SU1300084A1 - Method of constructing a dam of locally available materials - Google Patents

Method of constructing a dam of locally available materials Download PDF

Info

Publication number
SU1300084A1
SU1300084A1 SU853966313A SU3966313A SU1300084A1 SU 1300084 A1 SU1300084 A1 SU 1300084A1 SU 853966313 A SU853966313 A SU 853966313A SU 3966313 A SU3966313 A SU 3966313A SU 1300084 A1 SU1300084 A1 SU 1300084A1
Authority
SU
USSR - Soviet Union
Prior art keywords
screen
dam
trench
excavation
loading
Prior art date
Application number
SU853966313A
Other languages
Russian (ru)
Inventor
Иван Иванович Заудальский
Original Assignee
Институт горного дела Севера Якутского филиала СО АН СССР
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела Севера Якутского филиала СО АН СССР filed Critical Институт горного дела Севера Якутского филиала СО АН СССР
Priority to SU853966313A priority Critical patent/SU1300084A1/en
Application granted granted Critical
Publication of SU1300084A1 publication Critical patent/SU1300084A1/en

Links

Landscapes

  • Revetment (AREA)

Abstract

Изобретение относитс  к строительству каменно-земл ных гидротехнических сооружений из местных материалов. Целью изобретени   вл етс  сокращение сроков возведени  дамбы и уменьщение объема доставки материалов. Способ включает послойную отсыпку упорной призмы, экрана и его пригрузки.Размещение упорной призмы осуществл ют преимущественно в предваритель- но создаваемой траншейной выемке. Перед отсыпкой элементов сооружени  производ т планировочные работы. До укладки пригрузки 6 каждого сло  вначале отсыпают нижнюю часть 3 экрана, затем возвод т упорную призму 4. После этого на нижней части 3 экрана возвод т верхнюю часть 5. Нижнюю 3 и верхнюю 5 части экрана при этом отсыпают в процессе создани  траншейной выемки из разрабатываемых в ней материалов, размеща  основание экрана на борту траншейной выемки. Указанна  последовательность работ позвол ет возвести дамбу выемочно-погрузочным средством без изменени  уровн  его установки и переукладки транспортных ком;;,1уникаций. 2 ил. i со 00 4The invention relates to the construction of stone-earth hydraulic structures from local materials. The aim of the invention is to reduce the time it takes to erect a dam and to reduce the amount of material delivered. The method includes layer-by-layer dumping of the stop prism, the screen and its loading. The placement of the stop prism is carried out mainly in the previously created trench recess. Before dumping the elements of the construction, planning works are carried out. Before laying the load 6 of each layer, the lower part 3 of the screen is first poured, then the stop prism 4 is erected. After that, the upper part 5 is erected on the lower part 3 of the screen. The lower 3 and top 5 parts of the screen are filled during the trenching in her materials, placing the base of the screen on board the trench recess. This sequence of works allows the dam to be erected with a excavating and loading means without changing the level of its installation and re-laying of the transport combs; 2 Il. i from 00 4

Description

Изобретение относитс  к строительству каменно-земл ных гидротехнических сооружений и может быть использовано при строительстве дамб и плотин хвостохранилищ, шла- моотстойников и сооружений дл  укладки отходов промывки металлосодержащих песков .The invention relates to the construction of stone-earth hydraulic structures and can be used in the construction of dams and dams of tailing ponds, sludge pits and facilities for laying waste from metal-containing sands.

Цель изобретени  - сокращение сроков возведени  дамбы и уменьшение объема доставки материалов.The purpose of the invention is to reduce the time to build a dam and reduce the amount of material delivered.

шают в сторону продвижени  работ и приступают к отсыпке очередного сло .move in the direction of progress of work and proceed to the filling of the next layer.

На возведенном участке дамбы осуществл ют планировочные работы. Последние могут выполн тьс  как в , процессе отсыпки дамбы, так и после ее возведени .Planning works are carried out on the constructed dam site. The latter can be performed both in the process of dumping the dam and after its construction.

Траншейна  выемка может создаватьс  на полное сечение и узкопрофильной, подлежащей расширению при отсыпке верхней части экрана, первоначально проходитс  вA trench dredging can be created on a full section and narrow, to be expanded when dumping the upper part of the screen, initially takes place in

На фиг. 1 изображен профиль дамбы; 10 контурах одного сло , нескольких слоев и на фиг. 2 - дамба, вид в плане.вдоль всего фронта отсыпки дамбы. ПараСпособ возведени  дамбы из местных материалов в услови  наращивани  объединенного хвостохранилища осуществл ют следующим образом.FIG. 1 shows the dam profile; 10 contours of one layer, several layers and in FIG. 2 - dam, plan view. Along the entire front of dumping of the dam. A pair of a method for erecting a dam from local materials under the condition of increasing the joint tailing dump is carried out as follows.

Прокладывают транспортные коммуника- ции, например железнодорожный путь дл  доставки из карьера материала, из которого отсыпают упорную призму и приметры выемки выбирают в зависимости от типа примен емого выемочно-погрузочного оборудовани  с учетом потребности в материале дл  отсыпки экрана.Transport communications are laid, for example, a railway track for delivery of material from a quarry, from which a stop prism is poured and excavation parameters are chosen depending on the type of loading and handling equipment used, taking into account the need for material for screen filling.

Claims (1)

Формула изобретени Invention Formula грузку (скальные вскрышные породы). ОдСпособ возведени  дамбы из местных материалов путем послойной отсыпки упорной повременно с этим на намытом дл  отсып- 20 призмы, экрана и его пригрузки с разме- ки дамбы пл же хвостохранилища вые- щением призмы преимущественно в предва- мочно-погрузочным средством 1, например рите.тьно создаваемой траншейной выемке и экскаватором, создают траншейную выемку 2. выполнением на отсыпанном участке соору- Вынутый в контуре траншейной выемки мате- жени  планировочных работ, отличающийс  риал при этом отсыпают на ее борту в тем, что, с целью сокращени  сроков воз- нижнюю часть 3 экрана. После этого от- 25 ведени  дамбы и уменьшени  объема дос- сыпают упорную призму 4 с размещением танки материалов, до пригрузки каждогоload (rock overburden). One method of erecting a dam from local materials is to lay it down hard-wise with this on a 20-prism, screen and load it from the area of the dam of the same tailing dump by prism in the pre-loading means 1, for example, rite. In addition to the created trench excavation and an excavator, they create a trench excavation 2. Carrying out planning works on the poured area of the trench excavation in the trench excavation circuit of the mother, which is different at the same time, is dumped on its board in order scheni terms of WHO-lower part of the screen 3. After this, the removal of the dam and the decrease in volume is filled with a thrust prism 4 with the placement of tanks of materials, prior to the loading of each сло  экрана вначале отсыпают его нижнюю часть, затем упорную призму, после чего на нижней части экрана возвод т верхнюю часть, при этом нижнюю и верхнюю части экрана отсыпают в процессе создани  траншейной выемки из разрабатываемых вthe screen layer is first poured out its lower part, then the stop prism, after which the upper part is erected on the lower part of the screen, while the lower and upper parts of the screen are poured out during the construction of the trench excavation from ее преимущественно в предварительно создаваемой траншейной выемке и выполнением на отсыпанном участке сооружени  планировочных работ. Затем на нижнюю часть 3 экрана отсыпают его верхнюю часть 5 из грунта, вынимаемого из траншейной выемки. После этого отсыпают пригрузку б экрана , выемочно-погрузочное средство переме30its predominantly in the pre-created trench excavation and the performance of planning work on the dumped site. Then on the lower part 3 of the screen poured his upper part 5 of the soil taken out of the trench excavation. After this, the loading of the screen b is poured, the loading-out tool 30 ней материалов, а основание экрана размещают на борту траншейной выемки.her materials, and the base of the screen is placed on board the trench recess. шают в сторону продвижени  работ и приступают к отсыпке очередного сло .move in the direction of progress of work and proceed to the filling of the next layer. На возведенном участке дамбы осуществл ют планировочные работы. Последние могут выполн тьс  как в , процессе отсыпки дамбы, так и после ее возведени .Planning works are carried out on the constructed dam site. The latter can be performed both in the process of dumping the dam and after its construction. Траншейна  выемка может создаватьс  на полное сечение и узкопрофильной, подлежащей расширению при отсыпке верхней части экрана, первоначально проходитс  вA trench dredging can be created on a full section and narrow, to be expanded when dumping the upper part of the screen, initially takes place in контурах одного сло , нескольких слоев и вдоль всего фронта отсыпки дамбы. Параконтурах одного сло , нескольких слоев и вдоль всего фронта отсыпки дамбы. Параметры выемки выбирают в зависимости от типа примен емого выемочно-погрузочного оборудовани  с учетом потребности в материале дл  отсыпки экрана. the contours of one layer, several layers and along the entire front of the embankment of the dam. Paracontours of one layer, several layers and along the whole front of dumping of the dam. The parameters of the excavation are chosen depending on the type of excavation and loading equipment used, taking into account the need for material for filling the screen. Формула изобретени Invention Formula ней материалов, а основание экрана размещают на борту траншейной выемки.her materials, and the base of the screen is placed on board the trench recess. Составитель В.. КазаковCompiled by V. Kazakov Редактор Е. КопчаТехред И. ВересКорректор Г. РешетникEditor E. KopchaTehred I. VeresKorrektor G. Reshetnik Заказ 822/28Тираж 607ПодписноеOrder 822/28 Circulation 607Subscription ВНИИПИ Государственного комитета СССР по делам изобретений и открытийVNIIPI USSR State Committee for Inventions and Discoveries 1 13035, Москва, Ж-35, Раушска  наб., д. 4/5 Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 41 13035, Moscow, Zh-35, Raushsk nab. 4/5 Production and printing company, Uzhgorod, ul. Project, 4
SU853966313A 1985-10-17 1985-10-17 Method of constructing a dam of locally available materials SU1300084A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853966313A SU1300084A1 (en) 1985-10-17 1985-10-17 Method of constructing a dam of locally available materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853966313A SU1300084A1 (en) 1985-10-17 1985-10-17 Method of constructing a dam of locally available materials

Publications (1)

Publication Number Publication Date
SU1300084A1 true SU1300084A1 (en) 1987-03-30

Family

ID=21201727

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853966313A SU1300084A1 (en) 1985-10-17 1985-10-17 Method of constructing a dam of locally available materials

Country Status (1)

Country Link
SU (1) SU1300084A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Бел ев А. М. Отстойные пруды рудопромывочных фабрик. - Горный журнал, 1952, № 5, с. 31, рис. 4. Инструкци по проектированию и строительству ограждающих дамб хвостохрани- лиш. с использованием вскрышных пород. Киев.: НИИСП, 1981, с. 51, рис. 20. *

Similar Documents

Publication Publication Date Title
US5257471A (en) Excavator for forming underground continuous wall
US5056242A (en) Underground wall construction method and apparatus
US5413047A (en) Overburden removal method with blast casting and excavating apparatus
CN102691300A (en) Construction method of foundation pit earthwork
US5194689A (en) Earth excavation using blast casting and excavating apparatus
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
SU1300084A1 (en) Method of constructing a dam of locally available materials
US5140907A (en) Method for surface mining with dragline and blast casting
RU2247241C1 (en) Method for extraction of mineral resources
JP2000291398A (en) Underground structure and its construction method
KR0179326B1 (en) Construction method of continuous continuous wall by steel support box
CN115262567A (en) An ultra-narrow full hard rock deep foundation pit excavation method
CN109235443A (en) The method and apparatus of deep basal pit is dug in narrow place
JPH0249896A (en) Open shield method and machine thereof
JPH0313691A (en) How to build an underground tunnel
SU1285151A1 (en) Method of strip mining of minerals
RU2052117C1 (en) Method for formation of dumps inside open pits
US3191387A (en) Method for making permeable conduits in subterranean lines of drainage
JPH0823266B2 (en) Construction method of underground space
SU1263855A1 (en) Method of mining mineral deposits
SU1411471A1 (en) Method of mining placer deposits
SU1335701A1 (en) Method of underground mining of ore deposits
JPH0726877A (en) How to build an underground structure
JPS5929760B2 (en) How to excavate underground storage cavities
SU1105649A1 (en) Method of constructing a crushing station in quarry