Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Вячеслав Иванович ИВАНЕНКОfiledCriticalВячеслав Иванович ИВАНЕНКО
Priority to UAU201212593UpriorityCriticalpatent/UA79152U/en
Publication of UA79152UpublicationCriticalpatent/UA79152U/en
A method for repair of road pavement that includes cleaning pot-hole, laying layer of binding agent, filling with repair material and compaction, besides that, after cleaning the pot-hole is first filled with repair material with excess for compaction, after that just at above, with overlap in contour of the pot-hole, one fills layer of granulated binding material, then the area of surface being repaired is heated by means of source of infrared radiation, and compaction is performed after mixing repair material with hot binding agent.
UAU201212593U2012-11-052012-11-05Method for repair of road pavement
UA79152U
(en)
Additive for reclamation of asphalt, paving material based on reclaimed asphalt that contains same, modified asphalt, and asphaltic paving material that contains same