[go: up one dir, main page]

US20020005139A1 - Machine for renewing a track - Google Patents

Machine for renewing a track Download PDF

Info

Publication number
US20020005139A1
US20020005139A1 US09/898,739 US89873901A US2002005139A1 US 20020005139 A1 US20020005139 A1 US 20020005139A1 US 89873901 A US89873901 A US 89873901A US 2002005139 A1 US2002005139 A1 US 2002005139A1
Authority
US
United States
Prior art keywords
ballast
tie
machine
frame
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/898,739
Other versions
US6450101B2 (en
Inventor
Josef Theurer
Manfred Brunninger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHAFT M.B.H. reassignment FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHAFT M.B.H. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRUNNINGER, MANFRED, THEURER, JOSEF
Publication of US20020005139A1 publication Critical patent/US20020005139A1/en
Application granted granted Critical
Publication of US6450101B2 publication Critical patent/US6450101B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/08Renewing or cleaning the ballast in situ, with or without concurrent work on the track the track having been taken-up
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/01Devices for working the railway-superstructure with track
    • E01B2203/015Devices for working the railway-superstructure with track present but lifted

Definitions

  • the present invention relates, in general, to a track renewal machine.
  • U.S. Pat. No. 4,854,243 describes a machine for renewing a track composed of two rails fastened to ties supported on ballast.
  • the track renewal machine includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages.
  • the machine frame has a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, with a frame joint connecting the front and rear frame parts to one another.
  • Drives interconnect the front and rear frame parts in an upper region thereof to spread the frame parts apart, whereby the frame parts are raised in a vertical direction at the frame joint.
  • the machine further includes a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; an endless ballast clearing device for taking up ballast, mounted on the machine frame between the tie lifting device and the tie laying device and designed to be set in rotation by a drive; and first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast.
  • ballast clearing device After removal of the old ties, ballast from the cribs between the ties remains lying on the ballast bed, creating an obstacle for laying the new ties.
  • This crib ballast is taken up by the ballast clearing device, having the shape of an endless chain, and is transported upwards to the conveyor. After being moved to the rear end of the machine, the ballast is discharged upon the new track which has been laid in the meantime in the intervening space. This serves to ballast the new ties resting on the newly graded ballast bed and thus to stabilize the track position.
  • French Pat. No. FR 2 736 367 A describes a track renewal machine which essentially includes a first machine unit for picking up the old ties, a trailing ballast cleaning unit, and a further machine unit for laying the new ties.
  • the ballast cleaning unit includes a clearing chain which cooperates with a ballast screen in which the soiled ballast is cleaned.
  • Located immediately behind the clearing chain in the operating direction is a ballast discharge station for returning cleaned ballast to the track, and a planing and consolidating device.
  • a machine for renewing a track composed of two rails fastened to ties supported on ballast includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and a drive interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint; a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast; a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast; a second conveyor for transporting ballast,
  • FIG. 1 is a schematic side elevational view of a front portion of a track renewal machine according to the present invention
  • FIG. 2 is a schematic side elevational view of a rear portion of the track renewal machine
  • FIG. 3 is a side elevational cutaway view, on an enlarged scale, of a middle portion of the track renewal machine.
  • FIG. 4 is a side elevational cutaway view, on an enlarged scale, of the rear portion of the track renewal machine.
  • the track renewal machine 1 for renewing a track 4 .
  • the track 4 is composed of two rails 2 fastened to ties 3 which rest on ballast 14 .
  • the track renewal machine 1 includes an elongated machine frame 6 which extends longitudinally in a direction along the track 4 and has opposite ends supported on the track 4 by two undercarriages 5 for mobility in an operating direction indicated by arrow 20 .
  • the machine frame 6 has front and rear frame parts 7 arranged behind one another in the longitudinal direction and articulatedly connected to one another by a frame joint 8 .
  • a drive 9 interconnects the frame parts 7 in the region above the frame joint 8 and serves to spread the frame parts 7 apart in a horizontal direction and to thereby cause the frame parts to be raised in a vertical direction at their ends connected by the frame joint 8 .
  • An additional undercarriage 10 located underneath the frame joint 8 is thereby also raised off the track 4 .
  • the drive 9 is further effective to steer the articulated machine frame 6 , when traveling in track curves with the undercarriage 10 in the raised position.
  • a ballast clearing device 11 is mounted on the machine frame 6 for vertical adjustment by a drive 12 .
  • the ballast clearing device 11 is equipped with an endless chain, which is rotated by a drive 13 and picks up ballast 14 of the track 4 for transport to a discharge end 15 .
  • a first conveyor 17 extends in the longitudinal direction along the machine frame 6 and has a discharge end 18 and a receiving end 16 which is associated with the discharge end 15 of the ballast clearing device 11 .
  • a second conveyor 19 Provided underneath the first conveyor 17 and also extending in the longitudinal direction is a second conveyor 19 , having a discharge end 22 which is arranged immediately ahead—with regard to the operating direction shown by arrow 20 —of a tie laying device 21 mounted on the machine frame 6 .
  • a ballast discharge device 23 is located underneath the discharge end 22 of the second conveyor 19 and includes a chute 24 with outlet openings 25 , as shown in particular in FIG. 3.
  • a ballast planing device 27 is positioned between the tie laying device 21 and the immediately preceding ballast discharge device 23 , and is connected to a vibratable ballast consolidating unit 28 and designed for vertical adjustment by drives 26 . Additionally, the ballast planing device 27 includes two plow shields 30 which are positioned at either side of the tie laying device 21 , respectively, and spaced from one another transversely to the longitudinal direction. Each plow shield 30 is pivotable about a vertical axis 29 .
  • the rear frame part 7 following in the operating direction, is provided with an extension in the shape of a frame 31 supported in a trailer-like manner on an undercarriage 32 .
  • a ballast chute 34 having outlet openings 35 distanced from one another transversely to the longitudinal direction, is arranged at a machine end 33 which is located immediately behind the undercarriage 32 (FIG. 4).
  • a receiving end 36 of the second conveyor 19 is positioned above the ballast chute 34 .
  • the first conveyor 17 has a rear conveyor belt 37
  • the second conveyor 19 has a further rear conveyor belt 38 .
  • Both rear conveyor belts 37 and 38 are supported on the frame 31 and are mounted for displacement in the longitudinal direction by means of a respective drive 39 .
  • a screening car 40 is coupled to the rear machine end 33 and includes a vibratable screening installation 41 for cleaning ballast and a motor unit 42 for supplying energy.
  • a tie lifting device 43 is arranged on the machine frame 6 immediately ahead of the ballast clearing device 11 in the operating direction of the machine 1 .
  • a tracing device 44 for tracing the vertical position of the old ties 3 is arranged on the front frame part 7 of the machine frame 6 immediately ahead of the tie lifting device 43 .
  • a gantry crane 45 is mounted for mobility on the front frame part 7 and serves to remove the old ties 3 and to deliver new ties 3 to a conveyor unit 46 attached to the front frame part 7 .
  • the new ties 3 are then delivered to the tie laying device 21 by means of a tie conveyor 47 which extends in the longitudinal direction along the machine frame 6 .
  • the track renewal machine 1 operates as follows: At the start of working operations, the two frame parts 7 are spread against one another in the horizontal direction by actuation of the drive 9 , causing the undercarriage 10 located underneath the frame joint 8 to be raised off the track 4 . As the track renewal machine 1 advances continuously in the direction of arrow 20 , the old ties 3 are picked up from the ballast 14 with the aid of the tie lifting device 43 and removed by the gantry crane 45 . At the same time, all of the ballast 14 is taken up by the ballast clearing device 11 lowered into the operating position, thus exposing an earth formation 48 . The ballast 14 is delivered via the first conveyor 17 to the screening installation 41 and cleaned therein.
  • the cleaned ballast 14 is transported by the second conveyor 19 to the ballast discharge device 23 and dropped immediately in front of the tie laying device 21 .
  • the ballast 14 is then planed by means of the ballast planing device 27 and directly thereafter compacted by the ballast consolidating unit 28 .
  • the new ties 3 are now laid upon the resulting planed and compacted new ballast formation 50 by the tie laying device 21 .
  • the track renewal machine 1 without a screening car 40 .
  • the ballast clearing device 11 is used to remove only ballast which remains from the cribs between the old ties 3 , thus creating a ballast formation 50 .
  • the two rear conveyor belts 37 , 38 of the conveyors 17 and 19 are correspondingly displaced in the longitudinal direction, the removed tie crib ballast is discharged into the ballast chute 34 (see dash-dotted arrow 49 in FIG. 4) and used to ballast the new ties 3 laid upon the ballast formation 50 , thus stabilizing the track position.
  • the track renewal machine 1 may be employed in a conventional way for renewing a track 4 , without using the ballast clearing device 11 which is now in its idle position.
  • the desired ballast formation is created with the aid of the ballast planing device 27 . Excess ballast stemming from the tie cribs is thereby displaced in a lateral direction onto the two shoulders of the ballast bed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A track renewal machine includes an elongate machine frame supported by undercarriages on the track and having front and rear frame parts connected by a frame joint. In an upper region, the frame parts are interconnected by a drive by which the frame parts can be spread apart and raised in a vertical direction at the frame joint. A rotatable endless ballast clearing device is mounted between tie lifting and tie laying devices which are mounted on the machine frame between the undercarriages. A first conveyor cooperates with the ballast clearing device for transporting away removed ballast, and a second conveyor for transporting ballast has a discharge end arranged between the ballast clearing device and the tie laying device. A ballast discharge device is associated with the discharge end of the second conveyor, and a vertically adjustable ballast planing device is arranged between the ballast clearing and tie laying devices.

Description

    CROSS-REFERENCES TO RELATED APPLICATIONS
  • This application claims the priority of Austrian Patent Application Serial No. GM 512/2000, filed Jul. 13, 2000, the subject matter of which is incorporated herein by reference. [0001]
  • BACKGROUND OF THE INVENTION
  • The present invention relates, in general, to a track renewal machine. [0002]
  • U.S. Pat. No. 4,854,243 describes a machine for renewing a track composed of two rails fastened to ties supported on ballast. The track renewal machine includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages. The machine frame has a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, with a frame joint connecting the front and rear frame parts to one another. Drives interconnect the front and rear frame parts in an upper region thereof to spread the frame parts apart, whereby the frame parts are raised in a vertical direction at the frame joint. The machine further includes a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; an endless ballast clearing device for taking up ballast, mounted on the machine frame between the tie lifting device and the tie laying device and designed to be set in rotation by a drive; and first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast. After removal of the old ties, ballast from the cribs between the ties remains lying on the ballast bed, creating an obstacle for laying the new ties. This crib ballast is taken up by the ballast clearing device, having the shape of an endless chain, and is transported upwards to the conveyor. After being moved to the rear end of the machine, the ballast is discharged upon the new track which has been laid in the meantime in the intervening space. This serves to ballast the new ties resting on the newly graded ballast bed and thus to stabilize the track position. [0003]
  • French Pat. No. [0004] FR 2 736 367 A describes a track renewal machine which essentially includes a first machine unit for picking up the old ties, a trailing ballast cleaning unit, and a further machine unit for laying the new ties. The ballast cleaning unit includes a clearing chain which cooperates with a ballast screen in which the soiled ballast is cleaned. Located immediately behind the clearing chain in the operating direction is a ballast discharge station for returning cleaned ballast to the track, and a planing and consolidating device.
  • It would be desirable and advantageous to provide an improved track renewal machine which is optimally suited for track renewal work and yet can be simultaneously also employed for cleaning an exposed or excavated ballast bed. [0005]
  • SUMMARY OF THE INVENTION
  • According to one aspect of the present invention, a machine for renewing a track composed of two rails fastened to ties supported on ballast, includes a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and a drive interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint; a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction; a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast; a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast; a second conveyor for transporting ballast, said second conveyor extending in the longitudinal direction and having a discharge end arranged between the ballast clearing device and the tie laying device; a ballast discharge device associated with the discharge end of the second conveyor; and a ballast planing device arranged between the ballast clearing device and the tie laying device and including a drive for vertically adjusting the ballast planing device. [0006]
  • Through the provision of a track renewal machine according to the present invention with two-part machine frame of articulated design which is supported at opposite ends on the track by undercarriages, it is now possible in a particularly advantageous manner to exploit the renewal gap, which is easily accessible as a consequence of a temporary removal of the track, for taking up ballast in a simplified and problem-free way. Since there is no track present in the renewal gap to create an obstacle, it now is very easy to clean even especially problematic areas, such as platforms, for example, where, in the course of normal cleaning operations with lifting of the track, there would normally not be sufficient space for operating a clearing chain. [0007]
  • An added advantage can be found in the possibility to precisely control or guide the vertical position of the clearing chain or the ballast planing device by tracing the vertical position of the immediately preceding old ties before the removal thereof, in order to accurately re-establish the track position. Thus, the pre-existing vertical position of the old track can be precisely reproduced by the new track. When the ballast clearing chain is moved to its idle position on the machine frame, the track renewal machine can be employed without any restrictions for regular track renewal operations, without involving cleaning of the ballast bed. As the track renewal machine is supported on undercarriages only at the opposite ends of the machine frame, it is possible to easily produce an exactly planed and consolidated ballast formation for the new track position.[0008]
  • BRIEF DESCRIPTION OF THE DRAWING
  • Other features and advantages of the present invention will be more readily apparent upon reading the following description of a preferred exemplified embodiment of the invention with reference to the accompanying drawing, in which: [0009]
  • FIG. 1 is a schematic side elevational view of a front portion of a track renewal machine according to the present invention; [0010]
  • FIG. 2 is a schematic side elevational view of a rear portion of the track renewal machine; [0011]
  • FIG. 3 is a side elevational cutaway view, on an enlarged scale, of a middle portion of the track renewal machine; and [0012]
  • FIG. 4 is a side elevational cutaway view, on an enlarged scale, of the rear portion of the track renewal machine. [0013]
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
  • This is one of three applications filed on the same day. All three applications deal with related inventions. They are commonly owned and have the same inventive entity. All three applications are unique, but incorporate the other by reference. Accordingly, the other U.S. patent applications, entitled “Machine for Renewing a Track” and “Machine for Removing an Old Track and Laying a New Track” are hereby expressly incorporated by reference. [0014]
  • Throughout all the Figures, same or corresponding elements are generally indicated by same reference numerals. [0015]
  • Turning now to the drawing, and in particular to FIGS. 1 and 2, there is shown a track renewal machine, generally designated by [0016] reference numeral 1 for renewing a track 4. The track 4 is composed of two rails 2 fastened to ties 3 which rest on ballast 14. The track renewal machine 1 includes an elongated machine frame 6 which extends longitudinally in a direction along the track 4 and has opposite ends supported on the track 4 by two undercarriages 5 for mobility in an operating direction indicated by arrow 20. The machine frame 6 has front and rear frame parts 7 arranged behind one another in the longitudinal direction and articulatedly connected to one another by a frame joint 8. A drive 9 interconnects the frame parts 7 in the region above the frame joint 8 and serves to spread the frame parts 7 apart in a horizontal direction and to thereby cause the frame parts to be raised in a vertical direction at their ends connected by the frame joint 8. An additional undercarriage 10 located underneath the frame joint 8 is thereby also raised off the track 4. The drive 9 is further effective to steer the articulated machine frame 6, when traveling in track curves with the undercarriage 10 in the raised position.
  • In the region of the [0017] frame joint 8, a ballast clearing device 11 is mounted on the machine frame 6 for vertical adjustment by a drive 12. The ballast clearing device 11 is equipped with an endless chain, which is rotated by a drive 13 and picks up ballast 14 of the track 4 for transport to a discharge end 15. A first conveyor 17 extends in the longitudinal direction along the machine frame 6 and has a discharge end 18 and a receiving end 16 which is associated with the discharge end 15 of the ballast clearing device 11. Provided underneath the first conveyor 17 and also extending in the longitudinal direction is a second conveyor 19, having a discharge end 22 which is arranged immediately ahead—with regard to the operating direction shown by arrow 20—of a tie laying device 21 mounted on the machine frame 6. A ballast discharge device 23 is located underneath the discharge end 22 of the second conveyor 19 and includes a chute 24 with outlet openings 25, as shown in particular in FIG. 3.
  • As can be seen more clearly in FIG. 3, a [0018] ballast planing device 27 is positioned between the tie laying device 21 and the immediately preceding ballast discharge device 23, and is connected to a vibratable ballast consolidating unit 28 and designed for vertical adjustment by drives 26. Additionally, the ballast planing device 27 includes two plow shields 30 which are positioned at either side of the tie laying device 21, respectively, and spaced from one another transversely to the longitudinal direction. Each plow shield 30 is pivotable about a vertical axis 29.
  • As shown in FIG. 2 and, more particularly, in FIG. 4, the [0019] rear frame part 7, following in the operating direction, is provided with an extension in the shape of a frame 31 supported in a trailer-like manner on an undercarriage 32. Thus, a working space for screwing operations on the track 4 is created under the frame 31. A ballast chute 34, having outlet openings 35 distanced from one another transversely to the longitudinal direction, is arranged at a machine end 33 which is located immediately behind the undercarriage 32 (FIG. 4). A receiving end 36 of the second conveyor 19 is positioned above the ballast chute 34.
  • As illustrated in FIG. 4, the [0020] first conveyor 17 has a rear conveyor belt 37, and the second conveyor 19 has a further rear conveyor belt 38. Both rear conveyor belts 37 and 38 are supported on the frame 31 and are mounted for displacement in the longitudinal direction by means of a respective drive 39. A screening car 40 is coupled to the rear machine end 33 and includes a vibratable screening installation 41 for cleaning ballast and a motor unit 42 for supplying energy.
  • A [0021] tie lifting device 43 is arranged on the machine frame 6 immediately ahead of the ballast clearing device 11 in the operating direction of the machine 1. A tracing device 44 for tracing the vertical position of the old ties 3 is arranged on the front frame part 7 of the machine frame 6 immediately ahead of the tie lifting device 43. A gantry crane 45 is mounted for mobility on the front frame part 7 and serves to remove the old ties 3 and to deliver new ties 3 to a conveyor unit 46 attached to the front frame part 7. The new ties 3 are then delivered to the tie laying device 21 by means of a tie conveyor 47 which extends in the longitudinal direction along the machine frame 6.
  • The [0022] track renewal machine 1 operates as follows: At the start of working operations, the two frame parts 7 are spread against one another in the horizontal direction by actuation of the drive 9, causing the undercarriage 10 located underneath the frame joint 8 to be raised off the track 4. As the track renewal machine 1 advances continuously in the direction of arrow 20, the old ties 3 are picked up from the ballast 14 with the aid of the tie lifting device 43 and removed by the gantry crane 45. At the same time, all of the ballast 14 is taken up by the ballast clearing device 11 lowered into the operating position, thus exposing an earth formation 48. The ballast 14 is delivered via the first conveyor 17 to the screening installation 41 and cleaned therein. Subsequently, the cleaned ballast 14 is transported by the second conveyor 19 to the ballast discharge device 23 and dropped immediately in front of the tie laying device 21. At this location, the ballast 14 is then planed by means of the ballast planing device 27 and directly thereafter compacted by the ballast consolidating unit 28. The new ties 3 are now laid upon the resulting planed and compacted new ballast formation 50 by the tie laying device 21.
  • According to a variation of working operations, it is also possible to employ the [0023] track renewal machine 1 without a screening car 40. In this case, the ballast clearing device 11 is used to remove only ballast which remains from the cribs between the old ties 3, thus creating a ballast formation 50. While the two rear conveyor belts 37,38 of the conveyors 17 and 19 are correspondingly displaced in the longitudinal direction, the removed tie crib ballast is discharged into the ballast chute 34 (see dash-dotted arrow 49 in FIG. 4) and used to ballast the new ties 3 laid upon the ballast formation 50, thus stabilizing the track position.
  • Finally, in a third operational variation, the [0024] track renewal machine 1 may be employed in a conventional way for renewing a track 4, without using the ballast clearing device 11 which is now in its idle position. In this instance, the desired ballast formation is created with the aid of the ballast planing device 27. Excess ballast stemming from the tie cribs is thereby displaced in a lateral direction onto the two shoulders of the ballast bed.
  • While the invention has been illustrated and described as embodied in a machine for renewing a track, it is not intended to be limited to the details shown since various modifications and structural changes may be made without departing in any way from the spirit of the present invention. [0025]
  • What is claimed as new and desired to be protected by Letters Patent is set forth in the appended claims: [0026]

Claims (7)

What is claimed is:
1. A machine for renewing a track composed of two rails fastened to ties supported on ballast, comprising:
(a) a machine frame extending in a longitudinal direction and having opposite ends supported on the track by undercarriages, wherein the machine frame includes a front frame part and a rear frame part, arranged one following the other in the longitudinal direction, a frame joint connecting the front and rear frame parts to one another, and drive means interconnecting the front and rear frame parts in an upper region thereof and effective to spread the frame parts apart, wherein the frame parts are raised in a vertical direction at the frame joint;
(b) a tie lifting device and a tie laying device, mounted on the machine frame between the undercarriages and spaced from one another in the longitudinal direction;
(c) a rotatable endless ballast clearing device, mounted on the machine frame between the tie lifting device and the tie laying device, for taking up ballast;
(d) a first conveyor, cooperating with the ballast clearing device, for transporting away taken-up ballast;
(e) a second conveyor for transporting ballast, said second conveyor extending in the longitudinal direction and having a discharge end arranged between the ballast clearing device and the tie laying device;
(f) a ballast discharge device associated with the discharge end of the second conveyor; and
(g) a ballast planing device arranged between the ballast clearing device and the tie laying device and including a drive for vertically adjusting the ballast planing device.
2. The machine of claim 1, and further comprising a ballast consolidating unit arranged between the ballast planing device and the tie laying device, and drives for vertically adjusting and vibrating the ballast consolidating unit.
3. The machine of claim 1, wherein the ballast planing device includes two plow shields pivotable about respective vertical axes, wherein the plow shields are spaced from one another transversely to the longitudinal direction and positioned at either side of the tie laying device.
4. A track-bound machine, comprising:
an elongate machine frame supported on a track by undercarriages for travel in an operating direction, wherein the machine frame has an elevatable frame area to clear a renewal section;
a tie lifting device for lifting old ties from the renewal section;
a tie laying device trailing the tie lifting device on the machine frame for placing new ties on the renewal section;
a ballast clearing device, positioned on the machine frame between the tie lifting device and the tie laying device, for withdrawing ballast from the renewal section;
a cleaning device receiving withdrawn ballast from the ballast clearing device for subsequent cleaning;
a ballast discharge device, arranged between the ballast clearing device and the tie laying device, for receiving cleaned ballast and depositing cleaned ballast on the renewal section; and
a ballast planing device arranged between the ballast clearing device and the tie laying device for leveling cleaned ballast.
5. The machine of claim 4, and further comprising a ballast consolidating unit arranged between the ballast planing device and the tie laying device, wherein the ballast consolidating unit is configured for vertical adjustment and vibration.
6. The machine of claim 4, wherein the ballast planing device includes two pivotable plow shields in spaced-apart relationship across the machine frame, wherein one plow shield is disposed on one side of the tie laying device, and the other plow shield is disposed on the other side of the tie laying device.
7. The machine of claim 4, and further comprising a tracing device, disposed on the machine frame in operating direction ahead of the tie lifting device, for tracing a vertical position of the old ties before the old ties are removed to thereby allow accurate laying of the new ties across the renewal section.
US09/898,739 2000-07-13 2001-07-02 Machine for renewing a track Expired - Fee Related US6450101B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT0051200U AT3917U3 (en) 2000-07-13 2000-07-13 MACHINE FOR RENEWING A TRACK
AT512/00U 2000-07-13
ATGM512/2000 2000-07-13

Publications (2)

Publication Number Publication Date
US20020005139A1 true US20020005139A1 (en) 2002-01-17
US6450101B2 US6450101B2 (en) 2002-09-17

Family

ID=3492555

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/898,739 Expired - Fee Related US6450101B2 (en) 2000-07-13 2001-07-02 Machine for renewing a track

Country Status (14)

Country Link
US (1) US6450101B2 (en)
EP (1) EP1172481B1 (en)
JP (1) JP4786068B2 (en)
CN (1) CN1152168C (en)
AT (2) AT3917U3 (en)
AU (1) AU779757B2 (en)
CA (1) CA2352939C (en)
CZ (1) CZ294638B6 (en)
DE (1) DE50107402D1 (en)
DK (1) DK1172481T3 (en)
ES (1) ES2247051T3 (en)
PL (1) PL201969B1 (en)
RU (1) RU2225472C2 (en)
UA (1) UA72905C2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1607522A1 (en) * 2004-06-07 2005-12-21 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. A method and a machine for exchanging railway sleepers
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
JP2009504945A (en) * 2005-08-11 2009-02-05 フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー Machine for re-laying the track
CN103334352A (en) * 2013-07-24 2013-10-02 北京铁五院工程机械有限公司 Full-automatic fine tuning wrench
CN106460347A (en) * 2014-06-24 2017-02-22 普拉塞-陶依尔铁路出口股份有限公司 Method for renovating a track
US20210317616A1 (en) * 2020-04-11 2021-10-14 Matisa Materiel Industriel S.A. Transfer car for sleepers and the associated railway vehicle

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT3917U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK
AT3919U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR DISMANTLING AN OLD AND LAYING A NEW TRACK
AT3918U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK
AT7189U3 (en) * 2004-07-19 2005-10-17 Plasser Bahnbaumasch Franz METHOD FOR REPLACING ALTERNATIVE WAVES OF A TRACK THROUGH NEW WAVES
AT504517B1 (en) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Method for controlled lowering of track, involves capturing and recording longitudinal slope of track in rear scanning location of measuring system according to displacement measurement
DE102008026873B4 (en) * 2008-06-05 2012-02-02 Ralf Zürcher trolley
CH708460B1 (en) * 2013-08-20 2017-06-30 Matisa Matériel Ind Sa Machine for renewing sleepers of a track.
US9428866B2 (en) 2014-09-23 2016-08-30 Nordco Inc. Segmented railway regulator blade
RU2700298C1 (en) * 2018-05-30 2019-09-16 Открытое Акционерное Общество "Российские Железные Дороги" Frontal portal type machine for soil treatment
CN110924244B (en) * 2019-12-27 2021-10-26 嘉兴德基机械设计有限公司 Multifunctional railway tamping car
AT524860B1 (en) 2021-03-24 2022-10-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Device and method for compacting a track bed
CN113338093B (en) * 2021-08-06 2021-10-22 中国土木工程集团有限公司 Method for rebuilding and expanding existing railway and newly-built railway of port area freight yard in conflict

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT316614B (en) * 1969-10-07 1974-07-25 Plasser Bahnbaumasch Franz Mobile devices for the continuous replacement or renewal of rails and sleepers of a track
CH583822A5 (en) * 1974-07-11 1977-01-14 Scheuchzer Auguste Les Fils De
AT340985B (en) * 1976-02-02 1978-01-10 Plasser Bahnbaumasch Franz DEVICE FOR LAYING OR CHANGING SECTIONS OF A TRACK
AT346887B (en) * 1976-10-15 1978-04-15 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR CONTINUOUSLY REPLACING A RAILWAY consisting of RAILS AND CROSS-SLEEPERS
AT377551B (en) * 1983-01-10 1985-04-10 Plasser Bahnbaumasch Franz FOERDER- OR SPACE CHAIN ARRANGEMENT FOR TRACKING MACHINES
AT384445B (en) * 1986-02-12 1987-11-10 Plasser Bahnbaumasch Franz MOBILE SYSTEM FOR RENEWING THE RAILS AND SILLS OF A TRACK
ATE44788T1 (en) 1986-07-25 1989-08-15 Plasser Bahnbaumasch Franz MACHINE FOR EXCHANGE OR. REPLACING THE RAILS AND SLEEPERS OF A LAYED TRACK.
RU2086723C1 (en) * 1993-06-16 1997-08-10 Франц Плассер Банбаумашинен-Индустригезельшафт Мбх Method of and device for reconditioning of railway track ballast layer
RU2059743C1 (en) * 1993-11-09 1996-05-10 Акционерное общество "Тулажелдормаш" Machine for renewal of railway ballast prism
JPH0738322Y2 (en) * 1994-05-12 1995-08-30 ハースコ コーポレイション Railway group train for railway track update
IT1283554B1 (en) 1995-04-18 1998-04-22 Plasser Bahnbaumasch Franz SYSTEM FOR THE CONTINUOUS RENEWAL OF A TRACK
US5664498A (en) * 1995-10-31 1997-09-09 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machgine
AT3917U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1607522A1 (en) * 2004-06-07 2005-12-21 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. A method and a machine for exchanging railway sleepers
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
JP2009504945A (en) * 2005-08-11 2009-02-05 フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー Machine for re-laying the track
CN103334352A (en) * 2013-07-24 2013-10-02 北京铁五院工程机械有限公司 Full-automatic fine tuning wrench
CN106460347A (en) * 2014-06-24 2017-02-22 普拉塞-陶依尔铁路出口股份有限公司 Method for renovating a track
US20210317616A1 (en) * 2020-04-11 2021-10-14 Matisa Materiel Industriel S.A. Transfer car for sleepers and the associated railway vehicle
US12338582B2 (en) * 2020-04-11 2025-06-24 Matisa Materiel Industriel S.A. Transfer car for sleepers and the associated railway vehicle

Also Published As

Publication number Publication date
PL348468A1 (en) 2002-01-14
EP1172481A2 (en) 2002-01-16
ES2247051T3 (en) 2006-03-01
PL201969B1 (en) 2009-05-29
AT3917U3 (en) 2001-08-27
CA2352939A1 (en) 2002-01-13
UA72905C2 (en) 2005-05-16
CN1152168C (en) 2004-06-02
DE50107402D1 (en) 2005-10-20
DK1172481T3 (en) 2005-11-21
CN1333405A (en) 2002-01-30
CZ20012496A3 (en) 2002-03-13
RU2225472C2 (en) 2004-03-10
JP4786068B2 (en) 2011-10-05
JP2002047601A (en) 2002-02-15
AU5434601A (en) 2002-01-17
AU779757B2 (en) 2005-02-10
CA2352939C (en) 2005-11-01
EP1172481A3 (en) 2003-11-19
AT3917U2 (en) 2000-10-25
EP1172481B1 (en) 2005-09-14
ATE304630T1 (en) 2005-09-15
US6450101B2 (en) 2002-09-17
CZ294638B6 (en) 2005-02-16

Similar Documents

Publication Publication Date Title
US6450101B2 (en) Machine for renewing a track
US4479439A (en) Mobile arrangement and method for improving a track bed
US4428296A (en) Railroad track relaying train
JPH0756122B2 (en) Self-propelled track changer
AU776179B2 (en) A machine for renewing a track
AU636791B2 (en) A machine for replacing the sleepers of a railway track
JPS62185901A (en) Self-propelling machine for performing cleaning and solidifying gravel bed of track
US6477960B2 (en) Machine for removing an old track and laying a new track
JP3732289B2 (en) Machine that removes old tracks and lays new tracks
US6422150B2 (en) Machine for renewing a track
AU642805B2 (en) A cleaning machine
CZ336692A3 (en) Apparatus for producing protective layer of a ballast bed and process of maintaining the ballast bed
JP2653701B2 (en) Track maintenance machine with track stabilization device
CA2383161C (en) A cleaning machine and method of cleaning ballast
US4342165A (en) Track working machine with a ballast removing and planing device
AU719850B2 (en) A machine for picking up bulk material lying on a track
CA1287261C (en) Mobile track renewal installation
US4119154A (en) Method and apparatus for treating ballast
AU643893B2 (en) A tamping machine
JPS626002A (en) Apparatus for re-laying gravel for tunnel
CA2570586C (en) Method for replacing old sleepers of a railway track by new sleepers
CA1079574A (en) Self-propelled ballast cleaning machine for on-and off-track work

Legal Events

Date Code Title Description
AS Assignment

Owner name: FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THEURER, JOSEF;BRUNNINGER, MANFRED;REEL/FRAME:011966/0421

Effective date: 20010619

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140917