SU633970A1 - Repair train for railway bridges - Google Patents

Repair train for railway bridges

Info

Publication number
SU633970A1
SU633970A1 SU752170935A SU2170935A SU633970A1 SU 633970 A1 SU633970 A1 SU 633970A1 SU 752170935 A SU752170935 A SU 752170935A SU 2170935 A SU2170935 A SU 2170935A SU 633970 A1 SU633970 A1 SU 633970A1
Authority
SU
USSR - Soviet Union
Prior art keywords
crane
track
train
platform
conveyor
Prior art date
Application number
SU752170935A
Other languages
Russian (ru)
Inventor
Юрий Дмитриевич Гузевич
Александр Леонтьевич Брик
Леонид Павлович Сычев
Юрий Леонидович Эдишев
Original Assignee
Научно-Исследовательский Институт Мостов Ленинградского Института Инженеров Железнодорожного Транспорта Им. В.Н.Образцова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Мостов Ленинградского Института Инженеров Железнодорожного Транспорта Им. В.Н.Образцова filed Critical Научно-Исследовательский Институт Мостов Ленинградского Института Инженеров Железнодорожного Транспорта Им. В.Н.Образцова
Priority to SU752170935A priority Critical patent/SU633970A1/en
Application granted granted Critical
Publication of SU633970A1 publication Critical patent/SU633970A1/en

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

форма снабжена стационарным транспортером , расноложенным над выдвижным ленточным транспортером, и загрузочными бункерами , примыкающими к полувагону с тран спортирующим полом, причем в состав поезда введен экскаватор-планировщик на комбинированном ходу, размещенный под стрелой путеукладочного крана. Изобретение по сн етс  чертежами, где на фиг. 1 дана принципиальна  схема ремонтного поезда; на фиг. 2 показан поперечный разрез А-А на фиг. 1; на фиг. 3 дан поперечный разрез Б-Б на фиг. 1; на фиг. 4 представлена схема путеукладочного крана с выдвинутым транспортером. Ремонтный поезд содержит расположенный на платформе путеукладочный кран 1 со стрелой и крановой тележкой, промежуточную платформу 2 сустановленными на ней выдвиж ым ленточным транспортером 3 с транспортирующими роликами 4, стационарным тра 1спортером 5, расположенным над выдвижным ленточным транспортером 3, и загрузочными бункерами 6 и 7, полувагоны 8 уборочной мащины, снабженные наклонным транспортирующим полом 9, и стеллаж 10 дл  звеньев путевой рещетки 11, расположенный .между стрелой и платформой путеук.ладочного крана 1. Под стрелой путеукладочного крана 1 расположен полноповоротный экскаваторпланировщик 12 на гусеничном или пнев.моколесном ходу, оборудованный дополнительно комбинированным ходом 13 дл  езды по рельсовой колее и соответствующими сцепными устройствами. В пределах промежуточной платформы 2 над стационарным тр нснортером 5 устроена площадка 14, предназначенна  дл  хоз йственных нужд. Кранова  тележка стрелы путеукладочного крана I снабжена крюком 15, который посредством т говых лебедок крана поддерживает в рабочем положении консольную часть выдвижного ленточного транспортера 3, на конце которого находитс  распределительное устройство 16 дл  равномерной засыпки балласта при ремонте балластного корыта пролетного строени  17. Стационарный транспортер 5 предназначен дл  перемещени  сыпучих материалов из загрузочного бункера 7 на выдвижной лен точный транспортер 3. Загрузочный бункер 7 примыкает к наклонному транспортирующему полу 9 полувагона 8 уборочной .мащины. Бункер 6 небольшой емкости расположен над стационарным транспортером 5 на промежуточной платформе 2 и предназначен дл  сыпучих материалов. Ремонтный поезд работает следующим образом. Сцеп экскаватора-планировщика 12, путеукладочного крана 1 с выдвинутой стрелой , платформы 2 и полувагонов 8 уборочной машины, загруженных балластом, следует на объект ремонта. При этом бункер б загружен неском, на хоз йственной площадке 14 размещены материалы и средства малой механизации, а путеукладочный кран 1 выполн ет функцию локомотива. На объекте ремонта экскаватор-планировщик расцепл ют от путеукладочного крана 1 и отвод т вперед по рельсовой колее. Крюком 15 крановой тележки путеукладочного крана 1 последовательно снимают звень  путевой рещетки 11 с балластного корыта пролетного строени  17 и укладывают их на стеллаж 10. Затем экскаватор-планировщик 12 завод т под стрелу крана 1, котора  находитс  над ремонтируемой поверхностью, причем экскаватор перемещаетс  по балласту на гусеничном или пневмоколесном ходу. Очистка балластного корыта производитс  экскаватором-планировщиком 12 в направлении от платформы крана 1 к концу стрелы. Старый балласт сбрасывают в отвал или груз т в подвижный состав, сто щий на соседнем пути или впереди поезда. На очищенный участок балластного корыта пролетного строени  17 с хоз йственной площадки 14 крюком 15 крановой тележки подают средства малой механизации и материалы дл  гидроизол ционного-сло . Затем в балластное корыто засыпают защитный слой песка, который из бункера 6 ноступает на стационарный транспортер 5, который в свою очередь перемещает его на выдвижной ленточный транспортер 3 и через распределительное устройство 16 - в балластное корыто. Перемещение выдвижного ленточного транспортера 3 осуществл етс  по транспортирующим роликам 4 крюком 15, на котором подвешена его консольна  часть. Укладка нового балласта производитс  так же, как и песка, с той лишь разницей, что на транспортер 5 балласт подаетс  из загрузочного бункера 7. В свою очередь бункер 7 заполн етс  балласто.м, поступающим по наклонному транспортирующему полу 9 из полувагона 8 уборочной мащины. Выравнивание сло  балласта и его уплотнение осуществл ют экскаватором-планировщиком . 12 при убранном выдвижном ленточном транспортере 3. Далее укладывают в путь крюком 15 крановой тележки звень  путевой решетки 11, наход щиес  на стеллаже 10, и производ т засыпку щпальных  щиков балластом с помощью выдвижного транспортера 3 так же, как и засыпку балластного корыта. При. этом экскаватор-планировщик 12, размеща сь на рельсовом пути, разравнивает балласт и производит уборку его со щпал. Затем производ тс  путевые работы известным способом. Экскаватор-планировщик 12 сцепл ют с путеукладочным краном 1 и поезд увод т с объекта ремонта. Применение предлагаемого ремонтного поезда дл  искусственных сооружений на железных дорогах позвол ет значительно сократить врем  закрыти  перегона, уменьшить количество рабочих, зан тых на ремонте , и сократить стоимость работ за счет параллельной работы экскаватора-планировщика с путеукладочным краном и с выдвижным транснортером, транснортировани  балласта в полувагонах уборочной машины и разгрузки его непосредственно в балластное корыто, а также за счет исключени  трансформации поезда и устранени  операций по демонтажу контактной сети. the form is equipped with a stationary conveyor, located above the extendable belt conveyor, and loading bunkers adjacent to the gondola car with a transporting floor, with an excavator-planner on the combined course, placed under the jib of the track-laying crane. The invention is illustrated in the drawings, where in FIG. 1 is a schematic diagram of a repair train; in fig. 2 shows a cross-section A-A in FIG. one; in fig. 3 is given a cross-section of BB in FIG. one; in fig. 4 is a diagram of the track-laying crane with extended conveyor. The repair train contains a track-laying crane 1 with a boom and a crane truck located on the platform, an intermediate platform 2 installed on it a pull-out belt conveyor 3 with transporting rollers 4, a stationary tra 1porter 5 located above the pull-down belt conveyor 3 and loading hoppers 6 and 7, gondola cars 8 of the harvesting machine, equipped with an inclined transporting floor 9, and a rack 10 for links of the track grid 11, located between the boom and the platform of the landing crane 1. Under the boom The crane 1 is a full revolving excavator planner 12 on a caterpillar or pneumatic wheel drive, equipped with an additional combined move 13 for driving along a rail track and corresponding coupling devices. Within the intermediate platform 2 above the stationary transnorter 5, a platform 14 is designed for household needs. The crane truck of the tracklaying crane I is equipped with a hook 15 which, by means of a crane winch, keeps the cantilever part of the extendable conveyor belt 3 in its working position, at the end of which is a switchgear 16 for uniformly filling ballast when repairing the ballast trough of the span structure 17. Stationary conveyor 5 is for transporting bulk materials from the hopper 7 to the retractable flap, an accurate conveyor 3. The hopper 7 adjoins the inclined transport tiruyuschemu floor 9 8 gondola harvesting .maschiny. The bunker 6 of a small tank is located above the stationary conveyor 5 on the intermediate platform 2 and is intended for bulk materials. Repair train works as follows. The coupler of the excavator-scheduler 12, track-laying crane 1 with the boom extended, platform 2 and gondola 8 of the harvesting machine loaded with ballast, should be sent to the repair facility. At the same time, the bunker b is loaded with a pair, materials and means of small-scale mechanization are placed on the household site 14, and the track-laying crane 1 performs the function of a locomotive. At the repair facility, the excavator-planner is disengaged from the track-laying crane 1 and retracted along the track track. The hook 15 of the crane track-laying crane 1 successively removes the links of the track grid 11 from the ballast trough of the span structure 17 and places them on the rack 10. Then the excavator-scheduler 12 is set up under the crane boom 1, which is above the repaired surface, and the excavator moves along the ballast tracked or pneumowheel. The ballast trough is cleaned by excavator-planner 12 in the direction from the platform of the crane 1 to the end of the boom. Old ballast is dumped or dumped into rolling stock on a nearby track or in front of a train. The mechanized mechanization and materials for the waterproofing layer are fed to the cleaned area of the ballast trough of the span 17 from the economic site 14 by the hook 15 of the crane truck. Then a protective layer of sand is poured into the ballast trough, which from the bunker 6 enters the stationary conveyor 5, which in turn moves it to the retractable belt conveyor 3 and through the distribution device 16 to the ballast trough. The movement of the extendable conveyor belt 3 is carried out along transporting rollers 4 by hook 15 on which its cantilever part is suspended. The new ballast is laid in the same way as the sand, with the only difference that the conveyor 5 is supplied with ballast from the hopper 7. In turn, the bunker 7 is filled with ballast. The ballast is fed through the inclined conveying floor 9 from the gondola 8 of the harvester. The ballast layer is leveled and compacted by an excavator planner. 12 with the retractable belt conveyor 3 removed. Next, the track grid link 11 located on the rack 10 is placed on the path 15 of the crane trolley, and the ballast box is filled in with the help of the retractable conveyor 3 in the same way as the ballast trough. At. This excavator-planner 12, located on the track, levels the ballast and cleans it off from the ground. Then, track works are carried out in a known manner. Planing excavator 12 is engaged with track-laying crane 1 and the train is taken away from the repair facility. The use of the proposed repair train for artificial structures on railways significantly reduces the closure time of the haul, reduces the number of workers involved in repairs, and reduces the cost of work due to the parallel operation of a planning excavator with a track-laying crane and a retractable transnorter. harvesting machine and unloading it directly into the ballast trough, as well as by eliminating the transformation of the train and eliminating the operations of dismantling the contact tnoj network.

Предлагаемый поезд позвол ет, кроме того , осуществл ть работы по замене дренирующего грунта за усто ми железнодорожных мостов за одно трех-четырех часовое «окно.The proposed train also makes it possible to carry out work on the replacement of draining soil behind the foundations of railway bridges in one three to four hour window.

Claims (2)

1. Ремонтный поезд дл  железнодорожных мостов, включающий распо.южениыи на платфор.ме путеукладочный кран со стрелой , промежуточную платформу, полувагон с транспортирующим полом, стеллаж дл  звеньев путевой решетки, выдвижной ленточный транснортер с консольной частью и транспортирующие ролики, отличающийс  1. Repair train for railway bridges, including the location of a track-laying crane with an arrow, an intermediate platform, a gondola with a transporting floor, a rack for the links of the track grid, a retractable belt transnorter with a cantilever part and transporting rollers, different тем, что, с целью повышени  производительности работы и уменьшени  стеснени  движени  поездов, транспортирующие ролики расположены на промежуточной платформе и платформе путеукладочного крана, консольна  часть выдвижного ленточного транспортера подвешена на стреле крана, стел.чаж дл  звеньев путевой рен1етки расположен между стрелой и платформой путеукладочного крана, а промежуточна  плат .форма снабжена стационарным транспортером , расноложенным над выдвижным ленточным транспортером, и загрузочными бункерами , примыкающими к полувагону с тран спортирующим полом.By the fact that, in order to increase the productivity of work and reduce the constraint of train movement, the transporting rollers are located on the intermediate platform and the track laying crane platform, the cantilever part of the retractable belt conveyor is suspended on the crane boom, , and the intermediate plate. the form is equipped with a stationary conveyor, located above the retractable belt conveyor, and with loading bunkers adjacent to luvagonu with transsporting floor. 2. Ремонтный поезд дл  железнодорожных мостов по п. 1, отличающийс  тем, что в состав поезда введен экскаватор-п, ани joBimiK на комбинированном ходу, размещенный под стрелой путеукладочного крана.2. A repair train for railway bridges in accordance with claim 1, characterized in that an excavator-an joBimiK in a combined course, placed under the jib crane, is introduced into the train. Источники информации,прин тые во внимание при экспертизе:Sources of information taken into account in the examination: 1.Евграфов Г. К. Содержание и реконструкци  мостов изд-во «Транспорт 1964, с. 177-178.1. G.Kh. Yevgrafov. Maintenance and reconstruction of bridges “Transport 1964, p. 177-178. 2.Авторское сви.тетельство СССР ЛЬ 69574, кл. Е 01 В 27/02, 26.10.40.2. Author's testimony of the USSR: L, 69574, cl. Е 01 В 27/02, 10.26.40. ,//iy /.- / / / 4ff// ;yУа 2, // iy /.- / / / 4ff //; yUa 2 в-вin-in ое-еabout her // 7777 п 5 l 6 г 7 8p 5 l 6 g 7 8 о-ее о-вoh-oh-oh о-а oh fuz.fuz.
SU752170935A 1975-08-25 1975-08-25 Repair train for railway bridges SU633970A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU752170935A SU633970A1 (en) 1975-08-25 1975-08-25 Repair train for railway bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU752170935A SU633970A1 (en) 1975-08-25 1975-08-25 Repair train for railway bridges

Publications (1)

Publication Number Publication Date
SU633970A1 true SU633970A1 (en) 1978-11-25

Family

ID=20631285

Family Applications (1)

Application Number Title Priority Date Filing Date
SU752170935A SU633970A1 (en) 1975-08-25 1975-08-25 Repair train for railway bridges

Country Status (1)

Country Link
SU (1) SU633970A1 (en)

Similar Documents

Publication Publication Date Title
US4307667A (en) Railroad track relaying train
SU1237088A3 (en) Machine for continuous placing of sand layer between roadbed and ballast layer ofrailway track
CA1287263C (en) Mobile track renewal machines
US9605387B2 (en) Railway work vehicle
US3167193A (en) Loading car with conveyor
CZ59493A3 (en) Maintenance mechanized machine
PL180675B1 (en) W agon for the m agonization of loose materials PL PL PL
GB1559258A (en) Travellin machine arrangements
CN101955070B (en) Automatic shaper including coal shaping roller and applied to transporting coal by trains
CN109368137A (en) A kind of dumping plough transition dislocation method
US3752334A (en) Industrial bulk material transportation
SU633970A1 (en) Repair train for railway bridges
US4316416A (en) Mobile apparatus for replacing old track ties by new track ties
US4319416A (en) Method for draining a railway track and a railway train for use in said method
CN208716444U (en) Movable loading chute device
CN114412497B (en) Construction method for quick soil discharging and feeding of normal tunneling of shield of short-interval vertical shaft
US1826069A (en) Method of surstitution of railroads by means of substitution-trains, and mechanical apparatus constituting the same
US2873866A (en) Material handling apparatus
US1879203A (en) Plant for loading and unloading wagons
CN203382233U (en) Large ultra-long double-arm material discharging and distributing machine
SU69574A1 (en) The device for the construction of railways
CN103332503A (en) Large-scale ultra-long one-armed spreader
CANTRELL RENEWAL OF BALLAST AND TRACK BY MECHANICAL MEANS IN POLHILL TUNNEL.(INCLUDES PLATES).
SU829939A1 (en) Method and apparatus for forming high dumps
Toenges Longwall Mining Methods in Some Mines of the Middle Western States