[go: up one dir, main page]

US10041794B1 - Site positioning system for an underground machine - Google Patents

Site positioning system for an underground machine Download PDF

Info

Publication number
US10041794B1
US10041794B1 US15/473,248 US201715473248A US10041794B1 US 10041794 B1 US10041794 B1 US 10041794B1 US 201715473248 A US201715473248 A US 201715473248A US 10041794 B1 US10041794 B1 US 10041794B1
Authority
US
United States
Prior art keywords
machine
prism
underground
positioning
total station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US15/473,248
Inventor
Carl Moberg
Thomas Temmann
Martin Teiner
Paul Kornev
Frank Kühnemund
Brian Rockwood
Matt Palmer
Brent Duppong
Björn-Andre Hühn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Global Mining Europe GmbH
Original Assignee
Caterpillar Global Mining Europe GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caterpillar Global Mining Europe GmbH filed Critical Caterpillar Global Mining Europe GmbH
Priority to US15/473,248 priority Critical patent/US10041794B1/en
Assigned to CATERPILLAR GLOBAL MINING EUROPE GMBH reassignment CATERPILLAR GLOBAL MINING EUROPE GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DUPPONG, Brent, Kühnemund, Frank, HÜHN, BJÖRN-ANDRE, TEMMANN, Thomas, KORNEV, Paul, TEINER, MARTIN, MOBERG, CARL, PALMER, MATT, ROCKWOOD, BRIAN
Priority to CA3058248A priority patent/CA3058248A1/en
Priority to PCT/EP2018/000136 priority patent/WO2018177597A1/en
Priority to AU2018241952A priority patent/AU2018241952A1/en
Application granted granted Critical
Publication of US10041794B1 publication Critical patent/US10041794B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/002Active optical surveying means
    • G01C15/004Reference lines, planes or sectors
    • G01C15/006Detectors therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/282Autonomous machines; Autonomous operations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/302Measuring, signaling or indicating specially adapted for machines for slitting or completely freeing the mineral
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • E21D9/004Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines using light beams for direction or position control
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/002Active optical surveying means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S17/00Systems using the reflection or reradiation of electromagnetic waves other than radio waves, e.g. lidar systems
    • G01S17/88Lidar systems specially adapted for specific applications
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Definitions

  • the present disclosure relates generally to positioning systems for machines and, more particularly, relates to site positioning systems for such underground machines.
  • Some underground industries such as, but not limited to, underground mining and underground construction, utilize underground machines that operate in a tunnel environment. In such environments, the work site is typically a confined space with low visibility. Moreover, some operations require accurate positioning of the underground machine, but being in the underground tunnel environment, however, obstructs the underground machine from utilizing the above-ground Global Positioning System (GPS) satellite network.
  • GPS Global Positioning System
  • a total station theodolite may be arranged at the underground worksite for determining position data from a prism located on the underground machine. The position data may then be utilized to assist in maneuvering the underground machine to a desired position. Often times, the total station theodolite is continuously monitoring and communicating with the prism to read the position data, which may unnecessarily shorten the battery life of the total station theodolite.
  • Chinese Patent No. CN104764434 discloses a total station that monitors three prisms in dynamic real-time to provide instantaneous coordinates of a machine fuselage.
  • the coordinate data is analyzed to determine the spatial position of the center of the machine fuselage and compare with the design position.
  • a site positioning system for an underground machine may include a first prism operatively coupled with the underground machine.
  • a second prism may be operatively coupled with the underground machine.
  • a primary total station may be in communication with the first prism and the second prism.
  • a reference prism may be in communication with the primary total station.
  • a positioning controller may be in communication with the primary total station and may be configured to: control, responsive to receiving a High Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and the second prism and to transmit a first prism position and a second prism position, respectively, to the positioning controller; control, responsive to receiving a Low Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and to transmit the first prism position to the positioning controller; determine, responsive to receiving a Reference Prism Measurement mode request signal, whether a reference prism measurement has been completed within a predetermined time period, and present positioning information for the machine based on one or more of the first prism position, the second prism position, or the reference measurement.
  • a machine may include a first prism and a second prism operatively coupled with the underground machine.
  • a positioning controller may be operatively coupled with the machine and may be in communication with a primary total station located off-board of the machine.
  • the primary total station may be in communication with the positioning controller.
  • the positioning controller may be configured to present positioning information for the machine based on one or more a first prism position, a second prism position, or a reference prism measurement.
  • the machine controller may be configured to: determine information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete; transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a High Accuracy Machine Position mode request signal to the positioning controller, the High Accuracy Machine Position mode request signal being associated with the first prism position and the second prism position; transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, a Low Accuracy Machine Position mode request signal to the positioning controller, the Low Accuracy Machine Position mode request signal being associated with the first prism position; and transmit, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, a
  • a method for operating a site positioning system for an underground machine may include determining information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete.
  • the method may further include monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a first prism and a second prism of the underground machine for transmitting a first prism position and a second prism position, respectively, to a positioning controller of the site positioning system the first prism position and the second prism position being associated with a High Accuracy Machine Position mode request.
  • the method may further include monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, the first prism for transmitting the first prism position to the positioning controller, the first prism position being associated with a Low Accuracy Machine Position mode request.
  • the method may further determining, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, whether a reference prism measurement has been completed within a predetermined time period, the reference prism measurement associated with a Reference Prism Measurement request signal.
  • the method may further include presenting positioning information for the machine based on one or more of the first prism position, the second prism position, or the reference prism measurement.
  • FIG. 1 is a block diagram of an exemplary underground machine and a site positioning system associated therewith, in accordance with an embodiment of the present disclosure
  • FIG. 2 is a block diagram illustrating components of an exemplary computing device, in accordance with an embodiment of the present disclosure
  • FIG. 3 is a pictorial illustration of an exemplary graphical user interface on a display, in accordance with an embodiment of the present disclosure.
  • FIG. 4 is a block diagram illustrating a sample sequence which may be practiced in accordance with the teachings of the present disclosure.
  • an exemplary underground machine constructed in accordance with the present disclosure is generally referred to by reference numeral 10 .
  • the underground machine 10 may be any type of underground machine utilized in underground mining and underground construction industries, to name a few examples, such as, but not limited to, tunneling machines and cutting units.
  • the underground machine 10 includes a site positioning system 12 for accurate positioning of the underground machine 10 at a worksite. While FIG.
  • the present disclosure may be applicable to other types machines that may operate outside of the purview some traditional worksites, such as, but not limited to, mining excavators, underground load-haul-dump (LHD) loaders and underground mining trucks, backhoe loaders, skid steer loaders, wheel loaders, material loaders, motor graders, track-type tractors, landfill compactors, excavators, and articulated trucks, to name a few, which are employed at a worksite.
  • LHD underground load-haul-dump
  • the site positioning system 12 includes a positioning controller 14 in communication with a machine controller 16 of the underground machine 10 .
  • the machine controller 16 is configured to control operations of the underground machine 10 such as, but not limited to, machine modes of tram, load, and cut; machine startup and shutdown; and Automatic Cut cycle.
  • the machine modes refer to operations performed by the machine 10 , either manually, semi-autonomously, or autonomously (e.g., “tram” may refer to a movement of a machine to a given position, “load” may refer to loading materials on an implement of a machine, and/or “cut” may refer to usage of an implement, or other element of a machine, to cut, dig, break, or otherwise break materials).
  • an “Automatic Cut cycle” may refer to an automated cycle of a machine including one or more processes of cutting, loading, and/or tramming, by the machine 10 .
  • the machine controller 16 is in communication with the positioning controller 14 and is also configured to transmit site positioning mode request signals 18 thereto, such as but not limited to High Accuracy Machine Position Mode, Low Accuracy Machine Position Mode, Reference Prism Measurement Mode, and OFF/Standby Mode.
  • the machine controller 16 determines which of the various site positioning mode request signals 18 to transmit to the positioning controller 14 based on particular combinations of control operations controlling the underground machine 10 by the machine controller 16 .
  • the site positioning system 12 includes a first prism 20 and a second prism 22 .
  • the first prism 20 and the second prism 22 are operatively coupled with the underground machine 10 and are in communication with the positioning controller 14 via a multiplexer 24 .
  • Operatively coupled may refer to any coupling between each of the first and second prisms 20 , 22 and the machine 10 , such as attachment of the prisms 20 , 22 on the machine 10 , mounting of the prisms 20 , 22 on the machine 10 , connecting the prisms 20 , 22 via a connecting device, and/or any suitable other systems, methods or devices that allow the prisms 20 , 22 to operate with respect to the machine 10 .
  • the site positioning system 12 further includes a primary total station 26 in communication with the first prism 20 and the second prism 22 .
  • the primary total station 26 is any type of total station theodolite well-known in the industry.
  • the primary total station 26 is also in communication with a reference prism 28 of the site positioning system 12 .
  • the reference prism 28 is situated off-board of the underground machine 10 and may be located strategically at the worksite.
  • the first prism 20 , the second prism 22 , and the reference prism 28 are any type of survey prisms well-known in the industry.
  • the positioning controller 14 is in communication with, and configured to control, the primary total station 26 via the multiplexer 24 .
  • the primary total station 26 is configured to monitor each of the first prism 20 , the second prism 22 , and the reference prism 28 independently, or in any combination thereof, to measure a first prism position, a second prism position, and a reference prism position, respectively.
  • the first prism position, the second prism position, and the reference prism positon are each monitored in three-dimensional measurements, for example, tracking individual x-, y-, and z-coordinates when being used by the positioning system 12 .
  • the primary total station 26 is configured to transmit the first prism position, the second prism position, and the reference prism position to the positioning controller 14 via the multiplexer 24 .
  • the primary total station 26 communicates wirelessly with the positioning controller 14 via the multiplexer 24 .
  • the site positioning system 12 further includes an inclinometer 30 in communication with the positioning controller 14 via the multiplexer 24 .
  • the inclinometer 30 is configured to measure roll and pitch of the underground machine 10 and to transmit roll and pitch data to the positioning controller 14 via the multiplexer 24 .
  • the positioning controller 14 is in communication with a display 32 , which is also in communication with the machine controller 16 .
  • the site positioning system 12 may, optionally, include a secondary total station 34 .
  • the positioning controller 14 may be in communication with, and configured to control, the secondary total station 34 via the multiplexer 24 .
  • the secondary total station 34 may be configured to monitor each of the first prism 20 , the second prism 22 , and the reference prism 28 independently, or in any combination thereof, to measure the first prism position, the second prism position, and the reference prism position, respectively.
  • the primary total station 26 may be configured to selectively monitor the first prism 20 and the secondary total station 34 may be configured to selectively monitor the second prism 22 .
  • the other functioning total station is configured to selectively monitor the first prism 20 , the second prism 22 , and/or the reference prism 28 . While the second total station 34 is depicted in FIG. 1 , it is certainly not necessary for functionality of the site positioning system 12 . Furthermore, any additional or alternative total stations may be utilized in conjunction with the total station 26 .
  • FIG. 2 is a block diagram of example components of an exemplary computing device 35 , which may be utilized to embody one or more components of the system 12 of FIG. 1 and/or the computing device may be utilized to perform one or more functions of one or more components of the system 12 .
  • the exemplary computing device 35 or multiple computing devices 35 may be used to embody or perform functions of one or more of the positioning controller 14 , the machine controller 16 , the primary total station 26 , and the secondary total station 34 .
  • the exemplary computing device 35 may be capable of executing instructions to realize the disclosed system and methods for positioning the underground machine 10 , as described below, and/or the computing device 35 may be capable of executing instructions to perform mode selection, as described below with reference to FIG. 4 .
  • the positioning controller 14 , the machine controller 16 , the primary total station 26 , and the secondary total station 34 may each include a processor, such as a processor 36 of the computing device 35 , that may be, for example, implemented by one or more microprocessors or controllers from any desired family or manufacturer.
  • the processor 36 includes a local memory 38 and is in communication with a main memory including a read-only memory 40 and a random access memory 42 , via a bus 44 .
  • the random access memory 42 may be implemented by Synchronous Dynamic Random Access Memory (SDRAM), Dynamic Random Access Memory (DRAM), RAMBUS Dynamic Random Access Memory (RDRAM) and/or any other type of random access memory device.
  • SDRAM Synchronous Dynamic Random Access Memory
  • DRAM Dynamic Random Access Memory
  • RDRAM RAMBUS Dynamic Random Access Memory
  • the read-only memory 40 may be implemented by a hard drive, flash memory and/or any other desired type of memory device.
  • the computing device 35 may also include an interface circuit 46 .
  • the interface circuit 46 may be implemented by any type of interface standard, such as, for example, an Ethernet interface, a universal serial bus (USB), and/or a PCI express interface.
  • One or more input devices 48 are connected to the interface circuit 46 via the bus 44 .
  • the input device(s) 48 permit an operator to enter data and commands into the processor 36 .
  • the input device(s) 48 may be implemented by, for example, a keyboard, a keypad, a touch screen, a mouse, a track-pad, a trackball, and/or a voice recognition system.
  • the input device(s) 48 may include any wired or wireless device for providing input.
  • a visual display 50 such as the display 32 , is also connected to the interface circuit 46 via the bus 44 .
  • the visual display may be implemented by, for example, one or more display devices for associated data (e.g., a liquid crystal display, a cathode ray tube display (CRT), etc.).
  • the computing device 35 may be used to execute machine readable instructions.
  • the positioning controller 14 , the machine controller 16 , the primary total station 26 , and the total station 34 may execute machine readable instructions to perform the mode selection shown in the block diagram of FIG. 4 and described in more detail below.
  • the machine readable instructions comprise a program for execution by a processor such as processor 36 .
  • the program may be embodied in software stored on a tangible computer readable medium such as a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), a Blu-rayTM disk, or a memory associated with the processor 36 , but the entire program and/or parts thereof could alternatively be executed by a device other than the processor 36 and/or embodied in firmware or dedicated hardware.
  • a tangible computer readable medium such as a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), a Blu-rayTM disk, or a memory associated with the processor 36 , but the entire program and/or parts thereof could alternatively be executed by a device other than the processor 36 and/or embodied in firmware or dedicated hardware.
  • a device such as a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), a Blu-rayTM disk, or a memory associated with the processor 36 , but the entire program and/or parts
  • the site positioning system 12 is configured to operate in various site positioning modes responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16 via the positioning controller 14 .
  • the machine controller 16 transmits the High Accuracy Machine Position mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 determines that (a) the machine mode is in tram, load, or cut, (b) the underground machine 10 is transitioned to stop, and (c) the underground machine 10 is not being shut down or cut mode is complete (e.g. cut mode is completed to 100%).
  • the positioning controller 14 In response to receiving the High Accuracy Machine Position mode request signal, the positioning controller 14 operates in the High Accuracy Machine Position mode and controls the primary total station 26 to monitor both the first prism 20 and the second prism 22 and to transmit the first prism position and the second prism position to the positioning controller 14 via the multiplexer 24 . With the first prism position and the second prism position, along with the roll and pitch data via the inclinometer 30 , the positioning controller 14 determines the full positioning (e.g. x, y, z, roll, pitch, and yaw) of the underground machine 10 . The positioning controller 14 transmits the corresponding full positioning data to the machine controller 16 .
  • the full positioning e.g. x, y, z, roll, pitch, and yaw
  • the machine controller 16 transmits the Low Accuracy Machine Position mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 determines that (a) the machine mode is in tram, load, or cut, (b) the underground machine 10 is moving, and (c) Automatic Cut cycle is not active.
  • the positioning controller 14 operates in the Low Accuracy Machine Position mode and controls the primary total station 26 to monitor only one of the first prism 20 and the second prism 22 and to transmit the corresponding prism position of either the first prism 20 or the second prism 22 to the positioning controller 14 via the multiplexer 24 . With only one of the first prism position or the second prism position, the positioning controller 14 determines the position (e.g. x, y, and z coordinates) of the underground machine 10 . The positioning controller 14 transmits the corresponding position data to the machine controller 16 .
  • the machine controller 16 transmits the Reference Prism Measurement mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 controls the underground machine 10 to begin operating in Automatic Cut cycle (e.g. Auto Cut OFF state transitions to Auto Cut ON state).
  • the positioning controller 14 operates in the Reference Prism Measurement mode and determines whether a reference prism measurement has been completed within a predetermined time period, for example 60 minutes, although it should be understood that the predetermined time period may be any other time period.
  • the positioning controller 14 determines that a reference prism measurement has not been completed within the predetermined time period, then the positioning controller 14 controls the primary total station 26 to monitor the reference prism 28 and to transmit the reference prism position to the positioning controller 14 via the multiplexer 24 . On the other hand, if the positioning controller 14 determines that a reference prism measurement has been completed within the predetermined time period, then the positioning controller 14 will not make a reference prism measurement (e.g. will not monitor the reference prism). After the positioning controller 14 receives the reference prism position, the positioning controller 14 enters one of the High Accuracy Machine Position mode, the Low Accuracy Machine Position mode, and the OFF/Standby mode responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16 .
  • the positioning controller 14 initially operates in the Reference Prism Measurement mode and controls the primary total station 26 to monitor the reference prism 28 and to transmit the reference prism position to the positioning controller 14 via the multiplexer 24 . After the positioning controller 14 receives the reference prism position, the positioning controller 14 enters one of the High Accuracy Machine Position mode, the Low Accuracy Machine Position mode, and the OFF/Standby mode responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16 .
  • the machine controller 16 transmits the OFF/Standby mode request signal to the positioning controller 14 .
  • the positioning controller 14 operates in the OFF/Standby mode and controls the primary total station 26 to refrain from monitoring any of the first prism 20 , the second prism 22 , and/or the reference prism 28 .
  • the positioning controller 14 responsive to receiving the High Accuracy Machine Position mode request signal from the machine controller 16 , the positioning controller 14 operates in the High Accuracy Machine Position mode and controls the primary total station 26 to monitor the first prism 20 and to transmit the first prism position to the positioning controller 14 and, additionally, controls the secondary total station 34 to monitor the second prism 22 and to transmit the second prism position to the positioning controller 14 .
  • the positioning controller 14 operates in the Reference Prism Measurement mode similarly to that described above.
  • the positioning controller 14 reverts back to responsively controlling the primary total station 26 in accordance to that which is described above in regards to embodiments including only the primary total station 26 .
  • the primary total station 26 may malfunction, fail, or otherwise cease to adequately perform the desired monitoring tasks in conjunction with any of the first prism 20 , the second prism 22 , and/or the reference prism 28 .
  • the secondary total station 34 may then act, functionally, as a primary, singular total station and the positioning controller 14 begins to responsively control the second total station 34 , which is running now as a single primary total station, in accordance with the above-described embodiments that include only the primary total station 26
  • the positioning controller 14 may further be configured to present positioning information (e.g. x, y, z, coordinates, roll, pitch, and yaw, among other things) for the machine 10 based on one or more of the first prism position, the second prism position, and the reference prism position, and any combinations thereof. To that end the positioning controller 14 may provide the positioning information for the machine 10 to a user, operator, observer, or any interested actor, via any data presentation device, such as, but not limited to, visual and/or audio output devices. For example, and with reference to FIG. 3 , the positioning controller 14 provides a graphical user interface (GUI) 52 to the display 18 .
  • GUI graphical user interface
  • the positioning controller 14 is configured to present a machine position graphic 54 , a machine yaw position graphic 56 , and a cutter head position graphic 58 via the GUI 52 .
  • the machine position graphic 54 presents the positioning information, indicative of the position (e.g., x, y, and z coordinates) of the underground machine 10 .
  • the machine yaw position graphic 56 represents the yaw of the underground machine 10 .
  • the present disclosure may find applicability with underground machines for any number of industrial settings such as, but not limited to, underground mining and underground construction.
  • the underground machine 10 may be a tunneling machine or a cutting unit.
  • the site positioning system 12 is implemented for positioning of the underground machine 10 at a worksite and may provide more accurate positioning thereof.
  • the site positioning system 12 may be utilized to control the primary total station 26 to selectively monitor the prisms, which may provide more efficient usage of the primary total station 26 and may lead to increased battery life thereof.
  • the positioning controller 14 of the site positioning system 12 operates in OFF/Standby mode unless it receives the High Accuracy Machine Position mode request signal, the Low Accuracy Machine Position mode request signal, or the Reference Prism Measurement mode request signal from the machine controller 16 .
  • the primary total station 26 is selectively controlled to monitor the first prism 20 , the second prism 22 , and the reference prism 28 , either individually or in combinations of, instead of operating continuously as in some other systems.
  • only data pertaining to the position e.g.
  • the positioning controller 14 may be required such that the positioning controller 14 operates in the Low Accuracy Machine Position mode such that the primary total station 26 is controlled to monitor the first prism 20 only.
  • more accurate positioning data such as the pose (e.g. x, y, z, and yaw) of the underground machine 10 may be required so that positioning controller 22 is requested to operate in the High Accuracy Machine Position mode to control the primary total station 26 to monitor both the first prism 20 and the second prism 22 .
  • the positioning system 12 may provide more efficient usage of the primary total station 26 as well as more accurate positioning of the underground machine 10 .
  • FIG. 4 is a block diagram 400 of a sample mode selection logic which may be utilized to operate a site positioning system for an underground machine. Certain conditions and/or actions which may affect or trigger such mode selection, of the logic illustrated in block diagram 400 , are depicted in FIG. 4 as dotted-line parallelogram blocks. Block 410 illustrates the positioning controller 14 in OFF/Standby mode.
  • the machine controller 16 determines that the machine mode of the underground machine is in tram, load, or cut and the underground machine is not being shut down or the Automatic Cut cycle of the underground machine is complete, as depicted by the condition block 420 , then the machine controller 16 transmits the High Accuracy Machine Position mode request signal to the positioning controller 14 , as illustrated at block 412 , such that the positioning controller 14 thereafter operates in the High Accuracy Machine Position mode.
  • the machine controller 16 determines, at block 410 , that the machine mode of the underground machine is in tram, load, or cut, the underground machine is moving, as depicted by the condition block 422 , and the Automatic Cut cycle of the underground machine is not active, then the machine controller 16 transmits the Low Accuracy Machine Position mode request signal to the positioning controller 14 , as illustrated at block 414 , such that the positioning controller 14 then operates in the Low Accuracy Machine Position mode.
  • the machine controller 16 transmits the Reference Prism Measurement request signal to the positioning controller 14 , as illustrated at block 416 , such that the positioning controller 14 operates in the Reference Prism Measurement mode.
  • the positioning controller 14 may transition amongst operating modes when operating in any of the discussed operating modes. For example, when operating in the High Accuracy Machine Position mode, embodied by block 412 , the positioning controller 14 may transition to the Low Accuracy Machine Position mode, of block 414 , if the machine 10 begins to move, as shown in the condition block 432 . Additionally, the positioning controller 14 may transition from the Low Accuracy Machine Position mode of block 412 to the Off/Standby mode of block 410 , if the machine 10 is stopped (condition block 434 ) and the positioning controller 14 determines that the prism data collected from the High Accuracy Machine Position mode is acceptable (condition block 436 ).
  • the positioning controller 14 may transition to the High Accuracy Machine Position mode, of block 412 , if it is determined that the machine 10 is no longer moving, as depicted by the condition block 442 .
  • the positioning controller 14 may transition to the Off/Standby mode of block 410 .
  • the machine controller 16 determines which one of the High Accuracy Machine Position mode request signal, the Low Accuracy Machine Position mode request signal, and the Reference Prism Measurement mode request signal should be transmitted to the positioning controller 14 .
  • the determined one or more of the first prism position, the second prism position, the reference prism position, and any combinations thereof may be utilized to determine the positioning information for the machine 10 .
  • Such positioning information may then be used by the positioning controller 14 to present such information to, for example, a user, an operator, and/or any other actor interested in the operations of the machine 10 . Further, in some examples, it is contemplated that such positioning information may be used to subsequently control the machine 10 , via any manual, semi-autonomous, and/or autonomous control systems associated with the machine 10 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Electromagnetism (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A site positioning system for an underground machine includes a first prism coupled with the underground machine, a second prism operatively coupled with the underground machine, a primary total station, and a reference prism may be in communication with the primary total station. A positioning controller is configured to control, responsive to receiving a High Accuracy Machine Position mode, the primary total station to monitor the first prism and the second prism and transmit a first prism position and a second prism position, respectively, to the positioning controller; control, responsive to receiving a Low Accuracy Machine Position mode, the primary total station to monitor the first prism and transmit the first prism position to the positioning controller; determine, responsive to receiving a Reference Prism Measurement mode, whether a reference prism measurement has been completed, and present positioning information for the machine based on one or more of the prism positions.

Description

TECHNICAL FIELD
The present disclosure relates generally to positioning systems for machines and, more particularly, relates to site positioning systems for such underground machines.
BACKGROUND
Some underground industries such as, but not limited to, underground mining and underground construction, utilize underground machines that operate in a tunnel environment. In such environments, the work site is typically a confined space with low visibility. Moreover, some operations require accurate positioning of the underground machine, but being in the underground tunnel environment, however, obstructs the underground machine from utilizing the above-ground Global Positioning System (GPS) satellite network.
Although GPS is generally ineffective for such underground environments, other efforts have been developed to facilitate the positioning of the underground machines. For example, a total station theodolite may be arranged at the underground worksite for determining position data from a prism located on the underground machine. The position data may then be utilized to assist in maneuvering the underground machine to a desired position. Often times, the total station theodolite is continuously monitoring and communicating with the prism to read the position data, which may unnecessarily shorten the battery life of the total station theodolite.
Chinese Patent No. CN104764434 (the '434 patent) discloses a total station that monitors three prisms in dynamic real-time to provide instantaneous coordinates of a machine fuselage. The coordinate data is analyzed to determine the spatial position of the center of the machine fuselage and compare with the design position.
SUMMARY
In accordance with an aspect of the disclosure, a site positioning system for an underground machine is provided. The site positioning system may include a first prism operatively coupled with the underground machine. A second prism may be operatively coupled with the underground machine. A primary total station may be in communication with the first prism and the second prism. A reference prism may be in communication with the primary total station. A positioning controller may be in communication with the primary total station and may be configured to: control, responsive to receiving a High Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and the second prism and to transmit a first prism position and a second prism position, respectively, to the positioning controller; control, responsive to receiving a Low Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and to transmit the first prism position to the positioning controller; determine, responsive to receiving a Reference Prism Measurement mode request signal, whether a reference prism measurement has been completed within a predetermined time period, and present positioning information for the machine based on one or more of the first prism position, the second prism position, or the reference measurement.
In accordance with another aspect of the disclosure, a machine is provided. The machine may include a first prism and a second prism operatively coupled with the underground machine. A positioning controller may be operatively coupled with the machine and may be in communication with a primary total station located off-board of the machine. The primary total station may be in communication with the positioning controller. The positioning controller may be configured to present positioning information for the machine based on one or more a first prism position, a second prism position, or a reference prism measurement. The machine controller may be configured to: determine information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete; transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a High Accuracy Machine Position mode request signal to the positioning controller, the High Accuracy Machine Position mode request signal being associated with the first prism position and the second prism position; transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, a Low Accuracy Machine Position mode request signal to the positioning controller, the Low Accuracy Machine Position mode request signal being associated with the first prism position; and transmit, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, a Reference Prism Measurement request signal to the positioning controller, the Reference Prism Measurement request signal being associated with the reference prism measurement.
In accordance with yet another aspect of the disclosure, a method for operating a site positioning system for an underground machine is provided. The method may include determining information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete. The method may further include monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a first prism and a second prism of the underground machine for transmitting a first prism position and a second prism position, respectively, to a positioning controller of the site positioning system the first prism position and the second prism position being associated with a High Accuracy Machine Position mode request. The method may further include monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, the first prism for transmitting the first prism position to the positioning controller, the first prism position being associated with a Low Accuracy Machine Position mode request. Further, the method may further determining, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, whether a reference prism measurement has been completed within a predetermined time period, the reference prism measurement associated with a Reference Prism Measurement request signal. The method may further include presenting positioning information for the machine based on one or more of the first prism position, the second prism position, or the reference prism measurement.
These and other aspects and features of the present disclosure will be more readily understood upon reading the following detailed description when taken in conjunction with the accompanying drawings. Aspects of different embodiments herein described can be combined with or substituted by one another.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a block diagram of an exemplary underground machine and a site positioning system associated therewith, in accordance with an embodiment of the present disclosure;
FIG. 2 is a block diagram illustrating components of an exemplary computing device, in accordance with an embodiment of the present disclosure;
FIG. 3 is a pictorial illustration of an exemplary graphical user interface on a display, in accordance with an embodiment of the present disclosure; and
FIG. 4 is a block diagram illustrating a sample sequence which may be practiced in accordance with the teachings of the present disclosure.
It is to be noted that the appended drawings illustrate only typical embodiments and are therefore not to be considered limiting with respect to the scope of the disclosure or claims. Rather, the concepts of the present disclosure may apply within other equally effective embodiments. Moreover, the drawings are not necessarily to scale, emphasis generally being placed upon illustrating the principles of certain embodiments.
DETAILED DESCRIPTION
Referring now to FIG. 1, an exemplary underground machine constructed in accordance with the present disclosure is generally referred to by reference numeral 10. The underground machine 10 may be any type of underground machine utilized in underground mining and underground construction industries, to name a few examples, such as, but not limited to, tunneling machines and cutting units. The underground machine 10 includes a site positioning system 12 for accurate positioning of the underground machine 10 at a worksite. While FIG. 1 and the present disclosure refer to an underground machine as an example, the present disclosure may be applicable to other types machines that may operate outside of the purview some traditional worksites, such as, but not limited to, mining excavators, underground load-haul-dump (LHD) loaders and underground mining trucks, backhoe loaders, skid steer loaders, wheel loaders, material loaders, motor graders, track-type tractors, landfill compactors, excavators, and articulated trucks, to name a few, which are employed at a worksite.
The site positioning system 12 includes a positioning controller 14 in communication with a machine controller 16 of the underground machine 10. The machine controller 16 is configured to control operations of the underground machine 10 such as, but not limited to, machine modes of tram, load, and cut; machine startup and shutdown; and Automatic Cut cycle. The machine modes refer to operations performed by the machine 10, either manually, semi-autonomously, or autonomously (e.g., “tram” may refer to a movement of a machine to a given position, “load” may refer to loading materials on an implement of a machine, and/or “cut” may refer to usage of an implement, or other element of a machine, to cut, dig, break, or otherwise break materials). Further, an “Automatic Cut cycle” may refer to an automated cycle of a machine including one or more processes of cutting, loading, and/or tramming, by the machine 10. The machine controller 16 is in communication with the positioning controller 14 and is also configured to transmit site positioning mode request signals 18 thereto, such as but not limited to High Accuracy Machine Position Mode, Low Accuracy Machine Position Mode, Reference Prism Measurement Mode, and OFF/Standby Mode. The machine controller 16 determines which of the various site positioning mode request signals 18 to transmit to the positioning controller 14 based on particular combinations of control operations controlling the underground machine 10 by the machine controller 16.
Moreover, the site positioning system 12 includes a first prism 20 and a second prism 22. The first prism 20 and the second prism 22 are operatively coupled with the underground machine 10 and are in communication with the positioning controller 14 via a multiplexer 24. Operatively coupled, as defined herein, may refer to any coupling between each of the first and second prisms 20, 22 and the machine 10, such as attachment of the prisms 20, 22 on the machine 10, mounting of the prisms 20, 22 on the machine 10, connecting the prisms 20, 22 via a connecting device, and/or any suitable other systems, methods or devices that allow the prisms 20, 22 to operate with respect to the machine 10. The site positioning system 12 further includes a primary total station 26 in communication with the first prism 20 and the second prism 22. The primary total station 26 is any type of total station theodolite well-known in the industry. The primary total station 26 is also in communication with a reference prism 28 of the site positioning system 12. The reference prism 28 is situated off-board of the underground machine 10 and may be located strategically at the worksite. The first prism 20, the second prism 22, and the reference prism 28 are any type of survey prisms well-known in the industry. The positioning controller 14 is in communication with, and configured to control, the primary total station 26 via the multiplexer 24. The primary total station 26 is configured to monitor each of the first prism 20, the second prism 22, and the reference prism 28 independently, or in any combination thereof, to measure a first prism position, a second prism position, and a reference prism position, respectively. The first prism position, the second prism position, and the reference prism positon are each monitored in three-dimensional measurements, for example, tracking individual x-, y-, and z-coordinates when being used by the positioning system 12. Moreover, the primary total station 26 is configured to transmit the first prism position, the second prism position, and the reference prism position to the positioning controller 14 via the multiplexer 24. In some embodiments, the primary total station 26 communicates wirelessly with the positioning controller 14 via the multiplexer 24.
The site positioning system 12 further includes an inclinometer 30 in communication with the positioning controller 14 via the multiplexer 24. The inclinometer 30 is configured to measure roll and pitch of the underground machine 10 and to transmit roll and pitch data to the positioning controller 14 via the multiplexer 24. The positioning controller 14 is in communication with a display 32, which is also in communication with the machine controller 16.
In some examples, the site positioning system 12 may, optionally, include a secondary total station 34. In such examples, the positioning controller 14 may be in communication with, and configured to control, the secondary total station 34 via the multiplexer 24. Similar to the primary total station 26, the secondary total station 34 may be configured to monitor each of the first prism 20, the second prism 22, and the reference prism 28 independently, or in any combination thereof, to measure the first prism position, the second prism position, and the reference prism position, respectively. In some examples, the primary total station 26 may be configured to selectively monitor the first prism 20 and the secondary total station 34 may be configured to selectively monitor the second prism 22. In the event that one of the primary total station 26 and the secondary total station 34 malfunctions, the other functioning total station is configured to selectively monitor the first prism 20, the second prism 22, and/or the reference prism 28. While the second total station 34 is depicted in FIG. 1, it is certainly not necessary for functionality of the site positioning system 12. Furthermore, any additional or alternative total stations may be utilized in conjunction with the total station 26.
FIG. 2 is a block diagram of example components of an exemplary computing device 35, which may be utilized to embody one or more components of the system 12 of FIG. 1 and/or the computing device may be utilized to perform one or more functions of one or more components of the system 12. Particularly, the exemplary computing device 35 or multiple computing devices 35 may be used to embody or perform functions of one or more of the positioning controller 14, the machine controller 16, the primary total station 26, and the secondary total station 34. Further, the exemplary computing device 35 may be capable of executing instructions to realize the disclosed system and methods for positioning the underground machine 10, as described below, and/or the computing device 35 may be capable of executing instructions to perform mode selection, as described below with reference to FIG. 4. The positioning controller 14, the machine controller 16, the primary total station 26, and the secondary total station 34 may each include a processor, such as a processor 36 of the computing device 35, that may be, for example, implemented by one or more microprocessors or controllers from any desired family or manufacturer.
The processor 36 includes a local memory 38 and is in communication with a main memory including a read-only memory 40 and a random access memory 42, via a bus 44. The random access memory 42 may be implemented by Synchronous Dynamic Random Access Memory (SDRAM), Dynamic Random Access Memory (DRAM), RAMBUS Dynamic Random Access Memory (RDRAM) and/or any other type of random access memory device. The read-only memory 40 may be implemented by a hard drive, flash memory and/or any other desired type of memory device.
The computing device 35 may also include an interface circuit 46. The interface circuit 46 may be implemented by any type of interface standard, such as, for example, an Ethernet interface, a universal serial bus (USB), and/or a PCI express interface. One or more input devices 48 are connected to the interface circuit 46 via the bus 44. The input device(s) 48 permit an operator to enter data and commands into the processor 36. The input device(s) 48 may be implemented by, for example, a keyboard, a keypad, a touch screen, a mouse, a track-pad, a trackball, and/or a voice recognition system. For example, the input device(s) 48 may include any wired or wireless device for providing input.
A visual display 50, such as the display 32, is also connected to the interface circuit 46 via the bus 44. The visual display may be implemented by, for example, one or more display devices for associated data (e.g., a liquid crystal display, a cathode ray tube display (CRT), etc.).
As mentioned above the computing device 35 may be used to execute machine readable instructions. For example, the positioning controller 14, the machine controller 16, the primary total station 26, and the total station 34 may execute machine readable instructions to perform the mode selection shown in the block diagram of FIG. 4 and described in more detail below. In such examples, the machine readable instructions comprise a program for execution by a processor such as processor 36. The program may be embodied in software stored on a tangible computer readable medium such as a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), a Blu-ray™ disk, or a memory associated with the processor 36, but the entire program and/or parts thereof could alternatively be executed by a device other than the processor 36 and/or embodied in firmware or dedicated hardware. Further, although the example programs are described with reference to the block diagram illustrated in FIG. 4, many other methods of implementing embodiments of the present disclosure may alternatively be used. For example, the order of execution of the blocks may be changed, and/or some of the blocks described may be changed, eliminated, or combined.
The site positioning system 12 is configured to operate in various site positioning modes responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16 via the positioning controller 14. For instance, the machine controller 16 transmits the High Accuracy Machine Position mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 determines that (a) the machine mode is in tram, load, or cut, (b) the underground machine 10 is transitioned to stop, and (c) the underground machine 10 is not being shut down or cut mode is complete (e.g. cut mode is completed to 100%). In response to receiving the High Accuracy Machine Position mode request signal, the positioning controller 14 operates in the High Accuracy Machine Position mode and controls the primary total station 26 to monitor both the first prism 20 and the second prism 22 and to transmit the first prism position and the second prism position to the positioning controller 14 via the multiplexer 24. With the first prism position and the second prism position, along with the roll and pitch data via the inclinometer 30, the positioning controller 14 determines the full positioning (e.g. x, y, z, roll, pitch, and yaw) of the underground machine 10. The positioning controller 14 transmits the corresponding full positioning data to the machine controller 16.
Furthermore, the machine controller 16 transmits the Low Accuracy Machine Position mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 determines that (a) the machine mode is in tram, load, or cut, (b) the underground machine 10 is moving, and (c) Automatic Cut cycle is not active. In response to receiving the Low Accuracy Machine Position mode request signal, the positioning controller 14 operates in the Low Accuracy Machine Position mode and controls the primary total station 26 to monitor only one of the first prism 20 and the second prism 22 and to transmit the corresponding prism position of either the first prism 20 or the second prism 22 to the positioning controller 14 via the multiplexer 24. With only one of the first prism position or the second prism position, the positioning controller 14 determines the position (e.g. x, y, and z coordinates) of the underground machine 10. The positioning controller 14 transmits the corresponding position data to the machine controller 16.
Moreover, the machine controller 16 transmits the Reference Prism Measurement mode request signal of the site positioning mode request signals 18 to the positioning controller 14 when the machine controller 16 controls the underground machine 10 to begin operating in Automatic Cut cycle (e.g. Auto Cut OFF state transitions to Auto Cut ON state). In response to receiving the Reference Prism Measurement mode request signal, the positioning controller 14 operates in the Reference Prism Measurement mode and determines whether a reference prism measurement has been completed within a predetermined time period, for example 60 minutes, although it should be understood that the predetermined time period may be any other time period. If the positioning controller 14 determines that a reference prism measurement has not been completed within the predetermined time period, then the positioning controller 14 controls the primary total station 26 to monitor the reference prism 28 and to transmit the reference prism position to the positioning controller 14 via the multiplexer 24. On the other hand, if the positioning controller 14 determines that a reference prism measurement has been completed within the predetermined time period, then the positioning controller 14 will not make a reference prism measurement (e.g. will not monitor the reference prism). After the positioning controller 14 receives the reference prism position, the positioning controller 14 enters one of the High Accuracy Machine Position mode, the Low Accuracy Machine Position mode, and the OFF/Standby mode responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16.
In addition, at startup of the underground machine 10, and without a request from the machine controller 16, the positioning controller 14 initially operates in the Reference Prism Measurement mode and controls the primary total station 26 to monitor the reference prism 28 and to transmit the reference prism position to the positioning controller 14 via the multiplexer 24. After the positioning controller 14 receives the reference prism position, the positioning controller 14 enters one of the High Accuracy Machine Position mode, the Low Accuracy Machine Position mode, and the OFF/Standby mode responsive to the corresponding site positioning mode request signals 18 received from the machine controller 16.
At all other times (e.g. when the machine controller 16 determines that the control operations of the underground machine 10 do not meet the conditions for transmitting the High Accuracy Machine Position mode request signal, the Low Accuracy Machine Position mode request signal, or the Reference Prism Measurement mode request signal of the site positioning mode request signals 18), the machine controller 16 transmits the OFF/Standby mode request signal to the positioning controller 14. In response to receiving the OFF/Standby mode request signal, the positioning controller 14 operates in the OFF/Standby mode and controls the primary total station 26 to refrain from monitoring any of the first prism 20, the second prism 22, and/or the reference prism 28.
In embodiments also including the secondary total station 34, responsive to receiving the High Accuracy Machine Position mode request signal from the machine controller 16, the positioning controller 14 operates in the High Accuracy Machine Position mode and controls the primary total station 26 to monitor the first prism 20 and to transmit the first prism position to the positioning controller 14 and, additionally, controls the secondary total station 34 to monitor the second prism 22 and to transmit the second prism position to the positioning controller 14. In such embodiments, the positioning controller 14 operates in the Reference Prism Measurement mode similarly to that described above. Moreover, in the event that the secondary total station 34 malfunctions, for example, the positioning controller 14 reverts back to responsively controlling the primary total station 26 in accordance to that which is described above in regards to embodiments including only the primary total station 26. Further, in some other examples, the primary total station 26 may malfunction, fail, or otherwise cease to adequately perform the desired monitoring tasks in conjunction with any of the first prism 20, the second prism 22, and/or the reference prism 28. In such examples, the secondary total station 34 may then act, functionally, as a primary, singular total station and the positioning controller 14 begins to responsively control the second total station 34, which is running now as a single primary total station, in accordance with the above-described embodiments that include only the primary total station 26
The positioning controller 14 may further be configured to present positioning information (e.g. x, y, z, coordinates, roll, pitch, and yaw, among other things) for the machine 10 based on one or more of the first prism position, the second prism position, and the reference prism position, and any combinations thereof. To that end the positioning controller 14 may provide the positioning information for the machine 10 to a user, operator, observer, or any interested actor, via any data presentation device, such as, but not limited to, visual and/or audio output devices. For example, and with reference to FIG. 3, the positioning controller 14 provides a graphical user interface (GUI) 52 to the display 18. The positioning controller 14 is configured to present a machine position graphic 54, a machine yaw position graphic 56, and a cutter head position graphic 58 via the GUI 52. The machine position graphic 54 presents the positioning information, indicative of the position (e.g., x, y, and z coordinates) of the underground machine 10. The machine yaw position graphic 56 represents the yaw of the underground machine 10.
INDUSTRIAL APPLICABILITY
In general, the present disclosure may find applicability with underground machines for any number of industrial settings such as, but not limited to, underground mining and underground construction. As non-limiting examples, the underground machine 10 may be a tunneling machine or a cutting unit. By utilizing the systems and methods disclosed herein, the site positioning system 12 is implemented for positioning of the underground machine 10 at a worksite and may provide more accurate positioning thereof. Moreover, the site positioning system 12 may be utilized to control the primary total station 26 to selectively monitor the prisms, which may provide more efficient usage of the primary total station 26 and may lead to increased battery life thereof.
For example, during operation of the underground machine 10, the positioning controller 14 of the site positioning system 12 operates in OFF/Standby mode unless it receives the High Accuracy Machine Position mode request signal, the Low Accuracy Machine Position mode request signal, or the Reference Prism Measurement mode request signal from the machine controller 16. As such, the primary total station 26 is selectively controlled to monitor the first prism 20, the second prism 22, and the reference prism 28, either individually or in combinations of, instead of operating continuously as in some other systems. Moreover, in some instances, only data pertaining to the position (e.g. x, y, and z) of the underground machine 10 may be required such that the positioning controller 14 operates in the Low Accuracy Machine Position mode such that the primary total station 26 is controlled to monitor the first prism 20 only. In other instances, more accurate positioning data, such as the pose (e.g. x, y, z, and yaw), of the underground machine 10 may be required so that positioning controller 22 is requested to operate in the High Accuracy Machine Position mode to control the primary total station 26 to monitor both the first prism 20 and the second prism 22. In such a manner, the positioning system 12 may provide more efficient usage of the primary total station 26 as well as more accurate positioning of the underground machine 10.
To illustrate transitioning amongst the machine monitoring modes discussed above, FIG. 4 is a block diagram 400 of a sample mode selection logic which may be utilized to operate a site positioning system for an underground machine. Certain conditions and/or actions which may affect or trigger such mode selection, of the logic illustrated in block diagram 400, are depicted in FIG. 4 as dotted-line parallelogram blocks. Block 410 illustrates the positioning controller 14 in OFF/Standby mode. At block 410, if the machine controller 16 determines that the machine mode of the underground machine is in tram, load, or cut and the underground machine is not being shut down or the Automatic Cut cycle of the underground machine is complete, as depicted by the condition block 420, then the machine controller 16 transmits the High Accuracy Machine Position mode request signal to the positioning controller 14, as illustrated at block 412, such that the positioning controller 14 thereafter operates in the High Accuracy Machine Position mode. If the machine controller 16 determines, at block 410, that the machine mode of the underground machine is in tram, load, or cut, the underground machine is moving, as depicted by the condition block 422, and the Automatic Cut cycle of the underground machine is not active, then the machine controller 16 transmits the Low Accuracy Machine Position mode request signal to the positioning controller 14, as illustrated at block 414, such that the positioning controller 14 then operates in the Low Accuracy Machine Position mode. Moreover, at block 410, if the machine controller 14 determines that the underground machine 10 is beginning to operate in Automatic Cut cycle, as depicted by the condition block 424, the machine controller 16 transmits the Reference Prism Measurement request signal to the positioning controller 14, as illustrated at block 416, such that the positioning controller 14 operates in the Reference Prism Measurement mode.
The positioning controller 14 may transition amongst operating modes when operating in any of the discussed operating modes. For example, when operating in the High Accuracy Machine Position mode, embodied by block 412, the positioning controller 14 may transition to the Low Accuracy Machine Position mode, of block 414, if the machine 10 begins to move, as shown in the condition block 432. Additionally, the positioning controller 14 may transition from the Low Accuracy Machine Position mode of block 412 to the Off/Standby mode of block 410, if the machine 10 is stopped (condition block 434) and the positioning controller 14 determines that the prism data collected from the High Accuracy Machine Position mode is acceptable (condition block 436). Additionally, when the positioning controller 14 is operating in the Low Accuracy Machine Position Mode, of block 414, the positioning controller 14 may transition to the High Accuracy Machine Position mode, of block 412, if it is determined that the machine 10 is no longer moving, as depicted by the condition block 442. When operating in the Reference Prism Measuring mode, at block 416, if the positioning controller 14 determines that the reference prism measurements made, when operating in the Reference Prism Measuring mode, are acceptable (condition block 452), then the positioning controller 14 may transition to the Off/Standby mode of block 410.
In any of the aforementioned mode transitioning scenarios of the logic of the block diagram 400, after the positioning controller 14 receives the reference prism position, the machine controller 16 determines which one of the High Accuracy Machine Position mode request signal, the Low Accuracy Machine Position mode request signal, and the Reference Prism Measurement mode request signal should be transmitted to the positioning controller 14.
In any of the above described modes, the determined one or more of the first prism position, the second prism position, the reference prism position, and any combinations thereof, may be utilized to determine the positioning information for the machine 10. Such positioning information, as discussed above, may then be used by the positioning controller 14 to present such information to, for example, a user, an operator, and/or any other actor interested in the operations of the machine 10. Further, in some examples, it is contemplated that such positioning information may be used to subsequently control the machine 10, via any manual, semi-autonomous, and/or autonomous control systems associated with the machine 10.

Claims (20)

What is claimed is:
1. A site positioning system for an underground machine, the site positioning system comprising:
a first prism operatively coupled with the underground machine;
a second prism operatively coupled with the underground machine;
a primary total station in communication with the first prism and the second prism;
a reference prism in communication with the primary total station;
a positioning controller in communication with the primary total station, the positioning controller
determining information regarding the underground machine, the information regarding the underground machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the underground machine is transitioned to stop, and information indicating whether one of the underground machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete, based on the machine mode
controlling the primary total station to monitor the first prism and the second prism and to transmit a first prism position and a second prism position, respectively, to the positioning controller in response to receiving a High Accuracy Machine Position mode request signal;
controlling the primary total station to monitor the first prism and to transmit the first prism position to the positioning controller in response to receiving a Low Accuracy Machine Position mode request signal;
determining whether a reference prism measurement has been completed within a predetermined time period in response to receiving a Reference Prism Measurement mode request signal; and
presenting positioning information for the machine based on one or more of the request signals.
2. The site positioning system of claim 1, wherein the positioning controller is further configured to control, responsive to receiving an OFF/Standby mode request, the primary total station to refrain from monitoring the first prism and the second prism.
3. The site positioning system of claim 2, wherein the positioning controller is further configured to control, responsive to determining that the reference prism measurement has not been completed within the predetermined time period, the primary total station to monitor the reference prism and to transmit a reference prism position to the positioning controller.
4. The site positioning system of claim 2 wherein the positioning controller is further configured to control, responsive to determining that the reference prism measurement has been completed within the predetermined time period, the primary total station to refrain from monitoring the reference prism.
5. The site positioning system of claim 1 wherein the positioning controller is further configured to operate, responsive to receiving the reference prism measurement from the primary total station, in one of a High Accuracy Machine Position mode, a Low Accuracy Machine Position mode, or an OFF/Standby mode.
6. The site positioning system of claim 1 wherein the positioning controller is further configured to control, at startup of the underground machine, the primary total station to monitor the reference prism and transmit the reference prism measurement to the positioning controller.
7. The site positioning system of claim 6, wherein the reference prism is located off-board of the underground machine.
8. The site positioning system of claim 1, further including a secondary total station in communication with the first prism, the second prism, and the positioning controller.
9. An underground machine, comprising:
a first prism and a second prism operatively coupled with the machine;
a positioning controller operatively coupled with the machine, the positioning controller in communication with a primary total station located off-board of the underground machine, the primary total station in communication with the first prism and the second prism, the positioning controller configured to present positioning information for the machine based on one or more a first prism position, a second prism position, or a reference prism measurement;
a machine controller in communication with the positioning controller, the machine controller configured to:
determine information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete,
transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a High Accuracy Machine Position mode request signal to the positioning controller,
the High Accuracy Machine Position mode request signal being associated with the first prism position and the second prism position,
transmit, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, a Low Accuracy Machine Position mode request signal to the positioning controller,
the Low Accuracy Machine Position mode request signal being associated with the first prism position, and
transmit, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, a Reference Prism Measurement request signal to the positioning controller,
the Reference Prism Measurement request signal being associated with the reference prism measurement.
10. The machine of claim 9, wherein the positioning controller is configured to: control, responsive to receiving the High Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and the second prism and to transmit the first prism position and the second prism position, respectively, to the positioning controller; control, responsive to receiving the Low Accuracy Machine Position mode request signal, the primary total station to monitor the first prism and to transmit the first prism position to the positioning controller; and determine, responsive to receiving the Reference Prism Measurement mode request signal, whether a reference prism measurement has been completed within a predetermined time period.
11. The machine of claim 10, wherein the positioning controller is further configured to control, responsive to receiving an OFF/Standby mode request from the machine controller, the primary total station to refrain from monitoring the first prism and the second prism.
12. The machine of claim 11, wherein the positioning controller is further configured to control, responsive to determining the reference prism measurement has not been completed within the predetermined time period, the primary total station to monitor the reference prism and to transmit the reference prism measurement to the positioning controller.
13. The machine of claim 11, wherein the positioning controller is further configured to control, responsive to determining the reference prism measurement has been completed within the predetermined time period, the primary total station to refrain from monitoring the reference prism.
14. The machine of claim 13, wherein the positioning controller is further configured to operate, responsive to receiving the reference prism measurement from the primary total station, in one of a High Accuracy Machine Position mode, a Low Accuracy Machine Position mode, and an OFF/Standby mode.
15. The machine of claim 14, wherein the positioning controller is further configured to control, at startup of the underground machine, the primary total station to monitor the reference prism and transmit the reference prism measurement to the positioning controller.
16. The machine of claim 15, wherein the reference prism is located off-board of the underground machine.
17. The machine of claim 16, further including a secondary total station in communication with the first prism, the second prism, and the positioning controller.
18. A method for operating a site positioning system for an underground machine, the method comprising:
determining information regarding the machine, the information regarding the machine including information indicating whether a machine mode of the underground machine is in tram, load, or cut, information indicating whether the machine is transitioned to stop, and information indicating whether one of the machine is not being shut down or whether an Automatic Cut cycle of the underground machine is complete
monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is transitioned to stop, a first prism and a second prism of the underground machine for transmitting a first prism position and a second prism position, respectively, to a positioning controller of the site positioning system the first prism position and the second prism position being associated with a High Accuracy Machine Position mode request;
monitoring, if the information regarding the machine indicates that the machine mode of the underground machine is in tram, load, or cut and the underground machine is moving, the first prism for transmitting the first prism position to the positioning controller, the first prism position being associated with a Low Accuracy Machine Position mode request;
determining, if the information regarding the machine indicates that the underground machine is beginning to operate in the Automatic Cut cycle, whether a reference prism measurement has been completed within a predetermined time period, the reference prism measurement associated with a Reference Prism Measurement request signal; and
presenting positioning information for the machine based on one or more of the first prism position, the second prism position, or the reference prism measurement.
19. The method of claim 18, wherein determining whether a reference prism measurement has been completed within a predetermined time period further includes monitoring, responsive to determining the reference prism measurement has not been completed within a predetermined time period, a reference prism of the site positioning system for transmitting a reference prism position to the positioning controller.
20. The method of claim 19, further including operating in an OFF/Standby mode responsive to receiving an OFF/Standby mode request from a machine controller such that monitoring of the first prism and the second prism is refrained.
US15/473,248 2017-03-29 2017-03-29 Site positioning system for an underground machine Expired - Fee Related US10041794B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US15/473,248 US10041794B1 (en) 2017-03-29 2017-03-29 Site positioning system for an underground machine
CA3058248A CA3058248A1 (en) 2017-03-29 2018-03-29 Site positioning system for an underground machine
PCT/EP2018/000136 WO2018177597A1 (en) 2017-03-29 2018-03-29 Site positioning system for an underground machine
AU2018241952A AU2018241952A1 (en) 2017-03-29 2018-03-29 Site positioning system for an underground machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US15/473,248 US10041794B1 (en) 2017-03-29 2017-03-29 Site positioning system for an underground machine

Publications (1)

Publication Number Publication Date
US10041794B1 true US10041794B1 (en) 2018-08-07

Family

ID=62116367

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/473,248 Expired - Fee Related US10041794B1 (en) 2017-03-29 2017-03-29 Site positioning system for an underground machine

Country Status (4)

Country Link
US (1) US10041794B1 (en)
AU (1) AU2018241952A1 (en)
CA (1) CA3058248A1 (en)
WO (1) WO2018177597A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111578918A (en) * 2020-06-24 2020-08-25 平湖市中地测绘规划有限公司 Total station control method and system applying same
CN112240205A (en) * 2019-07-18 2021-01-19 联邦科学和工业研究组织 Machine guidance integration
CN115218862A (en) * 2022-06-16 2022-10-21 上海隧道工程有限公司 Shield construction segment settlement automatic monitoring system and monitoring method based on total station
CN113048972B (en) * 2021-03-12 2023-05-23 衢州海西电子科技有限公司 Method and system for determining attitude and position of mining engineering machinery

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3130495A (en) * 1956-10-26 1964-04-28 Rheinpreussen Ag Surveying of underground tunnels and chambers
US3817624A (en) * 1971-11-30 1974-06-18 J Martin Apparatus for establishing a line in the same plane as a reference line
US4053182A (en) * 1976-03-05 1977-10-11 Ray M. Baughman Mining method and apparatus
US4261617A (en) * 1978-02-15 1981-04-14 Vereinigte Osterreichische Eisen-Und Stahlwerke - Alpine Montan Aktiengesellschaft Method of controlling the working motion of a cutting tool of a tunnel-driving machine over the breast, and apparatus for carrying out the method
US4732472A (en) * 1984-02-09 1988-03-22 Gewerkschaft Eisenhutte Westfalia Methods of, and systems for, determining the position of an object
US5822050A (en) * 1995-05-13 1998-10-13 Kabushiki Kaisha Topcon Direction finding system
US6369755B1 (en) * 1995-10-23 2002-04-09 Trimble Navigation Limited Integrated SATPS total survey station
US6480289B1 (en) * 1997-10-29 2002-11-12 Hitachi Construction Machinery Co. Ltd. Position measuring apparatus and optical deflection angle measuring apparatus for underground excavators
US6844923B2 (en) * 2002-01-11 2005-01-18 Morgan Est Plc Method and apparatus for surveying the geometry of tunnels
CN104295297A (en) 2014-09-16 2015-01-21 三一重型装备有限公司 System and method for positioning cutting head of tunneling machine and tunneling machine
CN104764434A (en) 2015-03-31 2015-07-08 徐州市市政设计院有限公司 Quick solution system and method for shield attitude
US9292017B2 (en) * 2013-04-22 2016-03-22 Dan Alan Preston System and method for real-time guidance and mapping of a tunnel boring machine and tunnel
US9797719B2 (en) * 2013-10-01 2017-10-24 Kabushiki Kaisha Topcon Measuring method and measuring instrument

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06100078B2 (en) * 1989-03-06 1994-12-12 株式会社フジタ Automatic survey positioning system for tunnel lining machines
JP3418682B2 (en) * 1999-12-28 2003-06-23 マック株式会社 Integrated surveying system for tunnels

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3130495A (en) * 1956-10-26 1964-04-28 Rheinpreussen Ag Surveying of underground tunnels and chambers
US3817624A (en) * 1971-11-30 1974-06-18 J Martin Apparatus for establishing a line in the same plane as a reference line
US4053182A (en) * 1976-03-05 1977-10-11 Ray M. Baughman Mining method and apparatus
US4261617A (en) * 1978-02-15 1981-04-14 Vereinigte Osterreichische Eisen-Und Stahlwerke - Alpine Montan Aktiengesellschaft Method of controlling the working motion of a cutting tool of a tunnel-driving machine over the breast, and apparatus for carrying out the method
US4732472A (en) * 1984-02-09 1988-03-22 Gewerkschaft Eisenhutte Westfalia Methods of, and systems for, determining the position of an object
US5822050A (en) * 1995-05-13 1998-10-13 Kabushiki Kaisha Topcon Direction finding system
US6369755B1 (en) * 1995-10-23 2002-04-09 Trimble Navigation Limited Integrated SATPS total survey station
US6480289B1 (en) * 1997-10-29 2002-11-12 Hitachi Construction Machinery Co. Ltd. Position measuring apparatus and optical deflection angle measuring apparatus for underground excavators
US6844923B2 (en) * 2002-01-11 2005-01-18 Morgan Est Plc Method and apparatus for surveying the geometry of tunnels
US9292017B2 (en) * 2013-04-22 2016-03-22 Dan Alan Preston System and method for real-time guidance and mapping of a tunnel boring machine and tunnel
US9797719B2 (en) * 2013-10-01 2017-10-24 Kabushiki Kaisha Topcon Measuring method and measuring instrument
CN104295297A (en) 2014-09-16 2015-01-21 三一重型装备有限公司 System and method for positioning cutting head of tunneling machine and tunneling machine
CN104764434A (en) 2015-03-31 2015-07-08 徐州市市政设计院有限公司 Quick solution system and method for shield attitude

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240205A (en) * 2019-07-18 2021-01-19 联邦科学和工业研究组织 Machine guidance integration
CN111578918A (en) * 2020-06-24 2020-08-25 平湖市中地测绘规划有限公司 Total station control method and system applying same
CN113048972B (en) * 2021-03-12 2023-05-23 衢州海西电子科技有限公司 Method and system for determining attitude and position of mining engineering machinery
CN115218862A (en) * 2022-06-16 2022-10-21 上海隧道工程有限公司 Shield construction segment settlement automatic monitoring system and monitoring method based on total station
CN115218862B (en) * 2022-06-16 2024-05-14 上海隧道工程有限公司 Automatic shield construction segment settlement monitoring system and method based on total station

Also Published As

Publication number Publication date
WO2018177597A1 (en) 2018-10-04
CA3058248A1 (en) 2018-10-04
AU2018241952A1 (en) 2019-11-07

Similar Documents

Publication Publication Date Title
US10041794B1 (en) Site positioning system for an underground machine
KR102564721B1 (en) work machine
CN109877831B (en) Multi-robot autonomous fault rescue method and device and computer storage medium
AU2015344388B2 (en) Map creation device
US10119830B2 (en) Control system for work machine, work machine, and management system for work machine
US20180292840A1 (en) Control system for work machine, work machine, management system for work machine, and management method for work machine
AU2015397104B2 (en) Adaptation of mining operations satellite coverage
US10395445B2 (en) System and method for monitoring payload distribution and machine including same
JP6487561B2 (en) Mining machine logging system, in-vehicle terminal device, and mining machine logging method
AU2017378136B2 (en) System and method for monitoring machine hauling conditions at work site and machine including same
CN105159280B (en) A kind of loading machine intelligent maintenance method for supporting remote diagnosis
WO2025018925A1 (en) System, vehicle controller, traffic control system, mining vehicle, kit, and methods for monitoring and controlling vehicles in a mining environment
US20170185906A1 (en) System and Method for Determining Machine Operational State
US11280616B2 (en) Operating status identification system for machine
EP4350085A1 (en) Work management system and work machine
WO2023100129A1 (en) A proximity status of equipment
KR101922222B1 (en) Remote diagnosis system of construction equipment
KR20230163843A (en) Machine guidance program and excavator using it
US20250052032A1 (en) Controlling movement of a track-mounted vehicle
US11270530B2 (en) Vehicle pose sharing diagnostic system
OA21772A (en) A proximity status of equipment.
US8874326B2 (en) Docking assistance system
KR20230004117A (en) Azimuth estimation apparatus for upper and lower body of construction equipment vehicle and method thereof

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20220807