US20070187086A1
US20070187086A1 US11/354,269 US35426906A US2007187086A1 US 20070187086 A1 US20070187086 A1 US 20070187086A1 US 35426906 A US35426906 A US 35426906A US 2007187086 A1 US2007187086 A1 US 2007187086A1
Authority
US
United States
Prior art keywords
pcs
perforator
casing pipe
indexing mechanism
muff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/354,269
Inventor
Anatoly Nikolayevich Ivanov
Artem Anatolyevich Ivanov
Artem Ivanovich Tichonov
Jake Palter
Boris Keyser
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAVIDSON DRILLING LLC
Original Assignee
DAVIDSON DRILLING LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAVIDSON DRILLING LLC filed Critical DAVIDSON DRILLING LLC
Priority to US11/354,269 priority Critical patent/US20070187086A1/en
Assigned to DAVIDSON DRILLING LLC reassignment DAVIDSON DRILLING LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KAYSER, BORIS, PALTER, JAKE, TICHONOV, ARTEM IVANOVICH, IVANOV, ANATOLY NIKOLAYEVICH, IVANOV, ARTEM ANATOLYEVICH
Publication of US20070187086A1 publication Critical patent/US20070187086A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/114Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/06Cutting windows, e.g. directional window cutters for whipstock operations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/119Details, e.g. for locating perforating place or direction

Definitions

  • This invention relates to the fields of mining, specifically oil and gas industry, hydro-geological, geological engineering and water supply industries and is intended for cutting slot-shaped seats in well side zones of producing formation by hydro-abrasive blast.
  • Slot unloading of well side zones of producing formations is known as one of the most effective methods of enhancement of efficiency (productivity) of oil, gas, pumping, hydro-geological, geological engineering and water supply wells.
  • This method provides for construction of slots in a well side zone which width, depth and orientation are predefined by known methods according to characteristics of the well and producing formation (e.g., see Reference bibliography in the end of the application).
  • Practical cutting of slots with desired parameters is quite difficult technical task as it is performed in complex conditions of different rocks and temperatures, at great depths, in the presence of extractive product and/or washing fluids and with remote control only.
  • One of the most successful methods of slot cutting is hydro-abrasive perforation when cutting is performed by fluid jet and sand at high pressure. For outlined devices used in this method see FIG. 1 .
  • a hydro-sandblast jet generator 1 which is connected with a perforator 3 by a tubing string 2 .
  • the perforator is put into the well inside a casing pipe 4 .
  • the tubing string 2 is formed of series-connected tubing.
  • the perforator 3 has two diametrical nozzles 5 , which are directed to the well wall.
  • a ball valve 7 is mounted at the perforator end.
  • the tubing string 2 is connected with the perforator 3 through a hydro brake with a lead up spring 8 .
  • This connection is complicated in construction and contains waterproof chambers with cross-flow canals for viscous fluid, a piston, pipes connected with each other and the tubing string (hereinafter PCS) by movable and fixed joints.
  • PCS tubing string
  • the device in FIG. 1 works as follows.
  • the hydro-brake tubular body is connected with PCS 2 by a muff, the second PCS end is connected with the hydro-abrasive jet generator 1 of above-ground equipment.
  • the upper chamber of the hydro brake is pre-filled with viscous fluid. Its properties are to be chosen for each cutting based on preset working conditions in the well (temperature, pressure, physical and mechanical properties of the casing pipe and rocks which form producing formation). Setting of the device is performed by selecting parameters of a cross-flow canal which connects chambers of the hydro brake. These parameters are fluidity of viscous fluid, length and diameter of the canal, temperature and pressure which are planned when the device is at work, as well as changes of parameters through temperature, pressure or efficacy of the hydro-abrasive jet.
  • PCS 2 (with the mounted hydro brake 8 , lead up device, perforator 3 and ball valve 7 ) is put into casing pipe 6 . . . at a given depth so as nozzles 5 of perforator 3 turn out to be in the well, where the top edge (roofing) of the cut slot is supposed to be.
  • a small ball is thrown down into the hydro brake internal pipe through PCS 2 (for closing ball valve 7 ).
  • the hydro-abrasive jet 1 generator of the above-ground equipment is engaged and it starts injecting abrasive compound into internal pipe of the device at preset (rated) pressure.
  • the compound reaches ball valve 7 and closes it tightly.
  • the perforator 3 through nozzles 5 starts cutting slots, first in walls of casing pipe 6 , and then in well side area.
  • the future slot cutting depth particularly depends on the perforator speed when it is traveling along the casing pipe.
  • hydro-brake 8 The design of hydro-brake 8 , its tight and movable joints with PCS 2 , perforator 3 and the wall of casing pipe 6 contains a lot of elements which change their characteristics when in use. Unpredictable stops and changes in cutting depth are unavoidable as the very principle of the hydro-brake in this application is unstable. The main reasons for such stops and changes are the attenuation of viscous fluid flow through the hydro-brake cross-flow canal which can be caused by temperature changes of viscosity and cross-flow canal, canal choking, and changes of the abrasive jet pressure or depressurization of the structure. In case of stop or significant change of perforator travel speed it is necessary to lift face equipment up and recalibrate it. This action is costly and time consuming.
  • the device which signals about the completion of perforation process is situated under ball valve 7 of perforator 3 and almost bridges the “direct” liquid flow from the perforator end. This prevents cleaning of the well dib hole from accumulated mud and sand.
  • the known devices are complicated, not stable, not reliable and not usable enough.
  • the determined task is solved by introducing essential changes into the known device for construction of cutting slot-shaped seats from the well wall inside the rock consisting of the hydro-abrasive jet generator connected with the perforator through the tubing string; the perforator is put into the casing pipe and has two diametrical nozzles which are directed at the well wall; there is a ball valve at the perforator end, as well as devices for adjustable partial unloading of PCS, PCS weight measuring device, abrasive jet pressure measuring device and the sealer for sealing of wellhead.
  • At least a couple of rotary fluke-claws with one end of each hingedly connected with the body of indexing mechanism, and the other end clasped to the casing pipe wall by spacer springs mounted between the indexing mechanism body and the fluke-flaw end, can be a variant of engagement of the indexing mechanism body with the casing pipe wall.
  • At least a couple of spring-mounted pins installed on the interior surface of the indexing device body can be a variant of split engagement of the indexing mechanism by step rings.
  • the pin heads are of round shape at the contacting end set against PCS.
  • a muff with conical inside surface and the exterior of streamlined form can be a variant of tripping muff for forced tripping of the indexing mechanism from the casing pipe wall.
  • the optimum distance between the step rings equals to one drain port diameter D ⁇ 5%, and the number of rings has to amount to prescribed length of the slot-shaped seat divided by the drain port diameter D. At the same time adjacent drainage canals will unite and form a single slot-shaped seat.
  • the recommended force for coupling of the split pin heads with PCS lies within the limits of 10-20% of PCS weight.
  • the recommended force for coupling of the indexing device body with the casing pipe wall is in the range from 30% of PCS weight up to breaking strength point of the casing pipe.
  • FIG. 1 an example of structure chart of the prototype device
  • FIG. 2 an example of structure chart of the claimed device
  • FIG. 3 an example of structure chart of the device subsurface part
  • FIG. 4 an example of implementation of the pin and the cylindrical retainer washer
  • FIG. 5 an example of implementation of the indexing (holding) mechanism
  • FIG. 6 an example of implementation of the tripping muff.
  • 1 hydro-abrasive jet generator
  • 2 production pipe string (PPS)
  • 3 perforator
  • 4 casing string
  • 5 nozzles
  • 6 well
  • 7 ball valve
  • 8 hydro-brake with the lead up spring
  • 9 device for PPS unloading
  • 10 weight measuring device (dynamometer)
  • 11 preventor
  • 12 hydro-abrasive jet pressure measuring device (manometer)
  • 13 recessed pin
  • 14 control-rods
  • 15 cylindrical retainer washer
  • 16 indexing mechanism (holder)
  • 17 step rings
  • 18 tripping muff
  • 19 body of indexing mechanism
  • 20 fluke-claws
  • 21 spacer springs
  • 22 pins
  • 23 springs
  • 24 pin heads.
  • the structure chart of the claimed device ( FIG. 2 ) consists of hydro-abrasive jet generator 1 which is connected with perforator 3 by PCS 2 .
  • the perforator is put into well 6 inside casing string 4 .
  • the perforator 3 has two diametrical nozzles 5 , which are directed to the well 6 wall.
  • the ball valve 7 is mounted at the perforator 3 end.
  • the device 9 for controllable unloading of PCS, PCS weight measuring device 10 and sealer 11 for wellhead sealing and jet pressure measuring device for abrasive 12 are mounted at the surface above well 6 .
  • perforator 3 is connected directly to the lower end of PCS 2 . Under the perforator there is a pin 13 which is able of axial movement.
  • the cylindrical washer 15 connected with pin 13 by control-rods 14 are mounted on the upper part of perforator 3 in series and in alignment.
  • the indexing mechanism 16 , step rings 17 and tripping muff 18 are put in series and in alignment on PCS 2 above perforator 3 with the possibility of axial movement. For more detailed description of this part of the device see FIG. 3 .
  • the pin 13 is connected with cylindrical washer 15 by control-rods 14 .
  • the washer is put on the upper part of the perforator with possible axial movement. This connection is shown in more detail in FIG. 4 .
  • the holder 16 is put on PCS 2 with possible rigid engagement of its body 19 with a casing pipe 4 wall and possible split engagement of its body by step rings 17 , which are rigidly mounted on PCS 2 .
  • step rings 17 which are rigidly mounted on PCS 2 .
  • the tripping muff 18 is rigidly mounted and fixed on PCS 2 with its skirt down. For an example of such structure see FIG. 6 .
  • pin 13 passes ball valve 7 seat and protrudes above the ball valve 7 opening.
  • the pin 13 is mounted with possible axial movement. Dotted lines show the position of pin 13 after axial downward movement.
  • the pin 13 is connected with cylindrical washer 15 mounted in the upper part of perforator 3 above nozzles 5 by control-rods 14 .
  • the washer 15 is also able of axial movement. Dotted lines show the position of the washer after axial downward movement. At that washer 15 has a hollow (groove) on its upper end. Depth and width of the hollow are enough for placing there the ends of fluke-claws 20 of the indexing mechanism 16 in run-in position.
  • FIG. 5 shows an example of engagement of the body 19 of indexing mechanism 16 with the casing pipe 6 wall. It has a pair of rotary fluke-claws 20 for reliable engagement with the casing pipe 6 wall in the process of forming the slot-shaped seat. At the same time it should not interfere with the casing pipe lowering-in to the place of forming slot-shaped seat at the beginning of the work. For that, one of the ends of each fluke-claw 20 is hingedly connected with the body 19 of indexing mechanism 16 , and the other end of the claw 20 in run-in position is clasped to the body 19 of indexing mechanism 16 by cylindrical washer 15 .
  • FIG. 5 shows an example of split engagement of indexing mechanism 16 by step rings 17 . It has a pair of spring-loaded pins 22 , which are installed on the interior surface of body 19 of indexing mechanism 16 . Heads 24 of pins 22 are set against PCS 2 and are round in shape.
  • the force for coupling of pin 22 heads 24 with PCS 2 is chosen within the limits of 10-20% of PCS weight. In case of larger force in the process of indexing of PCS 2 , the displacement of fluke-claws 20 along the casing pipe is possible. In case of lesser force one can hardly notice indexing earlier, when PCS is lowered or lifted.
  • FIG. 6 shows an example of arrangement of tripping muff 18 . It is mounted on PCS 2 directly above the last step ring 17 .
  • the muff is meant for the forced disengaging of indexing mechanism 16 from the wall of the casing pipe 4 on completion of the last drainage port. It has conical inside surface for resolute putting down of fluke-claws 20 of indexing mechanism 16 after partial loading of PCS 2 . Outer surface has streamlined form for better extraction from the well.
  • Optimal distance between step rings equals the diameter of drain port D ⁇ 5%, and the number of step rings amounts to predetermined productive formation thickness divided by the drain port diameter. At such distance between the ports, adjacent drainage canals reliably connect with each other and form desired slot-like seat.
  • the device for cutting slot-shaped seats operates as follows.
  • drain port diameter D and seat height T necessary number of drainage canals N and distance D between them are determined. These are calculated by dividing the seat height by the drain diameter.
  • perforator 3 is fixed on PCS 2 end (i.e. the lower tube of PCS), its nozzles 5 directed outwards in the opposite direction.
  • the perforator 3 has ball valve 7 with pin 13 on the end.
  • cylindrical retainer washer 15 is placed and connected with pin 13 by control-rods 14 .
  • indexing mechanism 16 is put on PCS 2 above cylindrical washer 15 , after that N of step rings 17 is coaxially fixed at a distance D from each other.
  • tripping muff 18 is rigidly fixed with its skirt down.
  • indexing mechanism 16 is set into starting run-in position—when fluke-claws 20 are clasped to the indexing mechanism 16 body and cylindrical washer 15 is moved up to them.
  • spring-loaded heads 24 of pins 22 are set against PCS 2 under the lower step ring 17 .
  • the lower pipe of PCS (with the mounted equipment) is connected to PCS 2 .
  • PCS 2 (with the installed equipment) is lowered at predetermined depth, and wellhead 6 is supplied with sealer 11 .
  • PCS 2 end is lowered so as nozzles 5 of perforator 3 stay at a depth of 100 meters.
  • PCS 2 with the equipment is retained hanging on top, this being done from the surface by device 9 for adjustable unloading of PCS 2 .
  • the hydro-abrasive jet generator is then switched on for pumping abrasive solution into PCS 2 .
  • pin 13 Under pressure of the abrasive solution pin 13 is sunk by ball valve 7 and it pulls control-rods 14 and cylindrical retainer washer 15 .
  • the pressure of the abrasive solution exceeds the friction of cylindrical retainer washer 15 with the ends of fluke-claws 20 which are pushed into it.
  • the pin 13 moves cylindrical washer 15 from the spring-loaded end of fluke-claws 20 .
  • fluke-claws 20 are deflected by the spacer spring 21 .
  • the fluke-claws 20 set against the casing pipe 4 walls of well 6 and become reliably engaged with it, not allowing indexing mechanism 16 to move along the well depth.
  • Actions are repeated as many times as many step rings 17 are mounted.
  • fluke-claws 20 of indexing mechanism 6 set against the tripping muff 18 skirt.
  • PCS 2 weight is unloaded by device 9 by more than 30%.
  • muff 18 sets against fluke-claws 20 by inside cone and with corresponding weight, thus laying them down into run-in position.
  • breakage of fluke-claws 20 is allowed.
  • Increase in drilling cable tension is considered a signal of laying down or breakage of fluke-claws 20 , which is in other words PCS 2 uncoupling from the casing pipe 4 wall. At uncoupling it becomes equal to the full weight of the instrument.
  • abrasive jet pressure drop (manometer 12 ). Operating time of the drainage canal is determined by mud which is washed out from the well. The fact of destruction of crosspieces and bridges of drainage canals is fixed by abrasive jet pressure drop (manometer 12 ) and is distinctive by the size and shape of mud (debris) that is removed from the well.
  • the claimed devices have been used for reduction of prices for equipment and works at construction of slot-shaped seats in well side areas of producing formations.
  • the devices have raised reliability and usability of such work. Specifically, they were applied in July-December, 2005 at the wells of Hall, Brinkmeyer and Rieger, the USA.
  • the claimed device processed four producing formations in different wells at depths of 1060-2870 feet of average thickness of 6-20 feet. In each case a slot with 1.0-1.2 feet spacing to the full thickness of the producing formation was constructed. Each time a clear and precise signal of casing pipe penetration was picked up.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

This device relates to the fields of mining, specifically oil and gas industry, hydro-geological, geological engineering and water supply industries and is intended for cutting slot-shaped seats in well side zones of producing formation by hydro-abrasive blast. The determined task is solved by introducing essential changes into the known device for construction of cutting slot-shaped seats from the well wall inside the rock consisting of the hydro-abrasive jet generator connected with the perforator through the pump-and-compressor tubing string; the perforator is put into the casing pipe and has two diametrical nozzles which are directed at the well wall; there is a ball valve at the perforator end, as well as devices for adjustable partial unloading of PCS, PCS weight measuring device, abrasive jet pressure measuring device and the sealer for sealing of wellhead. The changes are as follows:—The perforator is directly connected with PCS;—A pin mounted under the perforator with possible axial movements is introduced;—A cylindrical retainer washer is put on the upper part of the perforator above nozzles; the washer is fixed so as to permit axial movement;—PCS indexing mechanism, step rings and a tripping muff are mounted bottom up and in alignment on the lower tube of PCS which is in series connected with the perforator;—At the same time the pin is connected with the cylindrical washer situated on the upper part of the perforator by control-rods with possible axial movement;—The indexing mechanism is put on PCS with the possibility of fixed coupling of its body with the casing pipe wall and split engagement of its body by step rings. Step rings are to be rigidly fixed on the lower PCS tube, and the tripping muff-on the PPS with its skirt down. At least a couple of rotary fluke-claws, with one end of each hingedly connected with the body of indexing mechanism, and the other end clasped to the casing pipe wall by spacer springs mounted between the indexing mechanism body and the fluke-flaw end, can be a variant of engagement of the indexing mechanism body with the casing pipe wall. At least a couple of spring-mounted pins installed on the interior surface of the indexing device body can be a variant of split engagement of the indexing mechanism by step rings. At that the pin heads are of round shape at the contacting end set against PCS. A muff with conical inside surface and the exterior of streamlined form can be a variant of tripping muff for forced tripping of the indexing mechanism from the casing pipe wall. The optimum distance between the step rings equals to one drain port diameter D±5%, and the number of rings has to amount to prescribed length of the slot-shaped seat divided by the drain port diameter D. At the same time adjacent drainage canals will unite and form a single slot-shaped seat. The recommended force for coupling of the split pin heads with PCS lies within the limits of 10-20% of PCS weight. The recommended force for coupling of the indexing device body with the casing pipe wall is in the range from 30% of PCS weight up to breaking strength point of the casing pipe.

Description

    FIELD OF THE INVENTION
  • This invention relates to the fields of mining, specifically oil and gas industry, hydro-geological, geological engineering and water supply industries and is intended for cutting slot-shaped seats in well side zones of producing formation by hydro-abrasive blast.
  • BACKGROUND OF THE INVENTION
  • Slot unloading of well side zones of producing formations is known as one of the most effective methods of enhancement of efficiency (productivity) of oil, gas, pumping, hydro-geological, geological engineering and water supply wells. This method provides for construction of slots in a well side zone which width, depth and orientation are predefined by known methods according to characteristics of the well and producing formation (e.g., see Reference bibliography in the end of the application). Practical cutting of slots with desired parameters is quite difficult technical task as it is performed in complex conditions of different rocks and temperatures, at great depths, in the presence of extractive product and/or washing fluids and with remote control only. One of the most successful methods of slot cutting is hydro-abrasive perforation when cutting is performed by fluid jet and sand at high pressure. For outlined devices used in this method see FIG. 1.
  • Effective examples of such devices are described in e.g., USSR, author's certificate #1031263, Russian Federation patent #2,074,957; Reference book on oil production, M, “Nedra”. 1974; Instructions on slot unloading of well side zone, VNIMI, Minugleprom, L, 1987; U.S. Pat. No. 6,651,741 and U.S. application Ser. No. 10/957,871 of Apr. 10, 2004).
  • A device which is technically the closest to the claimed one was generally described in U.S. Pat. No. 6,651,741 of Nov. 25, 2003 and is selected as a prototype.
  • They consist of a hydro-sandblast jet generator 1 which is connected with a perforator 3 by a tubing string 2. The perforator is put into the well inside a casing pipe 4. The tubing string 2 is formed of series-connected tubing. The perforator 3 has two diametrical nozzles 5, which are directed to the well wall. A ball valve 7 is mounted at the perforator end. The tubing string 2 is connected with the perforator 3 through a hydro brake with a lead up spring 8. This connection is complicated in construction and contains waterproof chambers with cross-flow canals for viscous fluid, a piston, pipes connected with each other and the tubing string (hereinafter PCS) by movable and fixed joints.
  • Furthermore the above ground part is equipped with standard devices used on oil-rigs and elevator units for well repair: device 9 for partial unloading of PCS, PCS weight measuring device 10 and preventor 11 for sealing of wellhead 4 and pressure measuring device for abrasive jet 12. Their placing and function are evident from their names.
  • The device in FIG. 1 works as follows. The hydro-brake tubular body is connected with PCS 2 by a muff, the second PCS end is connected with the hydro-abrasive jet generator 1 of above-ground equipment. In a laboratory by imitation of bottomhole conditions, the upper chamber of the hydro brake is pre-filled with viscous fluid. Its properties are to be chosen for each cutting based on preset working conditions in the well (temperature, pressure, physical and mechanical properties of the casing pipe and rocks which form producing formation). Setting of the device is performed by selecting parameters of a cross-flow canal which connects chambers of the hydro brake. These parameters are fluidity of viscous fluid, length and diameter of the canal, temperature and pressure which are planned when the device is at work, as well as changes of parameters through temperature, pressure or efficacy of the hydro-abrasive jet.
  • Then PCS 2 (with the mounted hydro brake 8, lead up device, perforator 3 and ball valve 7) is put into casing pipe 6. . . at a given depth so as nozzles 5 of perforator 3 turn out to be in the well, where the top edge (roofing) of the cut slot is supposed to be. A small ball is thrown down into the hydro brake internal pipe through PCS 2 (for closing ball valve 7). The hydro-abrasive jet 1 generator of the above-ground equipment is engaged and it starts injecting abrasive compound into internal pipe of the device at preset (rated) pressure. The compound reaches ball valve 7 and closes it tightly. The perforator 3 through nozzles 5 starts cutting slots, first in walls of casing pipe 6, and then in well side area. The future slot cutting depth particularly depends on the perforator speed when it is traveling along the casing pipe.
  • For detailed description of the device and its work see the above-mentioned sources.
  • Let's analyze processes which take place during cutting slot-shaped seats by hydro-abrasive method. The perforator 3 is put into well 4 on PCS 2. The working perforator travels along the casing pipe at a speed determined by parameters of hydro-brake 8. It is significant to note that controlling the speed of perforator 3 movement in the process of cutting is technologically impossible. To get information about the end of travel, special signaling devices are applied. It can look like an upward pin mounted under the ball valve 7. The pin opens the ball valve 7 (i.e. it pushes the small ball out of the ball valve 7 when the perforator 3 travel is completed. This will cause abrupt pressure drop in the tube space (it will open from below) thus informing of the travel completion.
  • The described devices have some common shortcomings:
  • They are Complicated not Enough Reliable and Stable:
  • The design of hydro-brake 8, its tight and movable joints with PCS 2, perforator 3 and the wall of casing pipe 6 contains a lot of elements which change their characteristics when in use. Unpredictable stops and changes in cutting depth are unavoidable as the very principle of the hydro-brake in this application is unstable. The main reasons for such stops and changes are the attenuation of viscous fluid flow through the hydro-brake cross-flow canal which can be caused by temperature changes of viscosity and cross-flow canal, canal choking, and changes of the abrasive jet pressure or depressurization of the structure. In case of stop or significant change of perforator travel speed it is necessary to lift face equipment up and recalibrate it. This action is costly and time consuming.
  • Not Enough Reliable and Precise Cutting of Seats
  • This is over absence of control of cutting depth. Presumably the device works according to preliminary settings. Actual cutting depth can significantly differ from the rated one, for example, because of the jet pressure fluctuation, abrasive composition, thickness and hardness deviation of the casing pipe 4 or rock characteristics. Ordinary cases were reported when on completion of the correctly calculated cutting process it appeared that even the casing pipe is not completely cut.
  • Besides, the device which signals about the completion of perforation process is situated under ball valve 7 of perforator 3 and almost bridges the “direct” liquid flow from the perforator end. This prevents cleaning of the well dib hole from accumulated mud and sand.
  • In other words, the known devices are complicated, not stable, not reliable and not usable enough.
  • OBJECTS OF THE INVENTION
  • It is an object of the invention to decrease the listed shortcomings, and namely to simplify the device and enhance its convenience, reliability and stability.
  • TASK SOLUTION (DETAILED DESCRIPTION OF THE INVENTION)
  • The determined task is solved by introducing essential changes into the known device for construction of cutting slot-shaped seats from the well wall inside the rock consisting of the hydro-abrasive jet generator connected with the perforator through the tubing string; the perforator is put into the casing pipe and has two diametrical nozzles which are directed at the well wall; there is a ball valve at the perforator end, as well as devices for adjustable partial unloading of PCS, PCS weight measuring device, abrasive jet pressure measuring device and the sealer for sealing of wellhead.
  • The changes are as follows:
      • The perforator is directly connected with PCS;
      • A pin mounted under the perforator with possible axial movements is introduced;
      • A cylindrical retainer washer is put on the upper part of the perforator above nozzles; the washer is fixed so as to permit axial movement;
      • PCS indexing mechanism, step rings and a tripping muff are mounted bottom up and in alignment on the lower tube of PCS which is in series connected with the perforator;
      • At the same time the pin is connected with the cylindrical washer situated on the upper part of the perforator by control-rods with possible axial movement;
      • The indexing mechanism is put on PCS with the possibility of fixed coupling of its body with the casing pipe wall and split engagement of its body by step rings. Step rings are to be rigidly fixed on the lower PCS tube, and the tripping muff—on the PPS with its skirt down.
  • At least a couple of rotary fluke-claws, with one end of each hingedly connected with the body of indexing mechanism, and the other end clasped to the casing pipe wall by spacer springs mounted between the indexing mechanism body and the fluke-flaw end, can be a variant of engagement of the indexing mechanism body with the casing pipe wall.
  • At least a couple of spring-mounted pins installed on the interior surface of the indexing device body can be a variant of split engagement of the indexing mechanism by step rings. At that the pin heads are of round shape at the contacting end set against PCS.
  • A muff with conical inside surface and the exterior of streamlined form can be a variant of tripping muff for forced tripping of the indexing mechanism from the casing pipe wall.
  • The optimum distance between the step rings equals to one drain port diameter D±5%, and the number of rings has to amount to prescribed length of the slot-shaped seat divided by the drain port diameter D. At the same time adjacent drainage canals will unite and form a single slot-shaped seat.
  • The recommended force for coupling of the split pin heads with PCS lies within the limits of 10-20% of PCS weight.
  • The recommended force for coupling of the indexing device body with the casing pipe wall is in the range from 30% of PCS weight up to breaking strength point of the casing pipe.
  • SUMMARY OF THE INVENTION
  • The essence of the invention is explained by the following six Figures, and namely:
  • FIG. 1—an example of structure chart of the prototype device;
  • FIG. 2—an example of structure chart of the claimed device;
  • FIG. 3—an example of structure chart of the device subsurface part;
  • FIG. 4—an example of implementation of the pin and the cylindrical retainer washer;
  • FIG. 5—an example of implementation of the indexing (holding) mechanism;
  • FIG. 6—an example of implementation of the tripping muff.
  • Accepted notations in the figures are as follows: 1—hydro-abrasive jet generator, 2—production pipe string (PPS), 3—perforator, 4—casing string, 5—nozzles, 6—well, 7—ball valve, 8—hydro-brake with the lead up spring, 9—device for PPS unloading, 10—weight measuring device (dynamometer), 11—preventor, 12—hydro-abrasive jet pressure measuring device (manometer), 13—recessed pin, 14—control-rods, 15—cylindrical retainer washer, 16—indexing mechanism (holder), 17—step rings, 18—tripping muff, 19—body of indexing mechanism, 20—fluke-claws, 21—spacer springs, 22—pins, 23—springs, 24—pin heads.
  • The structure chart of the claimed device (FIG. 2) consists of hydro-abrasive jet generator 1 which is connected with perforator 3 by PCS 2. The perforator is put into well 6 inside casing string 4. The perforator 3 has two diametrical nozzles 5, which are directed to the well 6 wall. The ball valve 7 is mounted at the perforator 3 end. The device 9 for controllable unloading of PCS, PCS weight measuring device 10 and sealer 11 for wellhead sealing and jet pressure measuring device for abrasive 12 are mounted at the surface above well 6.
  • Inside casing pipe 4, perforator 3 is connected directly to the lower end of PCS 2. Under the perforator there is a pin 13 which is able of axial movement. The cylindrical washer 15 connected with pin 13 by control-rods 14 are mounted on the upper part of perforator 3 in series and in alignment. The indexing mechanism 16, step rings 17 and tripping muff 18 are put in series and in alignment on PCS 2 above perforator 3 with the possibility of axial movement. For more detailed description of this part of the device see FIG. 3.
  • The pin 13 is connected with cylindrical washer 15 by control-rods 14. The washer is put on the upper part of the perforator with possible axial movement. This connection is shown in more detail in FIG. 4.
  • The holder 16 is put on PCS 2 with possible rigid engagement of its body 19 with a casing pipe 4 wall and possible split engagement of its body by step rings 17, which are rigidly mounted on PCS 2. For an example of such structure see FIG. 5.
  • The tripping muff 18 is rigidly mounted and fixed on PCS 2 with its skirt down. For an example of such structure see FIG. 6.
  • In FIG. 4 pin 13 passes ball valve 7 seat and protrudes above the ball valve 7 opening. The pin 13 is mounted with possible axial movement. Dotted lines show the position of pin 13 after axial downward movement. The pin 13 is connected with cylindrical washer 15 mounted in the upper part of perforator 3 above nozzles 5 by control-rods 14. The washer 15 is also able of axial movement. Dotted lines show the position of the washer after axial downward movement. At that washer 15 has a hollow (groove) on its upper end. Depth and width of the hollow are enough for placing there the ends of fluke-claws 20 of the indexing mechanism 16 in run-in position. Dotted lines show the position of the fluke-claws ends 20 in the indicated washer's hollow-groove 15 (run-in position) and after axial downward movement of washer 15—outside the hollow-groove (on-position). Run-in position is that in which the device is let down to casing pipe 4. In these positions fluke-claws 20 have to be pressed to PCS 2 so as not to prevent it from its lowering to well 4.
  • FIG. 5 shows an example of engagement of the body 19 of indexing mechanism 16 with the casing pipe 6 wall. It has a pair of rotary fluke-claws 20 for reliable engagement with the casing pipe 6 wall in the process of forming the slot-shaped seat. At the same time it should not interfere with the casing pipe lowering-in to the place of forming slot-shaped seat at the beginning of the work. For that, one of the ends of each fluke-claw 20 is hingedly connected with the body 19 of indexing mechanism 16, and the other end of the claw 20 in run-in position is clasped to the body 19 of indexing mechanism 16 by cylindrical washer 15. In run-in position washer 15 will be moved downward and the ends of fluke-claws 20 will move apart set against the wall of casing pipe 6 and will rigidly fix the position of PCS 2 in well 6. Firm lines show the position of fluke-claws 20 in on-position, and dotted lines—in run-in position. The force for coupling of body 19 of indexing mechanism 16 with the casing pipe 4 wall is chosen in the range from 30% of PCS weight up to breaking strength point of the casing pipe. Minimum value by weight indicator 10 allows unique distinguishing of the coupling of the indexing mechanism with the casing pipe from accidental coupling and friction of PCS 2 against the casing pipe 4 wall. Maximum value excludes the destruction of integrity of casing pipe 4.
  • FIG. 5 shows an example of split engagement of indexing mechanism 16 by step rings 17. It has a pair of spring-loaded pins 22, which are installed on the interior surface of body 19 of indexing mechanism 16. Heads 24 of pins 22 are set against PCS 2 and are round in shape.
  • The force for coupling of pin 22 heads 24 with PCS 2 is chosen within the limits of 10-20% of PCS weight. In case of larger force in the process of indexing of PCS 2, the displacement of fluke-claws 20 along the casing pipe is possible. In case of lesser force one can hardly notice indexing earlier, when PCS is lowered or lifted.
  • FIG. 6 shows an example of arrangement of tripping muff 18. It is mounted on PCS 2 directly above the last step ring 17. The muff is meant for the forced disengaging of indexing mechanism 16 from the wall of the casing pipe 4 on completion of the last drainage port. It has conical inside surface for resolute putting down of fluke-claws 20 of indexing mechanism 16 after partial loading of PCS 2. Outer surface has streamlined form for better extraction from the well.
  • Optimal distance between step rings equals the diameter of drain port D±5%, and the number of step rings amounts to predetermined productive formation thickness divided by the drain port diameter. At such distance between the ports, adjacent drainage canals reliably connect with each other and form desired slot-like seat.
  • The device for cutting slot-shaped seats operates as follows.
  • First the device for performing the prescribed cutting is formed. By known drain port diameter D and seat height T, necessary number of drainage canals N and distance D between them are determined. These are calculated by dividing the seat height by the drain diameter. Then perforator 3 is fixed on PCS 2 end (i.e. the lower tube of PCS), its nozzles 5 directed outwards in the opposite direction. The perforator 3 has ball valve 7 with pin 13 on the end. In the upper part of perforator 3 above nozzles 5, cylindrical retainer washer 15 is placed and connected with pin 13 by control-rods 14. Then indexing mechanism 16 is put on PCS 2 above cylindrical washer 15, after that N of step rings 17 is coaxially fixed at a distance D from each other. Directly above the upper step ring, tripping muff 18 is rigidly fixed with its skirt down. After that indexing mechanism 16 is set into starting run-in position—when fluke-claws 20 are clasped to the indexing mechanism 16 body and cylindrical washer 15 is moved up to them. At that, spring-loaded heads 24 of pins 22 are set against PCS 2 under the lower step ring 17. Then the lower pipe of PCS (with the mounted equipment) is connected to PCS 2.
  • Then PCS 2 (with the installed equipment) is lowered at predetermined depth, and wellhead 6 is supplied with sealer 11. For example, if a seat should be formed at a depth of 100-101 meters, PCS 2 end is lowered so as nozzles 5 of perforator 3 stay at a depth of 100 meters.
  • At that, PCS 2 with the equipment is retained hanging on top, this being done from the surface by device 9 for adjustable unloading of PCS 2.
  • Then a small ball is thrown to PCS 2 for closing ball valve 7 on the perforator end. The ball falls into the ball valve 7 opening on pin 13, but does not sink it.
  • The hydro-abrasive jet generator is then switched on for pumping abrasive solution into PCS 2. Under pressure of the abrasive solution pin 13 is sunk by ball valve 7 and it pulls control-rods 14 and cylindrical retainer washer 15. The pressure of the abrasive solution exceeds the friction of cylindrical retainer washer 15 with the ends of fluke-claws 20 which are pushed into it. The pin 13 moves cylindrical washer 15 from the spring-loaded end of fluke-claws 20. After displacement of cylindrical retainer washer 15 fluke-claws 20 are deflected by the spacer spring 21. The fluke-claws 20 set against the casing pipe 4 walls of well 6 and become reliably engaged with it, not allowing indexing mechanism 16 to move along the well depth.
  • Simultaneously the penetration of the first pair of openings starts through nozzles 5 of perforator 3. At first, casing pipe 4 is cut, then the critical area of formation. When casing pipe 4 characteristics, the critical area rock and the efficiency of the perforator are given, the operator determines the time of forming a drainage canal at selected depth. At that, the operator fixes the pressure drop value in PCS 2 after opening of the casing pipe and at the end of estimated time of forming the drainage canal. After the drainage canal (opening) is formed, the operator switches perforator 3 off.
  • Then by means of device 9 the operator unloads PCS 2 by 20% loosening of drilling cable. Such gain in PCS 2 weight leads to sinking of spring-loaded heads 24 of pins 22 of indexing mechanism 16 by the first lower step ring 17, which it is set against. At that PCS 2 becomes free from its stop at pins 22 and by its own weight starts lowering itself. Spring-loaded heads 24 of pins 22, released from the pressure of step ring 17, will straighten themselves up and will push themselves out again towards PCS 2. At PCS lowering, pins 22 slide along its surface until set against the next step ring 17, which is mounted on PCS. The pins 22 will set against it and stop PCS from further moving down. Stop of pipe travel before the next ring 17 arises from the fact that PS tube is elastic, and the movement of the lower part of PCS relieves the vertical load (they say ‘the column is gaining weight’); the drilling cable tension increases and the pins load goes down.
  • This ensures PCS pacing at predetermined interval.
  • Actions are repeated as many times as many step rings 17 are mounted.
  • After passing the last (upper) step ring 17, fluke-claws 20 of indexing mechanism 6 set against the tripping muff 18 skirt. Then PCS 2 weight is unloaded by device 9 by more than 30%. At the indicated gain in the PCS 2 weight, muff 18 sets against fluke-claws 20 by inside cone and with corresponding weight, thus laying them down into run-in position. When performing this operation, breakage of fluke-claws 20 is allowed. Increase in drilling cable tension is considered a signal of laying down or breakage of fluke-claws 20, which is in other words PCS 2 uncoupling from the casing pipe 4 wall. At uncoupling it becomes equal to the full weight of the instrument.
  • In case of need to pull out or release tools at work, the procedure of PCS 2 displacement inside indexing mechanism 16 is repeated the required number of times, not exposing casing pipe 4.
  • The exposures of casing pipe 4 are well fixed by abrasive jet pressure drop (manometer 12). Operating time of the drainage canal is determined by mud which is washed out from the well. The fact of destruction of crosspieces and bridges of drainage canals is fixed by abrasive jet pressure drop (manometer 12) and is distinctive by the size and shape of mud (debris) that is removed from the well.
  • Industrial Use
  • The offered engineering solutions have been repeatedly practiced. We have not faced any difficulties during the industrial production of devices. All necessary components, materials and technologies have been known for a long time and are well coped with. The cost of the claimed devices is considerably lower than that of prototype devices (minimum two times less). This is evident from the comparison of the components'complexity and costs.
  • The claimed devices have been used for reduction of prices for equipment and works at construction of slot-shaped seats in well side areas of producing formations. The devices have raised reliability and usability of such work. Specifically, they were applied in July-December, 2005 at the wells of Hall, Brinkmeyer and Rieger, the USA.
  • The works carried out there proved efficiency of the claimed device and accomplishment of the set tasks. Thus, the claimed device processed four producing formations in different wells at depths of 1060-2870 feet of average thickness of 6-20 feet. In each case a slot with 1.0-1.2 feet spacing to the full thickness of the producing formation was constructed. Each time a clear and precise signal of casing pipe penetration was picked up.
  • (32 actions—pressure drop from 5000-6000 psi to 4300-4200 psi).
  • Well capacity initially totaled 1-2 barrels of oil per day. At all indicated producing formations before the construction of unloading slots according the claimed technology, intensification works with the use of acid treatment and powder generators of elastic vibrations were carried out. But for all that, none of the indicated methods of intensification has produced any noticeable increase in efficiency of the said wells. After treating wells according to the claimed method, the efficiency increased up to 7-16 barrels of oil per day.
  • As the prototype devices had been used at the same projects until the claimed devices were introduced, it was possible to compare their efficiency. Working hours have reduced almost by two times (mainly due to elimination of stoppage and resetting of cutting equipment), and well capacity of treated wells has risen up to 350-700% (due to more precise design size accomplishment of slots at the well side area). Moreover, serviceability has notably improved due to securing of simple and reliable travel of the perforator along the well depth.
  • Thus, problems posed by the invention are solved.
  • The authors are not aware of any devices similar to the claimed one.
  • The offered solutions are unobvious for specialists-otherwise they would have already been in use. Oil, pressure, hydro geological and water-supply wells and gassers are in great demand in the world. A great number of specialists are occupied with their improvement—enhance efficiency, reduce costs, increase durability etc.
  • In our opinion the offered solutions comply with all the requirements specified for an invention—they are new, unobvious for a specialist (have an invention level) and are exploitable.
  • REFERENCE BIBLIOGRAPHY
    • 1. U.S. Pat. No. 3,966,992, No. 5,337,825 of Aug. 16, 1994, U.S. Pat. No. 6,651,741 of Nov. 25, 2003.
    • 2. Application PCT/RU93/00101, edition WO94/05898 of Mar. 17, 1994.
    • 3. U.S. application Ser. No. 10/957871 of Apr. 10, 1984.
    • 4. Author's certificate USSR #1,031,263, published in 1984.
    • 5. Russian Federation patent #2,074,957; published on Oct. 3, 1997.
    • 6. Reference book on oil production, M, “Nedra”. 1974
    • 7. Instructions on slot unloading of well side zone, VNIMI, Minugleprom, L, 1987
    • 8. On liquid influx to the well when using different methods of producing formations development.
    • A. Ivanov, G. Krylov et al. Geophysical Journal, No. 5, 1984.

Claims (7)

1. A device for construction of slot-shaped seats from the well wall inside the rock consisting of a hydro-abrasive jet generator which is connected with a perforator through tubing string; the perforator is put into casing pipe and has two diametrical nozzles which are directed at the well wall; there is a ball valve at the perforator end,
as well a device for adjustable partial unloading of PCS, PCS weight measuring device, abrasive jet pressure measuring device and a sealer for the wellhead sealing;
the distinction lies in the fact that:
The perforator is directly connected with PCS; a pin is mounted into the opening on the lower end of the perforator with possible axial movements; a cylindrical retainer washer is put on the upper part of the perforator above nozzles; the washer is connected with the pin by control-rods; on the lower tube of PCS which is connected with the perforator, the PCS indexing mechanism, step rings and a tripping muff are bottom up mounted in series and in alignment. The indexing mechanism is put on PCS with the possibility of fixed coupling of its body with the casing pipe wall and split engagement of its body by step rings, which are rigidly fixed on the lower PCS tube, and the tripping muff—on PCS with the skirt down.;
2. Device as in claim 1, the distinction lies in the fact that the indexing mechanism body is engaged with the casing pipe wall in the form of at least a couple of rotary fluke-claws, with one end of each hingedly connected with the body of indexing mechanism, and the other end is clasped to the casing pipe wall by spacer springs mounted between the indexing mechanism body and the fluke-flaw.
3. Device as in claim 1, the distinction lies in the fact that the indexing mechanism's split engagement by step rings is in the form of at least a couple of spring-mounted pins installed on the interior surface of the indexing device body; with pin heads of round shape at the contacting end set against PCS.
4. Device as in claim 3, the distinction lies in the fact that the force for coupling of the indexing device with the casing pipe wall is chosen in the range from 30% of PCS weight up to breaking strength point of the casing pipe.
5. Device as in claim 3, the distinction lies in the fact that the force for coupling of the split pin heads with PCS is chosen within the limits of 10-20% of PCS weight.
6. Device as in claim 1, the distinction lies in the fact that the distance between the step rings is equal to the drain port diameter D±5%, and the number of rings amounts to the productive formation thickness divided by drain port diameter D.
7. Device as in claim 1, the distinction lies in the fact that the tripping muff has a conical inside surface and the exterior of streamlined form.
US11/354,269 2006-02-14 2006-02-14 Device for cutting slot-shaped seats in wells by hydro-sandblasting method Abandoned US20070187086A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/354,269 US20070187086A1 (en) 2006-02-14 2006-02-14 Device for cutting slot-shaped seats in wells by hydro-sandblasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/354,269 US20070187086A1 (en) 2006-02-14 2006-02-14 Device for cutting slot-shaped seats in wells by hydro-sandblasting method

Publications (1)

Publication Number Publication Date
US20070187086A1 true US20070187086A1 (en) 2007-08-16

Family

ID=38367144

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/354,269 Abandoned US20070187086A1 (en) 2006-02-14 2006-02-14 Device for cutting slot-shaped seats in wells by hydro-sandblasting method

Country Status (1)

Country Link
US (1) US20070187086A1 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839668A (en) * 2010-04-19 2010-09-22 张达 Jet-type heat exchange device made of high polymer polyphenylene sulfide material
US8240369B1 (en) * 2011-11-02 2012-08-14 Go Energy, Inc. Slot-perforating system for oil, gas and hydro-geological wells
US8863823B1 (en) * 2013-11-25 2014-10-21 Anatoli Nikouline Universal underground hydro-slotting perforation system controlled by working fluid pressure for activation and intensification of gas, oil, and hydro-geological wells
GB2527202A (en) * 2014-05-21 2015-12-16 Proserv Uk Ltd Cutting tool
US20160168969A1 (en) * 2014-12-15 2016-06-16 Oil Well Consulting, LLC Method for Increasing Productivity of Wells
RU173432U1 (en) * 2016-08-22 2017-08-28 Общество с ограниченной ответственностью "НЕККО" DEVICE FOR PERFORATION OF WELLS AND RELATED TECHNOLOGICAL OPERATIONS
RU173482U1 (en) * 2016-12-23 2017-08-29 Общество с ограниченной ответственностью "НЕККО" DEVICE FOR PERFORATION OF WELLS AND RELATED TECHNOLOGICAL OPERATIONS
RU2634766C1 (en) * 2016-08-22 2017-11-03 Общество с ограниченной ответственностью "НЕККО" Multi-function hydromechanical perforator
RU2637349C1 (en) * 2016-08-22 2017-12-04 Общество с ограниченной ответственностью "НЕККО" Complex method and device for performing perforation of wells and associated technological operations (versions)
CN108316883A (en) * 2017-01-16 2018-07-24 新疆如通石油技术服务有限公司 Automatically pouring mud tool
US20180340401A1 (en) * 2017-05-26 2018-11-29 Anjelika Gretskaia Method and system for creating unloading slots in oil and gas wells by stretch-slotting perforation
US10208579B2 (en) * 2016-07-12 2019-02-19 Leon Marmorshteyn Method of increasing productivity of oil and gas recovery from previously used wells
CN112483032A (en) * 2019-09-11 2021-03-12 中国石油天然气股份有限公司 Cutting device
CN118346238A (en) * 2024-06-17 2024-07-16 东营市华科石油科技开发有限责任公司 Underground water distributor for petroleum exploitation

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USRE21085E (en) * 1939-05-16 Method and means of perforating
US3318393A (en) * 1964-04-07 1967-05-09 Halliburton Co Formation treatment
US3593797A (en) * 1969-05-16 1971-07-20 Schlumberger Technology Corp Method and apparatus for consolidating a subsurface earth formation
USRE29621E (en) * 1972-07-17 1978-05-02 Westinghouse Electric Corp. Variable capacity multiple compressor refrigeration system
US4102149A (en) * 1977-04-22 1978-07-25 Westinghouse Electric Corp. Variable capacity multiple compressor refrigeration system
US4122899A (en) * 1977-08-08 1978-10-31 Brieger Emmet F Well perforator with anchor and method
US4259038A (en) * 1977-12-21 1981-03-31 Danfoss A/S Method and regulator for controlling the delivery of a pump arrangement according to demand
US4526513A (en) * 1980-07-18 1985-07-02 Acco Industries Inc. Method and apparatus for control of pipeline compressors
US4560319A (en) * 1983-08-01 1985-12-24 MAN Maschinenfabrik Unternehmensbereich GHH Sterkrade Method and apparatus for controlling at least two parallel-connected turbocompressors
US4646530A (en) * 1986-07-02 1987-03-03 Carrier Corporation Automatic anti-surge control for dual centrifugal compressor system
US5337825A (en) * 1992-09-09 1994-08-16 Uma Ltd. Method of oil well productivity increase
US5522707A (en) * 1994-11-16 1996-06-04 Metropolitan Industries, Inc. Variable frequency drive system for fluid delivery system
US6185946B1 (en) * 1999-05-07 2001-02-13 Thomas B. Hartman System for sequencing chillers in a loop cooling plant and other systems that employ all variable-speed units
US6651741B2 (en) * 2001-10-13 2003-11-25 1407580 Ontario Inc. Method of increasing productivity of oil, gas and hydrogeological wells
US20050244277A1 (en) * 2004-04-30 2005-11-03 Hurst Ernest P Jr Fixed and variable compressor system capacity control
US20060070730A1 (en) * 2004-10-04 2006-04-06 Nord Service, Inc. Device for cutting of slot-like key seats in wells by a hydroabrasive method
US20060225445A1 (en) * 2005-04-07 2006-10-12 Carrier Corporation Refrigerant system with variable speed compressor in tandem compressor application
US20070107449A1 (en) * 2004-04-12 2007-05-17 York International Corporation System and method for capacity control in a multiple compressor chiller system
US7240502B2 (en) * 2003-11-04 2007-07-10 Lg Electronics Inc. Method for controlling operation of air-conditioner
US20070227167A1 (en) * 2006-03-29 2007-10-04 Hussmann Corporation Control method for variable capacity compressors

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USRE21085E (en) * 1939-05-16 Method and means of perforating
US3318393A (en) * 1964-04-07 1967-05-09 Halliburton Co Formation treatment
US3593797A (en) * 1969-05-16 1971-07-20 Schlumberger Technology Corp Method and apparatus for consolidating a subsurface earth formation
USRE29621E (en) * 1972-07-17 1978-05-02 Westinghouse Electric Corp. Variable capacity multiple compressor refrigeration system
US4102149A (en) * 1977-04-22 1978-07-25 Westinghouse Electric Corp. Variable capacity multiple compressor refrigeration system
US4122899A (en) * 1977-08-08 1978-10-31 Brieger Emmet F Well perforator with anchor and method
US4259038A (en) * 1977-12-21 1981-03-31 Danfoss A/S Method and regulator for controlling the delivery of a pump arrangement according to demand
US4526513A (en) * 1980-07-18 1985-07-02 Acco Industries Inc. Method and apparatus for control of pipeline compressors
US4560319A (en) * 1983-08-01 1985-12-24 MAN Maschinenfabrik Unternehmensbereich GHH Sterkrade Method and apparatus for controlling at least two parallel-connected turbocompressors
US4646530A (en) * 1986-07-02 1987-03-03 Carrier Corporation Automatic anti-surge control for dual centrifugal compressor system
US5337825A (en) * 1992-09-09 1994-08-16 Uma Ltd. Method of oil well productivity increase
US5522707A (en) * 1994-11-16 1996-06-04 Metropolitan Industries, Inc. Variable frequency drive system for fluid delivery system
US6185946B1 (en) * 1999-05-07 2001-02-13 Thomas B. Hartman System for sequencing chillers in a loop cooling plant and other systems that employ all variable-speed units
US6651741B2 (en) * 2001-10-13 2003-11-25 1407580 Ontario Inc. Method of increasing productivity of oil, gas and hydrogeological wells
US7073587B2 (en) * 2001-10-13 2006-07-11 1407580 Ontario Inc System for increasing productivity of oil, gas and hydrogeological wells
US7240502B2 (en) * 2003-11-04 2007-07-10 Lg Electronics Inc. Method for controlling operation of air-conditioner
US20070107449A1 (en) * 2004-04-12 2007-05-17 York International Corporation System and method for capacity control in a multiple compressor chiller system
US20050244277A1 (en) * 2004-04-30 2005-11-03 Hurst Ernest P Jr Fixed and variable compressor system capacity control
US20060070730A1 (en) * 2004-10-04 2006-04-06 Nord Service, Inc. Device for cutting of slot-like key seats in wells by a hydroabrasive method
US20060225445A1 (en) * 2005-04-07 2006-10-12 Carrier Corporation Refrigerant system with variable speed compressor in tandem compressor application
US20070227167A1 (en) * 2006-03-29 2007-10-04 Hussmann Corporation Control method for variable capacity compressors

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839668A (en) * 2010-04-19 2010-09-22 张达 Jet-type heat exchange device made of high polymer polyphenylene sulfide material
US8240369B1 (en) * 2011-11-02 2012-08-14 Go Energy, Inc. Slot-perforating system for oil, gas and hydro-geological wells
US8863823B1 (en) * 2013-11-25 2014-10-21 Anatoli Nikouline Universal underground hydro-slotting perforation system controlled by working fluid pressure for activation and intensification of gas, oil, and hydro-geological wells
GB2527202A (en) * 2014-05-21 2015-12-16 Proserv Uk Ltd Cutting tool
GB2527202B (en) * 2014-05-21 2017-05-10 Proserv Uk Ltd Cutting tool
US10119373B2 (en) 2014-05-21 2018-11-06 Proserv Uk Limited Cutting tool
US20160168969A1 (en) * 2014-12-15 2016-06-16 Oil Well Consulting, LLC Method for Increasing Productivity of Wells
US10208579B2 (en) * 2016-07-12 2019-02-19 Leon Marmorshteyn Method of increasing productivity of oil and gas recovery from previously used wells
RU2634766C1 (en) * 2016-08-22 2017-11-03 Общество с ограниченной ответственностью "НЕККО" Multi-function hydromechanical perforator
RU2637349C1 (en) * 2016-08-22 2017-12-04 Общество с ограниченной ответственностью "НЕККО" Complex method and device for performing perforation of wells and associated technological operations (versions)
RU173432U1 (en) * 2016-08-22 2017-08-28 Общество с ограниченной ответственностью "НЕККО" DEVICE FOR PERFORATION OF WELLS AND RELATED TECHNOLOGICAL OPERATIONS
RU173482U1 (en) * 2016-12-23 2017-08-29 Общество с ограниченной ответственностью "НЕККО" DEVICE FOR PERFORATION OF WELLS AND RELATED TECHNOLOGICAL OPERATIONS
CN108316883A (en) * 2017-01-16 2018-07-24 新疆如通石油技术服务有限公司 Automatically pouring mud tool
US20180340401A1 (en) * 2017-05-26 2018-11-29 Anjelika Gretskaia Method and system for creating unloading slots in oil and gas wells by stretch-slotting perforation
CN112483032A (en) * 2019-09-11 2021-03-12 中国石油天然气股份有限公司 Cutting device
CN118346238A (en) * 2024-06-17 2024-07-16 东营市华科石油科技开发有限责任公司 Underground water distributor for petroleum exploitation

Similar Documents

Publication Publication Date Title
US20070187086A1 (en) Device for cutting slot-shaped seats in wells by hydro-sandblasting method
RU2645044C1 (en) Equipment and operations of movable interface unit
US6394184B2 (en) Method and apparatus for stimulation of multiple formation intervals
EA004100B1 (en) Method and apparatus for stimulation of multiple formation intervals
RU2612061C1 (en) Recovery method of shale carbonate oil field
US10060210B2 (en) Flow control downhole tool
RU2634134C1 (en) Method of interval multistage hydraulic fracturing of formation in oil and gas wells
EP2964873B1 (en) Wireline assisted coiled tubing portion and method for operation of such a coiled tubing portion
RU2129208C1 (en) Method for operation of gusher wells with use of gas-lift phenomenon of associated oil gas
AU2015201029B2 (en) Apparatus and method for stimulating subterranean formations
CN108204228A (en) A kind of composite fracturing process pipe string and its application method
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
US20170058646A1 (en) Deepwater extended reach hardrock completions
RU2594027C1 (en) Method of well development of oil reservoir area
RU2225938C1 (en) Methods for exploiting oil extracting wells
EP3710668A1 (en) Removable modular control assembly
US3036634A (en) Completion of wells in a plurality of formations
RU2021477C1 (en) Method for well construction
RU2174595C1 (en) Process of isolation of water-saturated pools in operational wells
RU2211303C2 (en) Method of shutoff of water inflow to well
RU2376460C1 (en) Equipment for multiple production of multilayer field wells
RU2541978C1 (en) Well construction method
US10570714B2 (en) System and method for enhanced oil recovery
RU2791008C1 (en) Device for multi-stage hydraulic fracturing
RU2774455C1 (en) Method for completing a well with a horizontal completion using a production column of one diameter from head to bottomhouse and subsequent carrying out large-volume, speed and multi-stage hydraulic fracturing

Legal Events

Date Code Title Description
AS Assignment

Owner name: DAVIDSON DRILLING LLC, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:IVANOV, ANATOLY NIKOLAYEVICH;IVANOV, ARTEM ANATOLYEVICH;TICHONOV, ARTEM IVANOVICH;AND OTHERS;REEL/FRAME:018068/0801;SIGNING DATES FROM 20060710 TO 20060807

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION