[go: up one dir, main page]

US20100251689A1 - Multiple stage gas turbine engine - Google Patents

Multiple stage gas turbine engine Download PDF

Info

Publication number
US20100251689A1
US20100251689A1 US12/820,699 US82069910A US2010251689A1 US 20100251689 A1 US20100251689 A1 US 20100251689A1 US 82069910 A US82069910 A US 82069910A US 2010251689 A1 US2010251689 A1 US 2010251689A1
Authority
US
United States
Prior art keywords
combustion
stage
gas
turbine engine
gas turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/820,699
Inventor
David A. Little
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Energy Inc
Original Assignee
Siemens Energy Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Energy Inc filed Critical Siemens Energy Inc
Priority to US12/820,699 priority Critical patent/US20100251689A1/en
Assigned to SIEMENS POWER GENERATION, INC. reassignment SIEMENS POWER GENERATION, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LITTLE, DAVID A.
Assigned to SIEMENS ENERGY, INC. reassignment SIEMENS ENERGY, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS POWER GENERATION, INC.
Publication of US20100251689A1 publication Critical patent/US20100251689A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • F02C6/003Gas-turbine plants with heaters between turbine stages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C3/00Gas-turbine plants characterised by the use of combustion products as the working fluid
    • F02C3/14Gas-turbine plants characterised by the use of combustion products as the working fluid characterised by the arrangement of the combustion chamber in the plant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • F02C6/18Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/70Application in combination with
    • F05D2220/72Application in combination with a steam turbine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T50/00Aeronautics or air transport
    • Y02T50/60Efficient propulsion technologies, e.g. for aircraft

Definitions

  • This invention relates generally to the field of power production, and more particularly to a combined cycle power plant incorporating a gas turbine topping cycle and a steam turbine bottoming cycle.
  • the '953 patent further describes a preferred embodiment wherein the reheat combustor takes the form of a combined reheat/superheat cavity that functions not only to reheat the combustion gas but also includes superheating coils for adding heat energy to the steam produced in the evaporator prior to its introduction into the steam turbine.
  • Table II of the '953 patent predicts that overall plant efficiencies of about 50% are possible with the preferred embodiment in a plant producing about 95,000 KW.
  • FIG. 1 is a schematic illustration of an improved combined cycle power plant.
  • FIG. 2 is an exemplary T/S diagram for the topping cycle of the power plant of FIG. 1 .
  • FIG. 3 is a schematic illustration of an alternative gas turbine engine design that may be used in the power plant of FIG. 1 .
  • FIG. 4 is a schematic illustration of an alternative gas turbine engine design that may be used in the power plant of FIG. 1 .
  • Important parameters that affect the total life cycle cost of an electrical power generating station include not only the fuel cost, which is directly related to thermal efficiency, but also manufacturing cost, repair/maintenance cost, and non-fuel operational costs.
  • One important non-fuel operational cost may be the cost of post-combustion exhaust gas treatment, such as the cost of providing the ammonia that is consumed in a selective catalytic reduction (SCR) treatment process.
  • the combined cycle power plant 10 of FIG. 1 includes a combustion gas topping cycle 12 for combusting a fuel 18 to produce shaft power and providing a flow of exhaust gas 14 to a steam bottoming cycle 16 .
  • the bottoming cycle 16 may be any such cycle known in the art that extracts heat from the exhaust gas 14 to produce additional shaft power. It is known that maintaining the incoming exhaust gas 14 at a temperature of about 625-650° C., and preferably about 640° C., may enhance cycle efficiency in such a steam bottoming cycle 16 .
  • such an elevated exhaust temperature typically requires a relatively high firing temperature in the topping cycle 12 , thereby creating conditions that favor the production of undesirable levels of oxides of nitrogen (NOx) in the exhaust gas 14 .
  • NOx oxides of nitrogen
  • the power plant 10 provides for staged in-situ combustion of the fuel 18 .
  • the topping cycle 12 includes a first stage of dry low NOx combustion 24 provided by an integrated torus-configured combustor chamber 20 and first stage vane 22 .
  • One such integrated combustor/first stage vane configuration is described in U.S. Pat. No. 6,796,130, which is incorporated by reference herein. This design is simple, efficient and compact when compared to other known low-emission combustor designs.
  • the topping cycle 12 of plant 10 also provides a second stage of combustion 26 and a third stage of combustion 28 in the form of in-situ re-heat combustion associated with the respective second row of vanes 30 and third row of vanes 32 .
  • the fuel 18 consumed in the second and third stages of combustion 26 , 28 may be introduced through the trailing edge or at other appropriate locations associated with the flow of the combustion gas over the vanes 30 , 32 .
  • each of the stages of combustion 24 , 26 , 28 of the present combined cycle power plant 10 is integrated within the topping cycle gas turbine engine 34 to provide a simple, compact combustion mechanism; unlike the large, discrete reheat burners described in the prior art '953 patent.
  • In-situ reheat combustion has previously been studied as an alternative to the traditional discrete reheat combustors for gas turbine applications under U.S. Department of Energy (DOE) Contract No. DE-FC26-00NT40913. In that study, only single stage reheat via the first row of vanes was found to have merit. In spite of such teaching, the combined cycle power plant 10 , the present inventor has discovered that by providing in-situ reheat combustion in both the second and third rows of vanes 30 , 32 , it is possible to reduce the life cycle costs of the plant 10 when compared to the prior art single stage in-situ reheat arrangement encouraged by the above-mentioned DOE study. This comes about because the peak firing temperature may be limited to about 1,400° C.
  • a firing temperature of only 1,400° C. allows the hot gas path components to be formed of superalloy steels rather than ceramic matrix composite materials, if desired, and/or with a reduced need for exotic cooling schemes and/or ceramic thermal barrier coating materials, thereby further limiting both the manufacturing and maintenance costs of these components.
  • Aspirated compressors have been studied since about 1993 for application to military jet engines.
  • An aspirated compressor is one wherein compressor performance is improved by removing about 1-4% of the flow from the boundary layer at critical locations within the compressor in order to avoid boundary layer separation.
  • Aspirated compressors provide a desired degree of compression with a greatly reduced number of stages when compared to non-aspirated designs.
  • Aspirated compressors have been developed under research funded by the United States Air Force, since the size and weight reductions provided by an aspirated design have obvious advantages in airborne applications.
  • the present inventor has recognized that an aspirated compressor may provide important life cycle cost advantages for land-based power generation applications, due to the reduced number and size of the rotating components, and thus the compressor 36 of topping cycle gas turbine engine 34 may be an aspirated compressor.
  • the air that is bled from the compressor 36 may be used for cooling and/or sealing purposes in lower pressure portions of the gas turbine engine 34 during normal operation.
  • Compressor 36 may further incorporate variable-pitch vanes, thereby eliminating the need for a compressor bleed system that would otherwise be necessary only for start-up operation.
  • Gas turbine engine 34 may be connected to an electrical generator 38 for providing electrical power to a grid.
  • Gas turbine 34 incorporates features that operate synergistically to minimize total plant life cycle cost by not only providing a compact, economical, efficient, low emission topping cycle 12 , but by also providing exhaust gas 14 to the associated bottoming cycle 16 at a temperature favorable for overall plant efficiency, while at the same time maintaining the peak combustion temperature low enough for extended hot gas path component life.
  • the present invention goes against modern gas turbine engine design philosophy that has resulted in ever-increasing firing temperatures in the blind pursuit of gas cycle thermal efficiency. Peak firing temperatures for commercial land-based gas turbine power plant engines were about 1,400° C. in the early 1990's.
  • the present invention avoids the high cost associated with such ultra-high temperature materials which not only cost more to manufacture but also may require more frequent in-service inspections and tend to have a relatively higher in-service failure rate.
  • the present invention may enable an approximate 10% reduction in total life cycle cost when compared to current combined cycle plant designs.
  • FIG. 2 The performance of an exemplary gas turbine engine 34 incorporating multiple in-situ reheat stages is illustrated in FIG. 2 .
  • Initial compression occurs in the aspirated compressor 36 along line 40 to a temperature of about 550° C.
  • the first stage of combustion 24 raises the temperature of the working fluid to about 1,400° C. along line 42 .
  • Work is then expended through the first row of rotating blades 44 along line 46 .
  • the second stage of combustion 26 raises the working gas temperature back to about 1,400° C. along line 48 .
  • Additional work is expended through the second row of rotating blades 50 along line 52 .
  • the third stage of combustion 28 again raises the working gas temperature to about 1,400° C. along line 54 prior to the working fluid expending work through the remaining rows of blades 56 along line 58 .
  • FIG. 3 illustrates an alternative embodiment of a gas turbine engine 60 that may be utilized in an improved combined cycle power plant such as plant 10 of FIG. 1 .
  • Engine 60 includes a compressor 62 and multiple stages of combustion integrated with an expansion turbine 61 (rotating components not illustrated).
  • the first stage of combustion 64 is an integrated torus combustor/vane arrangement 66 as described in U.S. Pat. No. 6,796,130.
  • a second stage of combustion 68 is provided by in-situ reheat combustion associated with a second turbine stage 70 .
  • a third stage of combustion 72 is provided by a second integrated torus combustor/vane arrangement 74 . Additional turbine stages 76 are provided downstream of the third stage of combustion 72 .
  • This design is similar to that of engine 34 of FIG.
  • the third stage of combustion 72 is provided by the torus combustor/vane arrangement 66 rather than the in-situ combustion stage 28 of FIG. 1 , and it may be preferred in some embodiments in order to assure complete combustion at the lower temperatures and pressures associated with the third stage and further downstream turbine stages 76 .
  • FIG. 4 illustrates a further embodiment of a gas turbine engine 80 (rotating components not illustrated) that uses integrated combustor/vane arrangements 82 , 84 , 86 for three consecutive stages of combustion; i.e. primary combustion 82 and two stages of reheat combustion 84 , 86 .
  • the selection of a particular combustion/reheat design for a particular application may be guided by a total plant life cycle cost evaluation.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A gas turbine engine (34) including a compressor (36) for producing compressed air, a first stage of combustion (24) in the compressed air producing combustion gas, an expansion turbine (61) expanding the combustion gas to produce work and an exhaust gas (14), a second stage of combustion (26) in the combustion gas disposed downstream of a first stage of expansion in the turbine (61), and a third stage of combustion (28) in the combustion gas disposed downstream of the second stage (26) of combustion. None of the stages of combustion produce a temperature in the combustion gas of more than about 1,400° C.

Description

  • This application is a divisional of, and claims priority to, co-pending U.S. patent application Ser. No. 11/440,838 filed on May 25, 2006.
  • FIELD OF THE INVENTION
  • This invention relates generally to the field of power production, and more particularly to a combined cycle power plant incorporating a gas turbine topping cycle and a steam turbine bottoming cycle.
  • BACKGROUND OF THE INVENTION
  • It is well known to utilize the waste heat generated by a gas turbine topping cycle to power a steam turbine bottoming cycle in a combined cycle power plant in order to augment the efficiency of an electrical power generating station. U.S. Pat. No. 4,272,953 describes a combined cycle plant wherein the topping cycle includes a gas turbine engine followed by a reheat combustor wherein the exhaust from the gas turbine engine is further heated prior to its introduction into a power turbine that is used to drive an electrical generator. Exhaust from the power turbine is then passed to an evaporator for generating steam for the steam bottoming cycle that is used to drive a second electrical generator. The '953 patent further describes a preferred embodiment wherein the reheat combustor takes the form of a combined reheat/superheat cavity that functions not only to reheat the combustion gas but also includes superheating coils for adding heat energy to the steam produced in the evaporator prior to its introduction into the steam turbine. Table II of the '953 patent predicts that overall plant efficiencies of about 50% are possible with the preferred embodiment in a plant producing about 95,000 KW.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention is explained in following description in view of the drawings that show:
  • FIG. 1 is a schematic illustration of an improved combined cycle power plant.
  • FIG. 2 is an exemplary T/S diagram for the topping cycle of the power plant of FIG. 1.
  • FIG. 3 is a schematic illustration of an alternative gas turbine engine design that may be used in the power plant of FIG. 1.
  • FIG. 4 is a schematic illustration of an alternative gas turbine engine design that may be used in the power plant of FIG. 1.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Whereas the designs of prior art power plants were generally focused on maximizing the thermal efficiency of the plants, the present inventor has discovered that prior art designs do not necessarily minimize the total life cycle cost (LCC) of the plants; e.g. the total time-valued cost of producing power over the life of a power plant. An improved combined cycle power plant 10 is described herein that not only provides a high level of thermal efficiency, but importantly also is predicted to provide a lower total LCC than prior art plants of a similar capacity.
  • Important parameters that affect the total life cycle cost of an electrical power generating station include not only the fuel cost, which is directly related to thermal efficiency, but also manufacturing cost, repair/maintenance cost, and non-fuel operational costs. One important non-fuel operational cost may be the cost of post-combustion exhaust gas treatment, such as the cost of providing the ammonia that is consumed in a selective catalytic reduction (SCR) treatment process.
  • The present inventor has recognized several limitations of prior art combined cycle power plants that tend to increase the plants' total life cycle costs. First, designs that optimize thermal efficiency tend to have very high manufacturing costs. For example, prior art U.S. Pat. No. 4,272,953 teaches at column 14, line 63 through column 15, line 13, that it is desirable to utilize a high power turbine expansion ratio, since expansion ratio is a measure of the over-all efficiency of a power generating system. To achieve a high expansion ratio in the turbine, a high compression ratio air compressor is utilized; for example, the nineteen-stage compressor illustrated in FIG. 2 of that patent. The present inventor has avoided such complicated designs in the improved plant of FIG. 1 in order to reduce the initial manufacturing cost as well as the maintenance/repair costs. In a further example, the reheat/superheat cavity of the '953 patent is described as having a required diameter of about 10 feet. The present inventor has purposefully avoided such large structures in order to avoid the excessive manufacturing costs associated with such structures.
  • The combined cycle power plant 10 of FIG. 1 includes a combustion gas topping cycle 12 for combusting a fuel 18 to produce shaft power and providing a flow of exhaust gas 14 to a steam bottoming cycle 16. The bottoming cycle 16 may be any such cycle known in the art that extracts heat from the exhaust gas 14 to produce additional shaft power. It is known that maintaining the incoming exhaust gas 14 at a temperature of about 625-650° C., and preferably about 640° C., may enhance cycle efficiency in such a steam bottoming cycle 16. However, such an elevated exhaust temperature typically requires a relatively high firing temperature in the topping cycle 12, thereby creating conditions that favor the production of undesirable levels of oxides of nitrogen (NOx) in the exhaust gas 14. Such emissions are minimized in the prior art either by exotic and expensive combustor designs and/or expensive post-combustion exhaust gas treatment. To avoid such undesirable emissions, and thereby to avoid the cost associated with post combustion treatment of the exhaust gas 14, the power plant 10 provides for staged in-situ combustion of the fuel 18. In the embodiment of FIG. 1, the topping cycle 12 includes a first stage of dry low NOx combustion 24 provided by an integrated torus-configured combustor chamber 20 and first stage vane 22. One such integrated combustor/first stage vane configuration is described in U.S. Pat. No. 6,796,130, which is incorporated by reference herein. This design is simple, efficient and compact when compared to other known low-emission combustor designs.
  • The topping cycle 12 of plant 10 also provides a second stage of combustion 26 and a third stage of combustion 28 in the form of in-situ re-heat combustion associated with the respective second row of vanes 30 and third row of vanes 32. The fuel 18 consumed in the second and third stages of combustion 26, 28 may be introduced through the trailing edge or at other appropriate locations associated with the flow of the combustion gas over the vanes 30, 32. Thus, each of the stages of combustion 24, 26, 28 of the present combined cycle power plant 10 is integrated within the topping cycle gas turbine engine 34 to provide a simple, compact combustion mechanism; unlike the large, discrete reheat burners described in the prior art '953 patent.
  • In-situ reheat combustion has previously been studied as an alternative to the traditional discrete reheat combustors for gas turbine applications under U.S. Department of Energy (DOE) Contract No. DE-FC26-00NT40913. In that study, only single stage reheat via the first row of vanes was found to have merit. In spite of such teaching, the combined cycle power plant 10, the present inventor has discovered that by providing in-situ reheat combustion in both the second and third rows of vanes 30, 32, it is possible to reduce the life cycle costs of the plant 10 when compared to the prior art single stage in-situ reheat arrangement encouraged by the above-mentioned DOE study. This comes about because the peak firing temperature may be limited to about 1,400° C. by providing multi-staged in-situ reheat combustion, while still providing a desirably high exhaust gas temperature of about 640° C. for optimal bottoming cycle efficiency. An adequate number of expansion stages is provided downstream of the fueled vanes 30, 32 to ensure that all fuel energy is released. In the illustrated embodiment of FIG. 1, an additional two downstream stages of blades and vanes are provided, although in other embodiments other stages of expansion may be used. The limited peak combustion temperature also minimizes the production of oxides of nitrogen and precludes the need for costly post-combustion exhaust treatment. Combustion at 1,700° C. may typically produce about 50 ppm of NOx, thereby requiring post-combustion treatment for most locations in the United States. However, combustion at 1,400° C. may typically produce only about 3 ppm of NOx, which may be acceptable for release to the atmosphere without the expense and availability problems associated with post-combustion exhaust treatment. Furthermore, a firing temperature of only 1,400° C. allows the hot gas path components to be formed of superalloy steels rather than ceramic matrix composite materials, if desired, and/or with a reduced need for exotic cooling schemes and/or ceramic thermal barrier coating materials, thereby further limiting both the manufacturing and maintenance costs of these components.
  • Aspirated compressors have been studied since about 1993 for application to military jet engines. An aspirated compressor is one wherein compressor performance is improved by removing about 1-4% of the flow from the boundary layer at critical locations within the compressor in order to avoid boundary layer separation. Aspirated compressors provide a desired degree of compression with a greatly reduced number of stages when compared to non-aspirated designs. Aspirated compressors have been developed under research funded by the United States Air Force, since the size and weight reductions provided by an aspirated design have obvious advantages in airborne applications. The present inventor has recognized that an aspirated compressor may provide important life cycle cost advantages for land-based power generation applications, due to the reduced number and size of the rotating components, and thus the compressor 36 of topping cycle gas turbine engine 34 may be an aspirated compressor. The air that is bled from the compressor 36 may be used for cooling and/or sealing purposes in lower pressure portions of the gas turbine engine 34 during normal operation. Compressor 36 may further incorporate variable-pitch vanes, thereby eliminating the need for a compressor bleed system that would otherwise be necessary only for start-up operation. Gas turbine engine 34 may be connected to an electrical generator 38 for providing electrical power to a grid.
  • Gas turbine 34 incorporates features that operate synergistically to minimize total plant life cycle cost by not only providing a compact, economical, efficient, low emission topping cycle 12, but by also providing exhaust gas 14 to the associated bottoming cycle 16 at a temperature favorable for overall plant efficiency, while at the same time maintaining the peak combustion temperature low enough for extended hot gas path component life. The present invention goes against modern gas turbine engine design philosophy that has resulted in ever-increasing firing temperatures in the blind pursuit of gas cycle thermal efficiency. Peak firing temperatures for commercial land-based gas turbine power plant engines were about 1,400° C. in the early 1990's. Since then, a series of engine designs have been introduced by each of the major gas turbine vendors that have pushed peak firing temperatures well past 2,000° C., being limited only by the availability of new high temperature materials and exotic cooling schemes. The present invention avoids the high cost associated with such ultra-high temperature materials which not only cost more to manufacture but also may require more frequent in-service inspections and tend to have a relatively higher in-service failure rate. The present invention may enable an approximate 10% reduction in total life cycle cost when compared to current combined cycle plant designs.
  • The performance of an exemplary gas turbine engine 34 incorporating multiple in-situ reheat stages is illustrated in FIG. 2. Initial compression occurs in the aspirated compressor 36 along line 40 to a temperature of about 550° C. The first stage of combustion 24 raises the temperature of the working fluid to about 1,400° C. along line 42. Work is then expended through the first row of rotating blades 44 along line 46. The second stage of combustion 26 raises the working gas temperature back to about 1,400° C. along line 48. Additional work is expended through the second row of rotating blades 50 along line 52. The third stage of combustion 28 again raises the working gas temperature to about 1,400° C. along line 54 prior to the working fluid expending work through the remaining rows of blades 56 along line 58. The inherent efficiency of this cycle may be appreciated by considering its similarity to an Erickson cycle, which is known to be an efficient gas cycle. With an engine pressurization ratio (PR) of approximately 40:1, a peak firing temperature of about 1,400° C., and an exhaust gas 14 temperature of about 640° C., the combined cycle net efficiency (LHV) of power plant 10 is expected to be in the mid-60% range, and the plant is expected to produce exhaust gas with no more than about 3 ppm of NOx. Importantly, this thermally efficient design is achieved in a plant having relatively low manufacturing and maintenance costs when compared to prior art combined cycle plants, and low operating cost due to its efficiency and lack of need for post-combustion exhaust treatment.
  • FIG. 3 illustrates an alternative embodiment of a gas turbine engine 60 that may be utilized in an improved combined cycle power plant such as plant 10 of FIG. 1. Engine 60 includes a compressor 62 and multiple stages of combustion integrated with an expansion turbine 61 (rotating components not illustrated). In this embodiment, the first stage of combustion 64 is an integrated torus combustor/vane arrangement 66 as described in U.S. Pat. No. 6,796,130. A second stage of combustion 68 is provided by in-situ reheat combustion associated with a second turbine stage 70. A third stage of combustion 72 is provided by a second integrated torus combustor/vane arrangement 74. Additional turbine stages 76 are provided downstream of the third stage of combustion 72. This design is similar to that of engine 34 of FIG. 1, except that the third stage of combustion 72 is provided by the torus combustor/vane arrangement 66 rather than the in-situ combustion stage 28 of FIG. 1, and it may be preferred in some embodiments in order to assure complete combustion at the lower temperatures and pressures associated with the third stage and further downstream turbine stages 76.
  • The various stages of reheat may be provided by any combination of fuel combustion directly in the combustion gas flow path and/or integrated combustor/vane arrangements in various embodiments. FIG. 4 illustrates a further embodiment of a gas turbine engine 80 (rotating components not illustrated) that uses integrated combustor/ vane arrangements 82, 84, 86 for three consecutive stages of combustion; i.e. primary combustion 82 and two stages of reheat combustion 84, 86. The selection of a particular combustion/reheat design for a particular application may be guided by a total plant life cycle cost evaluation.
  • While various embodiments of the present invention have been shown and described herein, it will be obvious that such embodiments are provided by way of example only. Numerous variations, changes and substitutions may be made without departing from the invention herein. Accordingly, it is intended that the invention be limited only by the spirit and scope of the appended claims.

Claims (8)

1. A gas turbine engine comprising:
a compressor for producing compressed air;
a first stage of combustion in the compressed air producing combustion gas;
an expansion turbine expanding the combustion gas to produce work and an exhaust gas;
a second stage of combustion in the combustion gas disposed downstream of a first stage of expansion in the turbine; and
a third stage of combustion in the combustion gas disposed downstream of the second stage of combustion,
wherein none of the stages of combustion produce a temperature in the combustion gas of more than about 1,400° C.
2. The gas turbine engine of claim 1, wherein at least one of the stages of combustion comprises a torus-configured combustion chamber that is associated with a vane of the expansion turbine.
3. The gas turbine engine of claim 1, wherein the first stage of combustion and the third stage of combustion each comprise a torus-configured combustion chamber that is associated with a respective stage vane of the expansion turbine.
4. The gas turbine engine of claim 1, wherein each of the stages of combustion comprises a torus-configured combustion chamber that is associated with a respective vane of the expansion turbine.
5. The gas turbine engine of claim 1, wherein the first stage of combustion comprises a torus-configured combustion chamber that is associated with a first stage vane of the expansion turbine, and the second and third stages of combustion each comprise in-situ reheat combustion associated with the respective second and third stages of the expansion turbine.
6. The gas turbine engine of claim 1, wherein the first stage of combustion comprises a torus-configured combustion chamber that is associated with a first stage vane of the expansion turbine, the second stage of combustion comprises in-situ reheat combustion associated with the second stage of the expansion turbine, and the third stage of combustion comprises a torus-configured combustion chamber that is associated with a third stage of the expansion turbine.
7. The gas turbine engine of claim 1, wherein the compressor comprises an aspirated compressor.
8. The gas turbine engine of claim 1, wherein the compressor, stages of combustion, and expansion turbine are synergistically effective to provide the exhaust gas at a temperature of about 640° C. with no more than about 3 ppm of NOx.
US12/820,699 2006-05-25 2010-06-22 Multiple stage gas turbine engine Abandoned US20100251689A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/820,699 US20100251689A1 (en) 2006-05-25 2010-06-22 Multiple stage gas turbine engine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/440,838 US7784261B2 (en) 2006-05-25 2006-05-25 Combined cycle power plant
US12/820,699 US20100251689A1 (en) 2006-05-25 2010-06-22 Multiple stage gas turbine engine

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US11/440,838 Division US7784261B2 (en) 2006-05-25 2006-05-25 Combined cycle power plant

Publications (1)

Publication Number Publication Date
US20100251689A1 true US20100251689A1 (en) 2010-10-07

Family

ID=38748239

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/440,838 Expired - Fee Related US7784261B2 (en) 2006-05-25 2006-05-25 Combined cycle power plant
US12/820,699 Abandoned US20100251689A1 (en) 2006-05-25 2010-06-22 Multiple stage gas turbine engine

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US11/440,838 Expired - Fee Related US7784261B2 (en) 2006-05-25 2006-05-25 Combined cycle power plant

Country Status (1)

Country Link
US (2) US7784261B2 (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7784261B2 (en) * 2006-05-25 2010-08-31 Siemens Energy, Inc. Combined cycle power plant
US8347628B2 (en) * 2009-08-18 2013-01-08 Gerard Henry M Power generation directly from compressed air for exploiting wind and solar power
US8322141B2 (en) * 2011-01-14 2012-12-04 General Electric Company Power generation system including afirst turbine stage structurally incorporating a combustor
US9121608B2 (en) * 2011-12-29 2015-09-01 General Electric Company Gas turbine engine including secondary combustion chamber integrated with the stator vanes in the turbine/expansion section of the engine and a method of operating the same
US9411326B2 (en) 2012-08-21 2016-08-09 General Electric Company Plant control optimization system including visual risk display
US9255525B2 (en) 2012-11-30 2016-02-09 General Electric Company System and method for gas turbine operation
CN103527319B (en) * 2013-10-07 2015-12-23 于魁江 A kind of turbogenerator
US9709069B2 (en) 2013-10-22 2017-07-18 Dayspring Church Of God Apostolic Hybrid drive engine
US10094570B2 (en) 2014-12-11 2018-10-09 General Electric Company Injector apparatus and reheat combustor
US10094569B2 (en) 2014-12-11 2018-10-09 General Electric Company Injecting apparatus with reheat combustor and turbomachine
US10094571B2 (en) 2014-12-11 2018-10-09 General Electric Company Injector apparatus with reheat combustor and turbomachine
US10107498B2 (en) 2014-12-11 2018-10-23 General Electric Company Injection systems for fuel and gas
US9605559B2 (en) 2015-02-02 2017-03-28 General Electric Company Wash timing based on turbine operating parameters
US20160313711A1 (en) * 2015-04-24 2016-10-27 Israel Hernandez Flores Enhancing base load operation of a power system
US11365677B2 (en) * 2020-03-25 2022-06-21 General Electric Company Combined cycle power plant and Methods of controlling emissions therefrom
US11781507B2 (en) * 2021-06-29 2023-10-10 ATRX, Inc. Multi-mode combined cycle propulsion engine
CN115045860B (en) * 2022-08-12 2022-11-22 中国航发沈阳发动机研究所 Compressor expands steady increase structure
US12037951B1 (en) 2022-12-30 2024-07-16 Ge Infrastructure Technology Llc System and method having load control for isothermal expansion in turbine stage of gas turbine engine
US11971170B1 (en) 2022-12-30 2024-04-30 Ge Infrastructure Technology Llc System and method having flame stabilizers for isothermal expansion in turbine stage of gas turbine engine
US11891949B1 (en) * 2022-12-30 2024-02-06 Ge Infrastructure Technology Llc System and method having multi-fluid injectors for isothermal expansion in turbine stage of gas turbine engine
US20240218838A1 (en) * 2022-12-30 2024-07-04 General Electric Company System and method having fluid injectors for isothermal expansion in turbine stage of gas turbine engine
US12385642B2 (en) * 2023-11-13 2025-08-12 General Electric Company Sequential combustion gas turbine engine including a steam system for injecting steam to each combustor

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4197700A (en) * 1976-10-13 1980-04-15 Jahnig Charles E Gas turbine power system with fuel injection and combustion catalyst
US6003297A (en) * 1995-03-06 1999-12-21 Siemens Aktiengsellschaft Method and apparatus for operating a gas turbine, with fuel injected into its compressor
US20010032450A1 (en) * 2000-02-18 2001-10-25 Siemens Westinghouse Power Corporation Adaptable, modular efficient gas turbine power plant and associated method
US20010047648A1 (en) * 2000-03-17 2001-12-06 Griffiths Kenneth F. Turbo-machines
US6484511B2 (en) * 2000-03-31 2002-11-26 Alstom (Switzerland) Ltd Turbine casing for an axial-throughflow gas turbine
US6619026B2 (en) * 2001-08-27 2003-09-16 Siemens Westinghouse Power Corporation Reheat combustor for gas combustion turbine
US6796130B2 (en) * 2002-11-07 2004-09-28 Siemens Westinghouse Power Corporation Integrated combustor and nozzle for a gas turbine combustion system
US7364404B2 (en) * 2003-11-26 2008-04-29 Rolls-Royce Deutschland Ltd & Co Kg Turbomachine with fluid removal
US7784261B2 (en) * 2006-05-25 2010-08-31 Siemens Energy, Inc. Combined cycle power plant

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2638741A (en) * 1948-08-11 1953-05-19 Jr Henry M Putman Axial flow gas turbine having reheating means and specially shaped rotor and stator blades to provide isothermal expansion
US4272953A (en) 1978-10-26 1981-06-16 Rice Ivan G Reheat gas turbine combined with steam turbine
US4813227A (en) 1978-10-26 1989-03-21 Rice Ivan G Preheat gas turbine combined with steam turbine
US5133182A (en) 1988-09-20 1992-07-28 United Technologies Corporation Control of low compressor vanes and fuel for a gas turbine engine
US5839267A (en) * 1995-03-31 1998-11-24 General Electric Co. Cycle for steam cooled gas turbines
JP4301692B2 (en) * 2000-03-31 2009-07-22 三菱重工業株式会社 gas turbine
DE10035676A1 (en) * 2000-07-21 2002-02-07 Siemens Ag Gas turbine and method for operating a gas turbine
EP1780387A3 (en) 2000-09-05 2007-07-18 Sudarshan Paul Dev Nested core gas turbine engine
JP3951909B2 (en) 2002-12-12 2007-08-01 株式会社日立製作所 Gas turbine combustor

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4197700A (en) * 1976-10-13 1980-04-15 Jahnig Charles E Gas turbine power system with fuel injection and combustion catalyst
US6003297A (en) * 1995-03-06 1999-12-21 Siemens Aktiengsellschaft Method and apparatus for operating a gas turbine, with fuel injected into its compressor
US20010032450A1 (en) * 2000-02-18 2001-10-25 Siemens Westinghouse Power Corporation Adaptable, modular efficient gas turbine power plant and associated method
US20010047648A1 (en) * 2000-03-17 2001-12-06 Griffiths Kenneth F. Turbo-machines
US6484511B2 (en) * 2000-03-31 2002-11-26 Alstom (Switzerland) Ltd Turbine casing for an axial-throughflow gas turbine
US6619026B2 (en) * 2001-08-27 2003-09-16 Siemens Westinghouse Power Corporation Reheat combustor for gas combustion turbine
US6796130B2 (en) * 2002-11-07 2004-09-28 Siemens Westinghouse Power Corporation Integrated combustor and nozzle for a gas turbine combustion system
US7364404B2 (en) * 2003-11-26 2008-04-29 Rolls-Royce Deutschland Ltd & Co Kg Turbomachine with fluid removal
US7784261B2 (en) * 2006-05-25 2010-08-31 Siemens Energy, Inc. Combined cycle power plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Merchant et al "Aerodynamic Design and Analysis of a High Pressure Ratio Aspirated Compressor Stage", May 2000, ASME Paper 2000-GT-619, pages 1-10. *

Also Published As

Publication number Publication date
US20070271898A1 (en) 2007-11-29
US7784261B2 (en) 2010-08-31

Similar Documents

Publication Publication Date Title
US20100251689A1 (en) Multiple stage gas turbine engine
US7600368B2 (en) High compression gas turbine with superheat enhancement
EP1044321B1 (en) Gas turbine engines connected in series
US6644011B2 (en) Advanced Cheng Combined Cycle
EP3623602A1 (en) Hybrid expander cycle with intercooling and turbo-generator
US6085514A (en) Method of steam cooling thermally highly loaded units of a gas-turbine group
US6223523B1 (en) Method of operating a power station plant
JP2581825B2 (en) Power plant
US5761896A (en) High efficiency method to burn oxygen and hydrogen in a combined cycle power plant
EP2423469A2 (en) Combined power augmentation system and method
US9188028B2 (en) Gas turbine system with reheat spray control
US9644542B2 (en) Turbine cooling system using an enhanced compressor air flow
US9500103B2 (en) Duct fired combined cycle system
US20070256424A1 (en) Heat recovery gas turbine in combined brayton cycle power generation
US9279365B2 (en) Power augmentation systems and methods for grid frequency control
US5906094A (en) Partial oxidation power plants and methods thereof
Sanjay et al. Thermodynamic modelling and simulation of advanced combined cycle for performance enhancement
US20140069078A1 (en) Combined Cycle System with a Water Turbine
Tsujikawa et al. Proposal of the atmospheric pressure turbine (apt) and high temperature fuel cell hybrid system
EP4438872A3 (en) Recovering water and/or heat energy from powerplant combustion products
JP2013133823A (en) System and method for controlling oxygen emission from gas turbine
Nelson et al. A fifty percent plus efficiency mid range advanced Cheng cycle
Soufi et al. A modern injected steam gas turbine cogeneration system based on exergy concept
Yang Reduction of specific fuel consumption in gas turbine power plants
US20020189262A1 (en) Method for operating a steam turbine , and a turbine system provided with a steam turbine that functions according to said method

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS ENERGY, INC., FLORIDA

Free format text: CHANGE OF NAME;ASSIGNOR:SIEMENS POWER GENERATION, INC.;REEL/FRAME:024575/0732

Effective date: 20080930

Owner name: SIEMENS POWER GENERATION, INC., FLORIDA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LITTLE, DAVID A.;REEL/FRAME:024574/0916

Effective date: 20060522

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION