[go: up one dir, main page]

US20100154321A1 - Permanent plastic formwork system - Google Patents

Permanent plastic formwork system Download PDF

Info

Publication number
US20100154321A1
US20100154321A1 US12/664,500 US66450007A US2010154321A1 US 20100154321 A1 US20100154321 A1 US 20100154321A1 US 66450007 A US66450007 A US 66450007A US 2010154321 A1 US2010154321 A1 US 2010154321A1
Authority
US
United States
Prior art keywords
slats
formwork system
plastic formwork
permanent plastic
separators
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/664,500
Inventor
Carlos Javierre Lardies
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ALPI SISTEMAS SL
Original Assignee
ALPI SISTEMAS SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ALPI SISTEMAS SL filed Critical ALPI SISTEMAS SL
Assigned to ALPI SISTEMAS, S.L. reassignment ALPI SISTEMAS, S.L. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JAVIERRE LARDIES, CARLOS
Publication of US20100154321A1 publication Critical patent/US20100154321A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • E04C5/0618Closed cages with spiral- or coil-shaped stirrup rod
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/062Forms for curved walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/05Forming boards or similar elements the form surface being of plastics
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/6116Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by locking means on lateral surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6125Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6125Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
    • E04B1/6129Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface the connection made by expansion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6179Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions and recesses on each frontal surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8647Walls made by casting, pouring, or tamping in situ made in permanent forms with ties going through the forms

Definitions

  • the invention relates to a permanent plastic formwork system, which provides the function for which it is intended with a series of novel features and advantages, in addition to other features and advantages inherent to its organization and formation, which will be described in detail below, involving an innovative and/or alternative improvement to the systems already known in this field for the same purpose.
  • the object of the invention consists of a permanent formwork system, i.e., not reusable, designed to be manufactured mainly from plastics, intended for building structures of any shape and essentially formed from two parallel surfaces, advantageously formed by the longitudinal coupling of a plurality of hollow slats obtained by means of extrusion, which prevents the restriction or limitation of the length or width thereof, the rebar being installed between the mentioned parallel surfaces, which rebar is duly secured by means of placing special separating elements which in turn fix and assure the distance between both surfaces, leaving the gap between them prepared to pour therein the fresh concrete.
  • the field of application of the present invention is the field of construction.
  • formworks are generally formed of a frame formed by a set of metal or wood plates suitably arranged to receive the concrete which, when hardened, forms the walls or construction elements built with this material which, depending on the type of construction, will have one shape or another.
  • the novel formwork system which as previously mentioned is especially designed to be manufactured mainly from plastics, is essentially formed from two parallel surfaces, between which the rebar is installed, leaving the gap between them prepared for pouring the fresh concrete therein.
  • Each of said surfaces consists of a plurality of hollow and identical slats which, according to the type of construction for which they are intended, can be slightly longitudinally curved, for example for making curved surfaces, or they can be flat and suitable in number so as to form the appropriate structure, being joined longitudinally to one another, which slats, preferably made of plastic, are obtained by means of extrusion; therefore the length or width thereof will not be restricted, being able to be cut according to if one size or another is required, depending on the width of the structure to be built.
  • Said slats are joined to one another by means of tonguing and grooving the respective ends thereof, which slats have a specially studied configuration so as to allow them to be distanced with respect to one another and, if needed, so that they can rotate with respect to one another up to a certain point as a result of the configuration of their ends and of the relative flexibility of the plastic from which they are made, thus exactly adjusting the length of the parallel surfaces to the length required to be able to form the different structures in each case.
  • the special geometry of the described slats furthermore and advantageously allows transporting them individually or as a group by winding the surface, formed by longitudinally joining the appropriate number of slats, in the form of a spiral.
  • the invention provides placing between each of them and at different levels a series of separating elements which furthermore act increasing the rigidity of the assembly.
  • Said separating elements made up of a tubular body, the length of which will determine the thickness of the wall to be built, have at each of their ends a threaded area suitable for inserting a nut in order to fix them to the corresponding slats, having the particularity of having in their central part one or two appendages generated therefrom in an inclined manner that are especially intended to serve as a support and secure the inner mesh or rebar which is located between the described parallel surfaces.
  • each of the slats forming the parallel surfaces of the formwork is secured to the ground by means of special U-shaped parts which will be fixed to said ground by means of conventional systems, inside which there is a threaded rod which allows adjusting the distance existing between said rod and one of the walls of the corresponding slat, clamping it and leaving it completely in register.
  • the invention additionally provides for the use of inner elements arranged diametrically, specifically metal bars the length of which will be defined by the size of the tank in each case, having flat surfaces at their ends which allow them to be secured to the inner surface of the formwork, which will aid in preventing the inner surface from collapsing towards the center and the outer surface from collapsing outwardly through the mentioned separating elements, which situation will be especially critical during the process of pouring the concrete and less important during the concrete setting phase.
  • said bars will be secured to the ground in an inclined manner on both sides thereof.
  • the slats can be fixed by means of an inner metal structure formed by rings fixed to vertical posts, the lower ring being fixed to the ground by means of a crosspiece, and externally incorporating outer bands which prevent the slats forming the outer surface of the formwork from collapsing outwardly.
  • the invention provides for the use of other slats with a trapezoidal configuration and special design suitable for being fixed laterally to one another until forming a conical covering in order to subsequently deposit the concrete.
  • the novel permanent plastic formwork system accordingly represents an innovative structure with structural and constitutional features that have been unknown up until now for such purpose, which reasons, combined with its practical use, provide it with sufficient basis to be granted the exclusive privilege that is sought.
  • FIG. 1 shows a perspective view of an embodiment of the novel permanent plastic formwork system according to the invention, using as an example the embodiment of a cylindrical tank, in which the main parts and elements it comprises as well as the configuration and arrangement thereof are observed.
  • FIG. 2-A shows a plan view of the slats forming the parallel inner and outer surfaces.
  • FIGS. 2-B and 2 -C show respective details of the reinforcing metal section introduced inside the slats and of the configuration of the tongued-and-grooved ends of the latter.
  • FIG. 3 shows a side elevational view of the slat.
  • FIGS. 4-A and 4 -B show in detail the two possible positions for joining the slats.
  • FIG. 5 shows a perspective view of the configuration of the separators.
  • FIG. 6 shows a detail view of the manner of joining the parallel surfaces with the separators by means of nuts as well as the support of the rebar mesh therein.
  • FIGS. 7 and 8 respectively show a perspective view of the configuration of the U-shaped parts and the manner of securing the slats to them.
  • FIG. 9 shows a perspective view of the configuration of the bars for additional inner support for the case of closed structures, such as the cylindrical structure used as an example.
  • FIGS. 10-A and 10 -B respectively show respective upper and lower perspective views of an embodiment of the slat intended for construction of conical coverings.
  • FIG. 11 shows a perspective view of the alternative variant of the separating element with two appendages.
  • FIG. 12 shows a perspective view of the alternative embodiment of the inner metal structure for building circular structures.
  • FIG. 13 shows a detail of the T-shaped configuration of the end of the crosspiece of the structure depicted in FIG. 12 .
  • FIG. 14 shows a detail of the configuration of the pins fixing the rings to the posts in the metal structure shown in FIG. 12 .
  • FIG. 15 shows a perspective view of the formwork built by means of the metal structure and external coupling of reinforcing bands option.
  • the formwork system in question is essentially formed from two parallel surfaces (cylindrical and concentric surfaces in the case of the depicted example as it is a circular tank), an outer surface ( 1 ) and an inner surface ( 2 ), between which there is installed a rebar mesh ( 3 ), leaving the gap between them prepared for pouring the fresh concrete therein.
  • Each of said surfaces ( 1 ) and ( 2 ) consists of a plurality of hollow slats ( 4 ) ( FIGS. 2-A , 2 -B, 2 -C and 3 ) preferably made of plastic and obtained by means of extrusion, provided with inner reinforcing partition walls, between which metal sections ( 13 ) are incorporated, as is observed in the detail of FIG. 2-B .
  • the slats ( 4 ) are all identical, flat or slightly longitudinally curved according to the type of structure to be built, the number of which will be suitable to form, in this case, the appropriate circumference, and are joined longitudinally to one another by means of the respective tongued-and-grooved ends ( 4 a ) and ( 4 b ) they have, allowing engagement in the contiguous slat.
  • said ends have the male end ( 4 a ), an inner arrow shape ( 14 ) arranged between respective longer walls ( 15 ) bent at their ends ( 16 ), a design which is especially studied to engage with certain flexibility, in two different positions, a more open position and a more closed position, whichever is suitable, as observed in FIGS.
  • the invention provides placing between each of the mentioned slats ( 4 ) forming it and at different levels a series of separating elements or separators ( 5 ), depicted in FIG.
  • the described separating element ( 5 ), as it is observed in FIG. 11 , has in its central area two appendages ( 8 ) arranged perpendicularly, such that one is secured to the horizontal rods of the mesh ( 3 ) and the other one to the vertical rods, and their threaded ends are hollow to receive screws ( 26 ), instead of nuts ( 7 ), for fixing them, furthermore having a flat configuration in the lower part of the tubular body forming it provided with a notch ( 27 ) suitable for resting in the lower gasket ( 28 ) which will be described below.
  • each of the slats ( 4 ) forming the surfaces ( 1 ) and ( 2 ) of the formwork is fixed to the ground by means of U-shaped parts ( 9 ), shown in FIG. 7 , which will be fixed to said ground by means of conventional systems, inside which there is a threaded rod ( 10 ) which allows adjusting the distance existing between said rod and one of the walls of the corresponding slat, clamping it and leaving it completely in register, as shown in FIG. 8 .
  • the invention additionally provides for the use of inner elements arranged diametrically, such as metal bars ( 11 ) the length of which will be defined by the inner diameter of the inner surface ( 2 ), having flat surfaces ( 12 ) at their ends which allow them to be secured thereto ( FIGS. 1 and 9 ), which optionally for longitudinal structures are suitable for being secured in an inclined manner on both surfaces ( 1 ) and ( 2 ) and against the ground.
  • inner elements arranged diametrically, such as metal bars ( 11 ) the length of which will be defined by the inner diameter of the inner surface ( 2 ), having flat surfaces ( 12 ) at their ends which allow them to be secured thereto ( FIGS. 1 and 9 ), which optionally for longitudinal structures are suitable for being secured in an inclined manner on both surfaces ( 1 ) and ( 2 ) and against the ground.
  • the process for assembling the assembly on which the concrete will be poured thus first consists of placing the U-shaped parts ( 9 ), following the necessary line or circumference depending on the size and shape of the structure to be built, being placed and fixed by means of conventional systems directly on the slab of the floor, having a fixed position therein, both those parts serving for securing to the outer surface ( 1 ) and those serving for securing to the inner surface ( 2 ) being placed at the same time.
  • the slats ( 4 ) forming the outer surface ( 1 ) are placed, successively engaging them with the contiguous slat by means of the respective insertion of the male ends ( 4 a ) and female ends ( 4 b ) in the most suitable position out of the two possible positions.
  • the rebar mesh ( 3 ) With the outer surface ( 1 ) completely formed, the rebar mesh ( 3 ) is placed thereon, securing it on the appendages ( 8 ) of each of the separators ( 5 ) which will also be inserted in each of the slats ( 4 ) forming the outer surface ( 1 ) while advancing in the placement of the mesh ( 3 ), said separators furthermore being fixed by means of nuts ( 7 ) from the outer side of the slats ( 4 ).
  • the metal bars ( 11 ) can be placed diametrically, where appropriate, inside the formed cylinder to increase resistance during the process of pouring and the setting of the concrete, which will have a length defined for each tank size, being fixed to the inner cylindrical surface ( 2 ) by means of flat surfaces ( 12 ) such that the load they support is compression.
  • the concreting process will be carried out, pouring the concrete in the gap or space remaining between the parallel surfaces ( 1 ) and ( 2 ), which will preferably be done from different points, allowing it to settle and vibrating it when considered appropriate.
  • the formwork can be removed, following the described steps in the reverse order and finally eliminating the threaded area ( 6 ) of the separators ( 5 ) which, after extracting the nuts ( 7 ), will project inside and outside the walls of the structure, the surface thus being smooth and the body thereof prepared for placing the dome, where appropriate.
  • the slats ( 4 ) have a circular trapezium configuration, being able to longitudinally be slightly curved, like those used for building circular structures, being provided at the lower parts with reinforcing ribs ( 19 ), such that the consecutive joining of a certain number of them by means of engaging the open sections ( 20 ) they have on one of their sides in the recesses ( 21 ) they have on the opposite side, forms a cone frustum.
  • Said slats ( 4 ) are coupled at the upper part by means of the flanges ( 24 ) which they have on their smaller sides, which overlap and are fixed by means of screwing to a ring ( 25 ), and at the lower part by means of the flanges ( 22 ) provided on their larger sides, provided with gaps ( 23 ) in the parallel surfaces ( 1 ) and ( 2 ) forming the tank or structure to be covered, fixed thereto by means of U-shaped joining parts ( 9 ), and to one another by means of separators ( 5 ) with the incorporation of the corresponding rebar mesh ( 3 ), then pouring the concrete so that it can set in the same way as that previously described, forming a perfect frustoconical covering once the formwork is removed.
  • the invention provides in order to assure the resistance of the formwork during the process of pouring the concrete for replacing the bars ( 11 ) with an inner metal structure ( FIG. 12 ), i.e. it will be located on the inner part of the inner surface ( 2 ), consisting of a plurality of circular rings ( 29 ), formed by sections of L-shaped flat surfaces fixed horizontally every certain space to vertical posts ( 31 ) by means of pins ( 30 ), the lower ring ( 29 ) being fixed to the ground by means of a crosspiece ( 32 ), at the T-shaped ends ( 33 ) of which, shown in FIG. 13 , there are coupled four of the aforesaid posts ( 31 ), diametrically opposite two by two, since these posts consist of quadrangular tubes engaging on said T-shaped ends ( 33 ).
  • the mentioned pins ( 30 ) fixing each ring ( 29 ) to the posts ( 31 ) consist of L-shaped flat surfaces, or angle irons, provided with a bracket ( 34 ) incorporating a hole ( 35 ) suitable for a bolt ( 36 ) or the pin itself, one being located on each side of the post ( 31 ) to join the ends of the sections of ring ( 29 ) thereto.
  • Said rings ( 29 ), are provided with holes ( 37 ) suitable for receiving the screws ( 26 ) which will fix the separators ( 5 ), or alternatively the threaded ends ( 6 ) of said separators which will be fixed by means of the corresponding nut ( 7 ), according to the type of separator that is used.
  • the invention provides for the coupling on external reinforcing bands ( 38 ) on the outer part of the slats ( 4 ) forming the outer surface ( 1 ), which prevent the outward collapse of said surface during the process of pouring the concrete ( FIG. 15 ).
  • the process for assembling the formwork system consists of fixing the crosspiece ( 32 ) and the four posts ( 31 ) on its T-shaped ends ( 33 ), then placing the first of the rings ( 29 ) or lower ring flush with the ground and equally fixed thereto.
  • the first slat ( 4 ) forming the inner surface ( 2 ) of the formwork is placed, placing therein the separators ( 5 ), optionally resting on a lower gasket ( 28 ) by means of the notch ( 27 ) provided in the alternative shape of said separators ( 5 ), as observed in FIG. 11 , and placing the mesh ( 3 ) secured to them by the appendages ( 8 ), after which the first of the slats ( 4 ) forming the outer surface ( 1 ) of the formwork will be placed, externally fixing the separators ( 5 ) whether with nuts ( 7 ) or screws ( 26 ), according to the type of separator.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present disclosure relates to a permanent plastic formwork system formed by two parallel surfaces, namely an outer surface and an inner surface, comprising a plurality of flat or longitudinally curved, hollow plastic slats obtained by means of extrusion, provided internally with a rebar mesh providing them with rigidity and joined longitudinally by means of tongued-and-grooved ends with separators existing between the two surfaces. The separators are provided with a threaded area and an inclined appendage for securing the rebar mesh located between the surfaces. The slats are secured to the ground using U-shaped parts containing a threaded rod that can be used to clamp and fix the same. In addition, in closed structures, reinforced internal elements can be incorporated diametrically, such as metal bars with flat surfaces at their ends enabling the same to be secured to the above-mentioned inner surface.

Description

    OBJECT OF THE INVENTION
  • As expressed in the title of the present specification, the invention relates to a permanent plastic formwork system, which provides the function for which it is intended with a series of novel features and advantages, in addition to other features and advantages inherent to its organization and formation, which will be described in detail below, involving an innovative and/or alternative improvement to the systems already known in this field for the same purpose.
  • More specifically, the object of the invention consists of a permanent formwork system, i.e., not reusable, designed to be manufactured mainly from plastics, intended for building structures of any shape and essentially formed from two parallel surfaces, advantageously formed by the longitudinal coupling of a plurality of hollow slats obtained by means of extrusion, which prevents the restriction or limitation of the length or width thereof, the rebar being installed between the mentioned parallel surfaces, which rebar is duly secured by means of placing special separating elements which in turn fix and assure the distance between both surfaces, leaving the gap between them prepared to pour therein the fresh concrete.
  • FIELD OF APPLICATION
  • The field of application of the present invention is the field of construction.
  • BACKGROUND OF THE INVENTION
  • As is known, formworks are generally formed of a frame formed by a set of metal or wood plates suitably arranged to receive the concrete which, when hardened, forms the walls or construction elements built with this material which, depending on the type of construction, will have one shape or another.
  • Today, and as a reference to the state of the art, it must be mentioned that different formwork systems are known for building different types of constructive elements, which, however, in most cases form elements which must be sized for each type of construction, being, according to what the sizes are, elements that are complex and heavy to handle, and even though they can be reused, they are expensive to manufacture.
  • It is therefore necessary to create a formwork system which, by means of standard elements that are easy and inexpensive to manufacture, and therefore low cost, allow building any type of structure regardless of the size or shape it must have, this being the main objective of the present invention, relating to which it should be mentioned on the other hand that the applicant does not know of the existence of any other permanent formwork system having technical, structural and constitutional or configuration features similar to those herein considered.
  • DESCRIPTION OF THE INVENTION
  • Therefore the formwork system proposed by the invention is by itself a novelty within its field, since due to its application a means is specifically achieved which provides considerable advantages for building any type of concrete structure because it is considerably more practical, effective and inexpensive, furthermore being quick and easy to install.
  • Specifically and to that end, the novel formwork system, which as previously mentioned is especially designed to be manufactured mainly from plastics, is essentially formed from two parallel surfaces, between which the rebar is installed, leaving the gap between them prepared for pouring the fresh concrete therein.
  • Each of said surfaces consists of a plurality of hollow and identical slats which, according to the type of construction for which they are intended, can be slightly longitudinally curved, for example for making curved surfaces, or they can be flat and suitable in number so as to form the appropriate structure, being joined longitudinally to one another, which slats, preferably made of plastic, are obtained by means of extrusion; therefore the length or width thereof will not be restricted, being able to be cut according to if one size or another is required, depending on the width of the structure to be built.
  • Said slats are joined to one another by means of tonguing and grooving the respective ends thereof, which slats have a specially studied configuration so as to allow them to be distanced with respect to one another and, if needed, so that they can rotate with respect to one another up to a certain point as a result of the configuration of their ends and of the relative flexibility of the plastic from which they are made, thus exactly adjusting the length of the parallel surfaces to the length required to be able to form the different structures in each case.
  • Also, and in order to prevent the plastic with which the slats are made from yielding albeit a millimeter, it has been provided to include inside said slat, which is hollow and provided with a series of longitudinal reinforcing partition walls internally dividing it into cells, metal sections which, adjusted to some of said cells, will provide the slats, and accordingly the structure of the formwork, with complete rigidity.
  • The special geometry of the described slats furthermore and advantageously allows transporting them individually or as a group by winding the surface, formed by longitudinally joining the appropriate number of slats, in the form of a spiral.
  • On the other hand, in order to assure that the distance between both parallel surfaces is maintained, the invention provides placing between each of them and at different levels a series of separating elements which furthermore act increasing the rigidity of the assembly.
  • Said separating elements, made up of a tubular body, the length of which will determine the thickness of the wall to be built, have at each of their ends a threaded area suitable for inserting a nut in order to fix them to the corresponding slats, having the particularity of having in their central part one or two appendages generated therefrom in an inclined manner that are especially intended to serve as a support and secure the inner mesh or rebar which is located between the described parallel surfaces.
  • In parallel, each of the slats forming the parallel surfaces of the formwork is secured to the ground by means of special U-shaped parts which will be fixed to said ground by means of conventional systems, inside which there is a threaded rod which allows adjusting the distance existing between said rod and one of the walls of the corresponding slat, clamping it and leaving it completely in register.
  • Also, and to assure the rigidity of the assembly, in the event of building closed structures, such as tanks or the like, the invention additionally provides for the use of inner elements arranged diametrically, specifically metal bars the length of which will be defined by the size of the tank in each case, having flat surfaces at their ends which allow them to be secured to the inner surface of the formwork, which will aid in preventing the inner surface from collapsing towards the center and the outer surface from collapsing outwardly through the mentioned separating elements, which situation will be especially critical during the process of pouring the concrete and less important during the concrete setting phase. In the event of building flat walls, said bars will be secured to the ground in an inclined manner on both sides thereof.
  • In an alternate embodiment of the invention, to build circular structures the slats can be fixed by means of an inner metal structure formed by rings fixed to vertical posts, the lower ring being fixed to the ground by means of a crosspiece, and externally incorporating outer bands which prevent the slats forming the outer surface of the formwork from collapsing outwardly.
  • Finally, to build the upper covering or dome in the case of building closed circular structures such as tanks or the like, the invention provides for the use of other slats with a trapezoidal configuration and special design suitable for being fixed laterally to one another until forming a conical covering in order to subsequently deposit the concrete.
  • The novel permanent plastic formwork system accordingly represents an innovative structure with structural and constitutional features that have been unknown up until now for such purpose, which reasons, combined with its practical use, provide it with sufficient basis to be granted the exclusive privilege that is sought.
  • DESCRIPTION OF THE DRAWINGS
  • To complement the description which is being made and for the purpose of aiding to better understand the features of the invention a set of drawings is attached to the present specification as an integral part thereof, in which the following has been depicted in an illustrative and non-limiting manner:
  • FIG. 1 shows a perspective view of an embodiment of the novel permanent plastic formwork system according to the invention, using as an example the embodiment of a cylindrical tank, in which the main parts and elements it comprises as well as the configuration and arrangement thereof are observed.
  • FIG. 2-A shows a plan view of the slats forming the parallel inner and outer surfaces.
  • FIGS. 2-B and 2-C show respective details of the reinforcing metal section introduced inside the slats and of the configuration of the tongued-and-grooved ends of the latter.
  • FIG. 3 shows a side elevational view of the slat.
  • FIGS. 4-A and 4-B show in detail the two possible positions for joining the slats.
  • FIG. 5 shows a perspective view of the configuration of the separators.
  • FIG. 6 shows a detail view of the manner of joining the parallel surfaces with the separators by means of nuts as well as the support of the rebar mesh therein.
  • FIGS. 7 and 8 respectively show a perspective view of the configuration of the U-shaped parts and the manner of securing the slats to them.
  • FIG. 9 shows a perspective view of the configuration of the bars for additional inner support for the case of closed structures, such as the cylindrical structure used as an example.
  • FIGS. 10-A and 10-B respectively show respective upper and lower perspective views of an embodiment of the slat intended for construction of conical coverings.
  • FIG. 11 shows a perspective view of the alternative variant of the separating element with two appendages.
  • FIG. 12 shows a perspective view of the alternative embodiment of the inner metal structure for building circular structures.
  • FIG. 13 shows a detail of the T-shaped configuration of the end of the crosspiece of the structure depicted in FIG. 12.
  • FIG. 14 shows a detail of the configuration of the pins fixing the rings to the posts in the metal structure shown in FIG. 12.
  • Lastly, FIG. 15 shows a perspective view of the formwork built by means of the metal structure and external coupling of reinforcing bands option.
  • PREFERRED EMBODIMENT OF THE INVENTION
  • In view of the mentioned figures and in accordance with the reference numbers used, a preferred embodiment of the permanent plastic formwork system comprising the parts indicated and described below can be seen therein.
  • Therefore, as observed in FIG. 1, the formwork system in question is essentially formed from two parallel surfaces (cylindrical and concentric surfaces in the case of the depicted example as it is a circular tank), an outer surface (1) and an inner surface (2), between which there is installed a rebar mesh (3), leaving the gap between them prepared for pouring the fresh concrete therein.
  • Each of said surfaces (1) and (2) consists of a plurality of hollow slats (4) (FIGS. 2-A, 2-B, 2-C and 3) preferably made of plastic and obtained by means of extrusion, provided with inner reinforcing partition walls, between which metal sections (13) are incorporated, as is observed in the detail of FIG. 2-B.
  • The slats (4) are all identical, flat or slightly longitudinally curved according to the type of structure to be built, the number of which will be suitable to form, in this case, the appropriate circumference, and are joined longitudinally to one another by means of the respective tongued-and-grooved ends (4 a) and (4 b) they have, allowing engagement in the contiguous slat.
  • As observed in FIG. 2-C, said ends have the male end (4 a), an inner arrow shape (14) arranged between respective longer walls (15) bent at their ends (16), a design which is especially studied to engage with certain flexibility, in two different positions, a more open position and a more closed position, whichever is suitable, as observed in FIGS. 4-A and 4-B, in the female end (4 b) of the contiguous slat, as a result of which said female end (4 b) has an arrow-shaped channel (17) suitable for receiving the aforesaid arrow (14) and two pairs of grooves (18) intended for the bent ends (16) of the male end (4 a) some of which are arranged closer to the end of the slat (4) and others of which are arranged more towards the inside, being able to move them apart or bring them closer to one another and, where appropriate, make them rotate slightly with respect to one another up to a certain limit angle, thus exactly adjusting the length and the diameter of the concentric or parallel surfaces (1) and (2) to the required length in order to be able to form the different diameters or structures needed in each case.
  • On the other hand, in order to assure that the distance between the parallel surfaces (1) and (2) is maintained, the invention provides placing between each of the mentioned slats (4) forming it and at different levels a series of separating elements or separators (5), depicted in FIG. 5, which further collaborate in increasing the rigidity of the assembly, made up of a tubular body, the length of which will determine the thickness of the wall, having at each of their ends a threaded area (6) suitable for inserting a nut (7) in order to fix them to the corresponding slats (4), with the particularity of having in their central part at least one appendage (8) generated therefrom in an inclined manner that is especially intended to serve as a support for securing the rebar mesh (3) which, as previously mentioned, is located between the described parallel surfaces (1) and (2), as can be observed in FIG. 6.
  • In an embodiment variant, the described separating element (5), as it is observed in FIG. 11, has in its central area two appendages (8) arranged perpendicularly, such that one is secured to the horizontal rods of the mesh (3) and the other one to the vertical rods, and their threaded ends are hollow to receive screws (26), instead of nuts (7), for fixing them, furthermore having a flat configuration in the lower part of the tubular body forming it provided with a notch (27) suitable for resting in the lower gasket (28) which will be described below.
  • In parallel, each of the slats (4) forming the surfaces (1) and (2) of the formwork is fixed to the ground by means of U-shaped parts (9), shown in FIG. 7, which will be fixed to said ground by means of conventional systems, inside which there is a threaded rod (10) which allows adjusting the distance existing between said rod and one of the walls of the corresponding slat, clamping it and leaving it completely in register, as shown in FIG. 8.
  • Also, and to assure the rigidity of the assembly, depending on the type of structure to be built, such as closed structures as is the case of the example used, the invention additionally provides for the use of inner elements arranged diametrically, such as metal bars (11) the length of which will be defined by the inner diameter of the inner surface (2), having flat surfaces (12) at their ends which allow them to be secured thereto (FIGS. 1 and 9), which optionally for longitudinal structures are suitable for being secured in an inclined manner on both surfaces (1) and (2) and against the ground.
  • The process for assembling the assembly on which the concrete will be poured thus first consists of placing the U-shaped parts (9), following the necessary line or circumference depending on the size and shape of the structure to be built, being placed and fixed by means of conventional systems directly on the slab of the floor, having a fixed position therein, both those parts serving for securing to the outer surface (1) and those serving for securing to the inner surface (2) being placed at the same time.
  • Once the position of the parts (9) is fixed, the slats (4) forming the outer surface (1) are placed, successively engaging them with the contiguous slat by means of the respective insertion of the male ends (4 a) and female ends (4 b) in the most suitable position out of the two possible positions.
  • With the outer surface (1) completely formed, the rebar mesh (3) is placed thereon, securing it on the appendages (8) of each of the separators (5) which will also be inserted in each of the slats (4) forming the outer surface (1) while advancing in the placement of the mesh (3), said separators furthermore being fixed by means of nuts (7) from the outer side of the slats (4).
  • A similar process will be followed to place the slats (4) forming the inner surface (2), assuring their fixing to the ground by means of the U-shaped parts (9) and introducing the opposite end of the separators (5) through them and equally fixed by means of nuts (7) at the inner face thereof, such that as a result of said separators both surfaces (1) and (2) are maintained parallel or coaxial (according to the type of structure) and fix the centered position of the rebar mesh (3) inside the thickness of the wall.
  • Once the assembly is assembled, the metal bars (11) can be placed diametrically, where appropriate, inside the formed cylinder to increase resistance during the process of pouring and the setting of the concrete, which will have a length defined for each tank size, being fixed to the inner cylindrical surface (2) by means of flat surfaces (12) such that the load they support is compression.
  • It should be indicated that the position of said bars (11) must be as uniform as possible so as to not cause overloads in any of the areas when others are reinforced, it not being necessary for them to all be placed at the same height since the force the concrete will exert will be greater in the lower part of the cylinder.
  • Finally, the concreting process will be carried out, pouring the concrete in the gap or space remaining between the parallel surfaces (1) and (2), which will preferably be done from different points, allowing it to settle and vibrating it when considered appropriate.
  • After the setting time of the concrete has elapsed, the formwork can be removed, following the described steps in the reverse order and finally eliminating the threaded area (6) of the separators (5) which, after extracting the nuts (7), will project inside and outside the walls of the structure, the surface thus being smooth and the body thereof prepared for placing the dome, where appropriate.
  • It must finally be pointed out that for building concrete domes intended to cover cylindrical tanks, as observed in FIGS. 10-A and 10-B, the slats (4) have a circular trapezium configuration, being able to longitudinally be slightly curved, like those used for building circular structures, being provided at the lower parts with reinforcing ribs (19), such that the consecutive joining of a certain number of them by means of engaging the open sections (20) they have on one of their sides in the recesses (21) they have on the opposite side, forms a cone frustum.
  • Said slats (4) are coupled at the upper part by means of the flanges (24) which they have on their smaller sides, which overlap and are fixed by means of screwing to a ring (25), and at the lower part by means of the flanges (22) provided on their larger sides, provided with gaps (23) in the parallel surfaces (1) and (2) forming the tank or structure to be covered, fixed thereto by means of U-shaped joining parts (9), and to one another by means of separators (5) with the incorporation of the corresponding rebar mesh (3), then pouring the concrete so that it can set in the same way as that previously described, forming a perfect frustoconical covering once the formwork is removed.
  • In an alternative embodiment variant of the invention especially intended for making circular structures, such as tanks or the like, the invention provides in order to assure the resistance of the formwork during the process of pouring the concrete for replacing the bars (11) with an inner metal structure (FIG. 12), i.e. it will be located on the inner part of the inner surface (2), consisting of a plurality of circular rings (29), formed by sections of L-shaped flat surfaces fixed horizontally every certain space to vertical posts (31) by means of pins (30), the lower ring (29) being fixed to the ground by means of a crosspiece (32), at the T-shaped ends (33) of which, shown in FIG. 13, there are coupled four of the aforesaid posts (31), diametrically opposite two by two, since these posts consist of quadrangular tubes engaging on said T-shaped ends (33).
  • For their part, as can be seen in the detail of FIG. 14 the mentioned pins (30) fixing each ring (29) to the posts (31) consist of L-shaped flat surfaces, or angle irons, provided with a bracket (34) incorporating a hole (35) suitable for a bolt (36) or the pin itself, one being located on each side of the post (31) to join the ends of the sections of ring (29) thereto.
  • Said rings (29), are provided with holes (37) suitable for receiving the screws (26) which will fix the separators (5), or alternatively the threaded ends (6) of said separators which will be fixed by means of the corresponding nut (7), according to the type of separator that is used.
  • Finally, the invention provides for the coupling on external reinforcing bands (38) on the outer part of the slats (4) forming the outer surface (1), which prevent the outward collapse of said surface during the process of pouring the concrete (FIG. 15).
  • Therefore, with this variant of embodiment, the process for assembling the formwork system consists of fixing the crosspiece (32) and the four posts (31) on its T-shaped ends (33), then placing the first of the rings (29) or lower ring flush with the ground and equally fixed thereto.
  • Then the remaining posts (31) are placed, the other rings (29) being fixed therein by means of the corresponding pins (30).
  • Once said structure is assembled, the first slat (4) forming the inner surface (2) of the formwork is placed, placing therein the separators (5), optionally resting on a lower gasket (28) by means of the notch (27) provided in the alternative shape of said separators (5), as observed in FIG. 11, and placing the mesh (3) secured to them by the appendages (8), after which the first of the slats (4) forming the outer surface (1) of the formwork will be placed, externally fixing the separators (5) whether with nuts (7) or screws (26), according to the type of separator.
  • After this point the remaining elements will be placed following the same order until covering the entire structure up to the last slat (4) of the outer surface (1), at which time the outer reinforcing bands (38) will be placed to finally place said slat (4).
  • Having sufficiently described the nature of the invention as well as a way of putting it into practice, it is not considered necessary to extend the explanation so that any person skilled in the art can understand its scope and the advantages derived therefrom, stating for all intents that within its essential nature, other embodiments can be carried out which differ in detail from the embodiment indicated by way of example which will also be granted the protection that is sought provided that its essential principle is not altered, changed or modified.

Claims (13)

1. Permanent plastic formwork system, of the type made up of a frame consisting of two parallel surfaces, an outer surface (1) and an inner surface (2), between which there is installed a rebar mesh (3), leaving the gap between them prepared for pouring the fresh concrete therein which, when hardened, will form the walls of the structure to be built, said frame subsequently being suitably removed, characterized in that each of said parallel surfaces (1) and (2) consists of a plurality of slats (4) suitable in number so as to form the appropriate structure in each case, preferably made of plastic and obtained by means of extrusion, which slats are hollow and identical and are joined longitudinally to one another by means of the tongued-and-grooved ends (4 a) and (4 b) that they have.
2. Permanent plastic formwork system according to claim 1, characterized in that the male end (4 a) of the slats (4) have a inner arrow shape (14) arranged between respective longer walls (15) bent at their ends (16), and the female end (4 b) has an arrow-shaped channel (17), suitable for receiving the aforesaid arrow (14), and two pairs of grooves (18), some more outer grooves and some more inner grooves, intended to receive the bent ends (16) of the male end (4 a), to engage in two different positions, a more open position and a more closed position.
3. Permanent plastic formwork system according to claims 1 and 2, characterized in that it is provided that there are arranged between the parallel surfaces (1) and (2), between each of the mentioned slats (4) forming them and at different levels, a series of separating elements or separators (5); in that said separators (5) are made up of a tubular body, the length of which will determine the thickness of the wall, having at each of their ends a threaded area (6) suitable for inserting a nut (7) in order to fix them to the corresponding slats (4).
4. Permanent plastic formwork system according to claims 1 to 3, characterized in that the separating elements or separators (5) in the central part of the tubular body forming them have an appendage (8) generated therefrom in an inclined manner that is especially intended to serve as a support for securing the rebar mesh (3) which is located between the surfaces (1) and (2).
5. Permanent plastic formwork system according to claims 1 to 4, characterized in that the separators (5) alternately have in their central area two appendages (8) arranged perpendicularly; in that their threaded ends are hollow to receive screws (26); and in that they have a flat T-shaped configuration in the lower part of the tubular body forming them provided with a notch (27) suitable for resting on a lower gasket (28).
6. Permanent plastic formwork system according to claims 1 to 5, characterized in that each of the slats (4) forming the surfaces (1) and (2) of the formwork is secured to the ground by means of U-shaped parts (9) which are fixed to said ground by means of conventional systems, and inside which there is a threaded rod (10) which allows adjusting the distance existing between said rod (10) and one of the walls of the corresponding slat (4), clamping it and leaving it completely in register.
7. Permanent plastic formwork system according to claims 1 to 6, characterized in that depending on the type of structure to be built, the slats (4) can have a longitudinally flat configuration for making flat surfaces, or a slightly curved configuration for making curved or cylindrical surfaces.
8. Permanent plastic formwork system according to claims 1 to 7, characterized in that the slats (4) incorporate, inserted therein between their longitudinal reinforcing partition walls, metal sections (13) providing rigidity to the slat.
9. Permanent plastic formwork system according to claim 1, characterized in that to build conical coverings, in addition to being able to have a longitudinally flat or curved configuration, the slats (4) forming the surfaces (1) and (2) have an elevated T-shaped configuration in the form of a circular trapezium, having at their lower part reinforcing ribs (19) and having on one of their sides for their mutual coupling, open sections (20) engaging in recesses (21) provided on their opposite side, as well as flanges (22) in their larger sides, provided with gaps (23) allowing their coupling on the parallel surfaces (1) and (2) forming the tank or structure to be covered, and flanges (24) overlapping one another fixed to a ring (25) joining them together.
10. Permanent plastic formwork system according to claims 1 to 5 and 8, characterized in that in an alternative embodiment variant there is provided an inner metal structure, located in the inner part of the inner surface (2), consisting of a plurality of circular rings (29), formed by sections of L-shaped flat surfaces, fixed horizontally to vertical posts (31) every certain space by means of pins (30), the lower ring (29) being fixed to the ground by means of a crosspiece (32), at the T-shaped ends (33) of which there are coupled four of the aforesaid posts (31), diametrically opposite two by two, since the latter consist of quadrangular tubes engaging on said T-shaped ends (33).
11. Permanent plastic formwork system according to claim 10, characterized in that the pins (30) fixing each ring (29) to the posts (31) consist of L-shaped flat surfaces, or angle irons, provided with a bracket (34) incorporating a hole (35) suitable for a bolt (36) or the pin itself, one being located on each side of the post (31) to join the ends of the sections of ring (29) thereto.
12. Permanent plastic formwork system according to claims 10 and 11, characterized in that the rings (29) are provided with holes (37) suitable for receiving the screws (26) which will fix the separators (5), or alternatively the threaded ends (6) of said separators which will be fixed by means of the corresponding nut (7), according to the type of separator that is used.
13. Permanent plastic formwork system according to claims 1 to 12, characterized in that the coupling of external reinforcing bands (38) at the outer part of the slats (4) forming the outer surface (1) is provided.
US12/664,500 2007-06-13 2007-07-13 Permanent plastic formwork system Abandoned US20100154321A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ES200701635A ES2336516B1 (en) 2007-06-13 2007-06-13 WRAPPED SYSTEM OF PLASTIC MATERIAL.
ESP200701635 2007-06-13
PCT/ES2007/000422 WO2009024623A2 (en) 2007-06-13 2007-07-13 Permanent plastic formwork system

Publications (1)

Publication Number Publication Date
US20100154321A1 true US20100154321A1 (en) 2010-06-24

Family

ID=40378745

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/664,500 Abandoned US20100154321A1 (en) 2007-06-13 2007-07-13 Permanent plastic formwork system

Country Status (6)

Country Link
US (1) US20100154321A1 (en)
EP (1) EP2169133A2 (en)
BR (1) BRPI0721758A2 (en)
ES (1) ES2336516B1 (en)
MX (1) MX2009013537A (en)
WO (1) WO2009024623A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190136566A1 (en) * 2014-02-28 2019-05-09 University Of Maine System Board Of Trustees Hybrid concrete - composite tower for a wind turbine and method of manufacturing
US10306984B2 (en) * 2016-08-30 2019-06-04 The Boeing Company Toroidal support structures
US12448772B1 (en) * 2025-03-13 2025-10-21 O. B. Bersano Group Ltd Modular construction system for permanent formwork

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2816303C (en) 2007-11-09 2015-06-02 Cfs Concrete Forming Systems Inc. Connector components for form-work systems and methods for use of same
US8943774B2 (en) 2009-04-27 2015-02-03 Cfs Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
EP2376724B1 (en) 2009-01-07 2016-11-09 CFS Concrete Forming Systems Inc. Methods and apparatus for restoring, repairing, reinforcing and/or protecting structures using concrete
CA2751610C (en) 2009-02-18 2015-06-09 Cfs Concrete Forming Systems Inc. Clip-on connection system for stay-in-place form-work
WO2012003587A1 (en) 2010-07-06 2012-01-12 Cfs Concrete Forming Systems Inc. Push on system for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
WO2013075250A1 (en) 2011-11-24 2013-05-30 Cfs Concrete Forming Systems Inc. Stay-in-place formwork with anti-deformation panels
US10151119B2 (en) 2012-01-05 2018-12-11 Cfs Concrete Forming Systems Inc. Tool for making panel-to-panel connections for stay-in-place liners used to repair structures and methods for using same
CA2859607C (en) 2012-01-05 2016-10-11 Cfs Concrete Forming Systems Inc. Panel-to-panel connections for stay-in-place liners used to repair structures
US9315987B2 (en) 2012-01-05 2016-04-19 Cfs Concrete Forming Systems Inc. Systems for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures with locatable stand-off components
WO2015081445A1 (en) 2013-12-06 2015-06-11 Cfs Concrete Forming Systems Inc. Structure cladding trim components and methods for fabrication and use of same
WO2015130154A1 (en) * 2014-02-25 2015-09-03 Chávez Flores José Set of accessories which, when combined and assembled, form moulds for receiving concrete or the like, which are used to construct cubes such as slabs, pillars, enclosures, columns, trusses, linings and flagstones and/or roofs, in civil engineering works
EP4234844A3 (en) 2014-04-04 2023-09-27 CFS Concrete Forming Systems Inc. Liquid and gas-impermeable connections for panels of stay- in-place form-work systems
CN108463599B (en) 2015-12-31 2020-11-03 Cfs 混凝土模板系统公司 Structural lining device with adjustable width and tools therefor
WO2018184103A1 (en) 2017-04-03 2018-10-11 Cfs Concrete Forming Systems Inc. Longspan stay-in-place liners
US10301838B1 (en) * 2017-11-09 2019-05-28 Kach Inc. Metal skeleton for the reinforcement of vertically elongated concrete structures
EP3728763A4 (en) 2017-12-22 2021-10-13 CFS Concrete Forming Systems Inc. SNAP-ON SPACERS FOR RESTORING, REPAIRING, REINFORCING, PROTECTING, INSULATING AND / OR STRUCTURES
WO2020160684A1 (en) 2019-02-08 2020-08-13 Cfs Concrete Forming Systems Inc. Retainers for restoring, repairing, reinforcing, protecting, insulating and/or cladding structures
US11739525B2 (en) * 2020-11-10 2023-08-29 Forma Technologies Inc. Composite column formwork and method of use
WO2024196258A1 (en) * 2023-03-17 2024-09-26 Marina Solutions As A modular building element for a concrete structure, a concrete structure having a permanent framework comprising a plurality of modular building elements and a method for constructing such a concrete structure

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1197140A (en) * 1914-10-10 1916-09-05 Richard E Findlay Section or block for sewer or conduit construction.
US3710581A (en) * 1971-07-06 1973-01-16 Reynolds Metals Co Tubular construction
US4192107A (en) * 1978-05-30 1980-03-11 Farmland Industries, Inc. Conical roof structure
US4479334A (en) * 1981-12-17 1984-10-30 Goode John T Liner for tower silo and method of installing same
US4587893A (en) * 1985-09-03 1986-05-13 Stormor, Inc. Grain drying bin
US4730427A (en) * 1985-05-28 1988-03-15 Compagnie Francois D'entreprises Cfe S.A. Shuttering and shoring wall
US4756033A (en) * 1985-02-21 1988-07-12 Schelfhorst Hendrik W Reservoir for placing in a fixed position on the ground and method for manufacturing same
US4915345A (en) * 1987-12-18 1990-04-10 Symons Corporation Concrete forming system for curved walls
US5595038A (en) * 1995-03-21 1997-01-21 Prestenback; Alfred Construction modules
US5704180A (en) * 1994-05-10 1998-01-06 Wallsystems International Ltd. Insulating concrete form utilizing interlocking foam panels
US6247280B1 (en) * 1999-04-23 2001-06-19 The Dow Chemical Company Insulated wall construction and forms and method for making same
US6314701B1 (en) * 1998-02-09 2001-11-13 Steven C. Meyerson Construction panel and method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB671300A (en) * 1949-11-24 1952-04-30 James Finlay & Company Ltd Shuttering system
FR2573116A1 (en) * 1984-11-14 1986-05-16 Bach Philippe Swimming pool partition having modular panels
JP2001132226A (en) * 1999-10-29 2001-05-15 Mamoru Shinohara Concrete form panel prepared by utilizing waste plastic
GB2367308A (en) * 2000-07-31 2002-04-03 John Caradoc Letton Prefabricated form for constructing walls
US6739102B2 (en) * 2001-09-21 2004-05-25 Marc Roy, Sr. Method and apparatus for forming a concrete foundation wall
JP4171677B2 (en) * 2003-08-08 2008-10-22 サンライフ有限会社 Method for constructing dome house and segment groove processing apparatus
EP1538273A1 (en) * 2003-12-05 2005-06-08 Florent Bahri Element of prefabricated permanent workform, module obtained with this workform element and structure made of such modules

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1197140A (en) * 1914-10-10 1916-09-05 Richard E Findlay Section or block for sewer or conduit construction.
US3710581A (en) * 1971-07-06 1973-01-16 Reynolds Metals Co Tubular construction
US4192107A (en) * 1978-05-30 1980-03-11 Farmland Industries, Inc. Conical roof structure
US4479334A (en) * 1981-12-17 1984-10-30 Goode John T Liner for tower silo and method of installing same
US4756033A (en) * 1985-02-21 1988-07-12 Schelfhorst Hendrik W Reservoir for placing in a fixed position on the ground and method for manufacturing same
US4730427A (en) * 1985-05-28 1988-03-15 Compagnie Francois D'entreprises Cfe S.A. Shuttering and shoring wall
US4587893A (en) * 1985-09-03 1986-05-13 Stormor, Inc. Grain drying bin
US4915345A (en) * 1987-12-18 1990-04-10 Symons Corporation Concrete forming system for curved walls
US5704180A (en) * 1994-05-10 1998-01-06 Wallsystems International Ltd. Insulating concrete form utilizing interlocking foam panels
US5595038A (en) * 1995-03-21 1997-01-21 Prestenback; Alfred Construction modules
US6314701B1 (en) * 1998-02-09 2001-11-13 Steven C. Meyerson Construction panel and method
US6247280B1 (en) * 1999-04-23 2001-06-19 The Dow Chemical Company Insulated wall construction and forms and method for making same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190136566A1 (en) * 2014-02-28 2019-05-09 University Of Maine System Board Of Trustees Hybrid concrete - composite tower for a wind turbine and method of manufacturing
US10519685B2 (en) * 2014-02-28 2019-12-31 University Of Maine System Board Of Trustees Hybrid concrete-composite tower for a wind turbine and method of manufacturing
US10306984B2 (en) * 2016-08-30 2019-06-04 The Boeing Company Toroidal support structures
US12448772B1 (en) * 2025-03-13 2025-10-21 O. B. Bersano Group Ltd Modular construction system for permanent formwork

Also Published As

Publication number Publication date
BRPI0721758A2 (en) 2013-04-02
WO2009024623A3 (en) 2009-05-28
ES2336516B1 (en) 2011-03-11
ES2336516A1 (en) 2010-04-13
MX2009013537A (en) 2010-03-15
EP2169133A2 (en) 2010-03-31
WO2009024623A2 (en) 2009-02-26

Similar Documents

Publication Publication Date Title
US20100154321A1 (en) Permanent plastic formwork system
US8646236B2 (en) Interlocking web for insulated concrete forms
KR20170014570A (en) Building Construction Method Using PC Wall With Foundation Structure
US10954662B1 (en) System and method for connecting a square concrete-filled steel tubular column to a reinforced concrete footing
US9091068B2 (en) Wall construction system, wall stud, and method of installation
KR101615200B1 (en) Splice Sleeve And Conclusion Method Thereof
WO2019207345A1 (en) Variable crosssectional formwork for buiding an annular concrete tower
US20180313065A1 (en) Storage tank and method for constructing same
JP2024020498A (en) Construction method of dome-shaped building made of concrete
US10954672B2 (en) Method of connecting a circular concrete-filled steel tubular column to a reinforced concrete footing
JP5484288B2 (en) Column foundations such as carports and terraces, column foundation construction methods and precast concrete blocks
EP1447496B1 (en) Reusable modular formwork for making columns
WO2008052282A1 (en) A building block
KR20100023228A (en) Flat tie
KR102314546B1 (en) Reinforcing structure for Column and Beam
US20170016237A1 (en) Assembly and Method for Creating a Wall from a Flowable Material
KR100774885B1 (en) Prefabricated anchor bolt structure embedded in the foundation structure and construction method of the foundation structure using the same
KR100612938B1 (en) Wall and slab construction system and construction method using the same
RU2820789C1 (en) Device for connection of building blocks during erection of walls
RU2819571C1 (en) Building block
RU2826619C1 (en) Method of erecting walls
AU2015410553B2 (en) A formwork panel assembly
KR20120131618A (en) Pile head reinforcement structure
JP3245443U (en) Dome-shaped building made of concrete
WO2009124092A2 (en) Interlocking bolted blocks and method of constructing walls

Legal Events

Date Code Title Description
AS Assignment

Owner name: ALPI SISTEMAS, S.L.,SPAIN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAVIERRE LARDIES, CARLOS;REEL/FRAME:023956/0304

Effective date: 20100201

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION