific values T1 and P1 (for example, slightly larger values than the temperature difference and the pressure difference at the time of activation). - It also is possible to detect the activation of the
second compressor 105 on the basis of the discharge temperature of theexpander 103 or the discharge pressure of theexpander 103, instead of the temperature difference Δ and the pressure difference ΔT. When thepower recovery system 108 is activated, theexpander 103 also rotates. After drawing the working fluid, theexpander 103 expands the drawn working fluid and discharges it. Therefore, the working fluid discharged from theexpander 103 has lower temperature and pressure than before being drawn thereinto. It is possible to determine that thesecond compressor 105 has been activated, by capturing a sudden change in the temperature (or pressure) as well as monitoring the temperature (or pressure) at the discharge port of theexpander 103 in chronological terms. - In the case of using a timer, a specific time t that has been experimentally or theoretically determined is set by the
controller 117. Thecontroller 117 transmits a control signal to themotor 101 b of thefirst compressor 101 and starts measuring the time by the timer. Thecontroller 117 detects that “thesecond compressor 105 has been activated” when the time measured by the timer exceeds the specific time t. - The “specific time t” is written in the activation control program to be executed in the
controller 117. For example, the time from the time point of the activation of thefirst compressor 101 to the activation of thesecond compressor 105 is actually measured under various operational conditions (such as outdoor air temperature). Then, the time from which the activation of thesecond compressor 105 is determinable in all the operational conditions can be set as the “specific time t”. Theoretically, a model of therefrigeration cycle apparatus 100 is constructed, and a pressure difference that is necessary and sufficient to activate thepower recovery system 108 is estimated by computer simulation. Then, using parameters such as the volume of thefirst compressor 101 and the filling amount of the working fluid in the workingfluid circuit 106, the initial activation time necessary to produce the estimated pressure difference is calculated. The calculated initial activation time can be set as the “specific time t”. - <Operation of
Refrigeration Cycle Apparatus 100> -
FIG. 2 is a flow chart of the activation control of therefrigeration cycle apparatus 100. Therefrigeration cycle apparatus 100 starts the regular operation after performing the activation control shown inFIG. 2 . In an operation standby state, thefirst compressor 101 is stopped, thefirst bypass valve 113 is closed, and the activation assistvalve 114 is opened. Thus, the pressure of the working fluid in the workingfluid circuit 106 is substantially uniform. A fan or a pump for causing a fluid (air or water) that should exchange heat with the working fluid to flow into theheat radiator 102 is actuated after the completion of the activation control. Similarly, a fan or a pump for causing a fluid that should exchange heat with the working fluid to flow into theevaporator 104 also is actuated after the completion of the activation control. - In step S11, in response to the reception of the activation command from the
input apparatus 118, thecontroller 117 transmits a control signal to the valve opening and 115 and 116 so that theclosing devices first bypass valve 113 is opened and the activation assistvalve 114 is closed (step S12). This allows thefirst bypass passage 112 to be opened, and theflow passage 106 d to be closed between the outlet of theevaporator 104 and the downstream end K2 of thefirst bypass passage 112. - Subsequently, the
controller 117 starts supplying power to themotor 101 b so that thefirst compressor 101 is activated (step S13). This allows the working fluid in theflow passage 106 e and thesecond bypass passage 110 to be drawn into thefirst compressor 101. Here, instead of opening thefirst bypass valve 113 before the activation of thefirst compressor 101, it also is possible to open thefirst bypass valve 113 in response to the activation of thefirst compressor 101. Similarly, in response to the activation of thefirst compressor 101, the activation assistvalve 114 may be closed. That is, there is no problem as long as the working fluid is allowed to flow in thefirst bypass passage 112 after the activation of thefirst compressor 101 and before the rotation of the power-recovery shaft 107. - Once the
first compressor 101 starts drawing the working fluid, the pressure in theflow passage 106 e and thesecond bypass passage 110 decreases. This causes thesecond bypass valve 111 to be opened, so that the working fluid on the upstream side of thesecond bypass valve 111, that is, the working fluid in the flow passages from the discharge port of theexpander 103 to the activation assist valve 114 (theflow passage 106 c, theevaporator 104 and a part of theflow passage 106 d) flows into thesecond bypass passage 110. The working fluid that has flown into thesecond bypass passage 110 is drawn into thefirst compressor 101 to be compressed therein, and discharged into theflow passage 106 a. Accordingly, the pressure in the flow passages from the discharge port of theexpander 103 to the activation assist valve 114 (theflow passage 106 c, theevaporator 104 and a part of theflow passage 106 d) decreases. - On the other hand, once the
first compressor 101 is activated, the pressure in the flow passages from the discharge port of thefirst compressor 101 to the suction port of the expander 103 (theflow passage 106 a, theheat radiator 102 and theflow passage 106 b) increases. The compressed working fluid flows also into theflow passage 106 d between the activation assistvalve 114 and the suction port of thesecond compressor 105 through thefirst bypass passage 112. This causes the pressure in the flow passage from the activation assistvalve 114 to the suction port of the second compressor 105 (a part of theflow passage 106 d) to increase. - As a result, as shown in
FIG. 6A , the pressure at the suction port of each of theexpander 103 and thesecond compressor 105 is rendered relatively high, and the pressure at the discharge port of each of theexpander 103 and thesecond compressor 105 is rendered relatively low. That is, a pressure difference can be caused not only between the suction port and the discharge port of theexpander 103, but also between the suction port and the discharge port of thesecond compressor 105. The pressure difference of the working fluid acts on each of theexpander 103 and thesecond compressor 105, and thus self-activation of thepower recovery system 108 can be easily achieved. - Upon detecting the activation of the
second compressor 105 through the activation detector 119 (step S14), thecontroller 117 transmits a control signal to the valve opening and 115 and 116 so that theclosing devices first bypass valve 113 is closed and the activation assistvalve 114 is opened (step S15). Specifically, thecontroller 117 detects the activation of thesecond compressor 105 by receiving the detection signal from theactivation detector 119, and thereafter closes thefirst bypass valve 113 and opens the activation assistvalve 114. This allows thefirst bypass passage 112 to be closed, and theflow passage 106 d to be opened. After the completion of the activation control, therefrigeration cycle apparatus 100 is transferred to the regular operation in which the working fluid is circulated in the workingfluid circuit 106. - In the transfer to the regular operation, the pressure at the downstream end H2 of the
second bypass passage 110 exceeds the pressure at the upstream end H1 thereof due to the increase of the pressure in thesecond compressor 105. Therefore, thesecond bypass valve 111 serving as a check valve is closed. The pressure in theflow passage 106 e and thesecond bypass passage 110 on the downstream side of thesecond bypass valve 111 is higher than the pressure in theflow passage 106 c, theevaporator 104 and theflow passage 106 d, and thus thesecond bypass valve 111 is kept closed. This allows the working fluid to be circulated in the workingfluid circuit 106 during the regular operation. - It should be noted that the working fluid in the liquid phase might be drawn into the
second compressor 105 at the time of activation of therefrigeration cycle apparatus 100, though it depends also on the conditions such as outdoor air temperature. Therefore, the fluid pressure motor compressor described above can be used suitably as thesecond compressor 105. This is because the fluid pressure motor compressor allows substantially no volume change of the working fluid to be caused in the working chamber and therefore is capable of accepting the working fluid in a liquid phase to be drawn therein to some extent. - Further, when the
first compressor 101 draws the working fluid in the regular operation, a pressure pulsation might occur in theflow passage 106 e on the basis that the working fluid is confined in thecompression mechanism 101 a. According toEmbodiment 1, a part of the second bypass passage 110 (the part from thesecond bypass valve 111 to the downstream end H2) can function as a buffer space to allow the volume of theflow passage 106 e to extend. Therefore, the pulse width of the pressure pulsation that has occurred in theflow passage 106 e can be expected to be reduced, resulting in an enhancement in the operational reliability of therefrigeration cycle apparatus 100. - Similarly, when the
second compressor 105 draws the working fluid, a pressure pulsation might occur in theflow passage 106 d on the basis that the working fluid is confined in the working chamber of thesecond compressor 105. According toEmbodiment 1, a part of the first bypass passage 112 (the part from thefirst bypass valve 113 to the downstream end K2) can function as a buffer space to allow the volume of theflow passage 106 d to extend. Therefore, the pulse width of the pressure pulsation that has occurred in theflow passage 106 d can be expected to be reduced, resulting in an enhancement in the operational reliability of therefrigeration cycle apparatus 100. - In order to stop the operation of the
refrigeration cycle apparatus 100, the rotation rate of thefirst compressor 101 is progressively reduced, for example. After thefirst compressor 101 is stopped, the working fluid travels through thefirst compressor 101, theexpander 103 and thesecond compressor 105, taking sufficient time. Therefore, the pressure difference in the workingfluid circuit 106 naturally disappears, so that the pressure becomes substantially uniform to be stabilized. This allows theexpander 103 and thesecond compressor 105 to be stopped naturally. - <Effects of the
Refrigeration Cycle Apparatus 100> - At the time of activation of the
refrigeration cycle apparatus 100, thefirst bypass valve 113 is opened, and the activation assistvalve 114 is closed, according toEmbodiment 1. Therefore, the working fluid in the flow passages from the discharge port of thefirst compressor 101 to the suction port of theexpander 103 can be supplied to the suction port of thesecond compressor 105 through thefirst bypass passage 112. This causes the pressure at the suction port of thesecond compressor 105 to increase. Further, the working fluid in the flow passages from the discharge port of theexpander 103 to the activation assistvalve 114 can be supplied directly to thefirst compressor 101 through thesecond bypass passage 110 in addition to the working fluid in theflow passage 106 e. - On the other hand, once the
first compressor 101 starts drawing the working fluid, the pressure in theflow passage 106 e and thesecond bypass passage 110 on the downstream side of thesecond bypass valve 111 decreases. This allows thesecond bypass valve 111 serving as a check valve to be opened. The working fluid in the flow passages from the discharge port of theexpander 103 to the activation assistvalve 114 flows into thesecond bypass passage 110, and is drawn into thefirst compressor 101 together with the working fluid in thesecond bypass passage 110 and theflow passage 106 e. - As described above, according to the
refrigeration cycle apparatus 100, a pressure difference can be caused not only between the suction port and the discharge port of theexpander 103 but also between the suction port and the discharge port of thesecond compressor 105. Therefore, thepower recovery system 108 can be activated stably and surely, resulting in an improvement in the reliability of therefrigeration cycle apparatus 100. -
FIG. 3 is a configuration diagram of arefrigeration cycle apparatus 200 inEmbodiment 2 of the present invention. As shown inFIG. 3 , therefrigeration cycle apparatus 200 differs fromEmbodiment 1 in that a three-way valve is used as thefirst bypass valve 201. That is, thefirst bypass valve 201 functions both as thefirst bypass valve 113 and the activation assistvalve 114 inEmbodiment 1. InEmbodiment 2, common parts withEmbodiment 1 are designated with identical reference numerals, and the detailed description thereof is omitted. - In
Embodiment 2, thefirst bypass valve 201 is provided at the junction of the downstream end K2 of thefirst bypass passage 112 and theflow passage 106 d. This makes it possible to open and close thefirst bypass passage 112 and to open and close theflow passage 106 d with one valve, easily and conveniently. Specifically, the channel for the working fluid can be switched easily and conveniently between (a) the state where theflow passage 106 d is opened, and thefirst bypass passage 112 is closed (for example, in the regular operation), and (b) the state where thefirst bypass passage 112 is opened, and theflow passage 106 d is closed at the junction with the downstream end K2 of the first bypass passage 112 (for example, in the activation control). Thus, the configuration of therefrigeration cycle apparatus 200 can be simplified inEmbodiment 2. Thefirst bypass valve 201 may be provided at the junction of the upstream end K1 of thefirst bypass passage 112 and theflow passage 106 b. - A
valve switching device 202 is provided in thefirst bypass valve 201. Thevalve switching device 202 is typically composed of an actuator such as a solenoid, and controlled by thecontroller 117. - <Operation of
Refrigeration Cycle Apparatus 200> -
FIG. 4 is a flow chart of the activation control of therefrigeration cycle apparatus 200. Therefrigeration cycle apparatus 200 starts the regular operation after performing the activation control shown inFIG. 4 . In an operation standby state, thefirst compressor 101 is stopped, theflow passage 106 d is opened by thefirst bypass valve 201, and thefirst bypass passage 112 is closed (the above state (a)). The pressure of the working fluid in the workingfluid circuit 106 is substantially uniform. - In step S21, in response to the reception of the activation command from the
input apparatus 118, thecontroller 117 transmits a control signal to avalve control device 202 so that the state is switched from the above-described state (a) to the state (b) (step S22). - Subsequently, the
controller 117 starts supplying power to themotor 101 b so that thefirst compressor 101 is activated (step S23). This allows the working fluid in theflow passage 106 e and thesecond bypass passage 110 to be drawn into thefirst compressor 101. The process of step S22 may be carried out in response to the activation of thefirst compressor 101. - Once the
first compressor 101 starts drawing the working fluid, the pressure in theflow passage 106 e and thesecond bypass passage 110 decreases. This causes thesecond bypass valve 111 to be opened, so that the working fluid on the upstream side of thesecond bypass valve 111, that is, the working fluid in the flow passages from the discharge port of theexpander 103 to the first bypass valve 201 (theflow passage 106 c, theevaporator 104 and a part of theflow passage 106 d) flows into thesecond bypass passage 110. The working fluid that has flown into thesecond bypass passage 110 is drawn into thefirst compressor 101 to be compressed therein, and discharged into theflow passage 106 a. Accordingly, the pressure in the flow passages from the discharge port of theexpander 103 to the first bypass valve 201 (theflow passage 106 c, theevaporator 104, a part of theflow passage 106 d) also decreases. - On the other hand, once the
first compressor 101 is activated, the pressure in the flow passages from the discharge port of thefirst compressor 101 to the suction port of the expander 103 (theflow passage 106 a, theheat radiator 102 and theflow passage 106 b) increases. The compressed working fluid flows also into theflow passage 106 d between thefirst bypass valve 201 and the suction port of thesecond compressor 105 through thefirst bypass passage 112. This causes the pressure in the flow passage from thefirst bypass valve 201 to the suction port of the second compressor 105 (a part of theflow passage 106 d) to increase. As is the case ofEmbodiment 1, the state shown inFIG. 6A is established, and thus self-activation of thepower recovery system 108 can be easily achieved. - Upon detecting the activation of the
second compressor 105 through the activation detector 119 (step S24), thecontroller 117 transmits a control signal to thevalve switching device 202 so that the state is switched from the above-described state (b) to the state (a) (step S25). This causes thefirst bypass valve 201 to be switched, and thefirst bypass passage 112 to be closed. After the completion of the activation control, therefrigeration cycle apparatus 200 is transferred to the regular operation. - Also in
Embodiment 2, a part of the second bypass passage 110 (the part from thesecond bypass valve 111 to the downstream end H2) can function as a buffer space to allow the volume of theflow passage 106 e to extend. Accordingly, as has been described inEmbodiment 1, the pulse width of the pressure pulsation that has occurred in theflow passage 106 e can be expected to be reduced, resulting in an enhancement in the operational reliability of therefrigeration cycle apparatus 200. - Similarly, the
first bypass passage 112 can function as a buffer space to allow the volume of theflow passage 106 b to extend. Accordingly, the pulse width of the pressure pulsation that has occurred in theflow passage 106 b can be expected to be reduced, resulting in an enhancement in the operational reliability of therefrigeration cycle apparatus 200. - <Effects of
Refrigeration Cycle Apparatus 200> - At the time of activation of the
refrigeration cycle apparatus 200, thefirst bypass passage 112 is opened, and theflow passage 106 d is closed at the junction with the downstream end K2 of thefirst bypass passage 112, according toEmbodiment 2. Therefore, the working fluid in the flow passages from the discharge port of thefirst compressor 101 to the suction port of theexpander 103 can be supplied to the suction port of thesecond compressor 105 through thefirst bypass passage 112. This causes the pressure at the suction port of thesecond compressor 105 to increase. Further, the working fluid in the flow passages from the discharge port of theexpander 103 to thefirst bypass valve 201 can be supplied directly to thefirst compressor 101 through thesecond bypass passage 110 in addition to the working fluid in theflow passage 106 e. - On the other hand, once the
first compressor 101 starts drawing the working fluid, the pressure in theflow passage 106 e and thesecond bypass passage 110 on the downstream side of thesecond bypass valve 111 decreases. This allows thesecond bypass valve 111 serving as a check valve to be opened. The working fluid in the flow passages from the discharge port of theexpander 103 to thefirst bypass valve 201 flows into thesecond bypass passage 110, and is drawn into thefirst compressor 101 together with the working fluid in thesecond bypass passage 110 and theflow passage 106 e. - Furthermore, according to the
refrigeration cycle apparatus 200, the pressure loss of the working fluid due to theevaporator 104 and thesecond compressor 105 can be avoided, and the pressure decrease of the working fluid to be drawn by thefirst compressor 101 can be suppressed, at the time of activation. These allow a reduction in the power required to increase the pressure of the working fluid by thefirst compressor 101. - As described above, according to the
refrigeration cycle apparatus 200, a pressure difference can be caused not only between the suction port and the discharge port of theexpander 103 but also between the suction port and the discharge port of thesecond compressor 105. Therefore, thepower recovery system 108 can be activated stably and surely, resulting in an improvement in the reliability of therefrigeration cycle apparatus 200. - Embodiments 1 and 2 are provided with the
second bypass passage 110 and thesecond bypass valve 111. However, these are not always necessary. That is, arefrigeration cycle apparatus 300 with a configuration in which thesecond bypass passage 110 and thesecond bypass valve 111 are omitted can be proposed, as shown inFIG. 5 . - According to the
refrigeration cycle apparatus 300, thefirst bypass valve 113 is opened, and the activation assistvalve 114 is closed, at the time of activation. In the state where thepower recovery system 108 has not been activated, thefirst compressor 101 can draw only the working fluid in theflow passage 106 e. That is, focusing on the amount of the working fluid that thefirst compressor 101 can draw thereinto,Embodiment 3 may be less advantageous than 1 and 2. However, according also toEmbodiments Embodiment 3, a pressure difference can be caused not only between the suction port and the discharge port of theexpander 103 but also between the suction port and the discharge port of the second compressor 105 (seeFIG. 6A ). Accordingly, even if thesecond bypass passage 110 and thesecond bypass valve 111 are omitted, thepower recovery system 108 can be activated easily and surely. - Furthermore, it also is possible to omit the activation assist
valve 114 in therefrigeration cycle apparatus 300. In that case, a pressure difference is caused only between the suction port and the discharge port of thesecond compressor 105, as shown inFIG. 6B . However, in the case where the volume of thesecond compressor 105 is sufficiently larger than the volume of theexpander 103, the driving resistance of thesecond compressor 105 is relatively larger than the driving resistance of theexpander 103. Accordingly, the state shown inFIG. 6B is more advantageous for the activation of thepower recovery system 108 than the state shown inFIG. 10 . - A
refrigeration cycle apparatus 400 shown inFIG. 7 differs from the conventional refrigeration cycle apparatus 500 (seeFIG. 9 ) in the position of the upstream end H1 of thebypass passage 110. Specifically, the upstream end H1 of thebypass passage 110 is positioned on theflow passage 106 c connecting the discharge port of theexpander 103 to the inlet of theevaporator 104. Except that, therefrigeration cycle apparatus 400 has the same configuration including the method for detecting the activation as therefrigeration cycle apparatus 100 that has been described with reference toFIG. 1 , etc. - According to the
refrigeration cycle apparatus 400, as therefrigeration cycle apparatus 500 that has been described with reference toFIG. 9 , a pressure difference cannot be caused between the suction port and the discharge port of thesecond compressor 105. However, therefrigeration cycle apparatus 400 allows the following advantageous effects to be obtained on the basis of the difference in the position of the upstream end H1 of thebypass passage 110. That is, according to therefrigeration cycle apparatus 400, the pressure loss of the working fluid due to theevaporator 104 and thesecond compressor 105 can be avoided during a constant period before and after the activation, and thereby the pressure decrease of the working fluid to be drawn by thefirst compressor 101 can be suppressed. These result in a reduction in the power required for thefirst compressor 101 to increase the pressure of the working fluid, thus making it easy to form a stable operation state more rapidly. - As shown in
FIG. 8A , the working fluid in the liquid phase tends to be retained in a comparatively downstream portion inside theevaporator 4 in the state where the conventional refrigeration cycle apparatus 500 (FIG. 9 ) is stopped. This can be seen also from the Mollier diagram ofFIG. 10 . If therefrigeration cycle apparatus 500 is activated in the state where the working fluid in the liquid phase is retained inside theevaporator 4, the working fluid in the vapor phase inside the 10 c and 10 d, and the working fluid in the vapor phase inside theflow passages evaporator 4 proceed in thefirst compressor 1 or thesecond compressor 5, while passing through the inside of theevaporator 4. Since the working fluid travels a comparatively long distance, the pressure loss also is comparatively large. Furthermore, there is a possibility that the working fluid in the liquid phase is drawn into thefirst compressor 101, and there also is a possibility that the working fluid in the liquid phase serves as a resistance and increases the pressure loss. - In contrast, according to the
refrigeration cycle apparatus 400 of Reference Example, the working fluid in the vapor phase flows back in theevaporator 104, and is drawn directly into thefirst compressor 101 through thebypass passage 110, as shown inFIG. 8 . The working fluid in the liquid phase travels inside theevaporator 104 while being vaporized, and is drawn into thefirst compressor 101 through thebypass passage 110. Thus, the pressure in theevaporator 104, that is, the suction pressure of thefirst compressor 101 is maintained substantially constant. The working fluid in the liquid phase never serves as a resistance, and the pressure loss of the working fluid in the vapor phase is comparatively low. Moreover, the possibility that the working fluid in the liquid phase is drawn into thefirst compressor 101 at the time of activation is low, and therefore stable activation can be achieved. - The
100 and 200 ofrefrigeration cycle apparatus 1 and 2 also are provided with theEmbodiments bypass passage 110, and therefore the above-mentioned effects can be obtained at the time of activation. - The refrigeration cycle apparatus of the present invention is useful as equipments such as water heaters, air conditioners, dryers, etc.
Claims (20)
1. A refrigeration cycle apparatus comprising:
a working fluid circuit formed of a first compressor for compressing a working fluid, a heat radiator for cooling the working fluid compressed by the first compressor, an expander for expanding the working fluid cooled by the heat radiator and recovering power from the working fluid, an evaporator for evaporating the working fluid expanded by the expander, a second compressor for increasing the pressure of the working fluid evaporated by the evaporator and supplying it to the first compressor, and flow passages connecting these components in this order;
a power-recovery shaft coupling the expander to the second compressor so that the second compressor is driven by the power recovered by the expander;
a first bypass passage for communicating between a portion from a discharge port of the first compressor to a suction port of the expander in the working fluid circuit and a portion from an outlet of the evaporator to a suction port of the second compressor in the working fluid circuit; and
a first bypass valve for controlling flow of the working fluid in the first bypass passage, the first bypass valve being provided on the first bypass passage.
2. The refrigeration cycle apparatus according to claim 1 , further comprising:
an activation assist valve provided on the working fluid circuit at a point that is located between the outlet of the evaporator and the suction port of the second compressor and that is closer to the evaporator than a downstream end of the first bypass passage is.
3. The refrigeration cycle apparatus according to claim 2 , wherein
the first bypass valve is provided in an upstream end section or a downstream end section of the first bypass passage.
4. The refrigeration cycle apparatus according to claim 2 , wherein
the first bypass valve is an on-off valve or a three-way valve.
5. The refrigeration cycle apparatus according to claim 1 , further comprising:
a second bypass passage for communicating between a portion from a discharge port of the expander to a downstream end of the first bypass passage in the working fluid circuit and a portion from a discharge port of the second compressor to a suction port of the first compressor in the working fluid circuit.
6. The refrigeration cycle apparatus according to claim 5 , further comprising:
a second bypass valve for controlling flow of the working fluid in the second bypass passage, the second bypass valve being provided on the second bypass passage.
7. The refrigeration cycle apparatus according to claim 2 , wherein
the first bypass valve is opened before activation of the first compressor or in response to the activation of the first compressor.
8. The refrigeration cycle apparatus according to claim 2 , wherein
the first bypass valve is closed after activation of the second compressor.
9. The refrigeration cycle apparatus according to claim 8 , further comprising:
an activation detector for detecting the activation of the second compressor; and
a controller for controlling opening and closing of the first bypass valve, wherein
the controller detects the activation of the second compressor by receiving a detection signal from the activation detector, and closes the first bypass valve.
10. The refrigeration cycle apparatus according to claim 9 , wherein
the activation detector is a temperature detector for detecting a difference between a temperature of the working fluid to be drawn into the expander and a temperature of the working fluid discharged from the expander, and
the activation of the second compressor is detected when the temperature difference exceeds a specific value.
11. The refrigeration cycle apparatus according to claim 9 , wherein
the activation detector is a pressure detector for detecting a difference between a pressure of the working fluid to be drawn into the expander and a pressure of the working fluid discharged from the expander, and
the activation of the second compressor is detected when the pressure difference exceeds a specific value.
12. The refrigeration cycle apparatus according to claim 9 , wherein
the activation detector is a timer for measuring time elapsed from a time point of activation of the first compressor, and
the activation of the second compressor is detected when the time measured by the timer exceeds a specific time.
13. The refrigeration cycle apparatus according to claim 2 , wherein
the activation assist valve is closed before activation of the first compressor, or in response to the activation of the first compressor.
14. The refrigeration cycle apparatus according to claim 2 , wherein
the activation assist valve is opened after activation of the second compressor.
15. The refrigeration cycle apparatus according to claim 14 , further comprising:
an activation detector for detecting the activation of the second compressor; and
a controller for controlling opening and closing of the activation assist valve, wherein
the controller detects the activation of the second compressor by receiving a detection signal from the activation detector, and opens the activation assist valve.
16. The refrigeration cycle apparatus according to claim 15 , wherein
the activation detector is a temperature detector for detecting a difference between a temperature of the working fluid to be drawn into the expander and a temperature of the working fluid discharged from the expander, and
the activation of the second compressor is detected when the temperature difference exceeds a specific value.
17. The refrigeration cycle apparatus according to claim 15 , wherein
the activation detector is a pressure detector for detecting a difference between a pressure of the working fluid to be drawn into the expander and a pressure of the working fluid discharged from the expander, and
the activation of the second compressor is detected when the pressure difference exceeds a specific value.
18. The refrigeration cycle apparatus according to claim 15 , wherein
the activation detector is a timer for measuring time elapsed from a time point of activation of the first compressor, and
the activation of the second compressor is detected when the time measured by the timer exceeds a specific time.
19. The refrigeration cycle apparatus according to claim 1 , wherein
the expander and the second compressor are accommodated in a single closed casing.
20. The refrigeration cycle apparatus according to claim 1 , wherein the first bypass valve is a three-way valve provided at a junction of the downstream end of the first bypass passage and the portion from the outlet of the evaporator to the suction port of the second compressor in the working fluid circuit.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008325208 | 2008-12-22 | ||
| JP2008-325208 | 2008-12-22 | ||
| PCT/JP2009/007066 WO2010073586A1 (en) | 2008-12-22 | 2009-12-21 | Refrigeration cycle device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20110247358A1 true US20110247358A1 (en) | 2011-10-13 |
Family
ID=42287235
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/140,331 Abandoned US20110247358A1 (en) | 2008-12-22 | 2009-12-21 | Refrigeration cycle apparatus |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20110247358A1 (en) |
| EP (1) | EP2381190A4 (en) |
| JP (1) | JPWO2010073586A1 (en) |
| CN (1) | CN102257332B (en) |
| WO (1) | WO2010073586A1 (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130192294A1 (en) * | 2012-01-30 | 2013-08-01 | Jaeyoo YOO | Apparatus and method for controlling compressor, and refrigerator having the same |
| US20130195678A1 (en) * | 2012-01-30 | 2013-08-01 | Jaeyoo YOO | Apparatus and method for controlling compressor, and refrigerator having the same |
| US20160159204A1 (en) * | 2013-07-31 | 2016-06-09 | Denso Corporation | Refrigeration cycle device for vehicle |
| US10415857B2 (en) | 2015-05-01 | 2019-09-17 | Mayekawa Mfg. Co., Ltd. | Refrigerator and operation method for refrigerator |
| US11031312B2 (en) | 2017-07-17 | 2021-06-08 | Fractal Heatsink Technologies, LLC | Multi-fractal heatsink system and method |
| US20230417465A1 (en) * | 2020-12-01 | 2023-12-28 | Mayekawa Mfg. Co., Ltd. | Refrigerator and operation method during precooling of refrigerator |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5710007B2 (en) * | 2011-09-01 | 2015-04-30 | 三菱電機株式会社 | Refrigeration cycle equipment |
| JP6276000B2 (en) * | 2013-11-11 | 2018-02-07 | 株式会社前川製作所 | Expander-integrated compressor, refrigerator, and operation method of refrigerator |
| JP7192347B2 (en) * | 2018-09-21 | 2022-12-20 | 株式会社富士通ゼネラル | refrigeration cycle equipment |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5131235A (en) * | 1990-03-31 | 1992-07-21 | Aisin Seiki Kabushiki Kaisha | Cooling system having coolant mass flow control |
| US20040118138A1 (en) * | 2002-10-31 | 2004-06-24 | Matsushita Electric Industrial Co., Ltd. | Determining method of high pressure of refrigeration cycle apparatus |
| US20090031738A1 (en) * | 2005-05-06 | 2009-02-05 | Tomoichiro Tamura | Refrigerating machine |
| US8109116B2 (en) * | 2005-08-26 | 2012-02-07 | Mitsubishi Electric Corporation | Dual compressor air conditioning system with oil level regulation |
| US20120131949A1 (en) * | 2010-04-30 | 2012-05-31 | Panasonic Corporation | Fluid machine and refrigeration cycle apparatus |
| US20120167606A1 (en) * | 2009-10-07 | 2012-07-05 | Mitsubishi Electric Corporation | Refrigeration cycle apparatus |
| US8505317B2 (en) * | 2007-05-22 | 2013-08-13 | Angelantoni Life Science SRI | Refrigerating device and method for circulating a refrigerating fluid associated with it |
| US8528359B2 (en) * | 2006-10-27 | 2013-09-10 | Carrier Corporation | Economized refrigeration cycle with expander |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3044736B2 (en) * | 1990-03-30 | 2000-05-22 | ヤマハ株式会社 | Air conditioning duct noise attenuator |
| JP2001141315A (en) * | 1999-11-10 | 2001-05-25 | Aisin Seiki Co Ltd | Refrigeration air conditioner |
| JP3953871B2 (en) | 2002-04-15 | 2007-08-08 | サンデン株式会社 | Refrigeration air conditioner |
| JP2004251558A (en) * | 2003-02-20 | 2004-09-09 | Matsushita Electric Ind Co Ltd | Refrigeration cycle apparatus and control method thereof |
| JP4321095B2 (en) * | 2003-04-09 | 2009-08-26 | 日立アプライアンス株式会社 | Refrigeration cycle equipment |
| JP2006071257A (en) * | 2004-08-06 | 2006-03-16 | Daikin Ind Ltd | Refrigeration cycle equipment |
| JP2007155277A (en) * | 2005-12-08 | 2007-06-21 | Valeo Thermal Systems Japan Corp | Refrigerating cycle |
| US8074471B2 (en) | 2006-10-25 | 2011-12-13 | Panasonic Corporation | Refrigeration cycle apparatus and fluid machine used for the same |
| CN101568769A (en) * | 2006-12-26 | 2009-10-28 | 开利公司 | Refrigerant system with economizer, intercooler and multi-stage compressor |
| CN101688698B (en) * | 2007-05-14 | 2012-12-05 | 开利公司 | Refrigerant vapor compression system with flash tank economizer |
-
2009
- 2009-12-21 WO PCT/JP2009/007066 patent/WO2010073586A1/en not_active Ceased
- 2009-12-21 CN CN200980151528.6A patent/CN102257332B/en not_active Expired - Fee Related
- 2009-12-21 JP JP2010543836A patent/JPWO2010073586A1/en not_active Ceased
- 2009-12-21 EP EP09834397.3A patent/EP2381190A4/en not_active Withdrawn
- 2009-12-21 US US13/140,331 patent/US20110247358A1/en not_active Abandoned
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5131235A (en) * | 1990-03-31 | 1992-07-21 | Aisin Seiki Kabushiki Kaisha | Cooling system having coolant mass flow control |
| US20040118138A1 (en) * | 2002-10-31 | 2004-06-24 | Matsushita Electric Industrial Co., Ltd. | Determining method of high pressure of refrigeration cycle apparatus |
| US20090031738A1 (en) * | 2005-05-06 | 2009-02-05 | Tomoichiro Tamura | Refrigerating machine |
| US8109116B2 (en) * | 2005-08-26 | 2012-02-07 | Mitsubishi Electric Corporation | Dual compressor air conditioning system with oil level regulation |
| US8528359B2 (en) * | 2006-10-27 | 2013-09-10 | Carrier Corporation | Economized refrigeration cycle with expander |
| US8505317B2 (en) * | 2007-05-22 | 2013-08-13 | Angelantoni Life Science SRI | Refrigerating device and method for circulating a refrigerating fluid associated with it |
| US20120167606A1 (en) * | 2009-10-07 | 2012-07-05 | Mitsubishi Electric Corporation | Refrigeration cycle apparatus |
| US20120131949A1 (en) * | 2010-04-30 | 2012-05-31 | Panasonic Corporation | Fluid machine and refrigeration cycle apparatus |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130192294A1 (en) * | 2012-01-30 | 2013-08-01 | Jaeyoo YOO | Apparatus and method for controlling compressor, and refrigerator having the same |
| US20130195678A1 (en) * | 2012-01-30 | 2013-08-01 | Jaeyoo YOO | Apparatus and method for controlling compressor, and refrigerator having the same |
| US9366246B2 (en) * | 2012-01-30 | 2016-06-14 | Lg Electronics Inc. | Apparatus and method for controlling compressor, and refrigerator having the same |
| US9670933B2 (en) * | 2012-01-30 | 2017-06-06 | Lg Electronics Inc. | Apparatus and method for controlling compressor, and refrigerator having the same |
| KR101904870B1 (en) * | 2012-01-30 | 2018-10-08 | 엘지전자 주식회사 | Apparatus and method for controlling compressor, and refrigerator having the same |
| US20160159204A1 (en) * | 2013-07-31 | 2016-06-09 | Denso Corporation | Refrigeration cycle device for vehicle |
| US10220681B2 (en) * | 2013-07-31 | 2019-03-05 | Denso Corporation | Refrigeration cycle device for vehicle |
| US10415857B2 (en) | 2015-05-01 | 2019-09-17 | Mayekawa Mfg. Co., Ltd. | Refrigerator and operation method for refrigerator |
| US11031312B2 (en) | 2017-07-17 | 2021-06-08 | Fractal Heatsink Technologies, LLC | Multi-fractal heatsink system and method |
| US11670564B2 (en) | 2017-07-17 | 2023-06-06 | Fractal Heatsink Technologies LLC | Multi-fractal heatsink system and method |
| US12288731B2 (en) | 2017-07-17 | 2025-04-29 | Fractal Heatsink Technologies LLC | Multi-fractal heatsink system and method |
| US20230417465A1 (en) * | 2020-12-01 | 2023-12-28 | Mayekawa Mfg. Co., Ltd. | Refrigerator and operation method during precooling of refrigerator |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102257332A (en) | 2011-11-23 |
| EP2381190A1 (en) | 2011-10-26 |
| JPWO2010073586A1 (en) | 2012-06-07 |
| EP2381190A4 (en) | 2013-10-02 |
| CN102257332B (en) | 2013-08-14 |
| WO2010073586A1 (en) | 2010-07-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20110247358A1 (en) | Refrigeration cycle apparatus | |
| CN102859295B (en) | Refrigeration cycle device | |
| EP2015004B1 (en) | Air conditioner | |
| EP2312136A1 (en) | Waste heat regeneration system | |
| JP4053082B2 (en) | Refrigeration cycle equipment | |
| JPH09178274A (en) | Refrigerating system | |
| US7886550B2 (en) | Refrigerating machine | |
| CN102483276A (en) | Refrigeration cycle device | |
| CN110678342B (en) | Indirect reversible air conditioning circuit for a motor vehicle and method of operation in defrost mode | |
| JP5036593B2 (en) | Refrigeration cycle equipment | |
| JP4976970B2 (en) | Refrigeration cycle equipment | |
| JP2007009897A (en) | Heat cycle device, and high pressure protective device | |
| JP2013155992A (en) | Heat pump cycle device | |
| JP2009109069A (en) | Heat pump water heater | |
| WO2006112157A1 (en) | Refrigeration cycle device and method of operating the same | |
| JP2004060989A (en) | Vapor compression type refrigerator and expander-integrated compressor | |
| JP2007101179A5 (en) | ||
| JP2006162186A (en) | Refrigeration cycle equipment | |
| JP3837307B2 (en) | Hermetic compressor and refrigeration apparatus using the same | |
| JP2012102968A (en) | Refrigerating cycle device | |
| JP2004324930A (en) | Vapor compression refrigerator | |
| JP2002071226A (en) | Refrigeration equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: PANASONIC CORPORATION, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WADA, MASANOBU;HIKICHI, TAKUMI;SHIOTANI, YU;AND OTHERS;SIGNING DATES FROM 20110607 TO 20110613;REEL/FRAME:026587/0745 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |