[go: up one dir, main page]

SU1710743A1 - Method of mining ore bodies - Google Patents

Method of mining ore bodies Download PDF

Info

Publication number
SU1710743A1
SU1710743A1 SU904816990A SU4816990A SU1710743A1 SU 1710743 A1 SU1710743 A1 SU 1710743A1 SU 904816990 A SU904816990 A SU 904816990A SU 4816990 A SU4816990 A SU 4816990A SU 1710743 A1 SU1710743 A1 SU 1710743A1
Authority
SU
USSR - Soviet Union
Prior art keywords
chambers
panels
stage
zone
cameras
Prior art date
Application number
SU904816990A
Other languages
Russian (ru)
Inventor
Евгений Витальевич Тарчевский
Вячеслав Хаимович Беркович
Владимир Иванович Дорошенко
Юрий Абрамович Дик
Михаил Петрович Попов
Original Assignee
Уральский научно-исследовательский и проектный институт медной промышленности "УНИПРОМЕДЬ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Уральский научно-исследовательский и проектный институт медной промышленности "УНИПРОМЕДЬ" filed Critical Уральский научно-исследовательский и проектный институт медной промышленности "УНИПРОМЕДЬ"
Priority to SU904816990A priority Critical patent/SU1710743A1/en
Application granted granted Critical
Publication of SU1710743A1 publication Critical patent/SU1710743A1/en

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

Изобретение относитс  к разработке мощных крутопадающих рудных тел. Цель - повышение эффективности ^ разработки за счет увеличени  интенсивности горных работ. Определ ют ширину зоны жесткого поддержани  нале* гающих пород, которую отрабатываюттрем  панел ми. Каждую панель отрабатывают камерами первой и второй очередей. Выработанное пространство закладывают твердеющими смес ми. В смежных попадению панел х камеры первой и второй очереди отрабатывают соосно друг под другом, а их размеры определ ют по расчетной формуле. Камеры первой очереди во всех панел х зоны жесткого поддержани  отрабатывают и закладывают одновременно. Затем отрабатывают и закладывают камеры второй очереди в первой и третьей панел х. После этого отрабатыг вают камеры второй очереди во второй панели одновременно с отработкой камер первой очереди в смежной по падению зоне жесткого поддержани  налегающих пород. Дальнейшую отработку залежи зонами ведут аналогично предыдущей зоне. 1 ил. ,The invention relates to the development of powerful steeply dipping ore bodies. The goal is to increase the efficiency of mining by increasing the intensity of mining. The width of the zone of rigid support of the adjacent rocks is determined, which is worked out with three panels. Each panel work out the cameras of the first and second stages. The developed space is set with hardening mixtures. In the panels adjacent to the hit, the chambers of the first and second stages are worked out coaxially under each other, and their dimensions are determined by the calculation formula. The cameras of the first stage in all the panels of the hard support zone are worked out and laid down simultaneously. Then the cameras of the second turn are worked out and laid in the first and the third panels. After this, the second-stage chambers in the second panel are processed simultaneously with the first-stage chambers in the zone of rigid support of overburden adjacent to the fall. Further mining of the deposits are carried out similarly to the previous zone. 1 il. ,

Description

Изобретение относитс  к горнодобывающей промышленности и может быть использовано при подземной разработке крутрпадающих рудных месторождений в удароопасных услови х.- ,,..,,The invention relates to the mining industry and can be used in the underground mining of ore deposits in shock-hazardous conditions.

Цель изобретени  - повышение эффективности разработки за счет увеличени интенсивности горных работ. .The purpose of the invention is to increase the development efficiency by increasing the intensity of mining. .

На чертенке изображена проекци  На вертикальную плоскость отрабатываемого участка рудного тела, который разбивают на зоны жесткого поддержании налегающих пород.The imp is a projection onto the vertical plane of the ore body being worked out, which is divided into zones of rigid support of overburden.

Способ осуществл ют следующим .The method is carried out as follows.

Определ ют зону жесткого поддержани  пород и дел т ее по падению подэтажными выработками 1 на три панели 2. Выемочные панели отрабатывают камерами первой 3 и второй очередей . При этом каждую камеру Ц отрабатывают соосно камерам 3 одна под другой в вышележащей и нижележащей панел х 2. Выработанное пространство закладывают твердеющей смесью..The zone of rigid support of the rocks is determined and divided by the fall of the subsurface mines 1 into three panels 2. The excavation panels are worked out with chambers of the first 3 and second stages. At the same time, each chamber C is processed coaxially to chambers 3 one below the other in the overlying and underlying panels 2. The worked out space is laid with a hardening mixture.

Claims (1)

Очистные работы производ т одновременно по всей зоне жесткого поддержани , отрабатыва  камеры 3 во все трех панел х и закладыва  выработанное пространство твердеющей смесью. 3 . 1 После набора закладкой нормативной прочности производ т выемку камер одновременно на первой и третьей панел х с погашением пустот твердеющей смесью. Отработку камер второй панели осуществл ют одновременно с отработкой камер 3 в смежной по паде нию зоне жесткого поддержани  пород. Дл  соблюдени  условий жесткого поддержани  налегающей толщи пород при отработке крутопадающих мощных месторождений размеры камер первой и второй очередей в смежных по падению панел х определ ют из соотношени  1+L Р где 1 - ширина пролета кровли камер первой очереди, м; L - ширина пролета кровли камер второй очереди, м; Р - нагрузка на целик (напр жение , действующее в массиве н легающей толщи пород), МПа; предел прочности твердеющей закладки на одноосное сжатие в образце, МПа. Дальнейшую отработку осуществл ют проведением аналогичной последовател ности операций. Формула изобретени  Способ разработки рудных тел, включающий определение ширины зоны жесткого поддержани  налегающих пород , отработку этой зоны трем  (е3 нел ми, отработку панелей камерами первой и второй очереди и закладку выработанного пространства твердеющими смес ми, отличающийс  тем, что, с целью повышени  эффективности разработки за счет увеличени  интенсивности горных работ, камеры первой очереди и камеры второй очереди в смежных по падению панел х отрабатывают соосно один над другой, причем их размеры определ ют из соотношени  сад где 1 ширина пролета кровли камер первой очереди, м; L - ширина пролета кровли камер второй очереди, м; Р - нагрузка на целик (напр жение , действующее в массиве налегающей толщи пород), МПа; , предел прочности твердеющей закладки на одноосное сжатие, МПа, камеры первой очереди во всех панел х зоны жесткого поддержани  отрабатывают и закладывают одновременно, затем отрабатывают и закладывают камеры второй очереди в первой и третьей панел х, после этого отрабатыва ют камеры второй очереди во второй панели одновременно с отработкой камер первой очереди в смежной по падению зоне жесткого поддержани  налегающих пород.. .The cleaning works are performed simultaneously over the entire zone of hard maintenance, working on chamber 3 in all three panels and laying the developed space with a hardening mixture. 3 1 After being set with a bookmark of standard strength, the chambers were removed at the same time on the first and third panels with void curing with a hardening mixture. The working of the chambers of the second panel is carried out simultaneously with the working of the chambers 3 in the zone of rigid support of the rocks adjacent to the fall. In order to comply with the conditions of rigid maintenance of the overlying strata of rocks during the development of steeply dipping powerful fields, the dimensions of the chambers of the first and second lines in adjacent panels are determined from the ratio 1 + L P where 1 is the width of the roof span of the chambers of the first turn, m; L is the width of the span of the roof of the chambers of the second stage, m; P is the load on the rear sight (voltage acting in the massif and the adjacent stratum of rocks), MPa; tensile strength hardening bookmarks on uniaxial compression in the sample, MPa. Further testing is carried out by conducting a similar sequence of operations. The invention The method of developing ore bodies, including determining the width of the zone of rigid support of overburden, working out this zone by three (e3), working out the panels with chambers of the first and second stages and laying the developed space with hardening mixtures, in order to increase the development efficiency by increasing the intensity of mining, the cameras of the first stage and the cameras of the second stage in the adjacent falling panels are worked out coaxially one above the other, and their dimensions are determined from the ratio Yeni garden where 1 is the width of the span of the roof of the chambers of the first stage, m; L is the width of the span of the roof of the chambers of the second stage, m; P is the load on the rear sight (voltage acting in the array of the overlying strata of rocks), MPa ;, the tensile strength of the hardening tab on the uniaxial Compression, MPa, cameras of the first stage in all panels of the rigid support zone are worked and laid simultaneously, then cameras of the second stage in the first and third panels are worked and laid, after that cameras of the second turn are worked out in the second panel simultaneously with working chambers of the first stage in the adjacent zone of a hard support overlying rocks ... . e f. e f Д  D -i-i л -..  l - .. v v ;l; l i i A ,A , . , t . t. . P. P -.-. , 4 .- ., four .- . . . -- Г .G. ; r; r l.vv/l.vv / p. улp. street t / -vg/;c;;ii Й а жй / /1 I   t / -vg /; c ;; ii and a / / 1 I
SU904816990A 1990-04-23 1990-04-23 Method of mining ore bodies SU1710743A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904816990A SU1710743A1 (en) 1990-04-23 1990-04-23 Method of mining ore bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904816990A SU1710743A1 (en) 1990-04-23 1990-04-23 Method of mining ore bodies

Publications (1)

Publication Number Publication Date
SU1710743A1 true SU1710743A1 (en) 1992-02-07

Family

ID=21509758

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904816990A SU1710743A1 (en) 1990-04-23 1990-04-23 Method of mining ore bodies

Country Status (1)

Country Link
SU (1) SU1710743A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2223401C2 (en) * 2002-02-20 2004-02-10 Читинский государственный технический университет Process of development of complex-structured deposits
RU2248448C1 (en) * 2003-12-02 2005-03-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Method for extraction of steep-falling deposits of weak ores
RU2280765C1 (en) * 2005-04-18 2006-07-27 ОАО "Восточный научно-исследовательский горнорудный институт" Ore body development method
RU2411360C1 (en) * 2009-11-03 2011-02-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method of underground mining of massive steep ore deposits

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 989070, кл. Е 21 С ijl/ie, 1981.Авторское свидетельство СССР № 161361Й, кл. Е 21 С i»1/l6, 1989. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2223401C2 (en) * 2002-02-20 2004-02-10 Читинский государственный технический университет Process of development of complex-structured deposits
RU2248448C1 (en) * 2003-12-02 2005-03-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Method for extraction of steep-falling deposits of weak ores
RU2280765C1 (en) * 2005-04-18 2006-07-27 ОАО "Восточный научно-исследовательский горнорудный институт" Ore body development method
RU2411360C1 (en) * 2009-11-03 2011-02-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method of underground mining of massive steep ore deposits

Similar Documents

Publication Publication Date Title
SU1710743A1 (en) Method of mining ore bodies
SU1668667A1 (en) Method for combination mining of gently sloping seams
RU2101497C1 (en) Method for developing seams of minerals
SU1270337A1 (en) Method of mining thick ore bodies
RU2182970C2 (en) Method of preparing gas-bearing bed
SU1229362A1 (en) Method of dismantling power supports
SU877013A1 (en) Method of mining thick sloping coal beds
SU1613614A1 (en) Method of mining ore deposits
SU1723326A1 (en) Method for recultivation of land broken by open-pit mining
RU2093678C1 (en) Method for mining thick steep ore bodies
SU1461942A1 (en) Method of mining thick ore deposits
SU912934A1 (en) Method of strip mining of mineral deposits
SU1054543A1 (en) Method of working ore deposits
RU2047780C1 (en) Method for strengthening filling mass
SU1645517A1 (en) Method of mining ore bodies in slices
SU573596A1 (en) Method of mining ores
SU840360A1 (en) Method of consolidating slopes in quarries
SU684142A1 (en) Method of exacavating roof-supporting ore pillars
SU1689622A1 (en) Method for working interstall support pillars
SU693017A1 (en) Method of mining mineral deposits
SU691567A1 (en) Method for the protection of preparatory galleries
SU1362829A1 (en) Method of protecting undermined objects
SU1745937A1 (en) Method of exploitation of thick adjacent mineral seams
SU1677156A1 (en) Method for erecting dam by caving blast
Dangerfield Longwall experience in the Pittsburgh seam: Proc 1st conference on ground control in mining, Morgantown, 27–29 July 1981, Supplement. Publ Morgantown: West Virginia University, 1981