SU522306A1 - The method of construction of pile foundations in permafrost soil - Google Patents
The method of construction of pile foundations in permafrost soilInfo
- Publication number
- SU522306A1 SU522306A1 SU1815511A SU1815511A SU522306A1 SU 522306 A1 SU522306 A1 SU 522306A1 SU 1815511 A SU1815511 A SU 1815511A SU 1815511 A SU1815511 A SU 1815511A SU 522306 A1 SU522306 A1 SU 522306A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- construction
- pile foundations
- permafrost soil
- permafrost
- soil
- Prior art date
Links
- 238000000034 method Methods 0.000 title description 5
- 239000002689 soil Substances 0.000 title description 2
- 238000010276 construction Methods 0.000 title 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000004576 sand Substances 0.000 description 2
- 238000001035 drying Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Description
обретени о р м у л а 1. Способ возвеаени свайного фундамента в вечномерэпом грунте путем образов 1-ни скважины, заливки в нее рабочей среды и установ(и сваи, отличающийс тем, что, с целью повышени несушей спо собности свайного фундамента за счет сокращени продолжительности вмерзани его в грунт, в качестве рабочей среды используют гор чую воду и сухой песок, причем вначале в скважину запивают гор чую воду. 5 а затем в околосвайное пространство засы пают сухой песок с f однсжременным еговибрированием . 2. Способ до JB. 1 о т л в ч а ю ш в им с ji г&м, vto гор сую воду ёапивают в скважину до установки сваи. 3t Способ по . 1, отличающийс тем, что гор чую воду заливают в сква живу после установки сваи. 4. Способ по п,п. -l-S, о т л и ч а ю ш и и с тем - что гор чую воду опотау ют с температурой не выше 60-С.1. The method of erecting a pile foundation in a permafrost soil by forming a 1 well, pouring a working medium into it and setting (and piles, characterized in that, in order to increase the non-drying capacity of the pile foundation by reducing its duration is frozen into the ground, hot water and dry sand are used as the working medium, and the hot water is first washed down the well 5 and then dry sand is fed into the well space with a one-time flexing 2. Method up to JB. tl in h and y wv im with ji g & m, vto mountain water is poured into the well before installing the pile 3t method according to claim 1, characterized in that hot water is poured into the well after installation of the pile 4. method according to claim l-ls, about tons of l and often, so that hot water is hooded with a temperature not higher than 60 ° C.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU1815511A SU522306A1 (en) | 1972-07-28 | 1972-07-28 | The method of construction of pile foundations in permafrost soil |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU1815511A SU522306A1 (en) | 1972-07-28 | 1972-07-28 | The method of construction of pile foundations in permafrost soil |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU522306A1 true SU522306A1 (en) | 1976-07-25 |
Family
ID=20523364
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU1815511A SU522306A1 (en) | 1972-07-28 | 1972-07-28 | The method of construction of pile foundations in permafrost soil |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU522306A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2348759C2 (en) * | 2007-02-16 | 2009-03-10 | Государственное образовательное учреждение высшего профессионального образования "Московский государственный университет путей сообщения" (МИИТ) | Method of building of pile foundation and pile foundation |
-
1972
- 1972-07-28 SU SU1815511A patent/SU522306A1/en active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2348759C2 (en) * | 2007-02-16 | 2009-03-10 | Государственное образовательное учреждение высшего профессионального образования "Московский государственный университет путей сообщения" (МИИТ) | Method of building of pile foundation and pile foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| SU499821A3 (en) | The method of construction of underwater foundations | |
| CN103938623A (en) | Tubular pile construction method | |
| SU522306A1 (en) | The method of construction of pile foundations in permafrost soil | |
| GB561765A (en) | Improvements in piles and foundations | |
| SU617547A1 (en) | Construction element | |
| GB1351992A (en) | Method of stabilising an aboveground structure supported on or by a plurality of friction piles and the stabilisable structures per se | |
| SU844692A1 (en) | Foundation constructing method | |
| CN207619919U (en) | A kind of assembled eco-embankment structure | |
| SU421735A1 (en) | METHOD OF DIPPING THE SUPPORT WELL IN GROUND | |
| SU487206A1 (en) | Foundation construction method | |
| SU527495A1 (en) | The method of construction of shipbuilding and ship repair complex | |
| SU21394A1 (en) | The method of erection of clay walls | |
| SU362920A1 (en) | METHOD FOR EXTRACTING POWERFUL FLOW OF DROPING PLATES LAYERS WITH ARTIFICIAL ROOFING | |
| CN214530634U (en) | Improved tubular pile suitable for aeolian sand geology | |
| CN210194631U (en) | Novel foundation pit backfilling structure | |
| Urbanowski | Lining of Slopes of Navigable Canals and Barks of Water Reservoirs | |
| CN109972678A (en) | Construction method of underground continuous wall | |
| SU452647A1 (en) | A method of strengthening flooded unbound soils | |
| SU7497A1 (en) | Device for splicing a wooden pile in water with an upper reinforced concrete structure in hydraulic structures | |
| SU638673A1 (en) | Method of erecting wall in soil | |
| SU585252A1 (en) | Device for building up a drilled-cast pile | |
| SU1749387A1 (en) | Method of pile installation | |
| SU1240822A1 (en) | Method of extending tails pond | |
| RU1813850C (en) | Method for erection of foundation | |
| SU1708994A1 (en) | Method for erecting wall in soil antiseepage curtain |