US20020005139A1 - Machine for renewing a track - Google Patents
Machine for renewing a track Download PDFInfo
- Publication number
- US20020005139A1 US20020005139A1 US09/898,739 US89873901A US2002005139A1 US 20020005139 A1 US20020005139 A1 US 20020005139A1 US 89873901 A US89873901 A US 89873901A US 2002005139 A1 US2002005139 A1 US 2002005139A1
- Authority
- US
- United States
- Prior art keywords
- ballast
- tie
- machine
- frame
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004140 cleaning Methods 0.000 claims description 8
- 238000000151 deposition Methods 0.000 claims 1
- 230000015572 biosynthetic process Effects 0.000 description 6
- 238000012216 screening Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/08—Renewing or cleaning the ballast in situ, with or without concurrent work on the track the track having been taken-up
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/01—Devices for working the railway-superstructure with track
- E01B2203/015—Devices for working the railway-superstructure with track present but lifted
Definitions
- the present invention relates, in general, to a track renewal machine.
- U.S. Pat. No. 4,854,243 describes a machine for renewing a track composed of two rails fastened to ties supported on ballast.
- the track renewal machine includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages.
- the machine frame has a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, with a frame joint connecting the front and rear frame parts to one another.
- Drives interconnect the front and rear frame parts in an upper region thereof to spread the frame parts apart, whereby the frame parts are raised in a vertical direction at the frame joint.
- the machine further includes a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; an endless ballast clearing device for taking up ballast, mounted on the machine frame between the tie lifting device and the tie laying device and designed to be set in rotation by a drive; and first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast.
- ballast clearing device After removal of the old ties, ballast from the cribs between the ties remains lying on the ballast bed, creating an obstacle for laying the new ties.
- This crib ballast is taken up by the ballast clearing device, having the shape of an endless chain, and is transported upwards to the conveyor. After being moved to the rear end of the machine, the ballast is discharged upon the new track which has been laid in the meantime in the intervening space. This serves to ballast the new ties resting on the newly graded ballast bed and thus to stabilize the track position.
- French Pat. No. FR 2 736 367 A describes a track renewal machine which essentially includes a first machine unit for picking up the old ties, a trailing ballast cleaning unit, and a further machine unit for laying the new ties.
- the ballast cleaning unit includes a clearing chain which cooperates with a ballast screen in which the soiled ballast is cleaned.
- Located immediately behind the clearing chain in the operating direction is a ballast discharge station for returning cleaned ballast to the track, and a planing and consolidating device.
- a machine for renewing a track composed of two rails fastened to ties supported on ballast includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and a drive interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint; a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast; a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast; a second conveyor for transporting ballast,
- FIG. 1 is a schematic side elevational view of a front portion of a track renewal machine according to the present invention
- FIG. 2 is a schematic side elevational view of a rear portion of the track renewal machine
- FIG. 3 is a side elevational cutaway view, on an enlarged scale, of a middle portion of the track renewal machine.
- FIG. 4 is a side elevational cutaway view, on an enlarged scale, of the rear portion of the track renewal machine.
- the track renewal machine 1 for renewing a track 4 .
- the track 4 is composed of two rails 2 fastened to ties 3 which rest on ballast 14 .
- the track renewal machine 1 includes an elongated machine frame 6 which extends longitudinally in a direction along the track 4 and has opposite ends supported on the track 4 by two undercarriages 5 for mobility in an operating direction indicated by arrow 20 .
- the machine frame 6 has front and rear frame parts 7 arranged behind one another in the longitudinal direction and articulatedly connected to one another by a frame joint 8 .
- a drive 9 interconnects the frame parts 7 in the region above the frame joint 8 and serves to spread the frame parts 7 apart in a horizontal direction and to thereby cause the frame parts to be raised in a vertical direction at their ends connected by the frame joint 8 .
- An additional undercarriage 10 located underneath the frame joint 8 is thereby also raised off the track 4 .
- the drive 9 is further effective to steer the articulated machine frame 6 , when traveling in track curves with the undercarriage 10 in the raised position.
- a ballast clearing device 11 is mounted on the machine frame 6 for vertical adjustment by a drive 12 .
- the ballast clearing device 11 is equipped with an endless chain, which is rotated by a drive 13 and picks up ballast 14 of the track 4 for transport to a discharge end 15 .
- a first conveyor 17 extends in the longitudinal direction along the machine frame 6 and has a discharge end 18 and a receiving end 16 which is associated with the discharge end 15 of the ballast clearing device 11 .
- a second conveyor 19 Provided underneath the first conveyor 17 and also extending in the longitudinal direction is a second conveyor 19 , having a discharge end 22 which is arranged immediately ahead—with regard to the operating direction shown by arrow 20 —of a tie laying device 21 mounted on the machine frame 6 .
- a ballast discharge device 23 is located underneath the discharge end 22 of the second conveyor 19 and includes a chute 24 with outlet openings 25 , as shown in particular in FIG. 3.
- a ballast planing device 27 is positioned between the tie laying device 21 and the immediately preceding ballast discharge device 23 , and is connected to a vibratable ballast consolidating unit 28 and designed for vertical adjustment by drives 26 . Additionally, the ballast planing device 27 includes two plow shields 30 which are positioned at either side of the tie laying device 21 , respectively, and spaced from one another transversely to the longitudinal direction. Each plow shield 30 is pivotable about a vertical axis 29 .
- the rear frame part 7 following in the operating direction, is provided with an extension in the shape of a frame 31 supported in a trailer-like manner on an undercarriage 32 .
- a ballast chute 34 having outlet openings 35 distanced from one another transversely to the longitudinal direction, is arranged at a machine end 33 which is located immediately behind the undercarriage 32 (FIG. 4).
- a receiving end 36 of the second conveyor 19 is positioned above the ballast chute 34 .
- the first conveyor 17 has a rear conveyor belt 37
- the second conveyor 19 has a further rear conveyor belt 38 .
- Both rear conveyor belts 37 and 38 are supported on the frame 31 and are mounted for displacement in the longitudinal direction by means of a respective drive 39 .
- a screening car 40 is coupled to the rear machine end 33 and includes a vibratable screening installation 41 for cleaning ballast and a motor unit 42 for supplying energy.
- a tie lifting device 43 is arranged on the machine frame 6 immediately ahead of the ballast clearing device 11 in the operating direction of the machine 1 .
- a tracing device 44 for tracing the vertical position of the old ties 3 is arranged on the front frame part 7 of the machine frame 6 immediately ahead of the tie lifting device 43 .
- a gantry crane 45 is mounted for mobility on the front frame part 7 and serves to remove the old ties 3 and to deliver new ties 3 to a conveyor unit 46 attached to the front frame part 7 .
- the new ties 3 are then delivered to the tie laying device 21 by means of a tie conveyor 47 which extends in the longitudinal direction along the machine frame 6 .
- the track renewal machine 1 operates as follows: At the start of working operations, the two frame parts 7 are spread against one another in the horizontal direction by actuation of the drive 9 , causing the undercarriage 10 located underneath the frame joint 8 to be raised off the track 4 . As the track renewal machine 1 advances continuously in the direction of arrow 20 , the old ties 3 are picked up from the ballast 14 with the aid of the tie lifting device 43 and removed by the gantry crane 45 . At the same time, all of the ballast 14 is taken up by the ballast clearing device 11 lowered into the operating position, thus exposing an earth formation 48 . The ballast 14 is delivered via the first conveyor 17 to the screening installation 41 and cleaned therein.
- the cleaned ballast 14 is transported by the second conveyor 19 to the ballast discharge device 23 and dropped immediately in front of the tie laying device 21 .
- the ballast 14 is then planed by means of the ballast planing device 27 and directly thereafter compacted by the ballast consolidating unit 28 .
- the new ties 3 are now laid upon the resulting planed and compacted new ballast formation 50 by the tie laying device 21 .
- the track renewal machine 1 without a screening car 40 .
- the ballast clearing device 11 is used to remove only ballast which remains from the cribs between the old ties 3 , thus creating a ballast formation 50 .
- the two rear conveyor belts 37 , 38 of the conveyors 17 and 19 are correspondingly displaced in the longitudinal direction, the removed tie crib ballast is discharged into the ballast chute 34 (see dash-dotted arrow 49 in FIG. 4) and used to ballast the new ties 3 laid upon the ballast formation 50 , thus stabilizing the track position.
- the track renewal machine 1 may be employed in a conventional way for renewing a track 4 , without using the ballast clearing device 11 which is now in its idle position.
- the desired ballast formation is created with the aid of the ballast planing device 27 . Excess ballast stemming from the tie cribs is thereby displaced in a lateral direction onto the two shoulders of the ballast bed.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
A track renewal machine includes an elongate machine frame supported by undercarriages on the track and having front and rear frame parts connected by a frame joint. In an upper region, the frame parts are interconnected by a drive by which the frame parts can be spread apart and raised in a vertical direction at the frame joint. A rotatable endless ballast clearing device is mounted between tie lifting and tie laying devices which are mounted on the machine frame between the undercarriages. A first conveyor cooperates with the ballast clearing device for transporting away removed ballast, and a second conveyor for transporting ballast has a discharge end arranged between the ballast clearing device and the tie laying device. A ballast discharge device is associated with the discharge end of the second conveyor, and a vertically adjustable ballast planing device is arranged between the ballast clearing and tie laying devices.
Description
- This application claims the priority of Austrian Patent Application Serial No. GM 512/2000, filed Jul. 13, 2000, the subject matter of which is incorporated herein by reference.
- The present invention relates, in general, to a track renewal machine.
- U.S. Pat. No. 4,854,243 describes a machine for renewing a track composed of two rails fastened to ties supported on ballast. The track renewal machine includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages. The machine frame has a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, with a frame joint connecting the front and rear frame parts to one another. Drives interconnect the front and rear frame parts in an upper region thereof to spread the frame parts apart, whereby the frame parts are raised in a vertical direction at the frame joint. The machine further includes a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; an endless ballast clearing device for taking up ballast, mounted on the machine frame between the tie lifting device and the tie laying device and designed to be set in rotation by a drive; and first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast. After removal of the old ties, ballast from the cribs between the ties remains lying on the ballast bed, creating an obstacle for laying the new ties. This crib ballast is taken up by the ballast clearing device, having the shape of an endless chain, and is transported upwards to the conveyor. After being moved to the rear end of the machine, the ballast is discharged upon the new track which has been laid in the meantime in the intervening space. This serves to ballast the new ties resting on the newly graded ballast bed and thus to stabilize the track position.
- French Pat. No.
FR 2 736 367 A describes a track renewal machine which essentially includes a first machine unit for picking up the old ties, a trailing ballast cleaning unit, and a further machine unit for laying the new ties. The ballast cleaning unit includes a clearing chain which cooperates with a ballast screen in which the soiled ballast is cleaned. Located immediately behind the clearing chain in the operating direction is a ballast discharge station for returning cleaned ballast to the track, and a planing and consolidating device. - It would be desirable and advantageous to provide an improved track renewal machine which is optimally suited for track renewal work and yet can be simultaneously also employed for cleaning an exposed or excavated ballast bed.
- According to one aspect of the present invention, a machine for renewing a track composed of two rails fastened to ties supported on ballast, includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and a drive interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint; a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast; a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast; a second conveyor for transporting ballast, said second conveyor extending in the longitudinal direction and having a discharge end arranged between the ballast clearing device and the tie laying device; a ballast discharge device associated with the discharge end of the second conveyor; and a ballast planing device arranged between the ballast clearing device and the tie laying device and including a drive for vertically adjusting the ballast planing device.
- Through the provision of a track renewal machine according to the present invention with two-part machine frame of articulated design which is supported at opposite ends on the track by undercarriages, it is now possible in a particularly advantageous manner to exploit the renewal gap, which is easily accessible as a consequence of a temporary removal of the track, for taking up ballast in a simplified and problem-free way. Since there is no track present in the renewal gap to create an obstacle, it now is very easy to clean even especially problematic areas, such as platforms, for example, where, in the course of normal cleaning operations with lifting of the track, there would normally not be sufficient space for operating a clearing chain.
- An added advantage can be found in the possibility to precisely control or guide the vertical position of the clearing chain or the ballast planing device by tracing the vertical position of the immediately preceding old ties before the removal thereof, in order to accurately re-establish the track position. Thus, the pre-existing vertical position of the old track can be precisely reproduced by the new track. When the ballast clearing chain is moved to its idle position on the machine frame, the track renewal machine can be employed without any restrictions for regular track renewal operations, without involving cleaning of the ballast bed. As the track renewal machine is supported on undercarriages only at the opposite ends of the machine frame, it is possible to easily produce an exactly planed and consolidated ballast formation for the new track position.
- Other features and advantages of the present invention will be more readily apparent upon reading the following description of a preferred exemplified embodiment of the invention with reference to the accompanying drawing, in which:
- FIG. 1 is a schematic side elevational view of a front portion of a track renewal machine according to the present invention;
- FIG. 2 is a schematic side elevational view of a rear portion of the track renewal machine;
- FIG. 3 is a side elevational cutaway view, on an enlarged scale, of a middle portion of the track renewal machine; and
- FIG. 4 is a side elevational cutaway view, on an enlarged scale, of the rear portion of the track renewal machine.
- This is one of three applications filed on the same day. All three applications deal with related inventions. They are commonly owned and have the same inventive entity. All three applications are unique, but incorporate the other by reference. Accordingly, the other U.S. patent applications, entitled “Machine for Renewing a Track” and “Machine for Removing an Old Track and Laying a New Track” are hereby expressly incorporated by reference.
- Throughout all the Figures, same or corresponding elements are generally indicated by same reference numerals.
- Turning now to the drawing, and in particular to FIGS. 1 and 2, there is shown a track renewal machine, generally designated by
reference numeral 1 for renewing atrack 4. Thetrack 4 is composed of tworails 2 fastened toties 3 which rest onballast 14. Thetrack renewal machine 1 includes anelongated machine frame 6 which extends longitudinally in a direction along thetrack 4 and has opposite ends supported on thetrack 4 by twoundercarriages 5 for mobility in an operating direction indicated byarrow 20. Themachine frame 6 has front andrear frame parts 7 arranged behind one another in the longitudinal direction and articulatedly connected to one another by aframe joint 8. Adrive 9 interconnects theframe parts 7 in the region above theframe joint 8 and serves to spread theframe parts 7 apart in a horizontal direction and to thereby cause the frame parts to be raised in a vertical direction at their ends connected by theframe joint 8. Anadditional undercarriage 10 located underneath theframe joint 8 is thereby also raised off thetrack 4. Thedrive 9 is further effective to steer the articulatedmachine frame 6, when traveling in track curves with theundercarriage 10 in the raised position. - In the region of the
frame joint 8, aballast clearing device 11 is mounted on themachine frame 6 for vertical adjustment by adrive 12. Theballast clearing device 11 is equipped with an endless chain, which is rotated by adrive 13 and picks upballast 14 of thetrack 4 for transport to adischarge end 15. Afirst conveyor 17 extends in the longitudinal direction along themachine frame 6 and has adischarge end 18 and a receivingend 16 which is associated with thedischarge end 15 of theballast clearing device 11. Provided underneath thefirst conveyor 17 and also extending in the longitudinal direction is asecond conveyor 19, having adischarge end 22 which is arranged immediately ahead—with regard to the operating direction shown byarrow 20—of atie laying device 21 mounted on themachine frame 6. Aballast discharge device 23 is located underneath thedischarge end 22 of thesecond conveyor 19 and includes achute 24 withoutlet openings 25, as shown in particular in FIG. 3. - As can be seen more clearly in FIG. 3, a
ballast planing device 27 is positioned between thetie laying device 21 and the immediately precedingballast discharge device 23, and is connected to a vibratableballast consolidating unit 28 and designed for vertical adjustment bydrives 26. Additionally, theballast planing device 27 includes twoplow shields 30 which are positioned at either side of thetie laying device 21, respectively, and spaced from one another transversely to the longitudinal direction. Eachplow shield 30 is pivotable about avertical axis 29. - As shown in FIG. 2 and, more particularly, in FIG. 4, the
rear frame part 7, following in the operating direction, is provided with an extension in the shape of aframe 31 supported in a trailer-like manner on anundercarriage 32. Thus, a working space for screwing operations on thetrack 4 is created under theframe 31. Aballast chute 34, havingoutlet openings 35 distanced from one another transversely to the longitudinal direction, is arranged at amachine end 33 which is located immediately behind the undercarriage 32 (FIG. 4). A receivingend 36 of thesecond conveyor 19 is positioned above theballast chute 34. - As illustrated in FIG. 4, the
first conveyor 17 has arear conveyor belt 37, and thesecond conveyor 19 has a furtherrear conveyor belt 38. Both 37 and 38 are supported on therear conveyor belts frame 31 and are mounted for displacement in the longitudinal direction by means of arespective drive 39. Ascreening car 40 is coupled to therear machine end 33 and includes avibratable screening installation 41 for cleaning ballast and amotor unit 42 for supplying energy. - A
tie lifting device 43 is arranged on themachine frame 6 immediately ahead of theballast clearing device 11 in the operating direction of themachine 1. Atracing device 44 for tracing the vertical position of theold ties 3 is arranged on thefront frame part 7 of themachine frame 6 immediately ahead of thetie lifting device 43. Agantry crane 45 is mounted for mobility on thefront frame part 7 and serves to remove theold ties 3 and to delivernew ties 3 to aconveyor unit 46 attached to thefront frame part 7. Thenew ties 3 are then delivered to thetie laying device 21 by means of atie conveyor 47 which extends in the longitudinal direction along themachine frame 6. - The
track renewal machine 1 operates as follows: At the start of working operations, the twoframe parts 7 are spread against one another in the horizontal direction by actuation of thedrive 9, causing theundercarriage 10 located underneath the frame joint 8 to be raised off thetrack 4. As thetrack renewal machine 1 advances continuously in the direction ofarrow 20, theold ties 3 are picked up from theballast 14 with the aid of thetie lifting device 43 and removed by thegantry crane 45. At the same time, all of theballast 14 is taken up by theballast clearing device 11 lowered into the operating position, thus exposing anearth formation 48. Theballast 14 is delivered via thefirst conveyor 17 to thescreening installation 41 and cleaned therein. Subsequently, the cleanedballast 14 is transported by thesecond conveyor 19 to theballast discharge device 23 and dropped immediately in front of thetie laying device 21. At this location, theballast 14 is then planed by means of theballast planing device 27 and directly thereafter compacted by theballast consolidating unit 28. Thenew ties 3 are now laid upon the resulting planed and compactednew ballast formation 50 by thetie laying device 21. - According to a variation of working operations, it is also possible to employ the
track renewal machine 1 without a screeningcar 40. In this case, theballast clearing device 11 is used to remove only ballast which remains from the cribs between theold ties 3, thus creating aballast formation 50. While the two 37,38 of therear conveyor belts 17 and 19 are correspondingly displaced in the longitudinal direction, the removed tie crib ballast is discharged into the ballast chute 34 (see dash-dottedconveyors arrow 49 in FIG. 4) and used to ballast thenew ties 3 laid upon theballast formation 50, thus stabilizing the track position. - Finally, in a third operational variation, the
track renewal machine 1 may be employed in a conventional way for renewing atrack 4, without using theballast clearing device 11 which is now in its idle position. In this instance, the desired ballast formation is created with the aid of theballast planing device 27. Excess ballast stemming from the tie cribs is thereby displaced in a lateral direction onto the two shoulders of the ballast bed. - While the invention has been illustrated and described as embodied in a machine for renewing a track, it is not intended to be limited to the details shown since various modifications and structural changes may be made without departing in any way from the spirit of the present invention.
- What is claimed as new and desired to be protected by Letters Patent is set forth in the appended claims:
Claims (7)
1. A machine for renewing a track composed of two rails fastened to ties supported on ballast, comprising:
(a) a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and drive means interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint;
(b) a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction;
(c) a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast;
(d) a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast;
(e) a second conveyor for transporting ballast, said second conveyor extending in the longitudinal direction and having a discharge end arranged between the ballast clearing device and the tie laying device;
(f) a ballast discharge device associated with the discharge end of the second conveyor; and
(g) a ballast planing device arranged between the ballast clearing device and the tie laying device and including a drive for vertically adjusting the ballast planing device.
2. The machine of claim 1 , and further comprising a ballast consolidating unit arranged between the ballast planing device and the tie laying device, and drives for vertically adjusting and vibrating the ballast consolidating unit.
3. The machine of claim 1 , wherein the ballast planing device includes two plow shields pivotable about respective vertical axes, wherein the plow shields are spaced from one another transversely to the longitudinal direction and positioned at either side of the tie laying device.
4. A track-bound machine, comprising:
an elongate machine frame supported on a track by undercarriages for travel in an operating direction, wherein the machine frame has an elevatable frame area to clear a renewal section;
a tie lifting device for lifting old ties from the renewal section;
a tie laying device trailing the tie lifting device on the machine frame for placing new ties on the renewal section;
a ballast clearing device, positioned on the machine frame between the tie lifting device and the tie laying device, for withdrawing ballast from the renewal section;
a cleaning device receiving withdrawn ballast from the ballast clearing device for subsequent cleaning;
a ballast discharge device, arranged between the ballast clearing device and the tie laying device, for receiving cleaned ballast and depositing cleaned ballast on the renewal section; and
a ballast planing device arranged between the ballast clearing device and the tie laying device for leveling cleaned ballast.
5. The machine of claim 4 , and further comprising a ballast consolidating unit arranged between the ballast planing device and the tie laying device, wherein the ballast consolidating unit is configured for vertical adjustment and vibration.
6. The machine of claim 4 , wherein the ballast planing device includes two pivotable plow shields in spaced-apart relationship across the machine frame, wherein one plow shield is disposed on one side of the tie laying device, and the other plow shield is disposed on the other side of the tie laying device.
7. The machine of claim 4 , and further comprising a tracing device, disposed on the machine frame in operating direction ahead of the tie lifting device, for tracing a vertical position of the old ties before the old ties are removed to thereby allow accurate laying of the new ties across the renewal section.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT0051200U AT3917U3 (en) | 2000-07-13 | 2000-07-13 | MACHINE FOR RENEWING A TRACK |
| AT512/00U | 2000-07-13 | ||
| ATGM512/2000 | 2000-07-13 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20020005139A1 true US20020005139A1 (en) | 2002-01-17 |
| US6450101B2 US6450101B2 (en) | 2002-09-17 |
Family
ID=3492555
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US09/898,739 Expired - Fee Related US6450101B2 (en) | 2000-07-13 | 2001-07-02 | Machine for renewing a track |
Country Status (14)
| Country | Link |
|---|---|
| US (1) | US6450101B2 (en) |
| EP (1) | EP1172481B1 (en) |
| JP (1) | JP4786068B2 (en) |
| CN (1) | CN1152168C (en) |
| AT (2) | AT3917U3 (en) |
| AU (1) | AU779757B2 (en) |
| CA (1) | CA2352939C (en) |
| CZ (1) | CZ294638B6 (en) |
| DE (1) | DE50107402D1 (en) |
| DK (1) | DK1172481T3 (en) |
| ES (1) | ES2247051T3 (en) |
| PL (1) | PL201969B1 (en) |
| RU (1) | RU2225472C2 (en) |
| UA (1) | UA72905C2 (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1607522A1 (en) * | 2004-06-07 | 2005-12-21 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | A method and a machine for exchanging railway sleepers |
| US20060102042A1 (en) * | 2004-08-20 | 2006-05-18 | Martin Green | Long rail pick-up and delivery system |
| JP2009504945A (en) * | 2005-08-11 | 2009-02-05 | フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー | Machine for re-laying the track |
| CN103334352A (en) * | 2013-07-24 | 2013-10-02 | 北京铁五院工程机械有限公司 | Full-automatic fine tuning wrench |
| CN106460347A (en) * | 2014-06-24 | 2017-02-22 | 普拉塞-陶依尔铁路出口股份有限公司 | Method for renovating a track |
| US20210317616A1 (en) * | 2020-04-11 | 2021-10-14 | Matisa Materiel Industriel S.A. | Transfer car for sleepers and the associated railway vehicle |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT3917U3 (en) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | MACHINE FOR RENEWING A TRACK |
| AT3919U3 (en) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | MACHINE FOR DISMANTLING AN OLD AND LAYING A NEW TRACK |
| AT3918U3 (en) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | MACHINE FOR RENEWING A TRACK |
| AT7189U3 (en) * | 2004-07-19 | 2005-10-17 | Plasser Bahnbaumasch Franz | METHOD FOR REPLACING ALTERNATIVE WAVES OF A TRACK THROUGH NEW WAVES |
| AT504517B1 (en) * | 2007-04-12 | 2008-06-15 | Plasser Bahnbaumasch Franz | Method for controlled lowering of track, involves capturing and recording longitudinal slope of track in rear scanning location of measuring system according to displacement measurement |
| DE102008026873B4 (en) * | 2008-06-05 | 2012-02-02 | Ralf Zürcher | trolley |
| CH708460B1 (en) * | 2013-08-20 | 2017-06-30 | Matisa Matériel Ind Sa | Machine for renewing sleepers of a track. |
| US9428866B2 (en) | 2014-09-23 | 2016-08-30 | Nordco Inc. | Segmented railway regulator blade |
| RU2700298C1 (en) * | 2018-05-30 | 2019-09-16 | Открытое Акционерное Общество "Российские Железные Дороги" | Frontal portal type machine for soil treatment |
| CN110924244B (en) * | 2019-12-27 | 2021-10-26 | 嘉兴德基机械设计有限公司 | Multifunctional railway tamping car |
| AT524860B1 (en) | 2021-03-24 | 2022-10-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Device and method for compacting a track bed |
| CN113338093B (en) * | 2021-08-06 | 2021-10-22 | 中国土木工程集团有限公司 | Method for rebuilding and expanding existing railway and newly-built railway of port area freight yard in conflict |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT316614B (en) * | 1969-10-07 | 1974-07-25 | Plasser Bahnbaumasch Franz | Mobile devices for the continuous replacement or renewal of rails and sleepers of a track |
| CH583822A5 (en) * | 1974-07-11 | 1977-01-14 | Scheuchzer Auguste Les Fils De | |
| AT340985B (en) * | 1976-02-02 | 1978-01-10 | Plasser Bahnbaumasch Franz | DEVICE FOR LAYING OR CHANGING SECTIONS OF A TRACK |
| AT346887B (en) * | 1976-10-15 | 1978-04-15 | Plasser Bahnbaumasch Franz | MOBILE DEVICE FOR CONTINUOUSLY REPLACING A RAILWAY consisting of RAILS AND CROSS-SLEEPERS |
| AT377551B (en) * | 1983-01-10 | 1985-04-10 | Plasser Bahnbaumasch Franz | FOERDER- OR SPACE CHAIN ARRANGEMENT FOR TRACKING MACHINES |
| AT384445B (en) * | 1986-02-12 | 1987-11-10 | Plasser Bahnbaumasch Franz | MOBILE SYSTEM FOR RENEWING THE RAILS AND SILLS OF A TRACK |
| ATE44788T1 (en) | 1986-07-25 | 1989-08-15 | Plasser Bahnbaumasch Franz | MACHINE FOR EXCHANGE OR. REPLACING THE RAILS AND SLEEPERS OF A LAYED TRACK. |
| RU2086723C1 (en) * | 1993-06-16 | 1997-08-10 | Франц Плассер Банбаумашинен-Индустригезельшафт Мбх | Method of and device for reconditioning of railway track ballast layer |
| RU2059743C1 (en) * | 1993-11-09 | 1996-05-10 | Акционерное общество "Тулажелдормаш" | Machine for renewal of railway ballast prism |
| JPH0738322Y2 (en) * | 1994-05-12 | 1995-08-30 | ハースコ コーポレイション | Railway group train for railway track update |
| IT1283554B1 (en) | 1995-04-18 | 1998-04-22 | Plasser Bahnbaumasch Franz | SYSTEM FOR THE CONTINUOUS RENEWAL OF A TRACK |
| US5664498A (en) * | 1995-10-31 | 1997-09-09 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Track renewal machgine |
| AT3917U3 (en) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | MACHINE FOR RENEWING A TRACK |
-
2000
- 2000-07-13 AT AT0051200U patent/AT3917U3/en unknown
-
2001
- 2001-05-23 ES ES01890153T patent/ES2247051T3/en not_active Expired - Lifetime
- 2001-05-23 EP EP01890153A patent/EP1172481B1/en not_active Expired - Lifetime
- 2001-05-23 DK DK01890153T patent/DK1172481T3/en active
- 2001-05-23 DE DE50107402T patent/DE50107402D1/en not_active Expired - Lifetime
- 2001-05-23 AT AT01890153T patent/ATE304630T1/en active
- 2001-06-29 JP JP2001198845A patent/JP4786068B2/en not_active Expired - Fee Related
- 2001-07-02 US US09/898,739 patent/US6450101B2/en not_active Expired - Fee Related
- 2001-07-03 PL PL348468A patent/PL201969B1/en unknown
- 2001-07-10 CZ CZ20012496A patent/CZ294638B6/en not_active IP Right Cessation
- 2001-07-11 UA UA2001074877A patent/UA72905C2/en unknown
- 2001-07-12 AU AU54346/01A patent/AU779757B2/en not_active Ceased
- 2001-07-12 RU RU2001119200/11A patent/RU2225472C2/en not_active IP Right Cessation
- 2001-07-12 CA CA002352939A patent/CA2352939C/en not_active Expired - Fee Related
- 2001-07-13 CN CNB011232013A patent/CN1152168C/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1607522A1 (en) * | 2004-06-07 | 2005-12-21 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | A method and a machine for exchanging railway sleepers |
| US20060102042A1 (en) * | 2004-08-20 | 2006-05-18 | Martin Green | Long rail pick-up and delivery system |
| US7350467B2 (en) | 2004-08-20 | 2008-04-01 | Loram Maintenance Of Way, Inc. | Long rail pick-up and delivery system |
| JP2009504945A (en) * | 2005-08-11 | 2009-02-05 | フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー | Machine for re-laying the track |
| CN103334352A (en) * | 2013-07-24 | 2013-10-02 | 北京铁五院工程机械有限公司 | Full-automatic fine tuning wrench |
| CN106460347A (en) * | 2014-06-24 | 2017-02-22 | 普拉塞-陶依尔铁路出口股份有限公司 | Method for renovating a track |
| US20210317616A1 (en) * | 2020-04-11 | 2021-10-14 | Matisa Materiel Industriel S.A. | Transfer car for sleepers and the associated railway vehicle |
| US12338582B2 (en) * | 2020-04-11 | 2025-06-24 | Matisa Materiel Industriel S.A. | Transfer car for sleepers and the associated railway vehicle |
Also Published As
| Publication number | Publication date |
|---|---|
| PL348468A1 (en) | 2002-01-14 |
| EP1172481A2 (en) | 2002-01-16 |
| ES2247051T3 (en) | 2006-03-01 |
| PL201969B1 (en) | 2009-05-29 |
| AT3917U3 (en) | 2001-08-27 |
| CA2352939A1 (en) | 2002-01-13 |
| UA72905C2 (en) | 2005-05-16 |
| CN1152168C (en) | 2004-06-02 |
| DE50107402D1 (en) | 2005-10-20 |
| DK1172481T3 (en) | 2005-11-21 |
| CN1333405A (en) | 2002-01-30 |
| CZ20012496A3 (en) | 2002-03-13 |
| RU2225472C2 (en) | 2004-03-10 |
| JP4786068B2 (en) | 2011-10-05 |
| JP2002047601A (en) | 2002-02-15 |
| AU5434601A (en) | 2002-01-17 |
| AU779757B2 (en) | 2005-02-10 |
| CA2352939C (en) | 2005-11-01 |
| EP1172481A3 (en) | 2003-11-19 |
| AT3917U2 (en) | 2000-10-25 |
| EP1172481B1 (en) | 2005-09-14 |
| ATE304630T1 (en) | 2005-09-15 |
| US6450101B2 (en) | 2002-09-17 |
| CZ294638B6 (en) | 2005-02-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6450101B2 (en) | Machine for renewing a track | |
| US4479439A (en) | Mobile arrangement and method for improving a track bed | |
| US4428296A (en) | Railroad track relaying train | |
| JPH0756122B2 (en) | Self-propelled track changer | |
| AU776179B2 (en) | A machine for renewing a track | |
| AU636791B2 (en) | A machine for replacing the sleepers of a railway track | |
| JPS62185901A (en) | Self-propelling machine for performing cleaning and solidifying gravel bed of track | |
| US6477960B2 (en) | Machine for removing an old track and laying a new track | |
| JP3732289B2 (en) | Machine that removes old tracks and lays new tracks | |
| US6422150B2 (en) | Machine for renewing a track | |
| AU642805B2 (en) | A cleaning machine | |
| CZ336692A3 (en) | Apparatus for producing protective layer of a ballast bed and process of maintaining the ballast bed | |
| JP2653701B2 (en) | Track maintenance machine with track stabilization device | |
| CA2383161C (en) | A cleaning machine and method of cleaning ballast | |
| US4342165A (en) | Track working machine with a ballast removing and planing device | |
| AU719850B2 (en) | A machine for picking up bulk material lying on a track | |
| CA1287261C (en) | Mobile track renewal installation | |
| US4119154A (en) | Method and apparatus for treating ballast | |
| AU643893B2 (en) | A tamping machine | |
| JPS626002A (en) | Apparatus for re-laying gravel for tunnel | |
| CA2570586C (en) | Method for replacing old sleepers of a railway track by new sleepers | |
| CA1079574A (en) | Self-propelled ballast cleaning machine for on-and off-track work |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THEURER, JOSEF;BRUNNINGER, MANFRED;REEL/FRAME:011966/0421 Effective date: 20010619 |
|
| FPAY | Fee payment |
Year of fee payment: 4 |
|
| FPAY | Fee payment |
Year of fee payment: 8 |
|
| REMI | Maintenance fee reminder mailed | ||
| LAPS | Lapse for failure to pay maintenance fees | ||
| STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
| FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20140917 |