SU1767178A1 - Method for combination working of mineral deposits - Google Patents
Method for combination working of mineral deposits Download PDFInfo
- Publication number
- SU1767178A1 SU1767178A1 SU894694516A SU4694516A SU1767178A1 SU 1767178 A1 SU1767178 A1 SU 1767178A1 SU 894694516 A SU894694516 A SU 894694516A SU 4694516 A SU4694516 A SU 4694516A SU 1767178 A1 SU1767178 A1 SU 1767178A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- chambers
- underground
- pillar
- mining
- ore
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 5
- 229910052500 inorganic mineral Inorganic materials 0.000 title claims 2
- 239000011707 mineral Substances 0.000 title claims 2
- 238000005065 mining Methods 0.000 claims abstract description 11
- 238000005553 drilling Methods 0.000 claims abstract description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000006073 displacement reaction Methods 0.000 abstract 1
- 238000005422 blasting Methods 0.000 description 2
- 230000003245 working effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000007670 refining Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Изобретение относитс к горной промышленности . Цель изобретени - повышение безопасности работ за счет повышени устойчивости бортов карьера путем исключени деформаций и сдвижени бортов при снижении затрат на разработку Способ включает отработку карьера (К) до предельной глубины (ПГ), формирование рудного целика (РЦ) выше ПГ К, бурение скважин с поверхности на глубину подземного руса (ПЯ) до уровн нижней подсечки камер, отработку камер ПЯ, закладку выработанного пространства камер твердеющей смесью и отработку РЦ одновременно с отработкой камер ПЯ по мере твердени закладки. 1 з.п. ф-лы, 1 ил.The invention relates to the mining industry. The purpose of the invention is to increase the safety of work by increasing the stability of the pit walls by eliminating deformation and displacement of the boards while reducing development costs. The method includes mining the pit (K) to the maximum depth (PG), forming the ore pillar (RC) above the SG K, drilling wells the surface to the depth of the underground Russ (PU) to the level of the lower hooking of the chambers; . 1 hp f-ly, 1 ill.
Description
Изобретение относитс к горной промышленности и может быть использовано при переходе с открытых на подземные горные работы.The invention relates to the mining industry and can be used in the transition from open pit to underground mining.
Целью изобретени вл етс повышение безопасности работ за счет повышени устойчивости бортов карьера путем исключени деформаций и сдвижени бортов при снижении затрат на разработку.The aim of the invention is to increase the safety of work by increasing the stability of the pit walls by eliminating deformations and shifting the sides while reducing development costs.
На фиг.1 изображен разрез вкрест простирани рудного тела.Figure 1 shows a section across the strike of the ore body.
Способ осуществл етс следующим образом . Выше предельной глубины 1 карьера формируют рудный целик 2 мощностью, обеспечивающей устойчивость его при отработке подземного руса, дл изол ции подземных горных работ от карьерного выработанного пространства 3. Затем подземный рус подготавливают к отработке проведением транспортных 4, доставочных 5, погрузочных 6 и траншейных 7 выработок. По завершению подготовительных работ с поверхности целика 2 бур т нисход щиеThe method is carried out as follows. Above the maximum depth 1 of the open pit, the ore pillar 2 is formed with a capacity that ensures its stability during the development of an underground river, to isolate underground mining operations from the open pit mine 3. Then the underground Russian is prepared for mining by carrying out transport 4, delivery 5, loading 6 and trench 7 workings . Upon completion of the preparatory work from the surface of the rear sight 2, the wells are descending
скважины 8 большого диаметра, что позвол ет не проходить комплекс выработок, предназначенных дл бурени скаажин, и примен ть высокопроизводительное карьерное оборудование 9. После обу,эивани камерных запасов образуют компенсационное пространство путем оформлени траншейной подсечки 10. Зар жание и взрывание камерных запасов производ т с поверхности рудного целика 2. Отбойку ведут горизонтальными секци ми снизу вверх на зажатую среду, которой служит отбита руда 11. Поверхность очистного забо 12 посто нно поддерживают отбитой рудой 11, в результате чего снижаетс аэродинамическа св зь с карьером и по вл етс возможность уменьшени мощности рудного целика 2 о минимальных размеров. По завершению выпуска отбитой руды из камеры выработанное пространство заклгдывают твердеющей смесью 13, дл подачи которой используют скважины 14, ранее пэобурен- ные в рудном целике 2. Это позвол ет обесС/large diameter wells 8, which makes it possible not to go through the complex of workings intended for drilling the drills, and to use high-performance quarry equipment 9. After sizing up the chamber stocks, form a compensation space by shaping the trench sweep 10. Chamber blasting and blasting the surface of the ore pillar 2. Breaking up is carried out in horizontal sections from the bottom up to the squeezed medium, which serves obit 11. The surface of the refining slab 12 constantly supports the broken ore 11, thereby reducing the aerodynamic bond with the pit and is the ability to reduce thickness of the ore pillar 2 on the minimum size. At the completion of the release of broken ore from the chamber, the developed space is sealed with a hardening mixture 13, for the supply of which wells 14, previously drilled in the ore pillar 2, are used.
СWITH
XX
ОABOUT
XX
аbut
лечить надежный подпор рудного целика 2 твердеющей смесью 13, Рудный целик 2 отрабатывают одновременно с отработкой камер подземного руса по мере твердени закладки в камерах. Погрузку отбитой руды из рудного целика 2 осуществл ют карьерными экскаваторами 15.to treat a reliable support of the ore pillar 2 with a hardening mixture 13; the ore pillar 2 is worked out simultaneously with the mining of the chambers of the underground rus as the laying in the chambers hardens. Replaced ore from the ore pillar 2 is loaded by mining excavators 15.
Изобретение позвол ет повысить концентрацию горных работ за счет совмещени открытых и подземных горных работ, повысить производительность труда в результате применени высокопроизводительного карьерного оборудовани , снизить затраты на добычу за счет исключени проходки бурового горизонта подземного руса и прокладки трубопроводов дл производства закладочных работ в подземных выработках.The invention makes it possible to increase the concentration of mining operations by combining open-pit and underground mining, to increase labor productivity as a result of using high-end mine equipment, and to reduce production costs by eliminating the penetration of the underground layer and laying pipelines for laying work in underground mines.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU894694516A SU1767178A1 (en) | 1989-05-24 | 1989-05-24 | Method for combination working of mineral deposits |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU894694516A SU1767178A1 (en) | 1989-05-24 | 1989-05-24 | Method for combination working of mineral deposits |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1767178A1 true SU1767178A1 (en) | 1992-10-07 |
Family
ID=21449088
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU894694516A SU1767178A1 (en) | 1989-05-24 | 1989-05-24 | Method for combination working of mineral deposits |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1767178A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2137921C1 (en) * | 1998-06-08 | 1999-09-20 | Акционерная компания "Алмазы России-Саха" | Method for combination development of mineral deposits |
| RU2165018C2 (en) * | 1999-07-14 | 2001-04-10 | Акционерная компания "АЛРОСА" ЗАО | Method of combined mining of flooded mineral deposits |
-
1989
- 1989-05-24 SU SU894694516A patent/SU1767178A1/en active
Non-Patent Citations (1)
| Title |
|---|
| Авторское свидетельство СССР № 1420160, кл. Е21 С 41/02, 1986. Авторское свидетельство СССР . № 1439240, кл. Е 21 С 41/02, 1986. * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2137921C1 (en) * | 1998-06-08 | 1999-09-20 | Акционерная компания "Алмазы России-Саха" | Method for combination development of mineral deposits |
| RU2165018C2 (en) * | 1999-07-14 | 2001-04-10 | Акционерная компания "АЛРОСА" ЗАО | Method of combined mining of flooded mineral deposits |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2099524C1 (en) | Combined method of mining of formation of steeply dipping coal seams | |
| CN115012936B (en) | Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration | |
| SU1767178A1 (en) | Method for combination working of mineral deposits | |
| Stupnik et al. | Technological measures to enhance efficiency of mining ore from stopes applying self-propelled equipment | |
| RU2270338C1 (en) | Method for preparation and excavation of inclined and steep mineral bed | |
| AU9285598A (en) | R.b. yun's method for the combined exploitation of mining fields | |
| RU2166631C2 (en) | Method of opening of mine horizons from deep openpits in mining of kimberlite deposits | |
| RU2081326C1 (en) | Method of bore-hole hydraulic mining of minerals in massive deposits | |
| SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
| RU1788258C (en) | Method for mining flat coal seams | |
| SU1051280A1 (en) | Method of mining minerals | |
| SU1032840A1 (en) | Method of excavating steep ore bodies | |
| RU2762170C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
| SU1314066A1 (en) | Method of mining ore bodies | |
| SU1035226A1 (en) | Method of solid working of ore bodies | |
| RU2215145C1 (en) | Method of mineral deposit underground mining in strips | |
| SU1333771A1 (en) | Method of finishing open mines ,particularly, with rod-like deposits | |
| RU2206741C2 (en) | Method of mining of thick mineral beds | |
| SU1420159A1 (en) | Method of final mining of ores in open mine sides | |
| SU1717821A1 (en) | Method for mining mineral deposits | |
| SU1666710A1 (en) | Method for development of mineral deposits | |
| SU1452992A1 (en) | Method of remining of mineral deposits | |
| SU1701917A1 (en) | Method of combined mining of deposits | |
| SU1317128A1 (en) | Method of mining thick ore deposits | |
| SU968409A1 (en) | Method of working ore bodies |