Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Инновэйтив Бизнес Текнолоджиз ЛтдfiledCriticalИнновэйтив Бизнес Текнолоджиз Лтд
Priority to UAU201211833UpriorityCriticalpatent/UA76822U/en
Publication of UA76822UpublicationCriticalpatent/UA76822U/en
Priority to RU2013145634/02Uprioritypatent/RU158624U1/en
A grinding body formed by deformation. The fragments of old-designed rails of rail steel is blank for production of grinding body, at that for body formation by deformation at least one of methods is chosen: preliminary-screw rolling, stamping, forging or casting, or any other method adapted for formation of grinding bodies by deformation.
UAU201211833U2012-10-122012-10-12Grinding body
UA76822U
(en)
Rolled steel that hardens by means of precipitation after hot-forming and/or quenching with a tool having very high strength and ductility, and method for manufacturing same