[go: up one dir, main page]

US1561139A - Road construction - Google Patents

Road construction Download PDF

Info

Publication number
US1561139A
US1561139A US46888A US4688825A US1561139A US 1561139 A US1561139 A US 1561139A US 46888 A US46888 A US 46888A US 4688825 A US4688825 A US 4688825A US 1561139 A US1561139 A US 1561139A
Authority
US
United States
Prior art keywords
road
mortar
stone
rock
road construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US46888A
Inventor
Raymond W Coburn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US46888A priority Critical patent/US1561139A/en
Application granted granted Critical
Publication of US1561139A publication Critical patent/US1561139A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre

Definitions

  • This invention relates to road construction and has for its object simplicity of construction, and minimum building and maintenance costs.
  • the invention finds its principal use in the construction of bituminous macadam roads, though it may also be used for the base course or portion of other roads and pavements, for-example a pavement having a hot mix sheet asphalt. or bituminous concrete wearing surface.
  • a macadam road in service may have a rigid base, it has not proved practicable to lay a macadam surface upon a hardened concrete base because the necessary rolling of the bare rock of the macadam surface'upon the unyielding concrete of the base course would crush the macadam surface rock.
  • a macadam surface could not be laid and rolled upon a freshly poured green concrete base.
  • the construction of the present pavement in its preferred form is begun by preparing the sub-grade upon which is placed a layer of clean, broken stone, say 4 or 5 inches in de th. This should referably be principally No. 1 stone rom 2 to 1%"). After this stone has been rolled to a comact condition there is then applied to it a dry mortar of cement and sand (for example a 1:2 mix). A suitable quantity is pounds of dry mortar to 500 pounds of rock or broken stone. This should be well mixed and then spread over the surface of the rock into which it is brushed and rolled until the rock will not carry any more mortar. The surplus is then broomed ofl and the top is left in a. mosaic condition.
  • a layer of clean, broken stone say 4 or 5 inches in de th.
  • a dry mortar of cement and sand for example a 1:2 mix.
  • a suitable quantity is pounds of dry mortar to 500 pounds of rock or broken stone. This should be well mixed and then
  • a spreading machine with a mechanical agitation baflle board gives more uniform results than when the mortar is spread by hand, though the latter means, if carefully done, is entirely satisfactory.
  • additional clean rock or broken No. 1 stone (preferably without any smaller sizes) is then spread and rolled. The rolling can be thoroughly done Without danger of crushing the surface rock as the entire structure is flexible at this time, being simply keyed by the stone and the dry mortar.
  • the heated bituminous material naturally asphalt, oil asphalt, or tar
  • a pressure machine in the usual manner of penetrating bituminous macadam, after which-a finishing layer of pea stone or chips is spread and rolled, and a seal coat of bituminous material applied, and this in turn covered with stone chips.
  • the application of the seal coat may be delayed a day or two and the road meanwhile being periodically sprinkled, without interruption of traflic on the road. If desired, some sprinkling may be done before the bitumen is applied.
  • the pavement is now com leted except for the curing or setting of t e base course.
  • the curing can ordinarily be accomplished in any manner which keeps the shoulders of the road moist or wet, for example by drenching the shoulders at regular intervals with a Watering cart, pipe lines with sprays radiating therefrom along the sides of the road, or by means of low dikes or pending water along the sides of the road.
  • the road as thus described will set up so that the base portion, though not containing nearly so much cement as is ordinarily used in a Portland cement concrete base, approaches the strength of a standard concrete base and with a far better bond of the surface to the base portion because, after the surface rgck is-placed, the mortar is slowly cured and kept moist by the ercolation and ca illary action, as well as eing kept from rying out by the water-impervious wearing surface.
  • the strength of a road is often brought up to that of one having 9. Portland cement concrete base at a considerable saving of labor and without loss of use in connection with the usual covering of a base with loam for a long curing period.
  • the dry mortar is easily worked in and stays put, being there comparted and held in place by the rolling and keying of the stone, and since it is then set up slowly as the moisture reaches it the danger of weak spots due to the washing away of cement particles is eliminated. In this respect it has a distinct advantage over one practice of using a thin liquid cement grout.
  • the above procedure of applying stone may be modified by placing the broken stone in one layer, applying the dry mortar to within a specified distance from the top, sprinkling to clean the surface rock (and incidentally to start hydration), and then rolling and applying the bituminous surfacing. Ineither case the net result is substantially the same.
  • I claim 1 The method of road construction which consists in reparing a suitable sub-grade, depositing t ereon crushed stone and dry mortar, and placin bituminous material on the same before. said mortar has set.
  • the method of road construction which consists in pre arin a suitable sub-grade, depositing roc an dr mortar on said sub-grade, depositing an rolling additional rock thereon, and penetrating the surface rock with bitumen.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Description

Patented Nov. 10, 1925.
RAYMOND W. COBURN, OF WESTON, MASSAGHUSEITS.
BOLD GOHSTRUCTION.
11o Drawing.
To all whom it may concern:
Be it known that I, RAYMOND W. CoBURN, a citizen of the United States, residing at Weston, in' the county of Middlesex and State of Massachusetts, have invented certain new and useful Improvements in Road Construction, of which the following is a specification.
This invention relates to road construction and has for its object simplicity of construction, and minimum building and maintenance costs.
The invention finds its principal use in the construction of bituminous macadam roads, though it may also be used for the base course or portion of other roads and pavements, for-example a pavement having a hot mix sheet asphalt. or bituminous concrete wearing surface. Though it is desirable that a macadam road in service have a rigid base, it has not proved practicable to lay a macadam surface upon a hardened concrete base because the necessary rolling of the bare rock of the macadam surface'upon the unyielding concrete of the base course would crush the macadam surface rock. Obviously a macadam surface could not be laid and rolled upon a freshly poured green concrete base. In the road construction of this invention provision is made to set up Or harden the base course after the wearing surface hasbeen com leted, the base portion being temporarily exible to allow the rolling of the surface, but later acquiring rigidity and a permanent bond of. the surface to the base portion by reasonof the setting of a mortar ap lied in a dry state.
The construction of the present pavement in its preferred form is begun by preparing the sub-grade upon which is placed a layer of clean, broken stone, say 4 or 5 inches in de th. This should referably be principally No. 1 stone rom 2 to 1%"). After this stone has been rolled to a comact condition there is then applied to it a dry mortar of cement and sand (for example a 1:2 mix). A suitable quantity is pounds of dry mortar to 500 pounds of rock or broken stone. This should be well mixed and then spread over the surface of the rock into which it is brushed and rolled until the rock will not carry any more mortar. The surplus is then broomed ofl and the top is left in a. mosaic condition. For the purpose Application filed July 29,
1925. Serial No. 48,888.
of spreading the dry mortar, a spreading machine with a mechanical agitation baflle board gives more uniform results than when the mortar is spread by hand, though the latter means, if carefully done, is entirely satisfactory. After the mortar has been spread, brushed in and rolled, additional clean rock or broken No. 1 stone (preferably without any smaller sizes) is then spread and rolled. The rolling can be thoroughly done Without danger of crushing the surface rock as the entire structure is flexible at this time, being simply keyed by the stone and the dry mortar. Upon the surface of the road is now sprayed the heated bituminous material (natural asphalt, oil asphalt, or tar) from a pressure machine in the usual manner of penetrating bituminous macadam, after which-a finishing layer of pea stone or chips is spread and rolled, and a seal coat of bituminous material applied, and this in turn covered with stone chips. In some cases in order to insure a thorough and uniform hydration of the base course the application of the seal coat may be delayed a day or two and the road meanwhile being periodically sprinkled, without interruption of traflic on the road. If desired, some sprinkling may be done before the bitumen is applied. The pavement is now com leted except for the curing or setting of t e base course. This may be done in various ways depending somewhat on the climate and sub-soil. The curing can ordinarily be accomplished in any manner which keeps the shoulders of the road moist or wet, for example by drenching the shoulders at regular intervals with a Watering cart, pipe lines with sprays radiating therefrom along the sides of the road, or by means of low dikes or pending water along the sides of the road.
It has been found that the road as thus described will set up so that the base portion, though not containing nearly so much cement as is ordinarily used in a Portland cement concrete base, approaches the strength of a standard concrete base and with a far better bond of the surface to the base portion because, after the surface rgck is-placed, the mortar is slowly cured and kept moist by the ercolation and ca illary action, as well as eing kept from rying out by the water-impervious wearing surface. The strength of a road is often brought up to that of one having 9. Portland cement concrete base at a considerable saving of labor and without loss of use in connection with the usual covering of a base with loam for a long curing period. Thus a road of this construction can be used immediately after it is laid, without first allowing the same to set and without keeping traific off of it while it sets. Because the surface rock is rolled down into the base portion before the mortor has set it keys or bonds with the base portion and is held by the mortar. The addition of the small amount of cement mortar in a dry state has proved to be a real economy in time and labor and when the mortar is moistened in this manner there is no formation of an objectionable laitance or scum impairing the bond which is often the case with a poured concrete base. The dry mortar is easily worked in and stays put, being there comparted and held in place by the rolling and keying of the stone, and since it is then set up slowly as the moisture reaches it the danger of weak spots due to the washing away of cement particles is eliminated. In this respect it has a distinct advantage over one practice of using a thin liquid cement grout.
The above procedure of applying stone may be modified by placing the broken stone in one layer, applying the dry mortar to within a specified distance from the top, sprinkling to clean the surface rock (and incidentally to start hydration), and then rolling and applying the bituminous surfacing. Ineither case the net result is substantially the same.
I claim 1. The method of road construction which consists in reparing a suitable sub-grade, depositing t ereon crushed stone and dry mortar, and placin bituminous material on the same before. said mortar has set.
2. The method of road construction which consists in preparing a suitable sub-grade, depositing thereon crushed stone and dry mortar and penetrating the. surface-of said stone with bituminous material before the said mortar has set.
3. The method of road construction which consists in preparing a suitable sub-grade, depositin thereon crushed rock and dry mortar, epositing additional rock, and applying bitumen thereto.
4. The method of road construction which consists in preparing a suitable sub-grade, depositing roc an dry mortar thereon, and applying a hot-mix bituminous surface mixture.
5. The method of road construction which consists in pre arin a suitable sub-grade, depositing roc an dr mortar on said sub-grade, depositing an rolling additional rock thereon, and penetrating the surface rock with bitumen.
6. The steps in constructing a bituminous surfaced road which consist in depositing and working dry mortar into the base portion of the road, and completing the surface of said road before the mortar has set.
RAYMOND W. COBURN.
US46888A 1925-07-29 1925-07-29 Road construction Expired - Lifetime US1561139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US46888A US1561139A (en) 1925-07-29 1925-07-29 Road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US46888A US1561139A (en) 1925-07-29 1925-07-29 Road construction

Publications (1)

Publication Number Publication Date
US1561139A true US1561139A (en) 1925-11-10

Family

ID=21945934

Family Applications (1)

Application Number Title Priority Date Filing Date
US46888A Expired - Lifetime US1561139A (en) 1925-07-29 1925-07-29 Road construction

Country Status (1)

Country Link
US (1) US1561139A (en)

Similar Documents

Publication Publication Date Title
CN103806356B (en) A kind of preparation method of decorative concrete earth construction
US20090277127A1 (en) Decorative aggregate concrete surface preparation process
CN108625252A (en) Urban road laying construction method
CN204530366U (en) Novel anticracking asphalt roads structure
US7607859B2 (en) Surface seeded fine aggregate concrete simulating quarried stone
CN108264291A (en) One kind is misfired concrete pouring construction method
US1561139A (en) Road construction
US1915814A (en) Method of constructing asphalt macadam surface courses
CN108342939A (en) A kind of anti-ponding type asphalt pavement construction method
US2147195A (en) Method of constructing pavements
US1717445A (en) Waxier h
US1507282A (en) Pavement
CN106555371A (en) Garden large area pervious concrete road construction technique
KR100272801B1 (en) Method for paving ground with earth-soil
US1701497A (en) Paving
US1071293A (en) Process of making bituminous concrete pavements.
CN209636583U (en) A kind of pitch composite seal coat for road in airport
US2309593A (en) Pavement
GB2053329A (en) Road surfacing
CN114876155A (en) Construction technology of non-flammable fine stone concrete polished ground
US1677600A (en) Consturction of street pavements
CN221297469U (en) A composite pavement structure with asphalt permeable concrete base
US1779481A (en) Concrete construction and method of waterproofing the same
ES8403180A1 (en) Method of establishing a surfacing for sports grounds, in particular for tennis courts.
US2014700A (en) Asphalt terrazzo composition and method of laying the same