TWI240053B - Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline - Google Patents

Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline Download PDF

Info

Publication number
TWI240053B
TWI240053B TW93103317A TW93103317A TWI240053B TW I240053 B TWI240053 B TW I240053B TW 93103317 A TW93103317 A TW 93103317A TW 93103317 A TW93103317 A TW 93103317A TW I240053 B TWI240053 B TW I240053B
Authority
TW
Taiwan
Prior art keywords
pipeline
pipe
tube
cable
hole
Prior art date
Application number
TW93103317A
Other languages
Chinese (zh)
Other versions
TW200526892A (en
Inventor
Ching-Lung Liau
Original Assignee
Great Taipei Gas Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Taipei Gas Corp filed Critical Great Taipei Gas Corp
Priority to TW93103317A priority Critical patent/TWI240053B/en
Publication of TW200526892A publication Critical patent/TW200526892A/en
Application granted granted Critical
Publication of TWI240053B publication Critical patent/TWI240053B/en

Links

Landscapes

  • Light Guides In General And Applications Therefor (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The present invention provides a conduit fastened on a pipeline for inlet/outlet of cables and a method for laying a cable in a pipeline. The wall of the pipeline is formed with at least a through hole. The conduit includes a base having a top face and a bottom face, and a channel formed on the top face of the base and going through the top face and the bottom face. The conduit is detachably attached on the outer wall of a pipeline, and the channel is located on the opening end of the bottom face corresponding to the through hole of the pipeline. Another end of the channel is for the in/out of a cable. The invented method for laying a cable in a pipeline comprises: (1) forming a through hole at a selected position of a pipeline; (2) installing a conduit having a channel therein on the selected position so that the conduit is attached on the outer periphery of the pipeline, where one end of the channel corresponds to the through hole; and (3) laying a cable into the pipeline from one end of the channel.

Description

1240053 5 10 15 玖 發明說明: 【發明所屬之技術領域】 本發明是有關於一種固定#总& 導呈及於口疋於官線上供纜線進出管線的 :二佈_的方法,特別是指-種利用既設 … 可於活氣施工之原則下,佈設ι線之導且及 ^官線中佈設纜線的方法。 、/、 【先前技術】 隨著科技的發展,多媒體的内容及資源的共享觀今越 ?普=造就資料傳輸上的壓力也就越加魔大,傳統:用 =雙紋線的傳輪方式,其頻寬已漸漸無法滿足現 :戈人的“。因此,一種衰減較小、頻寬大且具良好電磁 傳輸介質,,光缓,,便應運而生。目前,光境的佈設已 、長途幹線、區域網及城域網,慢慢地向客戶端 之接入網發展’ gj此H預計將會成為未來都會型 傳輸網的骨幹。 ' 94.05修正本 光規-般的架設,針對各種應用及環境,有架空、直 埋、管道、水底及室内箄夂鍤 寺各種不同的敷設方式,但仍以利 用既有的輸送設施和交通運輸道路的方式為最佳選擇,除 可節省建設費S,縮短建設週期外,最重要的是具經濟丄 的競爭性。除了油管及瓦斯管路#輸送設施較未被廣泛利 用之外,其他既有的電信線路及交通道路等已儼然成為各 家廠商必爭之地。 在這種可佈設之通路稀少的情形下,由於沒有太多的 競爭者,I易造成Φ斷,而使用戶成料宰#、羊。此外, 1240053 94.05修正本 對於架設時採用部分線路為架空明線桿路的方式,除容易 受到外界的因素如趨風及地震等損壞外,對環境也=成 視覺上的衝擊,且其後續的使用維護也較不易。再:,對 於使用直埋的方式,由於土質中所含的部分物質可能會對 光繞外之保護層造成損壞,使其維修更換的頻率必項二古 ,除造成不便外,其相對成本也會增加,且於其他二事: 工挖掘時亦容易遭受不預期的損壞。 於$ # #加 貝么另方面,於流體之 輸运官内力木設光缓時,為顧及施工過程中的安全性, 10 15 20 於施工期間停止流體的輸送,除了必須避開用戶使用的尖 峰時段外,也會造成客戶於使 人令广々、便用上的不便。因此,如 不影響用戶使用的條件下,發 鍤7广m 佈_的方法及穿置二::種可應用於流體管線内 、矛、可~低轭工及後續維修之成本 及麻煩之外,也可確保資料傳輸之品 解決的問題。 风4心待 【發明内容1 因此,本發明之首一目的,在提供一種可於活氣下設 置於管線上供纜線進出之導具。 線之=。月之另一目的’在提供一種於既設管線上佈設欖 是,本發明固定於管線上供缓線進出之導具,設於 一管線之管壁上,g ~ &应立 導… 1於官壁上設有至少-貫穿之通孔,該 卜曰、::—具有—頂面及—底面之基座,及-設置於頂面 上且貫穿基座之福、苦 、,基座用以連結管線並使通道於基座 底面之開口端與通孔連通,以供境線於佈設時可無損傷地 1240053 94.05修正本 穿出及穿入。 本發明之於既設管線上佈設纜線之方法,包含下列步 $ · (1)於該管線擇定一位置穿設一通孔;(2)於該擇定位置 文裝一具有一通道的導具,使該導具附著於管線外部,且 通道的一端對應於該通孔;(3)由通道之一端施放纜線進入 管線中。 ίο 15 20 斤本發明之供缆線進出之導具,主要是利用於裝設地點 之官線上鑽孔,且立即設置本發明之導具而進行纜線穿設 之2業,導具除提供纜線穿設之外,更可包含止洩單元7 ,得境線可於活氣下短時間内穿設完成,且可避免佈設後 官A内流體㈣的可能。再者,佈設之境線不受外界因素如 趟風,土質等之影響而損壞’降低汰換之機率及維修成本 b /卜本發明中於既設管線上佈設纜線之方法,亦提供 種間易且活氣的施工方式,不須使用特殊的施工機呈、 特殊的技術人員及較大的場地,亦不須避 峰 2期間,因此’在施工之作業上及成本上皆符合經= 【實施方式】 有關本發明之前述及其他技術内容、特點 以下配合參考圖彳4 土 屯 楚的明白。目式之-較佳實施例的詳細說明中,將可清 在進入較佳 以下的敘述中, 參閱圖1、 只施例的說明之前,必須先了解的是,在 相類似功能的構件將採用相同的編號。 圖2及圖3,本發明供纔線進出之一導具的 8 1240053 94.05修正本 較佳實施例,採用地下低壓瓦斯管之光纜佈設來作說明, 但不以此為限。本發明供纜線進出之導具2設置於一供瓦 斯流通之低壓瓦斯管10上,此低壓瓦斯管1〇為金屬材且 包括一管壁111,及至少一配合該導具2設置時供光纜9進 出且貫穿官壁111的通孔112。本發明之導具2於本實施例 中採用一鞍座裝置來作說明,但不以此為限。該鞍座裝置 包含一鞍座組21,及分別連結鞍座組21之一主臂管單元 31及一側臂管單元41。 10 15 鞍座組21是以一上鞍座211及一下鞍座212上下包夾 於該低壓瓦斯管H)上’並利用—螺栓組213將兩鞍座2ιι 、2i2可拆離地鎖固於管壁lu之外周面上。上下鞍座川 、212分別具有一截面為下凹及上凹圓弧型,且對應管壁形 狀之上鞍體215及下鞍體22G,兩鞍體215、22()之兩端分 助外水平延伸成二上螺接段加及二下螺接段221。固定 呀’以螺拴223依序穿過兩螺接段216、221上貫穿之上、 下螺孔^ 217、222 ’再以螺帽224予以鎖固。本實施例中 之上鞍體215即為該導具2最基本型式之基座,該 (基座)215下凹接近管壁⑴為一底面215〇, : =異面為-頂面一通…穿上鞍體:: 、面215G與底面2152間並與通孔112相對應, 供境線進出該管壁⑴的通孔112。 H ^215G之開口端其外周緣上形成—往上較體 215 頂面 2152 t a 可供_橡_ μ °延伸之環形凹槽部219,此凹槽部219 乡貝之鞍座止茂環體214巍入,當鞍座组21鎖 20 5 10 15 20 1240053 94.05修正本 固於管壁111上時,止为璟灿 ιη門介丨、 洩衣脰214可提供鞍座組21及管壁 間工隊的止浅功能。作是 通之幹穿其鸿仁疋田鞍座組21裝設於無流體流 月s、'泉上% ’痛略較座止茂環體21 亦不影響本I置之基本功能。 m9’ 本較佳貧施例中’採用兩相對應且可鎖接之 、犯’作為與低a瓦斯管10連結之構件,亦 部分環型之基座等,此基座可以預設於管壁nl上 力:限位固定,該預留件如翻轉式扣座或扣帶等等,只要 疋能將基座固設於管壁1 n 一 上即可。此外,本裝置可設置之 輸送管線並不限於掖厭F 1 、低&瓦斯官,也可為水管、電管、雷作 設備管等,輸送管之姑所 " 貝亦可為鑄鐵、PVC、FRP及預鑄混 ^寺’且其官徑大小可依實際狀況而有各種不同之態樣 〇 “此外’上鞍座211上設有—觀測管31卜可提供光境9 方、g線中订進的貧訊以增加佈設時的便利性。此觀測管阳 位於上« 215之頂面上,由通道218的外周緣垂直向上 延伸’且於遠離上鞍座211之—端的内周面上具有—主臂内i 累文314可为別與主體塞頭312及視窗塞頭313(見圖4) 之外螺紋部315、316非同時地對應連結。主體塞頭312為 一無貫穿開孔之塞頭’於輕座組21設置完成到佈境之間及 佈規後使用,可供密封觀測管311之管口,而視窗塞頭313 =要用於水線及規線佈設的過程中,具有一中央貫穿之螺 栓體317,及-設於螺栓體317内之透明部318。當螺检體 317與觀測官311連結後’可由觀測管311外透過透明部 10 1240053 94.05修正本 川觀測低壓瓦斯管内光纜9拉設之情況。透明部爪之材 :可為玻璃、壓克力等。當輪送管内無流體流通時,主體 基頭3 12及視窗塞頭3 13可予以省略。 、由於光_ 9為-半剛體材f,為避免缝9於施放之 過私中因f折角度過大,產生損害影響資料封包傳輸的正 ^ 口此觀測官311上連結有一供纜線進出之穿設管 411。穿設管411由觀測管311之外周面底端向外且向上延 伸:與官線之軸線方向呈—角度,供光縵9穿設使用,且 於遠離瓦斯管之—端的内周面上具有_側臂内螺紋部413, 並具有一位於中央且連通觀測管311之孔槽414,孔槽414 具有一位於上方之大孔徑部415、一位於下方之小孔徑部 416,及一位於大孔徑部415及小孔徑部416間之肩部々Η 。此外,為增加光纜9佈設後氣密的效果,穿設管411上更 没有-止:¾單元412。止&單元412具有裝設於穿設管411 内之二側臂密封環體418及二金屬環形墊片419,及一可連 結穿設管411之有孔塞頭42〇。側臂密封環體418及金屬環 形墊片419由下而上交錯堆疊地置於孔槽414内且頂抵於 肩部417上。有孔塞頭42〇於其一端具有一有孔外螺紋部 422,可螺接於側臂内螺紋部413,使有孔塞頭42〇與穿設 管411連結,當有孔塞頭42〇鎖緊時,可透過金屬環形墊片 419擠壓袷封環體4丨8,使其向穿設管4丨丨之管徑中心膨脹 ,使與穿設之光纜9密接,增加止洩效果。再者,於鞍座 組架設後到光纜9施放間,可使用一無孔塞頭421連結於 穿設管411上以密封孔槽414避免瓦斯外洩。另一方面,於 1240053 — π.们修止本 光纜9穿管時可由有孔塞頭42〇 、雕低壓瓦斯官一端開口 , 孔塞頭42G與難間之空隙注人油體,可且防止 瓦斯編潤滑域9之作用。此處,以穿設管4ιι之管軸 軸線及瓦斯管的軸線間夾角為 人角马45度來作說明,但不以此為 I艮。 .本貫施例中’主體塞頭312及無孔塞頭421為相同 形狀及大小,但於不同之實施態樣下,此二塞頭312、421 °為相異之螺柽體。再者’當輸送管内無流體流通且不影 10 15 20 響本=明之基本功能時’止料元412及無孔塞頭421,可 、'省各此外,主臂官單兀31主要用於觀測光繞9佈線 過程中,獲取光缓9於低壓瓦斯管内因佈線而移動的資訊 ’亦可予以省略。當省略主臂管單元31時,側臂管單元 之穿設管4U將由通道218之外周緣向外且向上延伸,且孔 槽414連通通道218。 /閱圖10,為保濩穿設完成之光纜9,使外露於鞍座 組之之光纜9不因外力產生過大的彎曲而損傷,可以於穿 叹b 411及光纜9間增加一保護單元51。保護單元η包括 浪& 511及二分別套設於浪管511之二端的冷縮管η〕。 浪管511套設於穿設管411及外露於穿設管4ΐι之光纜9上 ,避免外露之光纜9過度彎折而損壞。接近穿設管411之冷 縮官512被覆於穿設管411及浪管511上,將設於冷縮管 512内之撐材抽離後可使冷縮管512氣密地包覆穿設管々η 及浪& 5 11上且提供界面上止洩的功能,而遠離穿設管4 “ 之冷縮管512,用以氣密地被覆浪管511及光纜9。當光纜 12 5 10 15 20 1240053 a ^ 94.05修正本 9無過度彎折而損害,且流體 η 灵之情形下,俘谁輩开 51可予以省略’而不影響本裝置之基本功能。 早 ^透㈣置地點之選定,將本發明、纜線"進出裝置於一區 段之輸送官上鑽孔後分別設於_ οπ 0a 退點及—出口點,利用 本衣置中相關之止洩元件,降低 宝夕撼Α π 低^官内流體外茂造成危 。之機f,使得光纜9得以於活氣 π ^ . 乳的Ν况下,順利地在進 ”,'占及出口點間拉設,達到佈纜之目的。 參閱圖5’本發明於管線中佈設纜線的方法之較佳實施 !,ί要包含圖5中所示之各主要實施步驟,用以於」既 口又之官線内佈设光纜9。本實施例中之光 τ心亢、'見佈设,係以具鞍 座組21以供纜線進出之導具,設 、 有瓦斯流通之低廢 瓦斯管上料行㈣為㈣作說明,但不以此為限。 二在開始敘述實施步驟前必須先說明的,關於本方法施 作财所需執行的有關施作前計劃之擬定、報開工、職前勞 工安全衛生訓練、工作井之開挖及設置、安全維護,及人 孔手孔之安放等習知程序與作業,非本方法之重:及特徵 所在,於此不再贅述。 參閱圖6,於選定之地點進行開挖後,便可於出露的瓦 Τ管上進行鞍座組2!之設置,設置之前需於低壓瓦斯管擇 定位置之管壁上進行鑽設通孔112之作業(步驟61)。鑽設通 孔112之作業依瓦斯電動鑽孔機工作及安全作業標準施作, 只鑽孔不需攻牙,且通孔112之孔徑以不超過四分之一瓦斯 管管徑為原則。鑽孔時可將密閉式穿孔機,如日本大肯精 密株式會社生產販售之密閉式穿孔機Ν〇·3、電動機Ν〇·8及 13 1240053 配合之特殊I法等f知機具技術,架設於瓦斯管上,以鍵 條圈繞瓦斯管並將穿孔機緊密地固定於瓦斯管上,藉由恭 動機帶動穿孔機之刃部,利用磨㈣方式進行鋼管 作業,鑿孔過程中不會產生火花引爆瓦斯的危險。 10 15 20 參閱圖1及圖7,鑽孔完畢後應立即將上、下鞍座211 、叫裝設於通孔112之位置上,且使其通道218對應於通 孔U2,亚均一性地以螺栓組213將兩鞍座211、212鎖固( 步驟62)。此時,位於上鞍座211底面上之止茂環體叫將 圈繞於通孔m之外周緣外,並藉由螺检组213《鎖固使其 緊密地頂抵於管壁1U上’防止瓦斯於上鞍座2ιι及管壁 m _漏。為確職座組21設置之正確性,可使用四分 之三英忖之pvc管或-小段光境由穿設管411伸入,球定 通孔m及通道218之相對位置,以檢驗兩鞍座2ii ' 212 裝設之位置是否正確,若有偏差時應予以調正或重新安裝 。然4灸以無孑L羞^豆頁 421 及Φ 愛。ί 1 、 土只及王月丑基碩312分別連結於穿設管 411及觀測g 3 11之官口,於光境9施放前防止瓦斯由觀測 管3H及穿設管411外茂。由於本實施例中之瓦斯管為低壓 管且鞍座組21 ^置時間短暫’因此於施作過程_所造成之 瓦斯外、;&量仍符合於相關規定之要求,不會產生不良的影 塑。 曰 然後可由通道218的-端進行光境9的施放(步驟63)。 光缆9的施放方式-般可分為直接施放及間接施放兩種, 直接施放的方式乃是將光9直接從穿設f 411的管口伸入 ’佈設於瓦斯管内;間接施放的方式乃是先於出σ端及入 14 5 10 15 20 1240053 、而之間的瓦斯管内進行一水線的拉設,然後再透過水線 的拉引將光纜9施放於瓦斯管内。前者通常是在纜線可沿 瓦斯官線直接連結到客戶端或是只針對某—區段佈纜之情 下採用,而後者則是須於管線的中途穿出,或因多區段 ^ &細工工序上的安排及便利性的考量而予以採行。關 2直接施放的方式,首先是先將鎖固於穿設管411上之無孔 基頭421除去,將預定施放之光纜9依序穿過有孔塞頭 二金屬環形塾片419、密封環體418、金屬環形塾片419及 ㈣環體418,再將光境9穿入穿設管411,使其佈設於瓦 斯管内。光纜9佈設過程中,必須先將二組密封環體418 及環型塾片419依序塞入穿設管411内,並將有孔塞頭· 不鎖緊地連結於穿設管川上,以不使瓦斯外料原則,待 光缓9穿設完成後再將有孔塞頭42〇予以鎖緊。此時,穷 封環體4㈣因受穿設管411轴向之塵力而向穿設管川: 官控方向膨脹,使其緊貼於光繞9之外周面,增加防茂效 果。紐9可於管内沿瓦斯管行進,直達於用戶端。> 參閱圖^圖8及圖9,間接施放的方式中,水線的佈 設方法乃是於進π端之穿設管411上置換成有孔塞頭似, 於出口端之觀測管311上改以設置視窗塞頭313、穿Μ 411上更換為有孔基頭42〇,及f設管4ιι内|設具有 屬彎鉤之補繩器。然後分別於進口端及出口端之] 420、313設置處以肥皂水進行氣 土頭 保安全。其次,以FRP材質之:;二,防止瓦斯物 卜 <通&條或是一段光纜9 口端之穿設管411進入’往出u端方向移動,進行通管之作 15 1240053 94.05修正本 10 業,通管條之说立而套5又一具有一環圈且可彈性捲縮之水線, 當由出口端之視®基頭j 13觀察到通管條行進至出口端之穿 設管411時,可以補繩器之彎鉤勾取水線之環圈而將水線由 出口端處之穿設管411拉出,.此時,將預定佈放之水線連結 其上,然後由進口端之穿設管411回抽通管條,帶出預定佈 放之水線。水線拉出所需之長度後,前端加一長形金屬桿使 之可置於牙设管411内且頂抵於穿設管‘Η之肩部417上, 出口端處亦採取相同之作法,此時水線拉設完成。當水線拉 設完成後,拆除進口端及出口端處穿設管411及觀測管3ιι 上之有孔塞頭420及視窗塞頭3 13,改以無孔塞頭421及主 體塞頭312旋緊於穿設管411及觀測管311之管口上。然後 以肥皂水進行洩漏測試以確保安全。 15 20 接者便進行光纜9的施放。佈纜的工作將利用前述中 所拉設之水線來進行。首先於進口端將光纜9依序穿過有 孔塞頭420 '金屬環形墊片419、密封環體418、金屬環形 墊片419及密封環體418 ’並於前端套設一具有—環圈之拉 境網套’其次鬆開進口端處連結於穿設t4u之管口的無孔 基頭421,取出預留水線之端頭,將水線與拉缓網套之環圈 連結,且將套設於練9上之兩組密封環體418及金屬環 化墊片419置入穿設官411内,並將有孔塞頭伽不鎖緊地 鎖接於穿設管411之管口上,有孔塞頭42Q鎖接時以不使瓦 斯外茂為原則,然後鬆開出口端處出口管4ιι之無孔塞頭 似,並取出水線之另-端。然後,從出口端處開始回拉水 線,連結於水線進π端處之—端的光矣覽9將由進口端經由 16 10 15 20 1240053 舛.05修正本 2管而穿出出口端處之穿設管411,此時,拆除拉缓網套 /將密封環體418、金屬環形塾片419、密封環體418、 孟屬%形墊片4丨9及有孔塞頭42G依序套設於光境9上, 然後將套設於錢9上之兩組密封環體418及金屬環形塾 片仙置入穿設管411内並鎖緊有孔塞頭42〇,進口端處穿 叹官川上之有孔塞頭亦予以鎖緊。之後於完成拉镜之 進口端及出口端,利用肥皂水檢測穿設f 411及有孔塞頭 420是否有瓦㈣漏,有瓦斯、沒漏情況時應將有孔塞頭42〇 重新予以鎖緊或採取其他補救措施。 通常於光缓9施放後,會由穿設管411延伸出部分光缓 9作為後續其他卫事或維修使用,對這些外露之預留缓線可 μ收容及彳m因此’本方法中可更包含—對外露於導 具之纜線加以收容及保護之步驟64 .為進行步驟64,須於 步驟63進行的過程中作一些配合的措施:於步驟63中將 光纜9穿入穿設管411前,須於金屬環形墊片419及密封環 體418穿設於光纜9之前,先將冷縮管512、浪管511及冷 縮管512依序先套設於光纟覽9上,且光規9於出口端穿出 穿設管411後,須於金屬環形墊片419及密封環體418穿設 於光緵9後,緊接著套設。 參閱圖10及圖11,首先,在完成光纜9拉設之後,於 進口端及鄰近之另一出口端處分別預留一段外露之光纜9 以為將來工事使用,或以光纜9接續點盒並利用光纜熔接 機,依客戶需求及設計芯數連結至其他客戶端使用,此預 留之光缦9必須將其整理,並捲入光纜收容架上,再將此 17 5 10 15 20 1240053 , 94.05修正本 光纜9收好以便於德誇 ^用。其次,為使光纜9與穿設管 乂接處侍以更為氣密,並固 度f折造成損壞,且須於交接;::511以保護光、€ 9免因過 管川分別於浪管511之^ 縮管512,並使冷縮 浪管511及光境9上,且之::「緊密地附著於穿設管-、 冷縮作業完成後必須針對:::斯從交接編之機率。 認無安全顧慮時,㈣品質作—測試,經確 便兀成整個光纜9佈設的過程。 =述,本發明揭示一峨進出裝置及其工法, 就其光繞佈設之便利性 . a „ 和用一種間易的方法來達到 佈、、泉的目的,且不需避開 ,滿足施作上的便利。戶使用之太峰時段亦不需停氣 就經濟效益而言,先螬佑妗酤翠v 長生活中觸手可及,並^ 置所採用之材質皆為曰 不須頜外進行材料的合成,且苴造 價成本不高,符合經濟要长。 ^ 於+由n /屬要求另一方面’由於不直接埋設 率。,*此不H f成份的影響,降低汰換及維修之機 士就施工上而言’本發明之裝置及其工法,由於未使用 特殊之材料、施工機且 '施 铽八轭工技術及大範圍之場地等,且 也之工法簡易,可於活氣原則下施工, 工時間。 且無須太長之施 踩會層面而言,資訊化的時代強調訊息的快速且益 :地^通’錢已是目前科技中較佳㈣擇,利用現有的、 官路设備來佈設,使管路沿線的客戶端皆能於第一時間内 掌握重要之訊息並分享科技所造就之生活品質的提昇,故 18 1240053 94.05修正本 確實能達到發明之目的。 惟以上所述者’僅為本發明之較佳實施例而已, 能以此限定本發明實施之範圍,即大凡依本發 田 範圍及發明說明書内容所作之銪抑从斤 T明^ 廉……一乍之間早的等效變化與修飾,1240053 5 10 15 玖 Description of the invention: [Technical field to which the invention belongs] The present invention relates to a method for fixing # General & Refers to-a method that uses existing ... can be laid under the principle of live gas construction, the route of the ι line and ^ official line method of laying the cable. 、 / 、 【Previous technology】 With the development of science and technology, the concept of sharing multimedia content and resources has become more and more popular. The pressure on the transmission of data has increased. The tradition: the double-line transmission method , Its bandwidth has gradually failed to meet the present: Geren's ". Therefore, a low attenuation, large bandwidth and good electromagnetic transmission medium, light slow, came into being. At present, the layout of the light environment has been extended, long distance Trunks, regional networks, and metropolitan area networks are slowly developing to the client's access network. 'Gj This is expected to become the backbone of the metropolitan transmission network in the future.' 94.05 Amend this optical gauge-like setup for a variety of applications And environment, there are various laying methods of overhead, direct buried, pipeline, underwater and indoor Dai Temple, but it is still best to use the existing transportation facilities and transportation roads, in addition to saving construction costs In addition to shortening the construction period, the most important thing is to be economically competitive. In addition to the oil pipeline and gas pipeline # transmission facilities are not widely used, other existing telecommunications lines and traffic roads have become various companies. Manufacturers must compete. In this situation where there are few paths to deploy, because there are not many competitors, it is easy to cause Φ to break, which will cause users to slaughter #, sheep. In addition, the 1240053 94.05 amendment for the installation When part of the line is used as an overhead line pole, in addition to being easily damaged by external factors such as wind and earthquakes, it also has a visual impact on the environment, and its subsequent use and maintenance are also not easy. Then: For the method of using direct burial, because some of the material contained in the soil may cause damage to the protective layer outside the light winding, the frequency of its repair and replacement must be ancient. In addition to the inconvenience, its relative cost will also increase. And two other things: It is also easy to suffer unexpected damage during excavation. In $ # # 加贝 么 On the other hand, when the light transmission of the fluid transport officer's internal force is set, in order to take into account the safety during construction, 10 15 20 Stopping the flow of fluid during the construction period, in addition to avoiding the peak hours of user use, will also cause customers to be inconvenient and inconvenient. Therefore, if the user's conditions are not affected, Next, the method and installation of hair extension 7: m can be used in fluid pipelines, spears, low-yoke workers, and subsequent maintenance. Besides cost and trouble, it can also ensure data transmission. The problem of wind 4 is waiting. [Summary 1] Therefore, the first object of the present invention is to provide a guide that can be installed on a pipeline under a live gas for the cable to enter and exit. To provide a guide for laying a pipeline on an existing pipeline, the present invention is fixed on the pipeline for the guide wire for in and out of the pipeline, which is arranged on the pipe wall of a pipeline, g ~ & should be guided ... 1 is provided on the official wall at least- The penetrating through-hole said:-a base with-top surface and-bottom surface, and-a blessing and bitterness provided on the top surface and penetrating through the base, the base is used to connect the pipeline and make the channel The open end of the bottom surface of the base communicates with the through hole, so that the environment line can be worn out without damage during the deployment of 1240053 94.05. The method for laying a cable on an existing pipeline according to the present invention includes the following steps: (1) a through hole is selected at a certain position of the pipeline; (2) a guide with a channel is installed at the selected position , The guide is attached to the outside of the pipeline, and one end of the channel corresponds to the through hole; (3) a cable is put into the pipeline from one end of the channel. ίο 15 20 kg The guide for cable entry and exit of the present invention is mainly used for drilling holes on the official line of the installation site, and the guide of the present invention is immediately installed for cable routing. In addition to the cable routing, the anti-leakage unit 7 can also be included, and the border line can be completed in a short time under live air, and the possibility of fluid entrapment in the post officer A can be avoided. Furthermore, the laid border is not damaged by external factors such as wind, soil, etc. 'Reduces the probability of replacement and maintenance costs b / The method of laying cables on existing pipelines in the present invention also provides easy And the lively construction method does not require the use of special construction machines, special technicians and large sites, and it is not necessary to avoid the peak 2 period, so 'the construction operation and cost are consistent with the economic = [implementation method] ] The foregoing and other technical contents and features of the present invention are described below with reference to Figure 彳 4. In the detailed description of the preferred embodiment, it will be clear that in the following description of the preferred embodiment, refer to FIG. 1. Before explaining the example, it must be understood that components with similar functions will be used. The same number. Fig. 2 and Fig. 3, the preferred embodiment of the present invention is a 1240053 94.05 modification of a guide for the entry and exit of the supply line, but the optical cable arrangement of the underground low-pressure gas pipe is used for illustration, but not limited thereto. The guide 2 for cable entry and exit according to the present invention is provided on a low-pressure gas pipe 10 for gas circulation. The low-pressure gas pipe 10 is a metal material and includes a pipe wall 111. The optical cable 9 enters and exits and passes through the through hole 112 of the official wall 111. The guide 2 of the present invention is described by using a saddle device in this embodiment, but it is not limited thereto. The saddle device includes a saddle group 21, and a main arm tube unit 31 and a side arm tube unit 41 connected to one of the saddle groups 21, respectively. 10 15 The saddle group 21 is an upper saddle 211 and a lower saddle 212 sandwiched on the low-pressure gas pipe, and using the bolt set 213 to detachably lock the two saddles 2 and 2i2 to The outer wall of the tube wall lu. The upper and lower saddles 212 and 212 have a concave shape and a concave shape, respectively, and correspond to the shape of the tube wall. The upper saddle body 215 and the lower saddle body 22G, and both ends of the two saddle bodies 215 and 22 () help out. It extends horizontally into two upper screwed sections plus two lower screwed sections 221. To fix it, a bolt 223 is sequentially passed through the upper and lower screw holes 217, 222 of the two screw joint sections 216, 221, and then locked with a nut 224. In this embodiment, the upper saddle body 215 is the base of the most basic type of the guide 2, and the (base) 215 is recessed close to the wall of the pipe to form a bottom surface 215. The = different surface is-the top surface passes through ... Put on the saddle body: between the surface 215G and the bottom surface 2152 and corresponding to the through hole 112, for the border line to enter and exit the through hole 112 of the pipe alcove. The opening end of H ^ 215G is formed on the outer periphery of the open end—the upper surface of the body 215 is 2152 ta, which is an annular groove 219 for _ oak_ μ ° extension, and this groove 219 214, when the saddle group 21 is locked 20 5 10 15 20 1240053 94.05, it is fixed on the pipe wall 111, only the door can be opened, and the vent 脰 214 can provide the saddle group 21 and the pipe wall. The stop function of the engineering team. The operation is to pass through its Hongren Putian Saddle Group 21 and install it in a fluid-free month. The pain on the spring is slightly higher than that of the stop ring ring 21 and it does not affect the basic function of this device. m9 'In the preferred lean embodiment,' the two corresponding and lockable culprits' are used as the components connected to the low-a gas pipe 10, and also some ring-shaped bases, etc. This base can be preset on the tube Force on the wall nl: The position is fixed. The reserved parts, such as the flip type buckle seat or the buckle, etc., can be fixed as long as the base can be fixed on the pipe wall 1 n. In addition, the transport pipelines that can be set up in this device are not limited to F 1, low & gas officials, but also water pipes, electric pipes, thunder equipment pipes, etc., and the pipe's shelter can also be cast iron, PVC, FRP, and mixed temples, and the size of the official path can vary according to actual conditions. "In addition, the upper saddle 211 is provided-the observation tube 31 can provide light environment 9 square, g The poor information entered in the line increases the convenience of deployment. This observation tube is located on the upper surface of the upper «215, which extends vertically upward from the outer periphery of the channel 218 'and is located away from the inner periphery of the upper saddle 211- On the surface-the inside of the main arm of the accumulator 314 may be non-simultaneously corresponding to the external threaded portions 315, 316 of the main body plug 312 and the window plug 313 (see Figure 4). The main body plug 312 is a non-through The plug of the hole is used between the setting of the light seat group 21 and the layout, and can be used to seal the nozzle of the observation tube 311, and the window plug 313 = for waterline and gauge routing. In the process, there is a bolt body 317 penetrating through the center, and a transparent portion 318 provided in the bolt body 317. When the screw body 317 and After the inspector 311 is connected, the outside of the observation tube 311 can be corrected through the transparent part 10 1240053 94.05 to correct the situation where the optical cable 9 in the low-pressure gas tube is installed by Benkawa. The material of the claw of the transparent part: glass, acrylic, etc. When inside the tube When there is no fluid circulation, the main body base 3 12 and the window plug 3 13 can be omitted. As the light _ 9 is -semi-rigid body material f, in order to prevent the seam 9 from being too private during casting, the angle of f fold is too large, resulting in damage. The positive port that affects the transmission of data packets is connected with a penetrating pipe 411 for cable entry and exit. The penetrating pipe 411 extends outward and upward from the bottom end of the outer peripheral surface of the observation pipe 311: in the direction of the axis of the official line At an angle, it is used for the installation of the optical tube 9 and has a side arm female thread portion 413 on the inner peripheral surface far from the gas tube, and has a hole groove 414 and a hole groove located in the center and communicating with the observation tube 311. 414 has a large-aperture portion 415 located above, a small-aperture portion 416 located below, and a shoulder portion 间 located between the large-aperture portion 415 and the small-aperture portion 416. In addition, the airtight Effect, there is no more on the wear pipe 411: ¾ unit 412 The stop & unit 412 has two side arm sealing ring bodies 418 and two metal ring gaskets 419 installed in the through pipe 411, and a perforated plug 42 which can be connected to the through pipe 411. The side arm sealing ring The body 418 and the metal annular gasket 419 are staggered from bottom to top and are placed in the hole groove 414 and abut against the shoulder 417. The holed plug 42 has a holed external threaded portion 422 at one end, which can be screwed It is connected to the internal thread part 413 of the side arm, so that the holed plug 42 and the insertion pipe 411 are connected. When the holed plug 42 is locked, the ring seal body 4 can be squeezed through the metal ring gasket 419 , So that it expands toward the center of the diameter of the pipe 4 丨 丨, so that it is in close contact with the optical cable 9 through the pipe, increasing the anti-leak effect. Furthermore, after the saddle group is erected to the delivery room of the optical cable 9, a non-perforated plug 421 can be connected to the perforating pipe 411 to seal the hole groove 414 to prevent gas from leaking. On the other hand, when 1240053 — π. Repaired the optical cable 9 through the pipe, it can be opened with a hole plug 42, one end of the low-pressure gas officer, and the space between the hole plug 42G and the difficulty is filled with oil, which can prevent The role of gas knitting lubricating domain 9. Here, the angle between the axis of the pipe shaft passing through the tube and the axis of the gas pipe is 45 degrees for description, but this is not the case. In this embodiment, the main body plug 312 and the non-porous plug 421 have the same shape and size, but in different implementations, the two plugs 312 and 421 ° are different helical bodies. In addition, when there is no fluid circulation in the conveying pipe and it does not affect the basic function of 10 15 20, the stopper element 412 and the non-hole plug 421 can be used to save the province. In addition, the main arm official unit 31 is mainly used for In the process of observing the light around the wiring, the information of the light moving in the low-pressure gas pipe due to wiring is obtained. When the main arm tube unit 31 is omitted, the pipe 4U of the side arm tube unit will extend outward and upward from the outer periphery of the channel 218, and the hole 414 communicates with the channel 218. / See Figure 10, in order to ensure that the completed optical cable 9 is installed so that the optical cable 9 exposed in the saddle group is not damaged due to excessive bending caused by external forces, a protection unit 51 can be added between the wearing sigh b 411 and the optical cable 9 . The protection unit η includes a wave & 511 and two cold-shrinkable tubes η respectively set at two ends of the wave tube 511]. The wave tube 511 is sleeved on the penetrating tube 411 and the optical cable 9 exposed on the penetrating tube 4 to prevent the exposed optical cable 9 from being excessively bent and damaged. The cold-shrinking tube 512 close to the through-tube 411 is covered on the through-tube 411 and the wave tube 511. After pulling out the supporting material provided in the cold-shrink tube 512, the cold-shrink tube 512 can be hermetically covered by the through-tube. 々Η and Wave & 5 11 provide the function of anti-leakage on the interface, and away from the cold shrink tube 512 of the pipe 4 ″, for air-tightly covering the wave tube 511 and the optical cable 9. When the optical cable 12 5 10 15 20 1240053 a ^ 94.05 amended this 9 without excessive bending and damage, and in the case of fluid η spirit, the captive 51 can be omitted 'without affecting the basic function of the device. The present invention, the cable " in and out device are drilled on the transport officer of a section and set at the _ π 0a retreat point and the -exit point respectively. The relevant anti-leakage elements are used in the clothes to reduce Bao Xi shake Α π low ^ the internal fluid and the external fluid cause danger. The mechanism f allows the optical cable 9 to move in smoothly under the condition of milk π ^. The cable is installed between the "occupation and exit points" to achieve the purpose of cabling. . Referring to FIG. 5 ′, the method for laying cables in a pipeline according to the present invention is preferably implemented. The main implementation steps shown in FIG. 5 are included to lay the optical cable 9 in both the mouth and the official line. In the present embodiment, the light τ is hypercardia, and see the layout. It is described with a saddle group 21 for the cable to enter and exit, and a low waste gas pipe with gas circulation. But not limited to this. Two things that must be explained before beginning to describe the implementation steps, the preparation of the pre-construction plan, the start of construction, pre-employment labor safety and health training, the excavation and installation of work wells, safety maintenance, and The known procedures and operations such as the placement of manholes and handholes are not important to this method: and the features are not repeated here. Refer to Figure 6. After excavation at the selected site, the saddle group 2! Can be set on the exposed watt tube. Before setting, it is necessary to drill through the wall of the low-pressure gas tube at a certain position. Operation of hole 112 (step 61). The drilling of the through-hole 112 is performed according to the gas electric drilling machine work and safety operation standards. Only drilling does not require tapping, and the hole diameter of the through-hole 112 is based on the principle of not exceeding a quarter of the gas pipe diameter. When drilling, you can set up a closed-type punching machine, such as a special type I method with a closed-type punching machine No. 3 produced by Japan Daiken Precision Co., Ltd. and a motor No. 8 and 13 1240053. On the gas pipe, the key pipe is used to circle the gas pipe and the puncher is tightly fixed on the gas pipe. The blade of the puncher is driven by the respectful motive, and the steel pipe is operated by grinding. Sparks ignite the danger of gas. 10 15 20 Referring to Figure 1 and Figure 7, immediately after drilling, the upper and lower saddles 211 and 211 should be installed at the position of the through hole 112, and its channel 218 corresponds to the through hole U2. Sub-uniformly The two saddles 211 and 212 are fastened with the bolt set 213 (step 62). At this time, the Zhimao ring body located on the bottom surface of the upper saddle 211 is called to be wound around the outer periphery of the through hole m, and it is tightly pressed against the pipe wall 1U by the screw inspection group 213 Prevent gas leakage on the upper saddle 2m and the pipe wall m_. In order to confirm the correctness of the setting of the seat block 21, a three-quarters of a PVC pipe or a small section of light environment can be extended through the through pipe 411, and the relative position of the through hole m and the channel 218 can be checked to check the two Whether the installation position of saddle 2ii '212 is correct, if there is deviation, it should be adjusted or reinstalled. Of course, 4 moxibustions are Wu Xi L Sha ^ Bean Page 421 and Φ Love. ί 1, Tu Zhi and Wang Yue Chou Jishuo 312 are respectively connected to the gates of the penetrating pipe 411 and the observation g 3 11 to prevent gas from being observed by the observation pipe 3H and the penetrating pipe 411 before the light environment 9 is cast. Because the gas tube in this embodiment is a low-pressure tube and the saddle group 21 is placed for a short time, so the amount of gas outside the process of construction is still in line with the requirements of relevant regulations, and no bad Shadow plastic. The light environment 9 can then be cast from the-end of the channel 218 (step 63). The optical cable 9 can be divided into two types: direct and indirect. The direct method is to extend the light 9 directly from the pipe opening f 411 into the 'lay in the gas tube; the indirect method is First, a waterline is installed in the gas tube between the σ end and the 14 5 10 15 20 1240053, and then the optical cable 9 is placed in the gas tube through the water line pull. The former is usually used when the cable can be directly connected to the client along the gas line or only for a certain section of cable, while the latter is required to pass through the pipeline midway or because of multiple sections ^ & Arrangements for convenience and convenience are taken into consideration. The direct release method of Guan 2 is to first remove the non-porous base 421 locked on the installation pipe 411, and pass the planned optical cable 9 through the two metal ring-shaped cymbals 419 and the sealing ring in order. The body 418, the metal ring-shaped cymbal 419, and the ring-shaped body 418, and then the light environment 9 is penetrated into the penetrating pipe 411 so as to be arranged in the gas pipe. During the installation of the optical cable 9, two sets of sealing ring bodies 418 and ring-shaped cymbals 419 must be sequentially inserted into the wearing pipe 411, and the holed plug head must be connected to the wearing pipe without locking. Do not make the gas material principle, after the completion of the installation of the light delay 9 and then the hole plug 42 is locked. At this time, the poorly-sealed ring body 4 向 is exposed to the penetrating pipe by the dust force in the axial direction of the penetrating pipe 411: it expands in the direction of official control to make it close to the outer peripheral surface of the light winding 9 and increase the anti-moisturizing effect. The New 9 can travel along the gas pipe in the pipe and reach the user end directly. > Referring to Figures ^ Figures 8 and 9, in the indirect casting method, the waterline is laid out by replacing the through-pipe 411 on the inlet side with a plug with a hole on the observation tube 311 on the outlet side. Instead, set the window plug 313, wear M 411 to be replaced with a hole base 420, and f set the tube within 4m | set a rope supplement device with a hook. Then use the soap and water head at the setting points of the inlet and outlet] 420 and 313 to ensure safety. Secondly, using FRP material: Second, to prevent gas material < through & strips or a section of optical cable 9 mouth end through the pipe 411 enter 'to the direction of the u-end to move through the pipe 15 1240053 94.05 correction In the 10th industry, the piping strips stand upright and the sleeve 5 has a loop and elastically shrinkable waterline. When the piping strips travel to the exit end from the view of the exit end® base j 13 When the tube 411 is used, the hook of the rope repair device can be used to pick the loop of the waterline and pull the waterline out of the pipe 411 at the exit end. At this time, the waterline intended to be laid is connected to it, and then The inlet pipe 411 draws back the pipe strip and brings out the water line intended to be laid out. After the waterline is pulled out to the required length, a long metal rod is added at the front end so that it can be placed in the dental tube 411 and abut against the shoulder 417 of the penetrating tube. The same method is adopted at the exit end. At this point, the waterline is set up. After the waterline installation is completed, remove the holed plug 420 and the window plug 3 13 on the inlet pipe and the outlet pipe 411 and the observation pipe 3 ι, and change to the non-hole plug 421 and the main body plug 312. Tighten the nozzles of the feed pipe 411 and the observation pipe 311. Leak test with soap and water to ensure safety. 15 20 The receiver then casts the optical cable 9. The cabling work will be carried out using the waterline drawn in the foregoing. First, the optical cable 9 is sequentially passed through the plug 420 'metal ring gasket 419, sealing ring body 418, metal ring gasket 419 and sealing ring body 418' at the entrance end, and a ring with The pull-out net cover 'is followed by loosening the non-porous base 421 connected to the inlet of the t4u at the inlet end, taking out the end of the reserved waterline, connecting the waterline to the ring of the pull-net cover, and The two sets of sealing ring bodies 418 and metal ring gaskets 419 that are sleeved on the drill 9 are placed in the penetrating officer 411, and the holed plugs G are locked to the mouth of the penetrating pipe 411 without locking. The hole plug 42Q is locked on the principle of not letting gas out, then loosen the hole-free plug of the outlet pipe 4m at the outlet end, and take out the other-end of the waterline. Then, start to pull back the waterline from the exit end, and the light line 9 connected to the inlet π end of the waterline will pass through the inlet end through 16 10 15 20 1240053 舛 .05 to modify the 2 pipes and exit the exit end. Thread the tube 411. At this time, remove the pull-net cover / set the sealing ring body 418, the metal ring-shaped cymbal 419, the sealing ring body 418, the Month% gasket 4 丨 9, and the hole plug 42G in order. On the light environment 9, the two sets of sealing ring bodies 418 and metal ring-shaped cymbals placed on the money 9 are placed in the insertion pipe 411 and the hole plug 42 is locked, and the entrance end is worn through the sigh Kawakami's holed plug was also tightened. After completing the entrance and exit ends of the mirror, use soapy water to test whether there is any leakage of the tile f 411 and the hole plug 420. If there is gas or no leakage, the hole plug 42 should be re-locked. Urgent or take other remedial measures. Usually after the light release 9 is released, a part of the light release 9 will be extended from the wear pipe 411 for subsequent other guards or maintenance use. These exposed reserved lines can be accommodated in μ and 彳 m. Therefore, 'this method can be changed Contains-Step 64 of accommodating and protecting the cables exposed to the guide. In order to perform Step 64, you must make some cooperative measures in the process of Step 63: In Step 63, insert the optical cable 9 into the duct 411 Before the metal ring gasket 419 and the sealing ring body 418 are installed on the optical cable 9, the cold-shrink tube 512, the wave tube 511 and the cold-shrink tube 512 must be installed on the light guide 9 in order, and the light After the guide tube 411 is passed through the outlet tube 411 at the exit end, the metal ring gasket 419 and the sealing ring body 418 must be installed on the optical tube 9 and then set. Referring to FIG. 10 and FIG. 11, first, after the installation of the optical cable 9 is completed, a section of the exposed optical cable 9 is reserved at the entrance end and another adjacent exit end for future construction use, or the optical cable 9 is connected to the point box and used. The optical fiber fusion splicer is connected to other clients according to customer requirements and design cores. The reserved optical fiber 9 must be organized and rolled into the optical cable storage rack, and then this 17 5 10 15 20 1240053, 94.05 amended The optical cable 9 is put away for convenience. Secondly, in order to make the connection between the optical cable 9 and the pipe pipe more airtight, and damage caused by the solidity f, and must be handed over: :: 511 to protect the light, € 9 to prevent from passing through the river respectively in the waves The tube 511 ^ shrinks the tube 512, and makes the cold-shrink wave tube 511 and the light environment 9 and: "" tightly attached to the wearing pipe-, after the cold-shrinking operation is completed, it must be directed to :: Probability. When there are no safety concerns, make a quality test—test, and it will surely form the entire process of laying the optical fiber cable 9. In summary, the present invention discloses an E-in and out device and its construction method, regarding the convenience of its optical routing. A „And use an easy method to achieve the purpose of cloth, spring, and do not need to avoid, to meet the convenience of construction. No need to stop the gas during the Taifeng period. In terms of economic benefits, you can easily reach out in your long life, and the materials used are all synthesized without external jaws. Moreover, the cost of construction is not high, which is in line with the economy. ^ Yu + by n / general requirements on the other hand ′ due to not directly buried rate. * This does not affect the H f component, and reduces the replacement and maintenance of the fighters. As far as construction is concerned, the device of the present invention and its construction method, because no special materials, construction machines are used, and Large-scale sites, etc., and also simple construction method, can be constructed under the principle of vitality, construction time. And without having to be too long, at the level of the conference, the era of information emphasizes the speed and benefit of information: local money is the better choice in current technology. Use existing and official road equipment to deploy, so that All clients along the pipeline can grasp important information and share the improvement of quality of life created by technology in the first time. Therefore, the amendment of 18 1240053 94.05 can indeed achieve the purpose of the invention. However, the above-mentioned ones are only the preferred embodiments of the present invention, and can be used to limit the scope of the present invention. Early equivalent changes and modifications at a glance,

應仍屬本發明專利涵蓋之範圍内 【圖式簡單說明】 圖1為本發明供瘦線進出管線的導具之較# 立體分解圖; U 睛專利 皆 貫施例的 10 15 圖2為本發明供境線進出管線的導具 主體基頭及無孔塞頭之立體剖面圖; 乂 土只 圖3為本發明供境線進出管 側視圖; 之較佳實施例的 圖4為本發明㈣線進 體剖面圖; 、^ 1視窗塞頭的立 施例中 圖5為本發明 施作流程圖; 於管線中佈設 20 境線的方法較佳實施例之 圖6為於管線中佈設纜 斯管上鑽孔的剖面圖; 去杈佳實施例中,於瓦 圖7為於管線中佈設纜 組設置完成之側視圖; 、/較佳實施例中,鞍座 圖8為於管線中佈 設境線的 條通管完成之側視圖; 方去敷佳實施例中,通管 線中物線的方法較佳 水線完成之側視圖,· 汽施例中,預 19 94.05修正本 1240053 圖10為於管線中佈設纜線的方法較佳實施例中,佈 纜完成之側視圖;及 圖1 1為於管線中佈設纜線的方法較佳實施例中,光纜 收容完成之側視圖。 20 94.05修正本 1240053 【圖式之主要元件代表符號說明】 10 低壓瓦斯管 313 視窗塞頭 111 管壁 314 主臂内螺紋部 112 通孑L 315 主體外螺紋部 21 鞍座組 316 視窗外螺紋部 211 上鞍座 317 螺栓體 212 下鞍座 318 透明部 213 螺栓組 41 側臂管單元 214 止洩環體 411 穿設管 215 上鞍體(基座) 412 止泡單元 2150 底面 413 側臂内螺紋部 2152 頂面 414 孔槽 216 上螺接段 415 大孔徑部 217 上螺孔部 416 小孔徑部 218 通道 417 肩部 219 凹槽部 418 側臂密封環體 220 下鞍體 419 金屬環形墊片 221 下螺接段 420 有孔塞頭 222 下螺孔部 421 無孔塞頭 223 螺栓 422 有孔外螺紋部 224 螺帽 51 保護單元 31 主臂管單元 511 浪管 311 觀測管 512 冷縮管 312 主體塞頭 9 光纜 21It should still be within the scope of the patent of the present invention. [Schematic description] Figure 1 is a three-dimensional exploded view of the guide for the thin line in and out of the pipeline of the present invention. A perspective sectional view of the main body base and non-hole plug of the supply line inlet and outlet pipeline of the invention; Figure 3 is a side view of the supply line inlet and outlet pipe of the invention; Figure 4 of the preferred embodiment of the invention Fig. 5 is a flow chart of the present invention in the embodiment of the window plug; Figure 6 is a method of laying a line of 20 in a pipeline. A preferred embodiment of the method is shown in Figure 6. A cross-sectional view of the hole; in the preferred embodiment, Figure 7 is a side view of the completion of the laying of the cable group in the pipeline; / in the preferred embodiment, the saddle Figure 8 is a way of laying the boundary line in the pipeline Side view of the pipe completion; In the embodiment of the side-to-side application, the method of passing the object line in the pipeline is better than the side view of the waterline completion. · In the steam embodiment, the pre-19 94.05 amendment 1240053 is shown in Figure 10. In a preferred embodiment of the method of wiring, a side view of the cable is completed; The method of FIG. 11 is a cable laid in the pipeline embodiment, a side view of the preferred embodiment of the cable accommodating completed. 20 94.05 amendment 1240053 [Description of the main symbols of the drawings] 10 Low-pressure gas pipe 313 Window plug 111 Pipe wall 314 Internal thread of the main arm 112 Through L 315 External thread of the main body 21 Saddle group 316 External thread of the window 211 Upper saddle 317 Bolt body 212 Lower saddle 318 Transparent part 213 Bolt set 41 Side arm tube unit 214 Anti-drain ring body 411 Pass-through tube 215 Upper saddle body (base) 412 Antifoam unit 2150 Bottom surface 413 Side arm internal thread 2152 Top surface 414 Hole groove 216 Upper screwing section 415 Large hole diameter portion 217 Upper screw hole portion 416 Small hole diameter portion 218 Channel 417 Shoulder portion 219 Groove portion 418 Side arm sealing ring body 220 Lower saddle body 419 Metal ring gasket 221 Lower screw connection section 420 With plug 222 Lower screw hole 421 Non-hole plug 223 Bolt 422 With external threaded part 224 Nut 51 Protection unit 31 Main arm tube unit 511 Wave tube 311 Observation tube 512 Cold shrink tube 312 Main body Plug 9 optical cable 21

Claims (1)

1240053 94.05修正本 拾、申清專利範圍: 1· 一種供纜線進出管 供一纜線出入該管 ,該導具包含: 線之導具,裝設於一管線之管壁上, 壁,該管壁上形成至少一貫穿之通孔 一基座 可拆離地設於該管壁之外壁面上,具有一 頂面及一底面·, 道於該底面之開 出該管壁。 —通道貫穿該基座頂面及底面,且該通 口端可對應地連通該通孔,供該纜線進 2 ·依據申請專利節圓结 』軌圍弟1項所述之導具,更包含一 道於該頂面之外终A L、土 ^ 、、彖向外返離該管線傾斜延伸之穿設管。 3 ·依據申請專利範圍穿 圍弟2項所述之導具,更包含一具有_ 安裝於該穿設管之自 <目由糕且可供該纜線穿通之有孔塞 、裝設於該穿巧总〜 、 。&内之至少一橡膠環體及至 型墊片之止洶罝- ^ ^ 兀,可密閉該纜線及該穿設管之内壁面 間之空間。 157 4·依據申請專利筋图常Q 、首协过5 2項所述之導具,更包含一由該通 i、以了'面之外緣向外遠離該管線垂直延伸之觀 5•可供觀測該料於該管線内佈設之情況。 "& ’ •依據申請專利範图楚 号π乾圍罘4項所述之導具, 地設於該觀測管之更匕3 了止茂 6 y - , 而且/、有一透明部之視窗突豆百 6·依據申請專利範 in兄自基碩。 靶㈤罘5項所述之導具, 套没於該穿設管及兮弊 & 更 具有— 今亥$总$山 Λ、、見、在之外周面的浪管及二分別連接 。亥“兩端之冷縮管的保護單元。 】連接 •依據申請專利範圊笛」 圍弟4項所述之導具,其中,該基座延 22 1240053 94.05修正本 伸為一圍繞該通道、, 上知肢亚形成一上鞍座、一對應該 上鞍座之下鞍座, . ^ e ^ 及一可將分別設於該管線上下側之該 手鞍座鎖固之螺栓組。 8·依據申請專利範圊 …一 圍矛7項所述之導具,更包含-可設於 吕亥牙设管之自由☆山 而(、封閉該穿設管且止洩之無孔塞頭 〇 9 ·依據申請專利銥图# 寺才』乾圍弟8項所述之導具,更包 該觀測管之自由# u处& 0日> ^ 而彳,、封閉该觀測管且止洩之主體塞頭 〇 10·—種於一管線中佈 • ,。又 '、見線之方法,该方法包含下述步 驟· (1)方、4官線擇定一位置穿設一通孔 ⑺:該擇定位置安裝一具有一通道的導具,使該導 :附者於該管線外部’且該通道的_端對應於該 通孔 (3)由該通道之一端施放該境線進入該管線中。 U.依據中請專利範圍第1Q項所述之方法,其/,施放該雙 線進入邊官線的方式’可先於該管線中佈設—水線 藉由該水線進行纜線之施放。 12·依據申請專利範圍第u項所述之方法, 文包含''於*^女牛 驟⑶後對外露於該導具之魏線加以收容及保護之= 〇 231240053 94.05 Amends the scope of this patent and declares the patent: 1. A cable inlet and outlet tube for a cable to enter and exit the tube. The guide includes: a wire guide installed on the wall of a pipeline. The wall, the At least one through hole is formed in the pipe wall. A base is detachably provided on the outer wall surface of the pipe wall, and has a top surface and a bottom surface. The pipe wall is opened from the bottom surface. — The channel runs through the top and bottom surfaces of the base, and the port end can communicate with the through hole correspondingly for the cable to enter. Contains a through pipe that ends AL, soil ^, 彖 outside the top surface and extends obliquely away from the pipeline. 3 · According to the scope of the patent application, the guides described in item 2 of the siege, including a hole plug with a < mesh cake installed on the pipe, and the cable can be passed through, installed in The dressing is always ~,. & the at least one rubber ring body and the to-type gasket can be used to seal the space between the cable and the inner wall surface of the pipe. 157 4. In accordance with the patent application for the regular Q, Shouxian 52 mentioned in the guide, including a view from the through i, with the outer edge of the surface extending away from the pipeline vertical view 5 • 可It is used to observe the situation that the material is laid in the pipeline. " & '• According to the guidance tool described in the patent application Fantu Chu No. π Ganwei 4 items, the ground is located in the observation tube 3 止 茂 6 y-, and / or has a transparent window突 豆 百 6 · According to the patent application Fan in brother Zi Jishuo. The guides as described in the 5th item of the target, are not installed in the wearing pipe and the disadvantages & more have-Jinhai $ Total $ mountain, 见, 、, the outer wave tube and the second connection respectively. Hai "Protection unit of the cold shrink tube at both ends.] Connection • According to the patent application Fan Zhidi, the guide described in item 4 of the sibling, in which the base extends 22 1240053 94.05 to extend around the channel, The upper limbs form an upper saddle, a pair of lower saddles that should be upper saddles,. ^ E ^, and a bolt set that can be fixed to the hand saddles on the upper and lower sides of the pipeline, respectively. 8 · According to the patent application 圊 ... the guides described in item 7 of the perimeter spear, including-the freedom that can be installed in Lu Haiya to set up a pipe ☆ mountain and (, the non-porous plug that closes the through pipe and stops the leak. 09 · According to the application of the patent Iridium map # 寺 才 ”Qianwei brother 8 items of guides, including the freedom of the observation tube # u the place & 0 day> ^ And ,, close the observation tube and stop the leakage Main body plug 〇10 · —A kind of cloth in a pipeline. Also, the method of seeing the line, the method includes the following steps: (1) a square, 4 official line to choose a position through a through hole 该: A guide with a channel is installed at a selected position, so that the guide: the attachment is outside the pipeline 'and the _ end of the channel corresponds to the through-hole (3). The horizon is cast into the pipeline from one end of the channel. U. According to the method described in item 1Q of the patent scope of the application, it is that / the way to release the double line into the official line can be laid before the pipeline-the waterline is used to release the cable through the waterline. 12 · According to the method described in item u of the scope of patent application, the text contains `` Wei exposed to the guide after the female cow step (3). Be accommodated and protection = 23 billion
TW93103317A 2004-02-12 2004-02-12 Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline TWI240053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW93103317A TWI240053B (en) 2004-02-12 2004-02-12 Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW93103317A TWI240053B (en) 2004-02-12 2004-02-12 Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline

Publications (2)

Publication Number Publication Date
TW200526892A TW200526892A (en) 2005-08-16
TWI240053B true TWI240053B (en) 2005-09-21

Family

ID=37007640

Family Applications (1)

Application Number Title Priority Date Filing Date
TW93103317A TWI240053B (en) 2004-02-12 2004-02-12 Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline

Country Status (1)

Country Link
TW (1) TWI240053B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10967408B2 (en) * 2014-09-19 2021-04-06 Wesco Distribution, Inc. Pressurized conduit rodder
EP4329118A4 (en) * 2021-04-19 2025-04-09 Fujikura Ltd. Pipeline and method for laying cable

Also Published As

Publication number Publication date
TW200526892A (en) 2005-08-16

Similar Documents

Publication Publication Date Title
TWI240053B (en) Conduit fastened on pipeline for inlet/outlet of cables and method for laying cable in pipeline
NZ592205A (en) Laying network cable in water supply pipe along milaying network cable in water supply pipe along microduct tube using y-junction croduct tube using y-junction
US20030068143A1 (en) Method and apparatus providing fiber optic cables through gas service pipes
CN104238056A (en) Cable splice closure with both ends mechanically sealed
US6947647B2 (en) Methods for installing fiber optic cable in a building having a gas riser
KR100955049B1 (en) Fire extinguishing sprinkler piping system and construction method of fire sprinkler piping using the same
CN101369040B (en) Buried large-capacity optical cable transfer box
CA2405748A1 (en) Pipe threading
CN204116667U (en) Both-end mechanical seal cable splice closure
CN221597390U (en) Cross-road power cable pipe prefabrication device
CN203504076U (en) Cable release nozzle block
KR20110008464A (en) Corrugated pipe junction box connection device
US8505251B1 (en) System for routing conduit and related methods and apparatus
CN108954018B (en) Laying method of pipeline leakage sensing cable
CN207567809U (en) A kind of city integrated piping lane outlet combined system
KR100362205B1 (en) Optical cable for laying
CN203217135U (en) Tightly sleeved type internal elliptical shaped branched optical cable
JP2007113197A (en) Manhole structure and cable construction method
JPH10174238A (en) Method for inserting hose with nozzle in pipeline
CN218335272U (en) Cable pit fire prevention plugging device
RU65168U1 (en) DEVICE FOR LAYING COMMUNICATION FACILITIES IN PIPELINE TRANSITIONS (OPTIONS)
BR102019015729A2 (en) SAFETY DEVICE FOR HYDROSTATIC TESTING IN FIRE FIGHTING HOSES
JPH10290517A (en) Manhole for communication cable
TW461944B (en) Construction method: to install optical fiber through gas pipe
JP4219627B2 (en) Construction method of information-compatible tube, construction structure thereof, and construction member thereof

Legal Events

Date Code Title Description
MK4A Expiration of patent term of an invention patent