[go: up one dir, main page]

SU1497340A1 - Arrangement for reconstructing a mooring embankment on weak foundation - Google Patents

Arrangement for reconstructing a mooring embankment on weak foundation Download PDF

Info

Publication number
SU1497340A1
SU1497340A1 SU874313326A SU4313326A SU1497340A1 SU 1497340 A1 SU1497340 A1 SU 1497340A1 SU 874313326 A SU874313326 A SU 874313326A SU 4313326 A SU4313326 A SU 4313326A SU 1497340 A1 SU1497340 A1 SU 1497340A1
Authority
SU
USSR - Soviet Union
Prior art keywords
casing
ground
pile
piston
reconstructing
Prior art date
Application number
SU874313326A
Other languages
Russian (ru)
Inventor
Александр Иванович Котов
Original Assignee
Ленинградский Институт Водного Транспорта
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский Институт Водного Транспорта filed Critical Ленинградский Институт Водного Транспорта
Priority to SU874313326A priority Critical patent/SU1497340A1/en
Application granted granted Critical
Publication of SU1497340A1 publication Critical patent/SU1497340A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

Изобретение относитс  к области гидротехнического строительства. Цель изобретени  - повышение эффективности работы. Устройство смонтировано на передвигаемой по крановым рельсам платформе 1 и включает буровую мачту 6, кожух с цилиндрическим наконечником и поршнем в нижней части и механизмом 9 перемещени  в верхней части, полую штангу с рабочим органом, прижимную плиту с плоским фильтром и контурным уплотнением, сопр женную с кожухом с возможностью поворота в вертикальной плоскости, средства дл  приготовлени  и подачи в грунт закрепл ющего раствора. После окончани  процесса изготовлени  грунтоцементной сваи всю выдвижную часть устройства открывают от грунта механизмом 9. Мачту 6 наклон ют в положение, соответствующее положению оси смежной сваи данного веерного р да свай, и процесс повтор етс . 3 ил.The invention relates to the field of hydraulic engineering. The purpose of the invention is to increase work efficiency. The device is mounted on a platform 1 moved along crane rails and includes a drilling mast 6, a casing with a cylindrical tip and a piston in the lower part and a mechanism 9 for moving in the upper part, a hollow rod with a working body, a pressure plate with a flat filter and a planimetric seal that mates with the casing can be rotated in a vertical plane; means for preparing and feeding a fixing solution into the ground. After the completion of the process of manufacturing the cement pile, the entire sliding part of the device is opened from the ground by mechanism 9. The mast 6 is tilted to the position corresponding to the position of the axis of the adjacent pile of the fan row of piles, and the process is repeated. 3 il.

Description

II

(2U 4313326/29-15(2U 4313326 / 29-15

(22) 06.10.87(22) 10/06/87

(46) 30.07.89. Бюл. № 28(46) 07/30/89. Bul Number 28

(71)Ленинградский институт водного транспорта(71) Leningrad Institute of Water Transport

(72)АоИ. Котов (53) 627.2(088.8)(72) AoI. Kotov (53) 627.2 (088.8)

(56) Будин А.Я. и др. Усиление портовых сооружений. М.: Транспорт, 1983, Со 78-82, 102-103.(56) Budin A.Ya. and others. Strengthening of port facilities. M .: Transport, 1983, Co 78-82, 102-103.

Авторское свидетельство СССР № 1174531, кл. Е 02 D 5/46, 1983.USSR Author's Certificate No. 1174531, class E 02 D 5/46, 1983.

JJ

irsirs

f,HO онбатории до игл1/6лени f, HO onbaths to needles1 / 6leni

Жно o /m}fliju/focjie yit/aJeHi/aO / m} fliju / focjie yit / aJeHi / a

rsrs

М/ттш ef: e tфlki Hi  M / m ef: e tflki Hi

(54) УСТРОЙСТВО ДЛЯ РЕКОНСТРУКЦИИ ПРИЧАЛЬНОЙ НАБЕРЕЖНОЙ НА СЛАБОМ ОСНОВАНИИ(54) DEVICE FOR RECONSTRUCTION OF THE MOBILE QUAY ON A WEAK BASE

(57) Изобретение относитс  к области гидротехнического строительства. Цель изобретени  - повьшение эффективности работы. Устройство смонтироi вано на передвигаемой по крановым рельсам платформе 1 и включает буро; вую мачту 6, кожух с цилиндрическим, наконечником и поршнем в нижней части механизмом 9 перемещени  в верх (Л(57) The invention relates to the field of hydraulic engineering. The purpose of the invention is to increase work efficiency. The device is mounted on a platform 1 moved on crane rails and includes a drill; a new mast 6, a casing with a cylindrical tip and a piston in the lower part by the upward movement mechanism 9 (L

со: 4from: 4

ней части, полую штангу с рабочим органомS прижимную плиту с плоским фильтром и контурным уплотнением, сопр женную с кожухом с возможностью поворота в вертикальной плоскости, средства дл  приготовлени  и подачи в грунт закрепл ющего раствора. После окончани  процесса изготовлени  грунтоцементной сваи всю выдвижную часть устройства открывают от грунта механизмом 9. Мачту 6 наклон ют .в положение, соответствующее положению оси смежной сваи данного веерного р да свай, и процес повтор етс  3 нл.In this part, a hollow rod with a working body, a pressure plate with a flat filter and a contour seal, which is mated with the casing can be rotated in a vertical plane, means for preparing and feeding fixing solution to the ground. After the completion of the process of manufacturing the cement-cement pile, the entire sliding part of the device is opened from the soil by mechanism 9. Mast 6 is tilted to a position corresponding to the position of the axis of the adjacent pile of a given fan row of piles, and the process is repeated 3 nl.

Изобретение относитс  к гидротехническому строительству, в частности к устройствам дл  реконструкции порто вых причальных сооружений, и может быть использовано в морских и речных портах дл  реконструкции причальных набережных, выполн емой, преимущест- венно, с одновременным углублением акватории.The invention relates to hydraulic engineering construction, in particular, to devices for reconstructing port mooring facilities, and can be used in sea and river ports for reconstructing quay berths, which is mainly performed while simultaneously deepening the water area.

Цель изобретени  - повышение эф фективности работы.The purpose of the invention is to increase the efficiency of work.

На фиг. 1 устройство по казано в рабочем положении; на фиг. 2 - деталь нижней части устройства в вертикальном разрезе; на фиг. 3 - кожух, поперечное сечение;FIG. 1 device is shown in the working position; in fig. 2 - detail of the lower part of the device in vertical section; in fig. 3 - casing, cross section;

УСТ1ЮЙСТВО смонтировано на плат- форме 1, имеющей ходовые тележки 2, установленные на крановых путах 3. На платформе 1 наход тс  средства дп  приготовлени  и подачи в грунт закрепл ющего раствора, включающие растворомешалку 4 и растворонасос 5.The device is mounted on the platform 1, which has the undercarriage 2 installed on the crane tracks 3. On the platform 1, there are means for preparing and feeding a fixing solution into the ground, including a mortar mixer 4 and a mortar pump 5.

На выступающей в сторону акватории консоли платформы 1 смонтирована с возможностью наклона бурова  мачта 6 Кроме того, на платформе установле- ны лебедки и вспомогательные механизмы (не показаны).On the console 1 protruding towards the water area, the platform 1 is mounted with the possibility of tilting the mast 6. In addition, winches and auxiliary mechanisms (not shown) are installed on the platform.

Направл ющий кожух 7 выполнен в виде пропущенной сквозь обойму 8 трубы, например, пр моугольного сечени , примыкающей щирокой гранью к лицевой поверхности мачты 6 (фиг. 3, фиг. DC, В верхней части направл ющего кожуха 7 имеетс  механизм его перемещени  9.The guide casing 7 is made in the form of a pipe passed through the yoke 8, for example, of a rectangular cross section, adjacent by a wide face to the front surface of the mast 6 (Fig. 3, Fig. DC). In the upper part of the casing 7 there is a mechanism for its movement 9.

Нижн   часть кожуха 7 снабжена цилиндрическим наконечником 10 с горизонтальной образующей. Внутри кожуха 7 помещен порщень 11, соединен- ный штангами 12 (фиг, 3) с самосто тельным механизмом прижима и подъг- ема 13. Пола  штанга 14 пропущена сквозь отверсти  в центре поршн  11,The lower part of the casing 7 is provided with a cylindrical tip 10 with a horizontal generatrix. Inside the casing 7 is placed a pistol 11 connected by rods 12 (FIG. 3) with an independent clamping mechanism and a lifting mechanism 13. The floor of the rod 14 is passed through a hole in the center of the piston 11,

На нижнем конце щтанги 14 расположен рабочий орган 15.At the lower end of the rod 14 is the working body 15.

Верхний конец штанги 14 соединен с вращателем 16, а полость штанги - через вертлюг 17 и гибкий напорньй трубопровод 18 с растворонасосом 5. Сопр женна  с возможностью поворота относительно цилиндрического наконечника 10 плита 19 снабжена плоским фильтром 20 и контурным уплотнением 21. Плоский фильтр 20 соединен гибким вакуумным шлангом 22 с расположенным на платформе 1 вакуум-насосом (не показан).The upper end of the rod 14 is connected to the rotator 16, and the cavity of the rod through the swivel 17 and the flexible pressure pipe 18 with the mortar pump 5. The plate 19 can be rotated relative to the cylindrical tip 10 and provided with a flat filter 20 and a contour seal 21. The flat filter 20 is connected with a flexible vacuum hose 22 with a vacuum pump located on platform 1 (not shown).

Устройство работает следующим образом .The device works as follows.

После расчетного углублени  акватории (фиг. 1) устройство устанавливают на крановых пут х реконструируемой набережной. Мачту 6 привод т в положение, соответствующее оси грунтоцементной сваи, ближайшей к лицевой стенке набережной 23. ПлитуAfter the calculated deepening of the water area (Fig. 1), the device is installed on the crane paths of the reconstructed embankment. The mast 6 is brought into position corresponding to the axis of the cement-cement pile nearest to the front wall of the quay 23. Plate

19опускают на дно акватории и после начала вакуумировани  грунта через фильтр 20 и вакуумный шланг 22 начинают погружение в грунт рабочего органа 15 с одновременным его вращением с помощью вращател  16о После расчетного заглублени  рабочего органа 15, не прекраща  его вращени - начинают закачивание в грунт закрепл ющего (например, цементного):раствора растворонасосом 5 через напорный трубопровод 18, вертлюг 17, полую штангу 14 и рабочий орган 15. Грунтоцементна  сва  24 формируетс  в грунте при постепенном выглублении рабочего органа 15 с одновременным его вращением. При плохо имешивакщих с  с закрепл кщим раствором грунтах производ т дополнительные погрзгжени  рабочего органа 15 без подачи в грун закрепл ющего растворао19 is let into the bottom of the water area and after the start of vacuuming the soil through the filter 20 and the vacuum hose 22, the working body 15 is immersed in the ground with its simultaneous rotation using a 16o rotator. After the calculated depth of the working body 15, it stops pumping into the ground fixing ( for example, cement mortar): with a solution of a mortar pump 5 through a pressure pipe 18, a swivel 17, a hollow rod 14 and a working body 15. A cement cement 24 is formed in the soil with a gradual deepening of the working body 15 with simultaneous mennym its rotation. In case of poorly bearing soils with a fixed solution, additional loads of the working body 15 are made without feeding the fixing solution into the ground.

Вакуумирование грунта через фильтSoil vacuuming through the filter

20обеспечивает уплотнение формуемой20 provides a formable seal

сваи и окружающего грунта и удаление избыточной воды, а механизмами 9 и 13 - дополнительное механическое уплотнение сваи и грунта, преимуп1ест венно, после окончани  формовани  сваи, и вт гивани  рабочего органа в кожух 7 вплотную к поршню 11, а также фиксацию проектной отметки дна акватории.Изготовление грунтоцемент- ных свай с использованием буропереме шивающей технологии без прижимной плиты и вакуумировани  грунта сопровождалось бы разуплотнением окружающего грунта, подъемом его поверхности и прорывами закрепл ющего раствора в акваторию при изготовлении верхних частей свай.piles and surrounding soil and removal of excess water, and mechanisms 9 and 13 - additional mechanical consolidation of the pile and soil, mainly after the completion of pile formation, and drawing the working body into the casing 7 close to the piston 11, as well as fixing the design level of the bottom of the water area .The production of soil-cement piles using a drilling technology without a pressure plate and vacuuming of the soil would be accompanied by a decompression of the surrounding soil, a rise in its surface and breaks of the fixing solution into aquatum. Oray in the manufacture of the upper parts of the pile.

После окончани  процесса изготовлени  грунтоцементной сваи, включа- ницего перемешивание грунта с закрепл ющим раствором, вакуумирование и механическое обжатие тела сваи с окружающим грунтом, вакуум-насос вы- . ключают и всю вьщвижную часть устройства (кожух 7 с поршнем 11, плитой 19 и рабочим органом 15 на штанге 14 отрывают от грунта механизмом.9, мачту 6 наклон ют в положение, соответствующее положению оси смежной сваи данного веерного р да свай и процесс повтор етс . Смежна  грунтоцементна  сва  данного р да изготовл етс  с частичной засечкой тела предыдущей сваи (фиг, 1), что обеспечиваетс  соответствующим ограничением времени технологического разрьгоа между изготовлением смежных свай р да. Согласно экспериментальным данным, по- лзгченным в бухте Пластун (Приморский край) указанный технологический разрыв не должен превышать 3 сут. После завершени  изготовлени  всех свай данного р да устройство передвигают вдоль набережной на расчетное расто-  ние между ос ми р дов и начинают изготовление свай в соседнем р ду.After the completion of the process of manufacturing the cement-cement pile, including the mixing of the soil with the fixing solution, the evacuation and mechanical compression of the pile body with the surrounding soil, the vacuum pump has come out. The entire remote part of the device is also turned on (the housing 7 with the piston 11, the plate 19 and the working body 15 on the rod 14 is detached from the ground by the mechanism.9, the mast 6 is tilted to the position corresponding to the position of the axis of the adjacent pile of the pile row and the process repeats The adjacent ground-cement pile of this series is made with a partial serif of the body of the previous pile (Fig. 1), which is ensured by an appropriate limitation of the technological failure time between the production of adjacent piles of rows. In the past, Plastun (Primorsky Krai), the specified technological gap should not exceed 3 days. After completion of the production of all the piles of a given row, the device is moved along the embankment to the design plant between the axes of the rows and the production of piles in the adjacent row begins.

который может быть расположен как вплотную к ранее изготовленному р ду, так и с некоторым зазором.which can be located both close to the previously manufactured row, and with a certain gap.

Изготовление грунтоцементных свай под водой при различном наклоне их осей к горизонту обеспечиваетс  шарнирным сопр жением плиты 19 и кожуха 7, которое, в свою очередь, дости- Q гаетс  посредством цилиндрического наконечника 10 с горизонтальной об-, разующей и уменьшенным размером поперечного- сечени  к;ожуха 7 в плоскости относительного поворота кожуха 7 и 5 плиты 19,Production of soil-cement piles under water at different inclinations of their axes to the horizon is provided by the hinge coupling of the plate 19 and the casing 7, which, in turn, is achieved by means of a cylindrical tip 10 with a horizontal shaping and reduced cross-section size; ozhu 7 in the plane of the relative rotation of the casing 7 and 5 of the plate 19,

Если, в соответствии с расчетом лицевой стенки реконструированной набережной необходимо повышение точки приложени  равнодействующей отпо- 0 ра грунта, то верхнюю зону грунта 25 между лицевой стенкой набережной и ближайшей к ней грунтоцементной сваей мелиорируют путем инъекции ипи внедрени  жестких распорных элемен- 5 тов.If, in accordance with the calculation of the front wall of the reconstructed embankment, it is necessary to increase the point of application of the resultant soil stripper, then the upper soil zone 25 between the front wall of the embankment and the ground-cement pile nearest to it is meliorized by injection and inserting rigid spacer elements.

Claims (1)

Формула изобретени Invention Formula Устройство дл  реконструкции при- 0 чальной набережной на слабом основании , включающее буровую мачту, на правл ющий кожух с механизмом перемещени  и фланцем, поршень с механизмом прижима и подъема, пропущенную сквозь поршень полую штангу с вращателем и рабочим органом, средства дл  приготовлени  и подачи в грунт закрепл ющего раствора, отличающеес  тем, что, с целью повы- Q шени  эффективности работы, направл ющий кожух снабжен в нижней части цилиндрическим наконечником с горизонтальной образующей, а фланец выполнен в виде снабженной плоскимA device for reconstructing the landing bank on a weak base, including a drilling mast, steering casing with a displacement mechanism and a flange, a piston with a pressing and lifting mechanism, a hollow rod with a rotator and a working body passed through the piston, means for preparing and feeding into the primer of the fixing solution, characterized in that, in order to improve the Q efficiency of operation, the guide casing is provided in the lower part with a cylindrical tip with a horizontal generatrix, and the flange is designed as gloss 5five , , g фильтром и контурным уплотнением плиты, сопр женной с цилиндрическимg filter and contour sealing plate, coupled with a cylindrical .наконечником кожуха с возможностью поворота в вертикальной плоскости. the tip of the casing can be rotated in a vertical plane. Фиг. 2FIG. 2 2121 А-АAa /2/ 2
SU874313326A 1987-10-06 1987-10-06 Arrangement for reconstructing a mooring embankment on weak foundation SU1497340A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874313326A SU1497340A1 (en) 1987-10-06 1987-10-06 Arrangement for reconstructing a mooring embankment on weak foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874313326A SU1497340A1 (en) 1987-10-06 1987-10-06 Arrangement for reconstructing a mooring embankment on weak foundation

Publications (1)

Publication Number Publication Date
SU1497340A1 true SU1497340A1 (en) 1989-07-30

Family

ID=21330535

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874313326A SU1497340A1 (en) 1987-10-06 1987-10-06 Arrangement for reconstructing a mooring embankment on weak foundation

Country Status (1)

Country Link
SU (1) SU1497340A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2485249C2 (en) * 2009-02-20 2013-06-20 Соилмек С.П.А. Equipment for jet cementation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2485249C2 (en) * 2009-02-20 2013-06-20 Соилмек С.П.А. Equipment for jet cementation

Similar Documents

Publication Publication Date Title
CN104988910B (en) Reducing rotating spraying mixture pile
US3896628A (en) Marine structures
CN106168033B (en) A kind of vertical mud and water balance constructing device
CN103015455B (en) Bridge pile-bucket combined foundation and construction method thereof
CN113322990A (en) Construction method of lock catch steel pipe pile cofferdam suitable for thin-covering-layer hard riverbed
US2580911A (en) Foundation structure for derricks
US3799614A (en) Method and apparatus for excavating settled body of solids
CN113638441A (en) Pile-barrel combined jacket supporting structure and construction method thereof
CN106088120B (en) A kind of cofferdam decentralization construction method
SU1497340A1 (en) Arrangement for reconstructing a mooring embankment on weak foundation
US3008691A (en) Pile jacking apparatus
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
CN113202128B (en) Ultra-large type deep water step type open caisson and soil taking strategy and construction method thereof
US1998803A (en) Compound foundation for plural wells
CN110952539B (en) A PHC pile internal drilling and hammering machine
CN108951623A (en) A kind of three axis high-pressure rotary-spray two-way stirring pile construction methods
CN2507914Y (en) Riprap foundation bed leveling platform of moveable cylindrical foundation supporting frame
CN113235657B (en) Heavy-caliber immersed tube assembly and immersed tube method
CN205591211U (en) Cavity cast member underground tunnelling construction assembly and diaphragm wall
SU1255684A2 (en) Arrangement for making ground-cement piles underwater
CN115726383A (en) Combined sinking construction method for ultra-deep segmental type pressure sinking large-diameter working well
US2688848A (en) Portable drilling equipment
CN209293002U (en) Double-row pile guide wall
CN215926122U (en) Platform equipment for cofferdam foundation cleaning
CN220580951U (en) Rectangular slide-resistant pile drilling machine with size-variable synchronous horizontal cantilever