US20090249708A1 - Passenger Terminal Consisting of Mobile Room Units - Google Patents
Passenger Terminal Consisting of Mobile Room Units Download PDFInfo
- Publication number
- US20090249708A1 US20090249708A1 US12/085,532 US8553206A US2009249708A1 US 20090249708 A1 US20090249708 A1 US 20090249708A1 US 8553206 A US8553206 A US 8553206A US 2009249708 A1 US2009249708 A1 US 2009249708A1
- Authority
- US
- United States
- Prior art keywords
- terminal
- passenger
- room units
- modular
- passenger terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000010276 construction Methods 0.000 claims abstract description 44
- 238000000034 method Methods 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 238000009417 prefabrication Methods 0.000 claims description 8
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 4
- 230000001419 dependent effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 239000010865 sewage Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 235000013361 beverage Nutrition 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B64—AIRCRAFT; AVIATION; COSMONAUTICS
- B64F—GROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT; DESIGNING, MANUFACTURING, ASSEMBLING, CLEANING, MAINTAINING OR REPAIRING AIRCRAFT, NOT OTHERWISE PROVIDED FOR; HANDLING, TRANSPORTING, TESTING OR INSPECTING AIRCRAFT COMPONENTS, NOT OTHERWISE PROVIDED FOR
- B64F1/00—Ground or aircraft-carrier-deck installations
- B64F1/36—Other airport installations
- B64F1/368—Arrangements or installations for routing, distributing or loading baggage
Definitions
- the invention concerns a passenger terminal that consists of mobile room units. Passenger terminals are needed for airports and seaports as well as for large train stations, bus terminals, and the like.
- a passenger terminal of the type described here can be universally used but is described here basically for the example of an airport, especially an international airport.
- airport passenger terminals find themselves at the limits of their capacity, because the numbers of passengers are increasing sharply every year.
- safety equipment especially in international airports
- high baggage loading and unloading capacity and high passenger handling capacity there are increases in the requirements for safety equipment, especially in international airports, and in the demand for high baggage loading and unloading capacity and high passenger handling capacity.
- many terminals need to be modernized, which at present can usually be accomplished only by complete rebuilding.
- new construction or conventional additions are generally erected on site by conventional means.
- the weather-dependent realization of the terminal at the site of construction has a significant effect on the construction time and can lead to serious time delays, cost overruns, or revenue losses in the terminal facilities.
- a great deal of time and a large number of technical personnel are required for the technical development, since after completion of the building, the many interfaces must be tested on site, especially in the case of high-technology terminals.
- Modern terminals for example, the new airport in Bangkok or Terminal 2 at Munich Airport, are produced in glass and steel construction with suitably large and stable hollow sections, partly with the use of repeating skeleton grids.
- US 2005/0138867 A1 proposes the development of various ecological house types for a wide variety of applications. A component system or modular system is not disclosed.
- US 2003/0213184 A1 discloses the arrangement in an airport of similarly or identically designed search booths arranged singly or multiply side by side or one after the other for the inspection of baggage and personal security screening of passengers. Modular construction of prefabricated units is not disclosed.
- the document US 2002/0189173 A1 discloses a structural unit that can be prefabricated for a power supply or sewage disposal facility, which can be prefabricated as a complete module and shipped to a site where it is to be used.
- the modules can be equipped, alternatively or additively, with an electric power generating plant, a water supply plant, a sewage plant, or the like.
- Containers of this type can then be flanged, for example, onto residential buildings that are being erected on site if suitable interfaces are present.
- the present invention proceeds on the basis that a container of this type can be used for the primary power supply or waste disposal in combination with the invention that will be described here.
- the objective of the invention is to propose a passenger terminal and a manufacturing method for it, which can be delivered anywhere in the world and erected in the shortest possible time fully functional and ready for occupancy.
- the solution to the problem comprises, first of all, a passenger terminal of a type that typically finds use in international airports, which consists of mobile room units in modular construction. It contains all of the facilities necessary for passenger traffic, at least for the following terminal areas: passenger registration/check-in, arrival rooms, departure rooms, baggage handling, terminal-specific engineering, administration, building engineering, and can be prefabricated from modular, mutually complementary, inherently stable room units. It can be shipped by means of ordinary transport vehicles for standardized containers by land, by sea and by air to the predetermined construction site and can be assembled there in a short amount of time to produce a functional passenger terminal building according to a predetermined planning grid.
- room units are to be used which correspond in their length and width to a standard transport container in accordance with DIN/ISO standards and are standardized in their height for the application.
- a room unit is used which conforms essentially to a box container with the designation 1 C according to DIN/ISO.
- all room units are formed as rectangular solids and have a steel frame, not made of any desired type of sections, like box containers, but rather made of standardized hollow sections, for example, Mannesmann steel building construction sections of preferably rectangular cross section. Therefore, the room units consist above all of a frame of hollow sections, with the hollow sections forming the edges of the rectangular solids. According to requirements, floors or side walls or ceilings can be inserted, as is well known in the case of box containers.
- a steel frame of this type can also be used as a modular room unit in itself, for example, as a support structure for other room units to be placed on it or next to it.
- Room units of this type which can be prefabricated according to standard specifications in a factory, which is weather-independent, can then be shipped to a prepared site by customary means of transportation, namely, transport vehicles that are suitable for container transport.
- cargo handling technology is designed to unload containers of this type from one means of transportation, for example, a ship, to a railroad car, an airplane, or a truck and then to transport it further.
- the steel frames of the modules are computed on the basis of the static conditions according to the requirements to be placed on them as building parts, but they are also designed for dynamic loads during their shipment by the various means of transportation and possibly dynamic loads due to internal structures built into the modules.
- a small airport can be realized with modules of this type, or an airport can be expanded by a terminal, or a temporary airfield terminal can be erected after catastrophic events.
- a terminal building of this type basically consists of at least five functional areas, namely, passenger departure, passenger arrival, passenger check-in and baggage check-in, a public or commercial area, for example, for stores or waiting areas, and a wing for administration and technical units for the building and possibly for the terminal function in connection with the airport or seaport.
- the cited standards for containers include, for example, so-called 20-foot ISO shipping containers with a length of 20 feet or a good 6 meters and a width of about 8 feet or not quite 2.5 meters. In standardized container construction, these containers also have a height of about 8 feet. For buildings, a different height is selected, preferably, in the case of terminals, a height of about 3.20 m overall or 2.75 m inside height of the containers, which generally corresponds to the usual room heights in buildings of this type. Instead of 20-foot-long containers of the same width and height, it is also possible to use 30-foot or 40-foot containers in this invention.
- the gross weights are about 20, 25, or 30 metric tons, depending on the size of the container. These weights allow a sufficiently large useful load for complete prefabrication of the individual modules as fully functional units with corresponding interfaces to adjacent modules.
- a terminal generally consists of several levels, four example, four tiers and can be modularly assembled from the specified modules.
- the method for erecting a passenger terminal of this type comprises the following steps, which can be supplemented by additional steps:
- a terminal of this type all of the functional areas that are desired are built in, but at least the previously cited areas for passenger registration or check-in and baggage check-in, an arrival zone, a departure zone, and public and commercial areas for the sale of food and beverages or for other typical businesses for duty-free articles or travel needs, and terminal engineering, for example, the monitoring of runway navigation lights, the administration and building engineering, such as the whole power department and fire department, and the like;
- the functional areas are optimized to the size of the room units and suitable interfaces are provided between the room units, so that doors, windows, or power lines can be connected with each other in the right places and a high degree of prefabrication is possible;
- the room units are prefabricated and shipped to the construction site, completely equipped with functional components according to the subsequent purpose of use.
- the terminal building is modularly assembled from the modules.
- a terminal that has been prepared in this way can be enlarged by inserting or adding modules to the extent that the number of passengers that can be handled can be increased at will. It has been found that in the planning of terminals with an annual capacity of 500,000 passengers, expansion up to 5,000,000 passengers per year can be achieved without any problem. Larger terminals can also be produced, but then one should start from a prototype variant in which at least 1,000,000 or 3,000,000 passengers per year are intended in advance as users.
- the steel frames of the room units are computed in such a way that they can absorb all vertical loads from roof and ceiling structures, and the load can be diverted into room modules located next to it or below it and thus supported.
- the room units are also designed in such a way that they can meet requirements for transport by land, sea, or air.
- the prefabrication of the modules is realized parallel to the erection of the infrastructure and on the construction site.
- all interior finishing and technical facilities provided for in the planning stage are already installed in the modules during the prefabrication.
- Module-overlapping installations are prepared in such a way that they can be connected with little effort at the construction site, e.g., by compression joints, bolted joints, or crimp joints of the corresponding power lines.
- the furniture can already be completely installed in room units during the prefabrication; it is only necessary to secure these furnishings for shipment.
- the prefabricated modules are secured for shipment, weatherproofed, if necessary, and then sent to the construction site by suitable means of transportation.
- the shipping phase of the first modules the last modules are already being prefabricated at the factory and prepared for shipment.
- the inventors have determined that about 400 prefabricated modules can be produced in a month. Since only about 406 modules are required for the construction of a prototype of an airport terminal of the type to be described below, the entire building can be prefabricated within about one month.
- the individual room units such as modules
- the individual room units can be stacked on top of each other as soon as strip footings or the like are ready.
- the modules are joined either by bolting or by welding. This does not require any complicated assembly technique but rather only standard tools and a mobile crane that is capable of moving the heaviest modular unit to the location and to the height that is intended for it in the terminal building.
- the prepared power and infrastructure connections can be connected to the terminal, and then the terminal is ready for occupancy and operation.
- a facade or a roof can be installed on a terminal building that has been prefabricated in this way, for example, to realize a rear-ventilated facade in a desert climate or, when bad weather strikes, to have suitable means of collecting precipitation or absorbing cold.
- FIG. 1 shows the ground pan of the first floor of a terminal.
- FIG. 2 shows the ground plan of the second floor of the terminal
- FIG. 3 shows the ground plan of the third floor of the terminal.
- FIG. 4 shows the ground plan of the fourth floor of the terminal.
- FIG. 5 shows a top view of the roof of a terminal according to FIGS. 1 to 4 .
- FIG. 6 shows a view of the building along the grid line Aa in FIG. 1 .
- FIG. 7 shows a section between the axes Ah and Ai according to FIG. 1 .
- FIG. 8 shows a front view of the building along the grid axis A 18 according to FIG. 1 .
- FIG. 9 shows a rear view of the building along the grid axis A 1 according to FIG. 1 .
- FIG. 10 shows an enlarged view of FIG. 1 in the area of reference number 10 .
- FIG. 11 shows a section of the building on the second floor above the area of reference number 10 .
- FIG. 12 shows a detail drawing from the fifth floor between the grid axes Am and An and A 5 to A 7
- FIG. 13 shows an enlarged detail drawing from the fifth floor between the grid axes An-Ap and A 2 to A 4 .
- FIG. 14 shows standard frames of a prior-art box container.
- FIG. 1 shows the ground plan of the first floor of an embodiment of a terminal. As viewed from the bottom towards the top in FIG. 1 , the ground plan shows horizontal grid lines 1 to 18 and vertical alignment grid lines A to P. To the left of grid line A, another grid line Av is seen.
- the grid lines will also be called axes with the capital letter A and the following line number, and the capital letter A and an additional letter for the other grid axis.
- the fields between the points of intersection of the grid axes or grid lines correspond exactly to the ground plan of a standard container that conforms to ISO; in this case, the area between the grid lines is determined by the basic dimensions of a 20-foot container. Between the grid lines A and B, the distance is about 20 feet or 6.05 m, and the distance between, for example, the grid lines 16 and 15 is 8 feet or 2.45 m.
- FIGS. 8 and 9 show the story heights or heights of the room units. These heights correspond to an arbitrarily selected grid separation distance of 3.20 m, which results in an interior room height for each room unit or each module of 2.75 m.
- the entrance for the passengers passengers enter a public area 5 , to the right of which are found, for example, a travel agency counter 8 and a car rental counter 7 , and to the left of which is found, for example, a ticket counter 9 .
- the passenger can proceed to the check-in counters 6 , of which nine are shown here, and then to a security screening area and finally to the departure lounge 3 .
- the passenger can purchase travel necessities in a duty-free shop 14 or eat in a restaurant 15 .
- the flight When the flight is announced, he can pass through the assigned gate 12 to get to the air side 2 , at which, for example, an airplane to his destination is standing by. It is apparent that administration offices 13 must also be provided for employees who have work to do on the air side.
- the entrance 11 for arriving passengers is seen on the right side of FIG. 1 .
- the arriving passengers enter an arrival lounge 4 , where they pick up their baggage from baggage conveyor belts and are able to leave the building through the public area 5 , where they can also obtain a rental car at the car rental counter 7 .
- FIG. 2 shows the same planning grid as in FIG. 1 , but here there is no axis AAv, because the baggage conveyor belt in area 10 is present only on the first floor.
- engineering areas 17 are provided, as well as auxiliary areas for the restaurant or additional offices 16 along the entire front of the building on the land side 2 .
- the area 19 designates the crawl spaces above the departure lounge, and area 20 designates the crawl space above the arrival lounge.
- FIG. 3 shows the ground plan of the third floor of the terminal.
- Reference number 22 designates the ceiling spaces of the second floor, since on the second floor there are no room units above the departure lounge and the arrival lounge; only in area 21 an engineering bridge is present, which connects the engineering areas in FIG. 2 .
- FIG. 4 shows additional offices or administrative rooms 24 on the land side 2 , while on the air side 2 , this ground plan shows only the roof 22 over the arrival and departure lounges.
- FIG. 5 is a top view of the roof 22 and again shows the design of the terminal with the various grid axes.
- FIG. 6 shows a view of the terminal building along the grid line A in FIG. 1 , i.e., without the additional room units with the baggage conveyor belt
- FIG. 7 shows a section between the axes Ah and Ai according to FIG. 1 through the building from the air side 1 to the land side 2 .
- FIG. 8 shows the front view of the building from the air side, i.e., a view that corresponds to the grid axis A 18 .
- an installed facade is indicated, which can be used for lettering the building or for air conditioning the building.
- FIG. 9 shows a corresponding rear view of the building or the land side 1 of the terminal along the grid line 1 .
- FIG. 10 shows an enlarged view of area 10 with the add-on modules, namely, the room modules Z 1 to Z 8 .
- the baggage conveyor belt 25 is located in this area.
- FIG. 11 shows the same area but now in the second story; it is apparent that there is no additional projecting structure here, but rather only the ground plan of the terminal is to be seen in this area between the grid axes Aa to Ac and A 7 to A 14 .
- the lounge is spanned by a support system 26 .
- This support system was prefabricated in sections that are shorter than room units, so that they could be shipped in the empty containers/empty modules, for example, Z 1 to Z 8 , to the construction site, where they are used in the manner illustrated here as supports for the lounge roof over the departure area.
- FIG. 14 shows the frame R of a commercial prior-art box container without walls, ceiling, or floor.
- FIGS. 12 and 13 show enlarged sections of the terminal, specifically, from the fifth floor of the terminal.
- two room units/modules with the designations M 4 . 073 and M 4 . 057 are arranged side by side and together form a pantry on the left side and a restroom on the right side.
- Each individual module for example the module M 4 . 058 , consists of a square tubular frame, whose vertical supports are indicated by the reference number R 58 .
- the other edges of the container which are produced with the same type of construction as is seen in the prior art according to FIG. 14 , are not shown in FIG. 12 . In this case, the room unit M 4 . 058 or the module M 4 .
- FIG. 12 shows two adjacent modular units
- FIG. 13 the scale was reduced somewhat, so that four modular units M 4 . 014 , M 4 . 015 , M 4 . 029 , and M 4 . 030 are shown.
- These modular units are welded together on the tubular frame or hollow section frame in such a way that an office unit consisting of an office and a conference room is obtained, in which the furniture F was already completely installed during the manufacture of the room module. Only in the case of module M 4 . 029 , was it necessary, at the construction site, to move the piece of furniture F 1 into the position illustrated here in order to realize a suitable furniture arrangement.
- All of the room modules have room edges, which consist of square hollow sections of the type MSH 100 mm ⁇ 100 mm with wall thicknesses of 6-12 mm. These frames or module foundations are sufficiently stable that they are able to support static loads in the finished terminal and are also able to absorb dynamic stresses during shipment without any problem. It is clear to those who are skilled in the art that an assignment of the modules or containers in the manner shown in FIGS. 12 and 13 requires that the sides of the module, which have no walls, must be temporarily sealed in a weatherproof way at the factory, so that during shipment from the factory to the construction site, dirt cannot get into the modules unnecessarily.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Residential Or Office Buildings (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Tents Or Canopies (AREA)
- Mobile Radio Communication Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
- The invention concerns a passenger terminal that consists of mobile room units. Passenger terminals are needed for airports and seaports as well as for large train stations, bus terminals, and the like.
- A passenger terminal of the type described here can be universally used but is described here basically for the example of an airport, especially an international airport. Throughout the world, airport passenger terminals find themselves at the limits of their capacity, because the numbers of passengers are increasing sharply every year. Similarly, there are increases in the requirements for safety equipment, especially in international airports, and in the demand for high baggage loading and unloading capacity and high passenger handling capacity. Furthermore, many terminals need to be modernized, which at present can usually be accomplished only by complete rebuilding. To increase capacity or to modernize the arrival and departure areas of terminals, new construction or conventional additions are generally erected on site by conventional means. The weather-dependent realization of the terminal at the site of construction has a significant effect on the construction time and can lead to serious time delays, cost overruns, or revenue losses in the terminal facilities. In general, a great deal of time and a large number of technical personnel are required for the technical development, since after completion of the building, the many interfaces must be tested on site, especially in the case of high-technology terminals.
- Modern terminals, for example, the new airport in Bangkok or Terminal 2 at Munich Airport, are produced in glass and steel construction with suitably large and stable hollow sections, partly with the use of repeating skeleton grids.
- In construction engineering, a series of modular designs is known, each of which is used individually by itself, depending on the purpose of the building and the room design. The production of planning grids for assembling ground plans is well known. It is also known that parts, for example, of a residential building, can be prefabricated and used in a structure that is otherwise to be constructed on site. In the case of residential buildings, for example, those with wood panel construction, complete homes are prefabricated in a factory and delivered in the form of panels to the construction site, where they are then assembled according to the architectural plans. The construction of container villages on construction sites is also well known. They can be used for the construction crew as offices, housing units, and sanitary facilities. In rare cases, modules are prefabricated for hospitals or rooming houses. These modules are planned in a structural size that just allows them to be shipped to the construction site, for example, adjusted in height for the nearest bridge.
- US 2005/0138867 A1 proposes the development of various ecological house types for a wide variety of applications. A component system or modular system is not disclosed.
- US 2003/0213184 A1 discloses the arrangement in an airport of similarly or identically designed search booths arranged singly or multiply side by side or one after the other for the inspection of baggage and personal security screening of passengers. Modular construction of prefabricated units is not disclosed.
- The document US 2002/0189173 A1 discloses a structural unit that can be prefabricated for a power supply or sewage disposal facility, which can be prefabricated as a complete module and shipped to a site where it is to be used. The modules can be equipped, alternatively or additively, with an electric power generating plant, a water supply plant, a sewage plant, or the like. Containers of this type can then be flanged, for example, onto residential buildings that are being erected on site if suitable interfaces are present. The present invention proceeds on the basis that a container of this type can be used for the primary power supply or waste disposal in combination with the invention that will be described here.
- Taking the cited prior art as a point of departure, the objective of the invention is to propose a passenger terminal and a manufacturing method for it, which can be delivered anywhere in the world and erected in the shortest possible time fully functional and ready for occupancy.
- In accordance with the invention, this objective is achieved by the features of
1 and 13. Refinements of the invention are specified in the dependent claims.claims - The solution to the problem comprises, first of all, a passenger terminal of a type that typically finds use in international airports, which consists of mobile room units in modular construction. It contains all of the facilities necessary for passenger traffic, at least for the following terminal areas: passenger registration/check-in, arrival rooms, departure rooms, baggage handling, terminal-specific engineering, administration, building engineering, and can be prefabricated from modular, mutually complementary, inherently stable room units. It can be shipped by means of ordinary transport vehicles for standardized containers by land, by sea and by air to the predetermined construction site and can be assembled there in a short amount of time to produce a functional passenger terminal building according to a predetermined planning grid.
- In this regard, room units are to be used which correspond in their length and width to a standard transport container in accordance with DIN/ISO standards and are standardized in their height for the application. For example, a room unit is used which conforms essentially to a box container with the designation 1C according to DIN/ISO.
- In any case, all room units are formed as rectangular solids and have a steel frame, not made of any desired type of sections, like box containers, but rather made of standardized hollow sections, for example, Mannesmann steel building construction sections of preferably rectangular cross section. Therefore, the room units consist above all of a frame of hollow sections, with the hollow sections forming the edges of the rectangular solids. According to requirements, floors or side walls or ceilings can be inserted, as is well known in the case of box containers. However, a steel frame of this type can also be used as a modular room unit in itself, for example, as a support structure for other room units to be placed on it or next to it.
- Room units of this type, which can be prefabricated according to standard specifications in a factory, which is weather-independent, can then be shipped to a prepared site by customary means of transportation, namely, transport vehicles that are suitable for container transport. Throughout the world, cargo handling technology is designed to unload containers of this type from one means of transportation, for example, a ship, to a railroad car, an airplane, or a truck and then to transport it further. The steel frames of the modules are computed on the basis of the static conditions according to the requirements to be placed on them as building parts, but they are also designed for dynamic loads during their shipment by the various means of transportation and possibly dynamic loads due to internal structures built into the modules.
- In accordance with the invention, a small airport can be realized with modules of this type, or an airport can be expanded by a terminal, or a temporary airfield terminal can be erected after catastrophic events.
- A terminal building of this type basically consists of at least five functional areas, namely, passenger departure, passenger arrival, passenger check-in and baggage check-in, a public or commercial area, for example, for stores or waiting areas, and a wing for administration and technical units for the building and possibly for the terminal function in connection with the airport or seaport.
- The cited standards for containers include, for example, so-called 20-foot ISO shipping containers with a length of 20 feet or a good 6 meters and a width of about 8 feet or not quite 2.5 meters. In standardized container construction, these containers also have a height of about 8 feet. For buildings, a different height is selected, preferably, in the case of terminals, a height of about 3.20 m overall or 2.75 m inside height of the containers, which generally corresponds to the usual room heights in buildings of this type. Instead of 20-foot-long containers of the same width and height, it is also possible to use 30-foot or 40-foot containers in this invention. The gross weights (total allowable weights) are about 20, 25, or 30 metric tons, depending on the size of the container. These weights allow a sufficiently large useful load for complete prefabrication of the individual modules as fully functional units with corresponding interfaces to adjacent modules.
- A terminal generally consists of several levels, four example, four tiers and can be modularly assembled from the specified modules.
- The method for erecting a passenger terminal of this type comprises the following steps, which can be supplemented by additional steps:
- Construction of the terminal for a standard size with a very small assumed number of passengers, for example, 500,000 passengers per year.
- In a terminal of this type, all of the functional areas that are desired are built in, but at least the previously cited areas for passenger registration or check-in and baggage check-in, an arrival zone, a departure zone, and public and commercial areas for the sale of food and beverages or for other typical businesses for duty-free articles or travel needs, and terminal engineering, for example, the monitoring of runway navigation lights, the administration and building engineering, such as the whole power department and fire department, and the like;
- after this step, there is a planning division of the terminal horizontally in two axes and vertically in the third axis, i.e., all together, into a cubic grid or room units with lengths and widths that conform with DIN/ISO containers and with a height that is to be established or predetermined.
- Then the functional areas are optimized to the size of the room units and suitable interfaces are provided between the room units, so that doors, windows, or power lines can be connected with each other in the right places and a high degree of prefabrication is possible;
- the room units are prefabricated and shipped to the construction site, completely equipped with functional components according to the subsequent purpose of use.
- At the construction site, the terminal building is modularly assembled from the modules.
- In the meantime, during the manufacturing of the room units, all necessary power and infrastructure connections, such as streets and paths, lighting, etc., and foundations are independently prepared at the construction site for the terminal as far as interfaces at which they can be connected with the terminal building.
- A terminal that has been prepared in this way can be enlarged by inserting or adding modules to the extent that the number of passengers that can be handled can be increased at will. It has been found that in the planning of terminals with an annual capacity of 500,000 passengers, expansion up to 5,000,000 passengers per year can be achieved without any problem. Larger terminals can also be produced, but then one should start from a prototype variant in which at least 1,000,000 or 3,000,000 passengers per year are intended in advance as users.
- It is not necessary for all parts of the terminal building to consist of room units of this type. It is also possible to design lounge-like areas, such as waiting areas for passengers, as rooms without columns by spanning a room of this type in the building from one module to another. The load-bearing systems or steel beams and the like that are required for this spanning can be prefabricated in similar fashion to the modules and shipped to the building site or construction site by means of empty room units, which later have only a support function on site in the terminal.
- The steel frames of the room units are computed in such a way that they can absorb all vertical loads from roof and ceiling structures, and the load can be diverted into room modules located next to it or below it and thus supported. In this regard, the room units are also designed in such a way that they can meet requirements for transport by land, sea, or air.
- The first two steps of the method for erecting a passenger terminal were described above. In the third phase, the prefabrication of the modules is realized parallel to the erection of the infrastructure and on the construction site. In this regard, in the production sequence, all interior finishing and technical facilities provided for in the planning stage are already installed in the modules during the prefabrication. Module-overlapping installations are prepared in such a way that they can be connected with little effort at the construction site, e.g., by compression joints, bolted joints, or crimp joints of the corresponding power lines. Similarly, the furniture can already be completely installed in room units during the prefabrication; it is only necessary to secure these furnishings for shipment.
- In the fourth phase, the prefabricated modules are secured for shipment, weatherproofed, if necessary, and then sent to the construction site by suitable means of transportation. During the shipping phase of the first modules, the last modules are already being prefabricated at the factory and prepared for shipment. The inventors have determined that about 400 prefabricated modules can be produced in a month. Since only about 406 modules are required for the construction of a prototype of an airport terminal of the type to be described below, the entire building can be prefabricated within about one month.
- In the further production phase after preparation of the construction field at the construction site, the individual room units, such as modules, can be stacked on top of each other as soon as strip footings or the like are ready. The modules are joined either by bolting or by welding. This does not require any complicated assembly technique but rather only standard tools and a mobile crane that is capable of moving the heaviest modular unit to the location and to the height that is intended for it in the terminal building.
- Finally, in a seventh phase, the prepared power and infrastructure connections can be connected to the terminal, and then the terminal is ready for occupancy and operation.
- Naturally, this operational readiness requires that the completely prefabricated room units have already been tested and inspected at the prefabrication factory, so that there is no need for further testing, e.g., of lines, at the construction site.
- If necessary or desired, a facade or a roof can be installed on a terminal building that has been prefabricated in this way, for example, to realize a rear-ventilated facade in a desert climate or, when bad weather strikes, to have suitable means of collecting precipitation or absorbing cold.
- The invention is described in greater detail below with reference to a specific embodiment.
-
FIG. 1 shows the ground pan of the first floor of a terminal. -
FIG. 2 shows the ground plan of the second floor of the terminal -
FIG. 3 shows the ground plan of the third floor of the terminal. -
FIG. 4 shows the ground plan of the fourth floor of the terminal. -
FIG. 5 shows a top view of the roof of a terminal according toFIGS. 1 to 4 . -
FIG. 6 shows a view of the building along the grid line Aa inFIG. 1 . -
FIG. 7 shows a section between the axes Ah and Ai according toFIG. 1 . -
FIG. 8 shows a front view of the building along the grid axis A18 according toFIG. 1 . -
FIG. 9 shows a rear view of the building along the grid axis A1 according toFIG. 1 . -
FIG. 10 shows an enlarged view ofFIG. 1 in the area ofreference number 10. -
FIG. 11 shows a section of the building on the second floor above the area ofreference number 10. -
FIG. 12 shows a detail drawing from the fifth floor between the grid axes Am and An and A5 to A7 -
FIG. 13 shows an enlarged detail drawing from the fifth floor between the grid axes An-Ap and A2 to A4. -
FIG. 14 shows standard frames of a prior-art box container. - The entire building is divided by a horizontal grid with the
planning lines 1 to 18 and in the second axis with the grid lines A to P for all areas of the four floors. Thegrid lines 1 to 18 are separated by a distance equal to the width of a container, and the grid lines with the letters A to P are separated by a distance equal to the length of a container. In this case, the basic dimensions are those of a 20-foot container with a length of 6 m and a width of about 2.5 m.FIG. 1 shows the ground plan of the first floor of an embodiment of a terminal. As viewed from the bottom towards the top inFIG. 1 , the ground plan showshorizontal grid lines 1 to 18 and vertical alignment grid lines A to P. To the left of grid line A, another grid line Av is seen. In the discussion which follows, the grid lines will also be called axes with the capital letter A and the following line number, and the capital letter A and an additional letter for the other grid axis. The fields between the points of intersection of the grid axes or grid lines correspond exactly to the ground plan of a standard container that conforms to ISO; in this case, the area between the grid lines is determined by the basic dimensions of a 20-foot container. Between the grid lines A and B, the distance is about 20 feet or 6.05 m, and the distance between, for example, the 16 and 15 is 8 feet or 2.45 m.grid lines FIGS. 8 and 9 show the story heights or heights of the room units. These heights correspond to an arbitrarily selected grid separation distance of 3.20 m, which results in an interior room height for each room unit or each module of 2.75 m. - It is clearly seen that a room unit is assigned to each field between the grid lines. This is seen especially well in the enlarged views in
FIGS. 12 and 13 . - In the prototype definition of the planning grid for the airport, only the grid lines A1 to A18 and AA to AP were provided at first; all parts of the terminal are located within the grid lines with the exception of the
infrastructure access 11 for the terminal. On further consideration, it became apparent that it would be logical to expand the airport, with itsair side 1 and itsland side 2, where the passengers enter the terminal, with abaggage conveyor belt 10. Therefore, another grid line Aav was added between the grid lines A6 and A14, parallel to the grid line AA, and additional add-on modules Z1 to Z8 (FIG. 10 ), which house a baggage roller table 25. In this way, it is possible to house add-on modules in all places or on several floors, as those skilled in the art will recognize in the course of the specification. On theland side 2, the entrance for the passengers, passengers enter apublic area 5, to the right of which are found, for example, atravel agency counter 8 and acar rental counter 7, and to the left of which is found, for example, aticket counter 9. After picking up a ticket, the passenger can proceed to the check-incounters 6, of which nine are shown here, and then to a security screening area and finally to thedeparture lounge 3. Before departure, the passenger can purchase travel necessities in a duty-free shop 14 or eat in arestaurant 15. When the flight is announced, he can pass through the assignedgate 12 to get to theair side 2, at which, for example, an airplane to his destination is standing by. It is apparent thatadministration offices 13 must also be provided for employees who have work to do on the air side. Theentrance 11 for arriving passengers is seen on the right side ofFIG. 1 . The arriving passengers enter anarrival lounge 4, where they pick up their baggage from baggage conveyor belts and are able to leave the building through thepublic area 5, where they can also obtain a rental car at thecar rental counter 7. -
FIG. 2 shows the same planning grid as inFIG. 1 , but here there is no axis AAv, because the baggage conveyor belt inarea 10 is present only on the first floor. On the second floor,engineering areas 17 are provided, as well as auxiliary areas for the restaurant oradditional offices 16 along the entire front of the building on theland side 2. Thearea 19 designates the crawl spaces above the departure lounge, andarea 20 designates the crawl space above the arrival lounge. -
FIG. 3 shows the ground plan of the third floor of the terminal.Reference number 22 designates the ceiling spaces of the second floor, since on the second floor there are no room units above the departure lounge and the arrival lounge; only inarea 21 an engineering bridge is present, which connects the engineering areas inFIG. 2 . Numerous offices 23 for administration or other needs, for example, conference rooms, are provided on the land side. - Similarly,
FIG. 4 shows additional offices oradministrative rooms 24 on theland side 2, while on theair side 2, this ground plan shows only theroof 22 over the arrival and departure lounges. -
FIG. 5 is a top view of theroof 22 and again shows the design of the terminal with the various grid axes. -
FIG. 6 shows a view of the terminal building along the grid line A inFIG. 1 , i.e., without the additional room units with the baggage conveyor belt, whileFIG. 7 shows a section between the axes Ah and Ai according toFIG. 1 through the building from theair side 1 to theland side 2. It is clearly seen that, in the area of the departure lounge and the arrival lounge, the terminal has only two stories with theengineering bridge 21, while on the land side, the building has four stories and is covered by aroof 22/3. -
FIG. 8 shows the front view of the building from the air side, i.e., a view that corresponds to the grid axis A18. In the upper part of the building, an installed facade is indicated, which can be used for lettering the building or for air conditioning the building. -
FIG. 9 shows a corresponding rear view of the building or theland side 1 of the terminal along thegrid line 1. -
FIG. 10 shows an enlarged view ofarea 10 with the add-on modules, namely, the room modules Z1 to Z8. Thebaggage conveyor belt 25 is located in this area. After the planning of the prototype of the terminal, which was originally intended to extend only to axes Aa, this projecting construction was provided, for which reason another axis AAv between the grid lines A14 to A6 was planned. Z1 to Z8 each represent a room unit or a module. -
FIG. 11 shows the same area but now in the second story; it is apparent that there is no additional projecting structure here, but rather only the ground plan of the terminal is to be seen in this area between the grid axes Aa to Ac and A7 to A14. In the area of the departure lounge, whose air space can be seen on the second floor, it is seen that the lounge is spanned by asupport system 26. This support system was prefabricated in sections that are shorter than room units, so that they could be shipped in the empty containers/empty modules, for example, Z1 to Z8, to the construction site, where they are used in the manner illustrated here as supports for the lounge roof over the departure area. -
FIG. 14 shows the frame R of a commercial prior-art box container without walls, ceiling, or floor. -
FIGS. 12 and 13 show enlarged sections of the terminal, specifically, from the fifth floor of the terminal. InFIG. 12 , two room units/modules with the designations M4.073 and M4.057 are arranged side by side and together form a pantry on the left side and a restroom on the right side. Each individual module, for example the module M4.058, consists of a square tubular frame, whose vertical supports are indicated by the reference number R58. The other edges of the container, which are produced with the same type of construction as is seen in the prior art according toFIG. 14 , are not shown inFIG. 12 . In this case, the room unit M4.058 or the module M4.058 is located between the grid axes Am and An on one side, and between the grid lines A5 and A6 on the other side. The module M4.073 between the grid axes A6 and A7 abuts on it and is welded with it by welds on the tubular frames R58 and R73, so that the modules M4.058 and M4.073 are immovably connected with each other. This makes it possible first to install a pantry in the parts F2 and F3 in both modules at the factory, and then these built-in internal structures F2 and F3 need only be joined with each other at the construction site. The same applies to the interface through the restroom cell. Provision was already made at the factory regarding the places in which doors for the module M4.058 are to be installed and regarding the place in which a window was to be provided in module M4.073. - While
FIG. 12 shows two adjacent modular units, inFIG. 13 the scale was reduced somewhat, so that four modular units M4.014, M4.015, M4.029, and M4.030 are shown. These modular units are welded together on the tubular frame or hollow section frame in such a way that an office unit consisting of an office and a conference room is obtained, in which the furniture F was already completely installed during the manufacture of the room module. Only in the case of module M4.029, was it necessary, at the construction site, to move the piece of furniture F1 into the position illustrated here in order to realize a suitable furniture arrangement. - All of the room modules have room edges, which consist of square hollow sections of the type MSH 100 mm×100 mm with wall thicknesses of 6-12 mm. These frames or module foundations are sufficiently stable that they are able to support static loads in the finished terminal and are also able to absorb dynamic stresses during shipment without any problem. It is clear to those who are skilled in the art that an assignment of the modules or containers in the manner shown in
FIGS. 12 and 13 requires that the sides of the module, which have no walls, must be temporarily sealed in a weatherproof way at the factory, so that during shipment from the factory to the construction site, dirt cannot get into the modules unnecessarily. The restroom cell according toFIG. 12 is prepared in such a way that all of the water connections and power connections are already completely installed in the walls, ceilings, and floors, and only in the case of lines that extend beyond the room module, is it necessary to connect the power lines to an interface by suitable screw connections, compression connections or plug connections. -
- 1 air side
- 2 land side
- 3 departure
- 4 arrival
- 5 public area/entrance
- 6 check-in counter
- 7 car rental counter
- 8 travel agency counter
- 9 ticket counter
- 10 baggage arrival/departure
- 11 arrival entrance
- 12 departure exit
- 13 administration,
level 0 - 14 commercial area, departure (shops)
- 15 restaurant
- 16 offices
- 17 engineering area
- 18 restaurant auxiliary area
- 19 crawl space above departure lounge
- 20 crawl space above arrival lounge
- 21 engineering
- 22 roof surfaces
- 23 administration offices,
level 2 - 24 administration offices,
level 3 - 25 conveyor belt
- 26 support system
- F furniture
- Z add-on module
- Aa-p grid line
- A1-14 grid line
- M module
- R frame section
Claims (22)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE202005018751.8 | 2005-11-28 | ||
| DE202005018751U DE202005018751U1 (en) | 2005-11-28 | 2005-11-28 | Airport passenger terminal from mobile room units |
| PCT/EP2006/011414 WO2007060018A1 (en) | 2005-11-28 | 2006-11-28 | Passenger terminal consisting of mobile room units |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20090249708A1 true US20090249708A1 (en) | 2009-10-08 |
Family
ID=36500646
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US12/085,532 Abandoned US20090249708A1 (en) | 2005-11-28 | 2006-11-28 | Passenger Terminal Consisting of Mobile Room Units |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20090249708A1 (en) |
| EP (1) | EP2049398B1 (en) |
| AT (1) | ATE507146T1 (en) |
| DE (2) | DE202005018751U1 (en) |
| RU (1) | RU2008125980A (en) |
| WO (1) | WO2007060018A1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110209415A1 (en) * | 2010-02-26 | 2011-09-01 | Peter Lowes | Security Screening Facility |
| US20110258837A1 (en) * | 2008-12-23 | 2011-10-27 | Xoma Technology Ltd. | Flexible manufacturing system |
| US8707630B1 (en) * | 2010-11-01 | 2014-04-29 | Walgreen Co. | Pharmacy workspace with clinic station |
| US8776445B1 (en) * | 2010-11-01 | 2014-07-15 | Walgreen Co. | Pharmacy workspace |
| US20150101264A1 (en) * | 2013-10-14 | 2015-04-16 | G-Con Manufacturing Inc. | Unit for connecting modular mobile rooms |
| US10196809B2 (en) * | 2017-06-13 | 2019-02-05 | Hall Labs Llc | Modular building component for floor and ceiling with rod-based dimensions |
| EP3587278A1 (en) * | 2018-06-28 | 2020-01-01 | Bbhs A/S | A method and system for handling of luggage or parcel items |
| CN112012343A (en) * | 2020-08-28 | 2020-12-01 | 民航机场规划设计研究总院有限公司 | Boarding hall and processing method thereof |
| CN116122465A (en) * | 2022-12-28 | 2023-05-16 | 北京城建集团有限责任公司 | Back bolt connecting system based on stone curtain wall |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102013107342A1 (en) | 2013-07-11 | 2015-01-15 | Envirochemie Gmbh | Wastewater treatment plants |
| ES2644170B1 (en) * | 2016-05-27 | 2018-09-13 | Vicente PECHUAN VILAR | ROOM WITH INDEPENDENT REST CABINS |
Citations (61)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US475842A (en) * | 1892-05-31 | zog-mann | ||
| US3118187A (en) * | 1962-07-05 | 1964-01-21 | Smalltel Inc | Portable layover unit |
| US3541743A (en) * | 1968-08-16 | 1970-11-24 | Francis J Kness | Air terminal dock |
| US3553911A (en) * | 1968-10-17 | 1971-01-12 | Robert C Morrow | Compartment for the temporary use of travelers |
| US3562984A (en) * | 1969-02-04 | 1971-02-16 | William E Merle | Air rights building structure |
| US3659387A (en) * | 1970-04-06 | 1972-05-02 | Clyde C Pearson Jr | Building structure with elevators |
| US3696574A (en) * | 1968-11-22 | 1972-10-10 | Richard Dietrich | Building having a skeleton frame |
| US3712008A (en) * | 1970-10-16 | 1973-01-23 | T Georgiev | Modular building construction system |
| US3778528A (en) * | 1972-04-27 | 1973-12-11 | I Kushner | Modular building unit and method for making same |
| US3782063A (en) * | 1971-08-31 | 1974-01-01 | Housing Systems Corp | Expandable prefabricated building system and method of construction |
| US3846947A (en) * | 1973-11-19 | 1974-11-12 | Levitz Furniture Corp | Combination warehouse-retail sales facility |
| US3894373A (en) * | 1970-10-14 | 1975-07-15 | John H Willingham | Industrialized building construction |
| US3905167A (en) * | 1973-11-09 | 1975-09-16 | Berne A Watkins | Modularized building system |
| US3916588A (en) * | 1973-09-13 | 1975-11-04 | John W Magill | Integrated industrial and urban airport complex with passenger and fright handling facilities |
| US3921362A (en) * | 1974-03-18 | 1975-11-25 | Pablo Cortina Ortega | Method of and means for multi-story building construction |
| US3923134A (en) * | 1974-09-26 | 1975-12-02 | Reza Rezazadeh | Rest accommodation compartment and complex |
| US3991528A (en) * | 1971-05-12 | 1976-11-16 | Fce-Dillon, Inc. | Module elevator system for installation in a multi-story building |
| US4594817A (en) * | 1982-08-31 | 1986-06-17 | Mclaren Charles L | Modular sleeping units |
| US4640070A (en) * | 1986-03-21 | 1987-02-03 | Ian Moffat | Method of adding extra floors on existing buildings |
| US5026006A (en) * | 1989-02-22 | 1991-06-25 | Tinder Landon D | Safety enclosures and systems for high speed vehicles |
| US5111626A (en) * | 1990-10-22 | 1992-05-12 | Fortune Jeffrey L | Self-contained modular unit |
| US5203707A (en) * | 1992-01-06 | 1993-04-20 | Symtron Systems Inc | Modular fire trainer |
| US5487240A (en) * | 1993-10-12 | 1996-01-30 | Miller; Frederick H. | Compact sleeping unit |
| US5520275A (en) * | 1991-12-17 | 1996-05-28 | Gemplus Card International | Method and device for servicing a terminal |
| USD370982S (en) * | 1994-12-27 | 1996-06-18 | Shane Penny P | Traveler's quarters |
| US5598783A (en) * | 1995-06-07 | 1997-02-04 | Autran Corp. | Integrated transportation system including transfer vehicles |
| US5638646A (en) * | 1994-12-27 | 1997-06-17 | Shane; Penny Petersen | Traveler's quarters |
| US5692342A (en) * | 1996-11-05 | 1997-12-02 | Devlin, Jr.; Catherine F. | Open but secure travel center kiosk |
| US5742956A (en) * | 1996-12-18 | 1998-04-28 | Tarver; Alan | Modular bathroom unit |
| US5806248A (en) * | 1994-12-15 | 1998-09-15 | Kim; Sung Yoon | Multi-purpose quarters having a slidable cover with a pull-down bed |
| US5906075A (en) * | 1997-02-06 | 1999-05-25 | Sowers; John Mark | Modular building structure |
| US6073401A (en) * | 1996-06-18 | 2000-06-13 | Sekisui Kagaku Kogyo Kabushiki Kaisha | Building unit, unit building and method of constructing the same |
| US6141924A (en) * | 1996-09-25 | 2000-11-07 | Quaintance-Weaver Hotels, L.L.C. | Restaurant and hotel combination |
| US6393774B1 (en) * | 1998-12-07 | 2002-05-28 | John Sergio Fisher | Construction system for modular apartments, hotels and the like |
| US20020189173A1 (en) * | 1998-04-24 | 2002-12-19 | Staschik Udo Ingmar | Utilities container |
| US20030023456A1 (en) * | 2001-07-20 | 2003-01-30 | Dilollo Michael R. | System and method for enabling retail sales to international travellers |
| US20030061080A1 (en) * | 1994-04-12 | 2003-03-27 | Ross Richard Thomas | Check-in, queuing, visa, paging and assessment systems |
| US20030101680A1 (en) * | 2000-04-18 | 2003-06-05 | Lee Soo Haeng | Design and construction method for pre-fabricated high rise building attaching for environments and village community |
| US6578330B1 (en) * | 2002-01-17 | 2003-06-17 | George Bergman | Vertically stacked condominium units |
| US6609659B2 (en) * | 1997-06-24 | 2003-08-26 | Richard P. Sehr | Passport system and methods utilizing multi-application passport cards |
| US20030177045A1 (en) * | 2002-01-25 | 2003-09-18 | Matt Fitzgerald | System and method for processing trip requests |
| US20030215143A1 (en) * | 2002-05-20 | 2003-11-20 | Zakrzewski Radoslaw Romuald | Viewing a compartment |
| US20030213184A1 (en) * | 2002-05-19 | 2003-11-20 | Hunt Harry Summer | Multiple search booths at airports and transportation terminals |
| US6698147B2 (en) * | 2002-01-17 | 2004-03-02 | George Bergman | Vertically stacked condominium units |
| US6748704B2 (en) * | 2000-10-19 | 2004-06-15 | Renesas Technology Corp. | Factory layout |
| US6813777B1 (en) * | 1998-05-26 | 2004-11-02 | Rockwell Collins | Transaction dispatcher for a passenger entertainment system, method and article of manufacture |
| US20040237420A1 (en) * | 2001-05-25 | 2004-12-02 | Changqing Zhang | Insert type removable built model |
| US6826879B1 (en) * | 1999-02-19 | 2004-12-07 | Cathartes Investment | Modular building construction |
| US20050048987A1 (en) * | 2003-08-28 | 2005-03-03 | Glass Andrew C. | Multi-dimensional graphical display of discovered wireless devices |
| US20050138867A1 (en) * | 2001-12-31 | 2005-06-30 | Bing Zhao | Multifunctional tridimensional combined green building |
| US20050144857A1 (en) * | 2003-12-19 | 2005-07-07 | Fernando Guerrero | Modular building system |
| US6920721B2 (en) * | 2002-06-05 | 2005-07-26 | Adv-Tech Building Systems, Llc | Building system |
| US6926203B1 (en) * | 1997-06-24 | 2005-08-09 | Richard P. Sehr | Travel system and methods utilizing multi-application traveler devices |
| US6981347B1 (en) * | 2002-02-25 | 2006-01-03 | Randy Walburger | Modular emergency shelter system |
| US20060265971A1 (en) * | 2002-12-03 | 2006-11-30 | John Window | Modular building unit and method of assembly |
| US20070039253A1 (en) * | 2005-08-08 | 2007-02-22 | Roy Snowden | Small format retail business building |
| US20070230656A1 (en) * | 2003-09-10 | 2007-10-04 | Peter Lowes | Baggage Screening System |
| US7364119B2 (en) * | 2003-08-26 | 2008-04-29 | Airbus Deutschland Gmbh | Multipurpose passenger compartment in a cabin of a commercial passenger transport aircraft |
| US7469782B2 (en) * | 2005-07-22 | 2008-12-30 | Dew Engineering And Development Limited | Conveyor system for loading and unloading aircraft baggage |
| US7823337B2 (en) * | 2008-07-29 | 2010-11-02 | Green Horizon Manufacturing Llc | Deployable prefabricated structure with a nested extension structure |
| US7823338B2 (en) * | 2007-04-10 | 2010-11-02 | Modular Security Systems, Inc. | Modular access control system |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3885368A (en) * | 1973-03-07 | 1975-05-27 | Levingston Armadillo Inc | Prefabricated building structure |
| NZ188651A (en) * | 1977-11-01 | 1982-03-23 | Abex Corp | Airport passenger loading bridge |
| SE9202459L (en) * | 1992-08-27 | 1994-02-28 | Istvan Nemet | Portable, heat insulated and fully furnished housing module |
| IT1310881B1 (en) * | 1999-07-22 | 2002-02-22 | Matteo Soldera | MODULAR PANEL FOR THE CONSTRUCTION OF PREFABRICATED ROOMS AS CABINS FOR SHIPS, HOTEL ROOMS OR SIMILAR AND RELATED |
-
2005
- 2005-11-28 DE DE202005018751U patent/DE202005018751U1/en not_active Expired - Lifetime
-
2006
- 2006-11-28 WO PCT/EP2006/011414 patent/WO2007060018A1/en active Application Filing
- 2006-11-28 RU RU2008125980/11A patent/RU2008125980A/en not_active Application Discontinuation
- 2006-11-28 DE DE502006009416T patent/DE502006009416D1/en active Active
- 2006-11-28 AT AT06829161T patent/ATE507146T1/en active
- 2006-11-28 EP EP06829161A patent/EP2049398B1/en active Active
- 2006-11-28 US US12/085,532 patent/US20090249708A1/en not_active Abandoned
Patent Citations (61)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US475842A (en) * | 1892-05-31 | zog-mann | ||
| US3118187A (en) * | 1962-07-05 | 1964-01-21 | Smalltel Inc | Portable layover unit |
| US3541743A (en) * | 1968-08-16 | 1970-11-24 | Francis J Kness | Air terminal dock |
| US3553911A (en) * | 1968-10-17 | 1971-01-12 | Robert C Morrow | Compartment for the temporary use of travelers |
| US3696574A (en) * | 1968-11-22 | 1972-10-10 | Richard Dietrich | Building having a skeleton frame |
| US3562984A (en) * | 1969-02-04 | 1971-02-16 | William E Merle | Air rights building structure |
| US3659387A (en) * | 1970-04-06 | 1972-05-02 | Clyde C Pearson Jr | Building structure with elevators |
| US3894373A (en) * | 1970-10-14 | 1975-07-15 | John H Willingham | Industrialized building construction |
| US3712008A (en) * | 1970-10-16 | 1973-01-23 | T Georgiev | Modular building construction system |
| US3991528A (en) * | 1971-05-12 | 1976-11-16 | Fce-Dillon, Inc. | Module elevator system for installation in a multi-story building |
| US3782063A (en) * | 1971-08-31 | 1974-01-01 | Housing Systems Corp | Expandable prefabricated building system and method of construction |
| US3778528A (en) * | 1972-04-27 | 1973-12-11 | I Kushner | Modular building unit and method for making same |
| US3916588A (en) * | 1973-09-13 | 1975-11-04 | John W Magill | Integrated industrial and urban airport complex with passenger and fright handling facilities |
| US3905167A (en) * | 1973-11-09 | 1975-09-16 | Berne A Watkins | Modularized building system |
| US3846947A (en) * | 1973-11-19 | 1974-11-12 | Levitz Furniture Corp | Combination warehouse-retail sales facility |
| US3921362A (en) * | 1974-03-18 | 1975-11-25 | Pablo Cortina Ortega | Method of and means for multi-story building construction |
| US3923134A (en) * | 1974-09-26 | 1975-12-02 | Reza Rezazadeh | Rest accommodation compartment and complex |
| US4594817A (en) * | 1982-08-31 | 1986-06-17 | Mclaren Charles L | Modular sleeping units |
| US4640070A (en) * | 1986-03-21 | 1987-02-03 | Ian Moffat | Method of adding extra floors on existing buildings |
| US5026006A (en) * | 1989-02-22 | 1991-06-25 | Tinder Landon D | Safety enclosures and systems for high speed vehicles |
| US5111626A (en) * | 1990-10-22 | 1992-05-12 | Fortune Jeffrey L | Self-contained modular unit |
| US5520275A (en) * | 1991-12-17 | 1996-05-28 | Gemplus Card International | Method and device for servicing a terminal |
| US5203707A (en) * | 1992-01-06 | 1993-04-20 | Symtron Systems Inc | Modular fire trainer |
| US5487240A (en) * | 1993-10-12 | 1996-01-30 | Miller; Frederick H. | Compact sleeping unit |
| US20030061080A1 (en) * | 1994-04-12 | 2003-03-27 | Ross Richard Thomas | Check-in, queuing, visa, paging and assessment systems |
| US5806248A (en) * | 1994-12-15 | 1998-09-15 | Kim; Sung Yoon | Multi-purpose quarters having a slidable cover with a pull-down bed |
| USD370982S (en) * | 1994-12-27 | 1996-06-18 | Shane Penny P | Traveler's quarters |
| US5638646A (en) * | 1994-12-27 | 1997-06-17 | Shane; Penny Petersen | Traveler's quarters |
| US5598783A (en) * | 1995-06-07 | 1997-02-04 | Autran Corp. | Integrated transportation system including transfer vehicles |
| US6073401A (en) * | 1996-06-18 | 2000-06-13 | Sekisui Kagaku Kogyo Kabushiki Kaisha | Building unit, unit building and method of constructing the same |
| US6141924A (en) * | 1996-09-25 | 2000-11-07 | Quaintance-Weaver Hotels, L.L.C. | Restaurant and hotel combination |
| US5692342A (en) * | 1996-11-05 | 1997-12-02 | Devlin, Jr.; Catherine F. | Open but secure travel center kiosk |
| US5742956A (en) * | 1996-12-18 | 1998-04-28 | Tarver; Alan | Modular bathroom unit |
| US5906075A (en) * | 1997-02-06 | 1999-05-25 | Sowers; John Mark | Modular building structure |
| US6926203B1 (en) * | 1997-06-24 | 2005-08-09 | Richard P. Sehr | Travel system and methods utilizing multi-application traveler devices |
| US6609659B2 (en) * | 1997-06-24 | 2003-08-26 | Richard P. Sehr | Passport system and methods utilizing multi-application passport cards |
| US20020189173A1 (en) * | 1998-04-24 | 2002-12-19 | Staschik Udo Ingmar | Utilities container |
| US6813777B1 (en) * | 1998-05-26 | 2004-11-02 | Rockwell Collins | Transaction dispatcher for a passenger entertainment system, method and article of manufacture |
| US6393774B1 (en) * | 1998-12-07 | 2002-05-28 | John Sergio Fisher | Construction system for modular apartments, hotels and the like |
| US6826879B1 (en) * | 1999-02-19 | 2004-12-07 | Cathartes Investment | Modular building construction |
| US20030101680A1 (en) * | 2000-04-18 | 2003-06-05 | Lee Soo Haeng | Design and construction method for pre-fabricated high rise building attaching for environments and village community |
| US6748704B2 (en) * | 2000-10-19 | 2004-06-15 | Renesas Technology Corp. | Factory layout |
| US20040237420A1 (en) * | 2001-05-25 | 2004-12-02 | Changqing Zhang | Insert type removable built model |
| US20030023456A1 (en) * | 2001-07-20 | 2003-01-30 | Dilollo Michael R. | System and method for enabling retail sales to international travellers |
| US20050138867A1 (en) * | 2001-12-31 | 2005-06-30 | Bing Zhao | Multifunctional tridimensional combined green building |
| US6698147B2 (en) * | 2002-01-17 | 2004-03-02 | George Bergman | Vertically stacked condominium units |
| US6578330B1 (en) * | 2002-01-17 | 2003-06-17 | George Bergman | Vertically stacked condominium units |
| US20030177045A1 (en) * | 2002-01-25 | 2003-09-18 | Matt Fitzgerald | System and method for processing trip requests |
| US6981347B1 (en) * | 2002-02-25 | 2006-01-03 | Randy Walburger | Modular emergency shelter system |
| US20030213184A1 (en) * | 2002-05-19 | 2003-11-20 | Hunt Harry Summer | Multiple search booths at airports and transportation terminals |
| US20030215143A1 (en) * | 2002-05-20 | 2003-11-20 | Zakrzewski Radoslaw Romuald | Viewing a compartment |
| US6920721B2 (en) * | 2002-06-05 | 2005-07-26 | Adv-Tech Building Systems, Llc | Building system |
| US20060265971A1 (en) * | 2002-12-03 | 2006-11-30 | John Window | Modular building unit and method of assembly |
| US7364119B2 (en) * | 2003-08-26 | 2008-04-29 | Airbus Deutschland Gmbh | Multipurpose passenger compartment in a cabin of a commercial passenger transport aircraft |
| US20050048987A1 (en) * | 2003-08-28 | 2005-03-03 | Glass Andrew C. | Multi-dimensional graphical display of discovered wireless devices |
| US20070230656A1 (en) * | 2003-09-10 | 2007-10-04 | Peter Lowes | Baggage Screening System |
| US20050144857A1 (en) * | 2003-12-19 | 2005-07-07 | Fernando Guerrero | Modular building system |
| US7469782B2 (en) * | 2005-07-22 | 2008-12-30 | Dew Engineering And Development Limited | Conveyor system for loading and unloading aircraft baggage |
| US20070039253A1 (en) * | 2005-08-08 | 2007-02-22 | Roy Snowden | Small format retail business building |
| US7823338B2 (en) * | 2007-04-10 | 2010-11-02 | Modular Security Systems, Inc. | Modular access control system |
| US7823337B2 (en) * | 2008-07-29 | 2010-11-02 | Green Horizon Manufacturing Llc | Deployable prefabricated structure with a nested extension structure |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10294658B2 (en) * | 2008-12-23 | 2019-05-21 | Xoma (Us) Llc | Flexible manufacturing system |
| US20110258837A1 (en) * | 2008-12-23 | 2011-10-27 | Xoma Technology Ltd. | Flexible manufacturing system |
| US20130067721A1 (en) * | 2008-12-23 | 2013-03-21 | Xoma Technology Ltd. | Flexible manufacturing system |
| US8584349B2 (en) * | 2008-12-23 | 2013-11-19 | Xoma Technology Ltd. | Flexible manufacturing system |
| US20170058508A1 (en) * | 2008-12-23 | 2017-03-02 | XOMA CORPORATION XOMA Ltd. | Flexible manufacturing system |
| US10106974B2 (en) * | 2008-12-23 | 2018-10-23 | Xoma (Us) Llc | Flexible manufacturing system |
| US20110209415A1 (en) * | 2010-02-26 | 2011-09-01 | Peter Lowes | Security Screening Facility |
| US8707630B1 (en) * | 2010-11-01 | 2014-04-29 | Walgreen Co. | Pharmacy workspace with clinic station |
| US8776445B1 (en) * | 2010-11-01 | 2014-07-15 | Walgreen Co. | Pharmacy workspace |
| US20150101264A1 (en) * | 2013-10-14 | 2015-04-16 | G-Con Manufacturing Inc. | Unit for connecting modular mobile rooms |
| US10161147B2 (en) * | 2013-10-14 | 2018-12-25 | G-Con Manufacturing Inc. | Method for connecting modular mobile rooms |
| US10196809B2 (en) * | 2017-06-13 | 2019-02-05 | Hall Labs Llc | Modular building component for floor and ceiling with rod-based dimensions |
| EP3587278A1 (en) * | 2018-06-28 | 2020-01-01 | Bbhs A/S | A method and system for handling of luggage or parcel items |
| CN112012343A (en) * | 2020-08-28 | 2020-12-01 | 民航机场规划设计研究总院有限公司 | Boarding hall and processing method thereof |
| CN116122465A (en) * | 2022-12-28 | 2023-05-16 | 北京城建集团有限责任公司 | Back bolt connecting system based on stone curtain wall |
Also Published As
| Publication number | Publication date |
|---|---|
| ATE507146T1 (en) | 2011-05-15 |
| EP2049398B1 (en) | 2011-04-27 |
| RU2008125980A (en) | 2010-01-10 |
| WO2007060018A1 (en) | 2007-05-31 |
| DE202005018751U1 (en) | 2006-05-11 |
| EP2049398A1 (en) | 2009-04-22 |
| DE502006009416D1 (en) | 2011-06-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20090249708A1 (en) | Passenger Terminal Consisting of Mobile Room Units | |
| US10947720B2 (en) | Block construction of prefabricated buildings | |
| JP7007277B2 (en) | Modular building structure | |
| US9067721B2 (en) | Height adjustable shipping container | |
| US8186110B2 (en) | Transportable, modular, self contained shipping container building | |
| US6625937B1 (en) | Modular building and method of construction | |
| EP0839237B1 (en) | Movable manufacturing facility for production of standard size dwellings | |
| US6523322B1 (en) | Method for building construction | |
| EP1733100B9 (en) | A transportable modular building and method of constructing thereof | |
| Mills et al. | Breaking the pre-fabricated ceiling: Challenging the limits for modular high-rise | |
| US20050235581A1 (en) | System for production of standard size dwellings using a satellite manufacturing facility | |
| US20060101727A1 (en) | Emergency response training and exercise facility | |
| EP0839236A1 (en) | Method of production of standard size dwellings using a movable manufacturing facility | |
| US20020007605A1 (en) | Manufactured standard size dwellings having an integral base frame | |
| US20220381050A1 (en) | System and Method for Hybrid Building Construction for Difficult Sites | |
| Kim | Development of modular building systems made of innovative steel sections and wall configurations | |
| Yusof et al. | The absence of smart technology as one of the key factors of transportation in modular construction: a case study in Malaysia | |
| Phung et al. | Challenges in the design of a modular multi-storey CLT building using Irish timber | |
| US20200087942A1 (en) | Hurricane, Tornado, Flood, Storm Surge, Forest Fire and Mud Slide Resistant House | |
| JP7587827B2 (en) | Container Structure | |
| KR20050049015A (en) | Prefebrication module and building method thereby | |
| AU2020250304A1 (en) | Low cost modular building system | |
| Mohammed et al. | ANALYSIS AND DESIGN OF PRE-ENGINEERED STEEL BUILDING FOR AIRBUS A-380 HANGAR USING IS CODES | |
| CN109577486B (en) | Method for forming building and building | |
| WO2009061702A1 (en) | Modular building construction unit, system, and method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: FLYPORT DEVELOPMENT ENTWICKLUNGS- UND BETREUUNGSGE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZSCHORNACK, NORBERT;LATZEL, WOLFGANG;REEL/FRAME:021116/0832 Effective date: 20080515 |
|
| AS | Assignment |
Owner name: A. KERBOUA HOLDING B.V., NETHERLANDS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FLYPORT DEVELOPMENT ENTWICKLUNGS- UND BETREUUNGSGESELLSCHAFT MBH;REEL/FRAME:026569/0180 Effective date: 20110118 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |