[go: up one dir, main page]

SU1765318A1 - Excavated rock volume estimation method - Google Patents

Excavated rock volume estimation method Download PDF

Info

Publication number
SU1765318A1
SU1765318A1 SU914906759A SU4906759A SU1765318A1 SU 1765318 A1 SU1765318 A1 SU 1765318A1 SU 914906759 A SU914906759 A SU 914906759A SU 4906759 A SU4906759 A SU 4906759A SU 1765318 A1 SU1765318 A1 SU 1765318A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rock mass
partial
quarry
excavated
volumes
Prior art date
Application number
SU914906759A
Other languages
Russian (ru)
Inventor
Леонид Давидович Певзнер
Дмитрий Георгиевич Пономарев
Original Assignee
Pevzner Leonid D
Ponomarev Dmitrij G
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pevzner Leonid D, Ponomarev Dmitrij G filed Critical Pevzner Leonid D
Priority to SU914906759A priority Critical patent/SU1765318A1/en
Application granted granted Critical
Publication of SU1765318A1 publication Critical patent/SU1765318A1/en

Links

Landscapes

  • Length Measuring Devices By Optical Means (AREA)
  • Operation Control Of Excavators (AREA)

Description

1one

(21)4906759/03(21) 4906759/03

(22)31.01.91(22) 01.31.91

(46)3009.92. Бюл. №36(46) 3009.92. Bul №36

(72) Л.Д. Певзнер и Д Г Пономарев(72) L.D. Pevzner and DG Ponomarev

(56)Журнал Уголь, 1988, Ms 6, с 36-38.(56) Coal Journal, 1988, Ms 6, pp. 36-38.

(54) СПОСОБ ОПРЕДЕЛЕНИЯ ОБЪЕМОВ ВЫНУТОЙ ГОРНОЙ МАССЫ(54) METHOD FOR DETERMINING VOLUMES OF FORCED MOUNTAIN MASS

(57)Сущность: включает определение рельефа рабочего карьера до и после выемки горной массы оптическими средствами путем определени  парциальных рассто ний(57) Essence: includes determining the relief of the working quarry before and after excavation of the rock mass by optical means by determining the partial distances

от плоскости, параллельной земной поверхности , до рабочей поверхности карьера с помощью лазерных датчиков, установленных на стреле экскаватора-драглайна, задают парциальную площадь, сравнивают соответствующие парциальные рассто ни  предыдущего и последующих измерений, результат сравнени  умножают на заданную парциальную площадь и получают парциальные объемы, суммиру  которые получают объемы вынутой горной массы. 2 ил.from the plane parallel to the earth's surface to the working surface of the quarry using laser sensors installed on the arrow of the dragline, determine the partial area, compare the corresponding partial distances of the previous and subsequent measurements, multiply the result of the comparison by the specified partial area and get the partial volumes, summed which receive volumes of excavated rock mass. 2 Il.

Изобретение относитс  к землеройному машиностроению и может быть использовано в землеройных машинах, например экскаваторах.The invention relates to earth moving machinery and can be used in earth moving machines, such as excavators.

Существует два типа определени  производительности экскаваторов один из которых заключаетс  в определении веса ковша при каждом цикле экскавации, другой - по объему экскавируемой горной массы .There are two types of definition of excavator performance, one of which is to determine the weight of the bucket during each excavation cycle, the other by the volume of the excavated rock mass.

Наиболее близким к предлг гаемому  вл етс  способ определени  объемов вынимаемой горной массы из карьера включающий съем информации о рельефе карьера с самолета до и после выемки горной массыThe closest to the proposed method is the method of determining the volumes of rock mass removed from the quarry, which includes picking up information about the relief of the pit from the aircraft before and after the mining mass

Однако известный способ не позвол ет определить объем вынимаемой горной массы экскаватором-драглайном. Кроме того, средства реализации известного способа  вл ютс  дорогими, так как сьемка осуществл етс  с самолетаHowever, the known method does not allow to determine the volume of the removed rock mass by the dragline excavator. In addition, means of implementing a known method are expensive, since the filming is carried out from an airplane.

Целью изобретени   вл етс  расширение функциональных возможностей за счетThe aim of the invention is to extend the functionality by

определени  выемки горной массы экскаватором-драглайномdetermination of excavation of rock mass by a dragline excavator

Поставленна  цель достигаетс  тем, что в способе определени  объемов вынимаемой горной массы определение рельефа карьера до и после выемки производитс  оптическими средствами, при этом измер ют парциальные рассто ни  от плоскости стрелы до поверхности карьера с помощью лазерных датчиков, установленных на стреле экскаватора-драглайна , задают парциальную площадь поверхности сравнивают соответствующие параметры предыдущего и последующего измерений, умножают их на парциальную площадь поверхности, при этом полученна  величина определ ет объем экскавируемой горной массы. Измерение парциальных рассто ний позвол ет ускорить съем рабочего рельефа карьера за счет исключени  фотограмметрического способа получени  рельефа, который требует врем  на обработку фотографических материалов и их оцифровкуThe goal is achieved by determining the relief of the quarry before and after excavation using optical methods in the method of determining the volumes of rock to be removed, while measuring the partial distances from the plane of the boom to the surface of the quarry using laser sensors installed on the boom of the dragline excavator, the partial surface area compares the corresponding parameters of the previous and subsequent measurements, multiplies them by the partial surface area, with the resulting value ate a volume ekskaviruemoy rock mass. The measurement of partial distances allows accelerating the removal of the working relief of the quarry by eliminating the photogrammetric method of obtaining the relief, which requires time to process photographic materials and digitize them.

(L

СWITH

VJVj

С ОТFROM

I- 00I- 00

Предлагаемый способ вычисл ет объем один раз, в то врем  как известный способ вычисл ет его дважды.The proposed method calculates the volume once, while the known method calculates it twice.

На фиг. 1 изображено расположение датчика на экскаваторе-драглайне, вид сбо- ку; на фиг. 2 - то же, вид сверху.FIG. 1 shows the location of the sensor on the dragline excavator, side view; in fig. 2 - the same, top view.

На фиг. 1 изображен экскаватор-драглайн , на стреле которого установлен лазерный датчик 1, рабоча  зона 2 измерени  рассто ний, котора  охватывает всю шири- ну экскавируемой поверхности, где а - угол сканировани . На фиг. 2 показана рабоча  поверхность карьера, где а)- углова  скорость вращени  экскаватора (паспортна  величина ).FIG. Figure 1 shows a dragline excavator, on the boom of which a laser sensor 1 is installed, a working distance measurement zone 2, which covers the entire width of the surface being excavated, where a is the scanning angle. FIG. Figure 2 shows the working surface of the quarry, where a) is the angular velocity of rotation of the excavator (passport value).

Способ осуществл етс  следующим образом .The method is carried out as follows.

Перед измерением ковш экскаватора фиксируетс  т говым канатом около корпуса экскаватора. При вращении экскаватора вокруг своей оси со скоростью о; лазерный датчик 1 измер ет парциальные рассто ни  до рабочей поверхности карьера по всей ширине рабочей зоны 2.Before measurement, the excavator bucket is fixed by a pull rope near the excavator body. When the excavator rotates around its axis at a speed of about; The laser sensor 1 measures the partial distances to the working surface of the pit over the entire width of the working zone 2.

Таким образом, сделав полный оборот вокруг оси, получают парциальные рассто ни  по всей рабочей поверхности карьера.Thus, having made a complete revolution around the axis, partial distances are obtained over the entire working surface of the quarry.

Фиг.11

Затем осуществл ют экскавацию горной массы. После этого повтор ют операцию измерени . Результаты измерени  дл  обработки поступают в ЭВМ, котора  определ ет объем вынутой горной массы.Then, the rock mass is excavated. After this, the measurement operation is repeated. Measurement results for processing are transferred to a computer that determines the volume of the excavated rock mass.

Claims (1)

Формула изобретени  Способ определени  объемов вынутой горной массы, включающий определение рельефа рабочего карьера до и после выемки горной массы оптическими средствами , отличающийс  тем, что, с целью расширени  функциональных возможностей за счет определени  выемки горной массы экскаватором-драглайном, определ ют парциальные рассто ни  от плоскости, параллельной земной поверхности, до рабочей поверхности карьера с помощью лазерных датчиков, установленных на стреле экскаватора-драглайна, задают парциальную площадь, сравнивают соответствующие парциальные рассто ни  предыдущего и последующего измерений, результат сравнени  умножают на заданную парциальную площадь и получают парциальные объемы, суммируют их и получают объем вынутой горной массы.Claims The method of determining the volumes of excavated rock mass, including determining the working quarry relief before and after excavating the rock mass by optical means, is characterized in that partial distances from the plane are determined to enhance the functionality by detecting the rock mass excavation by a dragline excavator. , parallel to the earth's surface, to the working surface of the quarry using laser sensors installed on the boom of the dragline excavator, set the partial area, compare The corresponding partial distances of the previous and subsequent measurements, the result of the comparison is multiplied by the specified partial area and receive the partial volumes, summarize them and get the volume of the excavated rock mass. Фиг. 2FIG. 2
SU914906759A 1991-01-31 1991-01-31 Excavated rock volume estimation method SU1765318A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU914906759A SU1765318A1 (en) 1991-01-31 1991-01-31 Excavated rock volume estimation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU914906759A SU1765318A1 (en) 1991-01-31 1991-01-31 Excavated rock volume estimation method

Publications (1)

Publication Number Publication Date
SU1765318A1 true SU1765318A1 (en) 1992-09-30

Family

ID=21557986

Family Applications (1)

Application Number Title Priority Date Filing Date
SU914906759A SU1765318A1 (en) 1991-01-31 1991-01-31 Excavated rock volume estimation method

Country Status (1)

Country Link
SU (1) SU1765318A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2652593C1 (en) * 2014-03-31 2018-04-27 Сименс Индастри, Инк. Method and system for active weighing of loading for shaft-sinking and tunneling equipment
US10190288B2 (en) * 2016-04-08 2019-01-29 Ace/Avant Concrete Construction Co., Inc. Excavation measurement with light curtain

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2652593C1 (en) * 2014-03-31 2018-04-27 Сименс Индастри, Инк. Method and system for active weighing of loading for shaft-sinking and tunneling equipment
US10190288B2 (en) * 2016-04-08 2019-01-29 Ace/Avant Concrete Construction Co., Inc. Excavation measurement with light curtain

Similar Documents

Publication Publication Date Title
US6691437B1 (en) Laser reference system for excavating machine
EP3194666B1 (en) Guidance system for earthmoving machinery
US6247538B1 (en) Automatic excavator, automatic excavation method and automatic loading method
JP2005227233A (en) Ground density measurement system
JP2014106075A (en) Method for geological survey during tunnel excavation
SU1765318A1 (en) Excavated rock volume estimation method
JP2873397B2 (en) Land Survey System
JPH0335114A (en) Position measuring device for underground digging machine
SU870598A1 (en) Device for monitoring bucket position of dragline excavator
JPH10252051A (en) Geological judgment method of the ground
JPH0510090A (en) Soil quality identification device in excavator
JPS5837295A (en) Facing stabilizing control method for shield excavator
RU2836012C1 (en) Method of determining stress-strain state of rock mass
SU767346A1 (en) Method and device for monitoring position of working member of mining machine with respect to the coal-rock boundary
CN113638463B (en) Excavator work guiding method, device and system
JPH04161525A (en) Linear automatic excavation control device for hydraulic power excavators
SU594252A2 (en) Device for determining position of dredger in heading
JPS6136498A (en) Method for detecting face condition of underground tunneling machine
SU1715998A1 (en) Method for bulldozer testing
CN108491360A (en) A kind of computational methods of coal mining output
Myrianthis Ground disturbance associated with shield tunneling, in overconsolidated stiff clay
JPS60230079A (en) Position detecting device of excavator
SU899756A1 (en) Device for automatically maintaining the optimized ratio of linear speeds of side motion and scoop chain travel of a dredge
SU82634A1 (en) The method of determining the effort arising from the introduction and removal of the pick-up bodies of loading excavator and other similar equipment
JPH01203585A (en) Excavator horizontal displacement detection method and device