US20070137436A1 - Method for the thermal treatment of raw materials and a device for carrying out said method - Google Patents
Method for the thermal treatment of raw materials and a device for carrying out said method Download PDFInfo
- Publication number
- US20070137436A1 US20070137436A1 US10/474,898 US47489802A US2007137436A1 US 20070137436 A1 US20070137436 A1 US 20070137436A1 US 47489802 A US47489802 A US 47489802A US 2007137436 A1 US2007137436 A1 US 2007137436A1
- Authority
- US
- United States
- Prior art keywords
- furnace
- gas phases
- gas
- raw materials
- gas phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 239000002994 raw material Substances 0.000 title claims abstract description 29
- 238000007669 thermal treatment Methods 0.000 title claims abstract description 11
- 239000007789 gas Substances 0.000 claims abstract description 113
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims abstract description 39
- 239000001301 oxygen Substances 0.000 claims abstract description 39
- 229910052760 oxygen Inorganic materials 0.000 claims abstract description 39
- 238000002347 injection Methods 0.000 claims description 9
- 239000007924 injection Substances 0.000 claims description 9
- 239000000203 mixture Substances 0.000 claims description 5
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 239000011261 inert gas Substances 0.000 claims description 4
- 238000006243 chemical reaction Methods 0.000 abstract description 14
- 230000035515 penetration Effects 0.000 abstract description 9
- 238000002844 melting Methods 0.000 abstract description 8
- 230000008018 melting Effects 0.000 abstract description 8
- 238000013021 overheating Methods 0.000 abstract description 4
- 239000000571 coke Substances 0.000 description 11
- 229910000805 Pig iron Inorganic materials 0.000 description 6
- 239000000463 material Substances 0.000 description 6
- 238000002485 combustion reaction Methods 0.000 description 4
- 239000000155 melt Substances 0.000 description 4
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 3
- 235000011941 Tilia x europaea Nutrition 0.000 description 3
- 239000004571 lime Substances 0.000 description 3
- 230000003647 oxidation Effects 0.000 description 3
- 238000007254 oxidation reaction Methods 0.000 description 3
- 239000002893 slag Substances 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- MYMOFIZGZYHOMD-UHFFFAOYSA-N Dioxygen Chemical compound O=O MYMOFIZGZYHOMD-UHFFFAOYSA-N 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005275 alloying Methods 0.000 description 2
- 239000000470 constituent Substances 0.000 description 2
- 229910001882 dioxygen Inorganic materials 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 206010024769 Local reaction Diseases 0.000 description 1
- 229910001570 bauxite Inorganic materials 0.000 description 1
- 238000001354 calcination Methods 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 230000037452 priming Effects 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B1/00—Shaft or like vertical or substantially vertical furnaces
- F27B1/10—Details, accessories or equipment specially adapted for furnaces of these types
- F27B1/16—Arrangements of tuyeres
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D7/00—Forming, maintaining or circulating atmospheres in heating chambers
- F27D7/06—Forming or maintaining special atmospheres or vacuum within heating chambers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D19/00—Arrangements of controlling devices
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/10—Reduction of greenhouse gas [GHG] emissions
- Y02P10/143—Reduction of greenhouse gas [GHG] emissions of methane [CH4]
Definitions
- the present invention relates to a method for the thermal treatment of raw materials and to a device for carrying out this method for the thermal treatment of raw materials.
- shaft furnaces employing prior art technology have a great variety of industrial uses.
- shaft furnaces can be used as melting units (e.g., blast furnaces, cupola furnaces) or for the heat treatment of a charge (e.g., lime kilns, calcining kilns for bauxite).
- One method for operating a cupola furnace is known, for example, from DE 41 22 381 A1.
- the cupola furnace is loaded at the top with the charge, a mixture of lumpy raw materials such as, for example, ore, scrap, coke charge, and fluxing materials.
- blast air
- the coke is oxidized to CO 2 and CO and thus produces the energy needed for melting.
- the air is conveyed into the furnace via tuyées, which are uniformly distributed in an annular plane on the circumference of the furnace.
- the molten pig iron is collected in the lower zone of the furnace, in what is called the hearth or hearth zone, and flows out continuously through a siphon system.
- Oxygen is added to the cold or hot blast in contemporary methods in order to increase the melting capacity and improve the metallurgical properties of the pig iron.
- Various advantages are achieved by the addition of oxygen. These include, among others, an increase in the temperature of the melting zone and a concomitant increase in melting capacity. Furthermore, higher pig iron temperatures are obtained, the coke charge burns more thoroughly (free residual coke can be found in the slag in the case of incomplete combustion), and less coke is therefore consumed.
- oxygen it must be noted that the pressure of the oxygen decreases within a short distance beyond the inlet with the result that a deeper penetration of the charge is not possible. Rather, a sharp temperature gradient occurs between the interior of the charge and the portion of the charge adjacent to the inlet.
- DE 197 29 624 A1 proposes that the oxygen be introduced in high-pressure pulses into the furnace by means of a lance disposed in the tuyère.
- the oxygen should penetrate the charge more deeply and thus eliminate the temperature gradient within the charge.
- the known method does indeed allow a deeper penetration of the charge, but the results remain unsatisfactory.
- the large increase in the local reaction temperature in the vicinity of the O 2 inlet causes a superproportional, exponential increase in reaction rates.
- known formulas e.g., the Arrhenius' equation
- the object of the present invention is to provide a method for the thermal treatment of raw materials that ensures the best possible penetration of the furnace charge and that avoids localized overheating within the charge.
- An additional goal is to introduce a device for carrying out the inventive method.
- a furnace such as a blast furnace, is used in the inventive method for the thermal treatment of raw materials.
- the raw materials are understood to be, for example, ore, scrap, coke charge, fluxing materials, etc.
- the furnace is charged with the raw materials and at least two gas phases are introduced into the furnace.
- the gas phases have different oxygen contents, and even an oxygen-free gas phase is permissible.
- the at least two gas phases are alternately introduced into the furnace.
- alternating introduction is understood to mean that for a certain period of time only one of the gas phases is introduced, without the gas phases having been mixed in advanced, and that the gas phases can be alternately introduced in any sequence. It is possible in principle to introduce the gas phases with different oxygen contents by turns in a continuous volume flow or discontinuously, i.e., for a certain period of time neither the one nor the other gas phase is supplied.
- the sequencing of high oxygen content gas phases with low oxygen content gas phases has the advantage that a “priming charge” occurs with the high-oxygen gas phase at exponentially increased reaction rates and material conversions (especially in the gas-solid reaction with the coke charge), while the atmospheres and temperatures are equalized by the low-oxygen gas phase at high flow rates and thus good removal of the gaseous reaction products.
- the inventive method allows good penetration of the furnace charge and avoids localized overheating within the charge.
- a high oxygen content gas phase for example, pure oxygen
- a low oxygen content gas phase for example, compressed air
- the injections of oxygen and compressed air can overlap each other, follow one another immediately, or be separated by a time delay.
- the method has the advantage that use of an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast.
- an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast.
- the local atmosphere is diluted and partially cooled with the result that the reaction equilibria are re-established.
- the equalization of the concentrations and temperatures through turbulence and diffusion owing to the batchwise introduction of oxygen and air accrues distinct advantages with regard to the execution of the reactions.
- the charge serves as an internal mixing apparatus for the production of enriched air. Mixing can be rapidly adapted to the process by varying the different cycle lengths, with the result that fluctuations in the melt can be minimized.
- the at least two gas phases undergoing alternating introduction into the furnace are introduced into the furnace under a pressure that is greater than the internal pressure of the furnace. This greater pressure achieves a deeper penetration of the furnace charge, on the one hand, while, on the other hand, minimizing the influence of the wall effect in this zone. This can substantially improve the technical combustion efficiency and the metallurgical results.
- the at least two gas phases are introduced into the furnace in a continuous volume flow. Accordingly, there is no interruption between the introductions of the different gas phases, and as a result the gas phases immediately following one another drive each other and thus promote constant flow conditions. This results in good penetration of the charge.
- one of the two gas phases in a preferred embodiment of the method is a mixture of an inert gas and oxygen.
- the inert gas is preferably N 2 and/or CO 2 and/or Ar.
- One of the at least two gas phases is air in an advantageous embodiment of the inventive method.
- One of the at least two gas phases is oxygen in another advantageous embodiment of the inventive method.
- the proportions of the oxygen quantities introduced into the furnace with the at least two gas phases are regulated in order to establish a certain atmosphere in the furnace. This enables short-term and very sensitive responses to changes in the operating parameters.
- the duration of introduction of the individual gas phases into the furnace is varied in order to adjust the quantities of oxygen delivered into the furnace with the at least two gas phases.
- the proportions of the oxygen quantities introduced into the furnace with the two gas phases can be regulated in order to ensure that the atmosphere inside the furnace is always optimal.
- the inventive furnace for the thermal treatment of raw materials has a chamber with a charging opening for the raw materials.
- This furnace is also provided with an injection apparatus for introducing the at least two gas phases with different oxygen contents into the chamber.
- the injection apparatus is designed in such a way that the at least two gas phases are introduced by turns into the furnace.
- the injection apparatus for delivering the gas phases has gas phase conduits equipped with control valves.
- Gas phase conduit is understood to mean any mode of delivery by which the gas phases are conveyed.
- the gas phases are introduced in sequences that can be arbitrarily varied in terms of length, the time interval between injections, and the relationship of the two gas phases to each other.
- the introduction can be regulated by means of stored-program control (SPC), e.g., with a microprocessor.
- SPC stored-program control
- the aforementioned parameters can be programmed variably and freely, and thus the inflow of the gas phases through the valves can be controlled.
- pressure regulators are provided for adjusting the gas pressure in the gas phase conduits.
- the furnace can be equipped with an analyzing device for analyzing the atmosphere in the furnace and/or a measuring device for measuring the temperature in the material discharged from the furnace.
- the inventive furnace is provided with one or more bustle pipes arranged around the furnace.
- the supply lances are connected to these bustle pipes.
- FIG. 1 a cutaway side view of a first embodiment of the inventive furnace
- FIG. 2 a cutaway side view of a second and third embodiment of the inventive furnace.
- FIG. 1 shows a furnace 2 , which in the embodiment under discussion is devised as a cupola furnace.
- This cupola furnace serves to melt pig iron continuously.
- the furnace 2 has a furnace housing 4 that encloses a chamber 6 .
- the chamber 6 has several zones in which various processes are carried out, namely, a charging zone 8 , a preheating zone 10 , a melting zone 12 , a so-called blast zone 14 , and a hearth zone 16 , with the last being situated directly above the furnace floor 18 .
- the furnace housing 4 has, at the charging zone, a lateral charging opening 20 , which can also be situated above the charging zone 8 .
- the charging opening is designed such that the raw materials to be treated (not shown), e.g., a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials, can be delivered to the chamber 6 through the opening.
- the furnace housing in the charging zone has a vent 22 through which the resulting blast-furnace gas can be conducted away.
- the shaft furnace 2 has a slag taphole 24 and an iron taphole 26 .
- the furnace 2 also has a first bustle pipe 28 , which surrounds the furnace housing 4 in annular fashion and is supplied with air via an air-supply device that is not shown.
- Uniformly distributed around the furnace 2 are a plurality of tubular tuyommes 30 , which on the one side are connected to the first bustle pipe 28 and on the other side lead into the chamber 6 at the blast zone 14 .
- the depicted first embodiment of the furnace 2 is also equipped with a second bustle pipe 32 , which surrounds the furnace housing in annular fashion.
- each of the gas phase supply lances 34 is disposed substantially coaxially in a tuy Guatemala 30 such that the end 36 of the gas phase supply lance 34 is situated in the center of the mouth of the tuyées 30 in the region of the chamber 6 .
- a first conduit 42 for delivering a first gas phase and a second conduit 44 for delivering a second gas phase flow into a common gas phase conduit 38 , to which the second bustle pipe 32 is connected.
- a first blast-pressure tank 46 is connected to the first gas phase conduit 24 [sic]
- a second blast-pressure tank 48 is connected to the second gas phase conduit 42 [sic].
- the blast-pressure tanks contain pressurized gas phases with different oxygen contents, and the pressure within the blast-pressure tanks 46 and 48 is higher than the pressure in the blast zone 14 of the chamber 6 of the furnace 2 .
- the gas phase conduits 42 and 44 deliver pure oxygen (O 2 ) to the first blast-pressure tank 46 and air to the second blast-pressure tank 48 .
- the blast-pressure tanks 46 and 48 are not absolutely necessary but serve only as vibration dampers.
- a first pressure regulator 50 is placed upstream from the first blast-pressure tank 46 and a first control valve 52 is placed downstream from the blast-pressure tank 46
- a second pressure regulator 54 is placed upstream from the second blast-pressure tank 48 and a second control valve 56 is placed downstream from the blast-pressure tank.
- the furnace has a control unit 40 that is connected via control circuits 60 to the first and second pressure regulators 50 and 54 and to the first and second control valves 52 and 56 .
- the control unit 40 controls the control valves in such a manner that the common gas phase conduit 38 and the first gas phase conduit 42 communicate with each other while the second gas phase conduit 44 is closed off, or the common gas phase conduit 38 and the second gas phase conduit 44 communicate with each other while the first gas phase conduit 42 is closed off.
- the control unit adjusts the pressure in the blast-pressure tanks by means of the pressure regulators 50 and 54 .
- the chamber 6 of the furnace 2 is charged through the charging opening 20 with the raw materials (not shown) which are to be thermally treated, wherein the raw materials in the chamber 6 constitute the so-called charge.
- the raw materials are a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials.
- the continuously supplied raw materials pass through the various zones of the chamber 6 successively from top to bottom.
- the raw materials agglomerate in the charging zone 8 .
- the preheating zone 10 the raw materials are preheated by the heat and reaction gases rising from the underlying zones
- the preheated raw materials then pass into the melting zone 12 , in which the raw materials begin to melt due to the high temperatures.
- the partially melted raw materials next pass into the blast zone 14 .
- air is blown through the first bustle pipe 28 and the tuy insomnias 30 into the chamber 6 .
- the air needed for combustion is blown into the blast zone 14 as unheated cold blast or as hot blast.
- the raw materials are completely melted in the blast zone 14 by the air thus supplied, and the melt passes into the hearth zone 16 , in which, on the one side, the slag floating on the melt is carried off through the first opening 24 and, on the other side, the melt is led away through the second opening 26 .
- At least two gas phases with different oxygen contents are alternately introduced into the blast zone 14 of the chamber 6 of the inventive furnace 2 .
- the gas phases are introduced in the process via the first and second gas phase conduits 42 and 44 , the common gas phase conduit 38 , and the gas phase supply lances 34 .
- the continual alternation between the gas phases thus supplied is controlled by the control unit 54 by means of the control valves 52 and 56 such that the pressurized oxygen-rich gas phase (O 2 ) and the pressurized oxygen-poor gas phase (air) are introduced sequentially into the blast zone 14 .
- control unit 54 The times during which the control valves are open or closed can be changed by the control unit 54 . Furthermore, the pressure of each gas phase can be changed by the pressure regulators 50 and 54 , respectively. To establish a certain atmosphere in the furnace, the proportions of the oxygen quantities introduced into the furnace with the two gas phases are regulated, and to adjust the oxygen quantities the duration of gas phase introduction is changed.
- the gas phase supply lances 3 [sic] are suitably arranged within the tuyommes 30 (preferably in concentric fashion), as shown in FIG. 1 .
- the gas phase supply lances 34 can be situated above the tuyommes so that the gas phases are introduced above the blast, as shown in FIG. 2 .
- Other arrangements of the gas phase supply lances 34 are also possible.
- the angle of inclination of the gas phase supply lances 34 with respect to the furnace axis or their depth of immersion into the chamber 6 of the furnace 2 can be varied.
- FIG. 2 /left and FIG. 2 /right, respectively, show second and third embodiments of the inventive furnace 2 .
- the second embodiment differs from the first embodiment in that the former does not have a second bustle pipe 32 .
- the inventive furnace 2 has several segmented bustle pipes 70 , of which only one is shown, and which are arranged in annular fashion around the furnace 2 . There is preferably a total of four circumferentially distributed segmented bustle pipes.
- the segmented bustle pipes are connected to a first gas phase conduit 38 and have gas phase supply lances 34 that open into the chamber 6 of the furnace 2 .
- the gas phases can be admitted to each segmented bustle pipe 70 independently of the others.
- the gas phases are preferably admitted to the pipes 70 in sequence so that the gas phases are introduced clockwise or counterclockwise from each side into the furnace. Refer to the description of FIG. 1 for the other parts of the furnace.
- the third embodiment differs from the first embodiment in that the former has separate gas phase supply lances 34 having one or two valves 72 each, such that each gas phase supply lance 34 has its own gas phase supply.
- a stored-program control (SPC) system for example, can be employed in this case, wherein valve disturbances or control errors can be detected with feedback sensors for pressure or flow, for example, and eliminated.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
- Furnace Details (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
The invention relates to a method for the thermal treatment of raw materials in which a furnace (2) is charged with the raw material and at least two gas phases are introduced into the furnace in which the raw material is subjected to the thermal treatment. The gas phases have different oxygen contents and are introduced into the furnace sequentially. During the introduction of a first gas phase with a relatively high oxygen content (for example, O2), a temperature and pressure rise occurs; the reaction gases are forced towards the center of the furnace by the subsequent introduction of a second gas phase with a relatively low or no oxygen content (for example, air, CH4), whereupon an equalization of temperature and concentration occurs in the melting zone. Said method permits a good penetration of the furnace charge and avoids localized overheating within the charge. The invention further relates to a furnace (2) for carrying out said method.
Description
- The present invention relates to a method for the thermal treatment of raw materials and to a device for carrying out this method for the thermal treatment of raw materials.
- The various known shaft furnaces employing prior art technology have a great variety of industrial uses. For example, shaft furnaces can be used as melting units (e.g., blast furnaces, cupola furnaces) or for the heat treatment of a charge (e.g., lime kilns, calcining kilns for bauxite).
- One method for operating a cupola furnace is known, for example, from DE 41 22 381 A1. Here, the cupola furnace is loaded at the top with the charge, a mixture of lumpy raw materials such as, for example, ore, scrap, coke charge, and fluxing materials. Through the injection of air (“blast”), the coke is oxidized to CO2 and CO and thus produces the energy needed for melting. In this process, the air is conveyed into the furnace via tuyères, which are uniformly distributed in an annular plane on the circumference of the furnace. The molten pig iron is collected in the lower zone of the furnace, in what is called the hearth or hearth zone, and flows out continuously through a siphon system. In older cupola furnaces, air at room temperature (cold blast) is used for the partial combustion of the coke charge. Newer units are run with a hot blast, which is air regeneratively preheated with the offgas (blast furnace gas) in hot blast stoves. A coal gas, namely, CO2 or CO, is introduced into the furnace according to this known method in order to maintain the CO content inside the furnace at a preset value or in order to vary the CO content inside the furnace.
- Oxygen is added to the cold or hot blast in contemporary methods in order to increase the melting capacity and improve the metallurgical properties of the pig iron. Various advantages are achieved by the addition of oxygen. These include, among others, an increase in the temperature of the melting zone and a concomitant increase in melting capacity. Furthermore, higher pig iron temperatures are obtained, the coke charge burns more thoroughly (free residual coke can be found in the slag in the case of incomplete combustion), and less coke is therefore consumed. Of course, when oxygen is added, it must be noted that the pressure of the oxygen decreases within a short distance beyond the inlet with the result that a deeper penetration of the charge is not possible. Rather, a sharp temperature gradient occurs between the interior of the charge and the portion of the charge adjacent to the inlet. As a solution to this problem, DE 197 29 624 A1 proposes that the oxygen be introduced in high-pressure pulses into the furnace by means of a lance disposed in the tuyère. In this way the oxygen should penetrate the charge more deeply and thus eliminate the temperature gradient within the charge. With the high pressure and thus the higher energy, the known method does indeed allow a deeper penetration of the charge, but the results remain unsatisfactory. One of the reasons for this is that the large increase in the local reaction temperature in the vicinity of the O2 inlet causes a superproportional, exponential increase in reaction rates. According to known formulas (e.g., the Arrhenius' equation), it can be assumed that, in the present case, the reaction rate doubles for each 20° C. to 30° C. increase in temperature.
- The object of the present invention is to provide a method for the thermal treatment of raw materials that ensures the best possible penetration of the furnace charge and that avoids localized overheating within the charge. An additional goal is to introduce a device for carrying out the inventive method.
- These objects are achieved by the characteristic features of patent claims 1 and 10, respectively. Advantageous embodiments of the invention are the subject matter of the dependent claims.
- A furnace, such as a blast furnace, is used in the inventive method for the thermal treatment of raw materials. The raw materials are understood to be, for example, ore, scrap, coke charge, fluxing materials, etc. The furnace is charged with the raw materials and at least two gas phases are introduced into the furnace. The gas phases have different oxygen contents, and even an oxygen-free gas phase is permissible. According to the invention, the at least two gas phases are alternately introduced into the furnace. Here, alternating introduction is understood to mean that for a certain period of time only one of the gas phases is introduced, without the gas phases having been mixed in advanced, and that the gas phases can be alternately introduced in any sequence. It is possible in principle to introduce the gas phases with different oxygen contents by turns in a continuous volume flow or discontinuously, i.e., for a certain period of time neither the one nor the other gas phase is supplied.
- In conventional methods the further penetration of the gas phase into the charge is blocked or, in unfavorable cases, the flow direction is even reversed. This is attributable to the fact that the oxidation products are predominantly gaseous, and the reactions are exothermic, with the result that sudden sharp increases in temperature and pressure occur locally.
- This disadvantage is surmounted by the alternating introduction of gas phases with different oxygen contents. The aforementioned increases in temperature and pressure occur during the introduction of a first gas phase with a relatively high oxygen content (e.g., O2); the reaction gases are forced back toward the center of the furnace by the subsequent introduction of a second gas phase with a relatively low or no oxygen content (e.g., air, CH4), whereupon the temperature and concentration are equalized. It is particularly advantageous here that the equalizing reactions occur in deeper zones of the charge through increasingly intensive intermixing of the successive gases, wherein gas-gas reactions take place at significantly higher reaction rates. The sequencing of high oxygen content gas phases with low oxygen content gas phases has the advantage that a “priming charge” occurs with the high-oxygen gas phase at exponentially increased reaction rates and material conversions (especially in the gas-solid reaction with the coke charge), while the atmospheres and temperatures are equalized by the low-oxygen gas phase at high flow rates and thus good removal of the gaseous reaction products. In this way the inventive method allows good penetration of the furnace charge and avoids localized overheating within the charge.
- In the inventive method, a high oxygen content gas phase, for example, pure oxygen, is thus briefly injected, preferably at high pressure, and causes a spontaneous oxidation. A low oxygen content gas phase, for example, compressed air, is then injected. The injections of oxygen and compressed air can overlap each other, follow one another immediately, or be separated by a time delay.
- The method has the advantage that use of an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast. Through the induction of compressed air the local atmosphere is diluted and partially cooled with the result that the reaction equilibria are re-established. The equalization of the concentrations and temperatures through turbulence and diffusion owing to the batchwise introduction of oxygen and air accrues distinct advantages with regard to the execution of the reactions. In principle the charge serves as an internal mixing apparatus for the production of enriched air. Mixing can be rapidly adapted to the process by varying the different cycle lengths, with the result that fluctuations in the melt can be minimized.
- In a preferred embodiment of the inventive method the at least two gas phases undergoing alternating introduction into the furnace are introduced into the furnace under a pressure that is greater than the internal pressure of the furnace. This greater pressure achieves a deeper penetration of the furnace charge, on the one hand, while, on the other hand, minimizing the influence of the wall effect in this zone. This can substantially improve the technical combustion efficiency and the metallurgical results.
- In another preferred embodiment of the method, the at least two gas phases are introduced into the furnace in a continuous volume flow. Accordingly, there is no interruption between the introductions of the different gas phases, and as a result the gas phases immediately following one another drive each other and thus promote constant flow conditions. This results in good penetration of the charge.
- More advantageously, one of the two gas phases in a preferred embodiment of the method is a mixture of an inert gas and oxygen. The inert gas is preferably N2 and/or CO2 and/or Ar.
- One of the at least two gas phases is air in an advantageous embodiment of the inventive method.
- One of the at least two gas phases is oxygen in another advantageous embodiment of the inventive method.
- In order to be able to respond to changes in the operating parameters, in a preferred embodiment the proportions of the oxygen quantities introduced into the furnace with the at least two gas phases are regulated in order to establish a certain atmosphere in the furnace. This enables short-term and very sensitive responses to changes in the operating parameters.
- In a preferred embodiment of the invention, the duration of introduction of the individual gas phases into the furnace is varied in order to adjust the quantities of oxygen delivered into the furnace with the at least two gas phases.
- The proportions of the oxygen quantities introduced into the furnace with the two gas phases can be regulated in order to ensure that the atmosphere inside the furnace is always optimal.
- The inventive furnace for the thermal treatment of raw materials has a chamber with a charging opening for the raw materials. This furnace is also provided with an injection apparatus for introducing the at least two gas phases with different oxygen contents into the chamber. The injection apparatus is designed in such a way that the at least two gas phases are introduced by turns into the furnace.
- In an advantageous embodiment of the inventive furnace the injection apparatus for delivering the gas phases has gas phase conduits equipped with control valves. Gas phase conduit is understood to mean any mode of delivery by which the gas phases are conveyed.
- The gas phases are introduced in sequences that can be arbitrarily varied in terms of length, the time interval between injections, and the relationship of the two gas phases to each other. The introduction can be regulated by means of stored-program control (SPC), e.g., with a microprocessor. In this manner the aforementioned parameters can be programmed variably and freely, and thus the inflow of the gas phases through the valves can be controlled.
- In a preferred embodiment of the furnace according to the invention, pressure regulators are provided for adjusting the gas pressure in the gas phase conduits.
- In order to allow the furnace to be monitored during operation and to allow the atmosphere to be changed, if need be, the furnace can be equipped with an analyzing device for analyzing the atmosphere in the furnace and/or a measuring device for measuring the temperature in the material discharged from the furnace.
- In a particularly preferred embodiment, the inventive furnace is provided with one or more bustle pipes arranged around the furnace. The supply lances are connected to these bustle pipes.
- Exemplary embodiments of the invention will be explained in detail in the following and with reference to the attached figures.
- The following are shown:
-
FIG. 1 a cutaway side view of a first embodiment of the inventive furnace and -
FIG. 2 a cutaway side view of a second and third embodiment of the inventive furnace. -
FIG. 1 shows afurnace 2, which in the embodiment under discussion is devised as a cupola furnace. This cupola furnace serves to melt pig iron continuously. Thefurnace 2 has a furnace housing 4 that encloses achamber 6. Considered from top to bottom thechamber 6 has several zones in which various processes are carried out, namely, a charging zone 8, a preheating zone 10, amelting zone 12, a so-called blast zone 14, and ahearth zone 16, with the last being situated directly above thefurnace floor 18. The furnace housing 4 has, at the charging zone, alateral charging opening 20, which can also be situated above the charging zone 8. The charging opening is designed such that the raw materials to be treated (not shown), e.g., a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials, can be delivered to thechamber 6 through the opening. In addition, the furnace housing in the charging zone has avent 22 through which the resulting blast-furnace gas can be conducted away. - The
shaft furnace 2 has aslag taphole 24 and aniron taphole 26. Thefurnace 2 also has afirst bustle pipe 28, which surrounds the furnace housing 4 in annular fashion and is supplied with air via an air-supply device that is not shown. Uniformly distributed around thefurnace 2 are a plurality oftubular tuyèress 30, which on the one side are connected to thefirst bustle pipe 28 and on the other side lead into thechamber 6 at the blast zone 14. The depicted first embodiment of thefurnace 2 is also equipped with asecond bustle pipe 32, which surrounds the furnace housing in annular fashion. Connected to thesecond bustle pipe 32 are essentially tubular gas phase supply lances 34, the ends 36 of which lead into thechamber 6 at the blast zone 14. In the first embodiment each of the gas phase supply lances 34 is disposed substantially coaxially in atuyères 30 such that theend 36 of the gasphase supply lance 34 is situated in the center of the mouth of thetuyères 30 in the region of thechamber 6. - A
first conduit 42 for delivering a first gas phase and asecond conduit 44 for delivering a second gas phase flow into a commongas phase conduit 38, to which thesecond bustle pipe 32 is connected. A first blast-pressure tank 46 is connected to the first gas phase conduit 24 [sic], and a second blast-pressure tank 48 is connected to the second gas phase conduit 42 [sic]. The blast-pressure tanks contain pressurized gas phases with different oxygen contents, and the pressure within the blast- 46 and 48 is higher than the pressure in the blast zone 14 of thepressure tanks chamber 6 of thefurnace 2. In the example under consideration, it is assumed that the 42 and 44 deliver pure oxygen (O2) to the first blast-gas phase conduits pressure tank 46 and air to the second blast-pressure tank 48. The blast- 46 and 48 are not absolutely necessary but serve only as vibration dampers.pressure tanks - In the first
gas phase conduit 42, afirst pressure regulator 50 is placed upstream from the first blast-pressure tank 46 and afirst control valve 52 is placed downstream from the blast-pressure tank 46, while in the second gas phase conduit 44 asecond pressure regulator 54 is placed upstream from the second blast-pressure tank 48 and asecond control valve 56 is placed downstream from the blast-pressure tank. - Furthermore, in order to regulate the inflow of the gas phases the furnace has a
control unit 40 that is connected viacontrol circuits 60 to the first and 50 and 54 and to the first andsecond pressure regulators 52 and 56.second control valves - The
control unit 40 controls the control valves in such a manner that the commongas phase conduit 38 and the firstgas phase conduit 42 communicate with each other while the secondgas phase conduit 44 is closed off, or the commongas phase conduit 38 and the secondgas phase conduit 44 communicate with each other while the firstgas phase conduit 42 is closed off. The control unit adjusts the pressure in the blast-pressure tanks by means of the 50 and 54.pressure regulators - The operation of the first embodiment of the inventive furnace, illustrated in
FIG. 1 , is described in the following. - The
chamber 6 of thefurnace 2 is charged through the chargingopening 20 with the raw materials (not shown) which are to be thermally treated, wherein the raw materials in thechamber 6 constitute the so-called charge. In the present example the raw materials are a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials. During the course of the process the continuously supplied raw materials pass through the various zones of thechamber 6 successively from top to bottom. The raw materials agglomerate in the charging zone 8. In the preheating zone 10 the raw materials are preheated by the heat and reaction gases rising from the underlying zones The preheated raw materials then pass into themelting zone 12, in which the raw materials begin to melt due to the high temperatures. The partially melted raw materials next pass into the blast zone 14. In the blast zone 14 air is blown through thefirst bustle pipe 28 and thetuyèress 30 into thechamber 6. The air needed for combustion is blown into the blast zone 14 as unheated cold blast or as hot blast. The raw materials are completely melted in the blast zone 14 by the air thus supplied, and the melt passes into thehearth zone 16, in which, on the one side, the slag floating on the melt is carried off through thefirst opening 24 and, on the other side, the melt is led away through thesecond opening 26. - In order to achieve good penetration of the charge and to avoid localized overheating within the charge, at least two gas phases with different oxygen contents are alternately introduced into the blast zone 14 of the
chamber 6 of theinventive furnace 2. The gas phases are introduced in the process via the first and second 42 and 44, the commongas phase conduits gas phase conduit 38, and the gas phase supply lances 34. The continual alternation between the gas phases thus supplied is controlled by thecontrol unit 54 by means of the 52 and 56 such that the pressurized oxygen-rich gas phase (O2) and the pressurized oxygen-poor gas phase (air) are introduced sequentially into the blast zone 14.control valves - The times during which the control valves are open or closed can be changed by the
control unit 54. Furthermore, the pressure of each gas phase can be changed by the 50 and 54, respectively. To establish a certain atmosphere in the furnace, the proportions of the oxygen quantities introduced into the furnace with the two gas phases are regulated, and to adjust the oxygen quantities the duration of gas phase introduction is changed.pressure regulators - In the above described first embodiment of the inventive furnace, the gas phase supply lances 3 [sic] are suitably arranged within the tuyèress 30 (preferably in concentric fashion), as shown in
FIG. 1 . However, the gas phase supply lances 34 can be situated above the tuyèress so that the gas phases are introduced above the blast, as shown inFIG. 2 . Other arrangements of the gas phase supply lances 34 are also possible. For example, the angle of inclination of the gas phase supply lances 34 with respect to the furnace axis or their depth of immersion into thechamber 6 of thefurnace 2 can be varied. - Furthermore, it may be desirable to arrange individual gas phase supply lances 34 or groups of gas phase supply lances 34 at different heights.
-
FIG. 2 /left andFIG. 2 /right, respectively, show second and third embodiments of theinventive furnace 2. The second embodiment (FIG. 2 /left) differs from the first embodiment in that the former does not have asecond bustle pipe 32. Instead, theinventive furnace 2 has several segmentedbustle pipes 70, of which only one is shown, and which are arranged in annular fashion around thefurnace 2. There is preferably a total of four circumferentially distributed segmented bustle pipes. The segmented bustle pipes are connected to a firstgas phase conduit 38 and have gas phase supply lances 34 that open into thechamber 6 of thefurnace 2. The gas phases can be admitted to eachsegmented bustle pipe 70 independently of the others. The gas phases are preferably admitted to thepipes 70 in sequence so that the gas phases are introduced clockwise or counterclockwise from each side into the furnace. Refer to the description ofFIG. 1 for the other parts of the furnace. - The third embodiment (
FIG. 2 /right) differs from the first embodiment in that the former has separate gas phase supply lances 34 having one or twovalves 72 each, such that each gasphase supply lance 34 has its own gas phase supply. A stored-program control (SPC) system, for example, can be employed in this case, wherein valve disturbances or control errors can be detected with feedback sensors for pressure or flow, for example, and eliminated.
Claims (13)
1-13. (canceled)
14: A method for the thermal treatment of raw materials comprising:
(i.) charging a furnace with the raw materials and at least two gas phases with different oxygen contents;
(ii.) subjecting the raw materials to the thermal treatment,
wherein the at least two gas phases are alternately introduced into the furnace.
15: The method according to claim 14 , wherein the at least two gas phases are introduced into the furnace at a pressure that is greater than the internal pressure of the furnace.
16: The method according to claim 14 , wherein the at least two gas phases are introduced in a continuous volume flow into the furnace.
17: The method according to claim 14 , wherein one of the at least two gas phases is a mixture of an inert gas and oxygen.
18: The method according to claim 17 , wherein the inert gas is selected from the group consisting of N2, CO2, and Ar.
19: The method according to claim 14 , wherein one of the at least two gas phases is air.
20: The method according to claim 14 , wherein one of the at least two gas phases is oxygen.
21: The method according to claim 14 , wherein the proportions of the oxygen quantities which is introduced into the furnace with the at least two gas phases are regulated in the furnace in order to establish a certain atmosphere in the furnace.
22: The method according to claim 21 , wherein the duration for which the individual gas phases are introduced into the furnace is varied in order to adjust the quantities of oxygen delivered to the furnace with the at least two gas phases.
23: Furnace for the thermal treatment of raw materials comprising a chamber (6) that has a charging opening (20) for the raw materials and an injection apparatus for delivering at least two gas phases with different oxygen contents into the chamber (6), wherein the injection apparatus is designed to introduce the at least two gas phases alternately into the furnace (2). claim 24: The furnace according to claim 23 , wherein the injection apparatus has two gas phase conduits (42, 44), each with a control valve (52, 54), for delivering the two gas phases with different oxygen contents into the chamber (6).
25: The furnace according to claim 24, wherein pressure regulators (50, 54) for adjusting the pressure of the gas phases are provided in the gas phase conduits (42, 44).
26: The furnace according to claim 23 , wherein the furnace is equipped with a plurality of segmented bustle pipes (70) disposed around the furnace (2), wherein each pipe has a plurality of gas phase supply lances (34) that open into the chamber (6), and in that the gas phases can be admitted to each segmented bustle pipe (70) independently of the others.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE10117962.6 | 2001-04-10 | ||
| DE10117962A DE10117962B4 (en) | 2001-04-10 | 2001-04-10 | Process for the thermal treatment of raw materials and for carrying out the process |
| PCT/EP2002/003918 WO2002097347A1 (en) | 2001-04-10 | 2002-04-09 | Method for the thermal treatment of raw materials and a device for carrying out said method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20070137436A1 true US20070137436A1 (en) | 2007-06-21 |
Family
ID=7681146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/474,898 Abandoned US20070137436A1 (en) | 2001-04-10 | 2002-04-09 | Method for the thermal treatment of raw materials and a device for carrying out said method |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20070137436A1 (en) |
| EP (1) | EP1379824B1 (en) |
| AT (1) | ATE331925T1 (en) |
| DE (2) | DE10117962B4 (en) |
| ES (1) | ES2266525T3 (en) |
| PT (1) | PT1379824E (en) |
| WO (1) | WO2002097347A1 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080277843A1 (en) * | 2005-11-10 | 2008-11-13 | L'air Liquide Societe Anonyme Pour L'etude Et L'ex | Method for Supersonically Injecting Oxygen into a Furnace |
| WO2010076210A1 (en) * | 2009-01-05 | 2010-07-08 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| WO2010076211A1 (en) * | 2009-01-05 | 2010-07-08 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| JP2010531390A (en) * | 2007-06-26 | 2010-09-24 | ティッセンクルップ アーテー プロテック ゲーエムベーハー | Shaft furnace and method of operating the furnace |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102012103996B4 (en) | 2011-06-01 | 2017-04-20 | Krytem - Kryotechnische + medizinische Systeme GmbH | Method and device for operating a shaft furnace and valve for introduction into a shaft furnace |
| DE102014102913A1 (en) | 2014-03-05 | 2015-09-10 | Thyssenkrupp Ag | Method for operating a shaft furnace, in particular a blast furnace |
| DE102019135200A1 (en) | 2019-12-19 | 2021-06-24 | SMB Rohrleitungsbau Wildau GmbH & Co. KG | Tube, reactor and process |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1778524A (en) * | 1929-02-11 | 1930-10-14 | Votaw S Durbin | Cupola furnace and method of operating the same |
| US2354997A (en) * | 1943-06-25 | 1944-08-01 | Brown Instr Co | Control system |
| US4045212A (en) * | 1976-02-17 | 1977-08-30 | General Motors Corporation | Method of operation of a cupola |
| US4138098A (en) * | 1975-08-14 | 1979-02-06 | Creusot-Loire | Method of blowing smelting shaft furnaces and tuyeres used for said blowing |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE459339C (en) * | 1925-12-25 | 1928-05-02 | Carl Rein | Wind guidance in cupolas with several rows of nozzles |
| DE851412C (en) * | 1949-03-22 | 1952-10-06 | Heinrich Dr Koppenberg | Process for performing metallurgical reactions in a shaft furnace |
| DE4122381A1 (en) * | 1991-07-05 | 1993-01-07 | Linde Ag | METHOD FOR OPERATING A COUPLING OVEN |
| DE29711593U1 (en) | 1997-07-02 | 1997-09-04 | Westfalen AG, 48155 Münster | Device for the thermal treatment of a raw material |
| GB2338961A (en) * | 1998-06-29 | 2000-01-12 | Unitika Ltd | Electrolytic production of ultrafine metal compound particles |
| DE19939305A1 (en) * | 1999-08-19 | 2001-02-22 | Linde Ag | Operating an oxygen-starved shaft furnace used in the production of metals comprises heat exchanging a partial stream of the oxygen introduced to the furnace with a partial stream of a gas mixture containing oxygen |
| DE19954556A1 (en) * | 1999-11-12 | 2001-05-23 | Messer Griesheim Gmbh | Process for operating a melting furnace |
-
2001
- 2001-04-10 DE DE10117962A patent/DE10117962B4/en not_active Expired - Lifetime
-
2002
- 2002-04-09 PT PT02745225T patent/PT1379824E/en unknown
- 2002-04-09 EP EP02745225A patent/EP1379824B1/en not_active Expired - Lifetime
- 2002-04-09 WO PCT/EP2002/003918 patent/WO2002097347A1/en not_active Ceased
- 2002-04-09 ES ES02745225T patent/ES2266525T3/en not_active Expired - Lifetime
- 2002-04-09 US US10/474,898 patent/US20070137436A1/en not_active Abandoned
- 2002-04-09 AT AT02745225T patent/ATE331925T1/en active
- 2002-04-09 DE DE50207382T patent/DE50207382D1/en not_active Expired - Lifetime
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1778524A (en) * | 1929-02-11 | 1930-10-14 | Votaw S Durbin | Cupola furnace and method of operating the same |
| US2354997A (en) * | 1943-06-25 | 1944-08-01 | Brown Instr Co | Control system |
| US4138098A (en) * | 1975-08-14 | 1979-02-06 | Creusot-Loire | Method of blowing smelting shaft furnaces and tuyeres used for said blowing |
| US4045212A (en) * | 1976-02-17 | 1977-08-30 | General Motors Corporation | Method of operation of a cupola |
Cited By (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8317897B2 (en) | 2005-11-10 | 2012-11-27 | L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Method for supersonically injecting oxygen into a furnace |
| US20080277843A1 (en) * | 2005-11-10 | 2008-11-13 | L'air Liquide Societe Anonyme Pour L'etude Et L'ex | Method for Supersonically Injecting Oxygen into a Furnace |
| US20100251855A1 (en) * | 2007-06-26 | 2010-10-07 | Thyssenkrupp At.Pro Tec Gmbh | Shaft furnace and method for operating a furnace |
| US8309016B2 (en) | 2007-06-26 | 2012-11-13 | Thyssenkrupp At.Pro Tec Gmbh | Shaft furnace and method for operating a furnace |
| AU2008267846B2 (en) * | 2007-06-26 | 2012-01-19 | Thyssenkrupp At.Pro Tec Gmbh | Shaft furnace and method for operating a furnace |
| JP2010531390A (en) * | 2007-06-26 | 2010-09-24 | ティッセンクルップ アーテー プロテック ゲーエムベーハー | Shaft furnace and method of operating the furnace |
| CN102272545A (en) * | 2009-01-05 | 2011-12-07 | 保尔伍斯耐火材料与工程有限责任公司 | Bustle pipe arrangement |
| WO2010076210A1 (en) * | 2009-01-05 | 2010-07-08 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| US20110272868A1 (en) * | 2009-01-05 | 2011-11-10 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| KR20110126597A (en) * | 2009-01-05 | 2011-11-23 | 풀 부르스 에스.에이. | Bustle pipe arrangement |
| EP2208952A1 (en) * | 2009-01-05 | 2010-07-21 | Paul Wurth Refractory & Engineering GmbH | Bustle pipe arrangement |
| EP2208953A1 (en) * | 2009-01-05 | 2010-07-21 | Paul Wurth Refractory & Engineering GmbH | Bustle pipe arrangement |
| WO2010076211A1 (en) * | 2009-01-05 | 2010-07-08 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| US20110253017A1 (en) * | 2009-01-05 | 2011-10-20 | Paul Wurth S.A. | Bustle pipe arrangement |
| US8808616B2 (en) * | 2009-01-05 | 2014-08-19 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| AU2009334940B2 (en) * | 2009-01-05 | 2014-09-18 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| US9028743B2 (en) * | 2009-01-05 | 2015-05-12 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| AU2009334939B2 (en) * | 2009-01-05 | 2015-09-10 | Paul Wurth Refractory & Engineering Gmbh | Bustle pipe arrangement |
| TWI509075B (en) * | 2009-01-05 | 2015-11-21 | 保爾伍斯股份有限公司 | Bustle pipe arrangement of a shaft furance |
| KR101642304B1 (en) | 2009-01-05 | 2016-07-29 | 풀 부르스 리프랙토리 앤드 엔지니어링 게엠베하 | Bustle pipe arrangement |
Also Published As
| Publication number | Publication date |
|---|---|
| ATE331925T1 (en) | 2006-07-15 |
| EP1379824B1 (en) | 2006-06-28 |
| DE10117962A1 (en) | 2002-10-24 |
| DE10117962B4 (en) | 2006-12-07 |
| ES2266525T3 (en) | 2007-03-01 |
| WO2002097347A1 (en) | 2002-12-05 |
| EP1379824A1 (en) | 2004-01-14 |
| PT1379824E (en) | 2006-09-29 |
| DE50207382D1 (en) | 2006-08-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4642047A (en) | Method and apparatus for flame generation and utilization of the combustion products for heating, melting and refining | |
| US12305926B2 (en) | Methods for preheating metal-containing pellets | |
| EP0219824A1 (en) | Method and apparatus for preheating charge materials for continuous steelmarking | |
| WO2007121530A1 (en) | Direct smelting plant with waste heat recovery unit | |
| CA1287216C (en) | Apparatus and method for increasing carbon content of hot directly reduced iron | |
| AU2009295258B2 (en) | A material supply apparatus and process | |
| US20070137436A1 (en) | Method for the thermal treatment of raw materials and a device for carrying out said method | |
| US5946340A (en) | Process for melting of metal materials in a shaft furnace | |
| JPS5811710A (en) | Improvement of copper refinement | |
| US20050155457A1 (en) | Method and device for the continuous production of steel using metal charge material | |
| JPH08504937A (en) | Method and apparatus for melting ferrous metal materials with coke burning cupola | |
| EP3924524B1 (en) | Direct reduction system and related process | |
| EP3543634B1 (en) | Oxy-fuel combustion system for melting a pelleted charge material | |
| US5246482A (en) | Molten metal producing and refining method | |
| US4414026A (en) | Method for the production of ferrochromium | |
| US5069715A (en) | Direct smelting process and apparatus | |
| EP0534020B1 (en) | Molten metal producing and refining method | |
| EP0915992B1 (en) | A process for the direct production of cast iron from iron bearing ore, and an apparatus suitable to carry out said process | |
| CN115298332B (en) | Method and system for increasing the carbon content of direct reduced iron in a reduction furnace | |
| US4996694A (en) | Method and apparatus for melting iron and steel scrap | |
| CN100529109C (en) | Direct smelting plant and process | |
| RU2820584C1 (en) | Upper blowing tuyere for converter, method of auxiliary raw material addition and method of liquid cast iron refining | |
| RU2342442C2 (en) | Facility for receiving of iron melt | |
| RU2342441C2 (en) | Method of iron-carbon alloy direct receiving and facility for its implementation | |
| EP1604373B1 (en) | Method and apparatus for controling temperature uniformity of the burden in a direct reduction shaft furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: AT.PRO TEC TECHNOLOGIE-TEAM GMBH, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LOFFLER, LOTHAR;REEL/FRAME:018841/0219 Effective date: 20031126 |
|
| AS | Assignment |
Owner name: THYSSENKRUPP AT.PRO TEC GMBH, GERMANY Free format text: CHANGE OF NAME;ASSIGNOR:AT.PRO TEC TECHNOLOGIE-TEAM GMBH;REEL/FRAME:023790/0930 Effective date: 20061107 |
|
| STCB | Information on status: application discontinuation |