SU1580005A1 - Method of driving in mining thick flat coal seam - Google Patents
Method of driving in mining thick flat coal seam Download PDFInfo
- Publication number
- SU1580005A1 SU1580005A1 SU884371921A SU4371921A SU1580005A1 SU 1580005 A1 SU1580005 A1 SU 1580005A1 SU 884371921 A SU884371921 A SU 884371921A SU 4371921 A SU4371921 A SU 4371921A SU 1580005 A1 SU1580005 A1 SU 1580005A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- coal
- carried out
- mine
- ledge
- zone
- Prior art date
Links
- 239000003245 coal Substances 0.000 title claims abstract 10
- 238000000034 method Methods 0.000 title claims abstract 4
- 238000005065 mining Methods 0.000 title abstract 2
- 239000011435 rock Substances 0.000 claims abstract 4
- 210000000056 organ Anatomy 0.000 claims abstract 3
- 239000000428 dust Substances 0.000 claims abstract 2
- 230000001629 suppression Effects 0.000 claims abstract 2
- 230000015572 biosynthetic process Effects 0.000 claims 3
- 238000009434 installation Methods 0.000 claims 1
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000003307 slaughter Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
Landscapes
- Soil Working Implements (AREA)
Abstract
Изобретение относитс к горной промышленности. Цель изобретени - снижение затрат на проведение и поддержание выработки (В), а также повышение безопасности работ. По мере проход очистного забо 1 кровлю над ранее пройденной B обрушают на краевую чатсь угольного массива 3 смежного столба. Затем провод т B13 почвоуступным забоем в присечку к ранее пройденной впереди очистного забо B. Верхний уступ 5 ведут в зоне установившегос горного давлени с опережением нижнего уступа 12 не менее, чем на величину зоны пылеподавлени . На подпочвенную толщу угл вслед за прохождением верхнего уступа 5 B со стороны обрушенных пород устанавливают органный р д стоек 8. По мере проведени нижнего уступа 12 у почвы пласта формируют угольный целик 14 высотой 1/4 - 2/3 мощности пласта. Проветривание нижнего уступа 12 и верхнего уступа 5 осуществл ют нагнетательным способом. 1 з.п. ф-лы, 2 ил.The invention relates to the mining industry. The purpose of the invention is to reduce the cost of carrying out and maintaining production (B), as well as improving the safety of work. As the passage of the clearing slab 1 of the roof above the previously passed B bring down on the marginal part of the coal massif 3 adjacent pillars. Then, B13 is carried out by soil-accessing slaughter in the notch to the clearing blade previously passed in front. Upper ledge 5 is conducted in the zone of established rock pressure with advance of the lower ledge 12 not less than by the size of the dust suppression zone. Following the passage of the upper ledge 5 B from the side of the collapsed rocks, an organ row of columns 8 is installed on the subsurface coal. As the lower ledge 12 is held near the reservoir soil, a coal pillar 14 of 1/4 - 2/3 height of the reservoir is formed. Airing of the lower step 12 and the upper step 5 is carried out by the injection method. 1 hp f-ly, 2 ill.
Description
А-АAa
ПP
1611 Ю 9 Фиг. 21611 S 9 FIG. 2
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU884371921A SU1580005A1 (en) | 1988-01-27 | 1988-01-27 | Method of driving in mining thick flat coal seam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU884371921A SU1580005A1 (en) | 1988-01-27 | 1988-01-27 | Method of driving in mining thick flat coal seam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1580005A1 true SU1580005A1 (en) | 1990-07-23 |
Family
ID=21353010
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU884371921A SU1580005A1 (en) | 1988-01-27 | 1988-01-27 | Method of driving in mining thick flat coal seam |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1580005A1 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2310752C1 (en) * | 2006-05-02 | 2007-11-20 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for steeply inclined medium-thickness and thin coal seam development |
| RU2310751C1 (en) * | 2006-03-22 | 2007-11-20 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for thick steeply inclined coal seam development |
| RU2320872C2 (en) * | 2006-04-10 | 2008-03-27 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for steeply-inclined low- and medium-thickness coal seam development |
| RU2360115C1 (en) * | 2007-12-25 | 2009-06-27 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Stripe-along-pitch method of development of thick steeply inclined coal bed |
-
1988
- 1988-01-27 SU SU884371921A patent/SU1580005A1/en active
Non-Patent Citations (1)
| Title |
|---|
| Авторское свидетельство СССР № 1257219, кл. Е 21 С 41/04, 1984. * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2310751C1 (en) * | 2006-03-22 | 2007-11-20 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for thick steeply inclined coal seam development |
| RU2320872C2 (en) * | 2006-04-10 | 2008-03-27 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for steeply-inclined low- and medium-thickness coal seam development |
| RU2310752C1 (en) * | 2006-05-02 | 2007-11-20 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for steeply inclined medium-thickness and thin coal seam development |
| RU2360115C1 (en) * | 2007-12-25 | 2009-06-27 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Stripe-along-pitch method of development of thick steeply inclined coal bed |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| SU1580005A1 (en) | Method of driving in mining thick flat coal seam | |
| US4216998A (en) | Method of underground mining by pillar extraction | |
| RU2039262C1 (en) | Method for mining thick gently dipping coal seams | |
| RU98106218A (en) | METHOD FOR PROCESSING PIPELINE KIMBERLITE DEPOSITS WITH INCLINED LAYERS TO RESTORE A MECHANIZED COMPLEX WITH A LAYOUT | |
| SU566933A1 (en) | Method of exploitation of thick gently sloping gas-bearing-strata | |
| SU1624157A1 (en) | Method of mining gently-sloping coal seams | |
| SU1509535A1 (en) | Excavation working support | |
| SU1666718A1 (en) | Method for mining coal beds | |
| SU796425A1 (en) | Method of excavating gently sloping coal beds | |
| SU1467183A1 (en) | Method of safeguarding mine workings | |
| SU889854A1 (en) | Method of working adjacent explosion-hazardous beds | |
| SU1579963A1 (en) | Method of working out thick steep and inclined seams | |
| SU1219826A1 (en) | Method of driving mine workings in beds of potassium deposits,hazadous in dynamic manifestations, with plastic rock either in direct ceiling or floor of the bed | |
| SU994734A1 (en) | Method of working medium-thick and thick coal beds | |
| RU2013547C1 (en) | Method for steep coal seams mining | |
| SU887809A1 (en) | Method of mining sloping and gently sloping coal beds | |
| SU928010A1 (en) | Method of mining thick gently-sloping mineral beds | |
| SU1364725A1 (en) | Method of remining bed deposits | |
| SU125787A1 (en) | Method for developing thin and low-powered steeply dipping seams | |
| SU1384751A1 (en) | Method of mining coal seams | |
| SU724736A1 (en) | Method of preparing excavation pillar | |
| SU1656135A1 (en) | Face-cleaning complex for combined mining extraction | |
| SU1671871A1 (en) | A method of protecting preliminary drift in working thick beds | |
| SU141125A1 (en) | The method of excavation of coal under flexible overlap | |
| SU1162975A1 (en) | Method of excavating coal beds |