SU1335627A1 - Method of hydraulic deposition of structures - Google Patents
Method of hydraulic deposition of structures Download PDFInfo
- Publication number
- SU1335627A1 SU1335627A1 SU864043952A SU4043952A SU1335627A1 SU 1335627 A1 SU1335627 A1 SU 1335627A1 SU 864043952 A SU864043952 A SU 864043952A SU 4043952 A SU4043952 A SU 4043952A SU 1335627 A1 SU1335627 A1 SU 1335627A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- water
- dam
- pulp
- soil
- embankment
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims 2
- 230000008021 deposition Effects 0.000 title 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 13
- 239000002689 soil Substances 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims abstract description 5
- 239000002351 wastewater Substances 0.000 claims abstract description 5
- 238000007596 consolidation process Methods 0.000 claims abstract description 4
- 238000004537 pulping Methods 0.000 claims description 2
- 238000007599 discharging Methods 0.000 claims 1
- 238000011010 flushing procedure Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 claims 1
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 239000002002 slurry Substances 0.000 abstract 1
- 239000002245 particle Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Изобретение относитс к гидротехническому строительству. Цель изобретени - сокращение сроков строительства и повьшение устойчивости сооружени путем ускорени консолидации , уменьшени уноса грунта со сбросной водой и равномерной раскладки фракций. Возвод т напорное обвалование 1, раздел ют сооружение на сменные секции I и II струена- правл ющей дамбой 2. Рассто ни В от дамбы до каждой стороны обваловани равны. Далее подвод т пульпу с помощью пульпопровода 3 и производ т рассредоточенный выпуск ее в каждую секцию дл послойной укладки грунта и осуществл ют сброс осветленной воды через водосбросные колодцы (ВК) 7, 6. ВК 7, 6 устанавливают в каждой секции в зоне выпусков 4, 5, расположенных вдоль стороны обваловани , сопр женной со струенаправл ющей дамбой. Подвод пульпы и сброс воды осуществл ют попеременной работой выпусков и ВК. При укладке очередного сло грунта выпуск пульпы произвс д т в одной секции, а сброс воды через ВК производ т в другой секции. Рассто ние от струенаправл ющей дамбы до каждой стороны обваловани равны. Попеременна работа выпусков и ВК исключает образование устойчивого русла потока пульпы и уменьшает унос грунта со сбросной водой. 2 ил. а сл -: } УЬгг 1FIELD OF THE INVENTION The invention relates to hydraulic engineering. The purpose of the invention is to reduce the construction time and increase the stability of the structure by accelerating consolidation, reducing the entrainment of soil with waste water and evenly distributing fractions. A pressure embankment 1 is erected, the structure is divided into replaceable sections I and II by a steerage dam 2. The distances B from the dam to each embankment side are equal. Next, the pulp is supplied using the slurry pipeline 3 and dispersed into each section for layering the ground and discharged clarified water through spillway wells (VK) 7, 6. VK 7, 6 are installed in each section in the discharge zone 4, 5, located along the embankment side adjacent to the diverting dam. The pulp supply and discharge of water are carried out by alternating work of the outlets and VC. When laying the next layer of soil, pulp is produced in one section, and water is discharged through a VC in another section. The distance from the jetting dam to each side of the embankment is equal. The alternate operation of the outlets and the VC eliminates the formation of a stable bed of the pulp flow and reduces the entrainment of the soil with the waste water. 2 Il. a cl -:} 'ugg 1
Description
Изобретение относитс к гидротехническому строительству и предназначено дл возведени намывных сооружений , преимущественно из пылеватых и суглинистых грунтов.The invention relates to hydraulic construction and is intended for the erection of alluvial structures, mainly from silty and loamy soils.
Цель изобретени - сокращение сроков строительства и повышение устойчивости сооружени путем ускорени консолидации, уменьшени уноса грунтThe purpose of the invention is to reduce the construction time and increase the stability of the structure by accelerating consolidation, reducing the entrainment of soil.
со сбросной водой и равноймерной раскладки фракций.with waste water and uniform layout fractions.
На фиг. 1 изображено предлагаемое сооружение, план; на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows the proposed structure, plan; in fig. 2 shows section A-A in FIG. one.
Намывное сооружение содержит напорное обвалование 1, струенаправл ю- щую дамбу 2, раздел ющуро сооружение на две секции I и II, причем рассто ни до каждой стороны обваловани 1 равны.The alluvial construction contains pressure heading 1, a streamlined dam 2, dividing the structure into two sections I and II, and the distances to each side of the embankment 1 are equal.
Пульпу к каждой секции подвод т по пульпоразвод щему трубопроводу 3, при этом выпуски 4 и 5 пульпы располагают вдоль стороны обваловани 1, сопр женной со струенаправл ющей дамбой 2, а в зоне выпусков 4 и 5 устанавливают водосбросные устройства , состо щие из водосбросных колодцев 6 и 7 и водоотводных труб 8 и 9.The pulp is brought to each section through the pulping conduit 3, with the outlets 4 and 5 of the pulp being placed along the embankment side 1 adjoining the diverting dam 2, and in the zone of outlets 4 and 5 the spillway devices consisting of spillway wells 6 are installed and 7 and drain pipes 8 and 9.
Намыв грунта осуществл ют сло ми 10, 11 и 12, при этом среднюю толщину каждогоAlluviation of the soil is carried out in layers 10, 11 and 12, with the average thickness of each
H+h сло H + h layer
принимают неaccept not
более 0,5 м. Подачу пульпы и сброс воды осуществл ют попеременной работой выпусков 4 и 5 и водосбросных ко- лодцев 6 и 7. При намыве сло 10 работают выпуски, 4 пульпы и водосбросный колодец 7, а выпуски 5 и водосбросный колодец 6 закрыты. После намыва сло 10 выпуски 4 пульпы и водосбросный колодец 7 закрывают и укладку сло 11 производ т из выпусков 5, а сброс воды - через водосброс-45 вдоль стороны обваловани , сопр женный , колодец 6 и т.д.,more than 0.5 m. The pulp is supplied and the water is discharged by alternately operating outlets 4 and 5 and outflow wells 6 and 7. When the layer 10 is being washed, the outlets, 4 outlets and the outflow well 7 are closed, and outlets 5 and the outlet overflow well 6 are closed . After alluvium layer 10 is washed, the 4 outlets 4 of the pulp and the water discharge well 7 are closed and the layer 11 is laid from the outlets 5, and the water is discharged through the outlet 45 along the embankment side, the conjugate, well 6, etc.
Разделением сооружени на смежные секции I и II таким образом, чтобы рассто ни В от струенаправл ющей дамбы до каждой стороны обваловани 1 были равны, и послойным намывом грунта при попеременной работе выпусков 4 и 5 и водосбросных колодцев 6 и 7 исключают образование устойчивого русла потока пульпы 13 и уменьпуска к колодцу,By dividing the structure into adjacent sections I and II in such a way that the distances B from the dam to each side of embankment 1 are equal and layered alluvium during alternate operation of outlets 4 and 5 and the spillway wells 6 and 7 exclude the formation of a stable pulp flow channel 13 and decrease to the well,
5five
00
5five
00
5five
00
шают унос грунта со сбросной водой, обеспечивают равномерную раскладку фракций и ускоренную консолидацию при чередовании слоев крупного и мелкого грунта.soil is carried away with waste water, provide a uniform layout of fractions and accelerated consolidation when alternating layers of coarse and shallow soil.
Кроме того, намыв каждого последующего сло начинают при отрицательных значени х уклона поверхности от вы- поэтому при намыве сло 12 из выпусков 4 наблюдаетс усиленна интенсивность осаждени всех частиц грунта до того, как уровень воды на карте подниметс на высоту h , после чего начинают сброс воды через водосбросный колодец 7, и урез 14 воды по мере увеличени толщины намытого сло 12 смещаетс к колодцу 7.In addition, the washing of each subsequent layer starts at negative surface slopes from high, so when the layer 12 is thinned from outlet 4, an increased intensity of sedimentation of all soil particles is observed before the water level on the map rises to height h, and then water discharge begins through the spillway well 7, and the water edge 14 as the thickness of the washed-up layer 12 increases, shifts to the well 7.
При наличии начальных уклонов основани выпуски пульпы располагают вдоль стороны обваловани , проход щей по максимальным отметкам, что обеспечивает намыв грунта при отрицательных уклонах с первого сло .If there are initial base slopes, pulp outlets are positioned along the embankment side, which passes through the maximum marks, which ensures that the soil is washed out with negative slopes from the first layer.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU864043952A SU1335627A1 (en) | 1986-03-28 | 1986-03-28 | Method of hydraulic deposition of structures |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU864043952A SU1335627A1 (en) | 1986-03-28 | 1986-03-28 | Method of hydraulic deposition of structures |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1335627A1 true SU1335627A1 (en) | 1987-09-07 |
Family
ID=21228984
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU864043952A SU1335627A1 (en) | 1986-03-28 | 1986-03-28 | Method of hydraulic deposition of structures |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1335627A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2162151C1 (en) * | 2000-04-26 | 2001-01-20 | Макеев Александр Юрьевич | Method of tailing dump formation |
| RU2498008C1 (en) * | 2012-03-01 | 2013-11-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет) (СКГМИ (ГТУ) | Method to erect embank hydraulic fill dam |
-
1986
- 1986-03-28 SU SU864043952A patent/SU1335627A1/en active
Non-Patent Citations (1)
| Title |
|---|
| Авторское свидетельство СССР № 960356, кл. Е 02 В 7/06, 1980. Авторское свидетельство СССР № 1114728, кл. Е 02 В 7/06, 1983. * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2162151C1 (en) * | 2000-04-26 | 2001-01-20 | Макеев Александр Юрьевич | Method of tailing dump formation |
| RU2498008C1 (en) * | 2012-03-01 | 2013-11-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет) (СКГМИ (ГТУ) | Method to erect embank hydraulic fill dam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105804047B (en) | A kind of drainage arrangement and method for accelerating blowing-filling sludge discharging consolidation speed | |
| SU1335627A1 (en) | Method of hydraulic deposition of structures | |
| US3731492A (en) | Method of forming structures by deposition | |
| RU2011826C1 (en) | Method for mining of inundated placers | |
| RU2162151C1 (en) | Method of tailing dump formation | |
| CN110185051A (en) | Deep narrow excavation water discharge method | |
| SU1671763A1 (en) | Method for hydraulic deposition of soil for a hydraulic structure | |
| SU1395749A1 (en) | Method of colnstructing horizontal drainage | |
| RU2078172C1 (en) | Method of building earthen structures by hydraulic deposition of soil | |
| SU1585445A1 (en) | Method of hydraulic deposition of earth structure | |
| RU2016163C1 (en) | Method of underwater formation of silting structure layer | |
| SU1428789A1 (en) | Method of hydraulic deposition of structure of local materials | |
| CN222715913U (en) | A construction platform system for constructing anti-seepage walls of hydropower stations in valleys | |
| SU1117364A1 (en) | Method of working a canal bed | |
| SU1565946A1 (en) | Method of erecting pressure structure from local materials | |
| CN112144425A (en) | Box culvert drainage ditch pouring method located at high water level and in sandy soil environment | |
| CN217419488U (en) | Novel pile foundation and bank wall combined revetment structure | |
| SU1100364A1 (en) | Method of constructing dams of locally available materials | |
| CN219195834U (en) | Fine sand hydraulic filling rapid land crossing system | |
| SU1565947A1 (en) | Method of washing narrow-profile structure | |
| SU889784A1 (en) | Method of erecting hydraulically filled structures in water ducts | |
| SU1664959A1 (en) | Method for erecting earth wash-up structure | |
| SU1714020A1 (en) | Hydraulic filling method | |
| SU1023024A2 (en) | Method of erecting hydraulic fill earth structures | |
| SU1663098A1 (en) | Method for soil washing up |