以下,參照圖式來說明本發明的一實施型態。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
(第一實施型態)
(First implementation form)
圖1係表示第一實施型態之氣體容器管理系統1的系統構成之圖。
FIG1 is a diagram showing the system configuration of a gas container management system 1 of the first embodiment.
氣體容器管理系統1係管理設施內的氣體容器之系統。氣體容器管理系統1具備有通訊裝置30、管理裝置40、寫入裝置50、氣瓶儲存庫(bombe stocker)60及圓筒櫃70。通訊裝置30、管理裝置40、寫入裝置50、氣瓶儲存庫60與圓筒櫃70係經由網路80而連接成可相通訊。網路80為LAN(Local Area Network,區域網路)。在以下的說明中,以通訊裝置30、管理裝置40、寫入裝置50、氣瓶儲存庫60及圓筒櫃70都設在一個客戶的一個工廠等的設施內之情形進行說明。亦即,在以下的說明中,氣體容器管理系統1為管理一個設施內的氣體容器之系統。
Gas container management system 1 is a system for managing gas containers in a facility. The gas container management system 1 includes a communication device 30 , a management device 40 , a writing device 50 , a bombe stocker 60 and a cylindrical cabinet 70 . The communication device 30 , the management device 40 , the writing device 50 , the gas cylinder storage 60 and the cylindrical cabinet 70 are connected through the network 80 so as to be able to communicate with each other. Network 80 is LAN (Local Area Network). In the following description, the communication device 30, the management device 40, the writing device 50, the gas cylinder storage 60, and the cylinder cabinet 70 are all installed in a facility such as a factory of one customer. That is, in the following description, the gas container management system 1 is a system that manages gas containers in one facility.
通訊裝置30係從黏貼在從氣體容器B的業者或販賣店交貨的氣體容器B上之標籤(label)3取得與氣體容器B有關的資訊(以下稱為「容器資訊」)。一般而言,標籤3係黏貼在氣體容器B的表面,該標籤3印刷有容器資訊。此處,容器資訊係例如至少包含容器編號、氣體名稱、氣體的濃度、品質保證期限、填充量及製造日之資訊。通訊裝置30係例如利用攝影機功能拍攝標籤3而取得圖像資料,再對取得的圖像資料進行分析。藉此,通訊裝置30取得標籤3上記載的容器資訊。通訊裝置30可例如在圖像資料的分析使用OCR(Optical Character Reader:光學式文字讀取裝置)功能。
The communication device 30 obtains information related to the gas container B (hereinafter referred to as "container information") from the label 3 attached to the gas container B delivered from the gas container B's business or retailer. Generally speaking, the label 3 is attached to the surface of the gas container B, and the label 3 is printed with the container information. Here, the container information includes, for example, at least the container number, gas name, gas concentration, quality assurance period, filling amount, and manufacturing date. The communication device 30 obtains image data by photographing the label 3, for example, using a camera function, and then analyzes the obtained image data. In this way, the communication device 30 obtains the container information recorded on the label 3. The communication device 30 can, for example, use an OCR (Optical Character Reader) function in the analysis of image data.
容器資訊中雖然會隨著氣體業者之不同而包含不同的資訊,但有各氣體業者都共通地會記載於氣體容器B之資訊(以下稱為「必須資訊」)。上述的容器編號、氣體名稱、氣體的濃度、品質保證期限、填充量及製造日為必須資訊的一例。通訊裝置30將取得的容器資訊之中的必須資訊發送至管理裝置40。通訊裝置30係採用例如平板終端機(tablet terminal)、智慧手機及行動電話等之可攜帶式的資訊處理裝置而構成。通訊裝置30為資訊取得裝置的一例。
Although the container information will contain different information depending on the gas company, there is information that is recorded in the gas container B (hereinafter referred to as "required information") that is common to all gas companies. The above-mentioned container number, gas name, gas concentration, quality assurance period, filling amount and manufacturing date are examples of required information. The communication device 30 sends the necessary information among the acquired container information to the management device 40 . The communication device 30 is constituted by a portable information processing device such as a tablet terminal, a smart phone, and a mobile phone. The communication device 30 is an example of an information acquisition device.
管理裝置40係管理氣體容器管理系統1之裝置。管理裝置40從通訊裝置30接收必須資訊,並保持接收到的必須資訊。管理裝置40將根據必須資訊而得的可辨別氣體容器B之辨別資訊發送至寫入裝置50。具體而言,管理裝置40可將必須資訊的一部分或全部作為辨別資訊而發送至寫入裝置50,也可將必須資訊轉換為預定的形式後作為辨別資訊而發送至寫入裝置50。此處,預定的形式可為例如可指出必須資訊之識別資訊(例
如ID等)。在以下的說明中,以管理裝置40係以容器編號作為辨別資訊而發送至寫入裝置50之構成為例進行說明。管理裝置40在將必須資訊轉換為預定的形式而設為辨別資訊之情況,會保持轉換後的預定的形式的識別資訊。
The management device 40 is a device that manages the gas container management system 1 . The management device 40 receives necessary information from the communication device 30 and retains the received necessary information. The management device 40 sends the identification information of the identifiable gas container B obtained based on the necessary information to the writing device 50 . Specifically, the management device 40 may send part or all of the necessary information to the writing device 50 as identification information, or may convert the necessary information into a predetermined form and send it to the writing device 50 as identification information. Here, the predetermined form may be, for example, identification information that indicates necessary information (e.g.
Such as ID, etc.). In the following description, a configuration in which the management device 40 uses the container number as identification information and sends it to the writing device 50 is explained as an example. When the management device 40 converts necessary information into a predetermined format and sets it as identification information, it retains the converted identification information in the predetermined format.
另外,管理裝置40從圓筒櫃70接收各種資訊(例如:壓力的監測結果、氣體洩漏的監測結果、氣體容器B的殘餘量的資訊及辨別資訊)。以及,管理裝置40從氣瓶儲存庫60接收各種資訊(例如:儲存空間的空位資訊及辨別資訊)。管理裝置40係使氣瓶儲存庫60及圓筒櫃70與辨別資訊建立對應關係而加以保持,該辨別資訊係和氣瓶儲存庫60及圓筒櫃70各者所收納的氣體容器B有關者。管理裝置40係採用個人電腦等之資訊處理裝置而構成。
In addition, the management device 40 receives various information from the cylinder cabinet 70 (e.g., pressure monitoring results, gas leakage monitoring results, information on the remaining amount of gas container B and identification information). Also, the management device 40 receives various information from the gas cylinder storage 60 (e.g., storage space vacancy information and identification information). The management device 40 establishes a corresponding relationship between the gas cylinder storage 60 and the cylinder cabinet 70 and the identification information and maintains it. The identification information is related to the gas container B stored in each of the gas cylinder storage 60 and the cylinder cabinet 70. The management device 40 is constructed using an information processing device such as a personal computer.
寫入裝置50係暫時記憶從管理裝置40發送來的辨別資訊,並按照使用者的操作,將記憶的辨別資訊寫入電子標籤90。寫入裝置50為例如RF讀寫器(reader/writer)。寫入裝置50只要可將辨別資訊寫入電子標籤90即可,亦可不是RF讀寫器。寫入裝置50係記錄裝置的一個具體例。
The writing device 50 temporarily stores the identification information sent from the management device 40 and writes the stored identification information into the electronic tag 90 according to the user's operation. The writing device 50 is, for example, an RF reader/writer. The writing device 50 only needs to be able to write the identification information into the electronic tag 90, and it does not need to be an RF reader/writer. The writing device 50 is a specific example of a recording device.
氣瓶儲存庫60係按氣體的種別而分別設置,一個氣瓶儲存庫60係收納複數個氣體容器B之收納庫。氣瓶儲存庫60係將門開閉,且於其內側的儲存空間以直立並排的狀態儲存複數個氣體容器B。氣瓶儲存庫60除此之外,還具備有例如偵測儲存空間的空位狀態之感測器,控制門的開閉之控制盒,用來與管理裝置40通訊之通訊部(未圖示)及從電子標籤
90讀取辨別資訊之讀取裝置61(取得部),且藉由通訊部將門的開閉狀態的資訊及儲存空間的空位資訊及辨別資訊等發送至管理裝置40。
The gas cylinder storage warehouse 60 is set up according to the type of gas, and one gas cylinder storage warehouse 60 is a storage warehouse for storing multiple gas containers B. The gas cylinder storage warehouse 60 has a door that can be opened and closed, and multiple gas containers B are stored in an upright and parallel state in the storage space inside. In addition, the gas cylinder storage warehouse 60 also has, for example, a sensor for detecting the vacancy state of the storage space, a control box for controlling the opening and closing of the door, a communication unit (not shown) for communicating with the management device 40, and a reading device 61 (acquisition unit) for reading identification information from the electronic tag 90, and the communication unit sends information on the opening and closing state of the door, vacancy information of the storage space, and identification information to the management device 40.
圓筒櫃70係將填充於氣體容器B內的氣體供給至半導體製造裝置之設備,一個圓筒櫃70係收納複數個氣體容器B之收納庫。圓筒櫃70係將門開閉,且於其內側的儲存空間以沿寬度方向直立並排之狀態儲存一對氣體容器B。而且,圓筒櫃70係可在任一方的氣體容器B在供給氣體的期間,藉由更換任一方的氣體容器B,而能夠以不用中斷氣體的供給之方式進行氣體供給。圓筒櫃70除此之外,還設有例如與氣體容器B連接之配管,收納用來進行門的開閉、閥的開閉及壓力的監測、氣體洩漏的監測等的機器之控制盒,收納用來與半導體製造裝置等連接的配管之配管用盒(皆未圖示)及從電子標籤90讀取辨別資訊之讀取裝置71(取得部)等。控制盒具備有用來與上位裝置通訊之通訊部(未圖示),藉由通訊部將門的開閉的資訊、閥的開閉的資訊、壓力的監測結果、氣體洩漏的監測結果、氣體容器B的殘餘氣體量的資訊及辨別資訊等發送至管理裝置40。
The cylindrical cabinet 70 is a device for supplying the gas filled in the gas container B to the semiconductor manufacturing equipment, and one cylindrical cabinet 70 is a storage for accommodating a plurality of gas containers B. The cylindrical cabinet 70 opens and closes the door, and stores a pair of gas containers B in a storage space inside the cylindrical cabinet 70 in a state of standing side by side in the width direction. Furthermore, the cylindrical cabinet 70 can supply gas without interrupting the supply of gas by replacing any one of the gas containers B while the gas container B is supplying gas. In addition to this, the cylindrical cabinet 70 is also provided with, for example, piping connected to the gas container B, and a control box for storing equipment for opening and closing doors, opening and closing valves, monitoring pressure, monitoring gas leakage, etc. A piping box (both not shown) for piping connected to semiconductor manufacturing equipment, a reading device 71 (acquisition unit) for reading identification information from the electronic tag 90, and the like. The control box is equipped with a communication unit (not shown) used to communicate with the upper device. Through the communication unit, the door opening and closing information, the valve opening and closing information, the pressure monitoring results, the gas leakage monitoring results, and the remaining gas container B are transmitted. The gas amount information, identification information, etc. are sent to the management device 40 .
電子標籤90係藉由寫入裝置50來記錄辨別資訊之記錄媒體。電子標籤90為例如RF標籤(RF tag)。在本實施型態中,以電子標籤90為頸帶(neckband)型的RF標籤為例進行說明,但電子標籤90只要是能裝設於氣體容器B之型態即可,可為任何型態。
The electronic tag 90 is a recording medium that records identification information by means of a writing device 50. The electronic tag 90 is, for example, an RF tag. In this embodiment, the electronic tag 90 is described as a neckband type RF tag, but the electronic tag 90 can be of any type as long as it can be installed in the gas container B.
在此,利用圖1來說明本發明的概要。
Here, Figure 1 is used to illustrate the outline of the present invention.
本發明之氣體容器管理系統1,係使用通訊裝置30而從黏貼有標籤3之氣體容器B取得必須資訊,標籤3上印刷有依每個氣體業者而不同的各種資訊。寫入裝置50將根據取得的必須資訊而得的辨別資訊寫入電子標籤
90。將寫入有辨別資訊之電子標籤90,安裝於交貨進來的氣體容器B。安裝了電子標籤90之氣體容器B係由使用者將之暫時收納至氣瓶儲存庫60。另外,若是實際要使用的氣體容器B,則由使用者將之收納至圓筒櫃70。
The gas container management system 1 of the present invention uses the communication device 30 to obtain necessary information from the gas container B affixed with the label 3. Various information that differs for each gas company is printed on the label 3. The writing device 50 writes the identification information obtained based on the obtained necessary information into the electronic tag.
90. An electronic tag 90 with identification information written on it is installed on the incoming gas container B. The gas container B equipped with the electronic tag 90 is temporarily stored in the gas cylinder storage 60 by the user. In addition, if the gas container B is actually used, the user stores it in the cylindrical cabinet 70 .
收納氣體容器B之氣瓶儲存庫60及圓筒櫃70,具備有可將寫入電子標籤90的資訊讀出之讀取裝置61及讀取裝置71。讀取裝置61及讀取裝置71係取得寫入電子標籤90之資訊,並經由未圖示的通訊部將取得的資訊發送至管理裝置40。藉此,管理裝置40管理複數個氣體容器B的收納場所。因此,即使氣體容器B移動了,也可容易地掌握氣體容器B是收納在哪個氣瓶儲存庫60或圓筒櫃70。然後,在氣體容器B要歸還時將電子標籤90拆下,且將寫入電子標籤90之資訊刪除。藉此,使電子標籤90可再利用。
The gas cylinder storage warehouse 60 and cylinder cabinet 70 storing gas container B are equipped with a reading device 61 and a reading device 71 that can read the information written in the electronic tag 90. The reading device 61 and the reading device 71 obtain the information written in the electronic tag 90 and send the obtained information to the management device 40 via a communication unit not shown. In this way, the management device 40 manages the storage locations of multiple gas containers B. Therefore, even if the gas container B is moved, it is easy to grasp which gas cylinder storage warehouse 60 or cylinder cabinet 70 the gas container B is stored in. Then, when the gas container B is to be returned, the electronic tag 90 is removed and the information written in the electronic tag 90 is deleted. In this way, the electronic tag 90 can be reused.
採用以上所述的架構,就可更簡便地管理氣體容器。
By adopting the above-mentioned architecture, gas containers can be managed more easily.
圖2係顯示第一實施型態之通訊裝置30的功能構成之概略方塊圖。通訊裝置30具備有經由匯流排而相連接的CPU(Central Processing Unit,中央處理單元)、記憶體(memory)及輔助記憶裝置等,並執行控制程式。藉由控制程式之執行,通訊裝置30作為具備攝像部31、記憶部32、顯示部33、操作部34、控制部35及通訊部36的裝置而發揮功能。另外,通訊裝置30的各功能的全部或一部分,亦可利用ASIC(Application Specific Integrated Circuit,特定應用積體電路)或PLD(Programmable Logic Device,可編程邏輯裝置)或FPGA(Field Programmable Gate Array,現場可編程閘陣列)等之硬體而實現。控制程式可記錄於電腦可讀取的記錄媒體。電腦可讀取的記錄媒體為例如軟碟、磁
光碟、ROM、CD-ROM等之可攜帶媒體、內建於電腦系統之硬碟等的記憶裝置。控制程式亦可經由電信線路而接收或發送。
FIG. 2 is a schematic block diagram showing the functional structure of the communication device 30 of the first embodiment. The communication device 30 has a CPU (Central Processing Unit, central processing unit), a memory, an auxiliary memory device, etc. connected via a bus, and executes a control program. By executing the control program, the communication device 30 functions as a device including an imaging unit 31 , a memory unit 32 , a display unit 33 , an operation unit 34 , a control unit 35 and a communication unit 36 . In addition, all or part of each function of the communication device 30 may also be implemented using ASIC (Application Specific Integrated Circuit), PLD (Programmable Logic Device) or FPGA (Field Programmable Gate Array). Programmable gate array) and other hardware. The control program can be recorded on a computer-readable recording medium. Computer-readable recording media are, for example, floppy disks, magnetic
Portable media such as optical discs, ROMs, CD-ROMs, and memory devices such as hard disks built into computer systems. Control programs may also be received or sent via telecommunications lines.
攝像部31係按照使用者的操作而拍攝標籤3。
The imaging unit 31 photographs the tag 3 in accordance with the user's operation.
記憶部32係記憶攝像部31所拍攝得到的標籤3的圖像資料。記憶部32係採用磁碟裝置或半導體記憶裝置等之記憶裝置而構成。
The memory unit 32 stores the image data of the tag 3 captured by the imaging unit 31. The memory unit 32 is formed by a memory device such as a disk device or a semiconductor memory device.
顯示部33為液晶顯示器、有機EL(Electro Luminescence,電致發光)顯示器等之圖像顯示裝置。顯示部33顯示出例如控制部35所做的圖像分析的結果或資訊的選擇畫面。顯示部33亦可為用以將圖像顯示裝置連接至通訊裝置30之介面。在此情況,通訊裝置30係產生用以顯示資訊的影像訊號,將影像訊號輸出至與自身連接的圖像顯示裝置。
The display unit 33 is an image display device such as a liquid crystal display, an organic EL (Electro Luminescence) display, etc. The display unit 33 displays, for example, the result of image analysis performed by the control unit 35 or an information selection screen. The display unit 33 can also be an interface for connecting the image display device to the communication device 30. In this case, the communication device 30 generates an image signal for displaying information and outputs the image signal to the image display device connected to itself.
操作部34係採用鍵盤、指向裝置(pointing device)(滑鼠、數位板(tablet)等)、觸控面板、按鈕(buttom)等之既有的輸入裝置而構成。操作部34係在將使用者的指示輸入至通訊裝置30之際,由使用者加以操作。例如,操作部34係接受資訊的選擇指示。
The operation unit 34 is composed of existing input devices such as a keyboard, a pointing device (mouse, tablet, etc.), a touch panel, and a button. The operation unit 34 is operated by the user when inputting the user's instructions to the communication device 30. For example, the operation unit 34 receives an instruction to select information.
控制部35係控制通訊裝置30的動作。例如,控制部35藉由分析記憶部32中記憶的圖像資料而取得文字資訊。藉此,控制部35取得容器資訊。
The control unit 35 controls the operation of the communication device 30. For example, the control unit 35 obtains text information by analyzing the image data stored in the memory unit 32. In this way, the control unit 35 obtains the container information.
通訊部36係在與別的裝置之間進行通訊。例如,通訊部36在與管理裝置40之間進行通訊。
The communication unit 36 communicates with other devices. For example, the communication unit 36 communicates with the management device 40 .
圖3係表示第一實施型態之管理裝置40的功能構成之概略方塊圖。管理裝置40具備有經由匯流排而相連接的CPU、記憶體及輔助記憶裝置等,並執行控制程式。藉由控制程式之執行,管理裝置40作為具備通訊部41、操作部42、記憶部43、顯示部44、控制部45的裝置而發
揮功能。另外,管理裝置40的各功能的全部或一部分,亦可利用ASIC或PLD或FPGA等之硬體而實現。控制程式可記錄於電腦可讀取的記錄媒體。電腦可讀取的記錄媒體係指例如軟碟、磁光碟、ROM、CD-ROM等之可攜式媒體、內建於電腦系統之硬碟等的記憶裝置。控制程式亦可經由電信線路而接收或發送。
FIG. 3 is a schematic block diagram showing the functional configuration of the management device 40 of the first embodiment. The management device 40 is equipped with a CPU, a memory, an auxiliary memory device, etc. connected via a bus, and executes a control program. By executing the control program, the management device 40 is developed as a device including a communication unit 41, an operation unit 42, a memory unit 43, a display unit 44, and a control unit 45.
function. In addition, all or part of each function of the management device 40 can also be implemented using hardware such as ASIC, PLD, or FPGA. The control program can be recorded on a computer-readable recording medium. Computer-readable recording media refers to portable media such as floppy disks, magneto-optical disks, ROMs, CD-ROMs, and memory devices such as hard disks built into computer systems. Control programs may also be received or sent via telecommunications lines.
通訊部41係在與別的裝置之間進行通訊。例如,通訊部41在與通訊裝置30、寫入裝置50、氣瓶儲存庫60及圓筒櫃70之間進行通訊。
The communication unit 41 communicates with other devices. For example, the communication unit 41 communicates with the communication device 30 , the writing device 50 , the gas cylinder storage 60 and the cylindrical cabinet 70 .
操作部42係採用鍵盤、指向裝置(滑鼠、數位板等)、觸控面板、按鈕等之既有的輸入裝置而構成。操作部42係在將使用者的指示輸入至管理裝置40之際由使用者加以操作。例如,操作部42係接受對於寫入裝置50之資訊發送指示、資訊之顯示指示。
The operation unit 42 is configured using existing input devices such as a keyboard, a pointing device (mouse, tablet, etc.), a touch panel, and buttons. The operation unit 42 is operated by the user when inputting the user's instructions to the management device 40 . For example, the operation unit 42 receives an information transmission instruction and an information display instruction to the writing device 50 .
記憶部43係記憶容器表431及管理表432。容器表431係登錄有與氣體容器B有關的資訊之表。管理表432係登錄有管理氣體容器B所需的資訊之表。記憶部43係採用磁碟裝置或半導體記憶裝置等之記憶裝置而構成。
The storage unit 43 stores the container table 431 and the management table 432. The container table 431 is a table in which information related to the gas container B is registered. The management table 432 is a table in which information necessary for managing the gas container B is registered. The memory unit 43 is configured using a memory device such as a magnetic disk device or a semiconductor memory device.
顯示部44為液晶顯示器、有機EL顯示器等之圖像顯示裝置。顯示部44進行以登錄於容器表431及管理表432之資訊為依據之顯示。例如,顯示部44顯示出氣體容器B的收納狀況、氣體的儲存量及容器的接收資訊等。顯示部44亦可為用來將圖像顯示裝置連接至管理裝置40之介面。在此情況,顯示部44係產生出用以使資訊顯示的影像訊號,並將影像訊號輸出至與自身連接的圖像顯示裝置。
The display unit 44 is an image display device such as a liquid crystal display or an organic EL display. The display unit 44 performs display based on the information registered in the container table 431 and the management table 432 . For example, the display unit 44 displays the storage status of the gas container B, the storage amount of the gas, the reception information of the container, and the like. The display part 44 may also be an interface used to connect the image display device to the management device 40 . In this case, the display unit 44 generates an image signal for displaying information, and outputs the image signal to the image display device connected to itself.
控制部45係控制管理裝置40的動作。控制部45係例如按照使用者的操作,將從通訊裝置30發送來的必須資訊之中的容器編號設定至寫入裝置50。
The control unit 45 controls the operation of the management device 40. For example, the control unit 45 sets the container number in the required information sent from the communication device 30 to the writing device 50 according to the user's operation.
圖4係顯示第一實施型態之容器表431的一例之圖。
FIG. 4 is a diagram showing an example of a container table 431 of the first embodiment.
容器表431中,以與容器編號建立對應關係之方式登錄有氣體名稱、氣體的濃度、品質保證期限、初期填充量、製造日及殘餘量的資訊。容器編號係表示用來識別氣體容器B之識別資訊。氣體名稱係表示填充於氣體容器B內的氣體的名稱。氣體的濃度係表示填充於氣體容器B內的氣體的濃度。品質保證期限係表示填充於氣體容器B內的氣體的品質受到保證之期限。初期填充量係表示交貨時填充於氣體容器B內的氣體的量。初期填充量係相當於容器資訊當中的填充量。製造日係表示氣體填充到氣體容器B的日期。殘餘量係表示氣體容器B內殘餘的氣體的量。殘餘量之資訊係從圓筒櫃70按預定的時序發送。另外,在採用將必須資訊轉換為預定的形式而成的資訊作為辨別資訊之情況,於容器表431中可使每個容器與將必須資訊轉換為預定的形式而成的資訊建立對應關係。
In the container table 431, information such as the gas name, gas concentration, quality assurance period, initial filling quantity, manufacturing date, and residual quantity are registered in a manner that establishes a correspondence with the container number. The container number indicates identification information used to identify the gas container B. The gas name indicates the name of the gas filled in the gas container B. The gas concentration indicates the concentration of the gas filled in the gas container B. The quality assurance period indicates the period during which the quality of the gas filled in the gas container B is guaranteed. The initial filling quantity indicates the amount of gas filled in the gas container B at the time of delivery. The initial filling quantity is equivalent to the filling quantity in the container information. The manufacturing date indicates the date when the gas is filled into the gas container B. The residual quantity indicates the amount of gas remaining in the gas container B. The information of the residual quantity is sent from the cylinder cabinet 70 according to a predetermined timing. In addition, when the information obtained by converting the necessary information into a predetermined format is used as the identification information, a correspondence relationship can be established between each container and the information obtained by converting the necessary information into a predetermined format in the container table 431.
圖5係顯示第一實施型態中的管理表432的一例之圖。
FIG5 is a diagram showing an example of the management table 432 in the first embodiment.
管理表432中,與收納庫資訊相對應地登錄有標籤(tag)識別資訊、辨別資訊、搬入日及搬出日的資訊。收納庫資訊係表示與氣瓶儲存庫60及圓筒櫃70有關的資訊。就圖5而言,登錄有收納庫識別資訊、讀取器識別資訊、收納庫名稱、設置位置資訊來作為收納庫資訊。收納庫識別資訊係顯示用來識別氣瓶儲存庫60及圓筒櫃70之識別資訊。讀取器識別資訊係顯示用來識別氣瓶儲存庫60或圓筒櫃70所具備的讀取裝置,亦即識別讀取
裝置61及讀取裝置71之識別資訊。收納庫名稱係表示氣瓶儲存庫60及圓筒櫃70的名稱。設置位置資訊係顯示氣瓶儲存庫60及圓筒櫃70設置處的位置資訊。設置位置資訊可用經緯度加以表示。
In the management table 432, tag identification information, identification information, and information on the move-in date and move-out date are registered corresponding to the storage warehouse information. The storage warehouse information represents information related to the gas cylinder storage warehouse 60 and the cylinder cabinet 70. In FIG. 5 , storage warehouse identification information, reader identification information, storage warehouse name, and setting location information are registered as the storage warehouse information. The storage warehouse identification information is identification information used to identify the gas cylinder storage warehouse 60 and the cylinder cabinet 70. The reader identification information is used to identify the reading device of the gas cylinder storage warehouse 60 or the cylinder cabinet 70, that is, the identification information of the reading device 61 and the reading device 71. The storage warehouse name indicates the name of the gas cylinder storage warehouse 60 and the cylinder cabinet 70. The installation location information is the location information of the installation location of the gas cylinder storage warehouse 60 and the cylinder cabinet 70. The installation location information can be expressed in latitude and longitude.
標籤識別資訊係顯示用來識別電子標籤90的識別資訊。辨別資訊係顯示可辨別氣體容器B之資訊。搬入日係顯示將氣體容器B搬入收納庫的日期。搬出日係表示將氣體容器B從收納庫搬出的日期。另外,管理表432中,並非一定要登錄所有的資訊。例如,在搬出日的欄位,可只有在收納庫為氣瓶儲存庫60的情況才登錄。
The tag identification information is the identification information used to identify the electronic tag 90. The identification information is the information that can identify the gas container B. The move-in date is the date when the gas container B is moved into the storage warehouse. The move-out date is the date when the gas container B is moved out of the storage warehouse. In addition, not all information must be registered in the management table 432. For example, in the move-out date field, it can be registered only when the storage warehouse is the gas cylinder storage warehouse 60.
圖6係顯示第一實施型態之氣體容器管理系統1的氣體容器B的登錄處理的流程之順序圖。圖6之處理係在將氣體容器B交貨時進行。
FIG. 6 is a sequence diagram showing the flow of registration processing of the gas container B in the gas container management system 1 according to the first embodiment. The processing in Figure 6 is performed when the gas container B is delivered.
通訊裝置30的攝像部31按照使用者的操作而拍攝氣體容器B來取得攝像資料(步驟S101)。攝像部31將取得的攝像資料經由控制部35而記憶至記憶部32。控制部35對於記憶部32中記憶的攝像資料進行分析,從攝像資料取得容器資訊。具體而言,控制部35係以OCR方式對攝像資料進行圖像分析,將攝像資料中包含的文字轉換為文本(text)資料。控制部35使文本資料化的容器資訊顯示於顯示部33(步驟S102)。控制部35從顯示於畫面上的容器資訊之中選擇預定的資訊。例如,控制部35從容器資訊之中,選擇與容器編號、氣體名稱、氣體的濃度、品質保證期限、填充量及製造日有關的資訊作為預定的資訊。亦可由使用者從顯示於畫面上的容器資訊之中選擇資訊。在顯示於畫面上的容器資訊有錯誤之情況,或是文字無法辨識而無法讀取之情況,係由使用者經由操作部34而輸入必須資訊。
另外,控制部35亦可先從文本資料化的容器資訊之中選出必須資訊並顯示於顯示部33。
The imaging unit 31 of the communication device 30 photographs the gas container B according to the user's operation to obtain imaging data (step S101). The imaging unit 31 stores the acquired imaging data in the storage unit 32 via the control unit 35 . The control unit 35 analyzes the imaging data stored in the storage unit 32 and obtains container information from the imaging data. Specifically, the control unit 35 performs image analysis on the captured data using the OCR method, and converts the characters included in the captured data into text data. The control unit 35 causes the display unit 33 to display the textualized container information (step S102). The control unit 35 selects predetermined information from the container information displayed on the screen. For example, the control unit 35 selects information related to the container number, gas name, gas concentration, quality assurance period, filling amount, and manufacturing date from the container information as predetermined information. The user can also select information from the container information displayed on the screen. When the container information displayed on the screen is incorrect, or when the text is unrecognizable and cannot be read, the user inputs necessary information through the operation unit 34 .
In addition, the control unit 35 may also first select necessary information from the textualized container information and display it on the display unit 33 .
通訊部36按照使用者的操作,將選擇及輸入的必須資訊發送至管理裝置40(步驟S103)。
The communication unit 36 sends the necessary information selected and input to the management device 40 according to the user's operation (step S103).
管理裝置40的通訊部41接收從通訊裝置30發送來的必須資訊。通訊部41將接收到的必須資訊輸出至控制部45。控制部45將輸進來的必須資訊登錄至容器表431(步驟S104)。例如,在必須資訊中包含容器編號、氣體名稱、氣體的濃度、品質保證期限、填充量及製造日之資訊的情況,控制部45將取得的必須資訊登錄至容器表431的容器編號、氣體名稱、濃度、品質保證期限、初期填充量及製造日的欄位。然後,管理裝置40按照使用者的操作,將辨別資訊發送至寫入裝置50(步驟S105)。此處,假設管理裝置40係按照使用者的操作將所選擇的容器編號作為辨別資訊而發送至寫入裝置50。
The communication unit 41 of the management device 40 receives necessary information sent from the communication device 30 . The communication unit 41 outputs the received necessary information to the control unit 45 . The control unit 45 registers the input necessary information into the container table 431 (step S104). For example, when the necessary information includes information on the container number, gas name, gas concentration, quality assurance period, filling amount, and manufacturing date, the control unit 45 registers the acquired necessary information into the container number and gas name in the container table 431 , concentration, quality assurance period, initial filling volume and manufacturing date fields. Then, the management device 40 sends the identification information to the writing device 50 according to the user's operation (step S105). Here, it is assumed that the management device 40 sends the selected container number as identification information to the writing device 50 in accordance with the user's operation.
寫入裝置50取得從管理裝置40發送來的辨別資訊。寫入裝置50將取得的辨別資訊暫時保存起來(步驟S106)。寫入裝置50按照使用者的操作,將辨別資訊寫入電子標籤90(步驟S107)。在寫入裝置50中登錄有複數個辨別資訊之情況,由使用者選擇所期望的辨別資訊,而將所選擇的辨別資訊寫入電子標籤90。藉此,將辨別資訊記錄至電子標籤90。使用者將寫入有辨別資訊之電子標籤90安裝於交貨進來的氣體容器B(步驟S108)。
The writing device 50 obtains the identification information sent from the management device 40. The writing device 50 temporarily saves the obtained identification information (step S106). The writing device 50 writes the identification information into the electronic tag 90 according to the user's operation (step S107). In the case where multiple identification information is registered in the writing device 50, the user selects the desired identification information and writes the selected identification information into the electronic tag 90. In this way, the identification information is recorded in the electronic tag 90. The user installs the electronic tag 90 with the identification information written on the delivered gas container B (step S108).
然後,使用者將安裝有電子標籤90之氣體容器B收納至氣瓶儲存庫60(步驟S109)。氣瓶儲存庫60所具備的讀取裝置61係定期地
(例如每三小時、每天等)或以預定的時序進行電子標籤90的讀取(步驟S110)。氣瓶儲存庫60內有電子標籤90之情況,讀取裝置61會取得電子標籤90中記憶的辨別資訊。此時,讀取裝置61以與辨別資訊建立對應關係之方式也取得電子標籤90的識別資訊(標籤識別資訊)。讀取裝置61將取得的辨別資訊及電子標籤90的識別資訊輸出至未圖示的通訊部。通訊部將包含辨別資訊、電子標籤90的識別資訊、氣瓶儲存庫60的識別資訊及讀取裝置61的識別資訊之資訊發送至管理裝置40(步驟S111)。
Then, the user stores the gas container B with the electronic tag 90 installed in the gas bottle storage 60 (step S109). The reading device 61 provided in the gas cylinder storage 60 periodically
(For example, every three hours, every day, etc.) or in a predetermined time sequence to read the electronic tag 90 (step S110). When there is an electronic tag 90 in the gas cylinder storage warehouse 60 , the reading device 61 will obtain the identification information stored in the electronic tag 90 . At this time, the reading device 61 also obtains the identification information (tag identification information) of the electronic tag 90 in a manner corresponding to the identification information. The reading device 61 outputs the acquired identification information and the identification information of the electronic tag 90 to a communication unit (not shown). The communication unit sends information including the identification information, the identification information of the electronic tag 90 , the identification information of the gas cylinder storage 60 and the identification information of the reading device 61 to the management device 40 (step S111 ).
管理裝置40的通訊部41接收從氣瓶儲存庫60發送來的資訊。通訊部41將接收到的資訊輸出至控制部45。控制部45將輸出而來的資訊登錄至管理表432(步驟S112)。具體而言,控制部45係從記憶部43將管理表432讀出。控制部45從讀出的管理表432的記錄(record)之中,選出與取得的收納庫識別資訊及讀取器識別資訊對應的記錄。控制部45將取得的標籤識別資訊及辨別資訊登錄至所選擇的記錄的標籤識別資訊及辨別資訊的欄位。另外,控制部45在所選出的記錄的搬入日的欄位未登錄有值之情況,可將該日登錄作為搬入日。
The communication unit 41 of the management device 40 receives the information sent from the gas cylinder storage bank 60 . The communication unit 41 outputs the received information to the control unit 45 . The control unit 45 registers the output information into the management table 432 (step S112). Specifically, the control unit 45 reads the management table 432 from the storage unit 43 . The control unit 45 selects the record corresponding to the acquired storage identification information and reader identification information from among the records in the management table 432 that have been read. The control unit 45 registers the acquired tag identification information and identification information into the fields of the tag identification information and identification information of the selected record. In addition, if a value is not registered in the field of the move-in date of the selected record, the control unit 45 can register that day as the move-in date.
藉由以上的處理,將進貨進來的氣體容器B與收納該氣體容器B的收納庫建立對應關係並予以登錄。
Through the above processing, the incoming gas container B is associated with the storage warehouse that stores the gas container B and registered.
圖7係顯示第一實施型態之氣體容器管理系統1的氣體容器B的移動時的處理的流程之順序圖。圖7的處理係在將氣體容器B從氣瓶儲存庫60移動到圓筒櫃70的情況進行。
FIG. 7 is a sequence diagram showing the flow of processing when moving the gas container B in the gas container management system 1 according to the first embodiment. The process of FIG. 7 is performed when the gas container B is moved from the gas bottle storage 60 to the cylindrical cabinet 70 .
要將氣體容器B補充至圓筒櫃70之情況,使用者將氣體容器B從氣瓶儲存庫60搬出(步驟S201)。氣瓶儲存庫60所具備的讀取裝置61定期
地或以預定的時序進行電子標籤90的讀取(步驟S202)。然而,假設在讀取裝置61進行電子標籤90的讀取的時點並沒有電子標籤90。在此情況,讀取裝置61無法從電子標籤90取得辨別資訊。因此,讀取裝置61不向管理裝置40發送資訊(步驟S203)。或者,通訊部將包含氣瓶儲存庫60的識別資訊及讀取裝置61的識別資訊這兩個資訊之資訊發送至管理裝置40。
To replenish the gas container B to the cylindrical cabinet 70, the user moves the gas container B out of the gas bottle storage 60 (step S201). The reading device 61 provided in the gas cylinder storage warehouse 60 periodically
The electronic tag 90 is read locally or in a predetermined sequence (step S202). However, it is assumed that there is no electronic tag 90 when the reading device 61 reads the electronic tag 90 . In this case, the reading device 61 cannot obtain the identification information from the electronic tag 90 . Therefore, the reading device 61 does not send information to the management device 40 (step S203). Alternatively, the communication unit sends information including both the identification information of the gas cylinder storage 60 and the identification information of the reading device 61 to the management device 40 .
管理裝置40的控制部45本來在應從氣瓶儲存庫60得到資訊的時點並未得到資訊之情況,或者,在從氣瓶儲存庫60發送來的資訊只包含氣瓶儲存庫60的識別資訊及讀取裝置61的識別資訊這兩個資訊之情況,控制部45會判定為氣體容器B已從氣瓶儲存庫60搬出。亦即,控制部45在預定的期間未得到與收納庫建立有對應關係的辨別資訊之情況,判定為氣體容器B已從氣瓶儲存庫60搬出。如此的判定,在圓筒櫃70也一樣。具體而言,在圓筒櫃70收納有氣體容器B之情況,與氣瓶儲存庫60一樣,應該會從讀取裝置71取得辨別資訊。但是,在已將氣體容器B從圓筒櫃70搬出的情況,就不會從讀取裝置71取得辨別資訊。因此,控制部45與氣瓶儲存庫60的情況一樣,在接收到的資訊只包含圓筒櫃70的識別資訊及讀取裝置71的識別資訊這兩個資訊之情況,判定為氣體容器B已從圓筒櫃70搬出。然後,控制部45更新管理表432(步驟S204)。具體而言,控制部45係從記憶部43讀出管理表432。控制部45從讀出的管理表432的記錄之中,選擇與取得的收納庫識別資訊及讀取器識別資訊有建立對應關係的記錄。控制部45從選擇的記錄的標籤識別資訊及辨別資訊的欄位將未得到的資訊刪除。
The control unit 45 of the management device 40 does not obtain the information from the gas cylinder storage 60 at the time it should have received it, or the information sent from the gas cylinder storage 60 only contains the identification information of the gas cylinder storage 60 and When the two pieces of information, the identification information of the device 61 , are read, the control unit 45 determines that the gas container B has been moved out of the gas cylinder storage 60 . That is, if the control unit 45 does not obtain the identification information associated with the storage within a predetermined period, it determines that the gas container B has been moved out of the gas cylinder storage 60 . Such a judgment is the same for the cylindrical cabinet 70. Specifically, when the gas container B is stored in the cylindrical cabinet 70 , the identification information should be obtained from the reading device 71 in the same manner as the gas bottle storage 60 . However, when the gas container B has been moved out of the cylindrical cabinet 70 , the identification information is not acquired from the reading device 71 . Therefore, as in the case of the gas cylinder storage 60, when the received information includes only the identification information of the cylindrical cabinet 70 and the identification information of the reading device 71, it is determined that the gas container B has been Move out from the cylindrical cabinet 70 . Then, the control unit 45 updates the management table 432 (step S204). Specifically, the control unit 45 reads the management table 432 from the storage unit 43 . The control unit 45 selects a record corresponding to the acquired storage identification information and reader identification information from among the records in the read management table 432 . The control unit 45 deletes unobtained information from the fields of the tag identification information and identification information of the selected record.
一個氣瓶儲存庫60及圓筒櫃70中,可收納複數個氣體容器B。因此,在管理表432中,會有複數個標籤識別資訊及辨別資訊與一個氣瓶儲存庫60及圓筒櫃70建立對應關係。因此,在一個氣瓶儲存庫60及圓筒櫃70會有複數個標籤識別資訊及辨別資訊與之相對應的情況,即使沒有得到一個標籤識別資訊及辨別資訊,也會得到其他的標籤識別資訊及辨別資訊。因此,控制部45藉由將未得到標籤識別資訊及辨別資訊的資訊刪除,而管理與收納庫相對應的資訊。
A plurality of gas containers B can be stored in a gas cylinder storage warehouse 60 and a cylinder cabinet 70. Therefore, in the management table 432, a plurality of tag identification information and identification information are associated with a gas cylinder storage warehouse 60 and a cylinder cabinet 70. Therefore, in a case where a plurality of tag identification information and identification information are associated with a gas cylinder storage warehouse 60 and a cylinder cabinet 70, even if one tag identification information and identification information is not obtained, other tag identification information and identification information will be obtained. Therefore, the control unit 45 manages the information corresponding to the storage warehouse by deleting the information for which the tag identification information and identification information are not obtained.
假設使用者將從氣瓶儲存庫60搬出的氣體容器B搬入了圓筒櫃70(步驟S205)。圓筒櫃70所具備的讀取裝置71係定期地或以預定的時序進行電子標籤90的讀取(步驟S206)。在圓筒櫃70內有電子標籤90之情況,讀取裝置71會取得電子標籤90中記憶的辨別資訊。此時,讀取裝置71也與辨別資訊建立對應關係而取得電子標籤90的識別資訊(標籤識別資訊)。讀取裝置71將取得的辨別資訊及電子標籤90的識別資訊輸出至未圖示的通訊部。通訊部將包含辨別資訊、電子標籤90的識別資訊、圓筒櫃70的識別資訊及讀取裝置71的識別資訊之資訊發送至管理裝置40(步驟S207)。
Assume that the user moves the gas container B taken out from the gas cylinder storage 60 into the cylinder cabinet 70 (step S205). The reading device 71 provided in the cylinder cabinet 70 reads the electronic tag 90 periodically or at a predetermined time sequence (step S206). When there is an electronic tag 90 in the cylinder cabinet 70, the reading device 71 will obtain the identification information stored in the electronic tag 90. At this time, the reading device 71 also establishes a corresponding relationship with the identification information and obtains the identification information of the electronic tag 90 (tag identification information). The reading device 71 outputs the obtained identification information and the identification information of the electronic tag 90 to the communication unit not shown in the figure. The communication unit sends information including identification information, identification information of the electronic tag 90, identification information of the cylinder cabinet 70, and identification information of the reading device 71 to the management device 40 (step S207).
管理裝置40的通訊部41接收從圓筒櫃70發送來的資訊。通訊部41將接收到的資訊輸出至控制部45。控制部45依據輸進來的資訊進行管理表432的更新(步驟S208)。具體而言,控制部45係從記憶部43將管理表432讀出。控制部45選擇讀出的管理表432的記錄之中與取得的收納庫識別資訊及讀取器識別資訊對應的記錄。控制部45將取得的標籤識別資訊及辨別資訊登錄至所選擇的記錄的標籤識別資訊及辨別資訊的欄
位。以此方式,控制部45進行管理表432的更新。另外,控制部45在選擇的記錄的搬入日的欄位未登錄有值之情況,可將該日登錄作為搬入日。
The communication unit 41 of the management device 40 receives the information sent from the cylinder cabinet 70. The communication unit 41 outputs the received information to the control unit 45. The control unit 45 updates the management table 432 according to the input information (step S208). Specifically, the control unit 45 reads the management table 432 from the memory unit 43. The control unit 45 selects the record corresponding to the acquired storage identification information and reader identification information from the records of the read management table 432. The control unit 45 registers the acquired tag identification information and identification information to the tag identification information and identification information fields of the selected record. In this way, the control unit 45 updates the management table 432. In addition, if there is no value registered in the field of the moving-in date of the selected record, the control unit 45 can register that day as the moving-in date.
控制部45按照使用者的操作,使記憶部43中記憶的內容顯示於顯示部44(步驟S209)。圖8及圖9係顯示在顯示部44的畫面上顯示的畫面的一例之圖。
The control unit 45 causes the display unit 44 to display the content stored in the storage unit 43 in accordance with the user's operation (step S209). 8 and 9 are diagrams showing an example of a screen displayed on the screen of the display unit 44.
如圖8所示,在顯示部44的畫面上顯示有顯示選擇區域441、收納庫狀況顯示區域442、接收資訊顯示區域443及儲存量顯示區域444。顯示選擇區域441中,顯示出要觀看各房間內的收納庫的設置狀況之際可選擇的複數個按鈕。藉由選擇顯示選擇區域441中顯示的按鈕,會使收納庫狀況顯示區域442中顯示的資訊變更。例如,就圖8而言,選擇的是A室。收納庫狀況顯示區域442中,顯示出在顯示選擇區域441選擇的房間內的收納庫的狀況。例如,收納庫狀況顯示區域442中顯示出氣體容器B係收納於何處。塗黑的○表示該處收容有氣體容器B。該等的顯示係由控制部45藉由參照管理表432而予以顯示。
As shown in FIG. 8 , a display selection area 441 , a storage status display area 442 , a received information display area 443 and a storage amount display area 444 are displayed on the screen of the display unit 44 . The display selection area 441 displays a plurality of buttons that can be selected when viewing the installation status of storage in each room. By selecting a button displayed in the display selection area 441, the information displayed in the storage status display area 442 is changed. For example, in the case of Figure 8, room A is selected. The storage status display area 442 displays the status of the storage in the room selected in the display selection area 441 . For example, the storage status display area 442 displays where the gas container B is stored. A black ○ indicates that gas container B is stored there. These displays are displayed by the control unit 45 by referring to the management table 432 .
接收資訊顯示區域443中,顯示出今後預定接收的氣體容器B的資訊。接收資訊顯示區域443中的“訖”係表示是否已完成接收。根據對象的氣體容器B是否已收納到氣瓶儲存庫60來判定是否已完成接收。在對象的氣體容器B已收納到氣瓶儲存庫60之情況,控制部45判定為已完成接收。在此情況,控制部45使已完成接收的氣體容器B所對應的“訖”的顯示態樣,不同於尚未完成接收的氣體容器B所對應的“訖”的顯示態樣。例如,控制部45可使已完成接收的氣體容器B所對應的“訖”的顯示取消,
亦可如圖8所示將之塗黑。另一方面,在對象的氣體容器B尚未收納到氣瓶儲存庫60之情況,控制部45判定為尚未完成接收。
The receiving information display area 443 displays information about the gas container B scheduled to be received in the future. The "訖" in the receiving information display area 443 indicates whether the reception has been completed. Whether the reception has been completed is determined based on whether the target gas container B has been stored in the gas cylinder storage warehouse 60. In the case where the target gas container B has been stored in the gas cylinder storage warehouse 60, the control unit 45 determines that the reception has been completed. In this case, the control unit 45 makes the display state of the "訖" corresponding to the gas container B that has been received different from the display state of the "訖" corresponding to the gas container B that has not yet been received. For example, the control unit 45 can cancel the display of the "訖" corresponding to the gas container B that has been received, or it can be blacked out as shown in Figure 8. On the other hand, when the target gas container B has not yet been stored in the gas cylinder storage 60, the control unit 45 determines that the reception has not yet been completed.
儲存量顯示區域444中,顯示出在顯示選擇區域441選擇的房間內儲存的氣體的總量的資訊。高壓氣體的總儲存量,在與高壓氣體相關的法規中有規定。若儲存的量比與高壓氣體相關的法規所規定的總儲存量多,就必須申報。
The storage quantity display area 444 displays information on the total quantity of gas stored in the room selected in the display selection area 441. The total storage quantity of high-pressure gas is stipulated in the regulations related to high-pressure gas. If the storage quantity is more than the total storage quantity stipulated in the regulations related to high-pressure gas, it must be reported.
如上述進行顯示,使用者藉由觀看顯示部44的畫面,一眼就可掌握各房間內的收納庫的狀況、氣體的儲存量等之資訊。
By displaying as described above, the user can understand the status of the storage room in each room, the amount of gas stored, and other information at a glance by viewing the screen of the display unit 44.
當使用者選擇畫面上顯示的一個氣體容器B,控制部45係以如圖9所示的彈出式視窗(pop-up)445之形式來顯示與所選的氣體容器B有關的資訊。彈出式視窗445中,顯示出收納庫識別資訊、標籤識別資訊、容器編號、狀態、填充量、製造日、品質保證期限及標準交貨期的資訊。彈出式視窗445中顯示的資訊並不限於此,只要是管理裝置40所記憶的資訊皆可,可為任何資訊。此處,所謂的狀態,係表示選擇的時點的氣體容器B的狀態。例如,氣體容器B現在是否正在使用等。在氣體容器B現在正在使用時,就狀態而言係顯示“供給中”之資訊,在氣體容器B現在並非使用中的情況,就狀態而言係顯示“待機中”之資訊。標準交貨期係表示到到與選擇的氣體容器B相同種類的氣體容器B交貨為止的期間。標準交貨期可由管理裝置40按每個製造商的氣體種別而預先記憶。
When the user selects a gas container B displayed on the screen, the control unit 45 displays information related to the selected gas container B in the form of a pop-up window (pop-up) 445 as shown in FIG. 9 . The pop-up window 445 displays information on storage library identification information, label identification information, container number, status, filling amount, manufacturing date, quality assurance period, and standard delivery date. The information displayed in the pop-up window 445 is not limited to this, and can be any information as long as it is the information stored in the management device 40 . Here, the state means the state of the gas container B at the selected time point. For example, whether gas container B is currently in use, etc. When the gas container B is currently in use, the status is displayed as "supplying" information. When the gas container B is not currently in use, the status is displayed as "standby" information. The standard delivery date indicates the period until the gas container B of the same type as the selected gas container B is delivered. The standard delivery time can be memorized in advance by the management device 40 according to each manufacturer's gas category.
根據如以上所述構成的第一實施型態之氣體容器管理系統1,係具備有:將根據從氣體容器B取得的容器資訊而得的辨別資訊記錄至電子標籤90之寫入裝置50;收納安裝有電子標籤90的氣體容器B之複數
個收納庫;以及使複數個收納庫與和複數個收納庫各者所收納的氣體容器B有關的辨別資訊建立對應關係而加以保持之管理裝置40。因此,可容易地掌握氣體容器B收納在哪個收納庫中。因而,可更簡便地管理氣體容器。
The gas container management system 1 of the first embodiment configured as described above is provided with the writing device 50 for recording the identification information based on the container information obtained from the gas container B in the electronic tag 90; Plural number of gas containers B equipped with electronic tags 90
storage bins; and a management device 40 that establishes a correspondence relationship between a plurality of storage bins and identification information related to the gas containers B stored in each of the plurality of storage bins. Therefore, it is possible to easily grasp in which storage the gas container B is stored. Therefore, the gas container can be managed more easily.
另外,在氣體容器管理系統1中,在複數個收納庫具備有可讀取辨別資訊之讀取裝置61或讀取裝置71,且管理裝置40使讀取裝置61或讀取裝置71所取得的辨別資訊與具備取得辨別資訊的讀取裝置61或讀取裝置71之收納庫建立對應關係而加以保持。亦即,氣體容器管理系統1係在氣瓶儲存庫60及圓筒櫃70等之收納庫設置讀取裝置,而藉由讀取安裝於氣體容器B之電子標籤90而管理氣體容器B是收納在何處及其瓶數。因此,即使氣體容器B從保管的場所移動到其他的收納庫之情況,也可根據讀取裝置所讀取的資訊,而管理容器的移動及在各場所的瓶數的變化。而且,氣體容器管理系統1係即便容器上黏貼有依各氣體業者而不同的容器資訊,也只取得各製造商必定要記載的必須資訊,來謀求資訊的統一。因此,即使是氣體容器B的販賣者不同的情況亦可,而可統一管理。而且,使用者只要進行讀取交貨的氣體容器B的標籤3之操作及將資訊寫入電子標籤90之操作即可。因而,可更簡便地管理氣體容器。
In addition, in the gas container management system 1, a plurality of storages are provided with the reading device 61 or the reading device 71 that can read the identification information, and the management device 40 causes the reading device 61 or the reading device 71 to obtain the reading device 61 or the reading device 71. The identification information is associated with and held in a storage having the reading device 61 or the reading device 71 that acquires the identification information. That is, the gas container management system 1 is provided with a reading device in storage such as the gas bottle storage 60 and the cylindrical cabinet 70, and manages the storage of the gas container B by reading the electronic tag 90 attached to the gas container B. Where and the number of bottles. Therefore, even if the gas container B is moved from the storage place to another storage, the movement of the container and the change in the number of bottles in each place can be managed based on the information read by the reading device. Furthermore, the gas container management system 1 obtains only necessary information that must be recorded by each manufacturer, even if container information that differs from gas manufacturer to container is attached to the container, thereby unifying the information. Therefore, even if the sellers of the gas container B are different, unified management is possible. Furthermore, the user only needs to perform the operation of reading the tag 3 of the delivered gas container B and writing the information to the electronic tag 90 . Therefore, the gas container can be managed more easily.
再者,在氣體容器管理系統1中,在預定的期間都未得到與收納庫相對應的辨別資訊之情況,判定為氣體容器B已從收納庫移走而將與收納庫建立對應關係的辨別資訊刪除。因此,移走(搬出)的氣體容器B的資訊不會被持續保留。因而,可減低援用錯誤的資訊而進行管理的可能性。
Furthermore, in the gas container management system 1, if the identification information corresponding to the storage warehouse is not obtained within a predetermined period, it is determined that the gas container B has been removed from the storage warehouse and the identification information corresponding to the storage warehouse is deleted. Therefore, the information of the removed (carried out) gas container B will not be retained continuously. Therefore, the possibility of management based on erroneous information can be reduced.
(第二實施型態)
(Second implementation form)
第一實施型態係以用人手進行氣體容器B的移動之情況為例進行說明。第二實施型態係以採用氣瓶搬送用台車之情況為例進行說明,該氣瓶搬送用台車係以自動運行進行氣體容器B的搬送而藉此進行氣體容器B的移動。
The first embodiment is explained by taking the case of moving the gas container B manually as an example. The second embodiment is explained by taking the case of using a gas cylinder transport trolley as an example, and the gas cylinder transport trolley automatically transports the gas container B to move the gas container B.
圖10係表示第二實施型態之氣瓶搬送用台車2的外觀之圖。第二實施型態之氣瓶搬送用台車2係具備有:以自走方式進行氣體容器B的搬送之搬送車輛10;以及自動進行氣體容器B的搬出及搬入之搬出入用機器手(robot)20。
FIG10 is a diagram showing the appearance of the gas cylinder transport trolley 2 of the second embodiment. The gas cylinder transport trolley 2 of the second embodiment is equipped with: a transport vehicle 10 for transporting the gas container B in a self-propelled manner; and a robot 20 for automatically carrying the gas container B in and out.
搬送車輛10係也稱為AGV(Automated Guided Vehicle:自動導引車)之無人搬運車,係以自動運轉而進行氣體容器B的搬送。具體而言,該搬送車輛10係具有:設有載置氣體容器B的載置部11之車體12;以及將車體12支持成移動自如之複數個(本實施型態中為六個)車輪13(13a、13b、13c)。
The transport vehicle 10 is an unmanned transport vehicle also called AGV (Automated Guided Vehicle), and transports the gas container B by automatic operation. Specifically, the transport vehicle 10 has a vehicle body 12 provided with a mounting portion 11 for mounting the gas container B, and a plurality of (six in this embodiment) supporting the vehicle body 12 in a movable manner. Wheel 13 (13a, 13b, 13c).
車體12係形成為整體大致呈立方體狀,且寬度比氣體容器B寬,前後方向的長度比寬度方向的長度長,高度約為氣體容器B的1/2。載置部11係位於車體12的背面側。亦即,車體12的前面側係與載置部11所在側相反的一側。氣瓶搬送用台車2在要將氣體容器B搬入或搬出圓筒櫃70或氣瓶儲存庫60等的收納庫時係倒退移動。氣瓶搬送用台車2在移動時係向前移動。在車體12的背面,以如將車體12的側面的一部分往上下方向切除之方式而設的凹部14。載置部11設於此凹部14的內側。
The vehicle body 12 is formed into a substantially cubic shape as a whole, with a width wider than the gas container B, a front-rear length longer than a width direction, and a height approximately 1/2 of the gas container B. The placement portion 11 is located on the back side of the vehicle body 12 . That is, the front side of the vehicle body 12 is the side opposite to the side where the placing portion 11 is located. The gas cylinder transport trolley 2 moves backward when transporting the gas container B into or out of a storage such as the cylindrical cabinet 70 or the gas cylinder storage 60 . The gas cylinder transport trolley 2 moves forward when moving. A recessed portion 14 is provided on the back surface of the vehicle body 12 by cutting off part of the side surface of the vehicle body 12 in the up-down direction. The placement portion 11 is provided inside this recessed portion 14 .
在載置部11,設有將氣體容器B支持成在前後方向滑動自如之滑動支持機構15。滑動支持機構15係由自由滾筒(free roller)所構成,
具有在載置部11的前後方向並排設置的複數個滾筒15a以及將複數個滾筒15a支持成轉動自如之支持架15b。因此,可使載置在滑動支持機構15之上的氣體容器B保持直立的狀態而經由複數個滾筒15a往載置部11的前後方向滑動。
The placement portion 11 is provided with a sliding support mechanism 15 that supports the gas container B so as to be slidable in the front-rear direction. The sliding support mechanism 15 is composed of a free roller.
It has a plurality of rollers 15a arranged side by side in the front-rear direction of the placing part 11, and a support frame 15b that supports the plurality of rollers 15a in a rotatable manner. Therefore, the gas container B placed on the sliding support mechanism 15 can be kept in an upright state and can be slid in the front-rear direction of the placing portion 11 via the plurality of rollers 15 a.
關於滑動支持機構15,並不限定於非得是如此的由自由滾筒所構成者,亦可採用例如帶式輸送機(belt conveyer)。
The sliding support mechanism 15 is not limited to being composed of a free roller, and a belt conveyor, for example, may also be used.
另外,搬送車輛10亦可為具備有高度調整機構之構成,以配合設於上述的圓筒櫃70側的自由滾筒4的高度,而調整設於載置部11側的自由滾筒(滑動支持機構15)的高度。
In addition, the transport vehicle 10 may also be provided with a height adjustment mechanism to adjust the height of the free roller 4 provided on the side of the cylinder cabinet 70 described above, and to adjust the height of the free roller (sliding support mechanism 15) provided on the side of the loading portion 11.
再者,搬送車輛10亦可為除了上述的高度調整機構之外,也設有調整設在載置部11側的自由滾筒(滑動支持機構15)的前後方向的位置、前後左右的傾斜等的機構之構成。
Furthermore, the transport vehicle 10 may be provided with a mechanism for adjusting the front-rear position, the front-rear, left-right inclination, etc. of the free roller (sliding support mechanism 15) provided on the placement portion 11 side in addition to the above-described height adjustment mechanism. Structure of the organization.
在車體12,除了上述態樣之外,還設有在緊急時使搬送車輛10停止之緊急停止按鈕、進行各種顯示之顯示機器、進行各種操作之操作開關及進行與外部的通訊之天線16d等。
In addition to the above, the vehicle body 12 is also provided with an emergency stop button for stopping the transport vehicle 10 in an emergency, a display device for performing various displays, an operating switch for performing various operations, and an antenna 16d for communicating with the outside, etc.
複數個車輪13係轉動自如地安裝於車體12的下面。其中,在車體12的四個角設有四個腳輪(caster wheel)12a,各角輪12a係安裝成旋轉自如。另一方面,在車體12的中央設有在寬度方向並排之兩個驅動車輪12b,兩個驅動車輪12b經由馬達等之轉動驅動機構(未圖示)而被轉動驅動。
A plurality of wheels 13 are rotatably mounted below the vehicle body 12. Four caster wheels 12a are provided at the four corners of the vehicle body 12, and each corner wheel 12a is rotatably mounted. On the other hand, two driving wheels 12b are arranged side by side in the width direction in the center of the vehicle body 12, and the two driving wheels 12b are driven and rotated by a rotation drive mechanism (not shown) such as a motor.
搬送車輛10可藉由切換傳遞給該兩個驅動車輪12b之驅動力的配比,而控制該搬送車輛10的移動及轉向。另外,於搬送車輛10中,
關於用以進行氣體容器B的自動搬送之引導方式並沒有特別的限定,可採用過去公知的引導方式。
The transport vehicle 10 can control the movement and turning of the transport vehicle 10 by switching the ratio of the driving force transmitted to the two driving wheels 12b. In addition, in the transport vehicle 10, there is no particular limitation on the guidance method used for automatic transportation of the gas container B, and a conventionally known guidance method can be used.
再者,在搬送車輛10,例如可設置光電感測器或磁感測器、限位開關(limit switch)等的位置檢測器,或是設置進行氣瓶搬送用台車2與外部的通訊之通訊器等。
Furthermore, the transport vehicle 10 may be provided with a position detector such as a photoelectric sensor, a magnetic sensor, a limit switch, or a communicator for communicating between the gas cylinder transport trolley 2 and the outside.
搬出入用機器手20係設置於搬送車輛10的上部,自動地進行相對於載置部11之氣體容器B的搬出及搬入。具體而言,該搬出入用機器手20係具有:保持氣體容器B之保持機構21;以及使由保持機構21保持的氣體容器B往車體12的前後方向滑動驅動之滑動驅動機構22。
The robot arm 20 for carrying in and out is arranged on the upper part of the transport vehicle 10, and automatically carries out and carries in the gas container B relative to the loading part 11. Specifically, the robot arm 20 for carrying in and out has: a holding mechanism 21 for holding the gas container B; and a sliding drive mechanism 22 for slidingly driving the gas container B held by the holding mechanism 21 in the front and rear directions of the vehicle body 12.
保持機構21係具有抓持氣體容器B的主體部之一對臂部21a。一對臂部21a彼此具有彎成圓弧狀的形狀,且基端側透過鉸鍊而安裝成轉動自如。
The holding mechanism 21 is a pair of arm portions 21a having a main body portion for grasping the gas container B. The pair of arm portions 21a are curved into arc shapes with each other, and the base end sides are installed to be freely rotatable through hinges.
保持機構21係使該一對臂部21a互相逆向轉動操作,而在一對臂部21a之間從兩側抓持氣體容器B的主體部。另外,保持機構21係在上下方向並排設置兩組前述的一對臂部21a,以抓持氣體容器B的上部側及下部側。因此,可將直立狀態的氣體容器B保持成穩定的狀態。
The holding mechanism 21 is to rotate the pair of arms 21a in opposite directions to each other, and to grasp the main body of the gas container B from both sides between the pair of arms 21a. In addition, the holding mechanism 21 is to arrange two sets of the aforementioned pair of arms 21a side by side in the vertical direction to grasp the upper and lower sides of the gas container B. Therefore, the gas container B in an upright state can be maintained in a stable state.
關於保持機構21,並非一定要限定於如上述之利用一對臂部21a抓持氣體容器B的主體部之構成,亦可為例如吸附而保持氣體容器B之構成
The holding mechanism 21 is not necessarily limited to the structure in which the main body of the gas container B is grasped by the pair of arms 21 a as described above. For example, the holding mechanism 21 may be configured to hold the gas container B by adsorption.
滑動驅動機構22係使與保持機構21連結的滑動軸22a往前後方向滑動驅動。關於滑動軸22a的驅動,可為利用馬達等之驅動,亦可為利用氣缸或油壓缸等之驅動。
The sliding drive mechanism 22 slides and drives the sliding shaft 22a connected to the holding mechanism 21 in the front-rear direction. The sliding shaft 22a may be driven by a motor or the like, or may be driven by an air cylinder, a hydraulic cylinder, or the like.
如圖10所示,搬出入用機器手20係一邊利用保持機構21保持直立狀態的氣體容器B,一邊利用滑動驅動機構22使氣體容器B往車體12的前後方向滑動驅動。因此,可經由設於載置部11之滑動支持機構15使氣體容器B滑動,而在該載置部11與圓筒櫃(cylinder cabinet)70側的自由滾筒4之間自動進行氣體容器B的搬出及搬入。
As shown in FIG10 , the robot 20 for carrying in and out uses a holding mechanism 21 to hold the gas container B in an upright state, while using a sliding drive mechanism 22 to slide and drive the gas container B in the front and rear directions of the vehicle body 12. Therefore, the gas container B can be slid by the sliding support mechanism 15 provided on the loading portion 11, and the gas container B can be automatically carried out and carried in between the loading portion 11 and the free roller 4 on the side of the cylinder cabinet 70.
接著,以將上述說明的氣體容器管理系統1應用於將殘餘量變少的氣體容器B(以下稱為「更換對象氣體容器Be」)從圓筒櫃70搬出,並將填充完氣體的氣體容器B(以下稱為「搬入對象氣體容器Bf」)搬入圓筒櫃70的狀況而管理氣體容器B的情況為例進行說明。所謂的更換對象氣桶(gas bombe),係指未填充有足以進行供給的氣體之氣體容器。
Next, the gas container management system 1 described above is applied to the case where a gas container B with a reduced residual amount (hereinafter referred to as "replacement target gas container Be") is moved out of the cylinder cabinet 70, and a gas container B filled with gas (hereinafter referred to as "imported gas container Bf") is moved into the cylinder cabinet 70 to manage the gas container B. The so-called replacement target gas cylinder (gas bombe) refers to a gas container that is not filled with enough gas for supply.
圖11係表示第二實施型態之氣體容器管理系統1a的系統構成之圖。在圖11中,為了說明在氣瓶搬送用台車2進行氣體容器B的自動搬送的情況,而只顯示與自動搬送相關的構成。因此,氣體容器B的搬送以外的構成,都與第一實施型態一樣。氣體容器管理系統1a係具備有複數個氣瓶搬送用台車2-1、2-2、複數個氣瓶儲存庫60-1~60-4、複數個圓筒櫃70、操作終端機100及管理裝置40a。氣瓶搬送用台車2-1、2-2、圓筒櫃70、氣瓶儲存庫60-1~60-4的數目並沒有特別的限制。在以下的說明中,當未特別區別氣瓶搬送用台車2-1、2-2的情況係記載為氣瓶搬送用台車2。另外,當未特別區別氣瓶儲存庫60-1~60-4的情況係記載為氣瓶儲存庫60。
FIG. 11 is a diagram showing the system configuration of the gas container management system 1a according to the second embodiment. In FIG. 11 , in order to explain the automatic transportation of the gas container B on the gas cylinder transportation trolley 2 , only the configuration related to the automatic transportation is shown. Therefore, the structure other than the transportation of the gas container B is the same as that of the first embodiment. The gas container management system 1a system includes a plurality of gas cylinder transport trolleys 2-1 and 2-2, a plurality of gas cylinder storage warehouses 60-1 to 60-4, a plurality of cylindrical cabinets 70, an operation terminal 100, and management Device 40a. There is no particular restriction on the number of the gas cylinder transport trolleys 2-1 and 2-2, the cylindrical cabinet 70, and the gas cylinder storage warehouses 60-1 to 60-4. In the following description, when there is no particular distinction between the gas bottle transport trolleys 2-1 and 2-2, they will be described as the gas bottle transport trolley 2. In addition, when the gas cylinder storage bins 60-1 to 60-4 are not particularly distinguished, they are described as the gas cylinder storage bin 60.
氣瓶搬送用台車2、圓筒櫃70、氣瓶儲存庫60係設置於工廠內的地板(floor)之上。氣瓶搬送用台車2、圓筒櫃70、氣瓶儲存庫60、
操作終端機100及管理裝置40a係連接成可相通訊。氣瓶搬送用台車2-1及2-2分別位於預定的區域71-1及71-2。區域71-1係氣瓶搬送用台車2-1在處理開始時及處理完成時所位於的收容場所。區域71-2係氣瓶搬送用台車2-2在處理開始時及處理完成時所位於的收容場所。
The gas cylinder transport trolley 2, the cylindrical cabinet 70, and the gas cylinder storage warehouse 60 are installed on the floor in the factory. Cart for transporting gas cylinders 2, cylindrical cabinet 70, gas cylinder storage 60,
The operation terminal 100 and the management device 40a are connected to communicate with each other. The gas cylinder transport trolleys 2-1 and 2-2 are respectively located in predetermined areas 71-1 and 71-2. Area 71-1 is a storage place where the gas cylinder transport trolley 2-1 is located when processing starts and when processing is completed. Area 71-2 is a storage place where the gas cylinder transport trolley 2-2 is located when processing starts and when processing is completed.
氣瓶搬送用台車2-1為例如將更換對象氣體容器Be從圓筒櫃70搬出,然後將更換對象氣體容器Be搬入氣瓶儲存庫60之台車。
The gas cylinder transport trolley 2-1 is a trolley that, for example, carries the gas container Be to be replaced out of the cylinder cabinet 70 and then carries the gas container Be to be replaced into the gas cylinder storage warehouse 60.
氣瓶搬送用台車2-2為例如將搬入對象氣體容器Bf從氣瓶儲存庫60搬出,然後將搬入對象氣體容器Bf搬入圓筒櫃70之台車。
The gas cylinder transport trolley 2-2 is a trolley that, for example, carries out the gas container Bf to be carried in from the gas cylinder storage 60 and then carries the gas container Bf to be carried in into the cylinder cabinet 70.
氣瓶搬送用台車2-1、2-2經由天線16d而在與操作終端機100及管理裝置40a之間進行通訊。再者,氣瓶搬送用台車2亦可只採用一台來執行氣瓶搬送用台車2-1及氣瓶搬送用台車2-2的處理。例如,氣瓶搬送用台車2將更換對象氣體容器Be從圓筒櫃70搬出,然後將更換對象氣體容器Be搬入氣瓶儲存庫60,接著將搬入對象氣體容器Bf從氣瓶儲存庫60搬出,再將搬入對象氣體容器Bf搬入圓筒櫃70。
The gas cylinder transport trolleys 2-1 and 2-2 communicate with the operation terminal 100 and the management device 40a via the antenna 16d. Furthermore, only one gas bottle transport trolley 2 may be used to perform the processing of the gas bottle transport trolley 2-1 and the gas bottle transport trolley 2-2. For example, the gas bottle transport trolley 2 transports the gas container Be to be replaced from the cylindrical cabinet 70, then transports the gas container Be to be replaced into the gas cylinder storage 60, and then transports the gas container Bf to be carried out from the gas cylinder storage 60. Then, the gas container Bf to be carried is carried into the cylindrical cabinet 70 .
氣瓶儲存庫60係按照氣體的種別而分別設置,一個氣瓶儲存庫60中收容複數個氣體容器B。就圖11所示的例子而言,氣瓶儲存庫60-1及60-2係收容搬入對象氣體容器Bf,氣瓶儲存庫60-3及60-4係收容更換對象氣體容器Be。氣瓶儲存庫60係將門開閉,並於其內側的儲存空間以直立並排的狀態收納複數個氣體容器B。
The gas cylinder storage bins 60 are respectively provided according to the types of gases, and one gas cylinder storage bin 60 accommodates a plurality of gas containers B. In the example shown in FIG. 11 , the gas cylinder storage bins 60 - 1 and 60 - 2 accommodate the gas container Bf to be transported, and the gas cylinder storage bins 60 - 3 and 60 - 4 accommodate the gas container Be to be replaced. The door of the gas bottle storage 60 is opened and closed, and a plurality of gas containers B are stored upright and side by side in the storage space inside the gas cylinder storage 60 .
另外,在儲存空間的底部設有自由滾筒,各氣體容器B載置於自由滾筒。自由滾筒係具有:往儲存空間的前後方向排列設置的複數個滾筒;以及將複數個滾筒支持成轉動自如之支持架。因此,可使載置於自
由滾筒之上的氣體容器B維持著直立的狀態而經由複數個滾筒往儲存空間的前後方向滑動。
In addition, a free drum is provided at the bottom of the storage space, and each gas container B is placed on the free drum. The free roller system has: a plurality of rollers arranged in the front and rear directions of the storage space; and a support frame that supports the plurality of rollers to rotate freely. Therefore, it can be placed in the
The gas container B above the roller is maintained in an upright state and slides toward the front and back directions of the storage space through a plurality of rollers.
在氣瓶儲存庫60,除了上述態樣之外,還具備有例如偵測儲存空間的空位狀態之感測器、控制門的開閉之控制盒、用來與管理裝置40a進行通訊之通訊部(未圖示),且利用通訊部將門的開閉狀態的資訊及儲存空間的空位資訊等發送至管理裝置40a。
In addition to the above-mentioned aspects, the gas cylinder storage warehouse 60 also has, for example, a sensor for detecting the vacancy status of the storage space, a control box for controlling the opening and closing of the door, and a communication unit for communicating with the management device 40a ( (not shown), and uses the communication unit to transmit the information on the opening and closing status of the door, the vacancy information of the storage space, etc. to the management device 40a.
操作終端機100係在工廠內移動的作業員所持有的終端機。操作終端機100接收由作業員輸入的氣瓶搬送用台車2的操作指示、氣體容器B(Be、Bf)的搬入及搬出的指示。操作終端機100將接收到的指示,經由管理裝置40a而發送到氣瓶搬送用台車2。操作終端機100係採用例如平板終端機、智慧手機及行動電話等之可攜帶式的資訊處理裝置而構成。
The operation terminal 100 is a terminal held by an operator who moves within the factory. The operation terminal 100 receives the operation instructions of the gas cylinder transport trolley 2 and the instructions for loading and unloading the gas containers B (Be, Bf) input by the operator. The operation terminal 100 transmits the received instruction to the gas cylinder transport trolley 2 via the management device 40a. The operation terminal 100 is configured using a portable information processing device such as a tablet terminal, a smartphone, a mobile phone, or the like.
管理裝置40a係管理氣體容器管理系統1a之裝置。管理裝置40a進行與第一實施型態之同名的功能部相同的處理。此外,管理裝置40a會按照來自操作終端機100之要求,而將更換對象氣體容器Be之資訊發送至操作終端機100。另外,管理裝置40a會從圓筒櫃70接收各種資訊(例如,門的開閉的資訊、閥的開閉的資訊、壓力的監測結果、氣體洩漏的監測結果及氣體容器B的殘餘量的資訊)。管理裝置40a會從氣瓶儲存庫60接收各種資訊(例如,門的開閉的資訊、儲存空間的空位資訊)。管理裝置40a會按照來自操作終端機100的要求,而控制氣瓶搬送用台車2的移動。管理裝置40a係採用個人電腦等之資訊處理裝置而構成。
The management device 40a is a device that manages the gas container management system 1a. The management device 40a performs the same processing as the functional unit with the same name in the first embodiment. In addition, the management device 40a will send the information of the replacement target gas container Be to the operation terminal 100 according to the request from the operation terminal 100. In addition, the management device 40a receives various information from the cylindrical cabinet 70 (for example, door opening and closing information, valve opening and closing information, pressure monitoring results, gas leakage monitoring results, and remaining amount information of the gas container B). The management device 40a receives various information (for example, door opening and closing information, storage space vacancy information) from the gas cylinder storage warehouse 60. The management device 40a controls the movement of the gas cylinder transport trolley 2 in accordance with the request from the operation terminal 100. The management device 40a is configured using an information processing device such as a personal computer.
圖12係顯示第二實施型態之操作終端機100的功能構成之概略方塊圖。操作終端機100具備有藉由匯流排而相連接的CPU及記憶體
及輔助記憶裝置等,並執行操作程式。藉由操作程式之執行,操作終端機100係作為具備通訊部101、操作部102、控制部103、顯示部104、路徑資訊記憶部105的裝置而發揮功能。另外,操作終端機100的各功能的全部或一部分,亦可利用ASIC或PLD或FPGA等之硬體而實現。操作程式可記錄於電腦可讀取的記錄媒體。電腦可讀取的記錄媒體為例如軟碟、磁光碟、ROM、CD-ROM等之可攜式媒體、內建於電腦系統之硬碟等的記憶裝置。操作程式亦可經由電信線路而接收或發送。
FIG. 12 is a schematic block diagram showing the functional configuration of the operation terminal 100 of the second embodiment. The operation terminal 100 has a CPU, a memory, an auxiliary storage device, etc. connected by a bus, and executes an operation program. By executing the operation program, the operation terminal 100 functions as a device having a communication unit 101, an operation unit 102, a control unit 103, a display unit 104, and a path information storage unit 105. In addition, all or part of the functions of the operation terminal 100 can also be realized by hardware such as ASIC, PLD, or FPGA. The operation program can be recorded in a computer-readable recording medium. Computer-readable recording media include portable media such as floppy disks, magneto-optical disks, ROMs, CD-ROMs, and memory devices such as hard disks built into computer systems. Operating programs can also be received or sent via telecommunications lines.
通訊部101係在與別的裝置之間進行通訊。例如,通訊部101在與管理裝置40a之間進行通訊。
The communication unit 101 communicates with other devices. For example, the communication unit 101 communicates with the management device 40a.
操作部102係採用鍵盤、指向裝置(滑鼠、數位板等)、觸控面板、按鈕等之既有的輸入裝置而構成。操作部102係在要將使用者的指示輸入至操作終端機100之際由使用者加以操作。例如,操作部102係接受氣瓶搬送用台車2的移動指示,及氣瓶搬送用台車2之氣體容器B的搬出及搬入之指示。
The operation unit 102 is composed of existing input devices such as a keyboard, a pointing device (mouse, digital tablet, etc.), a touch panel, and buttons. The operation unit 102 is operated by the user when the user's instructions are to be input to the operation terminal 100. For example, the operation unit 102 receives instructions for moving the gas cylinder transport trolley 2 and instructions for carrying out and carrying in the gas container B of the gas cylinder transport trolley 2.
控制部103係控制操作終端機100的動作。例如,控制部103使從管理裝置40a發送來的資訊顯示於顯示部104。另外,控制部103控制通訊部101,將經由操作部102而輸入的使用者的指示發送至管理裝置40a。
The control unit 103 controls the operation of the operating terminal 100. For example, the control unit 103 displays the information sent from the management device 40a on the display unit 104. In addition, the control unit 103 controls the communication unit 101 to send the user's instructions input through the operation unit 102 to the management device 40a.
顯示部104為液晶顯示器、有機EL顯示器等之圖像顯示裝置。顯示部104顯示出例如從管理裝置40a發送來的資訊。顯示部104亦可為用以將圖像顯示裝置連接至操作終端機100之介面。在此情況,顯示部104係產生顯示資訊所需的影像訊號,並將影像訊號輸出至與自身連接的圖像顯示裝置。
The display unit 104 is an image display device such as a liquid crystal display, an organic EL display, etc. The display unit 104 displays information sent from the management device 40a, for example. The display unit 104 can also be an interface for connecting the image display device to the operation terminal 100. In this case, the display unit 104 generates an image signal required to display information and outputs the image signal to the image display device connected to itself.
路徑資訊記憶部105係記憶將氣瓶搬送用台車2的位置、目的地與路徑編號建立對應關係而製成的路徑指示表。氣瓶搬送用台車2的位置係顯示指示輸入時的氣瓶搬送用台車2的位置。例如,在處理開始時氣瓶搬送用台車2的位置為收容場所,在進行搬出或搬入時氣瓶搬送用台車2的位置為進行搬出或搬入的場所。目的地係氣瓶搬送用台車2要前往的目的地。例如,在進行更換對象氣體容器Be的搬出時,目的地係收容有更換對象氣體容器Be之圓筒櫃70。路徑編號係用來指示從氣瓶搬送用台車2的位置到目的地的路徑之編號。路徑資訊記憶部105係採用磁碟裝置或半導體記憶裝置等之記憶裝置而構成。
The route information storage unit 105 stores a route instruction table in which the position and destination of the gas cylinder transport trolley 2 are correlated with the route number. The position of the gas bottle transport trolley 2 is the position of the gas bottle transport trolley 2 when the display instruction is input. For example, the position of the gas bottle transport trolley 2 when the process is started is a storage place, and the position of the gas bottle transport trolley 2 when unloading or loading is performed is a place where unloading or loading is performed. The destination is the destination where the gas cylinder transport trolley 2 is going. For example, when the gas container Be to be replaced is carried out, the destination is the cylindrical cabinet 70 containing the gas container Be to be replaced. The route number is a number indicating the route from the position of the gas cylinder transport trolley 2 to the destination. The path information storage unit 105 is configured using a memory device such as a magnetic disk device or a semiconductor memory device.
圖13係表示第二實施型態之管理裝置40a的功能構成之概略方塊圖。管理裝置40a具備有藉由匯流排而相連接的CPU及記憶體及輔助記憶裝置等,並執行管理程式。藉由管理程式之執行,管理裝置40a作為具備通訊部41、操作部42、記憶部43a、顯示部44、控制部45a的裝置而發揮功能。另外,管理裝置40a的各功能的全部或一部分,亦可利用ASIC或PLD或FPGA等之硬體而實現。管理程式可記錄於電腦可讀取的記錄媒體。電腦可讀取的記錄媒體為例如軟碟、磁光碟、ROM、CD-ROM等之可攜式媒體、內建於電腦系統之硬碟等的記憶裝置。管理程式亦可經由電信線路而接收或發送。
FIG. 13 is a schematic block diagram showing the functional configuration of the management device 40a according to the second embodiment. The management device 40a is equipped with a CPU, a memory, an auxiliary memory device, etc. connected through a bus, and executes a management program. By executing the management program, the management device 40a functions as a device including a communication unit 41, an operation unit 42, a memory unit 43a, a display unit 44, and a control unit 45a. In addition, all or part of each function of the management device 40a can also be implemented using hardware such as ASIC, PLD, or FPGA. The management program can be recorded on a computer-readable recording medium. Computer-readable recording media are portable media such as floppy disks, magneto-optical disks, ROMs, CD-ROMs, and memory devices such as hard disks built into the computer system. Management programs may also be received or sent via telecommunications lines.
通訊部41係在與別的裝置之間進行通訊。例如,通訊部41在與氣瓶搬送用台車2、氣瓶儲存庫60、圓筒櫃70及操作終端機100之間進行通訊。
The communication unit 41 communicates with other devices. For example, the communication unit 41 communicates with the gas cylinder transport trolley 2 , the gas cylinder storage 60 , the cylindrical cabinet 70 and the operation terminal 100 .
操作部42係採用鍵盤、指向裝置(滑鼠、數位板等)、觸控面板、按鈕等之既有的輸入裝置而構成。操作部42係在要將使用者的指示輸入至管理裝置40a之際由使用者加以操作。例如,操作部42係接受氣瓶搬送用台車2之移動指示,及氣瓶搬送用台車2之氣體容器B的搬出及搬入之指示。
The operation unit 42 is composed of existing input devices such as a keyboard, a pointing device (mouse, digital tablet, etc.), a touch panel, and buttons. The operation unit 42 is operated by the user when the user's instructions are to be input into the management device 40a. For example, the operation unit 42 receives instructions for moving the gas cylinder transport trolley 2 and instructions for carrying out and carrying in the gas container B of the gas cylinder transport trolley 2.
記憶部43a係記憶容器表431、管理表432及台車資訊433。台車資訊433係至少記憶與氣瓶搬送用台車2的狀態(是否在作業中,在什麼作業中,位於什麼場所等)有關的資訊。氣瓶搬送用台車2的位置資訊可從氣瓶搬送用台車2取得。記憶部43a係採用磁碟裝置或半導體記憶裝置等之記憶裝置而構成。
The memory unit 43a stores the container table 431, the management table 432, and the trolley information 433. The trolley information 433 stores at least information related to the status of the gas cylinder transport trolley 2 (whether it is in operation, what operation it is in, where it is located, etc.). The position information of the gas cylinder transport trolley 2 can be obtained from the gas cylinder transport trolley 2. The memory unit 43a is composed of a memory device such as a disk device or a semiconductor memory device.
顯示部44為液晶顯示器、有機EL顯示器等之圖像顯示裝置。顯示部44進行以登錄於容器表431及管理表432之資訊為根據之顯示。例如,顯示部44顯示出氣體容器B的收納狀況、氣體的儲存量及容器的接收資訊等。顯示部44亦可為用來將圖像顯示裝置連接至管理裝置40a之介面。在此情況,顯示部44係產生顯示資訊所需的影像訊號,將影像訊號輸出至與本身連接的圖像顯示裝置。
The display unit 44 is an image display device such as a liquid crystal display, an organic EL display, etc. The display unit 44 performs a display based on the information registered in the container table 431 and the management table 432. For example, the display unit 44 displays the storage status of the gas container B, the storage volume of the gas, and the receiving information of the container. The display unit 44 can also be an interface for connecting the image display device to the management device 40a. In this case, the display unit 44 generates the image signal required to display the information and outputs the image signal to the image display device connected to itself.
控制部45a係控制管理裝置40a的動作。控制部45a係例如按照使用者的操作,而將從通訊裝置30發送來的必須資訊之中的容器編號設定於寫入裝置50。例如,控制部45a控制通訊部41,將與來自操作終端
機100的要求回應的資訊發送至操作終端機100。例如,控制部45a控制通訊部41,將來自操作終端機100之指示發送至作為對象之裝置。
The control unit 45a controls the operation of the management device 40a. The control unit 45a sets the container number among the necessary information sent from the communication device 30 to the writing device 50, for example, according to the user's operation. For example, the control unit 45a controls the communication unit 41 to communicate with the user from the operation terminal
The information requesting response from the machine 100 is sent to the operation terminal 100. For example, the control unit 45a controls the communication unit 41 to transmit an instruction from the operation terminal 100 to the target device.
圖14係顯示第二實施型態之氣瓶搬送用台車2的內部的功能構成之概略方塊圖。氣瓶搬送用台車2係如以上說明的,具備有搬送車輛10及搬出入用機器手20。
FIG. 14 is a schematic block diagram showing the internal functional configuration of the gas cylinder transport trolley 2 according to the second embodiment. As described above, the gas cylinder transport trolley 2 is equipped with the transport vehicle 10 and the transport robot 20 .
搬出入用機器手20具備有控制部24。控制部24係由例如PLC(programmable logic controller,可編程邏輯控制器)所構成。控制部24藉由執行程式,而作為通訊控制部241及搬出入控制部242來發揮功能。
The loading/unloading robot 20 is provided with a control unit 24 . The control unit 24 is composed of, for example, a PLC (programmable logic controller). The control unit 24 functions as the communication control unit 241 and the loading/unloading control unit 242 by executing the program.
通訊控制部241係控制在與別的裝置之間進行的通訊。例如,通訊控制部241按照藉由天線16d而接收的指示的內容,將指示輸出至搬出入控制部242或搬送車輛10。例如,通訊控制部241在藉由天線16d而接收到的指示中包含有氣體容器B的搬出或搬入的指示之情況,將指示輸出至搬出入控制部242。例如,通訊控制部241在藉由天線16d而接收到的指示中包含有表示要使氣瓶搬送用台車2移動之指示或表示要使氣瓶搬送用台車2連接至氣瓶儲存庫60或圓筒櫃70之指示的情況,將指示輸出至搬送車輛10。其中,所謂的使氣瓶搬送用台車2連接至氣瓶儲存庫60或圓筒櫃70,係使氣瓶搬送用台車2與氣瓶儲存庫60或圓筒櫃70對接(docking)成可將氣體容器B搬出或搬入。
The communication control unit 241 controls communication with other devices. For example, the communication control unit 241 outputs the instruction to the loading/unloading control unit 242 or the transportation vehicle 10 according to the content of the instruction received through the antenna 16d. For example, when the instruction received by the antenna 16d includes an instruction to carry out or carry in the gas container B, the communication control unit 241 outputs the instruction to the carry-in/out control unit 242. For example, the instruction received by the communication control unit 241 via the antenna 16d includes an instruction to move the gas bottle transport trolley 2 or to connect the gas bottle transport trolley 2 to the gas bottle storage 60 or the cylinder. In the case of an instruction from the drum cabinet 70, the instruction is output to the transport vehicle 10. Among them, the so-called connecting the gas bottle transport trolley 2 to the gas bottle storage 60 or the cylindrical cabinet 70 means that the gas bottle transport trolley 2 can be docked with the gas bottle storage 60 or the cylindrical cabinet 70. Gas container B is moved in or out.
搬出入控制部242係按照輸入的指示,控制保持機構21及滑動驅動機構22的動作。更具體而言,搬出入控制部242係按照輸入的指示而控制保持機構21,使之抓持住氣體容器B。搬出入控制部242並按照輸入的指示而控制滑動驅動機構22,使滑動軸22a往前後方向滑動驅動。
The carrying-in/out control unit 242 controls the actions of the holding mechanism 21 and the sliding drive mechanism 22 according to the input instructions. More specifically, the carrying-in/out control unit 242 controls the holding mechanism 21 according to the input instructions so that it can hold the gas container B. The carrying-in/out control unit 242 also controls the sliding drive mechanism 22 according to the input instructions so that the sliding shaft 22a can slide and drive in the forward and backward directions.
搬送車輛10係具備有記憶部25及移動控制部26。
The transport vehicle 10 is equipped with a memory unit 25 and a movement control unit 26.
記憶部25係記憶路徑表251。記憶部25係採用磁碟裝置或半導體記憶裝置等之記憶裝置而構成。
The memory unit 25 stores the path table 251. The memory unit 25 is configured using a memory device such as a magnetic disk device or a semiconductor memory device.
路徑表251係登錄有與氣瓶搬送用台車2要走的路徑有關之資訊。利用圖15來說明路徑表251的具體的構成。圖15係顯示第二實施型態之路徑表251的一例之圖。如圖15所示,路徑表251中與路徑編號相對應而登錄有路線(route)的資訊。路徑編號係顯示用以唯一地識別路線之識別編號。路線係顯示氣瓶搬送用台車2在工廠的地板上移動之際的移動路徑之資訊。路線例如包含:從氣瓶搬送用台車2的收容場所前往特定的氣瓶儲存庫60所需經過的移動路徑;從氣瓶儲存庫60的位置前往特定的圓筒櫃70所需經過的移動路徑;從圓筒櫃70的位置前往收容場所所需經過的移動路徑;從氣瓶搬送用台車2的收容場所前往特定的圓筒櫃70所需經過的移動路徑;從圓筒櫃70的位置前往特定的氣瓶儲存庫60所需經過的移動路徑。移動路徑也包含顯示應直線前進幾公尺及應在什麼位置左轉或右轉之資訊。路徑表251亦區分為供氣瓶搬送用台車2-1用之路徑表,與供氣瓶搬送用台車2-2用之路徑表。此係因為氣瓶搬送用台車2-1與氣瓶搬送用台車2-2的目的及設置位置不同的緣故。
The route table 251 is a table in which information related to the route that the gas cylinder transport trolley 2 is to take is recorded. The specific structure of the route table 251 is explained using FIG15. FIG15 is a diagram showing an example of the route table 251 of the second embodiment. As shown in FIG15, route information is recorded in the route table 251 corresponding to the route number. The route number is an identification number used to uniquely identify the route. The route is information showing the movement path of the gas cylinder transport trolley 2 when it moves on the floor of the factory. The route includes, for example: the moving path required to go from the storage place of the gas cylinder transport trolley 2 to the specific gas cylinder storage 60; the moving path required to go from the location of the gas cylinder storage 60 to the specific cylinder cabinet 70; the moving path required to go from the location of the cylinder cabinet 70 to the storage place; the moving path required to go from the storage place of the gas cylinder transport trolley 2 to the specific cylinder cabinet 70; the moving path required to go from the location of the cylinder cabinet 70 to the specific gas cylinder storage 60. The moving path also includes information showing how many meters to go straight ahead and where to turn left or right. The path table 251 is also divided into a path table for the gas cylinder transport trolley 2-1 and a path table for the gas cylinder transport trolley 2-2. This is because the purpose and installation location of the gas cylinder transport trolley 2-1 and the gas cylinder transport trolley 2-2 are different.
如上述,路徑表251中登錄有所有想得到的氣瓶搬送用台車2會走的移動路徑。因此,氣瓶搬送用台車2按照與路徑表251的路徑編號建立對應關係的路線所表示的移動路徑移動,就可到達目的的位置。
As described above, all imaginable movement routes that the gas cylinder transport trolley 2 can take are registered in the route table 251 . Therefore, the gas cylinder transport trolley 2 can reach the destination position by moving along the movement path represented by the path associated with the path number in the path table 251 .
回到圖14繼續氣瓶搬送用台車2的說明。
Return to Figure 14 to continue the description of the gas cylinder transport trolley 2.
移動控制部26按照輸入的指示,控制車輪13的轉動來控制氣瓶搬送用台車2的移動。
The movement control unit 26 controls the rotation of the wheels 13 to control the movement of the gas cylinder transporting trolley 2 according to the input instructions.
圖16及圖17係顯示第二實施型態之氣體容器管理系統1a中的空瓶搬出處理的流程之順序圖。所謂的空瓶搬出處理,係指將更換對象氣體容器Be從圓筒櫃70搬出之處理。假設在圖16及圖17的處理開始時,已取得目的地為使用者所選擇的圓筒櫃70之路徑編號。
16 and 17 are sequence diagrams showing the flow of the empty bottle unloading process in the gas container management system 1a according to the second embodiment. The empty bottle unloading process refers to a process of unloading the gas container Be to be replaced from the cylindrical cabinet 70 . It is assumed that at the start of the processing in FIGS. 16 and 17 , the route number whose destination is the cylindrical cabinet 70 selected by the user has been acquired.
操作終端機100的控制部103控制通訊部101,將包含取得的路徑編號之搬出指示發送至管理裝置40a(步驟S301)。管理裝置40a的通訊部41接收從操作終端機100發送來的搬出指示。然後,通訊部41將接收到的搬出指示發送至氣瓶搬送用台車2-1(步驟S302)。
The control unit 103 of the operation terminal 100 controls the communication unit 101 to send the removal instruction including the obtained path number to the management device 40a (step S301). The communication unit 41 of the management device 40a receives the carry-out instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received carry-out instruction to the gas cylinder transport trolley 2-1 (step S302).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的搬出指示。通訊控制部241因為接收到的指示為與搬出有關的資訊,所以將搬出指示輸出至移動控制部26(步驟S303)。
The antenna 16d of the gas cylinder transport trolley 2-1 receives the carry-out instruction transmitted from the management device 40a. Since the received instruction is information related to moving out, the communication control unit 241 outputs the moving out instruction to the movement control unit 26 (step S303).
作業員操作要成為氣體容器B的更換對象之圓筒櫃70而將門開啟。圓筒櫃70按照作業員的操作使門開啟。作業員在門開啟後,將氣體容器B的固定具、接頭、管子類拆除。
The operator operates the cylinder cabinet 70 to be replaced with the gas container B and opens the door. The cylinder cabinet 70 opens the door according to the operator's operation. After the door is opened, the operator removes the fixtures, joints, and pipes of the gas container B.
移動控制部26根據搬出指示及路徑表251,而使氣瓶搬送用台車2-1移動到搬出地點的圓筒櫃70的更換對象氣體容器Be的位置(步驟S304)。具體而言,移動控制部26係參照路徑表251,取得與搬出指示中包含的路徑編號對應的路線的資訊。然後,移動控制部26按照路線的資訊而控制車輪13,使氣瓶搬送用台車2-1移動到搬出地點的圓筒櫃70的更換對象氣體容器Be的位置。
The movement control unit 26 moves the cylinder transport trolley 2-1 to the position of the replacement target gas container Be of the cylinder cabinet 70 at the unloading location according to the unloading instruction and the path table 251 (step S304). Specifically, the movement control unit 26 refers to the path table 251 to obtain the information of the route corresponding to the path number included in the unloading instruction. Then, the movement control unit 26 controls the wheel 13 according to the route information to move the cylinder transport trolley 2-1 to the position of the replacement target gas container Be of the cylinder cabinet 70 at the unloading location.
當移動控制部26使氣瓶搬送用台車2-1移動到搬出地點的圓筒櫃70的更換對象氣體容器Be的位置,就對控制部24通知移動已完成。通訊控制部241將顯示移動已完成之移動完成資訊發送至管理裝置40a(步驟S305)。
When the movement control unit 26 moves the gas cylinder transport trolley 2-1 to the position of the replacement gas container Be of the cylinder cabinet 70 at the unloading location, it notifies the control unit 24 that the movement has been completed. The communication control unit 241 sends the movement completion information indicating that the movement has been completed to the management device 40a (step S305).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-1發送來的移動完成資訊。通訊部41將接收到的移動完成資訊發送至操作終端機100(步驟S306)。
The communication unit 41 of the management device 40a receives the movement completion information sent from the gas cylinder transport trolley 2-1. The communication unit 41 sends the received movement completion information to the operation terminal 100 (step S306).
操作終端機100的通訊部101接收從管理裝置40a發送來的移動完成資訊。控制部103根據通訊部101所接收到的移動完成資訊,詢問使用者是否將氣瓶搬送用台車2-1連接至圓筒櫃70(步驟S307)。具體而言,控制部103係使「要將氣瓶搬送用台車2-1連接至圓筒櫃70?」之顯示予以顯示於顯示部104的畫面上,來詢問使用者是否要將氣瓶搬送用台車2-1連接至圓筒櫃70。
The communication unit 101 of the operation terminal 100 receives the movement completion information transmitted from the management device 40a. The control unit 103 inquires the user whether to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70 based on the movement completion information received by the communication unit 101 (step S307). Specifically, the control unit 103 causes the display unit 104 to display the message "Do you want to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70?" to ask the user whether to transport the gas cylinder. Use the trolley 2-1 to connect to the cylindrical cabinet 70.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將氣瓶搬送用台車2-1連接至圓筒櫃70的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將氣瓶搬送用台車2-1連接至圓筒櫃70的指示。在此情況,控制部103控制通訊部101,將包含顯示要將氣瓶搬送用台車2-1連接至圓筒櫃70的指示之連接指示發送至管理裝置40a(步驟S308)。管理裝置40a的通訊部41接收從操作終端機100發送來的連接指示。然後,通訊部41將接收到的連接指示發送至氣瓶搬送用台車2-1(步驟S309)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When the instruction not to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70 is input, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70. In this case, the control unit 103 controls the communication unit 101 to transmit a connection instruction including an instruction to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70 to the management device 40a (step S308). The communication unit 41 of the management device 40a receives the connection instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received connection instruction to the gas cylinder transport trolley 2-1 (step S309).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的連接指示。通訊控制部241因為接收到的指示是與連接有關的資訊,所以將連接指示輸出至移動控制部26(步驟S310)。移動控制部26控制車輪13,使氣瓶搬送用台車2-1與圓筒櫃70連接起來(步驟S311)。
The antenna 16d of the gas cylinder transport trolley 2-1 receives the connection instruction sent from the management device 40a. Since the received instruction is information related to the connection, the communication control unit 241 outputs the connection instruction to the movement control unit 26 (step S310). The movement control unit 26 controls the wheel 13 to connect the gas cylinder transport trolley 2-1 to the cylinder cabinet 70 (step S311).
圓筒櫃70藉由感測器等而確認已與氣瓶搬送用台車2-1正確連接(步驟S312)。圓筒櫃70在已與氣瓶搬送用台車2-1正確連接之情況,發送顯示連接已完成之連接完成資訊至管理裝置40a(步驟S313)。另一方面,圓筒櫃70在並未與氣瓶搬送用台車2-1正確連接之情況,發送表示連接並未完成之錯誤資訊給管理裝置40a。此處,假設圓筒櫃70與氣瓶搬送用台車2-1已正確連接。
The cylindrical cabinet 70 confirms with a sensor etc. that it is correctly connected to the gas cylinder transport trolley 2-1 (step S312). When the cylindrical cabinet 70 is correctly connected to the gas cylinder transport trolley 2-1, it sends connection completion information indicating that the connection is completed to the management device 40a (step S313). On the other hand, when the cylindrical cabinet 70 is not correctly connected to the gas cylinder transport trolley 2-1, an error message indicating that the connection is not completed is sent to the management device 40a. Here, it is assumed that the cylindrical cabinet 70 and the gas cylinder transport trolley 2-1 are correctly connected.
管理裝置40a的通訊部41接收從圓筒櫃70發送來的連接完成資訊。通訊部41將接收到的連接完成資訊發送至操作終端機100(步驟S314)。
The communication unit 41 of the management device 40a receives the connection completion information sent from the cylinder cabinet 70. The communication unit 41 sends the received connection completion information to the operation terminal 100 (step S314).
操作終端機100的通訊部101接收從管理裝置40a發送來的連接完成資訊。控制部103根據通訊部101所接收到的連接完成資訊,詢問使用者是否將更換對象氣體容器Be從圓筒櫃70搬出(步驟S315)。具體而言,控制部103係使「要將更換對象氣體容器Be從圓筒櫃70搬出?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將更換對象氣體容器Be從圓筒櫃70搬出。
The communication unit 101 of the operating terminal 100 receives the connection completion information sent from the management device 40a. The control unit 103 inquires the user whether to move the replacement target gas container Be out of the cylinder cabinet 70 according to the connection completion information received by the communication unit 101 (step S315). Specifically, the control unit 103 displays the message "Do you want to move the replacement target gas container Be out of the cylinder cabinet 70?" on the screen of the display unit 104 to inquire the user whether to move the replacement target gas container Be out of the cylinder cabinet 70.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將更換對象氣體容器Be從圓筒櫃70搬出的指示之情況,操作終端機100結束處理。此處,假設由使用者輸入為要
將更換對象氣體容器Be從圓筒櫃70搬出的指示。在此情況,控制部103控制通訊部101,將包含顯示要將更換對象氣體容器Be從圓筒櫃70搬出的指示之搬出指示發送至管理裝置40a(步驟S316)。管理裝置40a的通訊部41接收從操作終端機100發送來的搬出指示。然後,通訊部41將接收到的搬出指示發送至氣瓶搬送用台車2-1(步驟S317)。
The user operates the operation unit 102 and inputs an answer to the inquiry displayed on the screen of the display unit 104. When the input is an instruction not to carry out the replacement gas container Be from the cylinder cabinet 70, the operation terminal 100 ends the processing. Here, it is assumed that the user inputs an instruction to carry out the replacement gas container Be from the cylinder cabinet 70. In this case, the control unit 103 controls the communication unit 101 to send a carry-out instruction including an instruction to carry out the replacement gas container Be from the cylinder cabinet 70 to the management device 40a (step S316). The communication unit 41 of the management device 40a receives the carry-out instruction sent from the operation terminal 100. Then, the communication unit 41 sends the received carry-out instruction to the gas cylinder transport trolley 2-1 (step S317).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的搬出指示。通訊控制部241因為接收到的指示為與搬出有關的資訊,所以將搬出指示輸出至搬出入控制部242。搬出入控制部242控制保持機構21及滑動驅動機構22,將更換對象氣體容器Be搬出(步驟S318)。搬出入控制部242在更換對象氣體容器Be的搬出完成時,對通訊控制部241通知更換對象氣體容器Be的搬出已完成。通訊控制部241發送顯示更換對象氣體容器Be的搬出已完成之搬出完成資訊至管理裝置40a(步驟S319)。亦可藉由例如更換對象氣體容器Be已載置在載置部11來判定更換對象氣體容器Be的搬出已完成。
The antenna 16d of the gas cylinder transport trolley 2-1 receives the unloading instruction sent from the management device 40a. Since the received instruction is information related to unloading, the communication control unit 241 outputs the unloading instruction to the unloading control unit 242. The unloading control unit 242 controls the holding mechanism 21 and the sliding drive mechanism 22 to unload the replacement gas container Be (step S318). When the unloading of the replacement gas container Be is completed, the unloading control unit 242 notifies the communication control unit 241 that the unloading of the replacement gas container Be has been completed. The communication control unit 241 sends unloading completion information indicating that the unloading of the replacement gas container Be has been completed to the management device 40a (step S319). It is also possible to determine that the removal of the replacement target gas container Be has been completed by, for example, placing the replacement target gas container Be on the placement section 11.
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-1發送來的搬出完成資訊。通訊部41將接收到的搬出完成資訊發送至操作終端機100(步驟S320)。
The communication unit 41 of the management device 40a receives the unloading completion information sent from the gas cylinder transporting trolley 2-1. The communication unit 41 sends the received unloading completion information to the operation terminal 100 (step S320).
操作終端機100的通訊部101接收從管理裝置40a發送來的搬出完成資訊。控制部103根據通訊部101所接收到的搬出完成資訊,詢問使用者是否要使搬出的更換對象氣體容器Be移動到氣瓶儲存庫60(步驟S321)。具體而言,控制部103係使「是否要使搬出的更換對象氣體容器Be移動
至氣瓶儲存庫60?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要使搬出的更換對象氣體容器Be移動到氣瓶儲存庫60。
The communication unit 101 of the operating terminal 100 receives the removal completion information sent from the management device 40a. The control unit 103 inquires the user whether to move the removed replacement target gas container Be to the gas cylinder storage warehouse 60 (step S321) based on the removal completion information received by the communication unit 101. Specifically, the control unit 103 displays the message "Do you want to move the removed replacement target gas container Be to the gas cylinder storage warehouse 60?" on the screen of the display unit 104, thereby inquiring the user whether to move the removed replacement target gas container Be to the gas cylinder storage warehouse 60.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要使搬出的更換對象氣體容器Be移動到氣瓶儲存庫60的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要使搬出的更換對象氣體容器Be移動到氣瓶儲存庫60的指示。在此情況,控制部103控制通訊部101,向管理裝置40a要求尚有可放置更換對象氣體容器Be的空位之氣瓶儲存庫60的清單。藉由此處理,從管理裝置40a得到尚有可放置更換對象氣體容器Be的空位之氣瓶儲存庫60的清單。控制部103使從管理裝置40a得到的清單顯示於顯示部104的畫面上,藉此讓使用者選擇搬出的更換對象氣體容器Be的搬入目的地之氣瓶儲存庫60。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When an instruction is input not to move the unloaded replacement target gas container Be to the gas cylinder storage 60, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to move the unloaded replacement target gas container Be to the gas cylinder storage 60 . In this case, the control unit 103 controls the communication unit 101 to request the management device 40a for a list of the gas cylinder storage bins 60 that have vacancies in which the replacement target gas container Be can be placed. Through this process, a list of the gas cylinder storage bins 60 that still have vacancies in which the gas container Be to be replaced is obtained from the management device 40a. The control unit 103 displays the list obtained from the management device 40a on the screen of the display unit 104, thereby allowing the user to select the gas cylinder storage 60 as the transport destination of the replacement gas container Be to be moved out.
此處,假設使用者選了搬出的更換對象氣體容器Be的搬入目的地之氣瓶儲存庫60(例如氣瓶儲存庫60-3)。在此情況,控制部103係參照路徑資訊記憶部105,取得與氣瓶搬送用台車2-1的現在位置及屬於目的地之所選擇的氣瓶儲存庫60-3建立對應關係的路徑編號。然後,控制部103控制通訊部101,發送包含取得的路徑編號在內之移動指示給管理裝置40a(步驟S322)。管理裝置40a的通訊部41接收從操作終端機100發送來的移動指示。然後,通訊部41將接收的移動指示發送至氣瓶搬送用台車2-1(步驟S323)。
Here, it is assumed that the user selects the gas cylinder storage 60 (for example, the gas cylinder storage 60 - 3 ) as the import destination of the replacement gas container Be to be moved out. In this case, the control unit 103 refers to the route information storage unit 105 and obtains a route number associated with the current position of the gas bottle transport trolley 2-1 and the selected gas bottle storage 60-3 belonging to the destination. Then, the control unit 103 controls the communication unit 101 to send a movement instruction including the obtained path number to the management device 40a (step S322). The communication unit 41 of the management device 40a receives the movement instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received movement instruction to the gas cylinder transport trolley 2-1 (step S323).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的移動指示。通訊控制部241因為接收到的移動指示為與移動有關的資訊,所以將移動指示輸出至移動控制部26(步驟S324)。
The antenna 16d of the gas cylinder transporting trolley 2-1 receives the movement instruction sent from the management device 40a. Since the received movement instruction is information related to the movement, the communication control unit 241 outputs the movement instruction to the movement control unit 26 (step S324).
移動控制部26根據移動指示及路徑表251而使氣瓶搬送用台車2-1移動到搬入目的地的氣瓶儲存庫60-3的位置(步驟S325)。具體而言,移動控制部26係參照路徑表251,取得與移動指示中包含的路徑編號對應之路線的資訊。然後,移動控制部26根據路線的資訊而控制車輪13,來移動到搬入目的地的氣瓶儲存庫60-3的位置。
The movement control unit 26 moves the gas cylinder transporting trolley 2-1 to the position of the gas cylinder storage warehouse 60-3 at the transport destination according to the movement instruction and the route table 251 (step S325). Specifically, the movement control unit 26 refers to the route table 251 to obtain the information of the route corresponding to the route number included in the movement instruction. Then, the movement control unit 26 controls the wheels 13 according to the route information to move to the position of the gas cylinder storage warehouse 60-3 at the transport destination.
移動控制部26在使氣瓶搬送用台車2-1移動到搬入目的地的氣瓶儲存庫60-3的位置時,通知控制部24移動已完成。通訊控制部241將顯示移動已完成之移動完成資訊發送至管理裝置40a(步驟S326)。
When the movement control unit 26 moves the gas bottle transport trolley 2-1 to the position of the gas cylinder storage warehouse 60-3 of the transport destination, the movement control unit 26 notifies the control unit 24 that the movement is completed. The communication control unit 241 sends the movement completion information indicating that the movement has been completed to the management device 40a (step S326).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-1發送來的移動完成資訊。通訊部41將接收到的移動完成資訊發送至操作終端機100(步驟S327)。
The communication unit 41 of the management device 40a receives the movement completion information sent from the gas cylinder transport trolley 2-1. The communication unit 41 sends the received movement completion information to the operation terminal 100 (step S327).
作業員對於完成了氣體容器B的更換之圓筒櫃70進行操作來使門關閉。圓筒櫃70按照作業員的操作而將門關閉。作業員對於成為更換對象氣體容器Be的搬入目的地之氣瓶儲存庫60-3進行操作來使門開啟。氣瓶儲存庫60-3按照作業員的操作而將門打開。
The operator operates the cylindrical cabinet 70 in which the gas container B has been replaced and closes the door. The door of the cylindrical cabinet 70 is closed according to the operator's operation. The operator opens the door of the gas cylinder storage bin 60-3, which is the destination of the gas container Be to be replaced, by operating the door. The door of the gas cylinder storage 60-3 is opened according to the operator's operation.
操作終端機100的通訊部101接收從管理裝置40a發送來的移動完成資訊。控制部103根據通訊部101所接收到的移動完成資訊,詢問使用者是否要將氣瓶搬送用台車2-1連接至氣瓶儲存庫60-3(步驟S328)。具體而言,控制部103係使「要將氣瓶搬送用台車2-1連接至氣瓶
儲存庫60-3?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將氣瓶搬送用台車2-1連接至氣瓶儲存庫60-3。
The communication unit 101 of the operation terminal 100 receives the movement completion information transmitted from the management device 40a. Based on the movement completion information received by the communication unit 101, the control unit 103 asks the user whether to connect the gas cylinder transport trolley 2-1 to the gas cylinder storage warehouse 60-3 (step S328). Specifically, the control unit 103 controls "to connect the gas cylinder transport trolley 2-1 to the gas cylinder."
Repository 60-3? " is displayed on the screen of the display unit 104, thereby asking the user whether to connect the gas bottle transport trolley 2-1 to the gas bottle storage 60-3.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將氣瓶搬送用台車2-1連接至氣瓶儲存庫60-3的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將氣瓶搬送用台車2-1連接至氣瓶儲存庫60-3的指示。在此情況,控制部103控制通訊部101,將包含顯示要將氣瓶搬送用台車2-1連接至氣瓶儲存庫60-3的指示之連接指示發送至管理裝置40a(步驟S329)。管理裝置40a的通訊部41接收從操作終端機100發送來的連接指示。然後,通訊部41將接收到的連接指示發送至氣瓶搬送用台車2-1(步驟S330)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When an instruction is input not to connect the gas bottle transport trolley 2-1 to the gas bottle storage 60-3, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to connect the gas bottle transport trolley 2-1 to the gas bottle storage 60-3. In this case, the control unit 103 controls the communication unit 101 to send a connection instruction including an instruction to connect the gas bottle transport trolley 2-1 to the gas bottle storage 60-3 to the management device 40a (step S329). The communication unit 41 of the management device 40a receives the connection instruction transmitted from the operation terminal 100. Then, the communication unit 41 sends the received connection instruction to the gas cylinder transport trolley 2-1 (step S330).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的連接指示。通訊控制部241因為接收到的連接指示是與連接有關的資訊,所以將連接指示輸出至移動控制部26(步驟S331)。移動控制部26控制車輪13,使氣瓶搬送用台車2-1與氣瓶儲存庫60-3連接(步驟S332)。
The antenna 16d of the gas cylinder transport trolley 2-1 receives the connection instruction transmitted from the management device 40a. Since the received connection instruction is information related to the connection, the communication control unit 241 outputs the connection instruction to the mobility control unit 26 (step S331). The movement control unit 26 controls the wheels 13 to connect the gas bottle transport trolley 2-1 to the gas bottle storage 60-3 (step S332).
氣瓶儲存庫60-3藉由感測器等而確認已與氣瓶搬送用台車2-1正確連接(步驟S333)。氣瓶儲存庫60-3在已與氣瓶搬送用台車2-1正確連接之情況,發送顯示連接已完成之連接完成資訊至管理裝置40a(步驟S334)。另一方面,氣瓶儲存庫60-3在並未與氣瓶搬送用台車2-1正確連接之情況,發送顯示連接並未完成之錯誤資訊給管理裝置40a。此處,假設氣瓶儲存庫60-3與氣瓶搬送用台車2-1已正確連接上。
The gas cylinder storage warehouse 60-3 confirms that it is correctly connected to the gas cylinder transport trolley 2-1 by means of a sensor or the like (step S333). When the gas cylinder storage warehouse 60-3 is correctly connected to the gas cylinder transport trolley 2-1, it sends connection completion information indicating that the connection is completed to the management device 40a (step S334). On the other hand, when the gas cylinder storage warehouse 60-3 is not correctly connected to the gas cylinder transport trolley 2-1, it sends error information indicating that the connection is not completed to the management device 40a. Here, it is assumed that the gas cylinder storage warehouse 60-3 is correctly connected to the gas cylinder transport trolley 2-1.
管理裝置40a的通訊部41接收從氣瓶儲存庫60-3發送來的連接完成資訊。通訊部41將接收到的連接完成資訊發送至操作終端機100(步驟S335)。
The communication unit 41 of the management device 40a receives the connection completion information transmitted from the gas cylinder storage bank 60-3. The communication unit 41 sends the received connection completion information to the operation terminal 100 (step S335).
操作終端機100的通訊部101接收從管理裝置40a發送來的連接完成資訊。控制部103根據通訊部101所接收到的連接完成資訊,詢問使用者是否要將更換對象氣體容器Be搬入氣瓶儲存庫60-3(步驟S336)。具體而言,控制部103係使「要將更換對象氣體容器Be搬入氣瓶儲存庫60-3?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將更換對象氣體容器Be搬入氣瓶儲存庫60-3。
The communication unit 101 of the operation terminal 100 receives the connection completion information transmitted from the management device 40a. Based on the connection completion information received by the communication unit 101, the control unit 103 asks the user whether to move the replacement gas container Be into the gas cylinder storage 60-3 (step S336). Specifically, the control unit 103 causes the display unit 104 to display the message "Do you want to move the gas container Be to be replaced into the gas cylinder storage 60-3?" to ask the user whether to move the gas container Be to be replaced. The container Be is moved into the gas cylinder storage 60-3.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將更換對象氣體容器Be搬入氣瓶儲存庫60-3的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將更換對象氣體容器Be搬入氣瓶儲存庫60-3的指示。在此情況,控制部103控制通訊部101,將包含要將更換對象氣體容器Be搬入氣瓶儲存庫60-3的指示在內之搬入指示發送至管理裝置40a(步驟S337)。管理裝置40a的通訊部41接收從操作終端機100發送來的搬入指示。然後,通訊部41將接收到的搬入指示發送至氣瓶搬送用台車2-1(步驟S338)。
The user operates the operation unit 102 and inputs an answer to the inquiry displayed on the screen of the display unit 104. In the case where the input is an instruction not to move the replacement gas container Be into the gas cylinder storage warehouse 60-3, the operation terminal 100 ends the processing. Here, it is assumed that the user inputs an instruction to move the replacement gas container Be into the gas cylinder storage warehouse 60-3. In this case, the control unit 103 controls the communication unit 101 to send the move-in instruction including the instruction to move the replacement gas container Be into the gas cylinder storage warehouse 60-3 to the management device 40a (step S337). The communication unit 41 of the management device 40a receives the move-in instruction sent from the operation terminal 100. Then, the communication unit 41 sends the received carrying instruction to the gas cylinder carrying trolley 2-1 (step S338).
氣瓶搬送用台車2-1的天線16d接收從管理裝置40a發送來的搬入指示。通訊控制部241因為接收到的搬入指示是與搬入有關的資訊,所以將搬入指示輸出至搬出入控制部242。搬出入控制部242控制保持機構21及滑動驅動機構22,將更換對象氣體容器Be搬入氣瓶儲存庫60-3(步驟S339)。搬出入控制部242在更換對象氣體容器Be的搬入完成
時,對通訊控制部241通知更換對象氣體容器Be的搬入已完成。通訊控制部241發送顯示更換對象氣體容器Be的搬入已完成之搬入完成資訊至管理裝置40a(步驟S340)。
The antenna 16d of the gas cylinder transport trolley 2-1 receives the carry-in instruction transmitted from the management device 40a. Since the received carry-in instruction is information related to carry-in, the communication control unit 241 outputs the carry-in instruction to the carry-in/out control unit 242 . The loading and unloading control unit 242 controls the holding mechanism 21 and the sliding drive mechanism 22 to carry the gas container Be to be replaced into the gas cylinder storage 60-3 (step S339). The loading/unloading control unit 242 completes loading of the replacement gas container Be.
, the communication control unit 241 is notified that the loading of the replacement gas container Be is completed. The communication control unit 241 sends the import completion information indicating that the import of the replacement gas container Be has been completed to the management device 40a (step S340).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-1發送來的搬入完成資訊。通訊部41將接收到的搬入完成資訊發送至操作終端機100(步驟S341)。
The communication unit 41 of the management device 40a receives the transport completion information sent from the gas cylinder transport trolley 2-1. The communication unit 41 sends the received transport completion information to the operation terminal 100 (step S341).
操作終端機100的通訊部101接收從管理裝置40a發送來的搬入完成資訊。控制部103根據通訊部101所接收到的搬入完成資訊,詢問使用者是否要使作業結束(步驟S342)。具體而言,控制部103係使「是否要使氣瓶搬送用台車2-1回到收容位置?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要使作業結束。
The communication unit 101 of the operation terminal 100 receives the import completion information transmitted from the management device 40a. The control unit 103 inquires the user whether to end the operation based on the import completion information received by the communication unit 101 (step S342). Specifically, the control unit 103 causes the display unit 104 to display a message "Do you want to return the gas cylinder transport trolley 2-1 to the storage position?" on the screen of the display unit 104, thereby asking the user whether to end the operation.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要使作業結束的指示之情況,作業員操作操作終端機100而繼續進行接下來的作業。此處,在使用者輸入為要使作業結束,亦即要使氣瓶搬送用台車2-1回到收容位置的移動指示之情況,氣瓶搬送用台車2-1係按照移動指示而回到收容位置(區域71-1)。
The user operates the operation unit 102 and inputs an answer to the question displayed on the screen of the display unit 104. When the input is an instruction not to terminate the operation, the operator operates the operation terminal 100 to continue the next operation. Here, when the user inputs a movement instruction to terminate the operation, that is, to return the gas cylinder transport trolley 2-1 to the storage position, the gas cylinder transport trolley 2-1 returns to the storage position (area 71-1) according to the movement instruction.
圖18及圖19係顯示第二實施型態之氣體容器管理系統1a中的實瓶搬入處理的流程之順序圖。實瓶搬入處理係將搬入對象氣體容器Bf搬入圓筒櫃70之處理。假設在圖18及圖19的處理開始時,已取得往使用者所選擇的至氣瓶儲存庫60的路徑編號。操作終端機100的控制部103控制通訊部101,將包含取得的路徑編號在內之搬出指示發送至管理裝置40a(步驟S401)。管理裝置40a的通訊部41接收從操作終端機100發
送來的搬出指示。然後,通訊部41將接收到的搬出指示發送至氣瓶搬送用台車2-2(步驟S402)。
18 and 19 are sequence diagrams showing the flow of real bottle loading processing in the gas container management system 1a according to the second embodiment. The real bottle loading process is a process of transporting the gas container Bf to be loaded into the cylindrical cabinet 70 . It is assumed that at the start of the processing of FIGS. 18 and 19 , the path number to the gas cylinder storage 60 selected by the user has been acquired. The control unit 103 of the operation terminal 100 controls the communication unit 101 and sends an unloading instruction including the acquired path number to the management device 40a (step S401). The communication unit 41 of the management device 40a receives the transmission from the operation terminal 100.
Move-out instructions sent. Then, the communication unit 41 transmits the received carry-out instruction to the gas cylinder transport trolley 2-2 (step S402).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的搬出指示。通訊控制部241因為接收到的搬出指示為與搬出有關的資訊,所以將搬出指示輸出至移動控制部26(步驟S403)。
The antenna 16d of the gas cylinder transport trolley 2-2 receives the unloading instruction sent from the management device 40a. Since the received unloading instruction is information related to unloading, the communication control unit 241 outputs the unloading instruction to the movement control unit 26 (step S403).
作業員對於要進行搬出的氣瓶儲存庫60進行操作來使門開啟。氣瓶儲存庫60按照作業員的操作而將門開啟。
The operator operates the gas cylinder storage warehouse 60 to open the door of the gas cylinder storage warehouse 60 to be unloaded. The gas cylinder storage warehouse 60 opens the door according to the operator's operation.
移動控制部26根據搬出指示及路徑表251而使氣瓶搬送用台車2-2移動到搬出目的地的氣瓶儲存庫60的位置(步驟S404)。具體而言,移動控制部26係參照路徑表251,取得與搬出指示中包含的路徑編號對應之路線的資訊。然後,移動控制部26根據路線的資訊而控制車輪13,來使氣瓶搬送用台車2-2移動到搬出目的地的氣瓶儲存庫60的位置。
The movement control unit 26 moves the gas bottle transport trolley 2-2 to the position of the gas bottle storage 60 of the transport destination based on the carry-out instruction and the route table 251 (step S404). Specifically, the movement control unit 26 refers to the route table 251 and obtains information on the route corresponding to the route number included in the move-out instruction. Then, the movement control unit 26 controls the wheels 13 based on the route information to move the gas bottle transport trolley 2-2 to the position of the gas bottle storage 60 of the transfer destination.
移動控制部26在使氣瓶搬送用台車2-2移動到搬出目的地的氣瓶儲存庫60的位置時,通知控制部24移動已完成。通訊控制部241將表示移動已完成之移動完成資訊發送至管理裝置40a(步驟S405)。
When the movement control unit 26 moves the gas cylinder transport trolley 2-2 to the position of the gas cylinder storage warehouse 60 at the destination of the transport, it notifies the control unit 24 that the movement has been completed. The communication control unit 241 sends the movement completion information indicating that the movement has been completed to the management device 40a (step S405).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-2發送來的移動完成資訊。通訊部41將接收到的移動完成資訊發送至操作終端機100(步驟S406)。
The communication unit 41 of the management device 40a receives the movement completion information transmitted from the gas cylinder transport trolley 2-2. The communication unit 41 sends the received movement completion information to the operation terminal 100 (step S406).
操作終端機100的通訊部101接收從管理裝置40a發送來的移動完成資訊。控制部103根據通訊部101所接收到的移動完成資訊,詢問使用者是否要將氣瓶搬送用台車2-2連接至氣瓶儲存庫60(步驟S407)。具體而言,控制部103係使「要將氣瓶搬送用台車2-2連接至氣瓶
儲存庫60?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將氣瓶搬送用台車2-2連接至氣瓶儲存庫60。
The communication unit 101 of the operation terminal 100 receives the movement completion information transmitted from the management device 40a. Based on the movement completion information received by the communication unit 101, the control unit 103 asks the user whether to connect the gas bottle transport trolley 2-2 to the gas bottle storage 60 (step S407). Specifically, the control unit 103 controls "to connect the gas cylinder transport trolley 2-2 to the gas cylinder."
Repository 60? ” is displayed on the screen of the display unit 104 to ask the user whether to connect the gas bottle transport trolley 2-2 to the gas bottle storage 60.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將氣瓶搬送用台車2-2連接至氣瓶儲存庫60的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將氣瓶搬送用台車2-2連接至氣瓶儲存庫60的指示。在此情況,控制部103控制通訊部101,將包含表示要將氣瓶搬送用台車2-2連接至氣瓶儲存庫60的指示在內之連接指示發送至管理裝置40a(步驟S408)。管理裝置40a的通訊部41接收從操作終端機100發送來的連接指示。然後,通訊部41將接收到的連接指示發送至氣瓶搬送用台車2-2(步驟S409)。
The user operates the operation unit 102 and inputs an answer to the inquiry displayed on the screen of the display unit 104. In the case where the input is an instruction not to connect the gas cylinder transport trolley 2-2 to the gas cylinder storage warehouse 60, the operation terminal 100 ends the processing. Here, it is assumed that the user input is an instruction to connect the gas cylinder transport trolley 2-2 to the gas cylinder storage warehouse 60. In this case, the control unit 103 controls the communication unit 101 to send a connection instruction including an instruction to connect the gas cylinder transport trolley 2-2 to the gas cylinder storage warehouse 60 to the management device 40a (step S408). The communication unit 41 of the management device 40a receives the connection instruction sent from the operation terminal 100. Then, the communication unit 41 sends the received connection instruction to the gas cylinder transporting trolley 2-2 (step S409).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的連接指示。通訊控制部241因為接收到的連接指示是與連接有關的資訊,所以將連接指示輸出至移動控制部26(步驟S410)。移動控制部26控制車輪13,使氣瓶搬送用台車2-2與氣瓶儲存庫60連接(步驟S411)。
The antenna 16d of the gas cylinder transport trolley 2-2 receives the connection instruction sent from the management device 40a. Since the received connection instruction is information related to the connection, the communication control unit 241 outputs the connection instruction to the movement control unit 26 (step S410). The movement control unit 26 controls the wheel 13 to connect the gas cylinder transport trolley 2-2 to the gas cylinder storage 60 (step S411).
氣瓶儲存庫60藉由感測器等而確認已與氣瓶搬送用台車2-2正確連接(步驟S412)。氣瓶儲存庫60在已與氣瓶搬送用台車2-2正確連接之情況,發送顯示連接已完成之連接完成資訊至管理裝置40a(步驟S413)。另一方面,氣瓶儲存庫60在並未與氣瓶搬送用台車2-2正確連接之情況,發送顯示連接並未完成之錯誤資訊給管理裝置40a。此處,假設氣瓶儲存庫60與氣瓶搬送用台車2-2已正確連接。
The gas cylinder storage warehouse 60 confirms that it is correctly connected to the gas cylinder transport trolley 2-2 by means of a sensor or the like (step S412). When the gas cylinder storage warehouse 60 is correctly connected to the gas cylinder transport trolley 2-2, it sends connection completion information indicating that the connection is completed to the management device 40a (step S413). On the other hand, when the gas cylinder storage warehouse 60 is not correctly connected to the gas cylinder transport trolley 2-2, it sends error information indicating that the connection is not completed to the management device 40a. Here, it is assumed that the gas cylinder storage warehouse 60 is correctly connected to the gas cylinder transport trolley 2-2.
管理裝置40a的通訊部41接收從氣瓶儲存庫60發送來的連接完成資訊。通訊部41將接收到的連接完成資訊發送至操作終端機100(步驟S414)。
The communication unit 41 of the management device 40a receives the connection completion information transmitted from the gas cylinder storage bank 60. The communication unit 41 sends the received connection completion information to the operation terminal 100 (step S414).
操作終端機100的通訊部101接收從管理裝置40a發送來的連接完成資訊。控制部103根據通訊部101所接收到的連接完成資訊,詢問使用者是否要將氣體容器B從氣瓶儲存庫60搬出(步驟S415)。具體而言,控制部103係使「要將氣體容器B從氣瓶儲存庫60搬出?」之顯示於顯示部104的畫面上顯示,來詢問使用者是否要將搬入對象氣體容器Bf從氣瓶儲存庫60搬出。
The communication unit 101 of the operation terminal 100 receives the connection completion information transmitted from the management device 40a. The control unit 103 inquires the user whether to move the gas container B out of the gas cylinder storage 60 based on the connection completion information received by the communication unit 101 (step S415). Specifically, the control unit 103 causes the display unit 104 to display a message "Do you want to move the gas container B out of the gas cylinder storage 60?" on the screen of the display unit 104, and asks the user whether or not he wants to move the gas container Bf to be moved out of the gas cylinder. Repository 60 is moved out.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將搬入對象氣體容器Bf從氣瓶儲存庫60搬出的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將搬入對象氣體容器Bf從氣瓶儲存庫60搬出的指示。在此情況,控制部103控制通訊部101,將包含要將搬入對象氣體容器Bf從氣瓶儲存庫60搬出的指示在內之搬出指示發送至管理裝置40a(步驟S416)。管理裝置40a的通訊部41接收從操作終端機100發送來的搬出指示。然後,通訊部41將接收到的搬出指示發送至氣瓶搬送用台車2-2(步驟S417)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When the instruction not to carry out the gas container Bf to be carried out from the gas cylinder storage 60 is input, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to carry out the gas container Bf to be carried out from the gas cylinder storage 60 . In this case, the control unit 103 controls the communication unit 101 to transmit a carry-out instruction including an instruction to carry out the gas container Bf to be carried out from the gas cylinder storage 60 to the management device 40a (step S416). The communication unit 41 of the management device 40a receives the carry-out instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received carry-out instruction to the gas cylinder transport trolley 2-2 (step S417).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的搬出指示。通訊控制部241因為接收到的搬出指示是與搬出有關的資訊,所以將搬出指示輸出至搬出入控制部242。搬出入控制部242控制保持機構21及滑動驅動機構22,將搬入對象氣體容器Bf從氣瓶儲存庫60搬出(步驟S418)。搬出入控制部242在搬入對象氣體容器Bf的搬出完成
時,對通訊控制部241通知搬入對象氣體容器Bf的搬出已完成。通訊控制部241發送顯示搬入對象氣體容器Bf的搬出已完成之搬出完成資訊至管理裝置40a(步驟S419)。亦可藉由例如搬入對象氣體容器Bf已載置在載置部11來判定搬入對象氣體容器Bf的搬出已完成。
The antenna 16d of the gas cylinder transport trolley 2-2 receives the carry-out instruction transmitted from the management device 40a. The communication control unit 241 outputs the carry-out instruction to the carry-out control unit 242 because the received carry-out instruction is information related to carry-out. The carry-in/out control unit 242 controls the holding mechanism 21 and the slide drive mechanism 22 to carry out the gas container Bf to be carried in from the gas cylinder storage 60 (step S418). The carry-in and carry-out control unit 242 completes the carry-out of the gas container Bf to be carried in.
, the communication control unit 241 is notified that the unloading of the gas container Bf to be loaded is completed. The communication control unit 241 transmits unloading completion information indicating that the unloading of the target gas container Bf has been completed to the management device 40a (step S419). It can also be determined that the unloading of the gas container Bf to be carried is completed by, for example, the gas container Bf to be carried being placed on the placement section 11 .
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-2發送來的搬出完成資訊。通訊部41將接收到的搬出完成資訊發送至操作終端機100(步驟S420)。
The communication unit 41 of the management device 40a receives the carry-out completion information transmitted from the gas cylinder transport trolley 2-2. The communication unit 41 sends the received unloading completion information to the operation terminal 100 (step S420).
操作終端機100的通訊部101接收從管理裝置40a發送來的搬出完成資訊。控制部103根據通訊部101所接收到的搬出完成資訊,詢問使用者是否要使搬出的搬入對象氣體容器Bf移動至圓筒櫃70(步驟S421)。具體而言,控制部103係使「是否要使搬出的搬入對象氣體容器Bf移動至圓筒櫃70?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要使搬出的搬入對象氣體容器Bf移動至圓筒櫃70。
The communication unit 101 of the operation terminal 100 receives the carry-out completion information transmitted from the management device 40a. Based on the carry-out completion information received by the communication unit 101, the control unit 103 asks the user whether to move the unloaded gas container Bf to be carried out to the cylindrical cabinet 70 (step S421). Specifically, the control unit 103 causes the display unit 104 to display a message "Do you want the gas container Bf to be moved out to be moved to the cylindrical cabinet 70?" to ask the user whether to move the gas container Bf to be moved out. The gas container Bf to be carried in is moved to the cylindrical cabinet 70 .
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要使搬出的搬入對象氣體容器Bf移動至圓筒櫃70的指示之情況,操作終端機100使處理結束。此處,假設使用者輸入為要使搬出的搬入對象氣體容器Bf移動至圓筒櫃70的指示。在此情況,控制部103控制通訊部101,向管理裝置40a要求尚有可放置搬入對象氣體容器Bf的空位之圓筒櫃70的清單。藉由此處理,從管理裝置40a得到尚有可放置搬入對象氣體容器Bf的空位之圓筒櫃70的清單。控制部103使從管理裝置40a得到的清單顯示於顯示部104的畫面上,藉此讓使用者選擇搬出的搬入對象氣體容器Bf的搬入目的地之圓筒櫃70。
The user operates the operation unit 102 and inputs an answer to the inquiry displayed on the screen of the display unit 104. In the case where the input is an instruction not to move the unloaded import gas container Bf to the cylinder cabinet 70, the terminal 100 is operated to end the processing. Here, it is assumed that the user inputs an instruction to move the unloaded import gas container Bf to the cylinder cabinet 70. In this case, the control unit 103 controls the communication unit 101 to request the management device 40a for a list of cylinder cabinets 70 that still have vacancies for placing the import gas container Bf. Through this processing, a list of cylinder cabinets 70 that still have vacancies for placing the import gas container Bf is obtained from the management device 40a. The control unit 103 displays the list obtained from the management device 40a on the screen of the display unit 104, thereby allowing the user to select the cylinder cabinet 70 as the destination for the transported gas container Bf to be transported out.
此處,假設使用者選了搬出的搬入對象氣體容器Bf的搬入目的地之圓筒櫃70。在此情況,控制部103係參照路徑資訊記憶部105,取得與氣瓶搬送用台車2-2的現在位置及屬於目的地之所選擇的圓筒櫃70建立對應關係的路徑編號。然後,控制部103控制通訊部101,發送包含取得的路徑編號在內之移動指示至管理裝置40a(步驟S422)。管理裝置40a的通訊部41接收從操作終端機100發送來的移動指示。然後,通訊部41將接收的移動指示發送至氣瓶搬送用台車2-2(步驟S423)。
Here, it is assumed that the user selects the cylindrical cabinet 70 as the destination of the gas container Bf to be moved out. In this case, the control unit 103 refers to the route information storage unit 105 and obtains a route number associated with the current position of the gas cylinder transport trolley 2-2 and the selected cylindrical cabinet 70 belonging to the destination. Then, the control unit 103 controls the communication unit 101 to send a movement instruction including the obtained path number to the management device 40a (step S422). The communication unit 41 of the management device 40a receives the movement instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received movement instruction to the gas cylinder transport trolley 2-2 (step S423).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的移動指示。通訊控制部241因為接收到的移動指示為與移動有關的資訊,所以將移動指示輸出至移動控制部26(步驟S424)。
The antenna 16d of the gas cylinder transporting trolley 2-2 receives the movement instruction sent from the management device 40a. Since the received movement instruction is information related to the movement, the communication control unit 241 outputs the movement instruction to the movement control unit 26 (step S424).
移動控制部26根據移動指示及路徑表251而使氣瓶搬送用台車2-2移動到搬入目的地的圓筒櫃70的位置(步驟S425)。具體而言,移動控制部26係參照路徑表251,取得與移動指示中包含的路徑編號對應之路線的資訊。然後,移動控制部26根據路線的資訊而控制車輪13,來移動到搬入目的地的圓筒櫃70的位置。
The movement control unit 26 moves the cylinder transporting trolley 2-2 to the position of the cylinder cabinet 70 at the transport destination according to the movement instruction and the path table 251 (step S425). Specifically, the movement control unit 26 refers to the path table 251 to obtain the information of the route corresponding to the path number included in the movement instruction. Then, the movement control unit 26 controls the wheels 13 according to the route information to move to the position of the cylinder cabinet 70 at the transport destination.
移動控制部26在使氣瓶搬送用台車2-2移動到要進行搬入的圓筒櫃70的位置時,對控制部24通知移動已完成。通訊控制部241將顯示移動已完成之移動完成資訊發送至管理裝置40a(步驟S426)。
When the movement control unit 26 moves the gas cylinder transport trolley 2-2 to the position of the cylinder cabinet 70 to be transported, it notifies the control unit 24 that the movement has been completed. The communication control unit 241 sends the movement completion information indicating that the movement has been completed to the management device 40a (step S426).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-2發送來的移動完成資訊。通訊部41將接收到的移動完成資訊發送至操作終端機100(步驟S427)。
The communication unit 41 of the management device 40a receives the movement completion information transmitted from the gas cylinder transport trolley 2-2. The communication unit 41 sends the received movement completion information to the operation terminal 100 (step S427).
作業員對於完成了搬入對象氣體容器Bf的搬出之氣瓶儲存庫60進行操作來使門關閉。氣瓶儲存庫60按照作業員的操作而將門關閉。作業員對於成為搬入對象氣體容器Bf的搬入目的地之圓筒櫃70進行操作來使門開啟。圓筒櫃70按照作業員的操作而將門開啟。
The operator operates the cylinder storage warehouse 60 that has completed the unloading of the target gas container Bf to close the door. The cylinder storage warehouse 60 closes the door according to the operator's operation. The operator operates the cylinder cabinet 70 that is the destination of the target gas container Bf to open the door. The cylinder cabinet 70 opens the door according to the operator's operation.
操作終端機100的通訊部101接收從管理裝置40a發送來的移動完成資訊。控制部103根據通訊部101所接收到的移動完成資訊,詢問使用者是否將氣瓶搬送用台車2-2連接至圓筒櫃70(步驟S428)。具體而言,控制部103係使「要將氣瓶搬送用台車2-1連接至圓筒櫃70?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將氣瓶搬送用台車2-2連接至圓筒櫃70。
The communication unit 101 of the operation terminal 100 receives the movement completion information transmitted from the management device 40a. The control unit 103 inquires the user whether to connect the gas cylinder transport trolley 2-2 to the cylindrical cabinet 70 based on the movement completion information received by the communication unit 101 (step S428). Specifically, the control unit 103 causes the display unit 104 to display the message "Do you want to connect the gas cylinder transport trolley 2-1 to the cylindrical cabinet 70?" to ask the user whether to connect the gas cylinder to the cylindrical cabinet 70. The transport trolley 2-2 is connected to the cylindrical cabinet 70.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將氣瓶搬送用台車2-2連接至圓筒櫃70的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將氣瓶搬送用台車2-2連接至圓筒櫃70的指示。在此情況,控制部103控制通訊部101,將要將氣瓶搬送用台車2-2連接至圓筒櫃70的指示之連接指示發送至管理裝置40a(步驟S429)。管理裝置40a的通訊部41接收從操作終端機100發送來的連接指示。然後,通訊部41將接收到的連接指示發送至氣瓶搬送用台車2-2(步驟S430)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When the instruction not to connect the gas cylinder transport trolley 2-2 to the cylindrical cabinet 70 is input, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to connect the gas cylinder transport trolley 2-2 to the cylindrical cabinet 70. In this case, the control unit 103 controls the communication unit 101 to transmit a connection instruction instructing to connect the gas cylinder transport trolley 2-2 to the cylindrical cabinet 70 to the management device 40a (step S429). The communication unit 41 of the management device 40a receives the connection instruction transmitted from the operation terminal 100. Then, the communication unit 41 transmits the received connection instruction to the gas cylinder transport trolley 2-2 (step S430).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的連接指示。通訊控制部241因為接收到的連接指示是與連接有關的資訊,所以將連接指示輸出至移動控制部26(步驟S431)。移動控制部26控制車輪13,使氣瓶搬送用台車2-2與圓筒櫃70連接(步驟S432)。
The antenna 16d of the gas cylinder transport trolley 2-2 receives the connection instruction transmitted from the management device 40a. Since the received connection instruction is information related to the connection, the communication control unit 241 outputs the connection instruction to the mobility control unit 26 (step S431). The movement control unit 26 controls the wheels 13 to connect the gas cylinder transport trolley 2-2 to the cylindrical cabinet 70 (step S432).
圓筒櫃70藉由感測器等而確認已與氣瓶搬送用台車2-2正確連接(步驟S433)。圓筒櫃70在已與氣瓶搬送用台車2-2正確連接上之情況,發送顯示連接已完成之連接完成資訊至管理裝置40a(步驟S434)。另一方面,圓筒櫃70在並未與氣瓶搬送用台車2-2正確連接之情況,發送顯示連接並未完成之錯誤資訊給管理裝置40a。此處,假設圓筒櫃70與氣瓶搬送用台車2-2已正確連接。
The cylinder cabinet 70 confirms that it is correctly connected to the cylinder transport trolley 2-2 by means of a sensor or the like (step S433). When the cylinder cabinet 70 is correctly connected to the cylinder transport trolley 2-2, it sends connection completion information indicating that the connection is completed to the management device 40a (step S434). On the other hand, when the cylinder cabinet 70 is not correctly connected to the cylinder transport trolley 2-2, it sends error information indicating that the connection is not completed to the management device 40a. Here, it is assumed that the cylinder cabinet 70 is correctly connected to the cylinder transport trolley 2-2.
管理裝置40a的通訊部41接收從圓筒櫃70發送來的連接完成資訊。通訊部41將接收到的連接完成資訊發送至操作終端機100(步驟S435)。
The communication unit 41 of the management device 40a receives the connection completion information transmitted from the cylindrical cabinet 70. The communication unit 41 sends the received connection completion information to the operation terminal 100 (step S435).
操作終端機100的通訊部101接收從管理裝置40a發送來的連接完成資訊。控制部103根據通訊部101所接收到的連接完成資訊,詢問使用者是否要將搬入對象氣體容器Bf搬入圓筒櫃70(步驟S436)。具體而言,控制部103係使「要將搬入對象氣體容器Bf搬入圓筒櫃70?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要將搬入對象氣體容器Bf搬入圓筒櫃70。
The communication unit 101 of the operation terminal 100 receives the connection completion information transmitted from the management device 40a. Based on the connection completion information received by the communication unit 101, the control unit 103 asks the user whether to move the gas container Bf to be moved into the cylindrical cabinet 70 (step S436). Specifically, the control unit 103 causes the display unit 104 to display the message "Do you want to move the gas container Bf to be moved into the cylindrical cabinet 70?" to ask the user whether to move the gas container Bf to be moved in. Cylindrical cabinet 70.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要將搬入對象氣體容器Bf搬入圓筒櫃70的指示之情況,操作終端機100結束處理。此處,假設使用者輸入為要將搬入對象氣體容器Bf搬入圓筒櫃70的指示。在此情況,控制部103控制通訊部101,將包含要將搬入對象氣體容器Bf搬入圓筒櫃70的指示之搬入指示發送至管理裝置40a(步驟S437)。管理裝置40a的通訊部41接收從操
作終端機100發送來的搬入指示。然後,通訊部41將接收到的搬入指示發送至氣瓶搬送用台車2-2(步驟S438)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When the instruction not to carry the gas container Bf to be carried into the cylindrical cabinet 70 is input, the operation terminal 100 ends the process. Here, it is assumed that the user inputs an instruction to carry the gas container Bf to be carried into the cylindrical cabinet 70 . In this case, the control unit 103 controls the communication unit 101 to transmit a carry-in instruction including an instruction to carry the gas container Bf to be carried into the cylindrical cabinet 70 to the management device 40a (step S437). The communication unit 41 of the management device 40a receives the slave operation
The move-in instruction sent from the terminal 100 is processed. Then, the communication unit 41 transmits the received import instruction to the gas cylinder transport trolley 2-2 (step S438).
氣瓶搬送用台車2-2的天線16d接收從管理裝置40a發送來的搬入指示。通訊控制部241因為接收到的搬入指示是與搬入有關的資訊,所以將搬入指示輸出至搬出入控制部242。搬出入控制部242控制保持機構21及滑動驅動機構22,將搬入對象氣體容器Bf搬入圓筒櫃70(步驟S439)。搬出入控制部242在搬入對象氣體容器Bf的搬入完成時,對通訊控制部241通知搬入對象氣體容器Bf的搬入已完成。通訊控制部241發送顯示搬入對象氣體容器Bf的搬入已完成之搬入完成資訊至管理裝置40a(步驟S44)。
The antenna 16d of the gas cylinder transport trolley 2-2 receives the carry-in instruction sent from the management device 40a. Since the received carry-in instruction is information related to the carry-in, the communication control unit 241 outputs the carry-in instruction to the carry-in control unit 242. The carry-in control unit 242 controls the holding mechanism 21 and the sliding drive mechanism 22 to carry the gas container Bf to be carried into the cylinder cabinet 70 (step S439). When the carry-in of the gas container Bf to be carried in is completed, the carry-in control unit 242 notifies the communication control unit 241 that the carry-in of the gas container Bf to be carried in is completed. The communication control unit 241 sends the carry-in completion information indicating that the carry-in of the gas container Bf to be carried in is completed to the management device 40a (step S44).
管理裝置40a的通訊部41接收從氣瓶搬送用台車2-2發送來的搬入完成資訊。通訊部41將接收到的搬入完成資訊發送至操作終端機100(步驟S441)。
The communication unit 41 of the management device 40a receives the transport completion information sent from the gas cylinder transport trolley 2-2. The communication unit 41 sends the received transport completion information to the operation terminal 100 (step S441).
操作終端機100的通訊部101接收從管理裝置40a發送來的搬入完成資訊。控制部103根據通訊部101所接收到的搬入完成資訊,詢問使用者是否要使作業結束(步驟S442)。具體而言,控制部103係使「是否要使氣瓶搬送用台車2-2回到收容位置?」之顯示於顯示部104的畫面上顯示,藉此來詢問使用者是否要使作業結束。
The communication unit 101 of the operation terminal 100 receives the transport completion information sent from the management device 40a. The control unit 103 asks the user whether to end the operation based on the transport completion information received by the communication unit 101 (step S442). Specifically, the control unit 103 displays the message "Do you want to return the gas cylinder transport trolley 2-2 to the storage position?" on the screen of the display unit 104 to ask the user whether to end the operation.
使用者操作操作部102而輸入對於顯示部104的畫面上顯示的詢問之回答。在輸入為不要使作業結束的指示之情況,作業員操作操作終端機100而繼續進行接下來的作業。此處,在使用者輸入為要使作業
結束,亦即要使氣瓶搬送用台車2-2回到收容位置的移動指示之情況,氣瓶搬送用台車2-2係按照移動指示而移動至收容位置(區域71-2)。
The user operates the operation unit 102 to input a response to the question displayed on the screen of the display unit 104 . When an instruction is input not to end the work, the operator operates the operation terminal 100 to continue the next work. Here, after the user input is to make the operation
When the movement instruction is completed, that is, the gas bottle transportation trolley 2-2 is returned to the storage position, the gas bottle transportation trolley 2-2 moves to the storage position (area 71-2) in accordance with the movement instruction.
根據如以上構成的第二實施型態之氣體容器管理系統1a,可得到與第一實施型態一樣的效果。
According to the gas container management system 1a of the second embodiment configured as above, the same effects as those of the first embodiment can be obtained.
而且,氣體容器管理系統1a係具備有:控制搬送用台車(氣瓶搬送用台車2)的動作之控制裝置(操作終端機100、管理裝置40a);以及按照控制裝置的控制指示,搬送氣體容器B,而在載置氣體容器B之載置部11與氣體容器B的搬入或搬出的目的地之間一邊使氣體容器B滑動,而一邊自動進行氣體容器B的搬出及搬入之搬送用台車。藉此,搬送用台車會按照控制裝置的指示而自動進行氣體容器B的搬送、搬出、搬入。因此,使用者只要操作控制裝置將指示傳送到搬送用台車即可,無須將氣體容器B運送至搬出目的地或搬入目的地。因而,可容易地進行氣體容器B的搬送、搬出、搬入。
Furthermore, the gas container management system 1a is provided with: a control device (operating terminal 100, management device 40a) for controlling the movement of the transport trolley (gas cylinder transport trolley 2); and a transport trolley for transporting the gas container B according to the control instructions of the control device, while sliding the gas container B between the loading portion 11 for carrying the gas container B and the destination of the gas container B to be loaded or unloaded, and automatically carrying out and loading the gas container B. Thus, the transport trolley automatically carries out the transport, unloading, and loading of the gas container B according to the instructions of the control device. Therefore, the user only needs to operate the control device to transmit the instructions to the transport trolley, and there is no need to transport the gas container B to the unloading destination or the loading destination. Therefore, the transport, unloading, and loading of the gas container B can be easily performed.
(第二實施型態的變形例)
(Modification of the second embodiment)
操作終端機100及氣瓶搬送用台車2亦可構成為不經由管理裝置40a而直接進行通訊之構成。操作終端機100及圓筒櫃70亦可構成為不經由管理裝置40a而直接進行通訊之構成。操作終端機100及氣瓶儲存庫60亦可構成為不經由管理裝置40a而直接進行通訊之構成。
The operation terminal 100 and the gas cylinder transport trolley 2 may be configured to communicate directly without going through the management device 40a. The operation terminal 100 and the cylindrical cabinet 70 may be configured to communicate directly without going through the management device 40a. The operation terminal 100 and the gas cylinder storage 60 may be configured to communicate directly without going through the management device 40a.
在上述的實施型態中,雖顯示作業員操作操作終端機100,而控制氣瓶搬送用台車2進行的搬送、搬出及搬入之構成,但亦可構成為作業員操作管理裝置40a而控制氣瓶搬送用台車2進行的搬送、搬出及搬入之構成。
在此情況,管理裝置40a係與操作終端機100同樣具備有路徑資訊記憶部105。
In the above-described embodiment, the operator operates the terminal 100 to control the transportation, unloading and loading of the gas cylinder transportation trolley 2. However, the operator may also be configured to operate the management device 40a to control the gas cylinder transportation. The bottle transport trolley 2 is used for transporting, unloading and loading.
In this case, the management device 40a is equipped with the route information storage unit 105 like the operation terminal 100.
路徑資訊記憶部105可配備於操作終端機100之外。例如,路徑資訊記憶部105可配備於管理裝置40a。在此情況,操作終端機100可不具備路徑資訊記憶部105。而且,從記憶有路徑資訊記憶部105之裝置發送指示訊號至氣瓶搬送用台車2。舉一例來進行說明。假設使用者在操作終端機100上顯示的區域之中選擇了搬出目的地的更換對象氣體容器Be。在此情況,控制部103控制通訊部101,使之將以所選的更換對象氣體容器Be為目的地之指示資訊發送至管理裝置40a。通訊部101按照控制部103的控制,將以所選的更換對象氣體容器Be為目的地之指示資訊發送至管理裝置40a。管理裝置40a的通訊部41接收從操作終端機100發送來的指示資訊。控制部45參照路徑資訊記憶部105,取得從氣瓶搬送用台車2的現在位置到指示資訊中包含的更換對象氣體容器Be的路徑編號。然後,通訊部41將包含取得的路徑編號在內之指示發送至氣瓶搬送用台車2。
The path information storage unit 105 may be provided outside the operating terminal 100. For example, the path information storage unit 105 may be provided in the management device 40a. In this case, the operating terminal 100 may not have the path information storage unit 105. Moreover, an instruction signal is sent from the device storing the path information storage unit 105 to the gas cylinder transporting trolley 2. Let's take an example to illustrate. Assume that the user selects a replacement object gas container Be as the transport destination from the area displayed on the operating terminal 100. In this case, the control unit 103 controls the communication unit 101 to send the instruction information with the selected replacement object gas container Be as the destination to the management device 40a. The communication unit 101 sends the instruction information with the selected replacement target gas container Be as the destination to the management device 40a according to the control of the control unit 103. The communication unit 41 of the management device 40a receives the instruction information sent from the operation terminal 100. The control unit 45 refers to the path information storage unit 105 to obtain the path number from the current position of the gas cylinder transport trolley 2 to the replacement target gas container Be included in the instruction information. Then, the communication unit 41 sends the instruction including the obtained path number to the gas cylinder transport trolley 2.
氣瓶儲存庫60及圓筒櫃70可按照從氣瓶搬送用台車2發送來的資訊而自動開閉。例如,氣瓶儲存庫60及圓筒櫃70在從氣瓶搬送用台車2接收到表示要將門開啟的訊號之情況,自動地將門開啟。例如,氣瓶儲存庫60及圓筒櫃70在從氣瓶搬送用台車2接收到表示要將門關閉的訊號之情況,自動地將門關閉。如此的控制可藉由氣瓶儲存庫60及圓筒櫃70所具備的控制盒而實現。
The gas bottle storage 60 and the cylindrical cabinet 70 can be automatically opened and closed based on information sent from the gas bottle transport trolley 2 . For example, the gas bottle storage 60 and the cylindrical cabinet 70 automatically open the doors when receiving a signal indicating that the doors are to be opened from the gas bottle transport trolley 2 . For example, the gas bottle storage 60 and the cylindrical cabinet 70 automatically close the doors when receiving a signal indicating that the doors are to be closed from the gas bottle transport trolley 2 . Such control can be realized by the control box provided in the gas cylinder storage warehouse 60 and the cylindrical cabinet 70 .
(第三實施型態)
(Third implementation form)
氣體容器B從訂貨到交貨需要一定的期間(交貨期間)。因此,設想在填充於氣體容器B的氣體的殘餘量低於閾值才訂貨的情況,會有新的氣體容器B交貨之前庫存不足之情形。因此,在第三實施型態中,將針對除了上述的構成之外,更根據氣體容器B的消耗趨勢而進行適當的庫存管理之構成進行說明。基本的系統構成都與第一實施型態或第二實施型態一樣。與第一實施型態及第二實施型態的不同點在於管理裝置的構成。因此,以下的說明將只針對不同點進行說明。
Gas container B requires a certain period of time from ordering to delivery (delivery period). Therefore, assuming that the order is placed when the remaining amount of gas filled in the gas container B is lower than the threshold value, there may be a situation where the inventory of the new gas container B is insufficient before delivery. Therefore, in the third embodiment, in addition to the above-described configuration, a configuration that performs appropriate inventory management based on the consumption trend of the gas container B will be described. The basic system configuration is the same as that of the first implementation type or the second implementation type. The difference from the first embodiment and the second embodiment lies in the structure of the management device. Therefore, the following description will only focus on the differences.
圖20係表示第三實施型態之管理裝置40b的功能構成之概略方塊圖。管理裝置40b具備有藉由匯流排而相連接的CPU及記憶體及輔助記憶裝置等,執行控制程式。藉由控制程式之執行,管理裝置40b係作為具備通訊部41、操作部42、記憶部43b、顯示部44、控制部45b的裝置而發揮功能。另外,管理裝置40b的各功能的全部或一部分,亦可利用ASIC或PLD或FPGA等之硬體而實現。控制程式可記錄於電腦可讀取的記錄媒體。電腦可讀取的記錄媒體為例如軟碟、磁光碟、ROM、CD-ROM等之可攜式媒體、內建於電腦系統之硬碟等的記憶裝置。控制程式亦可經由電信線路而接收或發送。
FIG. 20 is a schematic block diagram showing the functional configuration of the management device 40b of the third embodiment. The management device 40b has a CPU, a memory, and an auxiliary memory device connected by a bus, and executes a control program. By executing the control program, the management device 40b functions as a device having a communication unit 41, an operation unit 42, a memory unit 43b, a display unit 44, and a control unit 45b. In addition, all or part of the functions of the management device 40b can also be realized by hardware such as ASIC, PLD, or FPGA. The control program can be recorded in a computer-readable recording medium. Computer-readable recording media include portable media such as floppy disks, magneto-optical disks, ROMs, CD-ROMs, and memory devices such as hard disks built into computer systems. Control programs can also be received or sent via telecommunications lines.
記憶部43b係記憶容器表431、管理表432、氣體利用資訊434及預測模型435。氣體利用資訊434為顯示在圓筒櫃70的使用中的各氣體種別的每個氣體容器B的各日數的殘餘量之資訊。
The memory unit 43b stores the container table 431, the management table 432, the gas utilization information 434, and the prediction model 435. The gas utilization information 434 is information showing the residual quantity of each gas container B of each gas type in use in the cylinder cabinet 70 for each day.
預測模型435係以根據氣體利用資訊434而輸出氣體容器B中填充的氣體的量將變為低於閾值的推估日之方式進行學習而得之模型。預測模型435係按每個氣體種別而記憶於記憶部43b。
The prediction model 435 is a model learned so as to output an estimated day when the amount of gas filled in the gas container B will become lower than a threshold based on the gas utilization information 434 . The prediction model 435 is stored in the memory unit 43b for each gas type.
控制部45b係控制管理裝置40b的動作。控制部45b根據預測模型435所做的氣體的消耗預測、氣體容器B的庫存資訊、氣體容器B到貨所需的期間而判定是否滿足氣體訂貨條件,且在滿足氣體訂貨條件之情況輸出催促進行氣體容器B的訂貨之資訊。氣體容器B的庫存資訊可根據容器表431而算出。例如,控制部45b可將容器表431中登錄的氣體容器B之中未使用的氣體容器B當作是氣體容器B的庫存數而算出。控制部45b可例如將容器表431中登錄的氣體容器B之中收納於氣瓶儲存庫60的氣體容器B判定成是未使用的。氣體訂貨條件係用來判斷是否必須進行氣體容器B的訂貨之條件,例如為根據氣體的消耗預測而推估出的日期(以下稱為「推估日」)的氣體容器B的庫存為低於閾值。另外,在運用上,以滿足上述的條件,並且氣體容器B可在推估日之前交貨者為佳。控制部45b係根據氣體利用資訊434而進行預測模型435的學習。
The control unit 45b controls the operation of the management device 40b. The control unit 45b determines whether the gas ordering conditions are met based on the gas consumption forecast made by the forecast model 435, the inventory information of the gas container B, and the period required for the gas container B to arrive, and outputs information urging the order of the gas container B if the gas ordering conditions are met. The inventory information of the gas container B can be calculated based on the container table 431. For example, the control unit 45b can calculate the unused gas containers B among the gas containers B registered in the container table 431 as the inventory number of the gas containers B. The control unit 45b can, for example, determine that the gas containers B stored in the gas cylinder storage warehouse 60 among the gas containers B registered in the container table 431 are unused. The gas ordering condition is used to determine whether the gas container B must be ordered, for example, the inventory of gas container B on the date estimated based on the gas consumption forecast (hereinafter referred to as the "estimated date") is lower than the threshold. In addition, in terms of application, it is better to meet the above conditions and deliver the gas container B before the estimated date. The control unit 45b learns the prediction model 435 based on the gas utilization information 434.
圖21係顯示第三實施型態之管理裝置40b進行的訂貨處理的流程之流程圖。訂貨處理係進行氣體容器B的訂貨之處理。圖21的處理係以預定的時序執行。例如,圖21的處理可在預定的時點執行,亦可在使用者下達指示的時點執行。
FIG. 21 is a flowchart showing the flow of order processing performed by the management device 40b of the third embodiment. The order processing is a process for placing an order for the gas container B. The processing of Fig. 21 is executed in predetermined timing. For example, the processing in FIG. 21 may be executed at a predetermined time point, or may be executed at a time point when the user issues an instruction.
控制部45b選擇一種氣體種類(步驟S501)。例如,在使用者下達指示之情況,控制部45b選擇使用者所選擇的氣體種類。於使用者選擇複數種氣體種類之情況,控制部45b隨機選擇一種氣體種類。另外,當在預定的時點進行之情況,控制部45b係隨機選擇一種氣體種類。
The control unit 45b selects a gas type (step S501). For example, when the user issues an instruction, the control unit 45b selects the gas type selected by the user. When the user selects multiple gas types, the control unit 45b randomly selects a gas type. In addition, when it is performed at a predetermined time point, the control unit 45b randomly selects a gas type.
控制部45b從記憶部43b取得與所選擇的氣體種類對應之氣體利用資訊434及預測模型435。然後,控制部45b將取得的氣體利用
資訊434輸入預測模型435來取得推估日(步驟S502)。控制部45b從容器表431取得與所選擇的氣體種類對應的氣體容器B的庫存資訊(步驟S503)。而且,控制部45b取得與所選擇的氣體種類對應之氣體容器B的交貨期資訊(步驟S504)。與氣體種類對應之氣體容器B的交貨期資訊可預先記憶於管理裝置40b中,亦可包含在從通訊裝置30發送來的必須資訊中。
The control unit 45b acquires the gas utilization information 434 and the prediction model 435 corresponding to the selected gas type from the storage unit 43b. Then, the control unit 45b uses the obtained gas
The information 434 is input into the prediction model 435 to obtain the estimated date (step S502). The control unit 45b acquires the inventory information of the gas container B corresponding to the selected gas type from the container table 431 (step S503). Furthermore, the control unit 45b acquires the delivery date information of the gas container B corresponding to the selected gas type (step S504). The delivery date information of the gas container B corresponding to the gas type may be stored in the management device 40b in advance, or may be included in the necessary information sent from the communication device 30.
控制部45b根據取得的氣體的消耗預測、氣體容器B的庫存資訊及氣體容器B到貨所需的期間來判定是否滿足氣體訂貨條件(步驟S505)。若滿足氣體訂貨條件(步驟S505的結果為“是”),則控制部45b於顯示部44顯示催促進行氣體容器B的訂貨之資訊(步驟S506)。此時,控制部45b係除了是否要訂貨之外,亦可於顯示部44顯示包含氣體容器B的庫存數、庫存數再多少天會低於閾值等之資訊,作為催促進行氣體容器B的訂貨之資訊。控制部45b判定是否有表示需要訂貨之輸入(步驟S507)。若有表示需要訂貨之輸入(步驟S507的結果為“是”),則控制部45b進行該氣體容器B之訂貨(步驟S508)。控制部45b判定是否滿足結束條件(步驟S509)。結束條件係要使訂貨處理結束所需的條件,可為例如使用者輸入了結束訂貨之指示,亦可為針對所有氣體種類都進行了氣體訂貨條件的判定,或為進行了預定次數的氣體訂貨條件的判定。
The control unit 45b determines whether the gas order condition is satisfied based on the obtained gas consumption forecast, the inventory information of the gas container B, and the period required for the arrival of the gas container B (step S505). If the gas order condition is satisfied (the result of step S505 is "YES"), the control unit 45b displays information urging the ordering of the gas container B on the display unit 44 (step S506). At this time, in addition to whether to place an order, the control unit 45b may also display information on the display unit 44 including the inventory number of the gas container B and how many days it will take for the inventory number to fall below the threshold, as a prompt to order the gas container B. information. The control unit 45b determines whether there is an input indicating that an order is required (step S507). If there is an input indicating that an order is required (the result of step S507 is "YES"), the control unit 45b orders the gas container B (step S508). The control unit 45b determines whether the end condition is satisfied (step S509). The end condition is a condition required to end the order process. For example, the user inputs an instruction to end the order, the gas order conditions are determined for all gas types, or the gas order is placed a predetermined number of times. Judgment of conditions.
若滿足結束條件(步驟S509的結果為“是”),則控制部45b使訂貨處理結束。
If the termination condition is met (the result of step S509 is "yes"), the control unit 45b terminates the order processing.
另一方面,若未滿足結束條件(步驟S509的結果為“否”),則控制部45b進行步驟S501之後的處理。
On the other hand, if the end condition is not satisfied (the result of step S509 is "NO"), the control unit 45b performs the processing after step S501.
在步驟S505的處理若不滿足氣體訂貨條件(步驟S505的結果為“否”),或在步驟S507的處理進行了無需訂貨之輸入(步驟S507的結果為“否”),則控制部45b判定是否滿足結束條件(步驟S509)。
If the gas ordering conditions are not met in step S505 (the result of step S505 is "No"), or if an input indicating that no order is required is made in step S507 (the result of step S507 is "No"), the control unit 45b determines whether the termination conditions are met (step S509).
根據如以上構成的第三實施型態之氣體容器管理系統,可得到與第一實施型態或第二實施型態一樣的效果。
According to the gas container management system of the third embodiment constructed as above, the same effect as the first embodiment or the second embodiment can be obtained.
而且,第三實施型態之氣體容器管理系統係組合氣體消耗預測及氣體容器B的庫存資訊,來進行氣體容器B之訂貨的催促。藉此,可在氣體容器B不足之前通知管理者等需要進行氣體容器B的訂貨。如此,第三實施型態之氣體容器管理系統可簡便地管理氣體容器B。
Furthermore, the gas container management system of the third embodiment combines the gas consumption forecast and the inventory information of gas container B to urge the ordering of gas container B. Thus, the manager and others can be notified of the need to order gas container B before the gas container B is insufficient. In this way, the gas container management system of the third embodiment can easily manage gas container B.
(第三實施型態的變形例)
(Modification of the third embodiment)
控制部45b亦可構成為於顯示部44顯示使用者所選擇的氣體容器B的消耗預測結果。如此構成之情況,控制部45b係將與使用者所選擇的氣體容器B對應之氣體利用資訊434使用作為預測模型435的輸入。
The control unit 45b can also be configured to display the consumption prediction result of the gas container B selected by the user on the display unit 44. In such a configuration, the control unit 45b uses the gas utilization information 434 corresponding to the gas container B selected by the user as the input of the prediction model 435.
如此,可提供特定的氣體容器B的消耗預測結果給使用者。
In this way, the consumption prediction result of the specific gas container B can be provided to the user.
控制部45b亦可構成為在滿足氣體訂貨條件之情況,自動進行氣體容器B之訂貨。如此構成之情況,控制部45b係進行滿足氣體訂貨條件的時點的氣體容器B的庫存數與預定的庫存數之比較。然後,控制部45b自動進行相對於預定的庫存數而不足的個數的氣體容器B之訂貨。
The control unit 45b may be configured to automatically order the gas container B when the gas ordering conditions are met. In the case of such a configuration, the control unit 45b compares the stock number of the gas container B at the time when the gas order condition is satisfied with the predetermined stock number. Then, the control unit 45b automatically places an order for the number of gas containers B that is insufficient with respect to the predetermined inventory number.
(第一實施型態至第三實施型態共通的變形例)
(Variations common to the first to third embodiments)
管理裝置40、40a、40b亦可構成為以一台管理裝置進行複數個設施的氣體容器B的管理之構成。如此構成之情況,網路80係利用網際網路而構成。而且,管理裝置40、40a、40b從複數個設施收集通訊裝置30發送
出的資訊、氣瓶儲存庫60發送出的資訊及圓筒櫃70發送出的資訊。關於收集後的具體的處理,係與第一實施型態至第三實施型態的任一者相同。
The management devices 40, 40a, and 40b may be configured so that one management device manages the gas containers B of a plurality of facilities. In this case, the network 80 is constructed using the Internet. Furthermore, the management devices 40, 40a, and 40b collect transmissions from the communication devices 30 of a plurality of facilities.
The information sent out, the information sent out by the gas cylinder storage warehouse 60 and the information sent out by the cylinder cabinet 70. The specific processing after collection is the same as any one of the first to third embodiments.
通訊裝置30亦可從別的裝置取得攝像資料。例如,通訊裝置30可構成為從攝像裝置取得攝像資料,使用取得的攝像資料進行圖像分析。如此構成之情況,通訊裝置30可不具備拍攝標籤3之功能。
The communication device 30 can also obtain imaging data from other devices. For example, the communication device 30 may be configured to obtain imaging data from the imaging device and perform image analysis using the obtained imaging data. With such a configuration, the communication device 30 may not have the function of photographing the tag 3 .
上述的各實施型態中,通訊裝置30拍攝進貨進來的氣體容器B的標籤3的圖像來取得容器資訊之構成,但並非一定限定於此。例如,在交貨的氣體容器B附加有標籤且該標籤印刷有從容器資訊轉換而成之條碼資訊(例如一維條碼或二維條碼)之情況,通訊裝置30係讀取條碼資訊而取得容器資訊。
In each of the above-mentioned embodiments, the communication device 30 captures the image of the label 3 of the incoming gas container B to obtain the container information, but it is not necessarily limited to this. For example, when the delivered gas container B is attached with a label and the label is printed with barcode information converted from the container information (such as a one-dimensional barcode or a two-dimensional barcode), the communication device 30 reads the barcode information to obtain the container information.
亦可在收納於氣瓶儲存庫60及圓筒櫃70之氣體容器B,配置電子標籤90以外的記錄媒體。例如,可將從管理裝置40、40a、40b發送來的資訊轉換為條碼資訊(例如一維條碼或二維條碼)並將之印刷在標籤,然後將該標籤黏貼在氣體容器B。如此構成之情況,氣體容器管理系統1可具備可印刷出印刷有條碼資訊的標籤之印刷裝置來替代寫入裝置50。在此情況,就氣瓶儲存庫60的讀取裝置61及圓筒櫃70的讀取裝置71而言,可具備能夠讀取標籤上印刷的條碼資訊之讀取裝置。
A recording medium other than the electronic tag 90 may be installed on the gas container B stored in the gas cylinder storage 60 and the cylindrical cabinet 70 . For example, the information sent from the management devices 40, 40a, 40b can be converted into barcode information (such as one-dimensional barcode or two-dimensional barcode) and printed on a label, and then the label can be affixed to the gas container B. In the case of such a configuration, the gas container management system 1 may be provided with a printing device capable of printing a label with barcode information printed on it, instead of the writing device 50 . In this case, the reading device 61 of the gas cylinder storage 60 and the reading device 71 of the cylindrical cabinet 70 may be provided with a reading device capable of reading the barcode information printed on the label.
寫入裝置50亦可從通訊裝置30取得辨別資訊。如此構成之情況,通訊裝置30係將必須資訊及辨別資訊發送至管理裝置40、40a、40b,而且將辨別資訊發送至寫入裝置50。如此的情況,可在通訊裝置30自動產生辨別資訊,或是將使用者輸入的資訊用設為辨別資訊。
The writing device 50 may also obtain identification information from the communication device 30 . With this configuration, the communication device 30 sends necessary information and identification information to the management devices 40, 40a, and 40b, and also sends the identification information to the writing device 50. In this case, the communication device 30 can automatically generate identification information, or use the information input by the user as the identification information.
控制部45、45a、45b亦可構成為使超過品質保證期限之氣體容器B的資訊顯示於顯示部44的畫面上。
The control units 45, 45a, and 45b may be configured to display information on the gas container B that has exceeded the warranty period on the screen of the display unit 44.
以上,參照圖式而詳細說明了本發明的實施型態,但具體的構成並不限定於此實施型態,也包含未脫離本發明的主旨的範圍之設計等。
The above describes the implementation of the present invention in detail with reference to the drawings, but the specific structure is not limited to this implementation, and also includes designs that do not deviate from the scope of the subject matter of the present invention.