[go: up one dir, main page]

US20070137436A1 - Method for the thermal treatment of raw materials and a device for carrying out said method - Google Patents

Method for the thermal treatment of raw materials and a device for carrying out said method Download PDF

Info

Publication number
US20070137436A1
US20070137436A1 US10/474,898 US47489802A US2007137436A1 US 20070137436 A1 US20070137436 A1 US 20070137436A1 US 47489802 A US47489802 A US 47489802A US 2007137436 A1 US2007137436 A1 US 2007137436A1
Authority
US
United States
Prior art keywords
furnace
gas phases
gas
raw materials
gas phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/474,898
Inventor
Lothar Loffler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ThyssenKrupp AT PRO Tec GmbH
Original Assignee
ThyssenKrupp AT PRO Tec GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ThyssenKrupp AT PRO Tec GmbH filed Critical ThyssenKrupp AT PRO Tec GmbH
Assigned to AT.PRO TEC TECHNOLOGIE-TEAM GMBH reassignment AT.PRO TEC TECHNOLOGIE-TEAM GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LOFFLER, LOTHAR
Publication of US20070137436A1 publication Critical patent/US20070137436A1/en
Assigned to THYSSENKRUPP AT.PRO TEC GMBH reassignment THYSSENKRUPP AT.PRO TEC GMBH CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: AT.PRO TEC TECHNOLOGIE-TEAM GMBH
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories or equipment specially adapted for furnaces of these types
    • F27B1/16Arrangements of tuyeres
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D7/00Forming, maintaining or circulating atmospheres in heating chambers
    • F27D7/06Forming or maintaining special atmospheres or vacuum within heating chambers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/10Reduction of greenhouse gas [GHG] emissions
    • Y02P10/143Reduction of greenhouse gas [GHG] emissions of methane [CH4]

Definitions

  • the present invention relates to a method for the thermal treatment of raw materials and to a device for carrying out this method for the thermal treatment of raw materials.
  • shaft furnaces employing prior art technology have a great variety of industrial uses.
  • shaft furnaces can be used as melting units (e.g., blast furnaces, cupola furnaces) or for the heat treatment of a charge (e.g., lime kilns, calcining kilns for bauxite).
  • One method for operating a cupola furnace is known, for example, from DE 41 22 381 A1.
  • the cupola furnace is loaded at the top with the charge, a mixture of lumpy raw materials such as, for example, ore, scrap, coke charge, and fluxing materials.
  • blast air
  • the coke is oxidized to CO 2 and CO and thus produces the energy needed for melting.
  • the air is conveyed into the furnace via tuyées, which are uniformly distributed in an annular plane on the circumference of the furnace.
  • the molten pig iron is collected in the lower zone of the furnace, in what is called the hearth or hearth zone, and flows out continuously through a siphon system.
  • Oxygen is added to the cold or hot blast in contemporary methods in order to increase the melting capacity and improve the metallurgical properties of the pig iron.
  • Various advantages are achieved by the addition of oxygen. These include, among others, an increase in the temperature of the melting zone and a concomitant increase in melting capacity. Furthermore, higher pig iron temperatures are obtained, the coke charge burns more thoroughly (free residual coke can be found in the slag in the case of incomplete combustion), and less coke is therefore consumed.
  • oxygen it must be noted that the pressure of the oxygen decreases within a short distance beyond the inlet with the result that a deeper penetration of the charge is not possible. Rather, a sharp temperature gradient occurs between the interior of the charge and the portion of the charge adjacent to the inlet.
  • DE 197 29 624 A1 proposes that the oxygen be introduced in high-pressure pulses into the furnace by means of a lance disposed in the tuyère.
  • the oxygen should penetrate the charge more deeply and thus eliminate the temperature gradient within the charge.
  • the known method does indeed allow a deeper penetration of the charge, but the results remain unsatisfactory.
  • the large increase in the local reaction temperature in the vicinity of the O 2 inlet causes a superproportional, exponential increase in reaction rates.
  • known formulas e.g., the Arrhenius' equation
  • the object of the present invention is to provide a method for the thermal treatment of raw materials that ensures the best possible penetration of the furnace charge and that avoids localized overheating within the charge.
  • An additional goal is to introduce a device for carrying out the inventive method.
  • a furnace such as a blast furnace, is used in the inventive method for the thermal treatment of raw materials.
  • the raw materials are understood to be, for example, ore, scrap, coke charge, fluxing materials, etc.
  • the furnace is charged with the raw materials and at least two gas phases are introduced into the furnace.
  • the gas phases have different oxygen contents, and even an oxygen-free gas phase is permissible.
  • the at least two gas phases are alternately introduced into the furnace.
  • alternating introduction is understood to mean that for a certain period of time only one of the gas phases is introduced, without the gas phases having been mixed in advanced, and that the gas phases can be alternately introduced in any sequence. It is possible in principle to introduce the gas phases with different oxygen contents by turns in a continuous volume flow or discontinuously, i.e., for a certain period of time neither the one nor the other gas phase is supplied.
  • the sequencing of high oxygen content gas phases with low oxygen content gas phases has the advantage that a “priming charge” occurs with the high-oxygen gas phase at exponentially increased reaction rates and material conversions (especially in the gas-solid reaction with the coke charge), while the atmospheres and temperatures are equalized by the low-oxygen gas phase at high flow rates and thus good removal of the gaseous reaction products.
  • the inventive method allows good penetration of the furnace charge and avoids localized overheating within the charge.
  • a high oxygen content gas phase for example, pure oxygen
  • a low oxygen content gas phase for example, compressed air
  • the injections of oxygen and compressed air can overlap each other, follow one another immediately, or be separated by a time delay.
  • the method has the advantage that use of an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast.
  • an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast.
  • the local atmosphere is diluted and partially cooled with the result that the reaction equilibria are re-established.
  • the equalization of the concentrations and temperatures through turbulence and diffusion owing to the batchwise introduction of oxygen and air accrues distinct advantages with regard to the execution of the reactions.
  • the charge serves as an internal mixing apparatus for the production of enriched air. Mixing can be rapidly adapted to the process by varying the different cycle lengths, with the result that fluctuations in the melt can be minimized.
  • the at least two gas phases undergoing alternating introduction into the furnace are introduced into the furnace under a pressure that is greater than the internal pressure of the furnace. This greater pressure achieves a deeper penetration of the furnace charge, on the one hand, while, on the other hand, minimizing the influence of the wall effect in this zone. This can substantially improve the technical combustion efficiency and the metallurgical results.
  • the at least two gas phases are introduced into the furnace in a continuous volume flow. Accordingly, there is no interruption between the introductions of the different gas phases, and as a result the gas phases immediately following one another drive each other and thus promote constant flow conditions. This results in good penetration of the charge.
  • one of the two gas phases in a preferred embodiment of the method is a mixture of an inert gas and oxygen.
  • the inert gas is preferably N 2 and/or CO 2 and/or Ar.
  • One of the at least two gas phases is air in an advantageous embodiment of the inventive method.
  • One of the at least two gas phases is oxygen in another advantageous embodiment of the inventive method.
  • the proportions of the oxygen quantities introduced into the furnace with the at least two gas phases are regulated in order to establish a certain atmosphere in the furnace. This enables short-term and very sensitive responses to changes in the operating parameters.
  • the duration of introduction of the individual gas phases into the furnace is varied in order to adjust the quantities of oxygen delivered into the furnace with the at least two gas phases.
  • the proportions of the oxygen quantities introduced into the furnace with the two gas phases can be regulated in order to ensure that the atmosphere inside the furnace is always optimal.
  • the inventive furnace for the thermal treatment of raw materials has a chamber with a charging opening for the raw materials.
  • This furnace is also provided with an injection apparatus for introducing the at least two gas phases with different oxygen contents into the chamber.
  • the injection apparatus is designed in such a way that the at least two gas phases are introduced by turns into the furnace.
  • the injection apparatus for delivering the gas phases has gas phase conduits equipped with control valves.
  • Gas phase conduit is understood to mean any mode of delivery by which the gas phases are conveyed.
  • the gas phases are introduced in sequences that can be arbitrarily varied in terms of length, the time interval between injections, and the relationship of the two gas phases to each other.
  • the introduction can be regulated by means of stored-program control (SPC), e.g., with a microprocessor.
  • SPC stored-program control
  • the aforementioned parameters can be programmed variably and freely, and thus the inflow of the gas phases through the valves can be controlled.
  • pressure regulators are provided for adjusting the gas pressure in the gas phase conduits.
  • the furnace can be equipped with an analyzing device for analyzing the atmosphere in the furnace and/or a measuring device for measuring the temperature in the material discharged from the furnace.
  • the inventive furnace is provided with one or more bustle pipes arranged around the furnace.
  • the supply lances are connected to these bustle pipes.
  • FIG. 1 a cutaway side view of a first embodiment of the inventive furnace
  • FIG. 2 a cutaway side view of a second and third embodiment of the inventive furnace.
  • FIG. 1 shows a furnace 2 , which in the embodiment under discussion is devised as a cupola furnace.
  • This cupola furnace serves to melt pig iron continuously.
  • the furnace 2 has a furnace housing 4 that encloses a chamber 6 .
  • the chamber 6 has several zones in which various processes are carried out, namely, a charging zone 8 , a preheating zone 10 , a melting zone 12 , a so-called blast zone 14 , and a hearth zone 16 , with the last being situated directly above the furnace floor 18 .
  • the furnace housing 4 has, at the charging zone, a lateral charging opening 20 , which can also be situated above the charging zone 8 .
  • the charging opening is designed such that the raw materials to be treated (not shown), e.g., a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials, can be delivered to the chamber 6 through the opening.
  • the furnace housing in the charging zone has a vent 22 through which the resulting blast-furnace gas can be conducted away.
  • the shaft furnace 2 has a slag taphole 24 and an iron taphole 26 .
  • the furnace 2 also has a first bustle pipe 28 , which surrounds the furnace housing 4 in annular fashion and is supplied with air via an air-supply device that is not shown.
  • Uniformly distributed around the furnace 2 are a plurality of tubular tuyommes 30 , which on the one side are connected to the first bustle pipe 28 and on the other side lead into the chamber 6 at the blast zone 14 .
  • the depicted first embodiment of the furnace 2 is also equipped with a second bustle pipe 32 , which surrounds the furnace housing in annular fashion.
  • each of the gas phase supply lances 34 is disposed substantially coaxially in a tuy Guatemala 30 such that the end 36 of the gas phase supply lance 34 is situated in the center of the mouth of the tuyées 30 in the region of the chamber 6 .
  • a first conduit 42 for delivering a first gas phase and a second conduit 44 for delivering a second gas phase flow into a common gas phase conduit 38 , to which the second bustle pipe 32 is connected.
  • a first blast-pressure tank 46 is connected to the first gas phase conduit 24 [sic]
  • a second blast-pressure tank 48 is connected to the second gas phase conduit 42 [sic].
  • the blast-pressure tanks contain pressurized gas phases with different oxygen contents, and the pressure within the blast-pressure tanks 46 and 48 is higher than the pressure in the blast zone 14 of the chamber 6 of the furnace 2 .
  • the gas phase conduits 42 and 44 deliver pure oxygen (O 2 ) to the first blast-pressure tank 46 and air to the second blast-pressure tank 48 .
  • the blast-pressure tanks 46 and 48 are not absolutely necessary but serve only as vibration dampers.
  • a first pressure regulator 50 is placed upstream from the first blast-pressure tank 46 and a first control valve 52 is placed downstream from the blast-pressure tank 46
  • a second pressure regulator 54 is placed upstream from the second blast-pressure tank 48 and a second control valve 56 is placed downstream from the blast-pressure tank.
  • the furnace has a control unit 40 that is connected via control circuits 60 to the first and second pressure regulators 50 and 54 and to the first and second control valves 52 and 56 .
  • the control unit 40 controls the control valves in such a manner that the common gas phase conduit 38 and the first gas phase conduit 42 communicate with each other while the second gas phase conduit 44 is closed off, or the common gas phase conduit 38 and the second gas phase conduit 44 communicate with each other while the first gas phase conduit 42 is closed off.
  • the control unit adjusts the pressure in the blast-pressure tanks by means of the pressure regulators 50 and 54 .
  • the chamber 6 of the furnace 2 is charged through the charging opening 20 with the raw materials (not shown) which are to be thermally treated, wherein the raw materials in the chamber 6 constitute the so-called charge.
  • the raw materials are a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials.
  • the continuously supplied raw materials pass through the various zones of the chamber 6 successively from top to bottom.
  • the raw materials agglomerate in the charging zone 8 .
  • the preheating zone 10 the raw materials are preheated by the heat and reaction gases rising from the underlying zones
  • the preheated raw materials then pass into the melting zone 12 , in which the raw materials begin to melt due to the high temperatures.
  • the partially melted raw materials next pass into the blast zone 14 .
  • air is blown through the first bustle pipe 28 and the tuy insomnias 30 into the chamber 6 .
  • the air needed for combustion is blown into the blast zone 14 as unheated cold blast or as hot blast.
  • the raw materials are completely melted in the blast zone 14 by the air thus supplied, and the melt passes into the hearth zone 16 , in which, on the one side, the slag floating on the melt is carried off through the first opening 24 and, on the other side, the melt is led away through the second opening 26 .
  • At least two gas phases with different oxygen contents are alternately introduced into the blast zone 14 of the chamber 6 of the inventive furnace 2 .
  • the gas phases are introduced in the process via the first and second gas phase conduits 42 and 44 , the common gas phase conduit 38 , and the gas phase supply lances 34 .
  • the continual alternation between the gas phases thus supplied is controlled by the control unit 54 by means of the control valves 52 and 56 such that the pressurized oxygen-rich gas phase (O 2 ) and the pressurized oxygen-poor gas phase (air) are introduced sequentially into the blast zone 14 .
  • control unit 54 The times during which the control valves are open or closed can be changed by the control unit 54 . Furthermore, the pressure of each gas phase can be changed by the pressure regulators 50 and 54 , respectively. To establish a certain atmosphere in the furnace, the proportions of the oxygen quantities introduced into the furnace with the two gas phases are regulated, and to adjust the oxygen quantities the duration of gas phase introduction is changed.
  • the gas phase supply lances 3 [sic] are suitably arranged within the tuyommes 30 (preferably in concentric fashion), as shown in FIG. 1 .
  • the gas phase supply lances 34 can be situated above the tuyommes so that the gas phases are introduced above the blast, as shown in FIG. 2 .
  • Other arrangements of the gas phase supply lances 34 are also possible.
  • the angle of inclination of the gas phase supply lances 34 with respect to the furnace axis or their depth of immersion into the chamber 6 of the furnace 2 can be varied.
  • FIG. 2 /left and FIG. 2 /right, respectively, show second and third embodiments of the inventive furnace 2 .
  • the second embodiment differs from the first embodiment in that the former does not have a second bustle pipe 32 .
  • the inventive furnace 2 has several segmented bustle pipes 70 , of which only one is shown, and which are arranged in annular fashion around the furnace 2 . There is preferably a total of four circumferentially distributed segmented bustle pipes.
  • the segmented bustle pipes are connected to a first gas phase conduit 38 and have gas phase supply lances 34 that open into the chamber 6 of the furnace 2 .
  • the gas phases can be admitted to each segmented bustle pipe 70 independently of the others.
  • the gas phases are preferably admitted to the pipes 70 in sequence so that the gas phases are introduced clockwise or counterclockwise from each side into the furnace. Refer to the description of FIG. 1 for the other parts of the furnace.
  • the third embodiment differs from the first embodiment in that the former has separate gas phase supply lances 34 having one or two valves 72 each, such that each gas phase supply lance 34 has its own gas phase supply.
  • a stored-program control (SPC) system for example, can be employed in this case, wherein valve disturbances or control errors can be detected with feedback sensors for pressure or flow, for example, and eliminated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Details (AREA)
  • Crystals, And After-Treatments Of Crystals (AREA)
  • Crucibles And Fluidized-Bed Furnaces (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The invention relates to a method for the thermal treatment of raw materials in which a furnace (2) is charged with the raw material and at least two gas phases are introduced into the furnace in which the raw material is subjected to the thermal treatment. The gas phases have different oxygen contents and are introduced into the furnace sequentially. During the introduction of a first gas phase with a relatively high oxygen content (for example, O2), a temperature and pressure rise occurs; the reaction gases are forced towards the center of the furnace by the subsequent introduction of a second gas phase with a relatively low or no oxygen content (for example, air, CH4), whereupon an equalization of temperature and concentration occurs in the melting zone. Said method permits a good penetration of the furnace charge and avoids localized overheating within the charge. The invention further relates to a furnace (2) for carrying out said method.

Description

  • The present invention relates to a method for the thermal treatment of raw materials and to a device for carrying out this method for the thermal treatment of raw materials.
  • The various known shaft furnaces employing prior art technology have a great variety of industrial uses. For example, shaft furnaces can be used as melting units (e.g., blast furnaces, cupola furnaces) or for the heat treatment of a charge (e.g., lime kilns, calcining kilns for bauxite).
  • One method for operating a cupola furnace is known, for example, from DE 41 22 381 A1. Here, the cupola furnace is loaded at the top with the charge, a mixture of lumpy raw materials such as, for example, ore, scrap, coke charge, and fluxing materials. Through the injection of air (“blast”), the coke is oxidized to CO2 and CO and thus produces the energy needed for melting. In this process, the air is conveyed into the furnace via tuyères, which are uniformly distributed in an annular plane on the circumference of the furnace. The molten pig iron is collected in the lower zone of the furnace, in what is called the hearth or hearth zone, and flows out continuously through a siphon system. In older cupola furnaces, air at room temperature (cold blast) is used for the partial combustion of the coke charge. Newer units are run with a hot blast, which is air regeneratively preheated with the offgas (blast furnace gas) in hot blast stoves. A coal gas, namely, CO2 or CO, is introduced into the furnace according to this known method in order to maintain the CO content inside the furnace at a preset value or in order to vary the CO content inside the furnace.
  • Oxygen is added to the cold or hot blast in contemporary methods in order to increase the melting capacity and improve the metallurgical properties of the pig iron. Various advantages are achieved by the addition of oxygen. These include, among others, an increase in the temperature of the melting zone and a concomitant increase in melting capacity. Furthermore, higher pig iron temperatures are obtained, the coke charge burns more thoroughly (free residual coke can be found in the slag in the case of incomplete combustion), and less coke is therefore consumed. Of course, when oxygen is added, it must be noted that the pressure of the oxygen decreases within a short distance beyond the inlet with the result that a deeper penetration of the charge is not possible. Rather, a sharp temperature gradient occurs between the interior of the charge and the portion of the charge adjacent to the inlet. As a solution to this problem, DE 197 29 624 A1 proposes that the oxygen be introduced in high-pressure pulses into the furnace by means of a lance disposed in the tuyère. In this way the oxygen should penetrate the charge more deeply and thus eliminate the temperature gradient within the charge. With the high pressure and thus the higher energy, the known method does indeed allow a deeper penetration of the charge, but the results remain unsatisfactory. One of the reasons for this is that the large increase in the local reaction temperature in the vicinity of the O2 inlet causes a superproportional, exponential increase in reaction rates. According to known formulas (e.g., the Arrhenius' equation), it can be assumed that, in the present case, the reaction rate doubles for each 20° C. to 30° C. increase in temperature.
  • The object of the present invention is to provide a method for the thermal treatment of raw materials that ensures the best possible penetration of the furnace charge and that avoids localized overheating within the charge. An additional goal is to introduce a device for carrying out the inventive method.
  • These objects are achieved by the characteristic features of patent claims 1 and 10, respectively. Advantageous embodiments of the invention are the subject matter of the dependent claims.
  • A furnace, such as a blast furnace, is used in the inventive method for the thermal treatment of raw materials. The raw materials are understood to be, for example, ore, scrap, coke charge, fluxing materials, etc. The furnace is charged with the raw materials and at least two gas phases are introduced into the furnace. The gas phases have different oxygen contents, and even an oxygen-free gas phase is permissible. According to the invention, the at least two gas phases are alternately introduced into the furnace. Here, alternating introduction is understood to mean that for a certain period of time only one of the gas phases is introduced, without the gas phases having been mixed in advanced, and that the gas phases can be alternately introduced in any sequence. It is possible in principle to introduce the gas phases with different oxygen contents by turns in a continuous volume flow or discontinuously, i.e., for a certain period of time neither the one nor the other gas phase is supplied.
  • In conventional methods the further penetration of the gas phase into the charge is blocked or, in unfavorable cases, the flow direction is even reversed. This is attributable to the fact that the oxidation products are predominantly gaseous, and the reactions are exothermic, with the result that sudden sharp increases in temperature and pressure occur locally.
  • This disadvantage is surmounted by the alternating introduction of gas phases with different oxygen contents. The aforementioned increases in temperature and pressure occur during the introduction of a first gas phase with a relatively high oxygen content (e.g., O2); the reaction gases are forced back toward the center of the furnace by the subsequent introduction of a second gas phase with a relatively low or no oxygen content (e.g., air, CH4), whereupon the temperature and concentration are equalized. It is particularly advantageous here that the equalizing reactions occur in deeper zones of the charge through increasingly intensive intermixing of the successive gases, wherein gas-gas reactions take place at significantly higher reaction rates. The sequencing of high oxygen content gas phases with low oxygen content gas phases has the advantage that a “priming charge” occurs with the high-oxygen gas phase at exponentially increased reaction rates and material conversions (especially in the gas-solid reaction with the coke charge), while the atmospheres and temperatures are equalized by the low-oxygen gas phase at high flow rates and thus good removal of the gaseous reaction products. In this way the inventive method allows good penetration of the furnace charge and avoids localized overheating within the charge.
  • In the inventive method, a high oxygen content gas phase, for example, pure oxygen, is thus briefly injected, preferably at high pressure, and causes a spontaneous oxidation. A low oxygen content gas phase, for example, compressed air, is then injected. The injections of oxygen and compressed air can overlap each other, follow one another immediately, or be separated by a time delay.
  • The method has the advantage that use of an oxygen-enriched air feed avoids the hindrance of coke oxidation by a “nitrogen” ballast. Through the induction of compressed air the local atmosphere is diluted and partially cooled with the result that the reaction equilibria are re-established. The equalization of the concentrations and temperatures through turbulence and diffusion owing to the batchwise introduction of oxygen and air accrues distinct advantages with regard to the execution of the reactions. In principle the charge serves as an internal mixing apparatus for the production of enriched air. Mixing can be rapidly adapted to the process by varying the different cycle lengths, with the result that fluctuations in the melt can be minimized.
  • In a preferred embodiment of the inventive method the at least two gas phases undergoing alternating introduction into the furnace are introduced into the furnace under a pressure that is greater than the internal pressure of the furnace. This greater pressure achieves a deeper penetration of the furnace charge, on the one hand, while, on the other hand, minimizing the influence of the wall effect in this zone. This can substantially improve the technical combustion efficiency and the metallurgical results.
  • In another preferred embodiment of the method, the at least two gas phases are introduced into the furnace in a continuous volume flow. Accordingly, there is no interruption between the introductions of the different gas phases, and as a result the gas phases immediately following one another drive each other and thus promote constant flow conditions. This results in good penetration of the charge.
  • More advantageously, one of the two gas phases in a preferred embodiment of the method is a mixture of an inert gas and oxygen. The inert gas is preferably N2 and/or CO2 and/or Ar.
  • One of the at least two gas phases is air in an advantageous embodiment of the inventive method.
  • One of the at least two gas phases is oxygen in another advantageous embodiment of the inventive method.
  • In order to be able to respond to changes in the operating parameters, in a preferred embodiment the proportions of the oxygen quantities introduced into the furnace with the at least two gas phases are regulated in order to establish a certain atmosphere in the furnace. This enables short-term and very sensitive responses to changes in the operating parameters.
  • In a preferred embodiment of the invention, the duration of introduction of the individual gas phases into the furnace is varied in order to adjust the quantities of oxygen delivered into the furnace with the at least two gas phases.
  • The proportions of the oxygen quantities introduced into the furnace with the two gas phases can be regulated in order to ensure that the atmosphere inside the furnace is always optimal.
  • The inventive furnace for the thermal treatment of raw materials has a chamber with a charging opening for the raw materials. This furnace is also provided with an injection apparatus for introducing the at least two gas phases with different oxygen contents into the chamber. The injection apparatus is designed in such a way that the at least two gas phases are introduced by turns into the furnace.
  • In an advantageous embodiment of the inventive furnace the injection apparatus for delivering the gas phases has gas phase conduits equipped with control valves. Gas phase conduit is understood to mean any mode of delivery by which the gas phases are conveyed.
  • The gas phases are introduced in sequences that can be arbitrarily varied in terms of length, the time interval between injections, and the relationship of the two gas phases to each other. The introduction can be regulated by means of stored-program control (SPC), e.g., with a microprocessor. In this manner the aforementioned parameters can be programmed variably and freely, and thus the inflow of the gas phases through the valves can be controlled.
  • In a preferred embodiment of the furnace according to the invention, pressure regulators are provided for adjusting the gas pressure in the gas phase conduits.
  • In order to allow the furnace to be monitored during operation and to allow the atmosphere to be changed, if need be, the furnace can be equipped with an analyzing device for analyzing the atmosphere in the furnace and/or a measuring device for measuring the temperature in the material discharged from the furnace.
  • In a particularly preferred embodiment, the inventive furnace is provided with one or more bustle pipes arranged around the furnace. The supply lances are connected to these bustle pipes.
  • Exemplary embodiments of the invention will be explained in detail in the following and with reference to the attached figures.
  • The following are shown:
  • FIG. 1 a cutaway side view of a first embodiment of the inventive furnace and
  • FIG. 2 a cutaway side view of a second and third embodiment of the inventive furnace.
  • FIG. 1 shows a furnace 2, which in the embodiment under discussion is devised as a cupola furnace. This cupola furnace serves to melt pig iron continuously. The furnace 2 has a furnace housing 4 that encloses a chamber 6. Considered from top to bottom the chamber 6 has several zones in which various processes are carried out, namely, a charging zone 8, a preheating zone 10, a melting zone 12, a so-called blast zone 14, and a hearth zone 16, with the last being situated directly above the furnace floor 18. The furnace housing 4 has, at the charging zone, a lateral charging opening 20, which can also be situated above the charging zone 8. The charging opening is designed such that the raw materials to be treated (not shown), e.g., a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials, can be delivered to the chamber 6 through the opening. In addition, the furnace housing in the charging zone has a vent 22 through which the resulting blast-furnace gas can be conducted away.
  • The shaft furnace 2 has a slag taphole 24 and an iron taphole 26. The furnace 2 also has a first bustle pipe 28, which surrounds the furnace housing 4 in annular fashion and is supplied with air via an air-supply device that is not shown. Uniformly distributed around the furnace 2 are a plurality of tubular tuyèress 30, which on the one side are connected to the first bustle pipe 28 and on the other side lead into the chamber 6 at the blast zone 14. The depicted first embodiment of the furnace 2 is also equipped with a second bustle pipe 32, which surrounds the furnace housing in annular fashion. Connected to the second bustle pipe 32 are essentially tubular gas phase supply lances 34, the ends 36 of which lead into the chamber 6 at the blast zone 14. In the first embodiment each of the gas phase supply lances 34 is disposed substantially coaxially in a tuyères 30 such that the end 36 of the gas phase supply lance 34 is situated in the center of the mouth of the tuyères 30 in the region of the chamber 6.
  • A first conduit 42 for delivering a first gas phase and a second conduit 44 for delivering a second gas phase flow into a common gas phase conduit 38, to which the second bustle pipe 32 is connected. A first blast-pressure tank 46 is connected to the first gas phase conduit 24 [sic], and a second blast-pressure tank 48 is connected to the second gas phase conduit 42 [sic]. The blast-pressure tanks contain pressurized gas phases with different oxygen contents, and the pressure within the blast- pressure tanks 46 and 48 is higher than the pressure in the blast zone 14 of the chamber 6 of the furnace 2. In the example under consideration, it is assumed that the gas phase conduits 42 and 44 deliver pure oxygen (O2) to the first blast-pressure tank 46 and air to the second blast-pressure tank 48. The blast- pressure tanks 46 and 48 are not absolutely necessary but serve only as vibration dampers.
  • In the first gas phase conduit 42, a first pressure regulator 50 is placed upstream from the first blast-pressure tank 46 and a first control valve 52 is placed downstream from the blast-pressure tank 46, while in the second gas phase conduit 44 a second pressure regulator 54 is placed upstream from the second blast-pressure tank 48 and a second control valve 56 is placed downstream from the blast-pressure tank.
  • Furthermore, in order to regulate the inflow of the gas phases the furnace has a control unit 40 that is connected via control circuits 60 to the first and second pressure regulators 50 and 54 and to the first and second control valves 52 and 56.
  • The control unit 40 controls the control valves in such a manner that the common gas phase conduit 38 and the first gas phase conduit 42 communicate with each other while the second gas phase conduit 44 is closed off, or the common gas phase conduit 38 and the second gas phase conduit 44 communicate with each other while the first gas phase conduit 42 is closed off. The control unit adjusts the pressure in the blast-pressure tanks by means of the pressure regulators 50 and 54.
  • The operation of the first embodiment of the inventive furnace, illustrated in FIG. 1, is described in the following.
  • The chamber 6 of the furnace 2 is charged through the charging opening 20 with the raw materials (not shown) which are to be thermally treated, wherein the raw materials in the chamber 6 constitute the so-called charge. In the present example the raw materials are a mixture of pig iron, scrap, coke, lime, alloying constituents, and other fluxing materials. During the course of the process the continuously supplied raw materials pass through the various zones of the chamber 6 successively from top to bottom. The raw materials agglomerate in the charging zone 8. In the preheating zone 10 the raw materials are preheated by the heat and reaction gases rising from the underlying zones The preheated raw materials then pass into the melting zone 12, in which the raw materials begin to melt due to the high temperatures. The partially melted raw materials next pass into the blast zone 14. In the blast zone 14 air is blown through the first bustle pipe 28 and the tuyèress 30 into the chamber 6. The air needed for combustion is blown into the blast zone 14 as unheated cold blast or as hot blast. The raw materials are completely melted in the blast zone 14 by the air thus supplied, and the melt passes into the hearth zone 16, in which, on the one side, the slag floating on the melt is carried off through the first opening 24 and, on the other side, the melt is led away through the second opening 26.
  • In order to achieve good penetration of the charge and to avoid localized overheating within the charge, at least two gas phases with different oxygen contents are alternately introduced into the blast zone 14 of the chamber 6 of the inventive furnace 2. The gas phases are introduced in the process via the first and second gas phase conduits 42 and 44, the common gas phase conduit 38, and the gas phase supply lances 34. The continual alternation between the gas phases thus supplied is controlled by the control unit 54 by means of the control valves 52 and 56 such that the pressurized oxygen-rich gas phase (O2) and the pressurized oxygen-poor gas phase (air) are introduced sequentially into the blast zone 14.
  • The times during which the control valves are open or closed can be changed by the control unit 54. Furthermore, the pressure of each gas phase can be changed by the pressure regulators 50 and 54, respectively. To establish a certain atmosphere in the furnace, the proportions of the oxygen quantities introduced into the furnace with the two gas phases are regulated, and to adjust the oxygen quantities the duration of gas phase introduction is changed.
  • In the above described first embodiment of the inventive furnace, the gas phase supply lances 3 [sic] are suitably arranged within the tuyèress 30 (preferably in concentric fashion), as shown in FIG. 1. However, the gas phase supply lances 34 can be situated above the tuyèress so that the gas phases are introduced above the blast, as shown in FIG. 2. Other arrangements of the gas phase supply lances 34 are also possible. For example, the angle of inclination of the gas phase supply lances 34 with respect to the furnace axis or their depth of immersion into the chamber 6 of the furnace 2 can be varied.
  • Furthermore, it may be desirable to arrange individual gas phase supply lances 34 or groups of gas phase supply lances 34 at different heights.
  • FIG. 2/left and FIG. 2/right, respectively, show second and third embodiments of the inventive furnace 2. The second embodiment (FIG. 2/left) differs from the first embodiment in that the former does not have a second bustle pipe 32. Instead, the inventive furnace 2 has several segmented bustle pipes 70, of which only one is shown, and which are arranged in annular fashion around the furnace 2. There is preferably a total of four circumferentially distributed segmented bustle pipes. The segmented bustle pipes are connected to a first gas phase conduit 38 and have gas phase supply lances 34 that open into the chamber 6 of the furnace 2. The gas phases can be admitted to each segmented bustle pipe 70 independently of the others. The gas phases are preferably admitted to the pipes 70 in sequence so that the gas phases are introduced clockwise or counterclockwise from each side into the furnace. Refer to the description of FIG. 1 for the other parts of the furnace.
  • The third embodiment (FIG. 2/right) differs from the first embodiment in that the former has separate gas phase supply lances 34 having one or two valves 72 each, such that each gas phase supply lance 34 has its own gas phase supply. A stored-program control (SPC) system, for example, can be employed in this case, wherein valve disturbances or control errors can be detected with feedback sensors for pressure or flow, for example, and eliminated.

Claims (13)

1-13. (canceled)
14: A method for the thermal treatment of raw materials comprising:
(i.) charging a furnace with the raw materials and at least two gas phases with different oxygen contents;
(ii.) subjecting the raw materials to the thermal treatment,
wherein the at least two gas phases are alternately introduced into the furnace.
15: The method according to claim 14, wherein the at least two gas phases are introduced into the furnace at a pressure that is greater than the internal pressure of the furnace.
16: The method according to claim 14, wherein the at least two gas phases are introduced in a continuous volume flow into the furnace.
17: The method according to claim 14, wherein one of the at least two gas phases is a mixture of an inert gas and oxygen.
18: The method according to claim 17, wherein the inert gas is selected from the group consisting of N2, CO2, and Ar.
19: The method according to claim 14, wherein one of the at least two gas phases is air.
20: The method according to claim 14, wherein one of the at least two gas phases is oxygen.
21: The method according to claim 14, wherein the proportions of the oxygen quantities which is introduced into the furnace with the at least two gas phases are regulated in the furnace in order to establish a certain atmosphere in the furnace.
22: The method according to claim 21, wherein the duration for which the individual gas phases are introduced into the furnace is varied in order to adjust the quantities of oxygen delivered to the furnace with the at least two gas phases.
23: Furnace for the thermal treatment of raw materials comprising a chamber (6) that has a charging opening (20) for the raw materials and an injection apparatus for delivering at least two gas phases with different oxygen contents into the chamber (6), wherein the injection apparatus is designed to introduce the at least two gas phases alternately into the furnace (2). claim 24: The furnace according to claim 23, wherein the injection apparatus has two gas phase conduits (42, 44), each with a control valve (52, 54), for delivering the two gas phases with different oxygen contents into the chamber (6).
25: The furnace according to claim 24, wherein pressure regulators (50, 54) for adjusting the pressure of the gas phases are provided in the gas phase conduits (42, 44).
26: The furnace according to claim 23, wherein the furnace is equipped with a plurality of segmented bustle pipes (70) disposed around the furnace (2), wherein each pipe has a plurality of gas phase supply lances (34) that open into the chamber (6), and in that the gas phases can be admitted to each segmented bustle pipe (70) independently of the others.
US10/474,898 2001-04-10 2002-04-09 Method for the thermal treatment of raw materials and a device for carrying out said method Abandoned US20070137436A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE10117962.6 2001-04-10
DE10117962A DE10117962B4 (en) 2001-04-10 2001-04-10 Process for the thermal treatment of raw materials and for carrying out the process
PCT/EP2002/003918 WO2002097347A1 (en) 2001-04-10 2002-04-09 Method for the thermal treatment of raw materials and a device for carrying out said method

Publications (1)

Publication Number Publication Date
US20070137436A1 true US20070137436A1 (en) 2007-06-21

Family

ID=7681146

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/474,898 Abandoned US20070137436A1 (en) 2001-04-10 2002-04-09 Method for the thermal treatment of raw materials and a device for carrying out said method

Country Status (7)

Country Link
US (1) US20070137436A1 (en)
EP (1) EP1379824B1 (en)
AT (1) ATE331925T1 (en)
DE (2) DE10117962B4 (en)
ES (1) ES2266525T3 (en)
PT (1) PT1379824E (en)
WO (1) WO2002097347A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080277843A1 (en) * 2005-11-10 2008-11-13 L'air Liquide Societe Anonyme Pour L'etude Et L'ex Method for Supersonically Injecting Oxygen into a Furnace
WO2010076210A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
WO2010076211A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
JP2010531390A (en) * 2007-06-26 2010-09-24 ティッセンクルップ アーテー プロテック ゲーエムベーハー Shaft furnace and method of operating the furnace

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012103996B4 (en) 2011-06-01 2017-04-20 Krytem - Kryotechnische + medizinische Systeme GmbH Method and device for operating a shaft furnace and valve for introduction into a shaft furnace
DE102014102913A1 (en) 2014-03-05 2015-09-10 Thyssenkrupp Ag Method for operating a shaft furnace, in particular a blast furnace
DE102019135200A1 (en) 2019-12-19 2021-06-24 SMB Rohrleitungsbau Wildau GmbH & Co. KG Tube, reactor and process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1778524A (en) * 1929-02-11 1930-10-14 Votaw S Durbin Cupola furnace and method of operating the same
US2354997A (en) * 1943-06-25 1944-08-01 Brown Instr Co Control system
US4045212A (en) * 1976-02-17 1977-08-30 General Motors Corporation Method of operation of a cupola
US4138098A (en) * 1975-08-14 1979-02-06 Creusot-Loire Method of blowing smelting shaft furnaces and tuyeres used for said blowing

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE459339C (en) * 1925-12-25 1928-05-02 Carl Rein Wind guidance in cupolas with several rows of nozzles
DE851412C (en) * 1949-03-22 1952-10-06 Heinrich Dr Koppenberg Process for performing metallurgical reactions in a shaft furnace
DE4122381A1 (en) * 1991-07-05 1993-01-07 Linde Ag METHOD FOR OPERATING A COUPLING OVEN
DE29711593U1 (en) 1997-07-02 1997-09-04 Westfalen AG, 48155 Münster Device for the thermal treatment of a raw material
GB2338961A (en) * 1998-06-29 2000-01-12 Unitika Ltd Electrolytic production of ultrafine metal compound particles
DE19939305A1 (en) * 1999-08-19 2001-02-22 Linde Ag Operating an oxygen-starved shaft furnace used in the production of metals comprises heat exchanging a partial stream of the oxygen introduced to the furnace with a partial stream of a gas mixture containing oxygen
DE19954556A1 (en) * 1999-11-12 2001-05-23 Messer Griesheim Gmbh Process for operating a melting furnace

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1778524A (en) * 1929-02-11 1930-10-14 Votaw S Durbin Cupola furnace and method of operating the same
US2354997A (en) * 1943-06-25 1944-08-01 Brown Instr Co Control system
US4138098A (en) * 1975-08-14 1979-02-06 Creusot-Loire Method of blowing smelting shaft furnaces and tuyeres used for said blowing
US4045212A (en) * 1976-02-17 1977-08-30 General Motors Corporation Method of operation of a cupola

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8317897B2 (en) 2005-11-10 2012-11-27 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Method for supersonically injecting oxygen into a furnace
US20080277843A1 (en) * 2005-11-10 2008-11-13 L'air Liquide Societe Anonyme Pour L'etude Et L'ex Method for Supersonically Injecting Oxygen into a Furnace
US20100251855A1 (en) * 2007-06-26 2010-10-07 Thyssenkrupp At.Pro Tec Gmbh Shaft furnace and method for operating a furnace
US8309016B2 (en) 2007-06-26 2012-11-13 Thyssenkrupp At.Pro Tec Gmbh Shaft furnace and method for operating a furnace
AU2008267846B2 (en) * 2007-06-26 2012-01-19 Thyssenkrupp At.Pro Tec Gmbh Shaft furnace and method for operating a furnace
JP2010531390A (en) * 2007-06-26 2010-09-24 ティッセンクルップ アーテー プロテック ゲーエムベーハー Shaft furnace and method of operating the furnace
CN102272545A (en) * 2009-01-05 2011-12-07 保尔伍斯耐火材料与工程有限责任公司 Bustle pipe arrangement
WO2010076210A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
US20110272868A1 (en) * 2009-01-05 2011-11-10 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
KR20110126597A (en) * 2009-01-05 2011-11-23 풀 부르스 에스.에이. Bustle pipe arrangement
EP2208952A1 (en) * 2009-01-05 2010-07-21 Paul Wurth Refractory & Engineering GmbH Bustle pipe arrangement
EP2208953A1 (en) * 2009-01-05 2010-07-21 Paul Wurth Refractory & Engineering GmbH Bustle pipe arrangement
WO2010076211A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
US20110253017A1 (en) * 2009-01-05 2011-10-20 Paul Wurth S.A. Bustle pipe arrangement
US8808616B2 (en) * 2009-01-05 2014-08-19 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
AU2009334940B2 (en) * 2009-01-05 2014-09-18 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
US9028743B2 (en) * 2009-01-05 2015-05-12 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
AU2009334939B2 (en) * 2009-01-05 2015-09-10 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
TWI509075B (en) * 2009-01-05 2015-11-21 保爾伍斯股份有限公司 Bustle pipe arrangement of a shaft furance
KR101642304B1 (en) 2009-01-05 2016-07-29 풀 부르스 리프랙토리 앤드 엔지니어링 게엠베하 Bustle pipe arrangement

Also Published As

Publication number Publication date
ATE331925T1 (en) 2006-07-15
EP1379824B1 (en) 2006-06-28
DE10117962A1 (en) 2002-10-24
DE10117962B4 (en) 2006-12-07
ES2266525T3 (en) 2007-03-01
WO2002097347A1 (en) 2002-12-05
EP1379824A1 (en) 2004-01-14
PT1379824E (en) 2006-09-29
DE50207382D1 (en) 2006-08-10

Similar Documents

Publication Publication Date Title
US4642047A (en) Method and apparatus for flame generation and utilization of the combustion products for heating, melting and refining
US12305926B2 (en) Methods for preheating metal-containing pellets
EP0219824A1 (en) Method and apparatus for preheating charge materials for continuous steelmarking
WO2007121530A1 (en) Direct smelting plant with waste heat recovery unit
CA1287216C (en) Apparatus and method for increasing carbon content of hot directly reduced iron
AU2009295258B2 (en) A material supply apparatus and process
US20070137436A1 (en) Method for the thermal treatment of raw materials and a device for carrying out said method
US5946340A (en) Process for melting of metal materials in a shaft furnace
JPS5811710A (en) Improvement of copper refinement
US20050155457A1 (en) Method and device for the continuous production of steel using metal charge material
JPH08504937A (en) Method and apparatus for melting ferrous metal materials with coke burning cupola
EP3924524B1 (en) Direct reduction system and related process
EP3543634B1 (en) Oxy-fuel combustion system for melting a pelleted charge material
US5246482A (en) Molten metal producing and refining method
US4414026A (en) Method for the production of ferrochromium
US5069715A (en) Direct smelting process and apparatus
EP0534020B1 (en) Molten metal producing and refining method
EP0915992B1 (en) A process for the direct production of cast iron from iron bearing ore, and an apparatus suitable to carry out said process
CN115298332B (en) Method and system for increasing the carbon content of direct reduced iron in a reduction furnace
US4996694A (en) Method and apparatus for melting iron and steel scrap
CN100529109C (en) Direct smelting plant and process
RU2820584C1 (en) Upper blowing tuyere for converter, method of auxiliary raw material addition and method of liquid cast iron refining
RU2342442C2 (en) Facility for receiving of iron melt
RU2342441C2 (en) Method of iron-carbon alloy direct receiving and facility for its implementation
EP1604373B1 (en) Method and apparatus for controling temperature uniformity of the burden in a direct reduction shaft furnace

Legal Events

Date Code Title Description
AS Assignment

Owner name: AT.PRO TEC TECHNOLOGIE-TEAM GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LOFFLER, LOTHAR;REEL/FRAME:018841/0219

Effective date: 20031126

AS Assignment

Owner name: THYSSENKRUPP AT.PRO TEC GMBH, GERMANY

Free format text: CHANGE OF NAME;ASSIGNOR:AT.PRO TEC TECHNOLOGIE-TEAM GMBH;REEL/FRAME:023790/0930

Effective date: 20061107

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION